A-1 APPENDIX A. CHRONOLOGY This appendix of the supplemental final safety analysis report (FSER) contains a chronological listing of routine licensing correspondence between the staff of the U.S. Nuclear Regulatory Commission (NRC) and Korea Hydro & Nuclear Power Co. Ltd. (KHNP) regarding the review of the APR1400 reactor plant design under Project No. 782 and Docket No. 52-046. Revisions to APR1400 Design Control Document Revision Date 0 December 23, 2014 1 March 10, 2017 2 March 8, 2018 3 August 13, 2018

Upload: others

Post on 22-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

  • A-1  

    APPENDIX A. CHRONOLOGY

    This appendix of the supplemental final safety analysis report (FSER) contains a chronological listing of routine licensing correspondence between the staff of the U.S. Nuclear Regulatory Commission (NRC) and Korea Hydro & Nuclear Power Co. Ltd. (KHNP) regarding the review of the APR1400 reactor plant design under Project No. 782 and Docket No. 52-046.

    Revisions to APR1400 Design Control Document

    Revision Date

    0 December 23, 2014

    1 March 10, 2017

    2 March 8, 2018

    3 August 13, 2018

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML100890204

    04/21/2010 - 04/22/2010 Notice of Public and Closed Meetings With Korean Electric Power Corporation to Present the Advanced Power Reactor 1400 Design Information.

    6 5-Apr-2010 Meeting Agenda

    Meeting NoticeMemoranda

    NRC/NRO/DNRL/NMIP NRC/NRO/DNRL/NMIP PROJ0782

    ML101160481 (Non-Proprietary, Public) KEPCO April 2010 Pre-Application Meeting Presentations, Project No. 0782. 345 22-Apr-2010 Slides and Viewgraphs Korea Electric Power Corp NRC/NRO PROJ0782

    ML101810065April 21-22, 2010 Summary of Public Meeting With Korea Electric Power Corporation on the Advanced Power Reactor 1400 Design.

    4 26-Jul-2010 Meeting Summary NRC/NRO/DNRL/NMIP PROJ0782

    ML102040766

    List of Attendees - April 21-22, 2010 Summary of Public Meeting With Korea Electric Power Corporation on the Advanced Power Reactor 1400 Design.

    2 26-Jul-2010 - No Document Type Applies NRC/NRO/DNRL/NMIP PROJ0782

    ML10229004609/07/2010 - Notice of Meeting With Korean Electric Power Corporation To Present Advanced Power Reactor 1400 Fuel And Seisimic Design Information.

    6 24-Aug-2010 Meeting AgendaMeeting Notice NRC/NRO/DNRL/NMIP NRC/NRO/DNRL PROJ0782

    ML102530207 September 7, 2010 KEPCO APR-1400 Non-Proprietary Fuel Presentation. 108 7-Sep-2010Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp NRC/NRO/DNRL/NMIP PROJ0782

    ML102530217 September 7, 2010 KEPCO APR-1400 Seismic Presentation, Pre-Application Review Meeting. 97 7-Sep-2010Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp NRC/NRO/DNRL/NMIP PROJ0782

    ML110490390

    Summary of September 7, 2010 Public Meeting with Korean Electric Power Corporation on the Advanced Power Reactor (APR1400) Fuel and Seismic Design.

    7 1-Mar-2011 Meeting SummaryLetter NRC/NRO/DNRL/NMIPKorea Electric Power Corp PROJ0782

    ML110900490

    04/21/2011 Notice of Forthcoming Public and Closed Pre-Application Meeting with Korea Electric Power Corporation to Present Advanced Power Reactor 1400 Fluidic Device and Large Break Loss-of-Coolant Accident Design Information.

    5 4-Apr-2011 Meeting Notice

    Meeting AgendaMemoranda

    NRC/NRO/DNRL/NMIP NRC/NRO/DNRL/NMIP PROJ0782

    ML111120223 2011-04-21 KEPCO Presentation: APR1400 Safety Injection Tank - Fluidic Device. 27 21-Apr-2011Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp NRC/NRO PROJ0782

    ML1111202982011-04-21 KEPCO Presentation: Performance Verification of APR1400 Safety Injection Tank-Fluidic Device.

    15 21-Apr-2011Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp NRC/NRO PROJ0782

    ML1111203022011-04-21 KEPCO Presentation: Code Accuracy Based Realistic Evaluation Model (CAREM) for LBLOCA Analysis of APR1400.

    49 21-Apr-2011 Meeting Briefing Package/Handouts Korea Electric Power Corp NRC/NRO PROJ0782

    A-2

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML111640149

    04/21/11 Summary of the Public And Closed Meeting With Korea Electric Power Corporation Regarding The Advanced Power Reactor 1400 Fluidic Device And Large Break Loss-Of-Coolant Accident Analysis.

    5 29-Jun-2011 Meeting Summary NRC/NRO/DNRL/NMIP Korea Electric Power Corp PROJ0782

    ML13168A311Email from KHNP Notifying NRC of the Reorganization of Korean Nuclear Industry and Change in APR1400 Future Applicant.

    3 29-Aug-2011 E-Mail

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO/DNRL/LB2 PROJ0782

    ML112911466

    11/08/2011 Notice of Forthcoming Public and Closed Pre-Application Meeting With Korea Electric Power Corporation to Present Advanced Power Reactor 1400 Safety Instrumentation and Control System and Defense-In-Depth Design Information.

    6 26-Oct-2011 Meeting Notice

    Meeting AgendaMemoranda

    NRC/NRO/DNRL/NMIP NRC/NRO/DNRL/NMIP PROJ0782

    ML113191343 2011 November 08: KEPCO Presentation on Defense-in-Depth and Diversity (D3) for APR1400. 45 8-Nov-2011Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp NRC/NRO PROJ0782

    ML113191347 11/8/2011 - KEPCO presentation on Safety Instrumentation and Controls (I&C) for APR1400. 49 8-Nov-2011Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp NRC/NRO PROJ0782

    ML12011A117APR1400-K-Q-TR-11005-N, Revision 1, "KHNP Quality Assurance Program Description (QAPD) for the APR1400 Design Certification".

    42 29-Dec-2011 Report, Technical Korea Hydro Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML120030357

    1/19/2012 Notice of Meeting with Korea Electric Power Corporation Present Advanced Power Reactor 1400 Human Factors Engineering Design Information.

    6 4-Jan-2012 Meeting NoticeMeeting Agenda NRC/NRO/DNRL/NMIP NRC/NRO/DNRL/NMIP PROJ0782

    ML12011A116Submittal of the Topical Report entitled "KHNP Quality Assurance Program Description (QAPD) for the APR1400 Design Certification".

    1 6-Jan-2012 Letter Korea Hydro Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML120190587 2012-01-19: KHNP/KEPCO APR1400 Human Factors Engineering Pre-Application Presentation. 80 19-Jan-2012Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp

    Korea Hydro Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML12103A366 Korea Hydro and Nuclear Power Company, Intention to Submit DCD Application in 2013. 1 4-Apr-2012 LetterKorea Hydro Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML14104A008APR1400-N-M-T(TM)-12001-P, Rev. 0, "Data Base of Fluidic Device Performance Verification Experiment."

