1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. No. Item Details 1 Name of the Project/s Second Amendment in the Environmental Clearance awarded regarding Exploratory Drilling of 10 wells in NELP-VIII block CB-ONN-2009/4 in Western Basin in Vadodara, District Gandhi Nagar, Gujarat by M/s Oil and Natural Gas Corporation Ltd. EC Letter No. F. No. J-11011/1/2011-IA II (I) dated 25 th September, 2013 2 S. No. in the Schedule 1(b) 3 Proposed capacity / area / length / tonnage to be handled/ command area / lease area / no. of wells to be drilled 10 Nos. of well in 58.00 Sq. Km area 4 New / Expansion / Modernization New, EC letter to be amended due to change in well locations of two wells after acquisition and interpretation of G&G data and unavailability of land at previous locations. Locations mentioned in EC letter for remaining 05 wells are tentative only and will change after drilling currently proposed three wells and data acquisition. 5 Existing Capacity / Area etc. 58.00 sq.km. 6 Category of Project (A or B) A 7 Does it attract the general conditions? If yes, please specify. No 8 Does it attract specific condition? If yes, please specify No

Upload: others

Post on 06-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

1

APPENDIX I (See paragraph – 6)

FORM 1 (I) Basic Information

S.

No. Item Details

1 Name of the Project/s

Second Amendment in the Environmental

Clearance awarded regarding Exploratory

Drilling of 10 wells in NELP-VIII block

CB-ONN-2009/4 in Western Basin in

Vadodara, District Gandhi Nagar, Gujarat

by M/s Oil and Natural Gas Corporation

Ltd.

EC Letter No. F. No. J-11011/1/2011-IA

II (I) dated 25th

September, 2013

2 S. No. in the Schedule 1(b)

3

Proposed capacity / area /

length / tonnage to be handled/

command area / lease area / no.

of wells to be drilled

10 Nos. of well in 58.00 Sq. Km area

4 New / Expansion /

Modernization

New, EC letter to be amended due to

change in well locations of two wells

after acquisition and interpretation of

G&G data and unavailability of land at

previous locations. Locations mentioned

in EC letter for remaining 05 wells are

tentative only and will change after

drilling currently proposed three wells

and data acquisition.

5 Existing Capacity / Area etc. 58.00 sq.km.

6 Category of Project (A or B) A

7

Does it attract the general

conditions? If yes, please

specify.

No

8 Does it attract specific

condition? If yes, please specify No

Page 2: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

2

S.

No. Item Details

9

Location

Gandhinagar Districs, Gujarat,

Coordinates of Block are given in

Annexure-I

District Gandhinagar

State Gujarat

10 Nearest railway station / airport /

along with distance in km. Mehsana

11

Nearest town, city, district

headquarters along with

distances in kms

Gandhinagar Town, 20 Km from area of

interest

12

Village Panchayat, Zilla

Parishad, Municipal

Corporation, Local Body

(complete postal address with

telephone nos. to be given)

Mandhali (Vihar), Vihar, Bilodara, Ridrol,

Ajol, Charada and Ubhakai Villages in

Mansa Taluka of Gandhinagar District,

Map is enclosed with location of Basin

13 Name of the applicant ONGC, Baroda

14 Registered address

Jeevan Bharti Building, Tower-II, 9th

Floor, 124 Indira Chowk, New Delhi -

110001

15

Address for correspondence

Block-III, 4th Floor, Gaveshna Bhavan,

ONGC, Makarpura Road, Vadodara-

390009

Name A K Singh

Designation General Manager(Geol.)-Block

Manager-III

Address Block-III, 4

th Floor, Gaveshna Bhavan,

ONGC, Makarpura Road, Vadodara

Pin Code 390009

E-mail [email protected]

Telephone no. 0265-2641160

Fax no. 0265-2638855

16

Details of alternative sites

examined, if any. Location of

these sites should be shown on

the Toposheet

Yes after interpretation of data site

locations changed from previous one,

Map enclosed in Annexure-II

Page 3: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

3

S.

No. Item Details

17 Interlinked Projects

18

Whether separate application of

interlinked project has been

submitted?

Not Applicable

19 If yes, date of submission Not Applicable

20 If no, reason Not Applicable

21

Whether the proposal involves

approval / clearance under: if

yes, details of the same and

their status to be given:

The Forest (Conservation) Act,

1980

The Wildlife (Protection) Act,

1972

The C.R.Z Notification, 1991

No forest land/ National Park/Wild life

Sanctuary/Reserve forest/Eco sensitive

and CRZ area located in area of interest

22

Whether there is any

Government order / policy,

relevant / relating to the site

Block was awarded in NELP-VIII round

of bidding, PEL grant order no.

23 Forest land involved (ha.) Nil

24

Whether there is any litigation

pending against the project and

/ or land in which the project is

proposed to be set up?

