appendix k surface water assessment - home - … · appendix k surface water assessment ... it is...

28
J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 Appendix K Surface Water Assessment

Upload: lenhu

Post on 08-Sep-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05

Appendix K Surface Water Assessment

Page 2: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Contents

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 i

Appendix K Surface Water Assessment

K1.1 Overview ---------------------------------------------------------------------------------------------------- 1

K1.2 Design Peak Flood Flow Estimates for the McArthur River ------------------------------- 1

K1.3 Mathematical Hydraulic Modelling ----------------------------------------------------------------- 2

K1.3.1 Approach 2 K1.3.2 Hydraulic Model Data and Extents 3

K1.4 Hydraulic Model Calibration – Existing Conditions ------------------------------------------ 4

K1.4.1 Flood Flow Hydraulic Roughness Values 4 K1.4.2 Low Flow Hydraulic Roughness Values 5

K1.5 Verification of Model Flow Velocities For Fish Passage Flows -------------------------- 6

K1.6 Sediment Data for Sediment Transport Capacity Assessment--------------------------- 6

K1.7 Hydraulic Model Results – Existing and Proposed------------------------------------------- 7

K1.8 Historical Cross-section Surveys of McArthur River Channel-------------------------- 24

Page 3: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-1

K1.1 Overview

This Appendix presents technical information relating to the assessment of surface water for the McArthur River Mine Expansion EIS. The main EIS report provides complete background to the context and key environmental issues for surface water management, and information presented herein is limited to technical methods and data utilised to undertake the assessment of surface aspects of the project.

K1.2 Design Peak Flood Flow Estimates for the McArthur River

Estimates of design peak flood flows were required to assess existing flooding in the McArthur River and the impacts of the proposed realigned river and creek channels. For this EIS, estimates of design flood flows have been determined from studies undertaken by Kellogg Brown and Root (KBR, 2003) as part of investigations into the feasibility of the proposed works. The KBR flood estimates were determined utilising annual-series flood frequency analysis of observed floods at the DIPE stream gauging station (9070132 – MIM pump station) located immediately upstream of the mine. The flood frequency analysis was undertaken in accordance with procedures recommended in Australian Rainfall and Runoff (1987) which is widely accepted for this type of analysis.

An alternative method of estimating design peak flood flows (and hydrographs) utilising rainfall-runoff routing methods could not be applied with sufficient confidence for the McArthur River catchment. The main limitation is due to the sparsity of rainfall gauges in the catchment (which would be required for runoff model calibration), and uncertainty in design rainfall storm conditions to apply to the model (specifically the combined effect of uncertainty design rainfall intensities and application of rainfall areal reduction factors for the large catchment area).

The adopted design peak flood flow estimates (based on flood frequency analysis methods) are therefore considered the most reliable estimates for the project. It is important to note that:

• The KBR flood frequency estimates include the 2003 flood event which results in higher flood flow estimates from previous flood studies and reports.

• Estimates of floods for 100 year ARI (1% Annual Exceedance Probability - AEP) and 500 year ARI (0.2% AEP) should be utilised with caution as the estimates are likely to exceed the credible limit of extrapolation as defined in the recommendations of Australian Rainfall and Runoff – Book VI Extreme Floods (1999).

A flood frequency plot of the design flood estimates is presented in Figure K.1.

The flood frequency analysis results apply specifically to flood flows at the DIPE stream gauge. For estimates of flood flows at other locations along the McArthur River where the contributing catchment area (and flood magnitude) varies, the flood frequency estimates for the stream gauge location were scaled relating catchment area to peak discharge as shown in Equations 1 to 5 (KBR, 2003).

6.0500 9.73 AQ yearARI = Eq. 1

Page 4: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-2

6.0100 1.36 AQ yearARI = Eq. 2

6.050 4.25 AQ yearARI = Eq. 3

6.05 3.5 AQ yearARI = Eq. 4

6.02 8.1 AQ yearARI = Eq. 5

Where: Q = peak flow flow (m3/s), and Α = catchment area (km2)

Figure K.1 McArthur River Flood Frequency Plot

K1.3 Mathematical Hydraulic Modelling

K1.3.1 Approach

Mathematical hydraulic modelling of the McArthur River was undertaken to evaluate key hydraulic parameters of river flows for existing river conditions, and proposed works, in relation to flood levels, flow velocity, shear stress, stream power (as indicators of erosion potential in flood conditions), flow velocity for assessment of hydraulic requirements for fish passage, and sediment transport capacity (as indicators of sedimentation potential and broader geomorphologic characteristics).

