Appendix Appendix A - Public and Agency Participation Process Appendix B - Certification of Private Enterprise Participation Process & Financial Capacity of Transit Operator Appendix C - TIP/STIP Amendments and Administrative Modifications Appendix D - Metropolitan/Regional Planning Areas Listing of Obligations and Closures -- FFY 2015 Appendix E - Urban Secured Projects 2017-2022 Appendix F - Rural Secured Projects 2017-2022 Appendix G - Non-Federal Secured Local Projects 2017-2022 Appendix H - Planned Projects 2017-2022

Upload: others

Post on 12-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Appendix

Appendix A - Public and Agency Participation ProcessAppendix B - Certification of Private Enterprise Participation Process & Financial Capacity of Transit OperatorAppendix C - TIP/STIP Amendments and Administrative ModificationsAppendix D - Metropolitan/Regional Planning Areas Listing of Obligations and Closures -- FFY 2015Appendix E - Urban Secured Projects 2017-2022Appendix F - Rural Secured Projects 2017-2022Appendix G - Non-Federal Secured Local Projects 2017-2022Appendix H - Planned Projects 2017-2022

Page 2: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Appendix A - Public and Agency Participation Process

Page 3: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

BFCG Expanded Development Schedule For The 2017-2022 Metropolitan/Regional Transportation Improvement Program

July 1st - Date by which cities and towns are required to adopt their TIPs. (RCW 35.77.010)July 13th - Jurisdiction TIPs due to BFCG – sent electronically through web based STIP software.

August 5th - Jurisdiction TIPs posted to BFCG website.

August 5th – Public Meeting notification sent to MPO/RTPO public involvement distribution list, posted to the BFCG website and Facebook page.

August 21st and August 28th – Ad in the Tri-City Herald and tu Decides, the bilingual newspaper for the Transportation Fair on September 7th.

September 7th – Transportation Fair; Tri-Cities Visitors and Convention Center; Bechtal RoomSeptember 21st – Public Comments due to BFCGSeptember 22nd – Public Comments forwarded to jurisdiction(s) for response.September 27th – Response(s) from jurisdiction are due to BFCG

September 1st – Technical Advisory Committee (TAC) DRAFT TIP reviewSeptember 8th - Policy Advisory Committee (PAC) DRAFT TIP reviewSeptember 16th – Benton-Franklin Board DRAFT TIP Review

October 6th – TAC approval of 2017 MPO/RTPO TIPOctober 13th – PAC approval of 2017 MPO/RTPO TIP October 21st – BFCG Board approval of 2017 MPO/RTPO TIP

October 21st – Forward approved 2017 M/R TIP to WSDOT Olympia

Page 4: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Transportation Fair - Postcard and Flyer

¡FERIA DE TRANSPORTACIÓN!MIÉRCOLES,

7 DE SEPTIEMBRE4:30-6:30pm

www.bfcog.us www.bft.org http://www.tricityregionalchamber.com

Tri-Cities Business and Visitor Center en el Bechtel Board Room y área de sala de espera. 7130 W Grandridge Blvd, Kennewick.

Esta es una oportunidad para aprender sobre proyectos de transportación, planes, y programas de varias organizaciones, y proveer comentario. Juega Transportation Bucks y aplica tus Bucks a estratégias de mobilidad.

*The Benton-Franklin Council of Governments fully complies with Title VI of the Civil Rights Act of 1964 and related statues and regulation in all programs and activities.

BFGG Metropolitan/Regional Draft 2017-2022 Programa de Mejoramiento de Transportación (TIP)Plan de Desarrollo de Tránsito y Programa de Proyectos de Ben Franklin Transit

▶▶

¿Preguntas?Contacta a Jacob González [email protected]

Transportation Fair!WEDNESDAY,

SEPTEMBER 7TH4:30-6:30pm

Brought to you by:

Tri-Cities Business and Visitor Center in the Bechtel Board Room. 7130 W Grandridge Blvd, Kennewick.

This is an opportunity to learn about transportation projects, plans, and programs from various organizations, and provide input. Play Transportation Bucks and apply your Bucks to mobility strategies.

*The Benton-Franklin Council of Governments fully complies with Title VI of the Civil Rights Act of 1964 and related statues and regulation in all programs and activities.

Benton-Franklin Council of Governments Draft 2017-2022 Transportation Improvement Program (TIP)Ben Franklin Transit’s Transit Development Plan and Program of Projects

▶▶

www.bfcog.us www.bft.org http://www.tricityregionalchamber.com

Questions?Contact Jacob Gonzalez [email protected]

Page 5: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Transportation Fair!WEDNESDAY,

SEPTEMBER 7TH

4:30-6:30pm

▷Talk by transportation sta�

▷Opportunity to walk around the booths will follow

▷Play Transportation Bucks and apply your Bucks to mobility strategies

▷Light refreshments will be served

What

Where

Why

�e Fair will take place at the Tri-Cities Business and Visitor Center in the Bechtel Board Room and lobby area. 7130 W Grandridge Blvd, Kennewick.

�is is an opportunity to learn about transportation projects, plans, and programs from various organizations, and provide input, including:»BFCG Metropolitan/Regional Dra� 2017-2022 Transportation Improvement Program (TIP)

»Ben Franklin Transit’s Transit Development Plan and Program of Projects

We want to hear your thoughts regarding future transportation plans and projects. Join us and be involved in the discussion to improve our region’s transportation!

Questions?Contact Jacob Gonzalez at [email protected]

www.bfcog.us www.bft.org http://www.tricityregionalchamber.com/

*The Benton-Franklin Council of Governments fully complies with Title VI of the Civil Rights Act of 1964 and related statues and regulation in all programs and activities.

Page 6: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

¡FERIA DE TRANSPORTACIÓN!MIÉRCOLES,

7 DE SEPTIEMBRE

4:30-6:30pm

▷Discurso de personal de transportación

▷Oportunidad de visitar los puestos despues

▷Juega Transportation Bucks y aplica tus Bucks a estratégias de mobilidad

▷Refrescos serán servidos

Qué

Dónde

Por qué

La Feria se llevará a cabo en el Tri-Cities Business and Visitor Center en el Bechtel Board Room y área de sala de espera. 7130 W Grandridge Blvd, Kennewick.

Esta es una oportunidad para aprender sobre proyectos de transportación, planes, y programas de varias organizaciones, y proveer comentario, incluyendo:»BFGG Metropolitan/Regional Dra� 2017-2022 Programa de Mejoramiento de Transportación (TIP)

»Plan de Desarrollo de Tránsito y Programa de Proyectos de Ben Franklin Transit

Queremos escuchar tus pensamientos con respecto a futuros planes y proyectos de transporte. ¡Únete a nosotros y participa en la discusión para mejorar el transporte de nuestra región!

¿Preguntas?Contacta a Jacob González [email protected]

www.bfcog.us www.bft.org http://www.tricityregionalchamber.com/

*El Consejo de Gobiernos Benton-Franklin cumple totalmente con el Título VI de la Ley de Derechos Civiles de 1964 y estatuas relacionadas y la regulación en todos los programas y actividades.

Page 7: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Transportation Fair - Pictures of the event

Page 8: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Transportation Fair Sign in Sheet

Page 9: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required
Page 10: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Appendix B - Certification of Private Enterprise Participation Process & Financial Capacity of Transit Operator

Page 11: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Ben Franklin Transit Certification Statement

The Benton‐Franklin Council of Governments as the designated MPO/TMA for the Tri‐ Cities, Certifies that Ben Franklin Transit has followed the local process for the projects contained in the 2017 TIP. This process informed all private sector providers of Ben Franklin Transit improvement plans.

MPO Certification Of Transit Operator’s Financial Capacity

UMTA (FTA) Circular 7008.1 requires that MPOs certify the financial capacity of the transit operator for the Annual Element portion of the TIP. The Benton‐Franklin Council of Governments hereby certifies that Ben Franklin Transit has provided financial information showing that they have the financial capacity to carry out the projects programmed in the 2017 M/R TIP. Ben Franklin Transit provided to the Benton‐Franklin Council of Governments a six‐year financial plan that covers 2017‐2022.Ben Franklin Transit’s budget of revenues and expenses for 2017 shows they have the financial capacity to carry out the projects programmed in 2017.

Page 12: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Appendix C - TIP/STIP Amendments and Administrative Modifications

Page 13: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required
Page 14: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Appendix D - Metropolitan/Regional Planning Area List of Obligationsand Closures - FFY 2015

Page 15: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Pending

Page 16: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Appendix E - Urban Secured Projects 2017-2022

Page 17: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Benton

Agency: Ben Franklin Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-06637 23 CE No N/A N/A 3,693,944

5307 2017 - 2020 Equipment: Communication, security, data collection, passenger amenities, maintenance equipment

Purchase equipment to be installed on vehicles at the manufacturer or post vehicle delivery on BFT site. Also includes back office support for on road applications and maintenance equipment such as a fluid dispensing system. Includes design and permitting.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalALL 2017 5307 315,152 0 78,792 393,944

ALL 2018 5307 880,000 0 220,000 1,100,000

ALL 2019 5307 880,000 0 220,000 1,100,000

ALL 2020 5307 720,000 0 180,000 900,000

Project Totals 2,795,152 0 698,792 3,493,944

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 393,944 1,100,000 1,100,000 900,000 200,000

Totals 393,944 1,100,000 1,100,000 900,000 200,000

Page 2

Page 18: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Benton

Agency: Ben Franklin Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-05096 23 CE No N/A N/A 3,819,887

5307 2017 - 2020 Facilities

This is a bucket TIP project containing Ben Franklin Transit's FTA funding for facilities design/planning, equipment, paving, painting, security systems, shelters, passenger amenities, and aesthetics.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalALL 2017 5307 383,478 0 95,869 479,347

ALL 2018 5307 894,108 0 223,527 1,117,635

ALL 2019 5307 422,108 0 105,527 527,635

ALL 2020 5307 494,108 0 123,527 617,635

Project Totals 2,193,802 0 548,450 2,742,252

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 479,347 1,117,635 527,635 617,635 1,077,635

Totals 479,347 1,117,635 527,635 617,635 1,077,635

Page 3

Page 19: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Benton

Agency: Ben Franklin Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-04000 23 CE No N/A N/A 37,772,848

5307 2017 - 2020 Operating, Preventative Maintenance

This is a bucket TIP project containing Ben Franklin Transit FTA funded, General Labor Operating for a system with fewer than 75 fixed route buses in operation. During all years of this project 5307 Funds will be matched with local to maintain transit service.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalALL 2017 5307 3,311,692 0 3,311,692 6,623,384

ALL 2018 5307 3,602,507 0 3,602,507 7,205,014

ALL 2019 5307 3,771,786 0 3,771,786 7,543,572

ALL 2020 5307 4,021,430 0 4,021,430 8,042,860

Project Totals 14,707,415 0 14,707,415 29,414,830

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 6,623,384 7,205,014 7,543,572 8,042,860 8,358,018

Totals 6,623,384 7,205,014 7,543,572 8,042,860 8,358,018

Page 4

Page 20: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Benton

Agency: Ben Franklin Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-07002 18 CE No N/A N/A 457,377

5307 2017 - 2020 Planning Study Passenger Amenities, ITS Architecture

Planning study to complete ITS Architecture, Passenger Amenities Improvements and Other as needed.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalALL 2017 5307 105,902 0 26,475 132,377

ALL 2018 5307 100,000 0 25,000 125,000

ALL 2019 5307 32,000 0 8,000 40,000

ALL 2020 5307 64,000 0 16,000 80,000

Project Totals 301,902 0 75,475 377,377

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 132,377 125,000 40,000 80,000 80,000

Totals 132,377 125,000 40,000 80,000 80,000

Page 5

Page 21: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Benton

Agency: Ben Franklin Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-05091 23 CE No N/A N/A 15,133,011

5307 2017 - 2020 Transit Vehicle Replacements

This is a bucket TIP project which contains Ben Franklin Transit's FTA funded Revenue Vehicles for Replacement or Expansion including Transit Buses, Paratranist Coaches, Staff, and Vanpool Rideshare Vehicles. During all years of this project, the project will provide a cumulative total of up to 155 transit vehicles.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalALL 2017 5307 2,350,917 0 587,729 2,938,646

ALL 2018 5307 2,357,409 0 589,351 2,946,760

ALL 2019 5307 2,412,997 0 603,248 3,016,245

ALL 2020 5307 2,464,863 0 616,216 3,081,079

Project Totals 9,586,186 0 2,396,544 11,982,730

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 2,938,646 2,946,760 3,016,245 3,081,079 3,150,281

Totals 2,938,646 2,946,760 3,016,245 3,081,079 3,150,281

Page 6

Page 22: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Benton

Agency: Ben Franklin Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-05453 23 CE No N/A N/A 1,044,710

5310 2017 - 2020 Paratransit vehicles

This is a bucket TIP project which contains FTA funded Revenue Vehicles for Replacement or Expansion including Para-transit Coaches, support vehicles and equipment to provide transportation to seniors and disable exceeding ADA requirement. This will include up to 14 each less than 30 foot vehicles. For contracting agencies or organizations; and or sub-recipients providing transportation services such as Arc of Tri-Cities.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalALL 2017 5310 163,844 0 40,961 204,805

ALL 2018 5310 165,482 0 41,371 206,853

ALL 2019 5310 167,137 0 41,785 208,922

ALL 2020 5310 168,808 0 42,202 211,010

Project Totals 665,271 0 166,319 831,590

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 204,805 206,853 208,922 211,010 213,120

Totals 204,805 206,853 208,922 211,010 213,120

Page 7

Page 23: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Benton

Agency: Ben Franklin Transit

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 WA-05452 23 CE No N/A N/A 4,547,746

5339 2017 - 2020 Vehicle Purchase

This is a bucket TIP project which contains Ben Franklin Transit's FTA funded Revenue Vehicles for Replacement or Expansion including Transit Buses, Paratranist Coaches, and Vanpool Rideshare Vehicles. During all years of this project, the project will provide a cumulative total of up to 50 transit vehicles.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalALL 2017 5339 720,399 0 180,100 900,499

ALL 2018 5339 724,001 0 181,001 905,002

ALL 2019 5339 727,621 0 181,906 909,527

ALL 2020 5339 731,259 0 182,815 914,074

Project Totals 2,903,280 0 725,822 3,629,102

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 900,499 905,002 909,527 914,074 918,644

Totals 900,499 905,002 909,527 914,074 918,644

Federal FundsState Funds Local Funds Total

Agency Totals for Ben Franklin Transit

33,153,008 0 19,318,817 52,471,825

Page 8

Page 24: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: BFCG

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 9903(009) WA-05977 18 CE No N/A N/A 198,673

2017 - 2018 Unified Planning Work Program

This project will support tasks outlined in BFCG's UPWP for years 2016,2017 and 2018. Primarily "Program Administration, Interagency Coordination and Public Involement" in the Tri-Cities metropolitan area. The work elements are identified numerically as 220 in the UPWP.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 STP(UL) 96,520 0 13,030 109,550

PE 2017 STP(US) 3,176 0 428 3,604

PE 2017 STP(R) 17,000 0 2,295 19,295

PE 2018 STP(UL) 48,260 0 6,515 54,775

PE 2018 STP(US) 1,588 0 214 1,802

PE 2018 STP(R) 8,500 0 1,147 9,647

Project Totals 175,044 0 23,629 198,673

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 66,224 132,449 0 0 0

Totals 66,224 132,449 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for BFCG 175,044 0 23,629 198,673

Page 9

Page 25: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Franklin

Agency: Franklin Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

07 E112(002) WA-00157 11 0.100 CE No Milepost 3.41 Milepost 3.51 1,002,803

Taylor Flats Bridge #903-3.46 Widening

The project consits of widening a functionally obsolete bridge to meet current standards.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 STP(UL) 50,000 0 7,803 57,803

Project Totals 50,000 0 7,803 57,803

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 181,000 0 0 0 0

Totals 181,000 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Franklin Co. 50,000 0 7,803 57,803

Page 10

Page 26: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Franklin

Agency: Pasco

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

16 WA-07739 04 0.100 CE No Road 68 I-182 930,995

Dual Right Turn Southbound 68

This project will add a second right-turn lane from southbound Road 68 onto westbound I-182.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2018 STP(UL) 295,753 0 62,560 358,313

CN 2018 STP(UL) 495,370 0 77,312 572,682

Project Totals 791,123 0 139,872 930,995

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 358,313 0 0 0

CN 0 572,682 0 0 0

Totals 0 930,995 0 0 0

Page 11

Page 27: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Franklin

Agency: Pasco

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

06 3551(004) WA-06944 04 1.500 CE Yes Lewis Street Sun Willows Blvd 2,085,100

N. 20th Ave. Safety Improvements

Roadway, ADA, and signal improvements to address pedestrian safety and intersection improvements at 20th and Lewis, 20th and Sylvester, 20th and Henry, 20th and Pearl, 20th and I-182 on/off ramps, and 20th and Sunwillows. Address access management at 20th and Lewis, 20th and Court, and 20th and Sun Willows. Addition of two pedestrian hybrid beacons along safe walking routes.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 HSIP 1,164,880 0 635,120 1,800,000

Project Totals 1,164,880 0 635,120 1,800,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 1,164,880 0 0 0 0

Totals 1,164,880 0 0 0 0

Page 12

Page 28: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Franklin

Agency: Pasco

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 9911(010) WA-05347 21 CE No various various 1,656,861

Traffic Signal Improvements - City Wide - Phase 1

Upgrade traffic signals for better coordination and Fire EMS preemption. Create capacity through corridor signal and ADA improvements.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 STP(UL) 1,080,927 0 168,700 1,249,627

CN 2017 TAP(UL) 252,257 0 39,370 291,627

Project Totals 1,333,184 0 208,070 1,541,254

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 1,541,254 0 0 0 0

Totals 1,541,254 0 0 0 0

Page 13

Page 29: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Franklin

Agency: Pasco

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 WA-08734 21 CE Yes various various 1,130,992

Traffic Signal Improvements - City Wide Phase 2

Replace all of the City’s obsolete signal equipment with updated signal controllers, signal equipment, signal interconnect equipment, optimized corridor timing plans, vehicle detection system and emergency vehicle priority system. Pedestrian access will be upgraded to meet current ADA right of way accessibility design guidelines for the signalized intersections. PE done under federal project 9911(010)

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalRW 2017 STP(UL) 300,000 0 40,500 340,500

CN 2018 STP(UL) 683,776 0 106,716 790,492

Project Totals 983,776 0 147,216 1,130,992

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

RW 0 340,500 0 0 0

CN 0 790,492 0 0 0

Totals 0 1,130,992 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Pasco 4,272,963 0 1,130,278 5,403,241

Page 14

Page 30: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 BPBF BPBF 05 CE No Varies Varies 31,736,754

Asphalt/Chip Seal Preservation Benton-Franklin Council of Governments

Resurface the roadway with chip seal or hot mix asphalt to preserve the structural integrity of the roadway and extend the service life of the pavement. This record is for chip seal/asphalt paving projects within Benton and Franklin counties. For a list of included projects, go to www.wsdot.wa.gov/projects/search.