Name of the Court

Case No.

Order / directions of the Court, if

any and its relevance with the

proposed project

Nil

25 Expected cost of the project Rs. 80 Cr.

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions,

which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sl. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source

Page 4: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

4

of information data

1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

Yes Drilling of a well is temporary activity. Land being acquired (Temporarily) approx. 110Mx110M for one well

1.2 Clearance of existing land, vegetation and buildings?

Yes Land being acquired

1.3 Creation of new land uses?

No

1.4 Pre-construction investigations e.g. bore houses, soil testing?

No

1.5 Construction works?

Yes Initial land preparation for drilling operation.

1.6 Demolition works?

No

1.7 Temporary sites used for construction works or housing of construction workers?

No

1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

Yes

1.9 Underground works including mining or tunneling?

No

1.10 Reclamation works?

Yes

1.11 Dredging? No

1.12 Offshore structures? No

1.13 Production and manufacturing processes?

No

1.14 Facilities for storage of goods or materials?

Yes Diesel will be stored in above ground Diesel Storage tanks of approx. 40Kl capacity, MOC of tank – CS There will be water storage pit for collection of water required for drilling. Fluid storage pit for collection of waste water, which comes out after drilling operations.

1.15 Facilities for treatment or disposal of solid waste or liquid effluents?

Yes Water, Drilling, Fluid Storage pit and Drill cutting Storage pit. The waste water storage pit contains water used for preparation of drilling fluid. The Drilling Fluid

Page 5: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

5

Storage pit collects all the waste water, which come from drilling operations and the same is recycled and reused during drilling phase. The size of the pit is generally 70x30x2M. The pit shall be lined with HDPE sheet. At the end of drilling operation, the waste drilling fluid is solar dried and filled with top soil. The drill cuttings are removed from the mud by the shale shakers and transferred to mud tank. The mud is cleaned and pumped down the drill string again. The drilling mud is about 250M

3 per

well. Drill cuttings are collected, dried and disposed off as per GRR 546(E) dated 30th August 2005 guidelines for disposal of solid waste, drill cuttings and drilling fluids for Onshore drilling process. The size of the drill cutting pit is generally 22x15x1.5M. Cutting Pit shall be lined with HDPE sheet. Domestic Sewage Treatment & Disposal System The sewage generated will be treated in a septic tank – soak pit system. The septic tank will conform to the IS Design specifications.

1.16 Facilities for long term housing of operational workers?

No

1.17 New road, rail or sea traffic during Yes If access road is not

Page 6: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

6

construction or operation?

available then a temporary approach road will be made.

1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc?

Yes Preparation of approach road

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

No

1.20 New or diverted transmission lines or pipelines?

No

1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

No

1.22 Stream crossings? No

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

No

1.25 Transport of personnel or materials for construction, operation or decommissioning?

Yes Materials required during drilling operation will be transported from nearest project office. During drilling operation approx. 30 persons will be required at a time. Light vehicle will used for transportation of personnel.

1.26 Long-term dismantling or decommissioning or restoration works?

No

1.27 Ongoing activity during decommissioning which could have an impact on the environment?

No

1.28 Influx of people to an area in either temporarily or permanently?

Yes Temporarily

1.29 Introduction of alien species?

No

1.30 Loss of native species or genetic diversity?

No

1.31 Any other actions?

No

2. Use of Natural resources for construction or operation of the Project (such as

land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Page 7: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

7

Sl. No.

Information/checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha)

Yes Agricultural/ Non agricultural land being acquired, approx. 110x110M

2.2 Water (expected source & competing users) unit: KLD

Yes Approx. 30 m3/day/well during drilling operation

2.3 Minerals (MT) No

2.4 Construction material – stone, aggregates, sand / soil (expected source – MT)

Yes Temporary construction by Civil department of ONGC

2.5 Forests and timber (source – MT)

No

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

Yes 3000HP (03 Nos. of power pack of 1000HP each) Two nos. of Power packed DG Sets will be in operation at a time to meet the energy requirement of drilling operations. Fuel (HSD) consumption will be around 2.5 - 3.0 Kl/day during drilling ops.

2.7 Any other natural resources (use appropriate standard units)

No

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sl. No.

Information/Checklist confirmation

Yes/No

Details thereof (with Approximate quantities/ rates, wherever possible) with source of information data

3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

No

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

No

Page 8: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

8

3.3 Affect the welfare of people e.g. by changing living conditions?

Yes Job opportunities

Medical Facilities

School

Road Construction

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,

No

3.5 Any other causes N.A.

4. Production of solid wastes during construction or operation or

decommissioning (MT/month)

S.No.

Information/Checklist confirmation

Yes/No

Details thereof (with Approximate quantities/ rates, wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes Yes Inert solid cuttings having sand/silt/clay etc.

