APPENDIX - P

CONSTRUCTION BY LINE SEGMENT:

SEGMENT 1: VOLTAGE: 115 kV/345 kV LENGTH (345 kV): 9,190 FT. (1.7 MI) MINIMUM CONDUCTOR TO GROUND CLEARANCE: 55 FT. (PER EMF CRITERIA) STEEL STRUCTURE FINISH - GALVANIZED IN ACCORDANCE WITH ASTM A123. INSULATORS (345 kV) - PORCELAIN WITH LIGHT GRAY GLAZE COLOR INSULATORS (115 kV) - PORCELAIN WITH LIGHT GRAY GLAZE COLOR

FROM PROPOSED EMPIRE POWER PLANT SUBSTATION TO STRUCTURE 18: BUILD 345 kV CIRCUIT ON 345/115 kV DOUBLE CIRCUIT TUBULAR STEEL POLE STRUCTURES, VERTICAL CONFIGURATION. TANGENT AND SMALL ANGLE STRUCTURES TO BE MONOPOLES WITH DAVIT ARMS AND V-STRING INSULATOR ASSEMBLIES. LARGE ANGLE STRUCTURE TO BE TWO SINGLE CIRCUIT MONOPOLE DEAD-ENDS.

FROM EXISTING RENSSELAER COGEN PLANT SUBSTATION TO STRUCTURE 1, CONTINUES TO STRUCTURE 17, AND TO EXISTING CIRCUIT 16 STRUCTURE 28: REBUILD 115 kV N.M.P.C. CIRCUIT 16 FROM EXISTING 3-POLE STRUCTURE JUST OUTSIDE RENSSELAER COGEN PLANT SUBSTATION, ON PROPOSED WOOD POLE STRUCTURES FOR 600 FT, UP TO PROPOSED DOUBLE CIRCUIT STRUCTURE 1. CONTINUES ON DOUBLE CIRCUIT STRUCTURES (SHARED 115 kV/345 kV) TO EXISTING CIRCUIT 16 STRUCTURE 28. REGUY STRUCTURE 28 (CIRCUIT 16) AS REQUIRED.

SEGMENT 2: VOLTAGE: 345 kV LENGTH: 12,010 FT. (2.3 MI) LOCATION: FROM STRUCTURE 19 TO STRUCTURE 35 STEEL STRUCTURE FINISH - WEATHERING STEEL INSULATORS (345 kV) - PORCELAIN WITH BROWN GLAZE COLOR MINIMUM CONDUCTOR TO GROUND CLEARANCE: 37 FT. (PER NIAGARA MOHAWK STANDARDS)

BUILD SINGLE CIRCUIT ON TUBULAR STEEL POLE STRUCTURES, HORIZONTAL CONFIGURATION. TANGENT STRUCTURES TO BE TWO POLE H-FRAMES WITH VERTICAL SUSPENSION INSULATOR ASSEMBLIES ON OUTSIDE PHASES, V-STRING INSULATOR ASSEMBLY ON MIDDLE PHASE.

z D5113108 RJM SEGMENTS 2, 3, 2A 8. 2A CONNECTOR FILING JV eM

PSC COMMENT REVISION (""DR SEGMENT 1)1 11/27107 RJM JV eM

NO. DUE BY R~ISION APP.CK.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

TECHNICAL REQUIREMENTS

CONSTRUCTION BY LINE SEGMENT

DES. I,. 1m Ie< IOATE SCALE

APPROVED APPROVED INDEX

APPROVED APPROVED eo NOTE-001A

SEGMENT 3: VOLTAGE: 345 kV LENGTH: 21,450 FT. (4.1 MI) LOCATION: STRUCTURE 36 TO N.M.P.C. REYNOLDS ROAD SUBSTATION STEEL STRUCTURE FINISH - WEATHERING STEEL INSULATORS (345 kV) - PORCELAIN WITH BROWN GLAZE COLOR MINIMUM CONDUCTOR TO GROUND CLEARANCE: 37 FT. (PER NIAGARA MOHAWK STANDARDS)

REMOVE EXISITING N.M.P.C. CIRCUIT 17 WOOD STRUCTURES. BUILD SINGLE CIRCUIT ON TUBULAR STEEL POLE STRUCTURES, HORIZONTAL CONFIGURATION. TANGENT STRUCTURES TO BE TWO POLE H-FRAMES WITH VERTICAL SUSPENSION INSULATOR ASSEMBLIES ON OUTSIDE PHASES, V-STRING INSULATOR ASSEMBLY ON MIDDLE PHASE.

SEGMENT 2A CONNECTOR: VOLTAGE: 115 kV LENGTH: 1336 FT. (0.25 MI) LOCATION: N.M.P.C. CIRCUIT 16 STRUCTURE 64 TO STRUCTURE 69 INSULATORS (115 kV) - PORCELAIN WITH BROWN GLAZE COLOR MINIMUM CONDUCTOR TO GROUND CLEARANCE: 22 FT. (PER NIAGARA MOHAWK STANDARDS)

REMOVE EXISTING N.M.P.C. CIRCUIT 16 WOOD POLE STRUCTURES 64 TO 68. BUILD DOUBLE CIRCUIT (CIRCUITS 17 & 16), VERTICAL CONFIGURATION ON WEATHERING STEEL MONOPOLE TANGENT STRUCTURES WITH VERTICAL SUSPENSION INSULATOR ASSEMBLIES.

SEGMENT2A: VOLTAGE: 115 kV LENGTH: 2428 FT. (0.46 MI) LOCATION: N.M.P.C. CIRCUIT 4 STRUCTURE T-57 TO N.M.P.C. GREENBUSH SUBSTATION INSULATORS (115 kV)· PORCELAIN WITH BROWN GLAZE COLORMINIMUM CONDUCTOR TO GROUND CLEARANCE: 22 FT. (PER NIAGARA MOHAWK STANDARDS)

REMOVE EXISTING N.M.P.C. CIRCUIT 4 LATTICE STEEL STRUCTURES. CIRCUIT (CIRCUITS 4 & 17), VERTICAL CONFIGURATION ON WEATHERING STEEL MONOPOLE TANGENT STRUCTURES WITH VERTICAL SUSPENSION INSULATOR ASSEMBLIES.

RETERMINATION OF EXISTING CIRCUIT 9 AT GREENBUSH SUBSTATION.

, RJM SEGMENTS 2, 3, 2A &.2A CONNECTOR FILING 06113/08 eMJV

PSC COMMENT REViSiON (FOR SEGMENT 1) , RJM11f27107 JV eM

NO. DATE BY REVlSION eK APP.