Page 5: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Figure:42625552

HEC-RAS HYDRAULIC MODELCROSS-SECTION LAYOUT

EXISTING CONDITIONS

N

Approved:

File No: 42625552-g-154.worK.2

Job No:

Date: 03-08-05Drawn:

This

dra

win

g is

sub

ject

to C

OP

YR

IGH

T. It

rem

ains

the

prop

erty

of U

RS

Aus

tralia

Pty

Ltd

.

VH

Horizontal Datum: AGD84, Zone 53

Rev: A

A4

620000E

625000E

8190000N

615000E

8185000N

610000E

8180000N

605000E

8165000N

8175000N

8170000N

2,1482,1482,1482,1482,1482,1482,1482,1482,148

3,0243,0243,0243,0243,0243,0243,0243,0243,024

3,7483,7483,7483,7483,7483,7483,7483,7483,7484,7334,7334,7334,7334,7334,7334,7334,7334,733

6,0986,0986,0986,0986,0986,0986,0986,0986,0988,2118,2118,2118,2118,2118,2118,2118,2118,211

9,3949,3949,3949,3949,3949,3949,3949,3949,394

10,68310,68310,68310,68310,68310,68310,68310,68310,683

12,03812,03812,03812,03812,03812,03812,03812,03812,038

14,44914,44914,44914,44914,44914,44914,44914,44914,449

15,69215,69215,69215,69215,69215,69215,69215,69215,692

16,31716,31716,31716,31716,31716,31716,31716,31716,317

16,69816,69816,69816,69816,69816,69816,69816,69816,698

17,50717,50717,50717,50717,50717,50717,50717,50717,507

17,69617,69617,69617,69617,69617,69617,69617,69617,696

19,12619,12619,12619,12619,12619,12619,12619,12619,126

20,05720,05720,05720,05720,05720,05720,05720,05720,057

21,31721,31721,31721,31721,31721,31721,31721,31721,317

22,11922,11922,11922,11922,11922,11922,11922,11922,119

23,16223,16223,16223,16223,16223,16223,16223,16223,16223,89123,89123,89123,89123,89123,89123,89123,89123,891

24,45024,45024,45024,45024,45024,45024,45024,45024,45025,84825,84825,84825,84825,84825,84825,84825,84825,848

26,42726,42726,42726,42726,42726,42726,42726,42726,427

27,60227,60227,60227,60227,60227,60227,60227,60227,60229,00829,00829,00829,00829,00829,00829,00829,00829,008

30,08230,08230,08230,08230,08230,08230,08230,08230,08230,30030,30030,30030,30030,30030,30030,30030,30030,30031,22131,22131,22131,22131,22131,22131,22131,22131,221

31,67431,67431,67431,67431,67431,67431,67431,67431,67432,73232,73232,73232,73232,73232,73232,73232,73232,732

33,07833,07833,07833,07833,07833,07833,07833,07833,078

34,03334,03334,03334,03334,03334,03334,03334,03334,033

34,60334,60334,60334,60334,60334,60334,60334,60334,60335,94535,94535,94535,94535,94535,94535,94535,94535,945

37,34637,34637,34637,34637,34637,34637,34637,34637,346

38,22538,22538,22538,22538,22538,22538,22538,22538,225

38,99838,99838,99838,99838,99838,99838,99838,99838,99840,31940,31940,31940,31940,31940,31940,31940,31940,319

41,35341,35341,35341,35341,35341,35341,35341,35341,353

43,64943,64943,64943,64943,64943,64943,64943,64943,649828282828282828282

0 2.5

Scale

5Km

Scale 1:150 000 (A3)

McARTHUR RIVER MINEOPEN CUT PROJECT

ENVIRONMENTAL IMPACT STATEMENT

CMP

Page 6: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Figure:42625552

HEC-RAS HYDRAULIC MODELCROSS-SECTION LAYOUT

OPEN CUT PIT MINE EXPANSION

N

Approved:

File No: 42625552-g-155.worK.3

Job No:

Date: 03-08-05Drawn:

This

dra

win

g is

sub

ject

to C

OP

YR

IGH

T. It

rem

ains

the

prop

erty

of U

RS

Aus

tralia

Pty

Ltd

.