4.2 Municipal waste (domestic and or commercial wastes)

Yes Very negligible quantity of kitchen waste.

4.3 Hazardous wastes (as per Hazardous Waste Management Rules)

No

4.4 Other industrial process wastes No

4.5 Surplus product No

4.6 Sewage sludge or other sludge from effluent treatment

No

4.7 Construction or demolition wastes No

4.8 Redundant machinery or equipment No

4.9 Contaminated soils or other materials No

4.10 Agricultural wastes No

4.11 Other solid wastes No

5. Release of pollutants or any hazardous, toxic or noxious substances to air

(Kg/hr)

S.No.

Information/Checklist confirmation Yes/No

Details thereof (with Approximate quantities/ rates, wherever possible) with source of information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

Yes From DG Set, At a time two DG (power pack) sets will be in operation

Page 9: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

9

and third one will be kept standby Capacity: 1000 HP of each DG set, 3 Nos. No significant emissions from DG Sets are anticipated because deployed Engines are Euro-IV emission norms compliant. Stack height of DG set shall be kept as per CPCB guidelines.

5.2 Emissions from production processes No

5.3 Emissions from materials handling including storage or transport

Nil During rig transportation water spray shall be done to control the dust emission.

5.4 Emissions from construction activities including plant and equipment

Nil Construction activity shall be for a very short period. No significant emissions of dust anticipated. Water spray on approach roads shall be done.

5.5 Dust or odors from handling of materials including construction materials, sewage and waste

No

5.6 Emissions from incineration of waste

No

5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)

No

5.8 Emissions from any other sources No

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. No.

Information/Checklist confirmation Yes/No

Details thereof (with Approximate quantities/ rates, wherever possible) with source of information data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

Yes During running of Power Packs (DG Sets) and pumps, noise will be generated but noise will be very low outside the

Page 10: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

10

well site boundary. Noise level at 25m distance from well site boundary will be less than 58 dB(A) approx. DG sets shall be provided with acoustic enclosures..

6.2 From industrial or similar processes N.A.

6.3 From construction or demolition Yes

6.4 From blasting or piling N.A.

6.5 From construction or operational traffic

Yes

6.6 From lighting or cooling systems N.A.

6.7 From any other sources N.A.

7. Risks of contamination of land or water from releases of pollutants into the

ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. No.

Information/Checklist confirmation Yes/No

Details thereof (with Approximate quantities/ rates, wherever possible) with source of information data

7.1 From handling, storage, use or spillage of hazardous materials

Yes EMP being prepared and implemented.

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

N.A.

7.3 By deposition of pollutants emitted to air into the land or into water

N.A.

7.4 From any other sources N.A.

7.5 Is there a risk of long term build up of pollutants in the environment from these sources?

No

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S.No.

Information/Checklist confirmation Yes/No

Details thereof (with Approximate quantities/ rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc from storage, handling, use or

Yes ERP/DMP being prepared.

Page 11: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

11

production of hazardous substances

8.2 From any other causes N.A.

8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

Yes ERP will be in place to deal with any emergency.

9. Factors which should be considered (such as consequential development)

which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S.No.

Information/Checklist confirmation Yes/No

Details thereof (with Approximate quantities/ rates, wherever possible) with source of information data

9.1 Lead to development of supporting. Utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other

Yes N.A. N.A. N.A. N.A.

Approach roads shall be developed.

9.2 Lead to after-use of the site, which could have an impact on the environment

No

9.3 Set a precedent for later developments

Yes In case of commercial quantity of hydrocarbon reserves is established.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

No Temporary activity

(III) Environmental Sensitivity

S.No.

Areas

Name/ Identity

Aerial distance (within 15 km.) Proposed project location boundary

1 Areas protected under international conventions, national or local legislation for their ecological,

N.A.

Page 12: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

12

landscape, cultural or other related value

2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

N.A.

3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

N.A.

4 Inland, coastal, marine or underground waters

No

5 State, National boundaries

No Area of interest is located in Gandhinagar Districts of Gujarat state.

6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

No

7 Defense installations

No

8 Densely populated or built-up area

No

9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)

No

10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

Yes

11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)

No

12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

No

(IV). Proposed Terms of Reference for EIA studies

EIA Study and Public Consultation within the Block area are already carried as per approved TOR F. No. J-11011/1/2011-IA II (I) dated 29

th March, 2011.

Environmental Clearance for exploratory drilling of wells is granted vide F. No. J-

11011/1/2011-IA II (I) dated 25th

September, 2013, enclosed at Annexure-III.