BUILD DOUBLE

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

TECHNICAL REQUIREMENTS

CONSTRUCTION BY LINE SEGMENT

ITR Ie< IDATE

APPROVED

APPROVE[)

DES. IDR

APPROVED

APPROVED

SCALE

INDEX

NOTE-002A

"

CONSTRUCTION DATA:

POWER CONDUCTOR: 345 kV - 6 (2C/PHASE) 1192.5 KCMIL 45/7 ACSR "BUNTING", NON-SPECULAR FINISH, MAX. TENSION 10,000 LBS., NESC HEAVY LOADING INITIAL, UNLESS NOTED

OTHERWISE. 115 kV - 3 (1C/PHASE) 795.0 KCMIL 26/7 ACSR "DRAKE", OR 1192.5 KCMIL 45/7 ACSR

"BUNTING", AS NOTED, NON-SPECULAR FINISH, MAX. TENSION 8000 LBS., NESC HEAVY LOADING INITIAL, UNLESS NOTED OTHERWISE.

OVERHEAD GROUND WIRE: ONE (1) 3/8" EHS STEEL, MAX. TENSION 4600 LBS., NESC HEAVY LOADING INITIAL, UNLESS NOTED OTHERWISE.

OPTICAL GROUND WIRE: ONE (1) OPTICAL GROUND WIRE (OPGW), NON-SPECULAR FINISH, ALCOA-FUJIKURA ALUMACORE AC-74/552 (OR SIMILAR), 12 FIBERS (MIN.), MAX. TENSION 6000 LBS., NESC HEAVY LOADING INITIAL, UNLESS NOTED OTHERWISE.

SPACERS: BUNDLED CONDUCTOR SPACER RODS POSITIONED SUCH THAT SPACER INTERVAL NEVER EXCEEDS 250 FT., A MINIMUM OF AT LEAST TWO (2) BUNDLE SPACERS ARE APPLIED IN EACH SPAN, REGARDLESS OF SPAN LENGTH, ONE (1) SPACER TO BE PLACED 75 FT. FROM EACH POLEfTOWER, ANY ADDITIONAL SPACERS TO BE PLACED IN THE REMAINDER OF THE SPAN WITH SPACING OF NO GREATER THAN 250 FT., WORKING SYMMETRICALLY FROM THE CENTER OF THE SPAN TOWARD THE POLEfTOWER.

DAMPERS: MODIFIED STOCKBRIDGE TYPE VIBRATION DAMPERS ON ALTERNATING STRUCTURES, PLACING ONE PER CONDUCTOR PER SPAN.

TRANSMISSION STRUCTURES: NIAGARA MOHAWK POWER CORPORATION 345 kV AND 115 kV STANDARD AND MODIFIED STRUCTURE TYPES.

FOUNDATIONS FOR STEEL STRUCTURES: STEEL STRUCTURES (SEGMENTS 1,2,3): CAST-IN PLACE CONCRETE PIERS WITH AN EMBEDDED ANCHOR BOLT CAGE FOR ALL ANGLE, DEADEND, AND DOUBLE CIRCUIT STRUCTURES. H-FRAME TANGENT STRUCTURES TO BE DIRECTLY EMBEDDED IN SOIL, EXCEPT AT STATE HIGHWAY, INTERSTATE HIGHWAY, AND RAIL CROSSINGS, AND AS GEOTECHNICAL CONDITIONS PERMIT. STEEL STRUCTURES (SEGMENT 2A): CAST-IN PLACE CONCRETE PIERS WITH AN EMBEDDED ANCHOR BOLT CAGE, OR POLE DIRECTLY EMBEDDED IN SOIL.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

TECHNICAL REQUIREMENTS

CONSTRUCTION DATA

2 06/13/08 RJM SEGMENTS 2, 3, 2A /I, 2A CONNECTOR FILING JV CM DES I" 1m leK lOAn: SCAL'

, 11127/07 RJM PSG COMMENT REVISiON (FOR SEGMENT 1) JV CM APPROVED APPROVED INDEX

NO. DATE BY REVISION CK. A?P. APPROVED APPROVED NO NOTE-003A

HARDWARE: TRANSMISSION LINE HARDWARE SHALL BE CORONA FREE AND AS PER NIAGARA MOHAWK STANDARDS.

INSULATORS: SUSPENSION INSULATOR STRINGS WILL MEET ANSI 52-5 STANDARDS, M&E STRENGTH OF 30,000 LBS., GLAZE COLOR AS NOTED ABOVE. STRAIN INSULATOR STRINGS WILL MEET ANSI 52-5 (115 kV) AND/OR ANSI 52-8 (345 kV) STANDARDS, M&E STRENGTH OF 30,000 LBS, GLAZE COLOR AS NOTED ABOVE.

LADDERS: CLIMBING LADDERS TO BE INSTALLED ON ALL STEEL STRUCTURES. POSITION ON 1 FACE EACH POLE STARTING 15 FT. ABOVE GROUND, SOUTH OR EAST FACE WHERE POSSIBLE. WORKING LADDER POSITIONS ALL AROUND EACH POLE FOR SPECIFIED DISTANCE BELOW SHIELD WIRE POSITION PER N.M.P.C. STANDARDS.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

TECHNICAL REQUIREMENTS

CONSTRUCTION DATA

DES. 10, ITR leK IDATE SCALE SEGMENTS 2, 3, 2A & 2A CONNECTOR FILING JV2 06113108 RJM CM

APPROVED APPROVED INDEXPSC COMMENT REVISION (FOR SEGMENT 1) RJM JV1 11/27/07 eM

NOTE-004ANO. DATE REVlSIONBY CK APP. APPROVED WPROVED NO.

TRANSMISSION STRUCTURE TYPES:

STR. TYPE 0-1301.00 115 kV HORIZONTAL LINE POST INSULATOR TO STR. TYPE ASSEMBLY, 3 ASSEMBLIES PER STRUCTURE.

STR. TYPE 0-1304.00 115kV - 10 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE. 115 kV LINE POSTS - 3 PER STRUCTURE, FOR LINE ANGLES LESS THAN 90 0

STR. TYPE 0-1304.00M 1 115kV - 10 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE. 115 kV LINE POSTS - 3 PER STRUCTURE, FOR LINE ANGLES LESS THAN 90 0

STR. TYPE 0-1336.00M 1 115KV - 10 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE.

STR. TYPE 0-1337.OOM 1 115KV - 10 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE.

STR. TYPE 0-1391.00M1 115KV - 10 UNITS PER SUSPENSION ASSEMBLY, 6 TO STR.TYPE-1392.00M1 ASSEMBLIES PER STRUCTURE.

STR. TYPE 0-1394.00M 1 115KV - 10 UNITS PER STRAIN ASSEMBLY, 12 ASSEMBLIES TO STR. TYPE-1396.00M1 PER STRUCTURE.

STR. TYPE 0-1573.00M 1 115 kV - 10 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE. 345 kV - 40 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE. 345 kV LINE POSTS - 3 PER STRUCTURE.

STR. TYPE 0-1575.00 345 kV - 40 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE. 345 kV LINE POSTS - 3 PER STRUCTURE.

STR. TYPE 0-1575.00M1 115 kV - 10 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE. 115 kV LINE POSTS - 3 PER STRUCTURE.