Page 15

Page 31: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 NHPP 540,961 0 23,215 564,176

PE 2017 STP 39,427 0 0 39,427

PE 2018 NHPP 346,941 0 16,104 363,045

PE 2018 STP 55,651 0 0 55,651

PE 2019 NHPP 348,959 0 22,804 371,763

PE 2019 STP 221,145 0 0 221,145

PE 2020 STP 72,465 0 2,899 75,364

CN 2017 NHPP 3,025,076 0 66,590 3,091,666

CN 2017 STP 304,434 0 0 304,434

CN 2018 NHPP 5,548,738 0 118,231 5,666,969

CN 2018 STP 362,798 0 0 362,798

CN 2019 NHPP 5,958,895 0 141,692 6,100,587

CN 2019 STP 1,125,690 0 0 1,125,690

CN 2020 NHPP 4,933,681 0 147,919 5,081,600

CN 2020 STP 2,462,275 0 0 2,462,275

Project Totals 25,347,136 0 539,454 25,886,590

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 3,999,703 6,448,463 7,819,185 7,619,239 5,850,164

Totals 3,999,703 6,448,463 7,819,185 7,619,239 5,850,164

Page 16

Page 32: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

01 508207R 508207R03 03 1.500 CE Yes 99.00 100.50 24,900,000

I-82/Red Mountain Vicinity - Construct Interchange

Construct interchange. Improved access to the I-82 corridor between Benton County and the I-182 junction is critical for continuing economic development. This project will construct a new freeway overpass and on- and off-ramps for I-82 east of Benton City, to provide direct interstate access to West Richland and the surrounding Red Mountain area, and a new connection to SR 224.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalRW 2017 0 CWA 1,400,000 0 1,400,000

CN 2018 0 CWA 22,500,000 0 22,500,000

Project Totals 0 23,900,000 0 23,900,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 500,000 874,630 18,784,076 3,741,294 0

Totals 500,000 874,630 18,784,076 3,741,294 0

Page 17

Page 33: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

02 0240(022) 524003M 524003M03 21 4.070 CE No 30.80 34.87 75,268

SR 240/0.2 Miles E of Jadwin Ave to I-182 - ADA Compliance

Upgrade existing curb ramps to meet ADA compliance. Pedestrian ADA curb ramps at various intersections on SR 240 in the City of Richland do not fully meet ADA standards. This project will upgrade the curb ramps to meet current standards, improving accessibility for all pedestrians.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 NHPP 65,789 0 1,343 67,132

Project Totals 65,789 0 1,343 67,132

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 67,132 0 0 0 0

Totals 67,132 0 0 0 0

Page 18

Page 34: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 524003O 524003O03 21 12.700 CE No 20.40 34.87 5,000,000

SR 240/Richland Corridor Improvements

Intersection Improvements. SR 240 in Richland is experiencing increased congestion at several existing intersections. This project will construct intersection improvements along the SR 240 corridor in Richland to improve the safety and operational efficiency of this route. Improvements include acceleration and deceleration lanes, new channelization and signal system upgrades.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2019 0 CWA 500,000 0 500,000

CN 2020 0 CWA 4,500,000 0 4,500,000

Project Totals 0 5,000,000 0 5,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 298,000 4,043,040 456,960

Totals 0 0 298,000 4,043,040 456,960

Page 19

Page 35: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

02 0240(021) 524003G 524003G03 21 0.400 CE No 31.82 32.22 414,505

SR 240/SR 224/Van Giesen Street - Intersection Improvements

Add acceleration lane. The intersection of SR 240/SR 224/Van Giesen Street in Richland has a history of collisions. This project will construct an acceleration lane for eastbound SR 224 traffic turning onto eastbound SR 240 to reduce the risk of collisions.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 HSIP 374,699 0 7,647 382,346

Project Totals 374,699 0 7,647 382,346

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 364,377 17,970 0 0 0

Totals 364,377 17,970 0 0 0

Page 20

Page 36: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

02 0397(013) 539701V 539701V03 22 0.100 CE Yes 17.76 17.86 474,080

SR 397/E Bruneau Ave - Railroad Crossing Improvements

Install cantilever-mounted beacons - Xing #808925X. The railroad crossing on SR 397 at E Bruneau Ave has been identified as a location with a potential for train/vehicle collisions. The crossing is currently equipped with shoulder-mounted railroad crossing signs. This project will install cantilever-mounted flashing beacons to reduce the risk of collisions.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalRW 2017 HSIP 63,092 0 1,288 64,380

CN 2017 HSIP 338,061 0 6,899 344,960

Project Totals 401,153 0 8,187 409,340

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 409,340 0 0 0 0

Totals 409,340 0 0 0 0

Page 21

Page 37: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

07 0397(012) 539702D 539702D03 21 0.270 CE Yes 16.05 16.32 335,876

SR 397/S Yew St Vicinity - Roadside Improvements

Shoulder widening and install safety edge. This section of SR 397 has a history of run off the road collisions. This project will widen the existing shoulders and install a safety edge (taper) on the edge of pavement to reduce the risk of collisions.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 HSIP 212,423 0 4,335 216,758

Project Totals 212,423 0 4,335 216,758

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 216,758 0 0 0 0

Totals 216,758 0 0 0 0

Page 22

Page 38: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 539503X 539503X11 20 0.260 CE No 19.07 19.33 1,444,386

US 395/Pasco - Flamingo Mobile Home Park Noise Walls

Install noise walls. This project will install noise walls in the vicinity of Flamingo Mobile Home Park to reduce the highway noise for adjacent homes and properties.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 NHPP 192,016 0 8,001 200,017

CN 2019 NHPP 1,219,481 0 24,888 1,244,369

Project Totals 1,411,497 0 32,889 1,444,386

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 83,228 93,096 1,241,768 36,294 0

Totals 83,228 93,096 1,241,768 36,294 0

Page 23

Page 39: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 539504R 539504R11 40 0.230 CE No 18.75 18.98 40,851,607

US 395/Pioneer Memorial Bridge - Bridge Painting

Paint Bridge 395/40. The existing steel surfaces on the US 395 Pioneer Memorial Bridge between Kennewick and Pasco are in need of cleaning and painting. This project will clean and paint the existing steel surface to preserve the structural integrity of the bridge.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2020 NHPP 1,393,507 0 58,063 1,451,570

Project Totals 1,393,507 0 58,063 1,451,570

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 1,453,459

Totals 0 0 0 0 1,453,459

Page 24

Page 40: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

02 3457(002) 539504O 539504O03 03 0.800 CE No 13.30 14.10 17,000,000

US 395/Ridgeline Drive - Construct Interchange

Construct interchange. The intersection of US 395 and Ridgeline Drive experiences congestion due to recent development in this fast growing area of Kennewick, including a new high school and hospital. This four-laned limited access highway connects I-82 with I-182 through Pasco and Kennewick. Heavy truck volumes and higher vehicle speeds make safe access at this intersection a concern. This project will construct a new grade separated interchange to reduce congestion, improve access, and reduce the of collisions. PE and possible RW phases are being delivered by the City of Kennewick under STIP ID "kenn6".

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2020 0 CWA 15,000,000 2,000,000 17,000,000

Project Totals 0 15,000,000 2,000,000 17,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 16,818,043 181,957

Totals 0 0 0 16,818,043 181,957

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - SC 29,206,204 43,900,000 2,651,918 75,758,122

Page 25

Page 41: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Appendix F - Rural Secured Projects 2017-2022

Page 42: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County: Benton

Agency: Prosser

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

06 PROSSER 17 04 0.270 CE No Wine Country Road Meade Avenue 1,228,120

7th Street Improvements

The project will reconstruct 7th Street including new hot mix asphalt, curb and gutter, sidewalk, storm drainage, street lights, and ADA ramps.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 0 TIB 909,915 176,505 1,086,420

Project Totals 0 909,915 176,505 1,086,420

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 1,086,420 0 0 0 0

Totals 1,086,420 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Prosser 0 909,915 176,505 1,086,420

Page 2

Page 43: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County:

Agency: WSDOT - EAST

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

07 602102H 6021002H11 47 0.010 CE No 2.72 2.73 284,953

SR 21/Sand Hill Coulee Bridge - Deck Repair

Grind Sand Hill Coulee bridge deck and replace it with a modified or latex concrete overlay to preserve the structural integrity of the bridge.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2019 STP 65,215 0 2,717 67,932

CN 2020 STP 212,680 0 4,340 217,020

Project Totals 277,895 0 7,057 284,952

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 29,932 243,998 11,023

Totals 0 0 29,932 243,998 11,023

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - EAST 277,895 0 7,057 284,952

Page 3

Page 44: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

01 0823(068) 508208S 508208S03 14 0.110 CE No 132.49 132.60 15,623,595

I-82/Columbia River Bridge EB - Truss Deck Replacement

Replace truss deck and barrier on Bridge 82/280S. The bridge deck and barrier on the steel truss portion of the Columbia River Bridge on eastbound I-82 at the WA/OR state boundary are showing signs of deterioration due to normal wear and age. This project will remove and replace the existing bridge deck and barrier to maintain structural integrity, continue safe operation of the highway, and extend the life of the bridge. This project is split between WSDOT (50%) and ODOT (50%).

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 NHPP 7,198,282 0 146,904 7,345,186

CN 2017 0 0 7,345,186 7,345,186

Project Totals 7,198,282 0 7,492,090 14,690,372

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 6,828,095 7,827,137 35,140 0 0

Totals 6,828,095 7,827,137 35,140 0 0

Page 4

Page 45: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

01 508209V 508209V03 21 3.630 CE No 88.51 92.14 888,949

I-82/Gibbon Rd Vic to 1 Mile W of Yakitat Rd - Median Cable Barrier

Upgrade existing cable barrier. The existing 3-strand median cable barrier along this section of I-82 east of Prosser no longer meets current design standards. This project will replace the existing barrier with 4-strand high tension cable barrier to further reduce the risk of collisions.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2019 HSIP 123,251 0 5,136 128,387

CN 2020 HSIP 745,351 0 15,211 760,562

Project Totals 868,602 0 20,347 888,949

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 86,085 771,682 31,182

Totals 0 0 86,085 771,682 31,182

Page 5

Page 46: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

02 501701N 501701N11 21 1.500 CE No 7.59 9.09 17,168

SR 17/US 395 to 0.15 North of Mesa - Shoulder Rumble Strips

Install shoulder rumble strips. This two lane section of SR 17 has a history of run-off-road collisions. This project will install shoulder rumble strips to reduce the risk of collisions.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 HSIP 2,293 0 96 2,389

CN 2018 HSIP 14,485 0 294 14,779

Project Totals 16,778 0 390 17,168

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 2,388 14,780 0 0 0

Totals 2,388 14,780 0 0 0

Page 6

Page 47: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 500000F 500000F03 21 CE No varies varies 186,218

SR 22 ET AL/Benton and Yakima Co-Centerline Rumble Strips

Install centerline rumble strips. Sections of SR 22 and SR 221 are two-lane roadways with a high potential for crossover collisions. By installing centerline rumble strips, this project will reduce the risk of this type of collision and improve safety. Shoulder rumble strips may also be considered if warranted. This record represents the Benton county portion of this project split between Benton (50%) and Yakima (50%) counties.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 HSIP 36,287 0 1,512 37,799

CN 2018 HSIP 145,450 0 2,969 148,419

Project Totals 181,737 0 4,481 186,218

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 25,344 145,180 15,694 0 0

Totals 25,344 145,180 15,694 0 0

Page 7

Page 48: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County:

Agency: WSDOT - SC

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

06 502402T 502402T03 21 4.850 CE No 38.74 43.59 48,169

SR 24/SR 240 to Vernita - Shoulder and Centerline Rumble Strips

Install shoulder and centerline rumble strips. This two lane section of SR 24 has a history of run-off-road and crossover collisions. This project will install shoulder and centerline rumble strips to reduce the risk of collisions.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2018 HSIP 6,529 0 273 6,802

CN 2019 HSIP 40,540 0 827 41,367

Project Totals 47,069 0 1,100 48,169

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 6,801 41,366 0 0

Totals 0 6,801 41,366 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for WSDOT - SC 8,312,468 0 7,518,408 15,830,876

Page 8

Page 49: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Appendix G - Non-Federal Secured Local Projects 2017-2022

Page 50: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Franklin

Agency: Pasco

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

14 WA-04350 28 0.500 CE No various various 300,000

Annual ADA Access Handicap Ramp Retrofit

Ongoing effort to bring the City's pedestrian facilities into compliance with federal ADA regulations and standards.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 0 0 120,000 120,000

CN 2018 0 0 60,000 60,000

CN 2019 0 0 60,000 60,000

CN 2020 0 0 60,000 60,000

Project Totals 0 0 300,000 300,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 120,000 60,000 60,000 60,000 60,000

Totals 120,000 60,000 60,000 60,000 60,000

Page 2

Page 51: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Franklin

Agency: Pasco

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

17 WA-06311 01 1.000 CE No Road 68 Road 84 1,663,000

Chapel Hill Extension

Extension of Chapel Hill Blvd. from Road 68 to Road 84. The road section will match the existing Chapel Hill Blvd width at Road 84. The project will include the necessary signal improvements at the intersection of Road 68 and Chapel Hill Blvd.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 0 0 300,000 300,000

Project Totals 0 0 300,000 300,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 300,000 0 0 0 0

Totals 300,000 0 0 0 0

Page 3

Page 52: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Franklin

Agency: Pasco

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

09 WA-06941 01 1.000 CE No Clemente Lane Convention Drive 250,000

Wrigley Drive Extension

This project will extend Wrigley Drive from Clemente Lane to Convention Drive.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 0 0 50,000 50,000

CN 2017 0 0 200,000 200,000

Project Totals 0 0 250,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

CN 200,000 0 0 0 0

Totals 250,000 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Pasco 0 0 850,000 850,000

Page 4

Page 53: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG Y Inside N Outside October 4, 2016

County: Benton

Agency: Richland

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

16 3440(001) R002 01 0.670 EA Yes Queensgate Drive Cottonwood Drive 37,461,561

Duportail Bridge

Construct a 4-lane road and bridge over the Yakima River with sidewalks and bike paths on both sides. Construct new signalized intersections at Duportail St./Tanglewood Drive and Duportail/City View Drive. Reconstruct SR-240/Duportail intersection and modify traffic signal to accommodate additional lanes. Modify the Queensgate/Duportail intersection. Widen and raise at-grade railroad crossing of Port of Benton track.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 0 CWA 20,000,000 0 20,000,000

Project Totals 0 20,000,000 0 20,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 14,000,000 14,000,000 3,800,000 0

Totals 0 14,000,000 14,000,000 3,800,000 0

Federal FundsState Funds Local Funds Total

Agency Totals for Richland 0 20,000,000 0 20,000,000

Page 5

Page 54: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County: Benton

Agency: Benton Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

08 WA-09498 04 2.150 No 5.993 8.146 2,100,000

BERT JAMES RD: Sellards to Williamson

Reconstruct 2.15 miles of roadway to all-weather standard.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 0 0 50,000 50,000

Project Totals 0 0 50,000 50,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

Totals 50,000 0 0 0 0

Page 6

Page 55: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County: Benton

Agency: Benton Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

08 BCO2012-17 04 2.000 CE No Williamson Rd (MP 8.146) SR 221 (MP 10.240) 1,960,000

BERT JAMES RD: Williamson to SR 221

Reconstruct a 2 lane road segment.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalRW 2017 0 0 100,000 100,000

Project Totals 0 0 100,000 100,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

RW 100,000 0 0 0 0

Totals 100,000 0 0 0 0

Page 7

Page 56: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County: Benton

Agency: Benton Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

00 BCO2012-27 04 CE No various various 1,500,000

EMERGENT PROJECTS

Construct emergent projects.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalALL 2017 0 0 1,500,000 1,500,000

Project Totals 0 0 1,500,000 1,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 250,000 250,000 250,000 250,000 500,000

Totals 250,000 250,000 250,000 250,000 500,000

Page 8

Page 57: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County: Benton

Agency: Benton Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

08 BCO2012-09 04 3.000 CE Yes Coffin Rd Beck Rd 3,356,000

NINE CANYON RD Ph. III: Coffin to Beck

Reconstruct a segment of gravel road to an all weather road.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 0 CRAB 397,000 336,000 733,000

CN 2018 0 CRAB 2,623,000 0 2,623,000

Project Totals 0 3,020,000 336,000 3,356,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 733,000 2,623,000 0 0 0

Totals 733,000 2,623,000 0 0 0

Page 9

Page 58: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County: Benton

Agency: Benton Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

07 BCO2015-21 04 2.360 CE No 14.14 16.50 1,475,000

SELLARDS RD Phase II: 2 miles East of SR 221 to 1/2 mile East of Tyacke

Surface and road side rehabilitation.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 0 0 1,400,000 1,400,000

Project Totals 0 0 1,400,000 1,400,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 700,000 700,000 0 0 0

Totals 700,000 700,000 0 0 0

Page 10

Page 59: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County: Benton

Agency: Benton Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

07 BCO2015-20 04 2.650 CE No 16.50 19.15 1,475,000

SELLARDS RD Phase III: 1/2 mile East of Tyacke to Travis

Surface and road side rehabilitation.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 0 0 75,000 75,000

CN 2018 0 0 1,400,000 1,400,000

Project Totals 0 0 1,475,000 1,475,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 75,000 0 0 0 0

CN 0 1,400,000 0 0 0

Totals 75,000 1,400,000 0 0 0

Page 11

Page 60: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County: Benton

Agency: Benton Co.

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

08 BCO2015-24 04 2.000 CE No 0.00 2.00 1,000,000

TYRELL RD Ph. II: Travis Road to 2 miles West of Plymouth Road

Total road way reconstruction with HMA surfacing and a roadway structure rebuilt to an all weather standard.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalPE 2017 0 0 100,000 100,000

CN 2017 0 0 900,000 900,000

Project Totals 0 0 1,000,000 1,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 1,000,000 0 0 0 0

Totals 1,000,000 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Benton Co. 0 3,020,000 5,861,000 8,881,000

Page 12

Page 61: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County: Franklin

Agency: Connell

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

07 WA-00684 05 1.850 CE No SR 260 SR 395 250,000

Columbia Ave Chip Seal

Columbia Ave from SR 260 to SR 395. Chip Seal.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 0 TIB 225,000 0 225,000

Project Totals 0 225,000 0 225,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 250,000 0 0 0 0

Totals 250,000 0 0 0 0

Page 13

Page 62: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Washington State S. T. I. P.

2017 to 2020

(Project Funds to Nearest Dollar)

MPO/RTPO: BFCG N Inside Y Outside October 4, 2016

County: Franklin

Agency: Connell

FuncCls

ProjectNumber PIN STIP ID

ImpType

TotalProjectLength Environmental

TypeRWRequired

BeginTermini

EndTermini

Total Est. Cost of Project

STIPAmend.No.

16 WA-00688 05 No City Limit City Limit 35,000

Street Preservation Program

Overlays, seals,ETC.