    362 2-May-2012 Report, TechnicalGovt of Korea, Korea Atomic Energy Research Institute (KAERI)

    NRC/NRO PROJ0782

    ML12143A127Submittal of the Revised Topical Report Entitled "KHNP Quality Assurance Program Description (QAPD) for the APR1400 Design Certification."

    45 9-May-2012 LetterTopical ReportKorea Hydro Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    A-3

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML12151A269

    06/13/2012 Notice of Forthcoming Public Pre-Application Meeting with Korea Hydro and Nuclear Power Company LTD. To Present Advanced Power Reactor 1400 Design Information.

    6 1-Jun-2012 Meeting Agenda

    Meeting NoticeMemoranda

    NRC/NRO/DNRL/LB2 NRC/NRO/DNRL/LB2 PROJ0782

    ML12167A331 Pre-Application Review Meeting: Seismic Analysis of APR1400-E-S-EC-120002-NP. 139 13-Jun-2012Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp NRC/NRO PROJ0782

    ML12180A62507/11-13/2012 Notice of APR1400 Design Control Document Pre-Application Meeting with Korea Hydro and Nuclear Power.

    8 29-Jun-2012 Meeting Agenda

    Meeting NoticeMemoranda

    NRC/NRO/DNRL/LB2 NRC/NRO/DNRL/LB2 05200046PROJ0782

    ML12199A439 07/11-13/2012 Pre-Application Review Meeting for KHNP APR1400 - Submittal of (Draft) Presentations. 1 4-Jul-2012 LetterKorea Nuclear and Hydro Power Co, LTD NRC/NRO/DNRL/LB2 PROJ0782

    ML12199A401 07/11-13/2012 Pre-Application Review Meeting for KHNP APR1400 Severe Accident Analysis. 64 11-Jul-2012Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp

    Korea Hydro Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML12199A407 07/11-13/2012 Pre-Application Review Meeting for KHNP APR1400 Probabilistic Risk Assessment. 76 11-Jul-2012Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp

    Korea Hydro Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML12199A418 07/11-13/2012 Pre-Application Review Meeting for KHNP APR1400 I&C Licensing Plan. 30 12-Jul-2012Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Electric Power Corp

    Korea Hydro Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML12199A427 07/11-13/2012 Pre-Application Review Meeting for KHNP APR1400 I&C Licensing (Acronyms for I&C). 3 12-Jul-2012Meeting Briefing Package/Handouts NRC/NRO PROJ0782

    ML12202B04507/13/2012 Pre-Application Review Meeting for KHNP APR1400 - Lesson Learned from past DCD Reviews_CH 9 Water Systems.

    1 13-Jul-2012 Meeting Briefing Package/Handouts NRC/NRO/DSRAKorea Hydro Nuclear Power Co, Ltd PROJ0782

    ML13317A065 APR1400-F-C-NR-12001-NP, Rev 0, "Thermal Design Methodology". 21 31-Jul-2012 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML12234A297 KHNP/KEPCO QAPD Topical Report Acceptance Letter. 5 21-Aug-2012 Letter NRC/NRO/DNRL/LB2Korea Hydro Nuclear Power Co, Ltd PROJ0782

    ML13303B466 APR1400-F-A-NR-12002-NP, Rev. 0, "Post-LOCA Long Term Cooling Evaluation Model." 35 30-Sep-2012 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-4

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13303B467 APR1400-F-A-NR-12003-NP, Rev. 0, "Small Break LOCA Evaluation Model." 42 30-Sep-2012 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13093A527 KHNP RAI QAPD 1 CQAB 6834 Email. 1 5-Oct-2012 E-Mail

    Request for Additional Information (RAI)

    NRC/NRO/DNRL/LB2 Korea Hydro & Nuclear Power Co, Ltd PROJ0782

    ML13093A528 KHNP RAI QAPD 1 CQAB 6834. 5 5-Oct-2012 Request for Additional Information (RAI) NRC/NRO/DNRL/LB2Korea Hydro & Nuclear Power Co, Ltd PROJ0782

    ML12297A318

    11/8-9/2012 Notice of Forthcoming Public Pre-Application Meeting with Korea Hydro and Nuclear Power Company LTD to Present Advanced Power Reactor 1400 Design Information.

    8 24-Oct-2012 Meeting Agenda

    Meeting NoticeMemoranda

    NRC/NRO/DNRL/LB2 NRC/NRO/DNRL/LB2 PROJ0782

    ML12311A267 Intention of Submittal Schedule Change for APR1400 DCD. 1 25-Oct-2012 LetterKorea Hydro Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML12319A038 Intention of Submittal Schedule Change for APR1400 DCD. 1 25-Oct-2012 LetterKorea Hydro Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML12328A099 2012-11-08 KHNP APR1400 Pre-Application Review Meeting Presentation on GSI-191. 22 8-Nov-2012Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Hydro Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML12328A1012012-11-08 KHNP APR1400 Pre-Application Review Meeting presentation on Balance of Plant (BOP) Design.

    157 8-Nov-2012Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Hydro Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML12340A048 Submittal of KHNP Response to Request for Additional Information (RAI) No. 6834. 20 26-Nov-2012

    Letter Report, Miscellaneous

    Response to Request for Additional Information (RAI)

    Korea Hydro Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13018A139 APR1400-F-M-TR-12001-NP, Revision 0, "PLUS7 Fuel Design for the APR1400." 164 30-Nov-2012 Topical ReportKorea Hydro Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13018A147APR1400-F-C-TR-12002-NP, Revision 0, "KCE-1 Critical Heat Flux Correlation for PLUS7 Thermal Design."

    90 30-Nov-2012 Topical Report Korea Hydro Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13023A080APR1400-F-A-TR-12004-NP, Rev. 0, "Realistic Evaluation Methodology for Large-Break LOCA of the APR1400 Revision 0."

    767 31-Dec-2012 Topical Report Korea Hydro Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13107A008 APR1400-Z-M-TR-12003-NP, Rev. 0, "Fluidic Device Design for the APR1400." 68 31-Dec-2012 Topical ReportKorea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    A-5

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13018A095

    Transmittal of Topical Report APR1400-F-M-TR-12001-P/-NP, Revision 0, "PLUS7 Fuel Design for the APR1400" for Safety Evaluation, Dated November 2012.

    6 7-Jan-2013 Letter Korea Hydro Nuclear Power Co, Ltd

    NRC/NRO/DNRLNRC/Document Control Desk

    PROJ0782

    ML13018A096

    Transmittal of Topical Report APR1400-F-C-TR-12002-P/-NP, Revision 0, "KCE-1 Critical Heat Flux Correlation for PLUS7 Thermal Design" for Safety Evaluation, dated November 2012.