STR. TYPE 0-1576.00 345KV - 40 UNITS PER V-STRING ASSEMBLY, 1 ASSEMBLY PER STRUCTURE. 20 UNITS PER SUSPENSION ASSEMBLY, 2 ASSEMBLIES PER STRUCTURE.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

TRANSMISSION STRUCTURE TYPES

CONSTRUCTION DATA

2 06/13108 RJM SEGMENTS 2, 3, 2A & 2A CONNECTOR FILING N CM DES. IDR I" I" IOA.TE SCALE

, 11127107 RJM PSC COMMENT REVISION (FOR SEGMENT 1) N CM APPROvED APPROVED INDEX

NO, DATE BY REViSiON CK. APP. AP?ROVED APPROVED '0. NOTE-005A

STR. TYPE 0-1576.00M1

STR. TYPE 0-1577.00 TO STR. TYPE 0-1582.00

STR. TYPE 0-1586.00 TO STR. TYPE 0-1588.00

STR. TYPE 0-1589.00M1

345KV - 80 UNITS PER V-STRING ASSEMBLY, 1 ASSEMBLY PER STRUCTURE. 40 UNITS PER SUSPENSION ASSEMBLY, 2 ASSEMBLIES PER STRUCTURE.

345KV - 40 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE. 345 kV LINE POSTS - 3 PER STRUCTURE.

115 kV - 10 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE. 345 kV - 40 UNITS PER STRAIN ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE.

345KV - 40 UNITS PER V-STRING ASSEMBLY, 6 ASSEMBLIES PER STRUCTURE.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

TRANSMISSION STRUCTURE TYPES

CONSTRUCTION DATA

DES. lOR, ITR. 10< IOATE SCAlE 2 06113108 RJM SEGMENTS 2, 3, 2A & 2ACONNECTOR FILING JV CM

APPROVED APPROVED INDEXPSG COMMENT REVISION (FOR SEGMENT 1) 1 11127107 RJM JV CM

NOTE-006ANO. DATE BY REViSiON CK. APP. A.PPROVED APPROVED NO.

EM&CP DRAWING NOTES:

1. THE CONTRACTOR SHALL EMPLOY APPROPRIATE BEST MANAGEMENT AND HOUSEKEEPING PRACTICES AT ALL TIMES IN AND AROUND THE RIGHT-OF-WAY (ROW) IN ORDER TO:

A) PROTECT THE WORKFORCE AND PUBLIC, B) PROTECT THE ENVIRONMENT WITHIN THE CONSTRUCTION AREA, AND C) AVOID CONTRAVENTION OF STATE AND FEDERAL WETLAND AND WATERWAY

REGULATIONS.

2. ROW WIDTH VARIES DEPENDING UPON SITE-SPECIFIC CONDITIONS AS SHOWN ON THE PLANS. THE MAJORITY OF THE CONSTRUCTION R.OW. IS WITHIN AN EXISTING R.OW. CURRENTLY MAINTAINED BY NIAGARA MOHAWK.

3. DEFINITION OF CLEARING METHODS DESIGNATED ABOVE THE PHOTO-STRIP: A) "BRUSH MOW" (BM) IS PRESCRIBED FOR AREAS THAT MAY BE CONDUCIVE TO

CLEAR-CUTTING WITH A BRUSHHOG MACHINE AS LONG AS THE SITE IS DRY ENOUGH AT THE TIME OF CUTTING SO THAT SEVERE RUTTING WILL NOT OCCUR. MOWING MULCH WILL REMAIN IN PLACE. (RIGHT-OF WAY IS CURRENTLY MAINTAINED, UPLAND. MOWING SECOND YEAR SELECTIVE HERBICIDE APPLICATIONS.) THIS INCLUDES STRUCTURE PADS, WORK AREAS, ACCESS ROADS, WIRE ZONES.

B) "DROP & LOP" (DL) IS PRESCRIBED FOR AREAS WHERE SOIL MOISTURE OR SURFACE WATER LEVELS MAKE ACCESS BY CLEARING EQUIPMENT IMPRACTICAL AND POTENTIALLY DAMAGING TO WETLANDS OR OTHER SENSITIVE RESOURCES.

C) "HAND CUTTING" (HC) IS PRESCRIBED BY PERMIT CONDITIONS FOR THIS PROJECT WITHIN WETLAND RESOURCES AREAS OR OTHER AREAS THAT ARE SPECIFIED BECAUSE OF SITE CONDITIONS, CLEARLY MARKED ON THE PLANS AND IN THE FIELD. VEGETATION SHALL BE REMOVED FROM THE WETLAND RESOURCE AREA AND DISPOSED OF AS NOTED IN 4D. (STREAM BANKS - DROP & REMOVE, CHIP IN UPLAND AREAS.)

D) "CLEAR CUT" (CC) IS PRESCRIBED ALONG FORESTED UPLAND EDGE - CUT, STUMP TREATED, LOGS > 6" (AT SMALL END) REMOVE, LOGS < 6" CHIPPED. CHIPPINGS SPRAYED ON RIGHT-OF-WAY MAX. 3" DEPTH)

E) "NO CLEARING REQUIRED" (NCR) REFERS TO AREAS WHERE CLEARING IS NOT REQUIRED FOR CONSTRUCTION.

F) DANGER TREES BEYOND THE INDICATED CONSTRUCTION LIMITS SHALL BE DESIGNATED IN THE FIELD BY THE ENVIRONMENTAL INSPECTOR AND REMOVED AS FOLLOWS: THEY SHALL BE FELLED AS APPROVED BY THE ENVIRONMENTAL INSPECTOR, IN SUCH A MANNER AS TO MINIMIZE DAMAGE TO ADJACENT OR NEARBY TREES AND SHRUBS, AND WITHOUT A CHANCE OF DAMAGE TO NEARBY PROPERTY. WHERE DIRECTED BY THE ENVIRONMENTAL INSPECTOR, TREES SHALL BE TAKEN DOWN IN PIECES. IN WETLANDS, WHERE IT IS IMPRACTICAL TO REMOVE DANGER TREES BY HAND OR BY OTHER METHODS, THE DROP AND LOP METHOD WILL BE EMPLOYED TO ELIMINATE DISTURBANCE OF SATURATED SOILS. IN UPLAND AREAS, IN SO FAR AS PRACTICAL, ALL DANGER TREES SHALL BE REMOVED AT THE TIME OF INITIAL CLEARING AND AS PART OF THE NORMAL CLEARING ACTIVITIES. SLASH FROM THESE TREES WILL BE BROUGHT ONTO THE ROW FOR DISPOSAL IN ACCORDANCE WITH THE ROW DISPOSAL METHOD PRESCRIBED ON THE DRAWINGS FOR THE ADJOINING SECTION OF ROW, OR AS DIRECTED BY THE OWNER'S FIELD REPRESENTATIVE.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

EM&CP DRAWING NOTES

2 06/13108 fUM SEGMENTS 2, 3. 2A & 2A CONNECTOR FILING JV CM DES. lOR. ITe I" IDATE SCAlE

r 11/27/07 R"M PSC COMMENT REVISION (FOR SEGMENT 1) JV CM APPROVED APPROVED INDEX

NO. DATE BY REVISION CK. APP. APPROVED APPROVED " NOTE-GOlA

4. DEFINITION OF SLASH DISPOSAL METHODS: A) "CHIP" INDICATES THAT SMALL DIAMETER (LESS THAN 6 INCH) LIMBS, TOPS, AND

SAPLINGS WHICH WOULD INTERFERE WITH CONSTRUCTION IF PILED, ARE TO BE CHIPPED. DEPENDING ON THE TYPE OF CHIPPING EQUIPMENT AVAILABLE, WHOLE TREE CHIPPING MAY ALSO BE EMPLOYED. IN EITHER CASE, IF SITE CONDITIONS ARE NOT CONDUCIVE TO ACCESS BY CHIPPING EQUIPMENT WITHOUT CAUSING SEVERE RUTTING, THE OWNER'S ENVIRONMENTAL INSPECTOR MAY DIRECT THAT THE SLASH BE REMOVED TO ANOTHER AREA ON THE ROW FOR CHIPPING OR PILING.