Funding

Phase Start Date Federal Fund CodeFederal Funds

State Fund Code State Funds Local Funds TotalCN 2017 0 0 35,000 35,000

Project Totals 0 0 35,000 35,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 35,000 0 0 0 0

Totals 35,000 0 0 0 0

Federal FundsState Funds Local Funds Total

Agency Totals for Connell 0 225,000 35,000 260,000

Page 14

Page 63: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Appendix H - Planned Projects 2017-2022

Page 64: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 9 BCO2014-03 07/02/13 07/02/13 2013 519 01 C G P T 0.700 CE Yes

WILLAMETTE HEIGHTS - S. 38th AVE. (W. Rich. Limits to W. Rich. Limits

S. 38th Ave.

W. Rich. City Limits to W. Rich. City Limits

New construction in the vicinity of the Willamette Heights subdivision, S 38th Ave.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 290,000 290,000

P RW 2017 0 0 10,000 10,000

P CN 2019 STP(U) 983,000 0 0 983,000

Totals 983,000 0 300,000 1,283,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 290,000 0 0 0 0

RW 10,000 0 0 0 0

CN 0 0 983,000 0 0

Totals 300,000 0 983,000 0 0

Report Date: October 04, 2016 Page 1

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 65: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 9 BCO2014-04 07/02/13 07/02/13 2013 519 01 C G P T 0.100 CE Yes

WILLAMETTE HEIGHTS-MT.ADAMS VIEW (S. 38th Ave East to W.Rich.Limits)

Mt. Adams View Rd.

S. 38th Ave. East to W. Richland City Limits

New construction in the vicinity of the Willamette Heights subdivision, Mt Adams View.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 15,000 15,000

P RW 2017 0 0 5,000 5,000

P CN 2017 0 0 180,000 180,000

Totals 0 0 200,000 200,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 15,000 0 0 0 0

RW 5,000 0 0 0 0

CN 180,000 0 0 0 0

Totals 200,000 0 0 0 0

Report Date: October 04, 2016 Page 2

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 66: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 17 BCO2016-01 07/28/15 07/28/15 01 C G P T 0.500 CE Yes

DAGUE RD: Terril to Game Farm

Dague Rd

Terril Rd to Game Farm Rd

Proposed new roadway to be built to an all weather standard.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2022 0 0 25,000 25,000

P RW 2022 0 0 10,000 10,000

P CN 2022 0 0 215,000 215,000

Totals 0 0 250,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 25,000

RW 0 0 0 0 10,000

CN 0 0 0 0 215,000

Totals 0 0 0 0 250,000

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Benton Co. 983,000 0 750,000 1,733,000

Report Date: October 04, 2016 Page 3

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 67: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 3 / E112(002) WA-00157 06/29/16 06/29/16 2016-260 11 P T W 0.100 CE No

Taylor Flats Bridge #903-3.46 Widening

Taylor Flats Road

Milepost 3.41 to Milepost 3.51

The project consits of widening a functionally obsolete bridge to meet current standards.

903-3.46

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2017 STP(UL) 50,000 0 7,803 57,803

P CN 2017 0 CRAB 516,000 129,000 645,000

Totals 50,000 516,000 136,803 702,803

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 181,000 0 0 0 0

CN 0 545,000 0 0 0

Totals 181,000 545,000 0 0 0

Report Date: October 04, 2016 Page 4

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 68: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 7 WA-01011 06/29/16 06/29/16 2016-260 18 CE No

Dent Road and Burns Road Corridor Study

to

A study for transportation needs along the Dent Road and Burns Road corridor.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2019 0 0 75,000 75,000

Totals 0 0 75,000 75,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 75,000 0 0

Totals 0 0 75,000 0 0

Report Date: October 04, 2016 Page 5

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 69: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 14 WA-06282 06/29/16 06/29/16 2016-260 04 P T W 1.040 CE No

Dent Road Widening

10050

MP 2.19 to Burns Road

Widen existing county road to accommodate additional traffic from recent development.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 STP(U) 12,975 0 2,025 15,000

P RW 2020 STP(U) 12,975 0 2,025 15,000

P CN 2020 STP(U) 103,800 0 16,200 120,000

Totals 129,750 0 20,250 150,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 15,000 0

RW 0 0 0 15,000 0

CN 0 0 0 120,000 0

Totals 0 0 0 150,000 0

Report Date: October 04, 2016 Page 6

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 70: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 16 WA-01308 06/29/16 06/29/16 2016-260 04 P T W CE Yes

Dent Road/Road 68/Taylor Flats Road/Clark Road Intersection

Various Roads

Intersection Project to Intersection Project

Re-design and construct a new intersection for all five (5) legs.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 STP(U) 865,000 0 135,000 1,000,000

Totals 865,000 0 135,000 1,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 1,000,000

Totals 0 0 0 0 1,000,000

Report Date: October 04, 2016 Page 7

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 71: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 22 WA-09037 06/29/16 06/29/16 2016-260 04 P T W 3.370 CE No

Taylor Flats Overlay and Widening I

09030

0.09 City Limits to 3.46 Taylor Flats Bridge

Reconstruct and resurface to an all-weather standard.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 STP(U) 2,162,500 0 337,500 2,500,000

Totals 2,162,500 0 337,500 2,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 2,500,000

Totals 0 0 0 0 2,500,000

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Franklin Co. 3,207,250 516,000 704,553 4,427,803

Report Date: October 04, 2016 Page 8

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 72: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 kenn25 06/21/16 06/21/16 16-13 04 C G O P S T W

0.440 CE Yes

10th Avenue Reconstruction

10th Avenue

Clearwater Avenue to Steptoe Street (Clodfelter)

Street reconstruction - one travel lane each direction & TWLTL. Curb, gutter, sidewalk, storm drainage and illumination. Clearwater widening for left turn storage.Roundabout or Traffic Signal @ Clearwater & 10th Avenue

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 209,000 209,000

P RW 2017 0 0 200,000 200,000

P CN 2018 0 0 2,146,000 2,146,000

Totals 0 0 2,555,000 2,555,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 209,000 0 0 0 0

RW 200,000 0 0 0 0

CN 0 2,146,000 0 0 0

Totals 409,000 2,146,000 0 0 0

Report Date: October 04, 2016 Page 9

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 73: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 kenn9 06/21/16 06/21/16 16-13 04 C G O P S T W

0.810 CE No

10th Avenue Widening

Montana to Columbia Center Blvd.

Widening south side of the 10th Avenue. Bike lane, curb, gutter, illumination, sidewalk, center turn-lane, HMA Overlay of existing.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 TIB 96,000 64,000 160,000

P CN 2018 0 TIB 1,551,000 1,034,000 2,585,000

Totals 0 1,647,000 1,098,000 2,745,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 160,000 0 0 0 0

CN 0 2,585,000 0 0 0

Totals 160,000 2,585,000 0 0 0

Report Date: October 04, 2016 Page 10

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 74: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 kenn38 06/21/16 06/21/16 16-13 04 C G O P S T W

1.000 DCE Yes

45th Avenue Widening

Ely Street to Olympia Street

Reconstruction: roadway, curb, gutter, sidewalks, illumination, storm drainage, replace AC water lines, traffic control devices, channelization, signage. Project includes curb, gutter & sidewalk construction on one side of Ely Street from 45th to KID Canal.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 335,000 335,000

P RW 2020 0 0 150,000 150,000

P CN 2021 0 0 3,550,000 3,550,000

Totals 0 0 4,035,000 4,035,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 335,000 0

RW 0 0 0 150,000 0

CN 0 0 0 0 3,550,000

Totals 0 0 0 485,000 3,550,000

Report Date: October 04, 2016 Page 11

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 75: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 Kenn62 06/21/16 06/21/16 16-13 21 C G O P S T W

0.100 CE No

Amistad Elementary School Crossing Improvements

Kennewick Avenue

Ione Street to Intersection project

Install Rectangular Rapid Flash Beacon and associated signage.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 SRTS 8,000 0 8,000

P CN 2018 0 SRTS 76,750 0 76,750

Totals 0 84,750 0 84,750

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 8,000 0 0 0 0

CN 0 76,750 0 0 0

Totals 8,000 76,750 0 0 0

Report Date: October 04, 2016 Page 12

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 76: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 kenn5 06/21/16 06/21/16 16-13 01 C G P S T W

2.010 CE Yes

Bob Olson Parkway

City Limits (Sec. 7 T8N 29E) to Sherman Street

New road construction - 2 travel lanes in each direction, medians, curb & gutter, sidewalk.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2017 0 0 4,310,000 4,310,000

Totals 0 0 4,310,000 4,310,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 4,310,000 0 0 0 0

Totals 4,310,000 0 0 0 0

Report Date: October 04, 2016 Page 13

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 77: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 kenn50 06/21/16 06/21/16 16-13 21 C G P S T W

0.240 DCE Yes

Canal Drive & Edison Street Intersection Improvements

Canal Drive

Intersection Canal Dr. to and Edison Street

Roadway and storage lanes for turning motions, channelization modifications, access reconstructions sidewalk improvements, frontage improvements, signal modification, APS and ADA improvements.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 138,000 138,000

P RW 2019 0 0 150,000 150,000

P CN 2020 0 0 1,137,000 1,137,000

Totals 0 0 1,425,000 1,425,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 138,000 0 0

RW 0 0 150,000 0 0

CN 0 0 0 1,137,000 0

Totals 0 0 288,000 1,137,000 0

Report Date: October 04, 2016 Page 14

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 78: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 kenn16 06/21/16 06/21/16 16-13 28 O 0.550 CE No

Canal Drive Sidewalks

Canal Drive

US 395 to Hartford Street

Construct new sidewalks. Minor widening & curb construction.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2021 0 TIB 14,000 4,000 18,000

P CN 2021 0 TIB 186,000 46,000 232,000

Totals 0 200,000 50,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 18,000

CN 0 0 0 0 232,000

Totals 0 0 0 0 250,000

Report Date: October 04, 2016 Page 15

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 79: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 Kenn61 06/21/16 06/21/16 16-13 21 C G O P S T W

0.730 DCE Yes

Cascade Elementary School Sidewalk

Lyle Street to Cascade Street

Construct approximately 3,700 linear feet of new curb, gutter and sidewalk from Lyle Street to Cascade Street. Project includes a crossing of Highland Drive with a pedestrian activated Rectangular Rapid Flash Beacon (RRFB).

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 SRTS 40,000 0 40,000

P RW 2018 0 SRTS 406,000 0 406,000

P CN 2019 0 SRTS 360,000 80,000 440,000

Totals 0 806,000 80,000 886,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 40,000 0 0 0 0

RW 0 406,000 0 0 0

CN 0 0 440,000 0 0

Totals 40,000 406,000 440,000 0 0

Report Date: October 04, 2016 Page 16

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 80: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 kenn12 06/21/16 06/21/16 16-13 04 C G P S T W

1.370 CE Yes

Cascade Street

W. 45th Avenue to 27th and Washington

City standard street, curb, gutter, sidewalk, illumination, storm drainage. Includes new construction from Highland Drive to 45th Avenue. Also, roundabouts at 45th & Cascade, 27th and Washington and Cascade and Highland.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2021 0 0 485,000 485,000

P RW 2021 0 0 346,000 346,000

P CN 2022 0 0 5,539,000 5,539,000

Totals 0 0 6,370,000 6,370,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 485,000

RW 0 0 0 0 346,000

CN 0 0 0 0 5,539,000

Totals 0 0 0 0 6,370,000

Report Date: October 04, 2016 Page 17

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 81: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 kenn24 06/21/16 06/21/16 16-13 21 W 0.100 CE Yes

Center Parkway & Deschutes Ave. Roundabout

Center Parkway to Deschutes Avenue

Construction of a small diameter roundabout at Center Parkway and Deschutes Avenue.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 0 40,000 40,000

P RW 2018 0 0 50,000 50,000

P CN 2019 0 0 310,000 310,000

Totals 0 0 400,000 400,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 40,000 0 0 0

RW 0 50,000 0 0 0

CN 0 0 310,000 0 0

Totals 0 90,000 310,000 0 0

Report Date: October 04, 2016 Page 18

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 82: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 kenn37 06/21/16 06/21/16 16-13 04 P S T W 0.570 DCE Yes

Center Parkway Interchange

Intersection of Steptoe to 1-82

On/off ramps to a structure constructed under a separate project, traffic control devices, channelization, signage.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 2,120,000 2,120,000

P RW 2020 0 0 100,000 100,000

P CN 2021 0 0 6,490,000 6,490,000

Totals 0 0 8,710,000 8,710,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 2,120,000 0

RW 0 0 0 100,000 0

CN 0 0 0 0 6,490,000

Totals 0 0 0 2,220,000 6,490,000

Report Date: October 04, 2016 Page 19

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 83: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 kenn46 06/21/16 06/21/16 16-13 05 S T W 25.000 DCE No

City Arterial Pavement Preservation

City Wide to City Wide

Infrastructure preservation on city arterials.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 100,000 100,000

P CN 2017 0 0 1,300,000 1,300,000

Totals 0 0 1,400,000 1,400,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 100,000 0 0 0 0

CN 1,400,000 0 0 0 0

Totals 1,500,000 0 0 0 0

Report Date: October 04, 2016 Page 20

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 84: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 kenn47 06/21/16 06/21/16 16-13 04 C G P T W 0.100 DCE No

Clearwater Avenue - Utah Street Intersection Improvement

Intersection Clearwater to and Utah Street

Construct widening for right turn lane, modify permanent pavement markings, permanent traffic control signing, and storm drainage modifications.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 21,000 21,000

P CN 2020 0 0 188,000 188,000

Totals 0 0 209,000 209,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 21,000 0 0

CN 0 0 0 188,000 0

Totals 0 0 21,000 188,000 0

Report Date: October 04, 2016 Page 21

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 85: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 kenn55 06/21/16 06/21/16 16-13 04 C G O P S T W

0.100 CE Yes

Clearwater/Kellogg Intersection Improvements

intersection to intersection

Construct additional storage lanes for increased turning motions. Signal modifications. Channelization

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 90,800 90,800

P RW 2019 0 0 99,000 99,000

P CN 2020 0 0 835,200 835,200

Totals 0 0 1,025,000 1,025,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 90,800 0 0

RW 0 0 99,000 0 0

CN 0 0 0 835,200 0

Totals 0 0 189,800 835,200 0

Report Date: October 04, 2016 Page 22

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 86: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-07765 06/21/16 06/21/16 16-13 03 C G O P S T W

0.750 CE Yes

Columbia Center Boulevard Widening

Quinault Avenue to Deschutes Avenue

Street reconstruction and widening. Construct an additional travel lane in each direction, curb & gutter, sidewalk, storm drainage, illumination, signal modifications.

kenn18

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 717,000 717,000

P RW 2020 0 0 700,000 700,000

P CN 2021 0 0 5,243,000 5,243,000

Totals 0 0 6,660,000 6,660,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 717,000 0 0

RW 0 0 0 700,000 0

CN 0 0 0 0 5,243,000

Totals 0 0 717,000 700,000 5,243,000

Report Date: October 04, 2016 Page 23

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 87: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 kenn14 06/21/16 06/21/16 16-13 31 O 1.500 CE No

Columbia Overlook - Phase 2

Canal Drive

Neel Street to US 395

Install concrete sidewalk on north side of roadway. Irrigation system installation and landscaped linear park. Requires agreement with BNSF Railway.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 0 76,000 76,000

P CN 2019 TAP(UL) 598,580 0 93,420 692,000

Totals 598,580 0 169,420 768,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 76,000 0 0 0

CN 0 0 692,000 0 0

Totals 0 76,000 692,000 0 0

Report Date: October 04, 2016 Page 24

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 88: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 kenn17 06/21/16 06/21/16 16-13 28 O 0.200 CE No

E. 10th Avenue Sidewalks

E. 10th Avenue

SR 397 to Oak Street

Construction of new sidewalks.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 TIB 14,000 4,000 18,000

P CN 2017 0 TIB 186,000 46,000 232,000

Totals 0 200,000 50,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 18,000 0 0 0 0

CN 232,000 0 0 0 0

Totals 250,000 0 0 0 0

Report Date: October 04, 2016 Page 25

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 89: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 Kenn63 06/21/16 06/21/16 16-13 28 C G O P S T W

0.360 DCE No

East Columbia Park Bicycle Improvements – Phase 2

Columbia Park Trail

SR240 entrance to 1900 feet west

The project will construct pavement widening for dedicated bicycle lanes. The project includes permanent pavement markings and signage.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 Ped/Bike Program 25,000 3,000 28,000

P CN 2018 0 Ped/Bike Program 181,800 18,200 200,000

Totals 0 206,800 21,200 228,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 28,000 0 0 0 0

CN 0 200,000 0 0 0

Totals 28,000 200,000 0 0 0

Report Date: October 04, 2016 Page 26

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 90: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 Kenn60 06/21/16 06/21/16 16-13 21 C G O P S T W

0.080 CE No

Hawthorne Elementary School Crossing Improvements

Neel Street

John Day Avenue to 400 feet north

Construct a new crossing at the intersection of Neel & John Day, construct a median refuge at the existing crossing at mid-block,extend the school zone on Neel Street to encompass both crosswalks, install RRFB at both crossings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 SRTS 16,500 0 16,500

P CN 2018 0 SRTS 157,850 0 157,850

Totals 0 174,350 0 174,350

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 16,500 0 0 0 0

CN 0 157,850 0 0 0

Totals 16,500 157,850 0 0 0

Report Date: October 04, 2016 Page 27

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 91: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 kenn13 06/21/16 06/21/16 16-13 04 C G O P S T W

0.530 CE Yes

Kennewick Avenue Widening

Kennewick Avenue

Union Street to Morain Street

Reconstruction and widening. Curb, gutter, sidewalk, storm drainage & illumination.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 190,000 190,000

P RW 2021 0 0 180,000 180,000

P CN 2022 0 0 1,866,000 1,866,000

Totals 0 0 2,236,000 2,236,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 190,000 0

RW 0 0 0 0 180,000

CN 0 0 0 0 1,866,000

Totals 0 0 0 190,000 2,046,000

Report Date: October 04, 2016 Page 28

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 92: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 / 3532(001) kenn20 06/21/16 06/21/16 16-13 04 C G O P S T W

0.570 CE Yes

Metaline Avenue Widening

Metaline Avenue

Kellogg Street to Edison Street

Reconstruction and widening. Curb, gutter, sidewalk, storm drainage and illumination.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2017 STP(UL) 1,351,130 0 210,870 1,562,000

Totals 1,351,130 0 210,870 1,562,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 1,562,000 0 0 0 0

Totals 1,562,000 0 0 0 0

Report Date: October 04, 2016 Page 29

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 93: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 kenn41 06/21/16 06/21/16 16-13 04 C G O P S T W

1.090 DCE Yes

Montana Street Extension

10th Avenue to Ridgeline Drive

New construction: roadway, curb, gutter, sidewalks, illumination, storm drainage, traffic control devices, channelizatin, signage.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 693,600 693,600

P RW 2019 0 0 455,000 455,000

P CN 2020 0 0 5,541,400 5,541,400

Totals 0 0 6,690,000 6,690,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 693,600 0 0

RW 0 0 455,000 0 0

CN 0 0 0 5,541,400 0

Totals 0 0 1,148,600 5,541,400 0

Report Date: October 04, 2016 Page 30

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 94: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 kenn40 06/21/16 06/21/16 16-13 04 C G O P S T W

0.510 DCE Yes

Morain Street Extension

10th Avenue to 19th Avenue

New construction: roadway, curb, gutter, sidewalks, illumination, storm drainage, traffic control devices, channelization, signage. Kennewick Irrigation District (KID) Bridge/Culvert.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2021 0 0 206,000 206,000

P RW 2021 0 0 440,000 440,000

P CN 2022 0 0 1,779,000 1,779,000

Totals 0 0 2,425,000 2,425,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 206,000

RW 0 0 0 0 440,000

CN 0 0 0 0 1,779,000

Totals 0 0 0 0 2,425,000

Report Date: October 04, 2016 Page 31

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 95: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 kenn28 06/21/16 06/21/16 16-13 04 C G O P S W

1.250 DCE Yes

Ridgeline Drive Extension Phase 3

Center Parkway to Sherman Street

New alignment, gutter, sidewalks, illumination, storm drainage and controlled intersection. Right-of-way by developer donation.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 290,000 290,000

P CN 2020 0 0 3,340,000 3,340,000

Totals 0 0 3,630,000 3,630,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 290,000 0 0

CN 0 0 0 3,340,000 0

Totals 0 0 290,000 3,340,000 0

Report Date: October 04, 2016 Page 32

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 96: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 kenn27 06/21/16 06/21/16 16-13 01 C G O P S T W

1.250 EA Yes

Ridgeline Drive Extension Phase 4

Ridgeline Drive

Clodfelter Rd. to Center Parkway

New alignment. Curb, gutter, sidewalk, storm drainage, illumination and controlled intersection. Right-of-way by developer donation.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 463,000 463,000

P CN 2020 0 0 5,237,000 5,237,000

Totals 0 0 5,700,000 5,700,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 463,000 0 0

CN 0 0 0 5,237,000 0

Totals 0 0 463,000 5,237,000 0

Report Date: October 04, 2016 Page 33

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 97: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 kenn32 06/21/16 06/21/16 16-13 03 C G O P S T W

0.530 DCE Yes

Ridgeline Drive Reconstruction

Southridge Blvd. to Sherman St.