    6 7-Jan-2013 Letter Korea Hydro Nuclear Power Co, Ltd NRC/NRO/DNRL PROJ0782

    ML13018A097

    Transmittal of Topical Report APR 1400-Z-M-TR- 12003-P/-NP, Revision 0, "Fluidic Device Design for the APR1400" for Safety Evaluation, dated Dec. 2012.

    6 7-Jan-2013 Letter Korea Hydro Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13023A078

    Transmittal of Topical Report APR1400-F-A-TR-12004-P/-NP, Revision 0, "Realistic Evaluation Methodology for Large-Break LOCA of the APR1400" for Safety Evaluation, dated Dec. 2012.

    6 7-Jan-2013 Letter Korea Hydro Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13037A926 EMAIL re: sending Request for Additional Information: KHNP RAI QAPD 2 CQAB 7004. 1 30-Jan-2013 E-Mail NRC/NRO/DNRL/LB2Korea Hydro Nuclear Power Co, Ltd PROJ0782

    ML13037A927 Request for Additional Information: KHNP RAI QAPD 2 CQAB 7004. 1 30-Jan-2013Request for Additional Information (RAI) NRC/NRO PROJ0782

    ML13066A493 Submittal of KHNP Response to Request for Additional Information (RAI) No. 7004. 5 26-Feb-2013

    LetterResponse to Request for Additional Information (RAI)

    Korea Hydro Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13077A058 Notification of the APR1400 Design Certification Project Manager Replacement. 1 27-Feb-2013 LetterKorea Hydro Nuclear Power Co, Ltd

    NRC/NRONRC/Document Control Desk

    PROJ0782

    ML13091A152 APR1400-Z-J-EC-13002-NP, Revision 0, "Diversity and Defense-in-Depth," Technical Report. 64 28-Feb-2013 Report, Technical

    KHNP Central Research Institute

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13092A005 APR1400-Z-J-EC-13001-NP, Revision 0, "Safety I&C System for the APR1400". 180 28-Feb-2013 Topical Report

    KHNP Central Research Institute

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13091A151Transmittal of Technical Report APR1400-Z-J-EC-13002-P/-NP, Revision 0, "Diversity and Defense-in-Depth" Dated Feb. 2013.

    6 8-Mar-2013 Legal-AffidavitLetter

    KHNP Central Research Institute

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13092A004Transmittal of Topical Report APR1400-Z-J-EC-13001-P/-NP, Revision 0, "Safety I&C System for the APR1400," for Safety Evaluations, Dated Feb. 2013.

    6 8-Mar-2013 Legal-AffidavitLetter

    KHNP Central Research Institute

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    A-6

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13084A200 Audit Plan for Pre-application Audit Of KHNP APR1400 PRA, April 2-4, 2013. 10 26-Mar-2013 Audit Plan NRC/NRO/DNRLKorea Hydro Nuclear Power Co, Ltd PROJ0782

    ML13094A276Withdrawal of Topical Report APR1400-F-M-TR-12001-P/-NP, Revision 0, "PLUS7 Fuel Design for the APR1400" Submitted Jan. 7, 2013.

    1 4-Apr-2013 Letter KHNP Central Research Institute

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13112A243

    05/02/2013 Notice of Forthcoming Public Meeting with Korea Hydro & Nuclear Power Co., Ltd. to Discuss the Review of the APR1400 Topical Reports Related to Chapter 7, Instrumentation and Controls.

    7 22-Apr-2013 Meeting Agenda

    Meeting NoticeMemoranda

    NRC/NRO/DNRL/LB2 NRC/NRO/DNRL/LB2 05200046PROJ0782

    ML13304B432APR1400-Z-J-NR-13004-NP, Rev. 0, "Uncertainty Methodology and Application for Instrumentation for the APR1400."

    42 30-Apr-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B433APR1400-Z-J-NR-13005-NP, Rev. 0, "Setpoint Methodology for Plant Protection System for the APR1400."

    98 30-Apr-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13148A446G20130357: Catina Gibbs E-mail re: Action: change in visitors for Chairman drop-in on June 3, 2013. AMM.PDF

    1 24-May-2013 E-Mail NRC/OCM NRC/EDONRC/OCA PROJ0782

    ML13148A448G20130357: Sunny Bozin E-mail re: Action: change in visitors for Commissioner Ostendorff drop-in on June 3, 2013. WCO.PDF

    5 24-May-2013 E-Mail NRC/OCM NRC/EDONRC/OCA PROJ0782

    ML13143A529 AUDIT PLAN: June 3-7, 2013 KHNP APR1400 DCD Pre-Application Audit. 8 29-May-2013 Audit Plan NRC/NRO/DNRL/LB2Korea Hydro & Nuclear Power Co, Ltd PROJ0782

    ML13150A432 G20130357: Cancellation of Commission Drop-in by KHNP management for June 3, 2013. 2 30-May-2013 E-MailKorea Hydro & Nuclear Power Co, Ltd

    NRC/EDO NRC/OCM/AMM

    NRC/OCM/WCOPROJ0782

    ML13218A281 APR1400-E-I-EC-13005-NP, Presentation Material on Human Factors Engineering. 32 3-Jun-2013Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13161A079Withdrawal of Topical Report APR1400-Z-J-EC-13001-P/-NP, Revision 0, "Safety I&C System for the APR1400" Submitted March 8, 2013.

    1 7-Jun-2013 Letter Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13176A085

    RN-13-020, Issuance of Order Imposing Safeguards Information Protection Requirements and Fingerprinting and Criminal History Records (EA-13-033).

    2 25-Jun-2013 Enforcement Notification NRC/OE PROJ0782

    ML13175A400Acceptance Letter for KHNP Topical Report, KCE-1 Critical Heat Flux Correlation for PLUS7 Thermal Design.

    5 27-Jun-2013 Letter NRC/NRO/DNRL/LB2 Korea Hydro & Nuclear Power Co, Ltd PROJ0782

    A-7

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13175A401Acceptance Letter for KHNP Topical Report, Realistic Evaluation Methodology for Large-Break LOCA of the APR1400.

    5 27-Jun-2013 Letter NRC/NRO/DNRL/LB2 Korea Hydro & Nuclear Power Co, Ltd PROJ0782

    ML13175A402 Acceptance Letter for KHNP Topical Report, Fluidic Device Design for the APR1400. 5 27-Jun-2013Acceptance Review

    LetterLetter

    NRC/NRO/DNRL/LB2 Korea Hydro & Nuclear Power Co, Ltd PROJ0782

    ML13074A239

    Letter Transmitting Order to KHNP Imposing Safeguards Information Protection Requirements and Fingerprinting and Criminal History Records Check Requirements for Access to Safeguards Information.

    5 1-Jul-2013 Letter NRC/NRO Korea Hydro Nuclear Power Co, Ltd PROJ0782

    ML13074A244

    Order to KHNP Imposing Safeguards Information Protection Requirements and Fingerprinting and Criminal History Records Check Requirements for Access to Safeguards Information.