Page 13: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

13

(V) TECHNICAL JUSTIFICATION FOR CHANGE IN WELL LOCATIONS: Ten (10) numbers of Wells for exploration drilling in the NELP VIII block CB-ONN-2009/4 were accorded Environmental Clearance vide F No. J-11011/1/2011-IA II (I) dated 25th September, 2013 along with the mention of co-ordinates. (Annexure-III) Prior to the carrying out the EIA studies, ONGC had tentatively demarcated the ten (10) locations and the same co-ordinates have been cleared for the grant of EC in the JV block. Ist Amendment was received in which the co-ordinates of new finalized two locations, Well#1 and Well#2 were changed and approved vide F No. J-11011/1/2011-IA II(I) dated 24

th December,2014.

Subsequently Well#1 & Well#2 were drilled as CRAE (CRNL-1) and CRAF (CRNL-2) in the year 2014 & 2015. While implementing the Work programme in the JV consortium, the locations at SL. No. 3, 7 & 10 were tentatively put in the EIA report on the basis of earlier interpretation on 2D lines. The interpretation has been revised and re-revised now with the completion of drilled two wells CRNL-1 & CRNL-2. Further on the basis of revised interpretation, ONGC wants to seek the approval of three more locations listed in the original EC as Well# 3, Well#7 & Well#10. The new co-ordinates of the finalized three locations are as below:-

S.No. Name of the Well Latitude Longitude

1 Well#3 (CRAG) 230 32’ 37.37”N 72

0 37’ 37.72”E

2 Well#4 (CRAH) 230 27’ 22.90”N 72

0 39’ 24.00”E

3 Well#5 (CRAI) 230 26’ 11.09”N 72

0 40’ 04.52”E

It is thus requested that the above three locations CRAG CRAH & CRAI whose co-ordinates are 23

0 32’ 37.37”N; 72

0 37’ 37.72”E, 23

0 27’ 22.90”N; 72

0 39’

24.00”E & 230 26’ 11.09”N; 72

0 40’ 04.52”E respectively may be agreed for

modification so that the exploratory wells may be drilled in time for implementing the JV work programme. The modification in the co-ordinates of other remaining five(5) wells mentioned in the EC is also likely to be reviewed and changed on the basis of drilling results in the wells CRAG CRAH & CRAF.

Therefore, modified EC for drilling 3 (Three) wells CRAG, CRAH & CRAI in the

NELP VIII Block CB-ONN-2009/4 may kindly be approved.

(V) Proposed project is not located in critically and severely polluted areas as per

MOEF notification dated 13th January 2010.

“I hereby given undertake that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any

Page 14: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

14

part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any project will be revoked at our risk and cost.”

Date: 15.12.2015 GM – Block Manager-III Place: Baroda WOB, ONGC, Baroda

Page 15: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

15

Annexure-I

COORDINATES OF NELP-VIII BLOCK CB-ONN-2009/4

CORNER POINTS LONGITUDE LATITUDE

DEG. MIN. SEC. DEG. MIN. SEC.

A 72 37 35 23 34 18

B 72 38 47 23 34 18

C 72 42 55 23 27 03

D 72 40 16 23 25 53

E 72 39 17 23 27 30

F 72 41 00 23 27 30

G 72 41 00 23 28 14

H 72 40 18 23 28 14

I 72 39 11 23 28 07.5

J 72 39 11 23 28 36

K 72 39 15 23 29 59

L 72 37 35 23 31 15

A 72 37 35 23 34 18

Coordinates of finalized locations of two wells in which Ist Ammendment is received

Sl. No. Final well location Latitude Longitude

1 Well#1 (CRAE) 230 32’ 53.3” 72

0 38’ 56.8”

2 Well#2 (CRAF) 230 30’ 11.8” 72

0 39’ 16.8”

Coordinates of finalized locations of three wells for 2nd Ammendment

S.No. Name of the Well Latitude Longitude

1 Well#3 (CRAG) 230 32’ 37.37”N 72

0 37’ 37.72”E

2 Well#4 (CRAH) 230 27’ 22.9”N 72

0 39’ 24.00”E

3 Well#5 (CRAI) 230 26’ 11.09”N 72

0 40’ 04.52”E

Remaining 05 well locations are tentative and finalization of the coordinates depends up on acquisition of reservoir data by drilling of above three wells.

Page 16: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

16

Annexure-II

Map of Block with changed and tentative locations

Drilled Wells

Previous Well

Location

New Finalised Location

CRNL-1

CRNL-2

Page 17: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

17

Annexure-III

Page 18: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

18

Page 19: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

19

Page 20: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

20

Page 21: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

21

Page 22: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

22

Page 23: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

23

Page 24: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

24

Page 25: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

25

Annexure-IV

Page 26: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

26

Annexure-V

a&b

Page 27: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

27

Page 28: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

28

Page 29: APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. …environmentclearance.nic.in/writereaddata/modification/... · 2015. 12. 18. · 2 S. No. in the Schedule 1(b) 3 Proposed

29

Annexure-VI a,b&c