Reconstruct roadway, curb, gutter, sidewalks, illumination, storm drainage, traffic control devices, channelization, signage.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 178,400 178,400

P CN 2018 0 0 2,061,600 2,061,600

Totals 0 0 2,240,000 2,240,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 178,400 0 0 0 0

CN 0 2,061,600 0 0 0

Totals 178,400 2,061,600 0 0 0

Report Date: October 04, 2016 Page 34

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 98: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 kenn29 06/21/16 06/21/16 16-13 04 C G O P S W

0.300 DCE Yes

Sherman Street

Ridgeline Drive to Bob Olson Parkway

Reconstruction, curb, gutter, sidewalk, illumination and intersection control. Right-of-way by developer donation.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 0 262,100 262,100

P CN 2019 0 0 2,364,900 2,364,900

Totals 0 0 2,627,000 2,627,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 262,100 0 0 0

CN 0 0 2,364,900 0 0

Totals 0 262,100 2,364,900 0 0

Report Date: October 04, 2016 Page 35

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 99: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 kenn10 06/21/16 06/21/16 16-13 01 C G O P S T W

0.380 CE Yes

Southridge Center Parkway Extension

Bob Olson Parkway to Ridgeline Drive

New construction. City standard street, curb, gutter, sidewalk, illumination. Roundabouts at Bob Olson Parkway and Ridgeline Drive.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 303,000 303,000

P RW 2020 0 0 375,000 375,000

P CN 2021 0 0 2,152,000 2,152,000

Totals 0 0 2,830,000 2,830,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 303,000 0 0

RW 0 0 0 375,000 0

CN 0 0 0 0 2,152,000

Totals 0 0 303,000 375,000 2,152,000

Report Date: October 04, 2016 Page 36

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 100: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 WA-07764 06/21/16 06/21/16 16-13 01 C G O P S T W

0.280 CE Yes

Southridge/UGA Center Parkway Extension

Ridgeline to I-82

New construction. City standard street, curb, gutter, sidewalk, illumination. Grade separation @ I-82. Access to I-82 will be a separate project. Interchange justification report.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 1,156,000 1,156,000

P CN 2021 0 0 10,159,000 10,159,000

Totals 0 0 11,315,000 11,315,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 1,156,000 0 0

CN 0 0 0 0 10,159,000

Totals 0 0 1,156,000 0 10,159,000

Report Date: October 04, 2016 Page 37

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 101: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 Kenn64 06/21/16 06/21/16 16-13 28 C G O P S T W

0.620 DCE No

Spirit of America Trail – 15th to 27th

Spirit of America Trail

15th Avenue to 27th Avenue

The project will construct a 12-foot wide shared use (ped/bike) facility. The project includes paving the staging/parking area at the south termini, pavement markings and signage.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 Ped/Bike Program 45,000 5,000 50,000

P CN 2018 0 Ped/Bike Program 180,000 20,000 200,000

Totals 0 225,000 25,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

CN 0 200,000 0 0 0

Totals 50,000 200,000 0 0 0

Report Date: October 04, 2016 Page 38

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 102: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

12 kenn6 06/21/16 06/21/16 16-13 04 C G P S T W

0.250 CE No

US395/Ridgeline Drive Intersection Improvements

Ridgeline Drive to US395 Intersection

Construction of a grade separated intersection at US395 and Ridgeline Drive. Includes improvements on SR395. Prior PE $786,000

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 2,000,000 2,000,000

P CN 2019 0 0 4,000,000 4,000,000

S CN 2021 0 CWA 15,000,000 0 15,000,000

Totals 0 15,000,000 6,000,000 21,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 2,000,000 0 0 0 0

CN 0 0 4,000,000 15,000,000 0

Totals 2,000,000 0 4,000,000 15,000,000 0

Report Date: October 04, 2016 Page 39

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 103: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 Kenn31 06/21/16 06/21/16 16-13 21 C G O P S T W

0.100 CE No

Washington Elementary School Crossing Improvements

Intersection to Intersection

Install rectangular rapid flash beacon and associated signage and channelization

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 SRTS 5,500 0 5,500

P CN 2018 0 SRTS 51,800 0 51,800

Totals 0 57,300 0 57,300

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 5,500 0 0 0 0

CN 0 51,800 0 0 0

Totals 5,500 51,800 0 0 0

Report Date: October 04, 2016 Page 40

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 104: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 Kenn65 06/21/16 06/21/16 16-13 28 C G O P S T W

0.100 CE No

Washington Street/6th Avenue Pedestrian Safety Improvements

Washington Street

6th Avenue to Intersection

The project will install a pedestrian activated rectangular rapid flash beacon (RRFB) to improve recognition and warning,especially for southbound. Construction of a center median to provide a pedestrian shelter at the mid-point of the crossing and existing curb ramps reconstructed to current ADA standards. Crosswalk blocks will be installed to define the safe walking route;Washington Street channelization will be removed and reinstalled to utilize the existing width to the fullest advantage (lanes will be narrowed to provide traffic calming through the intersection).

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 Ped/Bike Program 45,000 5,000 50,000

P CN 2018 0 Ped/Bike Program 180,000 20,000 200,000

Totals 0 225,000 25,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

CN 0 20,000 0 0 0

Totals 50,000 20,000 0 0 0

Report Date: October 04, 2016 Page 41

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 105: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Kennewick

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 kenn4 06/21/16 06/21/16 16-13 01 C P S T W 1.000 CE Yes

Zintel Way/Ridgeline Drive/Bofer Canyon

Zintel Way to US 395

Zintel Way new street construction - Ridgeline Drive reconstruction - Bofer Canyon realignment. All roadways - sidewalks, curb and gutter, illumination, storm drainage, roundabout. (Right-of-way by developer donation).

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2021 0 0 2,405,000 2,405,000

Totals 0 0 2,405,000 2,405,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 0 0 0 2,405,000

Totals 0 0 0 0 2,405,000

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Kennewick 1,949,710 18,826,200 86,926,490 107,702,400

Report Date: October 04, 2016 Page 42

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 106: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

12 WA-04357 01 C G O P S T W

1.000 EIS Yes

A St & US 12 Interchange

A Street

A Street to US 12

New Interchange at US-12 between "A" Street and Sacajawea Road. WSDOT will be the lead on this project. The interchange will help with economic development of the industrial area.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2021 0 0 3,000,000 3,000,000

Totals 0 0 3,000,000 3,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 0 0 0 3,000,000

Totals 0 0 0 0 3,000,000

Report Date: October 04, 2016 Page 43

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 107: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 WA-04347 05 1.000 CE No

Annual Alley Hard Surface Maintenance & Preservation

Various

various to various

The alleyway hard surface maintenance and preservation program is expected to improve accessibility in alleyways by providing maintenance to existing alleyways. The program consists in the application some hard surface treatment to existing alleyways to prolong their life. The areas subject to this program will rotate to assure all alleyways are preserved.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2017 0 0 180,000 180,000

P CN 2018 0 0 100,000 100,000

P CN 2019 0 0 100,000 100,000

P CN 2020 0 0 100,000 100,000

P CN 2021 0 0 100,000 100,000

P CN 2022 0 0 100,000 100,000

Totals 0 0 680,000 680,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 180,000 100,000 100,000 100,000 200,000

Totals 180,000 100,000 100,000 100,000 200,000

Report Date: October 04, 2016 Page 44

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 108: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-08131 05 No

Annual Pavement Preservation Program

various locations

various to various

This program includes all pavement preservation activities such as Crack seal, Overlays and Micro-surfacing throughout the city

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2017 0 0 750,000 750,000

P CN 2018 0 0 750,000 750,000

P CN 2019 0 0 750,000 750,000

P CN 2020 0 0 750,000 750,000

P CN 2021 0 0 750,000 750,000

P CN 2022 0 0 750,000 750,000

Totals 0 0 4,500,000 4,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 750,000 750,000 750,000 750,000 1,500,000

Totals 750,000 750,000 750,000 750,000 1,500,000

Report Date: October 04, 2016 Page 45

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 109: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 WA-04363 44 0.100 CE No

Burden & Road 60 (Signal)

Burden Blvd

Buden Blvd to Road 60

This project will upgrade the intersection at Burden & Road 60 to a signalized intersection.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 30,000 30,000

Totals 0 0 30,000 30,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 30,000 0 0 0 0

Totals 30,000 0 0 0 0

Report Date: October 04, 2016 Page 46

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 110: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-08132 01 P S T W 1.000 CE No

Burns Road (Road 52 to Pasco City Limits)

Burns Road

Road 52 to City Limits

Extension of Burns Road from Road 52 to City Limits

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 250,000 250,000

Totals 0 0 250,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 250,000 0 0 0 0

Totals 250,000 0 0 0 0

Report Date: October 04, 2016 Page 47

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 111: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-08149 01 0.500 No

Burns Road (Road 68 to Convention Dr)

Burns Road

Road 68 to Convention Dr

Extension of Burns Rd from Rd 68 to Convention Dr.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 100,000 100,000

P RW 2017 0 0 100,000 100,000

Totals 0 0 200,000 200,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 100,000 0 0 0 0

RW 100,000 0 0 0 0

Totals 200,000 0 0 0 0

Report Date: October 04, 2016 Page 48

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 112: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 WA-06311 01 C G O P S T W

1.000 CE No

Chapel Hill Extension

Chapel Hill Blvd.

Road 68 to Road 84

Extension of Chapel Hill Blvd. from Road 68 to Road 84. The road section will match the existing Chapel Hill Blvd width at Road 84. The project will include the necessary signal improvements at the intersection of Road 68 and Chapel Hill Blvd.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2017 0 0 300,000 300,000

P CN 2019 STP(UL) 1,178,995 0 184,005 1,363,000

Totals 1,178,995 0 484,005 1,663,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 300,000 0 0 0 0

CN 0 0 1,363,000 0 0

Totals 300,000 0 1,363,000 0 0

Report Date: October 04, 2016 Page 49

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 113: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-08141 04 0.650 No

Downtown Street Circulation

Lewis Street

various to various

This project will improve the street networking to provide multi-modal access and downtown revitalization.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 STP(UL) 200,000 0 300,000 500,000

P CN 2019 STP(UL) 1,000,000 0 1,000,000 2,000,000

Totals 1,200,000 0 1,300,000 2,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 500,000 0 0

CN 0 0 2,000,000 0 0

Totals 0 0 2,500,000 0 0

Report Date: October 04, 2016 Page 50

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 114: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-04356 01 C G O P S T W

1.000 EIS Yes

Foster Wells / US 395 Interchange

Foster Wells

Foster Wells to US395

Install interchange at Foster Wells Road and US-395.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2021 STP(UL) 500,000 0 0 500,000

Totals 500,000 0 0 500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 500,000

Totals 0 0 0 0 500,000

Report Date: October 04, 2016 Page 51

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 115: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 WA-04361 44 0.100 CE No

Madison Avenue & Burden Blvd Signal (Design and Construction)

Madison Ave

Madison Ave to Burden Blvd

Intersection of Road 44 and Burden Blvd - Install traffic signal at the intersection of Madison Ave and Burden Blvd.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 15,000 15,000

P CN 2020 0 0 175,000 175,000

Totals 0 0 190,000 190,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 15,000

CN 0 0 0 0 175,000

Totals 0 0 0 0 190,000

Report Date: October 04, 2016 Page 52

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 116: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 / 0397(008) WA-04106 03 C G O P S T W

1.700 CE Yes

Oregon Avenue (SR397) Corridor Project - Phase 1

Oregon Avenue

"A" Street to I-182/US 12

The project will upgrade the existing Oregon Avenue corridor between the I-182/US 12 Interchange and "A" Street to provide safety, access management and mobility improvements. The project consists of pavement widening, installation of median/curbing in select locations; restriping to create left turn lanes at intersections and two-way left-turn lane between intersections. Installation of sidewalks and installation/ upgrade of curb and gutter, driveways and ADA ramps to meet standards, stormwater infrastructure, illumination and streetscaping. Traffic signals will be added at the intersections of Oregon Ave (SR 397) and Idaho Avenue, E. Salt Lake Street and Broadway St.Existing traffic signals will be updated at the intersection of Oregon Avenue and Lewis Street and 'A' Street.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2017 HSIP 848,000 TIB 4,230,000 0 5,078,000

P CN 2017 0 0 2,400,000 2,400,000

Totals 848,000 4,230,000 2,400,000 7,478,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 7,478,000 0 0 0 0

Totals 7,478,000 0 0 0 0

Report Date: October 04, 2016 Page 53

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 117: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-04364 44 C G O P S T W

0.100 CE No

Pedestrian Walkway on Road 68 Overpass

Road 68

I-182 to Road 68

This project will widen the existing Road 68 overpass to accommodate a pedestrian walkway.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2021 0 0 138,375 138,375

P CN 2021 STP(UL) 886,625 0 0 886,625

Totals 886,625 0 138,375 1,025,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 138,375

CN 0 0 0 0 886,625

Totals 0 0 0 0 1,025,000

Report Date: October 04, 2016 Page 54

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 118: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-08142 04 No

Pedestrian Walkway on Sylvester Street Overpass

Sylvester St

28th Ave to 32nd Ave

Provide a pedestrian walkway at the Sylvester Street overpass at US 395 to allow for safe pedestrian crossing.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 TIB 232,500 67,500 300,000

P CN 2018 HSIP 1,000,000 TIB 200,000 0 1,200,000

Totals 1,000,000 432,500 67,500 1,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 300,000 0 0 0

CN 0 1,200,000 0 0 0

Totals 0 1,500,000 0 0 0

Report Date: October 04, 2016 Page 55

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 119: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

02 WA-06942 03 C G O P T W

0.500 CE No

Road 68 Triple Right

Road 68

Road 68 to Interchange

This project will add a triple right turn at Road 68 and interchange for westbound I-182 to northbound Road 68.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 350,000 350,000

P CN 2017 STP 302,750 0 47,250 350,000

Totals 302,750 0 397,250 700,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 350,000 0 0 0 0

CN 350,000 0 0 0 0

Totals 700,000 0 0 0 0

Report Date: October 04, 2016 Page 56

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 120: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 WA-06309 03 C G O P S T W

1.000 CE Yes

Road 68 Widening - South

Road 68

Argent Road to South I-182

Widening Road 68 from Argent to I-182; increasing to two travel lanes in each direction, center turning movement with total of 5 lanes. Sidewalks will be installed on both sides, street lights and landscaping.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 100,000 100,000

P RW 2019 0 0 40,000 40,000

P CN 2020 STP(UL) 519,000 0 81,000 600,000

Totals 519,000 0 221,000 740,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 100,000 0 0

RW 0 0 40,000 0 0

CN 0 0 0 600,000 0

Totals 0 0 140,000 600,000 0

Report Date: October 04, 2016 Page 57

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 121: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 WA-04362 03 G O P S T 0.050 EA Yes

Sandifur (Convention to Road 68)

Sandifur Parkway

Convention to Road 68

This project will widen the existing roadway to the equivalent of a five lane section to accommodate future growth and traffic impacts. It will include curb and gutter, sidewalks, illumination and landscaping.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 50,000 50,000

P RW 2019 0 0 35,000 35,000

P CN 2020 STP(UL) 216,250 0 33,750 250,000

Totals 216,250 0 118,750 335,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

RW 0 0 0 35,000 0

CN 0 0 0 0 250,000

Totals 50,000 0 0 35,000 250,000

Report Date: October 04, 2016 Page 58

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 122: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 8 / 3522(001) WA-01693 06/20/11 06/20/11 3323 03 C G O P S T W

1.240 CE Yes

Argent Road Widening

Argent Road

20th Avenue to Road 36

The project consists of widening the existing 3 lane roadway to 5 lanes as part of mobility improvement for this corridor, which will accommodate future traffic needs including Columbia Basin College traffic and commercial development for Port of Pasco. The project also includes installation of a new traffic signal at 36th Avenue and Argent Road, as well as modifications/upgrades to existing traffic signals at Varney Lane/Saraceno Way and 20th Avenue intersections.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2018 STP(UL) 350,000 0 54,624 404,624

P CN 2018 0 0 4,095,376 4,095,376

Totals 350,000 0 4,150,000 4,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 4,500,000 0 0 0

Totals 0 4,500,000 0 0 0

Report Date: October 04, 2016 Page 59

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 123: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 15 WA-01699 06/20/11 06/20/11 3323 03 C G O P S T W

0.750 CE No

Road 100 Widening

Road 100

Chapel Hill to Court Street

This project will improve traffic conditions by widening the road from Court Street to Chapel Hill Boulevard.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2021 STP(UL) 103,800 0 16,200 120,000

P CN 2021 STP(UL) 951,500 0 148,500 1,100,000

Totals 1,055,300 0 164,700 1,220,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 120,000

CN 0 0 0 0 1,100,000

Totals 0 0 0 0 1,220,000

Report Date: October 04, 2016 Page 60

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 124: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 16 WA-01700 06/20/11 06/20/11 3323 03 C G O P S T W

0.500 CE No

Sandifur Parkway (Rd 52 - Rd 60)

Sandifur Parkway

Road 52 to Road 60

Currently there is a half street between Rd 52 and 60. This project will finish Sandifur Parkway from Road 52 and Road 60 to improve safety and provide the same street width for the continuation of the road.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 50,000 50,000