    19 1-Jul-2013 Federal Register NoticeOrder NRC/NROKorea Hydro Nuclear Power Co, Ltd PROJ0782

    ML13186A237

    Order to KHNP Imposing Safeguards Information Protection Requirements and Fingerprinting and Criminal History Records Check Requirements for Access to Safeguards Information.

    26 1-Jul-2013 Federal Register NoticeOrder NRC/NROKorea Hydro & Nuclear Power Co, Ltd PROJ0782

    ML13190A390 Submittal of Test Plan for In-Vessel Downstream Effect of the APR1400. 6 8-Jul-2013 LetterKorea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13190A392 APR1400-K-A-I(RA)-13001-NP, "Test Plan for In-vessel Downstream Effect (IDE) of the APR1400." 16 8-Jul-2013 Report, TechnicalKorea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13192A074 Appreciation Views on the Recent NRC Regulatory Policy with KHNP Delegation on 06/03. 1 9-Jul-2013 LetterKorea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13192A178

    07/23/2013 Notice of Forthcoming Public Meeting with Korea Hydro and Nuclear Power, Co., Ltd., To Discuss How Generic Safety Issue (GSI)-191 is addressed in the Advanced Power Reactor 1400 Design.

    6 11-Jul-2013 Meeting AgendaMeeting Notice NRC/NRO/DNRL/LB2 NRC/NRO/DNRL/EPB2 PROJ0782

    ML13198A184 Submittal of Meeting Documents for APR1400 Design Information - GSI-191. 8 16-Jul-2013 LetterKorea Hydro & Nuclear Power Co, Ltd

    NRC/NRONRC/Document Control Desk

    PROJ0782

    ML13198A186 APR1400-E-A-T(NR)-130003-NP, GSI-191 Resolution Approach. 19 16-Jul-2013 Slides and ViewgraphsKorea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13198A190APR1400-E-A-T(NR)-13002-NP, Revision 0, "APR1400 IRWST ECCS SUMP Strainer Test Plan." (Non-Proprietary).

    31 16-Jul-2013 Report, TechnicalOperating Plan

    Korea Hydro & Nuclear Power Co, Ltd

    Structural Integrity Associates, Inc

    NRC/NRO PROJ0782

    ML13198A188 APR1400-K-A-EC-13003-NP, In-vessel Effect Tests for the APR1400. 20 23-Jul-2013 Slides and ViewgraphsKorea Nuclear and Hydro Power Co, LTD NRC/NRO PROJ0782

    A-8

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13206A309 Co-Applicants for Design Certification of the APR1400. 2 25-Jul-2013 LetterKorea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRL/EPB2PROJ0782

    ML13212A096

    08/12-13/2013, Notice of Forthcoming Public Meeting with Korea Hydro and Nuclear Power, Co., LTD to Discuss Various Topics related to the Planned Submission of a Design Certification Application for the Advanced Power Reactor 1400 Design.

    8 31-Jul-2013 Meeting Agenda

    Meeting NoticeMemoranda

    NRC/NRO/DNRL/EPB2 NRC/NRO/DNRL/EPB2 PROJ0782

    ML13317A067APR1400-F-C-NR-13001-NP, Rev 0, "Functional Design Requirements for a Core Protection Calculator System for APR1400".

    247 31-Jul-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13220A127 APR1400 IRWST ECCS Sump Strainer Prototype Hydraulic Qualification Test Plan. 33 1-Aug-2013Test/Inspection/Operating Procedure

    Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13218A277Submittal of Meeting Materials for 11th Pre-Application Review Meeting on APR1400 Design Information.

    19 5-Aug-2013 Letter Korea Hydro Nuclear Power Co, Ltd

    NRC/NRONRC/Document Control Desk

    PROJ0782

    ML13218A278 APR1400-F-C-EC-13009-NP, Presentation Material on Thermal Conductivity Degradation. 26 5-Aug-2013Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13218A283 APR1400-F-X-EC-13007-NP, Presentation Material on TR Open Session. 49 5-Aug-2013

    Meeting Briefing Package/Handouts

    Slides and ViewgraphsTopical Report

    Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13218A284 APR1400-F-C-EC-13008-NP, Presentation Material on PLUS7 Fuel TR. 62 5-Aug-2013Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13220A124 Submittal of Test Plans for GSI-191 Related Testing of the APR1400. 7 5-Aug-2013 LetterKorea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13220A126 Test Plan for In-vessel Downstream Effect (IDE) of the APR1400. 16 5-Aug-2013Test/Inspection/Operating Procedure

    Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13283A210APR1400-E-A-T(NR)-13003-NP, Revision 1, "APR1400 IRWST ECCS Sump Strainer Bypass Test Plan."

    27 9-Aug-2013 Report, Technical Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13283A209 Submittal of APR1400 IRWST ECCS Sump Strainer Bypass Test Plan. 6 12-Aug-2013 LetterKorea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13218A282 APR1400-E-I-EC-13006-NP, Presentation Material on Radiation Protection. 36 13-Aug-2013Meeting Briefing

    Package/HandoutsSlides and Viewgraphs

    Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    A-9

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13238A025Enclosure 1, APR1400-K-Q-TR-11005-NP, Rev. 2, "KHNP Quality Assurance Program Description (QAPD) for the APR1400 Design Certification."

    42 21-Aug-2013Quality Assurance

    ProgramTopical Report

    KHNP Central Research Institute

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13239A122 Notification of Submittal Schedule for the APR1400 DCD. 1 22-Aug-2013 LetterKorea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRL/EPB2PROJ0782

    ML13239A343Enclosure 15: Slides on CAREM for LBLOCA Analysis of APR1400 for August 13, 2013 Meeting With NRC APR1400-F-A-EC-13012-NP).

    33 23-Aug-2013 Slides and Viewgraphs Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13239A344Re-Submittal of Meeting Materials for 11th Pre-Application Review Meeting on APR1400 Design Information.

    18 23-Aug-2013 Letter Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRL/EPB2PROJ0782

    ML13239A345

    Enclosure 2: Slides on Human Factors Engineering (HFE) Program for the APR1400, Responses to the June 3 through 7 HFE Audit Recommendations Presented at August 13, 2013 Meeting with NRC (APR1400-E-I-EC-13005-NP).

    32 23-Aug-2013 Slides and Viewgraphs Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13239A346Enclosure 4: Slides on Radiation Protection, 11th Pre-Application Review Meeting on August 13, 2013 with NRC (APR1400-E-I-EC-13006-NP).

    38 23-Aug-2013 Slides and Viewgraphs Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13239A347Enclosure 7: Slides on PLUS7 Fuel Design for the APR1400 from August 13, 2013 Meeting With NRC (APR1400-F-C-EC-13008-NP).

    62 23-Aug-2013 Slides and Viewgraphs Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13239A348

    Enclosure 11: Slides on KCE-1 Critical Heat Flux Correlation for PLUS7 Thermal Design Presented at August 13, 2013 Meeting With NRC (APR1400-F-C-EC-13010-NP).