VH

Horizontal Datum: AGD84, Zone 53

Rev: A

A4

625000E

620000E

615000E

8190000N

610000E

605000E

8185000N

8180000N

8175000N

8165000N

8170000N

2,2812,2812,2812,2812,2812,2812,2812,2812,281

3,4493,4493,4493,4493,4493,4493,4493,4493,449

4,7334,7334,7334,7334,7334,7334,7334,7334,733

6,0986,0986,0986,0986,0986,0986,0986,0986,0988,2118,2118,2118,2118,2118,2118,2118,2118,211

9,3949,3949,3949,3949,3949,3949,3949,3949,394

10,68310,68310,68310,68310,68310,68310,68310,68310,683

12,03812,03812,03812,03812,03812,03812,03812,03812,038

14,44914,44914,44914,44914,44914,44914,44914,44914,449377377377377377377377377377

1,4481,4481,4481,4481,4481,4481,4481,4481,448

1,7351,7351,7351,7351,7351,7351,7351,7351,735

1,8381,8381,8381,8381,8381,8381,8381,8381,838

2,0432,0432,0432,0432,0432,0432,0432,0432,0433,0783,0783,0783,0783,0783,0783,0783,0783,078

3,7603,7603,7603,7603,7603,7603,7603,7603,7604,1404,1404,1404,1404,1404,1404,1404,1404,140

4,7004,7004,7004,7004,7004,7004,7004,7004,700

5,9865,9865,9865,9865,9865,9865,9865,9865,986

20,69820,69820,69820,69820,69820,69820,69820,69820,69821,02621,02621,02621,02621,02621,02621,02621,02621,026

22,70522,70522,70522,70522,70522,70522,70522,70522,705

23,39323,39323,39323,39323,39323,39323,39323,39323,39324,68024,68024,68024,68024,68024,68024,68024,68024,68026,07926,07926,07926,07926,07926,07926,07926,07926,079

26,65826,65826,65826,65826,65826,65826,65826,65826,658

27,83227,83227,83227,83227,83227,83227,83227,83227,83229,23829,23829,23829,23829,23829,23829,23829,23829,238

30,31330,31330,31330,31330,31330,31330,31330,31330,31330,53130,53130,53130,53130,53130,53130,53130,53130,53131,45231,45231,45231,45231,45231,45231,45231,45231,452

31,90531,90531,90531,90531,90531,90531,90531,90531,90532,96332,96332,96332,96332,96332,96332,96332,96332,963

33,30933,30933,30933,30933,30933,30933,30933,30933,309

34,26434,26434,26434,26434,26434,26434,26434,26434,264

34,83434,83434,83434,83434,83434,83434,83434,83434,83436,17536,17536,17536,17536,17536,17536,17536,17536,175

37,57637,57637,57637,57637,57637,57637,57637,57637,57638,45638,45638,45638,45638,45638,45638,45638,45638,456

39,22839,22839,22839,22839,22839,22839,22839,22839,22840,55040,55040,55040,55040,55040,55040,55040,55040,550

41,58441,58441,58441,58441,58441,58441,58441,58441,584

43,88043,88043,88043,88043,88043,88043,88043,88043,880333331313133

15,39615,39615,39615,39615,39615,39615,39615,39615,396

16,19216,19216,19216,19216,19216,19216,19216,19216,19217,49617,49617,49617,49617,49617,49617,49617,49617,49618,07418,07418,07418,07418,07418,07418,07418,07418,074

20,27420,27420,27420,27420,27420,27420,27420,27420,274

0 2.5

Scale

5Km

Scale 1:150 000 (A4)

McARTHUR RIVER MINEOPEN CUT PROJECT

ENVIRONMENTAL IMPACT STATEMENT

CMP

Page 7: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-3

The mathematical modelling was undertaken utilising HEC-RAS software which accounts for steady-state, one-dimensional, gradually varied flow. HEC-RAS is produced and supported by the US Army Corp of Engineers, and widely accepted in Australia and internationally for this type of hydraulic analysis.