P CN 2020 STP(UL) 344,270 0 53,730 398,000

Totals 344,270 0 103,730 448,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 50,000 0 0

CN 0 0 0 398,000 0

Totals 0 0 50,000 398,000 0

Report Date: October 04, 2016 Page 61

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 125: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 25 WA-01705 06/20/11 06/20/11 3323 04 C G O P S T W

1.500 EA No

Sacagawea Heritage Trail

Sacagawea

Road 52 to Road 72

This project will lower the levee and install pathways for pedestrians, thus providing access along the river and connecting trails.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 0 65,000 65,000

P CN 2018 TAP(UL) 600,000 TIB 200,000 50,000 850,000

Totals 600,000 200,000 115,000 915,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 65,000 0 0 0

CN 0 850,000 0 0 0

Totals 0 915,000 0 0 0

Report Date: October 04, 2016 Page 62

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 126: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 26 WA-01706 06/20/11 06/20/11 3323 44 C G O P S T W

0.250 CE No

Road 68 and Court Street Signal

Road 68

Court Street to Road 68

Intersection improvements at the intersection of Road 68 and Court Street will consist of a traffic signal to improve efficiency and safety.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 40,000 40,000

P CN 2019 0 0 300,000 300,000

Totals 0 0 340,000 340,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 40,000 0 0

CN 0 0 300,000 0 0

Totals 0 0 340,000 0 0

Report Date: October 04, 2016 Page 63

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 127: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 30 WA-01708 06/20/11 06/20/11 3323 44 C G O P S T W

0.100 CE No

Road 100 & Argent Road Traffic Signal

Road 100

Road 100 to Argent Road

This project will install a new traffic signal at Argent Road and Road 100 to meet the demand in traffic flow when the traffic signal is warranted.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 30,000 30,000

P CN 2019 0 0 220,000 220,000

Totals 0 0 250,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 30,000 0 0

CN 0 0 220,000 0 0

Totals 0 0 250,000 0 0

Report Date: October 04, 2016 Page 64

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 128: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 31 WA-01728 06/20/11 06/20/11 3323 44 C G O P S T W

0.100 CE No

Road 84 & Chapel Hill Traffic Signal

Road 84

to

Install a new signal at the intersection of Road 84 & Chapel Hill to increase traffic flow in the area.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 40,000 40,000

P CN 2019 0 0 300,000 300,000

Totals 0 0 340,000 340,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 40,000 0 0

CN 0 0 300,000 0 0

Totals 0 0 340,000 0 0

Report Date: October 04, 2016 Page 65

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 129: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 33 WA-01710 06/20/11 06/20/11 3323 01 C G O P S T W

1.250 CE Yes

Road 76 Overpass - Argent Road to Burden Blvd

Road 76

Argent Road to Burden Blvd

Extend Road 76 north from Argent Road to Burden Blvd. Extending Road 76 between Argent Rd and Burden Blvd will serve as a connector between two arterial roadways near the new Chiawana High School which will lower volumes in the West Pasco area along Argent Rd and at the intersection of Argent Rd and Rd 68, and Rd 68 and Burden.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 STP(UL) 86,500 0 13,500 100,000

P RW 2019 STP(UL) 86,500 0 13,500 100,000

P CN 2020 STP(UL) 9,238,200 OTHER 1,441,800 0 10,680,000

Totals 9,411,200 1,441,800 27,000 10,880,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 100,000 0 0

RW 0 0 100,000 0 0

CN 0 0 0 10,680,000 0

Totals 0 0 200,000 10,680,000 0

Report Date: October 04, 2016 Page 66

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 130: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 34 WA-01711 06/20/11 06/20/11 3323 44 C G O P S T W

0.100 CE No

Road 44 & Burden Traffic Signal

Road 44

Road 44 to Burden Blvd

This project will install a traffic signal to improve traffic flow and level of service requirements.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 30,000 30,000

P CN 2020 0 0 160,000 160,000

Totals 0 0 190,000 190,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 30,000 0

CN 0 0 0 160,000 0

Totals 0 0 0 190,000 0

Report Date: October 04, 2016 Page 67

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 131: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 41 WA-01715 06/20/11 06/20/11 3323 03 C G O P S T W

0.250 EIS Yes

Lewis Street Overpass

Lewis Street

2nd Ave to 10th Ave

This project will construct a new overpass between 2nd Ave and Oregon Ave. A new overpass will replace the existing underpass which is deteriorating. State funds have been assigned to the project and federal funds have been allocated. Land acquisition is complete.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 STP(UL) 1,211,000 0 189,000 1,400,000

S CN 2020 0 CWA 15,000,000 0 15,000,000

P CN 2021 STP(UL) 17,300,000 0 5,700,000 23,000,000

Totals 18,511,000 15,000,000 5,889,000 39,400,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 1,200,000 200,000 0 0 0

CN 0 0 0 15,000,000 23,000,000

Totals 1,200,000 200,000 0 15,000,000 23,000,000

Report Date: October 04, 2016 Page 68

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 132: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 46 WA-01719 06/20/11 06/20/11 3323 44 C G O P S T W

0.100 CE No

Lewis Street & Heritage Ave Traffic Signal

Lewis Street

Lewis Street to Heritage Ave

This project will install a new traffic signal to meet the demand in traffic growth and to better serve the industrial area for growth and economic development.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 30,000 30,000

P CN 2019 0 0 190,000 190,000

Totals 0 0 220,000 220,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 30,000 0 0

CN 0 0 190,000 0 0

Totals 0 0 220,000 0 0

Report Date: October 04, 2016 Page 69

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 133: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Pasco

County: Franklin

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 47 WA-01720 06/20/11 06/20/11 3323 44 C G O P S T W

0.100 CE No

Heritage Ave & A Street Traffic Signal

Heritage Ave

Heritage Ave to A Street

This project will upgrade the intersection at Heritage Ave and A Street to a signalized intersection.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 30,000 30,000

P CN 2019 0 0 190,000 190,000

Totals 0 0 220,000 220,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 30,000 0 0

CN 0 0 190,000 0 0

Totals 0 0 220,000 0 0

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Pasco 36,923,390 21,304,300 25,986,310 84,214,000

Report Date: October 04, 2016 Page 70

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 134: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 WA-08224 03 0.300 CE No

Improvements to Waterfront Drive, North of University Drive

Waterfront Drive

to

Reconstruct existing Gravel road and add asphalt.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 OTHER 275,000 100,000 375,000

Totals 0 275,000 100,000 375,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 275,000 0 0 0 0

Totals 275,000 0 0 0 0

Report Date: October 04, 2016 Page 71

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 135: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 WA-05723 03 0.250 CE No

Snyder Road Reconstruction & Rail Road Crossing

Snyder Road

to

Improve existing Roadway and Install Rail Road Crossing

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 OTHER 275,000 100,000 375,000

Totals 0 275,000 100,000 375,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 275,000 0 0 0 0

Totals 275,000 0 0 0 0

Report Date: October 04, 2016 Page 72

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 136: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 4 WA-01843 06/08/11 06/10/11 11-16 01 0.490 CE No

Larson Road

Larson Road

to

Build new Road from Battelle Blvd to Horn Rapids Road.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 0 650,000 650,000

Totals 0 0 650,000 650,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 73

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 137: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 5 WA-01844 06/08/11 06/10/11 11-16 05 CE No

Slurry Seal Project

to

Slurry Seal Project, various locations from 1st Street to Horn Rapids Road. Within the Technology and Business Campus.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 0 100,000 100,000

Totals 0 0 100,000 100,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 74

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 138: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 6 WA-01845 06/08/11 06/10/11 11-16 04 CE No

Battelle Blvd. Traffic Signal Upgrade

to

Battelle Blvd and George Washington Way Traffic Signal Upgrade.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2018 0 0 200,000 200,000

Totals 0 0 200,000 200,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 75

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 139: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 7 WA-01846 06/08/11 06/10/11 11-16 01 0.500 CE No

Horn Rapids Road Extension Project

to

Horn Rapids Road Extension from East end of Horn Rapids Road to 1,000 ft East. Technology & Business Campus.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2019 0 0 350,000 350,000

Totals 0 0 350,000 350,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 76

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 140: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 8 WA-01847 06/08/11 06/10/11 11-16 06 1.000 CE No

Sidewalk Improvement Project Phase 2

to

Sidewalk Improvement Project Assorted within the Technology and Business Campus. Area boundaries George Washington Way, Richardson rd., University Drive, and 11th Street.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 0 1,060,000 1,060,000

Totals 0 0 1,060,000 1,060,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 77

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 141: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 9 WA-01848 06/08/11 06/10/11 11-16 03 CE No

South Richland Rail Transload Facility

to

Construction of Transload Facility, including road and rail improvements adjacent to I-182, SR 240, and Jadwin Ave.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2018 0 0 250,000 250,000

Totals 0 0 250,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 78

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 142: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 11 WA-01851 06/08/11 06/10/11 11-16 03 0.300 CE No

Benitz Road

to

Reconstruction of Benitz Road from Wine Country Road to Yakima River. Industrial Road.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 0 250,000 250,000

Totals 0 0 250,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 79

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 143: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 12 WA-01852 06/08/11 06/10/11 11-16 03 0.470 CE No

Lee Road

Lee Road

to

Reconstruction 24' side roadway to 36' wide roadway from Benitz Road to West POB Boundary.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2019 0 0 625,000 625,000

Totals 0 0 625,000 625,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 80

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 144: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Port of Benton

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 13 WA-01853 06/08/11 06/10/11 11-16 03 P S T W 0.400 CE No

1st Street West Project

1st Street

to

Construct roadway from Stevens Drive to 2000' West.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 0 1,500,000 1,500,000

Totals 0 0 1,500,000 1,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Port of Benton 0 550,000 5,185,000 5,735,000

Report Date: October 04, 2016 Page 81

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 145: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 1 / 3440(001) R002 01 C P T W 0.670 EA Yes

Duportail Bridge

Duportail Street

Queensgate Drive to Cottonwood Drive

Construct a 4-lane road and bridge over the Yakima River with sidewalks and bike paths on both sides. Construct new signalized intersections at Duportail St./Tanglewood Drive and Duportail/City View Drive. Reconstruct SR-240/Duportail intersection and modify traffic signal to accommodate additional lanes. Modify the Queensgate/Duportail intersection. Widen and raise at-grade railroad crossing of Port of Benton track.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2017 0 CWA 20,000,000 0 20,000,000

P CN 2017 0 0 11,800,000 11,800,000

Totals 0 20,000,000 11,800,000 31,800,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 14,000,000 14,000,000 3,800,000 0

Totals 0 14,000,000 14,000,000 3,800,000 0

Report Date: October 04, 2016 Page 82

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 146: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 2 / 3459(001) R001 01 0.330 CE Yes

Center Parkway Extension

Center Parkway

Gage Blvd to Tapteal Dr

Construct new 3-lane roadway with bike lanes, curb, gutter and sidewalk on both sides. Construct a signalized/gated at-grade crossing of the Port of Benton R/R track.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2017 STP(UL) 556,770 TIB 360,420 0 917,190

P CN 2017 STP(UL) 300,000 TIB 116,930 0 416,930

Totals 856,770 477,350 0 1,334,120

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 1,334,120 0 0 0 0

Totals 1,334,120 0 0 0 0

Report Date: October 04, 2016 Page 83

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 147: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 4 R033 03 O P S W 0.360 CE Yes

Queensgate Drive/Columbia Park Trail Improvements

Queensgate Drive

Keene Road to I-182 EB ramp terminal

Reconfigure the Queensgate Drive/Columbia Park Trail intersection by constructing a roundabout and extending Columbia Park Trail west to Jericho Court. Bike/Ped connections will be made to the Queensgate Pathway. Queensgate Drive will be widened to accommodate 4 travel lanes between Jericho Road and the I-182 EB ramp terminals. Access control will be implemented between Keene Road and Columbia Park Trail. All streets will include curb, gutter, sidewalks, street lights, storm drainage, and other utilities. Construct WB right-turn lane on Keene Road.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 TIB 100,000 20,000 120,000

P RW 2017 0 TIB 83,000 17,000 100,000

P CN 2017 0 TIB 1,245,400 234,600 1,480,000

Totals 0 1,428,400 271,600 1,700,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 120,000 0 0 0 0

RW 100,000 0 0 0 0

CN 1,480,000 0 0 0 0

Totals 1,700,000 0 0 0 0

Report Date: October 04, 2016 Page 84

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 148: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 5 R019 31 P S W 0.500 CE No

Swift Boulevard Improvements

Swift Boulevard

Stevens Dr to George Washington Way

Mill and overlay street, widen sidewalks, add shared parking/bike lanes, add decorative street lighting, irrigation, street trees and landscaped medians.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 STP(UL) 64,000 0 16,000 80,000

P CN 2017 STP(UL) 1,045,000 0 240,000 1,285,000

Totals 1,109,000 0 256,000 1,365,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 80,000 0 0 0 0

CN 1,250,000 0 0 0 0

Totals 1,330,000 0 0 0 0

Report Date: October 04, 2016 Page 85

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 149: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 6 R018 28 P W 0.400 CE Yes

Vantage Highway Pathway - Phase 2

Snyder Street

Robertson Drive to Stevens Drive

Construct a new, separated Hot Mix Asphalt multi-use pathway connecting the Vantage Highway Pathway Phase 1 with the Stevens Drive Pathway.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 Ped/Bike Program 43,250 6,750 50,000

P RW 2017 0 Ped/Bike Program 21,625 3,375 25,000

P CN 2018 0 Ped/Bike Program 505,750 89,250 595,000

Totals 0 570,625 99,375 670,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

RW 25,000 0 0 0 0

CN 0 595,000 0 0 0

Totals 75,000 595,000 0 0 0

Report Date: October 04, 2016 Page 86

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 150: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 7 R031 03 O S W 0.680 CE Yes

South George Washington Way Intersection Improvements

George Washington Way

I-182 to Comstock Street

Upgrade and reconfigure George Washington Way(GWW) including the intersections of GWW/Columbia Point Drive/Adams Street and GWW/Comstock Street to provide improved safety, capacity, and mobility. Improve pedestrian access and safety crossing George Washington Way. Also includes modifying the WB I-182, NB SR 240, and SB SR 240 ramps to improve safety.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 STP(UL) 187,800 TIB 450,720 112,680 751,200

P RW 2020 STP(UL) 125,000 TIB 75,000 300,000 500,000

P CN 2021 STP(UL) 2,159,700 TIB 5,183,280 1,295,820 8,638,800

Totals 2,472,500 5,709,000 1,708,500 9,890,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 751,200 0 0

RW 0 0 0 500,000 0

CN 0 0 0 0 8,638,800

Totals 0 0 751,200 500,000 8,638,800

Report Date: October 04, 2016 Page 87

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 151: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 8 R010 04 C P S T W 0.720 CE No

Columbia Park Trail - East

Columbia Park Trail

SR 240 WB Offramp to East City Limits

Reconstruct the street to provide 3-lanes, with curb, gutter, sidewalks, bike lanes street lights, drainage facilities and streetscape on both sides.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 TIB 90,000 60,000 150,000

P CN 2021 0 TIB 690,000 460,000 1,150,000

Totals 0 780,000 520,000 1,300,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 150,000 0

CN 0 0 0 0 1,150,000

Totals 0 0 0 150,000 1,150,000

Report Date: October 04, 2016 Page 88

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 152: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 9 R029 03 S W 0.230 CE Yes

Steptoe Street / Tapteal Drive Intersection Improvements

CID Canal to Canyon Street

Realign Tapteal Drive and Steptoe Street intersection by constructing a new intersection. Also includes sidewalks, street lights, fully signalized and gated at-grade railroad crossing, storm drainage.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P RW 2021 0 0 50,000 50,000

P CN 2021 0 0 1,330,000 1,330,000

Totals 0 0 1,380,000 1,380,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

RW 0 0 0 0 50,000

CN 0 0 0 0 1,330,000

Totals 0 0 0 0 1,380,000

Report Date: October 04, 2016 Page 89

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 153: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 10 R008 01 O P S W 1.200 CE Yes

Rachel Road Improvements

Rachel Road

Leslie Rd to Steptoe St

Construct a 2-lane collector with curb, gutter & sidewalk, street lights and storm drainage on both sides of the street. Left turn lanes will be constructed where needed.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 200,000 200,000

P RW 2020 0 0 300,000 300,000

P CN 2021 0 0 1,700,000 1,700,000

Totals 0 0 2,200,000 2,200,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 200,000 0 0

RW 0 0 0 300,000 0

CN 0 0 0 0 1,700,000

Totals 0 0 200,000 300,000 1,700,000

Report Date: October 04, 2016 Page 90

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 154: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 11 R012 01 C G P S T W

0.450 CE No

Queensgate Drive Extension

Queensgate Drive

Shockley Rd to Keene Rd

Construct a 3-lane street with curb, gutter, sidewalk, street lights and drainage facilities on both sides. Construct a roundabout at the Queensgate Drive/Shockley Road intersection. Modify the Keene Road/Queensgate Drive traffic signal to accommodate the new south leg of Queensgate Drive.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 150,000 150,000

P RW 2020 0 0 100,000 100,000

P CN 2021 0 0 850,000 850,000

Totals 0 0 1,100,000 1,100,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 150,000 0

RW 0 0 0 100,000 0

CN 0 0 0 0 850,000

Totals 0 0 0 250,000 850,000

Report Date: October 04, 2016 Page 91

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 155: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 12 R028 04 O P 0.750 CE No

Gage Boulevard Improvements

Gage Boulevard

Penny Royal Ave to Morency Dr.

Add bike lanes, shoulders, sidewalks, street lights, storm drainage on Gage Boulevard.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2021 0 0 75,000 75,000

P CN 2022 0 0 750,000 750,000

Totals 0 0 825,000 825,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 75,000

CN 0 0 0 0 750,000

Totals 0 0 0 0 825,000

Report Date: October 04, 2016 Page 92

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 156: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 13 R009 01 P S W 0.070 CE Yes

Bellerive Drive Extension

Bellerive Drive

Rachel Rd to 100' S. of Wenatchee Ln.