B) "SORT AND PILE" INDICATES THAT MERCHANTABLE LOGS WILL BE SEPARATED FROM NON-MERCHANTABLE MATERIALS AND PILED. NON-MERCHANTABLE MATERIALS ARE TO BE PILED WHERE THEY WILL NOT INTERFERE WITH CONSTRUCTION OR FUTURE MAINTENANCE. TYPICALLY, PILES ARE ARRANGED AT INTERVALS ALONG THE OUTSIDE EDGE OF THE ROW, THE TEMPORARY EASEMENT, OR AS DIRECTED BY THE ENVIRONMENTAL INSPECTOR. REFER TO ENVIRONMENTAL DETAILS DRAWING FOR BRUSH/SLASH AND LOG PILE PLACEMENT ON ROW.

C) "REMOVE" MEANS TO MOVE MERCHANTABLE LOGS, OVER 6" DIAMETER AT SMALL END, TO TEMPORARY PILES IN THE PARKING AREAS, WORK AREAS AND STRINGING AREAS AS DESIGNATED ON THE CONSTRUCTION DRAWINGS IN ORDER TO FACILITATE UNOBSTRUCTED CONSTRUCTION AND MAINTENANCE. ALL SLASH AND TIMBER CLEARED FOR CONSTRUCTION OF THIS PROJECT WILL BE REMOVED FROM THE ROW PRIOR TO COMPLETION OF CONSTRUCTION. IN WETLAND AREAS OR OTHER AREAS THAT ARE SPECIFIED BECAUSE OF SITE CONDITIONS, CUT TREES SHALL BE REMOVED BY HAND OR BY OTHER METHOD TO ELIMINATE DISTURBANCE OF SATURATED SOILS.

D) "CUT AND REMOVE TIMBER" MEANS TO REMOVE CUTTINGS SO AS NOT TO DISRUPT SOIL SURFACE/PROFILE. CUT MATERIAL IS TO BE REMOVED TO A 'SORT AND PILE' LOCATION AS DIRECTED BY THE OWNER'S FIELD REPRESENTATIVE.

5. RESTRICTED ACTIVITIES PERTAIN TO WATER-RELATED RESOURCES (STREAMS, WETLANDS, SPRINGS, DRAINAGE, ETC.). A PARTICULAR CLEARING METHOD REQUIRED BY PERMIT CONDITIONS WITHIN WETLANDS FOR THIS PROJECT IS DESCRIBED ABOVE IN NOTE 3C. IN ADDITION, FOR ALL AREAS WITHIN A 100 FOOT BUFFER OF WATER-RELATED RESOURCES, THE CONTRACTOR'S PERFORMANCE CRITERIA ARE TO MAINTAIN EXISTING SOIL SURFACE PROFILES AND HYDROLOGIC CONTOURS, TO PRESERVE WATER QUALITY, AND TO CONFORM TO STATE AND FEDERAL WETLAND REGULATIONS. SITE-SPECIFIC CONDITIONS MAY WARRANT PROTECTION MEASURES IN ADDITION TO: A) NO DEPOSITION OF SLASH WITHIN IDENTIFIABLE STREAM OR DRAINAGE CHANNELS; B) NO UNNECESSARY DEGRADATION OF STREAM BANKS. C) NO ACCUMULATION OF CONSTRUCTION DEBRIS WITHIN THE BOUNDS OF THE

DESIGNATED WATERWAY OR WETLAND AREA; D) NO EQUIPMENT WASHING OR REFUELING WITHIN THE BOUNDS OF THE DESIGNATED

AREA; AND E) NO STORAGE OF ANY PETROLEUM OR CHEMICAL MATERIALS WITHIN THE BOUNDS OF

THE DESIGNATED AREA.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

EM&CP DRAWING NOTES

DES. IDR. 1,< IDATE SCALEI"2 06113/08 RJM SEGMENTS 2, 3. 2A ...2A CONNECTOR FILING CMJV

, I~OEXAPPROVED APPRO\!tOPSC COMMENT REViSiON (FOR SEGMENT 1) 11/27107 RJM JV CM

NOTE-008ANO. DATE BY REVISION CK. APP. APPROVED APPROVED NO.

6. ACCESS ROADS ON OR OFF ROW SHALL HAVE A 12 FOOT TRAVEL SURFACE, WITHIN A 20 FOOT ROADWAY WIDTH ALONG THE ROUTES DESIGNATED ON THESE DRAWINGS, AND BE ONE OF THE DESIGNATIONS SHOWN UNDER PHOTO STRIP DEFINITIONS (SHEET 1), OR THE FOLLOWING TYPES AS NOTED:

TYPE 1 EXISTING PERMANENT STONE/GRAVEL SURFACE ROAD, NO ALIGNMENT

CHANGE; MINOR ADDITIONAL TOP DRESSING AS DIRECTED BY CONSTRUCTION MANAGER (CM) OR ENVIRONMENTAL INSPECTOR (EI).

TYPE 2 FIRM, LEVEL, UPLAND SOILS WITH MINOR GRADING NECESSARY, PLUS DRAINAGE DEVICES.

TYPE 3 GOOD SOIL REQUIRING 12 INCHES MIN. OF SELECT BORROW OR CRUSHERRUN, PLUS SLOPE CONTROL AND DRAINAGE DEVICES.

TYPE 4 SOFT SOILS REQUIRING GEOFABRIC, GEOGRID, ETC. AND 12 INCHES MIN. OF SELECT BORROW OR CRUSHER RUN, PLUS DRAINAGE DEVICES.

TYPE 5 TEMPORARY FILL ATOP GEOFABRIC, PERHAPS WITH CROSS DRAINAGE DEVICES, ALL TO BE REMOVED PRIOR TO FINAL ROW RESTORATION.

TYPE 6 EXISTING PAVED ROADS, UTILIZED DURING THE PROJECT IN ACCORDANCE WITH ANY REQUISITE HIGHWAY PERMITS; RESTORED TO PRE - CONSTRUCTION CONDITION AT PROJECT COMPLETION.

TYPE 7 EXISTING PAVED ROADS WITH GUIDERAIL, UTILIZED DURING THE PROJECT IN

ACCORDANCE WITH ANY REQUISITE HIGHWAY PERMITS; RESTORED TO PRE-CONSTRUCTION CONDITION AT PROJECT COMPLETION.