K1.3.2 Hydraulic Model Data and Extents

Topographic data to define the existing river waterway geometry in the HEC-RAS model was based on aerial photogrammetric survey (2001) supplemented with detailed ground-based surveyed cross-sections of the McArthur River in the vicinity of the mine.

The HEC-RAS model was developed to evaluate the variation of hydraulics in a broad reach of the river system and facilitate comparison of local reach hydraulics in the broader context. The model extended from 20 km downstream of the mine up to 25 km upstream of the mine.

For existing river conditions flood flows can break out of the main channel and flow into Barney Creek during large flood events (greater than 50 year ARI). In such flood conditions, there is no distinct flowpath divide between the main channel flood flow and flood flow along Barney Creek. The HEC-RAS model for existing flooding conditions was therefore developed with a single flowpath (reach).

For flood conditions after the mine expansion, the flood protection bund will provide a distinct flowpath divide between the main McArthur River channel flood flow and flood flow along Barney Creek for large flood events. The HEC-RAS model for the proposed conditions included split flow provisions for large flood events to account for the divided flood flow path.

The layout of the HEC-RAS model for existing conditions is presented in Figure K.2 and for proposed works is presented in Figure K.3. For reference to HEC-RAS model output plots presented in this EIS, the HEC-RAS model chainages can be correlated to the ‘design chainages’ for the new McArthur River channel works (shown in Figure 12.13 of the main EIS report) using Table K.1.

Page 8: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-4

Table K.1 HEC-RAS Model Chainage to McArthur River Design Chainage Reference

HEC-RAS Model Chainage Channel Design Chainage

15396 5254 15677 4973 15886 4764 16192 4457 16390 4260 16489 4160 16574 4076 16849 3801 17036 3614 17299 3351 17496 3154 17765 2884 17988 2662 18035 2615 18074 2576 18255 2394 18434 2216 18694 1955 18934 1715 19252 1398 19749 900 20274 376

K1.4 Hydraulic Model Calibration – Existing Conditions

The mathematical hydraulic model required hydraulic roughness values (Mannings’ n) that represent the resistance to flow by channel bed/banks and floodplain features. Existing vegetation along the river banks has a substantial influence on hydraulic roughness, and the influence varies according to depth and magnitude of flow. Different hydraulic roughness factors were therefore determined for flood flow conditions and for low-flow conditions of interest to the assessment of hydraulics for fish passage.

K1.4.1 Flood Flow Hydraulic Roughness Values

The hydraulic roughness values for the HEC-RAS model for flood flows were determined by calibration of the model using the observed flood level measurements from the 7 January 2003 flood event at the DIPE McArthur River MIM Pump Station stream gauge (upstream of the mine) and the McArthur River

Page 9: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-5

Mine gauge (downstream of the Glyde River Junction). An exact calibration match to observed flood levels was not attainable and preference was given to providing the best possible match at the upstream gauge. The limitations of the model calibration were considered to be likely due to possible errors in the observed flood levels, uncertainty in the high range of the upstream DIPE gauge rating curve and corresponding flow adopted for the 2003 flood, and uncertainty associated with the flow estimate at the downstream gauge due to unknown contribution of Glyde River flooding for 2003 flood event (note: downstream McArthur River Mine recorded is not gauged and does not have a rating curve).

The adopted hydraulic roughness values for flood flow conditions determined from the model calibration were n=0.080 for the main channel and n=0.075 for floodplain areas. The flood flow calibration results are summarised in Table K.2.

Table K.2 Calibration Results for 7 January 2003 Flood Event

Location HEC-RAS

Cross-section Peak Flow

(m3/s) Observed Level

(mAHD)

Modelled Flood Level

(mAHD)

DIPE Stream Gauge (MIM Pump 9070132)

(upstream of mine) 20795 4,700 36.21 35.71

MRM Gauge

(downstream of Glyde River) 12038 5,600 33.70 34.13

K1.4.2 Low Flow Hydraulic Roughness Values

The hydraulic roughness values for the HEC-RAS model for low flows (up to 100m3/s) were determined by calibration of the model to rating curve water levels for the DIPE McArthur River MIM Pump Station gauge (Station 9070132, upstream of the mine). At low flows, the effect of vegetation and large woody debris has a substantially varying influence on hydraulic roughness depending on the depth of flow. Accordingly, low flow hydraulic roughness values were specifically determined for three flow cases (20, 50, and 100 m3/s). The calibration results and adopted hydraulic roughness values are summarised in Table K.3.