Construct a new 2-lane street with curb, gutter, sidewalk, bike lanes, street lights and storm drainage facilities.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 10,000 10,000

P RW 2020 0 0 10,000 10,000

P CN 2021 0 0 50,000 50,000

Totals 0 0 70,000 70,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 10,000 0 0

RW 0 0 0 10,000 0

CN 0 0 0 0 50,000

Totals 0 0 10,000 10,000 50,000

Report Date: October 04, 2016 Page 93

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 157: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 14 R035 28 O W 0.270 CE No

Marcus Whitman Elementary - SRTS

Snow Ave

Duportail Street to Hoffman Street

Construct concrete sidewalks, curb and gutter, storm drainage, street lights, and HMA overlay on Snow Avenue between Duportail Street and Hoffman Street. Construct concrete sidewalks, curb and gutter, storm drainage, street lights, and HMA to tie into the south side of Gray Street between Snow Avenue and Winslow Avenue on the designated school walk route for Marcus Whitman Elementary.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 SRTS 30,000 0 30,000

P CN 2018 0 SRTS 461,200 0 461,200

Totals 0 491,200 0 491,200

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 30,000 0 0 0 0

CN 0 461,200 0 0 0

Totals 30,000 461,200 0 0 0

Report Date: October 04, 2016 Page 94

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 158: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

14 15 R016 28 C P T 2.250 CE No

Stevens Drive Pathway

Stevens Drive

Spengler St to Horn Rapids Rd

Construct a separated multi-use pathway on east side of Stevens Drive.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 70,000 70,000

P CN 2021 0 0 880,000 880,000

Totals 0 0 950,000 950,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 70,000 0

CN 0 0 0 0 880,000

Totals 0 0 0 70,000 880,000

Report Date: October 04, 2016 Page 95

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 159: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 16 R013 01 P S W 2.000 CE Yes

Queensgate Drive - Phase II

Queensgate Drive

Bermuda Rd to Alla Vista Rd

Construct new 2-lane collector with curb, gutter, sidewalk, street lights, and storm drainage facilities on both sides

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 300,000 300,000

P RW 2021 0 0 500,000 500,000

P CN 2022 0 0 2,600,000 2,600,000

Totals 0 0 3,400,000 3,400,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 300,000 0

RW 0 0 0 0 500,000

CN 0 0 0 0 2,600,000

Totals 0 0 0 300,000 3,100,000

Report Date: October 04, 2016 Page 96

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 160: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

12 17 R034 28 1.750 CE No

Vantage Highway Pathway - Phase 3

SR 240

Twin Bridges Road to Kingsgate Way

Construct a new, separated Hot Mix Asphalt multi-use pathway on the north side of SR 240.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2021 TAP(UL) 30,000 0 20,000 50,000

P CN 2022 TAP(UL) 500,000 0 50,000 550,000

Totals 530,000 0 70,000 600,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 50,000

CN 0 0 0 0 550,000

Totals 0 0 0 0 600,000

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Richland 4,968,270 29,456,575 24,650,475 59,075,320

Report Date: October 04, 2016 Page 97

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 161: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 1 / 3476(001) WA-00169 05/17/16 07/07/16 19-16 01 C G O P S T W

1.000 CE Yes

Paradise Way Extension - Phase 4

Paradise Way

Well # 6 to SR 224

New construction of a two lane roadway with a center turn lane. Including constructing pedestrian and bicycle facilities, storm drainage, and illumination.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2017 0 0 1,390,000 1,390,000

Totals 0 0 1,390,000 1,390,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 1,390,000 0 0 0 0

Totals 1,390,000 0 0 0 0

Report Date: October 04, 2016 Page 98

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 162: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 2 / 3509(004) WA-00167 05/17/16 07/07/16 19-16 03 C O P S T W

0.500 CE No

Bombing Range Road - Phase 8

Bombing Range Road

Silver Lake Court to Arena Road

Roadway widening creating two lanes and a center turn lane. Including constructing pedestrian and bicycle facilities, storm drainage, and illumination.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2017 0 0 430,000 430,000

Totals 0 0 430,000 430,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 430,000 0 0 0 0

Totals 430,000 0 0 0 0

Report Date: October 04, 2016 Page 99

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 163: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 3 / 9903(013) 00186 05/17/16 07/07/16 19-16 03 C T 1.400 CE Yes

S 38th Ave & Mt. Adams View Drive

S. 38th Ave and Mt. Adams View Drive

S 38th Ave: Orchard St to North Lake Drive to Mt. Adams View Drive: Bombing Range Road to S. 38th Ave

Rebuild the existing gravel roadway into a paved two land roadway with shoulders.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2017 0 0 1,243,000 1,243,000

Totals 0 0 1,243,000 1,243,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 1,243,000 0 0 0 0

Totals 1,243,000 0 0 0 0

Report Date: October 04, 2016 Page 100

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 164: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 4 WA-00166 05/17/16 07/07/16 19-16 21 C P T 0.000 CE Yes

S 38th Ave / SR224 Traffic Signal

S 38th Ave / SR 224

S 38th Ave to SR 224

Signalize Intersection

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2018 0 0 577,000 577,000

Totals 0 0 577,000 577,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 577,000 0 0 0

Totals 0 577,000 0 0 0

Report Date: October 04, 2016 Page 101

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 165: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 5 WA-07769 05/17/16 07/07/16 19-16 05 S W CE No

Grosscup Blvd Pavement Preservation

Grosscup Blvd

SR 224 to North 62nd Ave

Pavement Restoration

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2018 0 0 253,125 253,125

Totals 0 0 253,125 253,125

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 253,125 0 0 0

Totals 0 253,125 0 0 0

Report Date: October 04, 2016 Page 102

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 166: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 6 00190 05/17/16 07/07/16 19-16 05 C P S T W 0.720 CE No

North 62nd Pavement Preservation

North 62nd Ave

SR 224 to Grosscup Blvd

Pavement Preservation

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2018 0 0 907,000 907,000

Totals 0 0 907,000 907,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 907,000 0 0 0

Totals 0 907,000 0 0 0

Report Date: October 04, 2016 Page 103

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 167: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 7 WA-07770 05/17/16 07/07/16 19-16 05 S W CE No

Harrington Dr Pavement Preservation

Harrington Dr

North 62nd Ave to West City Limits

Pavement Preservation

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2018 0 0 230,604 230,604

Totals 0 0 230,604 230,604

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 230,604 0 0 0

Totals 0 230,604 0 0 0

Report Date: October 04, 2016 Page 104

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 168: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 8 WA-07771 05/17/16 07/07/16 19-16 05 S W CE No

Kennedy Rd Pavement Preservation

Kennedy Rd

Bombing Range Road to West City Limits

Pavement Preservation

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2018 0 0 143,732 143,732

Totals 0 0 143,732 143,732

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 143,732 0 0 0

Totals 0 143,732 0 0 0

Report Date: October 04, 2016 Page 105

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 169: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 9 WA-07772 05/17/16 07/07/16 19-16 05 S W CE No

Paradise Way Pavement Preservation

Paradise Way

Bombing Range Road to 600' W of Jade Ave

Pavement Preservation

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2019 0 0 492,000 492,000

Totals 0 0 492,000 492,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 492,000 0 0

Totals 0 0 492,000 0 0

Report Date: October 04, 2016 Page 106

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 170: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 10 WA-07773 05/17/16 07/07/16 19-16 05 S W CE No

Ruppert Rd Pavement Preservation

Ruppert Rd

SR 224 to West City Limits

Pavement Preservation

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2019 0 0 298,280 298,280

Totals 0 0 298,280 298,280

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 298,280 0 0

Totals 0 0 298,280 0 0

Report Date: October 04, 2016 Page 107

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 171: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 11 WA-00181 05/17/16 07/07/16 19-16 01 C G O P S T W

1.100 CE Yes

Belmont Blvd - Phase 2

Belmont Blvd

Paradise Way to SR 224

Construct Urban Arterial Collector

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2020 0 0 3,410,000 3,410,000

Totals 0 0 3,410,000 3,410,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 3,410,000 0

Totals 0 0 0 3,410,000 0

Report Date: October 04, 2016 Page 108

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 172: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 12 00184 05/17/16 07/07/16 19-16 03 C P S T W 0.230 EA Yes

S 38th Ave Downtown Redevelopment Project

S 38th Ave

Van Giesen (SR 224) to Fallon Dr

Construct Urban Collector Roadway

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 0 0 4,707,000 4,707,000

Totals 0 0 4,707,000 4,707,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 4,707,000

Totals 0 0 0 0 4,707,000

Report Date: October 04, 2016 Page 109

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 173: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 13 WA-00171 05/17/16 07/07/16 19-16 03 C G P S T W

0.700 CE No

Bombing Range Road Widening

Bombing Range Road

Collins Road to Norma

Roadway Widening

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 0 0 3,729,000 3,729,000

Totals 0 0 3,729,000 3,729,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 3,729,000

Totals 0 0 0 0 3,729,000

Report Date: October 04, 2016 Page 110

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 174: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 14 WA-00168 05/17/16 07/07/16 19-16 01 0.720 CE No

Keene Road - Phase 6

Keene Road

Pacific Rim Winery to Ruppert Road

Construct 3 Lane Urban Section with 12' ACP Pathway.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 3,313,000 3,313,000

Totals 0 0 3,313,000 3,313,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 3,313,000

Totals 0 0 0 0 3,313,000

Report Date: October 04, 2016 Page 111

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 175: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 15 00191 05/17/16 07/07/16 19-16 03 C G O P S T W

0.100 CE Yes

Bombing Range Road / Austin Drive Intersection Improvements

Bombing Range Road

Bombing Range Road to Austin Drive

Intersection Access and Safety Improvements

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 96,000 96,000

Totals 0 0 96,000 96,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 96,000

Totals 0 0 0 0 96,000

Report Date: October 04, 2016 Page 112

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 176: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 16 WA-00180 05/17/16 07/07/16 19-16 03 C O P S T W

0.800 CE Yes

S 38th Ave - Phase 2

S 38th Ave

Grant Street to Orchard St

Construct 3 Lane Urban Section and Widen Bridge

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 2,068,000 2,068,000

Totals 0 0 2,068,000 2,068,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 2,068,000

Totals 0 0 0 0 2,068,000

Report Date: October 04, 2016 Page 113

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 177: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 17 WA-00183 05/17/16 07/07/16 19-16 01 C G O P T 0.120 No

Watkins Way Extension

Watkins Way

West Lattin to Hazelwood Drive

Construct Arterial Collector

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 346,000 346,000

Totals 0 0 346,000 346,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 346,000

Totals 0 0 0 0 346,000

Report Date: October 04, 2016 Page 114

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 178: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 18 WA-00178 05/17/16 07/07/16 19-16 03 C G O P S T W

2.780 CE No

Keene Road Widening

Keene Road

Bombing Range Road to SR 224

Road Widening to 4 Lanes with 12' ACP Pathway

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 7,180,000 7,180,000

Totals 0 0 7,180,000 7,180,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 7,180,000

Totals 0 0 0 0 7,180,000

Report Date: October 04, 2016 Page 115

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 179: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 19 WA-00173 05/17/16 07/07/16 19-16 01 C G O P S T W

1.980 CE Yes

Keene Road - Phase 7

Keene Road

Ruppert Road to Twin Bridges

Construct 2 Lane Rural Section

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 4,206,000 4,206,000

Totals 0 0 4,206,000 4,206,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 4,206,000

Totals 0 0 0 0 4,206,000

Report Date: October 04, 2016 Page 116

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 180: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 20 WA-00172 05/17/16 07/07/16 19-16 01 C G O P S T W

1.500 CE Yes

Paradise Way Extension - Phase 5

Paradise Way

SR 224 to Ruppert Road

Construct 3 Lane Urban Section

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 3,259,000 3,259,000

Totals 0 0 3,259,000 3,259,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 3,259,000

Totals 0 0 0 0 3,259,000

Report Date: October 04, 2016 Page 117

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 181: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 21 00185 05/17/16 07/07/16 19-16 03 C P S T W 0.390 EA Yes

Fallon Dr Downtown Redevelopment Project

Fallon Dr

SR 224 to S 39th Ave

Construct Urban Collector

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 2,053,000 2,053,000

Totals 0 0 2,053,000 2,053,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 2,053,000

Totals 0 0 0 0 2,053,000

Report Date: October 04, 2016 Page 118

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 182: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 22 WA-08825 05/17/16 07/07/16 19-16 21 C O P S T W

0.000 CE Yes

SR 224 / RUPPERT ROAD TRAFFIC SIGNAL

SR 224 / RUPPERT RD

SR 224 to RUPPERT RD

SIGNALIZE INTERSECTION

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 500,000 500,000

Totals 0 0 500,000 500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 500,000

Totals 0 0 0 0 500,000

Report Date: October 04, 2016 Page 119

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 183: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 23 WA-08826 05/17/16 07/07/16 19-16 21 C O P S T W

0.000 CE No

SR 224 / PARADISE WAY TRAFFIC SIGNAL

SR 224/PARADISE WAY

SR 224 to PARADISE WAY

SIGNALIZE INTERSECTION

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 420,000 420,000

Totals 0 0 420,000 420,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 420,000

Totals 0 0 0 0 420,000

Report Date: October 04, 2016 Page 120

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 184: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 24 WA-08827 05/17/16 07/07/16 19-16 21 C O P S T W

0.000 CE No

SR 224 / KEENE RD TRAFFIC SIGNAL

SR 224 / KEENE RD

SR 224 to KEENE RD

SIGNALIZED INTERSECTION

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 500,000 500,000

Totals 0 0 500,000 500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 500,000

Totals 0 0 0 0 500,000

Report Date: October 04, 2016 Page 121

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 185: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 25 WA-08828 05/17/16 07/07/16 19-16 21 C O P S T W

0.000 CE Yes

BOMBING RANGE RD/MT ADAMS VIEW DR INTERSECTION MODIFICATIONS

BOMBING RANGE RD/MT ADAMS VIEW DR

Bombing Range Road to Mt. Adams View Drive: Bombing Range Road to S. 38th Ave

SIGNALIZE INTERSECTION

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 500,000 500,000

Totals 0 0 500,000 500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 500,000

Totals 0 0 0 0 500,000

Report Date: October 04, 2016 Page 122

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 186: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 26 WA-08829 05/17/16 07/07/16 19-16 21 C O P S T W

0.000 CE No

BOMBING RANGE RD/ KEENE RD ROUNDABOUT MODIFICATIONS

BOMBING RANGE RD/MT ADAMS VIEW DR

Bombign Range Road to KEENE RD

ROUND-A-BOUT MODIFICATIONS

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 1,000,000 1,000,000

Totals 0 0 1,000,000 1,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 1,000,000

Totals 0 0 0 0 1,000,000

Report Date: October 04, 2016 Page 123

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 187: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 27 WA-08830 05/17/16 07/07/16 19-16 11 0.000 CE No

BOMBING RANGE RD BRIDGE REPLACEMENT

BOMBING RANGE RD/SR 224

Bombing Range Road to SR 224

BRIDGE REPLACEMENT

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 1,400,000 1,400,000

Totals 0 0 1,400,000 1,400,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 1,400,000

Totals 0 0 0 0 1,400,000

Report Date: October 04, 2016 Page 124

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 188: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: West Richland

County: Benton

MPO/RTPO: BFCG Y Inside N Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 28 WA-08831 05/17/16 07/07/16 19-16 11 C O P S T W

0.000 CE No

S 38TH AVE BIDGE REPLACEMENT

S 38TH AVE

S 38TH AVE to S 38TH AVE

BRIDGE REPLACEMENT

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 900,000 900,000

Totals 0 0 900,000 900,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 900,000

Totals 0 0 0 0 900,000

Federal Funds State Funds Local Funds Total Funds

Grand Totals for West Richland 0 0 45,551,741 45,551,741

Report Date: October 04, 2016 Page 125

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 189: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton City

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 1 BC-000006 06/19/12 06/19/12 2012-22 05 P S T W 0.340 CE No

Chris Avenue Overlay Project

Chris Avenue

SR 225 to 14th Street

Overlay and Widening

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 TIB 64,600 3,400 68,000

P CN 2017 0 TIB 581,400 30,600 612,000

Totals 0 646,000 34,000 680,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 68,000 0 0 0 0

CN 612,000 0 0 0 0

Totals 680,000 0 0 0 0

Report Date: October 04, 2016 Page 126

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 190: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton City

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 2 BC-000010 06/17/14 04 0.300 CE No

8th Street * Della Sidewalks, Curb & Gutters

8th Street/Della Ave.

Dale Avenue to Della/ 8th & 9th

Remove existing deteriorated sidewalk, construct new curb and sidewalk with ADA ramps, pave between new sidewalk and add storm drainage

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 TIB 189,000 21,000 210,000

Totals 0 189,000 21,000 210,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 127

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 191: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton City

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 3 BC-000014 01 0.150 No

Edith Avenue Construction Project

Edith

Della Avenue to 13th Street

Construct Edith Avenue to connect existing roadway with 13th street

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 0 330,000 330,000

Totals 0 0 330,000 330,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 330,000 0 0 0 0

Totals 330,000 0 0 0 0

Report Date: October 04, 2016 Page 128

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 192: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton City

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 5 BC-000005 06/19/12 06/19/12 2012-22 05 0.140 CE No

6th Street Overlay Project

6th Street

Babs Avenue to Belle Avenue

Pavement Overlay and Striping

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 0 28,000 28,000

Totals 0 0 28,000 28,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 129

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 193: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton City

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 6 BC-000007 06/19/12 06/19/12 2012-22 03 T W 0.200 CE No

Alma Avenue Overlay Project

Alma Avenue

2nd Street to West End

Pavement Overlay & Cul-de-Sac Construction

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 WSDOT 32,000 8,000 40,000

Totals 0 32,000 8,000 40,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 130

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 194: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton City

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 6 BC-000016 04 0.140 No

Sun Valley Way Reconstuction

Sun Valley Way

9th Street to Capri Court

Total Reconstruction (road only with compaction of settlement areas, drainage repairs & total repaving

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2021 0 0 13,000 13,000

P CN 2021 0 0 137,000 137,000

Totals 0 0 150,000 150,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 131

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 195: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton City

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 7 BC-000002 06/19/12 06/19/12 2012-22 05 0.240 CE No

12th Street Overlay Project

12th Street

Corral Creek Road to 350' South of Neptune

Pavement Overlay

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2019 0 OTHER 35,000 13,000 48,000

Totals 0 35,000 13,000 48,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 132

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 196: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton City

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

02 9 BC-000013 21 No

9th Street Sidewalk

Ellen Ave to Grace Ave

New Sidewalk

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2019 0 TIB 82,000 4,300 86,300

Totals 0 82,000 4,300 86,300

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 133

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 197: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton City

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 9 BC-000012 06/19/12 06/19/12 2012-22 05 0.220 CE No

Della Avenue Overlay Project

Della Avenue

13th Street to West End

Pavement Overlay

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2018 0 0 66,000 66,000

Totals 0 0 66,000 66,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Report Date: October 04, 2016 Page 134

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 198: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton City

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 10 BC-000015 05 No

Carol/Cora/Irma Double Shot Road Surface

Carol, Cora, Irma

to

Double Shot surface - 20' wide

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2020 0 0 60,000 60,000

Totals 0 0 60,000 60,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

0 0 0 0 0

Totals 0 0 0 0 0

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Benton City 0 984,000 714,300 1,698,300

Report Date: October 04, 2016 Page 135

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 199: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 5 BCO2012-17 06/07/16 04 P T 2.000 CE No

BERT JAMES RD: Williamson to SR 221

15650

Williamson Rd (MP 8.146) to SR 221 (MP 10.240)

Reconstruct a 2 lane road segment.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S RW 2017 0 0 100,000 100,000

P CN 2020 0 CRAB 1,764,000 96,000 1,860,000

Totals 0 1,764,000 196,000 1,960,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

RW 100,000 0 0 0 0

CN 0 0 0 1,860,000 0

Totals 100,000 0 0 1,860,000 0

Report Date: October 04, 2016 Page 136

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 200: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 6 WA-09498 06/07/16 04 P T 2.150 No

BERT JAMES RD: Sellards to Williamson

15650

5.993 to 8.146

Reconstruct 2.15 miles of roadway to all-weather standard.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S PE 2017 0 0 50,000 50,000

P CN 2020 0 CRAB 1,890,000 160,000 2,050,000

Totals 0 1,890,000 210,000 2,100,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

CN 0 0 0 683,333 1,366,667

Totals 50,000 0 0 683,333 1,366,667

Report Date: October 04, 2016 Page 137

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 201: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 10 BCO2015-11 07/15/14 07/15/14 2014-545 04 C P T W 1.500 CE Yes

HANKS RD: 1/2 mile East of McDonald to Aller

Hanks Rd Phase 2

7.60 to 9.10

Reconstruction of vertical and horizontal alignment to an all weather road standard.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 90,000 90,000

P RW 2017 0 0 10,000 10,000

P CN 2022 0 CRAB 1,620,000 80,000 1,700,000

Totals 0 1,620,000 180,000 1,800,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 90,000 0 0 0 0

RW 10,000 0 0 0 0

CN 0 0 0 0 1,700,000

Totals 100,000 0 0 0 1,700,000

Report Date: October 04, 2016 Page 138

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 202: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 11 BCO2015-10 07/15/14 07/15/14 2014-545 04 C P T W 1.530 CE Yes

HANKS RD: Crosby to 1/2mile East of McDonald

Hanks Rd Phase1

6.07 to 7.60

Reconstruction of vertical and horizontal alignment to an all weather road standard.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 90,000 90,000

P RW 2017 0 0 10,000 10,000

P CN 2022 0 0 1,700,000 1,700,000

Totals 0 0 1,800,000 1,800,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 90,000 0 0 0 0

RW 10,000 0 0 0 0

CN 0 0 0 0 1,700,000

Totals 100,000 0 0 0 1,700,000

Report Date: October 04, 2016 Page 139

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 203: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 12 BCO2012-14 07/02/13 04 P T 2.300 CE No

CASE RD: OIEH to Hanks

31550

OIEH to Hanks Rd.