    48 23-Aug-2013 Slides and Viewgraphs Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13239A349

    Enclosure 13: Slides on Performance Verification of APR1400 Safety Injection Tank - Fluidic Device Presented at August 13, 2013 Meeting With NRC (APR1400-F-A-EC-13011-NP).

    31 23-Aug-2013 Slides and Viewgraphs Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13239A350

    Enclosure 9: Slides on The Effect of Fuel Thermal Conductivity Degradation on APR1400 Safety Analyses Presented at August 13, 2013 Meeting with NRC (APR1400-F-C-EC-13009-NP).

    25 23-Aug-2013 Slides and Viewgraphs Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13238A024

    Transmittal of Topical Report APR1400-K-Q-TR-11005-NP, Revision 2, "KHNP Quality Assurance Program Description (QAPD) for the APR1400 Design Certification."

    2 26-Aug-2013 Letter

    KHNP Central Research Institute

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13238A026 Enclosure 2, Summary of Changes in Revision 2 of APR1400-K-Q-TR-11005-NP. 1 26-Aug-2013 - No Document Type Applies

    KHNP Central Research Institute

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-10

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13238A302 KHNP Containment Sump Strainer Bypass Testing Audit Plan. 6 27-Aug-2013 Audit Plan NRC/NRO/DNRL/EPB2Korea Hydro & Nuclear Power Co, Ltd PROJ0782

    ML13298A420 APR1400-F-M-TR-13001-NP, Rev. 0, "PlUS7 Fuel Design for the APR1400." 201 31-Aug-2013 Report, TechnicalKorea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13283A197Korea Hydro and Nuclear Power Co., Ltd, Submittal of APR1400 ECCS Sump Strainer Head Loss Test Plan (Revision 2).

    4 11-Sep-2013 Letter Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13249A240 Audit Report for the KHNP APR1400 Design Certification Application Development. 5 12-Sep-2013 Memoranda NRC/NRO/DNRL/EPB2 NRC/NRO/DNRL/EPB2 PROJ0782

    ML13249A244 2013-06 APR1400 Audit Report (Encl 1). 27 12-Sep-2013 Audit Report NRC/NRO PROJ0782

    ML13249A247 2013-06 APR1400 Audit Report (Encl 2) Attendee List. 4 12-Sep-2013 - No Document Type Applies NRC/NRO PROJ0782

    ML13249A252 2013-06 APR1400 Audit Report (Encl 4) Table 1. 10 12-Sep-2013 Graphics incl Charts and Tables NRC/NRO PROJ0782

    ML13249A255 2013-06 APR1400 Audit Report (Encl 5) Table 2. 7 12-Sep-2013 Graphics incl Charts and Tables NRC/NRO PROJ0782

    ML13298A413Transmittal of Topical Report APR1400-F-M-TR-13001-P/-NP Rev.0, "PLUS7 Fuel Design for the APR1400" for Safety Evaluation.

    6 17-Sep-2013 Letter Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13259A196

    August 12-13, 2013, Summary of Public Meetings with Korea Hydro And Nuclear Power Co. Ltd. to Discuss the Topical Reports, Radiation Protection, and Human Factors Engineering

    8 18-Sep-2013 Meeting Summary NRC/NRO/DNRL/EPB2 PROJ0782

    ML13261A082

    10/08/13 Notice of Forthcoming Public Meeting with Korea Hydro and Nuclear Power, Co., Ltd., to Discuss Human Factors Engineering Related to the Planned Submission of a Design Certification Application for the Advanced Power Reactor 1400 Design.

    6 19-Sep-2013 Meeting Agenda

    Meeting NoticeMemoranda

    NRC/NRO/DNRL/EPB2 NRC/NRO/DNRL/EPB2 PROJ0782

    ML13277A051 Submittal of APR1400 Technical Reports. 6 30-Sep-2013 Letter Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A577 Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Submittal Letter 13 30-Sep-2013Design Control Document (DCD)

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A699Korea Hydro & Nuclear Power Co., Ltd Application for Design Certification of the APR1400 Standard Plant Design.

    13 30-Sep-2013 Letter

    License-Application for Design Certification

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A709 Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Submittal Letter 13 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    A-11

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13281A710 Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Environmental Report 72 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A711 Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 1 668 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A712Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 01-Introduction and General Description of the Plant

    311 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A713 Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 02-Site Characteristics 62 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A714Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-TOC

    31 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A715Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 1

    47 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A716Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 2

    102 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A717Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 3

    6 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A718Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 4

    43 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A720Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 5

    29 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A722Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 6

    85 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A723Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 7

    61 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    A-12

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13281A724Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Figure 7.1

    26 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A725Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Figure 7.2

    8 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A726Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Figure 7.3

    7 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A727

    Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Appendix 3.7A

    151 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A728

    Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Appendix 3.7B

    18 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A729Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 8

    122 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A730

    Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Figure 3.8A-1

    22 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A731

    Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Figure 3.8A-2

    34 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A733

    Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Appendix 3.8A

    88 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A734Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 9

    275 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A735Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 10

    17 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    A-13

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13281A737Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 11

    79 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A739Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 12

    36 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A740Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Section 13

    7 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A741Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 03-Design of Structures, Systems, Components, and Equipment-Appendix

    12 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A742 Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 04-Reactor 276 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A743Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 05-Reactor Coolant and Connecting Systems

    287 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A744Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 06-Engineered Safety Features

    774 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A745Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 07-Instrumentation and Controls

    451 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A746 Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 08-Electric Power 164 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A747 Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 09-Auxiliary Systems 1497 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A749Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 10-Steam and Power Conversion System

    260 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A750Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 11-Radioactive Waste Management-TOC

    15 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A751Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 11-Radioactive Waste Management-Section 1

    37 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    A-14

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13281A752Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 11-Radioactive Waste Management-Section 2

    62 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A753Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 11-Radioactive Waste Management-Section 3

    47 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A754Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 11-Radioactive Waste Management-Section 4

    37 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A755Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 11-Radioactive Waste Management-Section 5

    24 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A756Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 11-Radioactive Waste Management-Figure 11.5-1

    12 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A757Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 11-Radioactive Waste Management-Figure 11.5-2

    17 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A758Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 11-Radioactive Waste Management-Appendix 11A

    4 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A760Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 11-Radioactive Waste Management-Appendix 11B

    7 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A761 Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 12-Radiation Protection 311 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A762Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 13-Conduct of Operations

    30 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A763 Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 14-Verification Programs 399 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A764Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 15-Transient and Accident Analyses

    814 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A766Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 16-Technical Specifications_TS Bases

    665 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A767Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 16-Technical Specifications_TS LCO

    283 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    A-15

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13281A769Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 17-Quality Assurance and Reliability Assurance

    51 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A770Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 18-Human Factors Engineering

    79 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13281A771Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) - Tier 2 Chapter 19-Probabilistic Risk Assessment and Severe Accident Evaluation

    1171 30-Sep-2013Design Control Document

    (DCD)Letter

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13303B468 APR1400-E-P-NR-13003-NP, Rev. 0, "Severe Accident Analysis." 39 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B481APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-A, "Severe Accident Analysis Report for Hydrogen Issue," Cover through Page A-8.