Table K.3 Calibration Results for Low Flow Conditions

Flow (m3/s) DIPE Gauge 9070132 Rating Curve Level

(mAHD)

Modelled Water Level

(mAHD)

Channel Roughness Value

Manning’s ‘n’

20 23.40 23.38 0.230

50 23.88 23.93 0.120

100 24.77 24.72 0.080

Page 10: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-6

K1.5 Verification of Model Flow Velocities For Fish Passage Flows

The HEC-RAS model estimates of existing channel flow velocities for low flows of interest to hydraulic conditions for fish passage were verified with gauged flow velocity data obtained from DIPE for the stream gauge (9070132) located immediately upstream of the mine. DIPE has routinely undertaken gauged flow measurements at this gauging station since 1976. The data set included 98 measured flows and 13 measured flows were selected covering the range of flows from 20 to 100 m3/s. The gauged flows and corresponding mean gauged flow velocities are presented on Figure K.4. The gauged flow velocities confirmed acceptable estimates of existing river channel low-flow velocities from the HEC-RAS model.

DIPE Stream Gauge 9070132 - Gauging Data - Mean Velocity

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

0 50 100 150 200 250

Gauged Flow (m3/s)

Gau

ged

Mea

n Ve

loci

ty (m

/s)

Figure K.4 Gauged Mean Flow Velocities at DIPE Stream Gauge

K1.6 Sediment Data for Sediment Transport Capacity Assessment

The HEC-RAS hydraulic model was utilised to undertake sediment transport capacity calculations to provide an indicator of sedimentation potential under existing river conditions and with the proposed channel realignment. The sediment transport capacity analyses were undertaken using Ackers-White equation and required parameters to define the particle size distribution of typical sediment that could be transported by McArthur River flow. The sediment particle size distribution was selected from a range of sediment particle size distribution tests of the typical McArthur River floodplain and channel soils sampled as part of the geotechnical investigations for the project feasibility (Golders, 2004). The sediment particle size distributions and adopted data (TPA09) for the sediment transport analyses is presented on Figure K.5.

Page 11: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-7

McArthur River Sediment Particle Size Distribution

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100

A.S. Sieve Size (mm)

Perc

ent P

assi

ng

TPA10

TPA12

TPA08TPA01

TPE04

TPA09adopted

Figure K.5 Sediment Particle Size For McArthur River Channel / Floodplain Soils

K1.7 Hydraulic Model Results – Existing and Proposed

The hydraulic modelling results comparing existing river conditions and hydraulics with the proposed channel realignment and flood protection bund are presented as series of longitudinal profile plots in Figures K.6 to K.36 below. The plots are separated into specific hydraulic parameters and grouped according to flow cases as follows:

• 2 year ARI flood flow – Figures K.6 to K.10

• 5 year ARI flood flow – Figures K.11 to K.15

• 50 year ARI flood flow – Figures K.16 to K.20

• 100 year ARI flood flow – Figures K.21 to K.25

• 500 year ARI flood flow – Figures K.26 to K.30

• 20 m3/s (fish passage flow) – Figures K.31 to K.32

• 50 m3/s (fish passage flow) – Figures K.33 to K.34

• 100 m3/s (fish passage flow) – Figures K.35 to K.36

Page 12: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-8

McArthur RiverWater Surface Elevation Comparison for 2yr ARI

10

15

20

25

30

35

40

45

50

55

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Ele

vatio

n (m

AH

D)

Realigned Channel short term Realigned Channel long term Existing channel bed Realigned channel bed Existing

Flow

Figure K.6 Water Level– 2 year ARI flood event

McArthur RiverVelocity (Channel) Comparison for 2yr ARI

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Vel

ocity

(m/s

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.7 Velocity – 2 year ARI flood event

Page 13: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-9

McArthur RiverShear Stress (Channel) Comparison for 2yr ARI

0

20

40

60

80

100

120

140

160

180

200

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

She

ar S

tress

(N/s

q.m

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.8 Shear Stress – 2 year ARI flood event

McArthur RiverStream Power (Channel) Comparison for 2yr ARI

0

20

40

60

80

100

120

140

160

180

200

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Stre

am P

ower

(W/s

q.m

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.9 Stream Power – 2 year ARI flood event