Reconstruct a segment of road to an all weather road.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2020 0 0 2,000,000 2,000,000

Totals 0 0 2,000,000 2,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 0 0 660,000 1,340,000

Totals 0 0 0 660,000 1,340,000

Report Date: October 04, 2016 Page 140

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 204: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 13 2014-17 07/02/13 07/02/13 2013 519 04 P T 3.000 CE Yes

COUNTY WELL ROAD - Phase 1: SR221 to McBee

County Well Rd. #11110

SR 221 to McBee Road

Reconstruct current road to an all weather road. Existing alignment will remain the same but the profile will be improved. New subgrade will have one foot of surfacing with 0.30' of HMA. Other items of work include Guardrails and drainage.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 175,000 175,000

P RW 2020 0 0 50,000 50,000

P CN 2020 0 0 2,025,000 2,025,000

Totals 0 0 2,250,000 2,250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 175,000 0

RW 0 0 0 50,000 0

CN 0 0 0 2,025,000 0

Totals 0 0 0 2,250,000 0

Report Date: October 04, 2016 Page 141

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 205: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 14 2014-18 07/02/13 07/02/13 2013 519 04 P T 2.000 CE Yes

COUNTY WELL ROAD - Phase 2: McBee to Clodius

County Well Rd. #11110

McBee Rd. to Clodius Rd.

Reconstruct current road to an all weather road. Existing alignment will remain the same but the profile will be improved. New subgrade will have one foot of surfacing with 0.30' of HMA. Other items of work include Guardrails and drainage

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2022 0 0 100,000 100,000

P RW 2022 0 0 50,000 50,000

P CN 2022 0 0 1,350,000 1,350,000

Totals 0 0 1,500,000 1,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 100,000

RW 0 0 0 0 50,000

CN 0 0 0 0 1,350,000

Totals 0 0 0 0 1,500,000

Report Date: October 04, 2016 Page 142

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 206: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 15 2014-19 07/02/13 07/02/13 2013 519 04 P T 1.800 CE Yes

COUNTY WELL ROAD -Phase 3: Clodius to County Pit

County Well Rd. #11110

Clodius Rd. to County Pit

Reconstruct current road to an all weather road. Existing alignment will remain the same but the profile will be improved. New subgrade will have one foot of surfacing with 0.30' of HMA. Other items of work include Guardrails and drainage.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2022 0 0 85,000 85,000

P RW 2022 0 0 50,000 50,000

P CN 2022 0 0 1,215,000 1,215,000

Totals 0 0 1,350,000 1,350,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 85,000

RW 0 0 0 0 50,000

CN 0 0 0 0 1,215,000

Totals 0 0 0 0 1,350,000

Report Date: October 04, 2016 Page 143

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 207: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 16 BCO2014-16 07/02/13 07/02/13 2013 519 04 P T 2.100 CE Yes

FINLEY RD: M.P. 5.2 to End of Pavement

Finley Road

M.P. 5.2 to End of Pavement

Reconstruct a segment of gravel road to an all weather road.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2022 0 0 125,000 125,000

P RW 2022 0 0 50,000 50,000

P CN 2022 0 0 1,575,000 1,575,000

Totals 0 0 1,750,000 1,750,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 125,000

RW 0 0 0 0 50,000

CN 0 0 0 0 1,575,000

Totals 0 0 0 0 1,750,000

Report Date: October 04, 2016 Page 144

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 208: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 18 BCO2016-17 07/28/15 07/28/15 04 P T 2.200 CE Yes

JOHNSON RD: CR 12 to Griffin

Johnson Rd

Griffin to CR 12

Reconstruct to widen roadway for safety.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 0 75,000 75,000

P RW 2019 0 0 75,000 75,000

P CN 2022 0 0 1,320,000 1,320,000

Totals 0 0 1,470,000 1,470,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 75,000 0 0 0

RW 0 0 75,000 0 0

CN 0 0 0 0 1,320,000

Totals 0 75,000 75,000 0 1,320,000

Report Date: October 04, 2016 Page 145

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 209: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 22 BCO2012-19 07/02/13 07/02/13 04 P T 0.500 CE No

JOHNSON RD/GRIFFIN RD: Intersection Improvements

20250 / 20280

Intersection to Intersection

Intersection improvements.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2022 0 0 100,000 100,000

P CN 2022 0 0 900,000 900,000

Totals 0 0 1,000,000 1,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 0 100,000

CN 0 0 0 0 900,000

Totals 0 0 0 0 1,000,000

Report Date: October 04, 2016 Page 146

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 210: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 23 BCO2016-22 07/28/15 07/28/15 21 0.000 CE No

OBSOLETE BRIDGE REMOVAL

Varies

N/A to N/A

Removing short span bridges over filled in irrigation canals.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2020 0 0 300,000 300,000

Totals 0 0 300,000 300,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 0 0 100,000 200,000

Totals 0 0 0 100,000 200,000

Report Date: October 04, 2016 Page 147

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 211: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 24 BCO2016-23 07/28/15 07/28/15 21 0.000 CE No

ROADSIDE WATERWAY PIPING AND SAFETY MITIGATION

N/A to N/A

Safety improvements of roadways next to waterways.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2021 0 0 300,000 300,000

Totals 0 0 300,000 300,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 0 0 0 300,000

Totals 0 0 0 0 300,000

Report Date: October 04, 2016 Page 148

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 212: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 25 BCO2012-24 07/02/13 07/02/13 44 No

PATHS & TRAILS

various

various to various

Construct Paths & Trails, as required. (Emergent path projects)

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 0 0 60,000 60,000

Totals 0 0 60,000 60,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 10,000 10,000 10,000 10,000 20,000

Totals 10,000 10,000 10,000 10,000 20,000

Report Date: October 04, 2016 Page 149

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 213: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Benton Co.

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 26 BCO2012-26 07/02/13 07/02/13 22 CE No

RAILROAD CROSSINGS

various

various to various

Upgrade RR-Xings, when approved for funding.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2017 STP(S) 54,000 0 6,000 60,000

Totals 54,000 0 6,000 60,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 10,000 10,000 10,000 10,000 20,000

Totals 10,000 10,000 10,000 10,000 20,000

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Benton Co. 54,000 5,274,000 14,372,000 19,700,000

Report Date: October 04, 2016 Page 150

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 214: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 1 WA-00684 06/06/16 06/20/16 2016-07 05 1.850 CE No

Columbia Ave Chip Seal

Columbia Ave

SR 260 to SR 395

Columbia Ave from SR 260 to SR 395. Chip Seal.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

S CN 2017 0 TIB 225,000 0 225,000

P CN 2017 0 0 25,000 25,000

Totals 0 225,000 25,000 250,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 250,000 0 0 0 0

Totals 250,000 0 0 0 0

Report Date: October 04, 2016 Page 151

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 215: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 2 WA-00822 06/06/16 06/20/16 2016-07 03 0.300 CE No

East Birch Street

E. Birch St

Columbia Ave to Pioneer Pool

Reconstruction, drainage, curbs, gutters and sidewalk on one side.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 OTHER 65,000 0 65,000

P CN 2017 0 TIB 778,500 21,500 800,000

Totals 0 843,500 21,500 865,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 65,000 0 0 0 0

CN 800,000 0 0 0 0

Totals 865,000 0 0 0 0

Report Date: October 04, 2016 Page 152

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 216: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 4 WA-00682 06/06/16 06/20/16 2016-07 03 G P S T W 0.510 CE No

East Clark Street

E. Clark St.

Columbia Ave to Ford Ave

Reconstruction, drainage, curbs, gutters and sidewalk on both sides.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 0 150,000 150,000

P CN 2018 0 PWTF 1,600,000 0 1,600,000

Totals 0 1,600,000 150,000 1,750,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 150,000 0 0 0 0

CN 1,600,000 0 0 0 0

Totals 1,750,000 0 0 0 0

Report Date: October 04, 2016 Page 153

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 217: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 5 WA-03813 06/06/16 06/20/16 2016-07 04 0.230 No

South 5th Street Re-Construct

Hawthorne to Juniper

Reconstruction, drainage, curbs and gutters.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 0 0 71,000 71,000

P CN 2017 0 TIB 639,000 0 639,000

Totals 0 639,000 71,000 710,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 71,000 0 0 0 0

CN 639,000 0 0 0 0

Totals 710,000 0 0 0 0

Report Date: October 04, 2016 Page 154

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 218: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 6 WA-00690 06/06/16 06/20/16 2016-07 03 0.330 No

Hawthorne Street Project

Hawthorne St

S. Columbia Ave to S. 5th

Reconstruction, curbs, gutters,and sidewalk on one side.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 PWTF 88,000 0 88,000

P CN 2019 0 PWTF 781,800 10,200 792,000

Totals 0 869,800 10,200 880,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 88,000 0 0 0 0

CN 0 792,000 0 0 0

Totals 88,000 792,000 0 0 0

Report Date: October 04, 2016 Page 155

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 219: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 7 WA-08035 06/06/16 06/20/16 2016-07 05 1.100 No

W. Clark St. Chip Seal

Columbia Ave to SR 260

Chip Seal from Columbia Ave. to SR 260

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 TIB 22,000 0 22,000

P CN 2018 0 TIB 198,000 0 198,000

Totals 0 220,000 0 220,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 22,000 0 0 0 0

CN 198,000 0 0 0 0

Totals 220,000 0 0 0 0

Report Date: October 04, 2016 Page 156

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 220: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 8 WA-00694 06/06/16 06/20/16 2016-07 05 T W 1.100 No

Nordheim Road Chip Seal

Nordheim Rd

Garfield to Airport Rd

Chip Seal

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2018 0 TIB 54,000 6,000 60,000

Totals 0 54,000 6,000 60,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 60,000 0 0 0 0

Totals 60,000 0 0 0 0

Report Date: October 04, 2016 Page 157

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 221: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

16 9 WA-00689 06/06/16 06/20/16 2016-07 01 1.300 No

Ford Street Extension

Ford St

Ash Street to N. Columbia Ave

New Construction.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 OTHER 150,000 0 150,000

P RW 2019 0 OTHER 150,000 0 150,000

P CN 2020 0 OTHER 2,200,000 0 2,200,000

Totals 0 2,500,000 0 2,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 150,000 0 0 0 0

RW 0 150,000 0 0 0

CN 0 0 2,200,000 0 0

Totals 150,000 150,000 2,200,000 0 0

Report Date: October 04, 2016 Page 158

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 222: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 10 WA-00691 06/06/16 06/20/16 2016-07 06 0.610 Yes

Ford Ave. Bike Path Extension

Ford Ave

Clark St. to N. Columbia Ave.

Construction and extension of pedestrian/bicycle path.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 0 30,000 30,000

P CN 2019 0 0 270,000 270,000

Totals 0 0 300,000 300,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 30,000 0 0 0 0

CN 0 270,000 0 0 0

Totals 30,000 270,000 0 0 0

Report Date: October 04, 2016 Page 159

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 223: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 11 WA-03814 06/06/16 06/20/16 20156-07 01 0.020 No

Birch to Burke Connector

Birch St to Burke Ave

Construct road across old railroad right of way to connect Birch to Burke.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 30,000 30,000

P CN 2019 0 TIB 300,000 0 300,000

Totals 0 300,000 30,000 330,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 30,000 0 0 0 0

CN 300,000 0 0 0 0

Totals 330,000 0 0 0 0

Report Date: October 04, 2016 Page 160

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 224: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

19 12 WA-00685 06/06/16 06/20/16 2016-07 03 C G P S T W

0.170 CE No

East Davis Street

E.Davis St.

Almira to Chelan

Reconstruction with drainage, curbs, gutters and sidewalk on both sides.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 50,000 50,000

P CN 2019 0 TIB 540,000 10,000 550,000

Totals 0 540,000 60,000 600,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 50,000 0 0 0 0

CN 550,000 0 0 0 0

Totals 600,000 0 0 0 0

Report Date: October 04, 2016 Page 161

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 225: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 13 WA-06634 06/06/16 06/20/16 2016-07 04 0.120 No

South Burke Re-Construct

Fir Street to Elm Street

Reconstruction with drainage, curbs, gutters and sidewalk on 1 side

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 0 42,000 42,000

P CN 2018 0 TIB 378,000 0 378,000

Totals 0 378,000 42,000 420,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 42,000 0 0 0 0

CN 378,000 0 0 0 0

Totals 420,000 0 0 0 0

Report Date: October 04, 2016 Page 162

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 226: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 14 WA-00686 06/06/16 06/20/16 2016-07 06 0.420 Yes

Old Railroad right of way path

Columbia Ave to Ford Ave

Construction of pedestrian/bicycle path.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 10,200 10,200

P CN 2020 BR 173,000 0 16,800 189,800

Totals 173,000 0 27,000 200,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 10,200 0 0 0 0

CN 189,800 0 0 0 0

Totals 200,000 0 0 0 0

Report Date: October 04, 2016 Page 163

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 227: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 15 WA-00695 06/06/16 06/20/16 2016-07 06 0.100 Yes

SR 260 Pedestrian Crossing

SR 260

Gum St to Hawthorne

Construct a pedestrian bridge across SR 260.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 60,000 60,000

P CN 2020 0 OTHER 540,000 0 540,000

Totals 0 540,000 60,000 600,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 60,000 0 0 0 0

CN 540,000 0 0 0 0

Totals 600,000 0 0 0 0

Report Date: October 04, 2016 Page 164

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 228: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

17 16 WA-00693 06/06/16 06/20/16 2016-07 01 0.350 Yes

South Sixth Street Extension

S. Sixth St.

Clark St. to Elm Street

New construction of road and bridge over railway and Equatzel Coulee.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 STP(S) 300,000 0 0 300,000

P RW 2021 STP(S) 105,000 0 0 105,000

P CN 2022 STP(S) 2,595,000 0 0 2,595,000

Totals 3,000,000 0 0 3,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 300,000 0 0 0 0

RW 0 105,000 0 0 0

CN 0 0 2,595,000 0 0

Totals 300,000 105,000 2,595,000 0 0

Report Date: October 04, 2016 Page 165

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 229: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 17 WA-09018 06/06/16 06/20/16 2016-07 04 0.350 CE No

Old Town Re-Constuct-Phase 1

N. 3rd, 4th, 5th & Franklin

100 Blk of N. 3rd to 200 Blk of N. 5th

Reconstruct, drainage, curbs, gutters & sidewalk on one side.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 0 60,000 60,000

P CN 2018 0 TIB 1,080,000 60,000 1,140,000

Totals 0 1,080,000 120,000 1,200,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 60,000 0 0 0 0

CN 1,140,000 0 0 0 0

Totals 1,200,000 0 0 0 0

Report Date: October 04, 2016 Page 166

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 230: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Connell

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 18 WA-09019 06/06/16 06/20/16 2106-07 04 0.500 CE No

Old Town Reconstruct-Phase 2

N.3rd,4th,5th & Borah

200 N. 3rd to 300 N. 5th

Reconstruct, drainage, curbs, gutters & sidewalk on one side.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 85,000 85,000

P CN 2019 0 TIB 1,530,000 85,000 1,615,000

Totals 0 1,530,000 170,000 1,700,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 85,000 0 0 0 0

CN 1,615,000 0 0 0 0

Totals 1,700,000 0 0 0 0

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Connell 3,173,000 11,319,300 1,092,700 15,585,000

Report Date: October 04, 2016 Page 167

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 231: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 2 / F115(003) WA-05183 06/29/16 06/29/16 2016-260 04 P T 3.010 CE Yes

Pasco-Kahlotus Road Reconstruction/Overlay II

Pasco-Kahlotus Road

MP 5.92 - Peterson Road to MP 8.93

The project will upgrade an existing two-lane roadway to provide safety, mobility, and approach improvements. The improvements will consist of reconstructing a portion of the roadway to correct for vertical sight distance issues, pavement widening and overlay for the total length of the project, roadway-related storm water facilities, and address clear zone issues.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2017 0 CRAB 847,000 1,053,000 1,900,000

Totals 0 847,000 1,053,000 1,900,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 1,900,000 0 0 0 0

Totals 1,900,000 0 0 0 0

Report Date: October 04, 2016 Page 168

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 232: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 4 WA-09033 06/29/16 06/29/16 2016-260 11 0.100 CE No

Smith Canyon #722-0.07 Replacement

07220

0.02 to 0.12

Replace existing bridge 722-0.07

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2017 0 0 15,000 15,000

Totals 0 0 15,000 15,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 15,000 0 0 0 0

Totals 15,000 0 0 0 0

Report Date: October 04, 2016 Page 169

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 233: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 5 WA-01027 06/29/16 06/29/16 2016-260 04 P T W 4.120 CE Yes

Glade North Overlay III

Glade North Road

Selph Landing Road to Sagemoor Road

Widen and Overlay existing road and upgrade to an All-weather standard.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P RW 2017 STP(R) 259,500 0 40,500 300,000

P CN 2018 STP(R) 2,486,875 0 388,125 2,875,000

Totals 2,746,375 0 428,625 3,175,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

RW 300,000 0 0 0 0

CN 0 2,875,000 0 0 0

Totals 300,000 2,875,000 0 0 0

Report Date: October 04, 2016 Page 170

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 234: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 6 WA-07940 06/29/16 06/29/16 2016-260 28 P S T W 0.410 CE No