TYPE W WETLAND CROSSING AREAS REQUIRING 12 INCHES OF CRUSHED STONE, GEOFABRIC, GEOGRID, ETC. AND 6 INCHES MIN. OF SELECT BORROW OR CRUSHER RUN, PLUS DRAINAGE DEVICES.

TYPE G EXISTING DOMINION PIPELINE CROSSING AREA, REQUIRING 12 INCHES MIN. OF SELECT GRAVEL, GEOFABRIC, GEOGRID, ETC. AND 12 INCHES MIN. OF SELECT SUBBASE, PLUS DRAINAGE DEVICES.

TYPE WIG EXISTING DOMINION PIPELINE CROSSING AREA IN A WETLAND, REQUIRING TRACK MATS, 12 INCHES MIN. OF SELECT GRAVEL, GEOFABRIC, GEOGRID, ETC. AND 8 INCHES NOMINAL OF SELECT SUBBASE, PLUS DRAINAGE DEVICES.

7A. RESTRICTED ACCESS (RA) - ACCESS SHALL BE RESTRICTED FOR SPECIFIED ACTIVITIES ONLY (EG. CLEARING, RIDER POLE AND COUNTERPOISE INSTALL). THE ENVIRONMENTAL INSPECTOR OR HIS/HER QUALIFIED DESIGNEE MAY AUTHORIZE ACCESS IN THESE AREAS ONLY FOR EQUIPMENT REQUIRED FOR CLEARING OPERATIONS OR WIRE STRINGING.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

EM&CP DRAWING NOTES

DES. SCAlE 2 06/13/08 RJM SEGMENTS 2, 3, 2A &. 2A CONNECTOR FILING JV eM

eM APPROVED APPROVEO INDEX1 11/27/07 RJM PSC COMMENT REVISION (FOR SEGMENT 1) JV

NOTE-009ANO. OAll' BY REVlSION OK. APP, APPROVED APPROVED NO

7B. NO VEHICLE ACCESS (NVA) INDICATES THAT AN AREA DOES NOT HAVE A DESIGNATED

ACCESS PATHWAY AND THAT VEHICLES AND EQUIPMENT ARE RESTRICTED FROM CROSSING OR OPERATING IN THAT AREA. THE CONTRACTOR SHALL STRICTLY ADHERE TO

UTILIZING ONLY THE DESIGNATED ROADS SHOWN ON THE PLANS, AND PLACE BARRIERS TO EXISTING ACCESS ROADS NOT TO BE USED IN THIS PROJECT.

8. "INSTALL CMP" INDICATES THE INSTALLATION OF A CORRUGATED METAL PIPE USED TO MAINTAIN WATER FLOW AND DRAINAGE PATIERNS ALONG ACCESS ROADS AND STREAM

CROSSINGS. THE DIAMETER OF THE PIPE TO BE INSTALLED IS SPECIFICALL Y NOTED IN

INCHES. ALL PIPES ARE 20 FEET IN LENGTH UNLESS OTHERWISE NOTED. THE DIAMETER

OF THE PIPE SHALL BE AS SPECIFIED ON THE PLANS. THE ENVIRONMENTAL INSPECTOR

WILL DETERMINE IF END SECTIONS ARE TO BE INSTALLED.

9. "INSTALL WATER BAR" INDICATES PLACEMENT OF A WATER DIVERSION DEVICE ACROSS

THE TRAVEL WAY TO PROTECT THE ROAD FROM EROSION.

10. "INSTALL FORD" INDICATES INSTALLATION OF A HARDENED STREAM OR SWALE CROSSING USING CRUSHED STONE AND GEOTEXTILE.

11. INDUCTION MITIGATION REQUIREMENTS

SEGMENT 1 ONLY A) PARALLEL WIRE INSTALLATION

A BARE COPPER WIRE OF NO 4 AWG (MIN) SHALL BE BURIED AT A DEPTH OF 1}\ - 2 FT.

PARALLEL TO THE COMPLETE LENGTH OF THE FENCE, OFFSET 15 FT. FROM THE FENCE TOWARDS

THE TRANSMISSiON LINE. THE WIRE SHALL BE LEFT FLOATING AT THE ENDS, WITH NO

TERMINATIONS OR GROUNDING RODS USED, AND NOT CONNECTED TO THE FENCE AT ANY

LOCATION.

B) GRADIENT MAT INSTALLATION

A HORIZONTALLY BURIED 6 FT. DIA. OR LARGER GRADIENT CONTROL MAT SHALL BE

INSTALLED AT A DEPTH OF 1}\ - 2 FT.. AT ALL ABOVE GROUND APPURTENANCES WEST OF

STRUCTURE 4 AND SOUTH & EAST FROM STRUCTURE 10.

C) A 4" OVERLAY OF CRUSHED STONE SHALL BE PLACED A MINIMUM RADIUS OF 30 FT. FROM THE

BASE OF STRUCTURE 11, INCLUDING ALONG THE BASE OF ANY FENCE WITHIN THIS RANGE.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

EM&CP DRAWING NOTES

2 06/13108 RJM SEGMENTS 2, 3, 2A& 2A CONNECTOR FILING JV CM DES. 10, 1m I" IOATE SCALE

1 11127/07 RJM PSC COMMENT REVISiON (FOR SEGMENT 1) JV CM APPROVED APPROVED I~'DEX

NO. DATE BY REVISION CK APP. APPROVED APPROVED " NOTE-010A

SEGMENT 2, 3, 2A CONNECTOR, AND 2A

D) PLACE GROUND RODS BONDED TO ALL WIRE FENCES AND ROAD GUARD RAILS WITHIN THE

TRANSMISSION LINE ROW AS SHOWN ON DRAWING E-35471-E SHEET 3.

E) PLACE A GROUNDING LOOP USING #fi AWG COPPER (MINIMUM) BURIED 18" AROUND THE

PERIMETER OF THE BUILDING(S) OF THE NATIONAL GRID GARAGE COMPLEX, OFFSET 3 FEET

(ADJUSTING FOR OBSTRUCTIONS) FROM THE BUILDING FOUNDATION. THIS LOOP SHALL BE

BONDED TO THE STRUCTURE MEMBERS, THE GROUNDING SYSTEM, AND 8' COPPERWELD GROUND

RODS SPACED EVERY 30' ALONG THE WIRE GROUNDING LOOP. A MINIMUM OF TWO GROUND RODS

SHALL BE USED FOR A PERIMETER LENGTH LESS THAN 30'-0".

F) PARALLEL WIRE INSTALLATION -A SUPER ZINC RIBBON SHALL BE BURIED AT A DEPTH OF 1)1,- 2 FT.