Page 14: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-10

McArthur RiverSediment Transport Capacity (Channel) Comparison for 2yr ARI

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+05

1.E+06

1.E+07

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Sed

imen

t Tra

nspo

rt C

apac

ity (T

onne

s/da

y)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.10 Sediment Transport Capacity – 2 year ARI flood

event

McArthur RiverWater Surface Elevation Comparison for 5yr ARI

10

15

20

25

30

35

40

45

50

55

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Ele

vatio

n (m

AH

D)

Realigned Channel short term Realigned Channel long term Existing channel bed Realigned channel bed Existing

Flow

Figure K.11 Water Level – 5 year ARI flood event

Page 15: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-11

McArthur RiverVelocity (Channel) Comparison for 5yr ARI

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Vel

ocity

(m/s

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.12 Velocity – 5 year ARI flood event

McArthur RiverShear Stress (Channel) Comparison for 5yr ARI

020406080

100120140160180200220240260280300320340360

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

She

ar S

tress

(N/s

q.m

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.13 Shear Stress – 5 year ARI flood event

Page 16: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-12

McArthur RiverStream Power (Channel) Comparison for 5yr ARI

050

100150200250300350400450500550600650700750800850900950

1000105011001150

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Stre

am P

ower

(W/s

q.m

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.14 Stream Power – 5 year ARI flood event

McArthur RiverSediment Transport Capacity (Channel) Comparison for 5yr ARI

1.E-01

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+05

1.E+06

1.E+07

1.E+08

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Sed

imen

t Tra

nspo

rt C

apac

ity (T

onne

s/da

y)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.15 Sediment Transport Capacity – 5 year ARI flood event

Page 17: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-13

McArthur RiverWater Surface Elevation Comparison for 50yr ARI

10

15

20

25

30

35

40

45

50

55

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Ele

vatio

n (m

AH

D)

Realigned Channel short term Realigned Channel long term Existing channel bed Realigned channel bed Existing

Flow

Figure K.16 Water Level – 50 year ARI flood event

McArthur RiverVelocity (Channel) Comparison for 50yr ARI

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Vel

ocity

(m/s

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.17 Velocity – 50 year ARI flood event

Page 18: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-14

McArthur RiverShear Stress (Channel) Comparison for 50yr ARI

0

20

40

60

80

100

120

140

160

180

200

220

240

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

She

ar S

tress

(N/s

q.m

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.18 Shear Stress – 50 year ARI flood event

McArthur RiverStream Power (Channel) Comparison for 50yr ARI

050

100150200250300350400450500550600650700750800850

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Stre

am P

ower

(W/s

q.m

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.19 Stream Power – 50 year ARI flood event

Page 19: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-15

McArthur RiverSediment Transport Capacity (Channel) Comparison for 50yr ARI

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+05

1.E+06

1.E+07

1.E+08

1.E+09

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Sed

imen

t Tra

nspo

rt C

apac

ity (T

onne

s/da

y)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.20 Sediment Transport Capacity – 50 year ARI flood event

McArthur RiverWater Surface Elevation Comparison for 100yr ARI

10

15

20

25

30

35

40

45

50

55

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Ele

vatio

n (m

AH

D)

Realigned Channel short term Realigned Channel long term Existing channel bed Realigned channel bed Existing

Flow

Figure K.21 Water Level – 100 year ARI flood event

Page 20: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-16

McArthur RiverVelocity (Channel) Comparison for 100yr ARI

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Vel

ocity

(m/s

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.22 Velocity – 100 year ARI flood event

McArthur RiverShear Stress (Channel) Comparison for 100yr ARI

0

20

40

60

80

100

120

140

160

180

200

220

240

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

She

ar S

tress

(N/s

q.m

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.23 Shear Stress – 100 year ARI flood event

Page 21: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-17

McArthur RiverStream Power (Channel) Comparison for 100yr ARI

0

50

100

150

200

250

300

350

400

450

500

550

600

650

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Stre

am P

ower

(W/s

q.m

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.24 Stream Power – 100 year ARI flood event

McArthur RiverSediment Transport Capacity (Channel) Comparison for 100yr ARI

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+05

1.E+06

1.E+07

1.E+08

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Sed

imen

t Tra

nspo

rt C

apac

ity (T

onne

s/da

y)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.25 Sediment Transport Capacity – 100 year ARI flood event