Basin City Alternative Transportation Route Improvements II

Bailie Boulevard

0.00 to 0.41

Replace pedestrian ramps, install new sidewalks, improve adjunct facilities, and improve site drainage.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2017 TAP(R) 18,665 0 0 18,665

P CN 2018 TAP(R) 281,335 0 0 281,335

Totals 300,000 0 0 300,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 18,665 0 0 0 0

CN 0 281,335 0 0 0

Totals 18,665 281,335 0 0 0

Report Date: October 04, 2016 Page 171

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 235: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 8 WA-06254 06/29/16 06/29/16 2016-260 21 P T CE No

Bridge Approach Adjustment

Countywide

Countywide to Countywide

Correct approaches on bridges countywide that are either higher or lower than the bridge deck.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 CRAB 13,500 1,500 15,000

P CN 2019 0 CRAB 121,500 13,500 135,000

Totals 0 135,000 15,000 150,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 15,000 0 0

CN 0 0 135,000 0 0

Totals 0 0 150,000 0 0

Report Date: October 04, 2016 Page 172

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 236: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 9 WA-09034 06/29/16 06/29/16 2016-260 21 P CE No

Illumination LED Retrofit Countywide

Countywide

n/a to n/a

Convert existing high-pressure sodium lights to energy-efficient LED lights

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 0 5,000 5,000

P CN 2019 0 0 45,000 45,000

Totals 0 0 50,000 50,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 5,000 0 0

CN 0 0 45,000 0 0

Totals 0 0 50,000 0 0

Report Date: October 04, 2016 Page 173

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 237: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 10 WA-09036 06/29/16 06/29/16 2016-260 04 P T 0.300 CE No

Elm Road and Everett Road Intersection

Elm Road/Everett Road

Intersection to Intersection

Reconstruct intersection to address drainage issues

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 15,000 15,000

P CN 2020 0 0 135,000 135,000

Totals 0 0 150,000 150,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 15,000 0

CN 0 0 0 135,000 0

Totals 0 0 0 150,000 0

Report Date: October 04, 2016 Page 174

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 238: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 11 WA-06261 06/29/16 06/29/16 2016-260 05 P T CE No

Roadway Approach Improvement

Countywide

Countywide to Countywide

Improve roadway approaches to BST roads from gravel roads.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 0 20,000 20,000

P CN 2020 0 0 180,000 180,000

Totals 0 0 200,000 200,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 20,000 0

CN 0 0 0 180,000 0

Totals 0 0 0 200,000 0

Report Date: October 04, 2016 Page 175

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 239: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 12 WA-06258 06/29/16 06/29/16 2016-260 06 P T CE No

Scooteney Road Drainage Correction

03070

MP 5.20 to MP 5.20

Roadway repair and drainage redirection.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 STP(R) 25,950 0 4,050 30,000

P CN 2020 STP(R) 147,050 0 22,950 170,000

Totals 173,000 0 27,000 200,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 200,000 0

Totals 0 0 0 200,000 0

Report Date: October 04, 2016 Page 176

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 240: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

00 13 WA-01010 06/29/16 06/29/16 2016-260 18 CE No

Rural Freight Mobility Plan Study

Countywide

to

This study will include performing an analysis of existing classified and non classified routes in selected areas of the county.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2020 0 0 75,000 75,000

Totals 0 0 75,000 75,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 75,000 0

Totals 0 0 0 75,000 0

Report Date: October 04, 2016 Page 177

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 241: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 15 WA-09041 06/29/16 06/29/16 2016-260 11 T W 0.100 CE No

Selph Landing #906-8.79 Replacement

09060

8.74 to 8.84

Replace existing bridge #906-8.79

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 0 0 225,000 225,000

Totals 0 0 225,000 225,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 225,000

Totals 0 0 0 0 225,000

Report Date: October 04, 2016 Page 178

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 242: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

06 17 WA-01040 06/29/16 06/29/16 2016-260 04 P T 2.810 CE Yes

Hollingsworth Road All-Weather

Hollingsworth Road

Sagehill Road to South Wahluke Road

Reconstruct and resurface to an All-weather standard.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 STP(R) 2,162,500 0 337,500 2,500,000

Totals 2,162,500 0 337,500 2,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 2,500,000

Totals 0 0 0 0 2,500,000

Report Date: October 04, 2016 Page 179

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 243: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 18 WA-06257 06/29/16 06/29/16 2016-260 01 P T 3.060 CE Yes

Coyan Road (Warehouse Road to Muse Road)

02000

2.28 Muse Road to 5.34 Warehouse Road

Construct road over existing gravel roadway.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 STP(R) 2,162,500 0 337,500 2,500,000

Totals 2,162,500 0 337,500 2,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 2,500,000

Totals 0 0 0 0 2,500,000

Report Date: October 04, 2016 Page 180

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 244: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 19 WA-01015 06/29/16 06/29/16 2016-260 04 P T W 2.520 CE Yes

Pasco-Kahlotus Road V

Pasco-Kahlotus Road

MP 13.08 to MP 15.60 Murphy Rd

Reconstruct and Resurface Road.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 CRAB 1,800,000 200,000 2,000,000

Totals 0 1,800,000 200,000 2,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 2,000,000

Totals 0 0 0 0 2,000,000

Report Date: October 04, 2016 Page 181

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 245: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 20 WA-06256 06/29/16 06/29/16 2016-260 11 P T W 0.100 CE No

N Cherry Dr Bridge #944-0.05 Replacement

09440

0.00 to 0.10

Replace existing, structurally-deficient bridge. 944-0.05

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 BR 865,000 0 135,000 1,000,000

Totals 865,000 0 135,000 1,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 1,000,000

Totals 0 0 0 0 1,000,000

Report Date: October 04, 2016 Page 182

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 246: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 21 WA-09043 06/29/16 06/29/16 2016-260 03 P W 2.760 CE Yes

Coyan Road (Muse Road to Hatton Road) II

02000

0.04 Hatton Road to 2.80 Muse Road

Reconstruct and pave road. This project includes a R/R overpass.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 STP(R) 4,325,000 0 675,000 5,000,000

Totals 4,325,000 0 675,000 5,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 5,000,000

Totals 0 0 0 0 5,000,000

Report Date: October 04, 2016 Page 183

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 247: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 23 WA-01048 06/29/16 06/29/16 2016-260 04 P T W 3.600 CE Yes

R-170 Road (Klamath Road to Ringold Road) All Weather

R-170 Road

MP 11.95 Klamath Hill Road to MP 15.55 Ringold Road

Reconstruct and resurface to an All-weather standard.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 STP(R) 2,162,500 0 337,500 2,500,000

Totals 2,162,500 0 337,500 2,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 2,500,000

Totals 0 0 0 0 2,500,000

Report Date: October 04, 2016 Page 184

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 248: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 24 WA-09046 06/29/16 06/29/16 2016-260 03 P T W 3.000 CE Yes

Ringold Road (Taylor Flats to R-170) Reconstruction

05060

3.07 Taylor Flats to 6.07 R-170

Reconstruct to All Weather road, add truck climbing lane, address intersection of Ringold Road and Taylor Flats

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 STP(R) 4,325,000 0 675,000 5,000,000

Totals 4,325,000 0 675,000 5,000,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 5,000,000

Totals 0 0 0 0 5,000,000

Report Date: October 04, 2016 Page 185

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 249: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Franklin Co.

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 25 WA-01031 06/29/16 06/29/16 2016-260 04 P T 1.500 CE Yes

Pepiot Road All Weather

Pepiot Road

Mesa City Limits to Milepost 1.50

Reconstruct and resurface to an All-weather standard. The route will need to be classified.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 CRAB 1,200,000 300,000 1,500,000

Totals 0 1,200,000 300,000 1,500,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 1,500,000

Totals 0 0 0 0 1,500,000

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Franklin Co. 19,221,875 3,982,000 5,236,125 28,440,000

Report Date: October 04, 2016 Page 186

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 250: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Mesa

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

06 1 Mesa-4 06/14/16 06/14/16 2016-08 03 S 0.190 CE No

Pepiot Road

Pepiot Road

SR17 to Eastern Most School Exit

Widen, pave, curb, drains, sidewalks, and engineering.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2018 0 TIB 375,000 0 375,000

Totals 0 375,000 0 375,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 375,000 0 0 0

Totals 0 375,000 0 0 0

Report Date: October 04, 2016 Page 187

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 251: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Mesa

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

02 2 Mesa-7 06/14/16 06/14/16 2016-08 03 S 0.200 No

First Avenue Intersection

First Avenue Intersection

Pepiot Road to Old Town Road

Reconstruct intersection.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2020 0 TIB 450,000 0 450,000

Totals 0 450,000 0 450,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 450,000 0 0

Totals 0 0 450,000 0 0

Report Date: October 04, 2016 Page 188

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 252: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Mesa

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

02 3 Mesa-3 06/14/16 06/14/16 2016-08 44 S W 0.040 CE No

Manton Way

Manton Way

First Avenue to Rowell Avenue

Construct sidewalk.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 0 TIB 75,000 0 75,000

Totals 0 75,000 0 75,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 75,000 0

Totals 0 0 0 75,000 0

Report Date: October 04, 2016 Page 189

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 253: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Mesa

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

02 4 Mesa-2 06/14/16 06/14/16 2016-08 44 S W 0.570 CE No

First Avenue

First Avenue

Pepiot Road to Manton Way

Install curbs, gutters and sidewalks.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2020 0 TIB 300,000 0 300,000

Totals 0 300,000 0 300,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 300,000 0 0

Totals 0 0 300,000 0 0

Report Date: October 04, 2016 Page 190

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 254: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Mesa

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 5 Mesa-5 06/14/16 06/14/16 2016-08 01 W 0.030 EIS No

May Avenue North

May Avenue

Manton Way to North SR 17 access

Install water line, curb, gutters, sidewalk, paving, and engineering.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 0 OTHER 200,000 0 200,000

Totals 0 200,000 0 200,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 200,000 0

Totals 0 0 0 200,000 0

Report Date: October 04, 2016 Page 191

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 255: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Mesa

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 6 Mesa-6 06/14/16 06/14/16 2016-08 06 S W 0.060 CE No

Farrell Street

Farrell Street

May Avenue to Caldona Avenue

Replace water line and replace street.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 0 OTHER 48,000 0 48,000

Totals 0 48,000 0 48,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 48,000

Totals 0 0 0 0 48,000

Report Date: October 04, 2016 Page 192

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 256: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Mesa

County: Franklin

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 7 Mesa 06/14/16 06/14/16 2016-08 05 S W 0.030 CE No

Petra Court

Petra Court

First Avenue to Eveland Heights

Sealcoat.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 TIB 10,000 0 10,000

Totals 0 10,000 0 10,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 10,000

Totals 0 0 0 0 10,000

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Mesa 0 1,458,000 0 1,458,000

Report Date: October 04, 2016 Page 193

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 257: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 2 / B030(001) PROSSER 7 07/12/16 07/12/16 16-1519 04 C P S T W 0.760 CE No

Old Inland Empire Highway Improvements

West City Limits to Wine Country Road

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2018 STP(US) 2,069,080 0 322,920 2,392,000

Totals 2,069,080 0 322,920 2,392,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 2,392,000 0 0 0

Totals 0 2,392,000 0 0 0

Report Date: October 04, 2016 Page 194

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 258: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 3 / 3735(001) PROSSER 10 07/12/16 07/12/16 16-1519 04 C P S T W 0.250 CE No

Old Inland Empire Highway - Phase 2

Wine Country Road to Wamba Road

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 TIB 116,910 12,990 129,900

P CN 2019 0 TIB 896,220 99,580 995,800

Totals 0 1,013,130 112,570 1,125,700

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 129,900 0 0 0

CN 0 0 995,800 0 0

Totals 0 129,900 995,800 0 0

Report Date: October 04, 2016 Page 195

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 259: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 4 WA-06502 07/12/16 07/12/16 16-1519 04 C P S T W 0.510 CE Yes

Old Inland Empire Highway - Phase 3

Wamba Road to Grant Road

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 STP(US) 160,900 0 25,100 186,000

P RW 2019 STP(US) 50,000 0 9,000 59,000

P CN 2020 STP(US) 1,658,000 0 258,000 1,916,000

Totals 1,868,900 0 292,100 2,161,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 186,000 0 0

RW 0 0 59,000 0 0

CN 0 0 0 1,916,000 0

Totals 0 0 245,000 1,916,000 0

Report Date: October 04, 2016 Page 196

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 260: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 5 PROSSER 3 07/12/16 07/12/16 16-1519 21 C P S T W 1.000 CE No

Kinney Way/ Concord/ Market Sidewalk Improvements

Park Avenue to State Route 22

Curb and gutter and sidewalk improvements.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2018 0 OTHER 55,000 6,000 61,000

P CN 2019 0 OTHER 575,000 63,000 638,000

Totals 0 630,000 69,000 699,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 61,000 0 0 0

CN 0 0 638,000 0 0

Totals 0 61,000 638,000 0 0

Report Date: October 04, 2016 Page 197

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 261: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 6 PROSSER 5 07/12/16 07/12/16 16-1519 04 C P S T W 0.440 CE No

Wamba Road Improvements - Phase 1

Old Inland Empire Highway to Merlot Drive

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt and striping.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 OTHER 76,000 75,000 151,000

P CN 2020 0 OTHER 686,000 687,000 1,373,000

Totals 0 762,000 762,000 1,524,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 151,000 0 0

CN 0 0 0 1,373,000 0

Totals 0 0 151,000 1,373,000 0

Report Date: October 04, 2016 Page 198

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 262: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 7 PROSSER 6 07/12/16 07/12/16 16-1519 04 C P S T W 0.150 CE No

Wamba Road Improvements - Phase 2

Wine Country Road to Old Inland Empire Highway

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2020 0 OTHER 26,000 33,000 59,000

P CN 2021 0 OTHER 218,000 291,000 509,000

Totals 0 244,000 324,000 568,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 0 59,000 0

CN 0 0 0 0 509,000

Totals 0 0 0 59,000 509,000

Report Date: October 04, 2016 Page 199

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 263: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 8 PROSSER 8 07/12/16 07/12/16 16-1519 04 C P S T W 0.950 CE No

Byron Road Improvements

Sheridan Avenue to West City Limits

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 OTHER 254,640 63,660 318,300

P CN 2020 0 OTHER 1,952,400 488,100 2,440,500

Totals 0 2,207,040 551,760 2,758,800

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 318,300 0 0

CN 0 0 0 2,440,500 0

Totals 0 0 318,300 2,440,500 0

Report Date: October 04, 2016 Page 200

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 264: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

08 9 PROSSER 9 07/12/16 07/12/16 16-1519 04 C P S T W 0.390 CE No

Nunn Road Improvements

West City Limits to 200 east of Casi Court

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P PE 2019 0 TPP 102,000 11,000 113,000

P CN 2020 0 TPP 916,000 103,000 1,019,000

Totals 0 1,018,000 114,000 1,132,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

PE 0 0 113,000 0 0

CN 0 0 0 1,019,000 0

Totals 0 0 113,000 1,019,000 0

Report Date: October 04, 2016 Page 201

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 265: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 10 PROSSER 11 07/12/16 07/12/16 16-1519 04 C P S T W 0.500 CE No

Prosser Avenue Improvements

Market Street to Memorial Street

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2019 0 0 1,668,000 1,668,000

Totals 0 0 1,668,000 1,668,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 1,668,000 0 0

Totals 0 0 1,668,000 0 0

Report Date: October 04, 2016 Page 202

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 266: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 11 PROSSER 12 07/12/16 07/12/16 16-1519 04 C P S T W 0.310 CE No

Alexander Court Improvements - Phase 1

Highland Drive to Paterson Road

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 0 0 973,000 973,000

Totals 0 0 973,000 973,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 973,000

Totals 0 0 0 0 973,000

Report Date: October 04, 2016 Page 203

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 267: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 12 PROSSER 13 07/12/16 07/12/16 16-1519 04 C P S T W 0.230 CE No

Alexander Court Improvements - Phase 2

Wine Country Road to Highland Drive

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2021 0 0 700,000 700,000

Totals 0 0 700,000 700,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 700,000

Totals 0 0 0 0 700,000

Report Date: October 04, 2016 Page 204

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 268: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

09 13 PROSSER 14 07/12/16 07/12/16 16-1519 04 C P S T W 0.200 CE No

Benson Avenue Improvements

Mercer Court to Alexander Court

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 589,000 589,000

Totals 0 0 589,000 589,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 589,000

Totals 0 0 0 0 589,000

Report Date: October 04, 2016 Page 205

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 269: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 14 PROSSER 15 07/12/16 07/12/16 16-1519 04 C P S T W 0.280 CE No

Highland Drive Improvements

Alexander Court to State Route 22

Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, hot mix asphalt, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 1,093,000 1,093,000

Totals 0 0 1,093,000 1,093,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 1,093,000

Totals 0 0 0 0 1,093,000

Report Date: October 04, 2016 Page 206

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 270: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

06 15 PROSSER 16 07/12/16 07/12/16 16-1519 06 P S T W 0.170 CE No

Downtown Intersection Improvements - 5th Street

Bennett Street to Meade Street

Intersection Improvements including planing, hot mix asphalt overlay, curb and gutter, sidewalk, storm drainage, and pavement markings.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P ALL 2022 0 0 335,000 335,000

Totals 0 0 335,000 335,000

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

ALL 0 0 0 0 335,000

Totals 0 0 0 0 335,000

Report Date: October 04, 2016 Page 207

Six Year Transportation Improvement ProgramFrom 2017 to 2022

Page 271: Appendix - Benton-Franklin Council of Governmentsbfcog.us/wp-content/uploads/2016/10/2017-TIP-Document... · 2019-11-06 · July 1st - Date by which cities and towns are required

Agency: Prosser

County: Benton

MPO/RTPO: BFCG N Inside Y Outside

Fu

nctio

nal

Class

Prio

rity Nu

mb

er

A. PIN/Project No.C. Project TitleD. Road Name or NumberE. Begin & End TerminiF. Project Description

B. STIP ID

G. Structure ID

Hearin

g

Ad

op

ted

Am

end

men

t

Reso

lutio

n N

o.

Imp

rovem

ent T

ype

Utility C

od

es

To

tal Len

gth

En

viron

men

tal Typ

e

RW

Req

uired

07 16 WA-06603 07/12/16 07/12/16 16-1519 21 C P S T W CE No

Wine Country Road Illuminated Crosswalk Project

WCR/Chardonnay Avenue to

Install an illuminated crosswalk.

Funding

Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds

P CN 2018 0 Ped/Bike Program 55,510 5,390 60,900

Totals 0 55,510 5,390 60,900

Expenditure Schedule

Phase 1st 2nd 3rd 4th 5th & 6th

CN 0 60,900 0 0 0

Totals 0 60,900 0 0 0

Federal Funds State Funds Local Funds Total Funds

Grand Totals for Prosser 3,937,980 5,929,680 7,911,740 17,779,400

Report Date: October 04, 2016 Page 208

Six Year Transportation Improvement ProgramFrom 2017 to 2022