PARALLEL TO THE COMPLETE LENGTH OF THE DOMINION GAS PIPELINE BETWEEN THE

GREENBUSH SUBSTATION AND STRUCTURE #39 IN SEGMENT #3, AND BETWEEN STRUCTURE #fi3

TO REYNOLDS ROAD SUBSTATION. THE RIBBON SHALL BE OFFSET 3 FT. FROM THE PIPELINE

TOWARDS THE TRANSMISSION LINE, AND SHALL BE BONDED WITH DAIRYLAND POLARIZATION CELL

REPLACEMENTS (PCR), TO THE PIPELINE AT THE BEGINNING AND END OF THE ZINC RIBBON

SEGMENTS, AND AT APPROXIMATELY THE MID-POINT.

G) A VERTICAL 20 OHM RESISTANCE (OR LESS) GROUND ROD SHALL BE PLACED AT THE LOCATION

WHERE THE FIBER OPTIC CABLE LEAVES THE 345KV ROW NEAR INTERSTATE 1-90.

H) GRADIENT MAT INSTALLATION - AT ALL ABOVE GROUND PIPELINE APPURTENANCES, A

HORIZONTALLY BURIED 6 FT. DIA. OR LARGER GRADIENT CONTROL MAT SHALL BE USED. THE MAT

SHALL USE 'PLUS ZINC' RIBBON, AND SHALL BE INSTALLED AT A DEPTH OF 1)1, - 2 FT., BONDED TO

THE GROUND ZINC RIBBONS AND GROUND RODS BY MEANS OF ZINC CELLS (POLARIZATION

CELLS). A 4 INCH MINIMUM OVERLAY OF CRUSHED STONE EXTENDING 4'-0" BEYOND THE

GRADIENT MAT PERIPHERY SHALL BE PLACED FOR THE TOP SURFACE.

, 06/13108

t 11127107

NO. DATE

RJM

RJM

BY

SEGMENTS 2, 3, 2A & 2A CONNECTOR FILING JV CM

PSC COMMENT REVISION (FOR SEGMENT 1) JV CM

REVISION C< APP.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

EM&CP DRAWING NOTES

DES. fOR. ITR Ic< IOATE SCALE

APPROVED APPRO',IED I~DEX

APPROVED APPROVED no NOTE-011A

GENERAL ENVIRONMENTAL REQUIREMENTS:

1. EXCEPT AS OTHERWISE NOTED ON THE EM&CP DRAWINGS, ALL CONSTRUCTION ACTIVITIES (INCLUDING THE IDENTIFICATION AND PROTECTION OF SENSITIVE RESOURCES, SITE PREPARATION, CONSTRUCTION, AND FINAL RESTORATION) SHALL BE CONDUCTED IN ACCORDANCE WITH THIS DRAWING SET.

2. TO PRECLUDE CONTRAVENTION OF STATE REGULATIONS IN INSTANCES/SITUATIONS WHERE SEDIMENT, EROSION, OR STORMWATER RUNOFF CONTROL MEASURES ARE NEEDED, BUT FOR WHICH ALTERNATIVE MEASURES ARE NEEDED TO SATISFY THE INTENT OF THE EM&CP DOCUMENTS, THE CONTRACTOR WILL BE ALLOWED TO, WITH THE PRIOR APPROVAL OF THE ENVIRONMENTAL INSPECTOR AND/OR THE CONSTRUCTION MANAGER ON SITE, DEPLOY MEASURES THAT CONFORM TO THOSE IN (1) THE NEW YORK STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, AUGUST 2005 OR LATER, AND (2) THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION STORMWATER MANAGEMENT DESIGN MANUAL, AUGUST 2003 OR LATER.

3. ALL CLEARING, EQUIPMENT ACCESS, STORAGE OF EQUIPMENT AND MATERIALS, AND OTHER CONSTRUCTION ACTIVITIES SHALL BE CONFINED TO THE RIGHT-OF-WAY AND DESIGNATED MARSHALING YARDS UNLESS OTHERWISE SHOWN ON THE CONSTRUCTION DRAWINGS.

4. ANY EQUIPMENT BROUGHT TO THE CONSTRUCTION SITE SHALL BE CLEAN PRIOR TO ENTERING THE CONSTRUCTION SITE. CONTRACTOR SHALL OBTAIN AND HAVE ON FILE A LETIER OR FORM FROM THE EQUIPMENT VENDOR THAT CONSTRUCTION EQUIPMENT SUCH AS BULLDOZERS, COMPRESSORS, EXCAVATORS, DRILLS, ETC. ARE INITIALLY DELIVERED TO THE PROJECT AS "FREE, AS PRACTICAL, FROM OFF-SITE SOIL AND/OR PLANT DEBRIS THAT COULD SPREAD INVASIVE PLANTS".

5. SPECIFIC TURNAROUNDS ARE NOTED ON THE DRAWINGS FOR ALL SEGMENTS. EQUIPMENT SHALL UTILIZE THE INTERSECTION OF ACCESS ROADS AND ELECTRIC ROW SPUR ROADS FOR TURNING. WHERE THE RIGHT-OF-WAY ADJOINS PUBLIC ROADS, CONTRACTORS SHALL PARK PERSONAL AND CONSTRUCTION VEHICLES IN DESIGNATED AREAS WHICH WILL NOT INTERFERE WITH NORMAL TRAFFIC AND WILL NOT CAUSE ANY SAFETY HAZARD OR INTERFERE WITH EXISTING LAND USES.

6. DAMPENING DRY AREAS WITH A WATER TRUCK OR OTHER APPROPRIATE MEANS SHALL BE USED TO CONTROL FUGITIVE DUST RESULTING FROM CONSTRUCTION ACTIVITIES.

7. REFUELING OF CONSTRUCTION VEHICLES SHALL ONLY OCCUR ON EXISTING PAVED ROADS THAT INTERSECT WITH THE CONSTRUCTION ROW, AND NOT WITHIN 100 FT. OF A WETLAND OR WATERBODY. APPROPRIATE SPILL KITS AND FUEL ABSORBENT MATERIALS SHALL BE READILY AVAILABLE ON SITE DURING ANY REFUELING ACTIVITIES. ANY CONTAMINATED MATERIALS FOLLOWING CLEANUP SHALL BE MOVED OFFSITE TO AN APPROPRIATE LOCATION UTILIZING APPROPRIATE CONTAINERS, AND FOLLOWING PROCEDURES IN NIAGARA MOHAWK'S SPILL AND CLEAN UP PROCEDURES OUTLINED IN APPENDIX D.

8. BLASTING AND OTHER CONSTRUCTION ACTIVITIES SHALL BE CONTROLLED TO MINIMIZE AIRBORNE DEBRIS: INCLUDING THE USE OF BLASTING MATS, WHICH ARE REQUIRED WHEN BLASTING ADJACENT TO EXISTING FACILITIES.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

GENERAL ENVIRONMENTAL REQUIREMENTS

2 06/13/08 RJM SEGMENTS 2, 3, 2A & 2A CONNECTOR FlUNG JV CM DES. ID' IT, I" IDATE SCALE

t

NO.

11(27107

DATE.

RJM

BY

PSC COMMENT REVISION (FOR SEGMENT 1)

REVISION

JV

OK.

CM

APP.