    14 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B482APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-A, "Severe Accident Analysis Report for Hydrogen Issue," Page A-9 through Page A-11.

    3 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B483APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-A, "Severe Accident Analysis Report for Hydrogen Issue," Page A-36 through Page A-44.

    9 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B484APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-A, "Severe Accident Analysis Report for Hydrogen Issue," Page A-45 through Page A-55.

    11 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B485APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-A, "Severe Accident Analysis Report for Hydrogen Issue," Page A-56 through End.

    17 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B486APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-A, "Severe Accident Analysis Report for Hydrogen Issue," Page A-12 through Page A-22.

    11 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B487APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-A, "Severe Accident Analysis Report for Hydrogen Issue," Page A-23 through Page A-35.

    13 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-16

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13303B488APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-B, "Severe Accident Analysis Report for MCCI," Cover through Page B-24.

    31 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B489APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-B, "Severe Accident Analysis Report for MCCI," Page B-25 through Page B-38.

    14 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B490APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-B, "Severe Accident Analysis Report for MCCI," Page B-39 through Page B-43.

    5 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B491APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-B, "Severe Accident Analysis Report for MCCI," Page B-44 through Page B-48.

    5 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B492APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-B, "Severe Accident Analysis Report for MCCI," Page B-49 through End.

    7 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B499APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C1, "Severe Accident Analysis Report for DCH," Cover through Page C1-17.

    23 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B500APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C1, "Severe Accident Analysis Report for DCH," Page C1-18 through Page C1-29.

    12 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B501APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C1, "Severe Accident Analysis Report for DCH," Page C1-30 through Page C1-38.

    9 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B502APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C1, "Severe Accident Analysis Report for DCH," Page C1-51 through Page C1-56.

    6 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B503APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C1, "Severe Accident Analysis Report for DCH," Page C1-57 through Page C1-65.

    9 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B505APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C1, "Severe Accident Analysis Report for DCH," Page C1-66 through End.

    20 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-17

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13303B506APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C1, "Severe Accident Analysis Report for DCH," Page C1-39 through Page C1-49.

    11 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B507

    APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C1, "Severe Accident Analysis Report for DCH," Page C1-50.APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C1, "Severe Accident Analysis Report for DCH," Page C1-50.

    1 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B527APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C2, "Severe Accident Analysis Report for Rapid Depressurization," Cover through Page C2-8.

    12 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B529APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C2, "Severe Accident Analysis Report for Rapid Depressurization," Page C2-9 through Page C2-12.

    4 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B530APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-C2, "Severe Accident Accident Analysis Report for Rapid Depressurization," Page C2-13 through End.

    27 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B538APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, "Severe Accident Analysis Report for FCI," Cover through Page D-15.

    21 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B539APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, "Severe Accident Analysis Report for FCI," Page D-16 through D-35.

    20 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B540APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, "Severe Accident Analysis Report for FCI," Page D-36 through D-61.

    26 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B541APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, "Severe Accident Analysis Report for FCI," Page D-62 through D-88.

    27 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B542APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, "Severe Accident Analysis Report for FCI," Page D-89 through D-96.

    8 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-18

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13303B543APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, "Severe Accident Analysis Report for FCI," Page D-97 through D-98.

    2 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B544APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, "Severe Accident Analysis Report for FCI," Page D-99.

    1 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B545APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, " Severe Accident Analysis Report for FCI," Page D-100 to D-101.

    2 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B546APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, "Severe Accident Analysis Report for FCI," Page D-102.

    1 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B548APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, "Severe Accident Analysis Report for FCI," Page D-103 to D-104.

    2 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B549APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-D, "Severe Accident Analysis Report for FCI," Page D-105 through D-111.

    7 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B569APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-E, "Severe Accident Analysis Report for Containment Performance," Page E-1 through E-22.

    25 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B570

    APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-F, "Severe Accident Analysis Report for Equipment Survivability Evaluation," Table of Contents through F-A-4.

    58 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B571APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-F, "Severe Accident Analysis Report for Equipment Survivability Evaluation," Page F-A-5 through F-A-7.

    3 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13303B572APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-F, " Severe Accident Analysis Report for Equipment Survivability Evaluation," Page F-A-8 through F-A-10.

    3 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304A930APR1400-E-S-NR-13001-NP, Rev. 0, "Seismic Design Bases for the APR1400 Standard Plant Design."

    167 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-19

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13304A931

    APR1400-E-S-NR-13002-NP, Rev. 0, "Finite Element Seismic Models for SSI Analyses of the NI Buildings of the APR1400 Standard Plant," Cover through Page 40.

    52 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304A932

    APR1400-E-S-NR-13002-NP, Rev. 0, "Finite Element Seismic Models for SSI Analyses of the NI Buildings of the APR1400 Standard Plant," Page 41 through Page 50.

    10 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304A933

    APR1400-E-S-NR-13002-NP, Rev. 0, "Finite Element Seismic Models for SSI Analyses of the NI Buildings of the APR1400 Standard Plant," Page 51 through Page 60.

    10 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304A934

    APR1400-E-S-NR-13002-NP, Rev. 0, "Finite Element Seismic Models for SSI Analyses of the NI Buildings of the APR1400 Standard Plant," Page 61 through Page 70.

    10 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304A935

    APR1400-E-S-NR-13002-NP, Rev. 0, "Finite Element Seismic Models for SSI Analyses of the NI Buildings of the APR1400 Standard Plant," Page 71 through Page 135.

    65 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304A936

    APR1400-E-S-NR-13002-NP, Rev. 0, "Finite Element Seismic Models for SSI Analyses of the NI Buildings of the APR1400 Standard Plant," Page 136 through Page 139.

    4 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304A937

    APR1400-E-S-NR-13002-NP, Rev. 0, "Finite Element Seismic Models for SSI Analyses of the NI Buildings of the APR1400 Standard Plant," Page A1 through Page A7.

    7 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304A938

    APR1400-E-S-NR-13002-NP, Rev. 0, "Finite Element Seismic Models for SSI Analyses of the NI Buildings of the APR1400 Standard Plant," Page A8 through Page A14.

    7 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304A939

    APR1400-E-S-NR-13002-NP, Rev. 0, "Finite Element Seismic Models for SSI Analyses of the NI Buildings of the APR1400 Standard Plant," Page A15 through End.

    5 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B102

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Page E1 through Page E70.

    70 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B104

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant, Appendix F Page F1 through F48.

    48 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-20

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13304B106

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Appendix G, Page G1 through G24.

    24 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B108APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Cover through Page 60.

    69 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B109

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Page A1 through Page A7.

    7 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B110

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Page A8 through Page A13.

    6 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B111

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Page A14 through Page A19.

    6 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B112

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Page B1 through Page B40.

    40 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B113

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Page C1 through Page C81.