Page 22: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-18

McArthur RiverWater Surface Elevation Comparison for 500yr ARI

10

15

20

25

30

35

40

45

50

55

60

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Ele

vatio

n (m

AH

D)

Realigned Channel short term Realigned Channel long term Existing channel bed Realigned channel bed Existing

Flow

Figure K.26 Water Level – 500 year ARI flood event

McArthur RiverVelocity (Channel) Comparison for 500yr ARI

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Vel

ocity

(m/s

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.27 Velocity – 500 year ARI flood event

Page 23: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-19

McArthur RiverShear Stress (Channel) Comparison for 500yr ARI

0

20

40

60

80

100

120

140

160

180

200

220

240

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

She

ar S

tress

(N/s

q.m

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.28 Shear Stress – 500 year ARI flood event

McArthur RiverStream Power (Channel) Comparison for 500yr ARI

0

50

100

150

200

250

300

350

400

450

500

550

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Stre

am P

ower

(W/s

q.m

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.29 Stream Power – 500 year ARI flood event

Page 24: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-20

McArthur RiverSediment Transport Capacity (Channel) Comparison for 500yr ARI

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+05

1.E+06

1.E+07

1.E+08

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Sed

imen

t Tra

nspo

rt C

apac

ity (T

onne

s/da

y)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.30 Sediment Transport Capacity – 500 year ARI flood event

McArthur RiverVelocity (Channel) Comparison for 20 cumecs

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Vel

ocity

(m/s

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.31 Velocity – 20 m3/s (Fish Flow)

Page 25: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-21

McArthur RiverSediment Transport Capacity (Channel) Comparison for 20 cumecs

1.E-03

1.E-02

1.E-01

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+05

1.E+06

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Sed

imen

t Tra

nspo

rt C

apac

ity (T

onne

s/da

y)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.32 Sediment Transport Capacity – 20 m3/s (Fish Flow)

McArthur RiverVelocity (Channel) Comparison for 50 cumecs

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Vel

ocity

(m/s

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.33 Velocity – 50 m3/s (Fish Flow)

Page 26: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-22

McArthur RiverSediment Transport Capacity (Channel) Comparison for 50 cumecs

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+05

1.E+06

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Sed

imen

t Tra

nspo

rt C

apac

ity (T

onne

s/da

y)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.34 Sediment Transport Capacity – 50 m3/s (Fish Flow)

McArthur RiverVelocity (Channel) Comparison for 100 cumecs

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Vel

ocity

(m/s

)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.35 Velocity – 100 m3/s (Fish Flow)

Page 27: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-23

McArthur RiverSediment Transport Capacity (Channel) Comparison for 100 cumecs

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+05

1.E+06

1.E+07

0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000

Chainage (m)

Sed

imen

t Tra

nspo

rt C

apac

ity (T

onne

s/da

y)

Realigned Channel short term Realigned Channel long term Existing

Flow

Figure K.36 Sediment Transport Capacity – 100 m3/s (Fish Flow)

Page 28: Appendix K Surface Water Assessment - Home - … · Appendix K Surface Water Assessment ... It is important to note that: ... state, one-dimensional, gradually varied flow

Appendix K Surface Water Assessment

J:\JOBS\42625552\REPORT\APPENDICES\APPENDICES\APPENDIX K - SURFACE WATER\APPENDIX K SURFACE WATER.DOC\3-AUG-05 K-24

K1.8 Historical Cross-section Surveys of McArthur River Channel

Historical cross-section surveys of the McArthur River channel at the MIM Pump stream gauging station (9070132 upstream of the mine) were obtained from DIPE for a qualitative evaluation of recent historical changes to the river channel geometry and comparison to the qualitative geomorphologic assessment and quantitative hydraulic assessments. Overlay comparisons of the river channel cross-section are presented in Figure K.37 and confirm the EIS conclusions that the existing McArthur River channel near the mine is relatively stable.

Comparison of DIPE 9070132 Stream Gauge Cross-section Surveys

15

20

25

30

35

40

900 950 1000 1050 1100 1150 1200Distance (m)

Elev

atio

n (m

AH

D)

1992 Survey 1975 Survey

Figure K.37 Comparison of Historical McArthur River Channel Surveys