APPROVEO

APPROVED

APPROVEO

IJJ'PROVED

1.'.(lEX

NO. NOTE-012A

9. NOISE IMPACTS SHALL BE MINIMIZED AND MITIGATED.

10. CONSTRUCTION ACTIVITY SHALL BE GENERALLY BETWEEN THE HOURS OF 7:00 A.M. AND 7:00 P.M., MONDAY THROUGH SATURDAY, EXCEPT WHERE CONSTRUCTION IS OCCURRING WITHIN 200 FT. OF OCCUPIED STRUCTURES, CONSTRUCTION HOURS SHALL BE BETWEEN 7:00 A.M. AND 6:00 P.M. AT THE DISCRETION OF THE CONSTRUCTION MANAGER OR HIS OR HER QUALIFIED DESIGNEE, IF IT IS DETERMINED THAT THERE is NO LOCAL OPPOSITION TO THE CURRENT OPERATION, WORK HOURS MAY BE EXPANDED IF NECESSARY TO COMPLETE AN OPERATION IN A SENSITIVE AREA. IF SUNDAY OR HOLIDAY CONSTRUCTION BECOMES NECESSARY, ADVANCED NOTICE SHALL BE PROVIDED TO THE NYSDPS STAFF.

11. IN ALL WORK AREAS, ALL NECESSARY AND REASONABLE PRECAUTIONS SHALL BE PUT INTO PLACE IN ADVANCE OF CONSTRUCTION IN ORDER TO MINIMIZE SOIL EROSION AND STREAM SEDIMENTATION.

12. IN AREAS SUBJECT TO SOiL EROSION, TEMPORARY EROSION CONTROL DEVICES SHALL BE INSTALLED AND MADE FUNCTIONAL PRIOR TO THE START OF CONSTRUCTION/DISTURBANCE. ALL TEMPORARY SEDIMENT AND/OR EROSION CONTROLS INSTALLED, EXISTING, OR BY THE CONTRACTOR, SHALL BE MAINTAINED IN A FUNCTIONAL MANNER UNTIL THE ENVIRONMENTAL INSPECTOR DETERMINES THEY ARE NO LONGER NECESSARY.

13. TEMPORARY TRENCHES, EXCAVATIONS AND/OR CROSSINGS SHALL BE SECURED BY TEMPORARY BARRIERS AT THE END OF EACH DAY OR UNTIL BACKFILLED OR REMOVED TO MAINTAIN FARM OPERATIONS AND FOR THE PROTECTION OF PERSONS, LIVESTOCK, AND WILDLIFE.

14. FLOW OF WATER ALONG IMPROVED ACCESS ROAD SEGMENTS OR INTO WETLANDS, STREAMS AND OTHER SENSITIVE AREAS SHALL BE MINIMIZED BY INSTALLING TEMPORARY DITCH TURNOUTS DURING THE CONSTRUCTiON OPERATION AS NECESSARY.

15. UNDERGROUND FACILITIES PROTECTION: THE CONTRACTOR SHALL CONTACT DIG SAFELY NEW YORK AT 1-800-962-7962 A MINIMUM OF THREE WORKING DAYS PRIOR TO EXCAVATION ACTIVITIES. ALL MARKOUTS AND SIGNS FOR UTILITY FACILITIES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT. ANY MARKERS THAT HAVE BEEN REMOVED DURING CONSTRUCTION SHALL BE REPLACED PROMPTLY AND WILL BE MAINTAINED FOR THE DURATION OF THE PROJECT.

16. ALL OPEN EXCAVATIONS SHALL BE BACKFILLED AS SOON AS PRACTICAL, BUT AT A MINIMUM WITHIN FIVE WORKING (5) DAYS. ROADSIDE EXCAVATIONS OF ANY TYPE SHALL BE BACKFILLED AS SOON AS PRACTICAL, BUT AT A MINIMUM WITHIN ONE CALENDAR (1) WEEK. WHILE SUCH EXCAVATIONS ARE OPEN, SAFEGUARDS SHALL BE PROVIDED BY THE CONTRACTOR TO DENY ACCESS TO PERSONS (OTHER THAN WORKERS PERFORMING ACTIVITIES AT THAT LOCATION), LIVESTOCK, AND WILDLIFE.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES s RESTRICTIONS

GENERAL ENVIRONMENTAL REQUIREMENTS

2 06/13/0B R.iM SEGMENTS 2, 3, 2A "" 2A CONNECTOR FILING JV C" DES. lOR. I" I" IOATE SCAlE

1 11127/07 RJM PSC COMMENT REVISION (FOR SEGMENT 1) JV C" APPROVED AP~ROV£O I~WEX

so. DATE BY REVISION 0:. APP. APPROVED APPROVED " NOTE-013A

17. IN THE EVENT THAT ARCHAEOLOGICAL MATERIALS, HUMAN REMAINS, OR EVIDENCE OF HUMAN BURIALS ARE ENCOUNTERED DURING CONSTRUCTION.

A) ALL WORK IN THE VICINITY OF THE FIND SHALL BE IMMEDIATELY HALTED; B) THE AREA SHALL BE PROTECTED FROM FURTHER DAMAGE; C) THE ENVIRONMENTAL INSPECTOR SHALL NOTIFY THE OWNER'S ENVIRONMENTAL

DEPARTMENT; D) THE ENVIRONMENTAL DEPARTMENT SHALL NOTIFY (WITHIN 24 HOURS OF SUCH

DISCOVERY) ALL REGULATORY AND PROJECT MANAGEMENT ENTITIES AND COORDINATE ANY SUBSEQUENT INVESTIGATION BY ANDIOR WITH REGULATORS, CONTRACT ARCHEOLOGISTS, AND THE NYS OFFICE OF PARKS, RECREATION, AND HISTORiC PRESERVATION.

18. AT THE COMPLETION OF CONSTRUCTION, ALL EXCESS FILL, EXCAVATED MATERIAL, AND CONSTRUCTION MATERIAL SHALL BE REMOVED AND DISPOSED OF IN AN APPROVED MANNER. RESTORATION MEASURES SHALL BE CARRIED OUT WITHIN TEN (10) DAYS OR TEMPORARY EROSION CONTROL DEVICES EMPLOYED BY THE END OF THE WORKWEEK IN WHICH CONSTRUCTION COMMENCED, IN THE EVENT THAT WORK IS LIKELY TO CONTINUE.

19. UNLESS OTHERWISE DESIGNATED, THE CONSTRUCTION AREA SHALL BE THE TRANSMISSION LINE RIGHT OF WAY. OUTSIDE THE DESIGNATED CONSTRUCTION AREA, ALL TREES OVER TWO INCHES DBH OR SHRUBS OVER FOUR FEET IN HEIGHT DAMAGED OR DESTROYED BY THE OWNER'S ACTIVITIES DURING CONSTRUCTION, OPERATION, OR MAINTENANCE, REGARDLESS OF WHERE LOCATED, SHALL BE REPLACED BY THE OWNER WITH THE EQUIVALENT TYPE TREES OR SHRUBS EXCEPT WHERE:

A) PERMITTED BY ANY APPROVED EM&CP; B) EQUIVALENT-TYPE REPLACEMENT TREES OR SHRUBS WOULD INTERFERE WITH THE

PROPER CLEARING, CONSTRUCTION, OPERATION, OR MAINTENANCE OF THE FACILITY;

C) REPLACEMENT WOULD BE CONTRARY TO SOUND ROW MANAGEMENT PRACTICES OR TO ANY APPROVED LONG-RANGE ROW MANAGEMENT PLAN APPLICABLE TO THE PROJECT; OR

D) A PROPERTY OWNER (OTHER THAN THE CERTIFICATE HOLDER) ON WHOSE LAND THE DAMAGED OR DESTROYED TREES OR SHRUBS WERE LOCATED DECLINES REPLACEMENT.