    81 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B114

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Page D1 through Page D20.

    20 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B115

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Page D21 through Page D40.

    20 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B116

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Page D41 through Page D60.

    20 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B117

    APR1400-E-S-NR-13003-NP, Rev. 0, "SSI Analysis Methodology and Results of NI Buildings of the APR1400 Standard Plant," Page D61 through Page D78.

    18 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-21

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13304B151APR1400-E-S-NR-13004-NP, Rev. 0, "Evaluation of Effects of HRHF Response Spectra on SSCS of the APR1400 Standard Plant," Cover through Page 51.

    61 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B152

    APR1400-E-S-NR-13004-NP, Rev. 0, "Evaluation of Effects of HRHF Response Spectra on SSCS of the APR1400 Standard Plant," Page 52 through Page 86.

    35 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B153

    APR1400-E-S-NR-13004-NP, Rev. 0, "Evaluation of Effects of HRHF Response Spectra on SSCS of the APR1400 Standard Plant," Page 87 through Page 93.

    7 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B154

    APR1400-E-S-NR-13004-NP, Rev. 0, "Evaluation of Effects of HRHF Response Spectra on SSCS of the APR1400 Standard Plant," Page 94 through Page 99.

    6 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B155APR1400-E-S-NR-13004-NP, Rev. 0, "Evaluation of Effects of HRHF Response Spectra on SSCS of the APR1400 Standard Plant," Page 100 through 109.

    10 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B156

    APR1400-E-S-NR-13004-NP, Rev. 0, "Evaluation of Effects of HRHF Response Spectra on SSCS of the APR1400 Standard Plant," Appendix A, Page I through Page VI.

    7 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B164

    APR1400-E-S-NR-13005-NP, Rev. 0, "Evaluation of Structure-Soil-Structure Interaction (SSSI) Effects of the APR1400 Standard Plant," Page 75 through Page 169.

    95 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B165

    APR1400-E-S-NR-13005-NP, Rev. 0, "Evaluation of Structure-Soil-Structure Interaction (SSSI) Effects of the APR1400 Standard Plant," Page 170 through Page 185.

    16 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B166

    APR1400-E-S-NR-13005-NP, Rev. 0, "Evaluation of Structure-Soil-Structure Interaction (SSSI) Effects of the APR1400 Standard Plant," Cover through Page 74.

    87 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B179APR1400-E-S-NR-13006-NP, Rev. 0, "Stability Check for NI Common Basemat," Cover through Page 30.

    38 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B180APR1400-E-S-NR-13006-NP, Rev. 0, "Stability Check for NI Common Basemat," Page 31 through Page 36.

    6 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-22

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13304B181APR1400-E-S-NR-13006-NP, Rev. 0, "Stability Check For NI Common Basemat," Page 37 through Page 48.

    12 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B182APR1400-E-S-NR-13006-NP, Rev. 0, "Stability Check For NI Common Basemat," Page 49 through Page 67.

    19 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B196 APR1400-E-E-NR-12001-NP, Rev. 0, "Equipment Qualification Program," Cover through Page A2-4. 199 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B200

    APR1400-Z-M-NR-13010-NP, Rev. 0, "Pressure-Temperature Limits Methodology for RCS Heatup and Cooldown for the APR1400," Cover through A1-35.

    72 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B238APR1400-Z-A-NR-13007-NP, Rev. 0, "LOCA Mass and Energy Release Methodology for the APR1400,". Cover through G-3.

    264 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B288 APR1400-Z-J-EC-13001-NP, Rev. 0, "Safety I&C System for the APR1400," Cover through D-10. 216 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B362APR1400-Z-J-EC-13002-NP, Rev. 1, " Diversity and Defense-in-Depth for the APR1400," Cover through Page C-14.

    63 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B367APR1400-Z-J-NR-13003-NP, Rev. 0, "Software Program Manual for the APR1400," Cover through Page 4-2.

    105 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B440 APR1400-Z-A-NR-13008-NP, Rev. 0, "CCF Coping Analysis for the APR1400." 139 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B448 APR1400-Z-A-NR-13006-NP, Rev. 0, "Non-LOCA Safety Analysis Methodology for the APR1400." 115 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B449APR1400-E-J-NR-12001-NP, Rev. 0, "Functional Requirements Analysis and Function Allocation Implementation Plan."

    52 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-23

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13304B450 APR1400-E-J-NR-12002-NP, Rev. 0, "Human Factors Engineering Program Plan." 50 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B451 APR1400-E-J-NR-12003-NP, Rev. 0, "Operating Experience Review Implementation Plan." 25 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B452 APR1400-E-J-NR-12005-NP, Rev. 0, "Style Guide," Cover through Page B-14. 269 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B453 APR1400-E-J-NR-12005-NP, Rev. 0, "Style Guide," Page C-1 through Page C-20. 20 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B454 APR1400-E-J-NR-12005-NP, Rev. 0, "Style Guide," Page C-21 through Page C-40. 20 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B455 APR1400-E-J-NR-12005-NP, Rev. 0, "Style Guide," Page D-1 through Page D-3. 3 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B464 APR1400-E-J-NR-12007-NP, Rev. 0, "Task Analysis Implementation Plan." 28 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B465 APR1400-E-J-NR-12008-NP, Rev. 0, "Human-System Interface Design Implementation Plan." 34 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B467 APR1400-E-J-NR-12009-NP, Rev. 0, "Basic Human-System Interface Platform." 78 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B469APR1400-E-J-NR-12010-NP, Rev. 0, "Human Factors Verification and Validation Implementation Plan."

    84 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B474 APR1400-E-J-NR-13003-NP, Rev. 0, "Treatment of Important Human Actions Implementation Plan." 17 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-24

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13304B475 APR1400-E-J-NR-13002-NP, Rev. 0, "Human Factors Verification and Validation Scenarios." 430 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B477 APR1400-K-J-NR-13001-NP, Rev. 0, "Staffing and Qualifications Implementation Plan." 9 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B479 APR1400-K-J-NR-13002-NP, Rev. 0, "Design Implementation Plan." 8 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13304B480 APR1400-K-J-NR-13003-NP, Rev. 0, "Human Performance Monitoring Implementation Plan." 7 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B684APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Cover through Page 10-2.

    46 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B687APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Page A-1 through A-8.

    8 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B688APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Page A-9 through A-11.

    3 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B694APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Page A-12 through A-14.

    3 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B698APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Page A-15 through A-17.

    3 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B703APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Page A-18 through A-19.

    2 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B705APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Page A-20 through A-21.

    2 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    A-25

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13310B706APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Page A-22 through A-23.

    2 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B709APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Page B-1 through B-2.

    2 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B711APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Page B-3 through B-4.

    2 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B713APR1400-H-N-NR-13003-NP, Rev. 0, "Structural/Seismic Analysis of New and Spent Fuel Storage Racks," Page B-5 through B-6.

    2 30-Sep-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13261A265

    Safety Evaluation Report For The KHNP Topical Report APR1400-K-Q-Tr-11005-NP, Revision 2, KHNP Quality Assurance Program Description For APR1400 Design Certification.

    5 7-Oct-2013 Letter NRC/NRO/DNRL/EPB2 Korea Hydro & Nuclear Power Co, Ltd PROJ0782

    ML13303B398Submittal of Additional Technical Reports in Accordance with the APR1400 Reports Submittal Plan.

    6 7-Oct-2013 Legal-AffidavitLetter

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13303B574

    APR1400-E-P-NR-13003-NP, Rev. 0, Appendix-F, " Severe Accident Analysis Report for Equipment Survivability Evaluation," Page F-B-1 through F-B-145.

    145 7-Oct-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13302A139

    Submittal of Published Topical Report APR1400-K-Q-TR-11005-NP-A, Revision 0, "KHNP Quality Assurance Program Description (QAPD) for the APR1400 Design Certification".

    2 28-Oct-2013 Letter Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13302A140Enclosure 1: APR1400-K-Q-TR-11005-NP-A, Revision 0, "KHNP Quality Assurance Program Description for the APR1400 Design Certification."

    84 28-Oct-2013 Topical Report Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13302A141

    Submittal of Topical Report APR1400-K-Q-TR-11005-NP, Revision 3, "KHNP Quality Assurance Program Description (QAPD) for the APR1400 Design Certification".

    2 28-Oct-2013 Letter Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13302A142Enclosure 1 - KHNP Quality Assurance Program Description (QAPD) for the APR1400 Design Certification, Revision 3.

    45 28-Oct-2013 Report, Miscellaneous Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    A-26

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13302B877 Submittal of Test Plan for In-vessel Downstream Effect of the APR1400 (Rev. 2). 6 29-Oct-2013 LetterKorea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML13302B880 Encl 3 - Test Plan for In-vessel Downstream Effect (IDE) of the APR1400. 18 29-Oct-2013 Report, MiscellaneousKorea Hydro & Nuclear Power Co, Ltd NRC/NRR PROJ0782

    ML13281A538 Acknowledgement FRN - Notice of Receipt APR1400. 3 30-Oct-2013 Federal Register Notice NRC/NRO/DNRL/EPB2 PROJ0782

    ML13281A920Notice of Receipt and Availability - Korea Hydro and Nuclear Power Co., LTD and Korea Electric Power Corporation - Project 0782.

    2 30-Oct-2013 Memoranda NRC/NRO/DNRL/EPB2 NRC/ADM/DAS/RADB PROJ0782

    ML13310B639Submittal of Additional Technical Reports in Accordance with the APR1400 Reports Submittal Plan.

    6 31-Oct-2013 Letter Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13310B648APR1400-E-NR-13001-NP, Rev. 0, "APR1400 Design Features to Address GSI-191," Cover through Page 4-54.

    136 31-Oct-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B650APR1400-E-NR-13001-NP, Rev. 0, "APR1400 Design Features to Address GSI-191," Page A-1 through End.

    188 31-Oct-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13310B668APR1400-K-O-NR-13001-NP, Rev. 0, "Deviation Report Between NUREG-1432 Rev. 4.0 and APR1400 Technical Specifications."

    111 31-Oct-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13281A898

    Korea Hydro and Nuclear Power Co., LTD., and Korea Electric Power Corporation - Acknowledgment of Receipt of the Standard Design Certification of the APR1400 Application, And Association Federal Register Notice.

    6 8-Nov-2013 Letter NRC/NRO/DNRL/EPB2

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    PROJ0782

    ML13317A064 Submittal of KHNP Technical Reports Referenced in the DCD. 8 11-Nov-2013 LetterKorea Nuclear and Hydro Power Co, LTD

    NRC/Document Control Desk

    NRC/NROPROJ0782

    ML14111A309 List of Attendees for the APR1400 In-Vessel Downstream Effects Test Audit. 1 11-Nov-2013 - No Document Type Applies NRC/NRO/DNRL/LB2

    Korea Hydro & Nuclear Power Co, Ltd PROJ0782

    ML13322A795 Transmittal of Responses to the Questions about Chapter 7. 6 15-Nov-2013 LetterKorea Hydro Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13322A796 Questions and Answers for Chapter 7 related Conference Call. 15 15-Nov-2013 - No Document Type Applies

    Korea Hydro Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13323A589 Issuance Plan for the Post-Fukushima Action and AIA. 2 15-Nov-2013 LetterKorea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRL/EPB2PROJ0782

    A-27

  • Accession Number Document Title Pages Date Document Type Author Affiliation Addressee Affiliation

    Docket Number

    ML13330B023

    12/11-12/2013 - Notice Of Forthcoming Public Meetings With Korea Hydro And Nuclear Power, Co., Ltd., To Discuss Various Topics Related To The September 30, 2013, Submission Of A Design Certification Application For The Advanced Power Reactor 1400 Design.

    6 26-Nov-2013 Meeting Agenda

    Meeting NoticeMemoranda

    NRC/NRO/DNRL/EPB2 NRC/NRO/DNRL/EPB2 PROJ0782

    ML13333A945Korea Hydro & Nuclear Power Co, Ltd - Submittal of Additional Technical Reports in Accordance with the APR1400 Reports Submittal Plan.

    8 30-Nov-2013 Letter Korea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRL/LB2PROJ0782

    ML13333A946 APR1400-E-P-NR-13001-NP, "Probabilistic Risk Assessment Summary Report." 1000 30-Nov-2013 Report, TechnicalKorea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13333A949APR1400-F-A-NR-13002-NP, Rev. 0, "The Effect of Thermal Conductivity Degradation on APR1400 Design and Safety Analysis."

    66 30-Nov-2013 Report, Technical Korea Hydro & Nuclear Power Co, Ltd NRC/NRO PROJ0782

    ML13345A207APR1400-E-N-NR-13002-NP, Rev. 0, "IRWST Sump Strainer and Trash Rack Structural Analysis," Technical Report. Cover through Page 1-18.

    27 30-Nov-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13345A208APR1400-E-N-NR-13002-NP, Rev. 0, "IRWST Sump Strainer and Trash Rack Structural Analysis," Technical Report. Page 1-19 through End.

    30 30-Nov-2013 Report, Technical

    Korea Electric Power Corp

    Korea Hydro & Nuclear Power Co, Ltd

    NRC/NRO PROJ0782

    ML13340A391 Submittal of Responses to the Review Issues about Radiation Protection-APR1400. 3 6-Dec-2013 LetterKorea Hydro & Nuclear Power Co, Ltd

    NRC/Document Control Desk

    NRC/NRO/DNRLPROJ0782

    ML13340A759 Enclosure - Responses to Radiation Protection Acceptance Review Issues-APR1400. 9 6-Dec-2013 - No Document Type Applies

    Korea Nuclear and Hydro Power Co, LTD NRC/NRR PROJ0782

    ML13340A784

    Submittal of Meeting Documents for "Notice of Forthcoming Public Me