FOR THIS PROJECT, 'DESIGNATED CONSTRUCTION AREA' SHALL INCLUDE THE ENTIRE ROW.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

GENERAL ENVIRONMENTAL REQUIREMENTS

DES. IDR ITR. ICK IDAfE SCALE ;> 06/13108 RJM SEGMENTS 2, 3, 2A & 2A CONNECTOR FILING JV CM

1 11/27107 RJM PSG COMMENT REVISION (FOR SEGMENT 1) N CM APPROVED APPROVED INDEX

NO. DArE BY REVISION o; APP. APPROVED APPROVED ,.0 NOTE-014A

20. ONLY DESIGNATED ACCESS ROADS SHOWN ON THE PLANS SHALL BE USED FOR CONSTRUCTION. EXISTING ACCESS ROADS THAT ARE DESIGNATED AS "NOT FOR PROJECT USE" SHALL NOT BE USED FOR CONSTRUCTION OR PERMANENT ACCESS. ALL GENERAL VEHICULAR TRAFFIC SHALL BE CONFINED TO THE NEW OR UPGRADED ACCESS ROAD AS SHOWN. PRIOR TO CONSTRUCTION, A SNOW FENCE BARRIER AND SIGNAGE SHALL BE PLACED ALONG THE DESIGNATED CONSTRUCTION ACCESS ROADS WHICH ARE ADJACENT TO THE EXISTING GAS PIPELINE AS A VISUAL REMINDER TO CONSTRUCTION STAFF REGARDING THE APPROACH LIMITS TO THE PIPELINE. NEW ACCESS ROADS AND SPURS REQUIRED FOR THIS CONTRACT/PROJECT ARE SHOWN AND SHALL BE BUILT IN ACCORDANCE WITH THE CONSTRUCTION DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE TO THESE ROADS. WHERE THE ACCESS ROAD IS TO BE BUILT, REALIGNED, OR UPGRADED FOR THIS PROJECT, THE CONTRACTOR SHOULD DOCUMENT ALL PRE-EXISTING DAMAGE, AND REPORT SAME TO THE ENVIRONMENTAL INSPECTOR, PRIOR TO USE. TO MINIMIZE DAMAGE TO DESIRABLE PLANT COVER MANAGED BY THE OWNER ON THE ROW, THE CONTRACTOR IS NOT ALLOWED TO CROSS FROM THE DESIGNATED ON OR OFF-ROW ACCESS ROADS AS INDICATED IN THE EM&CP DRAWINGS. THE CONTRACTOR SHALL KEEP THE ROAD NETWORK OPEN AND ACCESSIBLE FOR ELECTRIC TRANSMISSION LINE MAINTENANCE NEEDS. PRIOR TO TRENCHING OR EXCAVATIONS OF ANY KIND, THROUGH ANY ACCESS ROADS, THE CONTRACTOR SHALL CONTACT THE FIELD CONSTRUCTION COORDINATOR TO ENSURE COORDINATION WITH THE GAS AND ELECTRIC OPERATING DEPARTMENTS, AS WELL AS WITH ANY OTHER UTILITIES WITHIN THE ROW; INCLUDING BUT NOT LIMITED TO TELECOMMUNICATIONS, WATER, AND SEWER.

21. GUARD STRUCTURES SHALL BE INSTALLED AT ALL ROAD AND RAILROAD CROSSINGS, WHERE INDICATED ON THE CROSSING PERMIT DRAWINGS, PRIOR TO CONDUCTOR STRINGING ACTIVITIES.

22. CONTRACTOR SHALL ENSURE THAT ALL FENCES WITHIN THE TRANSMISSION LINE ROW ARE GROUNDED IN ACCORDANCE WITH THE EM&CP DETAILS FOR METALLIC AND NON-METALLIC FENCE POST GROUNDING.

23. EXISTING FENCES AND GATES REMOVED FOR CONSTRUCTION SHALL BE RESTORED.

24. CROSS DRAINAGE WILL BE DETERMINED AS REQUIRED DURING CONSTRUCTION. CULVERTS SHALL NOT PLACE DRAINAGE FLOWS THAT STIMULATE EROSION OF THE SOILS ABOVE THE DOMINION PIPELINE.

25. EXISTING STRUCTURES TO BE REMOVED FROM SERVICE SHALL BE COMPLETELY DISASSEMBLED AND REMOVED. MATERIAL PLACED IN THE DESIGNATED AREA, AND ANY EXCAVATIONS APPROPRIATELY BACKFILLED AND SLIGHTLY MOUNDED CONDITION FOR SETILEMENT.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

GENERAL ENVIRONMENTAL REQUIREMENTS

2 06113108 RJM SEGMENTS 2,3, 2A & 2A CONNECTOR FILING JV eM DES. IDR ITR I" IDATE SCALE

1 11/27/07 RJM PSC COMMENT REVISION (FOR SEGMENT 1) JV eM APPROVED APPROVED INDEX

NO. DATE BY REViSION OK. A?P, AP!'~O'lED APPROVED I~O

NOTE-015A

a 06/13/08

t 11127/07

NO. DATE

DOMINION PIPELINE PROTECTIVE MEASURE REQUIREMENTS

1. THE DOMINION GAS LINE AND MARKERS (SEGMENTS 2A & 3) SHALL BE PROTECTED FROM DAMAGE FROM ANY AND ALL CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL REFER TO AND ADHERE TO THE "GUIDELINES FOR CONSTRUCTION ACTIVITIES ON RIGHT-OF-WAY AND IN THE VICINITY OF DOMINION TRANSMISSION, INC. (DTI) PIPELINES".

2. CONSTRUCTION ACCESS HAS BEEN DESIGNED TO MINIMIZE CROSSING OF THE PIPELINE. CONSTRUCTION EQUIPMENT SHALL CROSS OR PARALLEL THE PIPELINE ONLY AT DESIGNATED ACCESS ROADS NOTED ON THE PROJECT PLANS. A MINIMUM OF 5'-6" COVER OVER THE PIPELINE SHALL BE PLACED WHERE CONSTRUCTION ACTIVITIES CROSS OVER OR WITHIN 10'-0" TO THE CENTERLINE OF THE PIPELINE, AND ARE NOT IN DESIGNATED WETLAND AREAS. WHERE DESIGNATED WETLANDS RESTRICT THE PLACEMENT OF COVER, MATS SHALL BE PLACED AND GRADED OVER THE PIPELINE AS SHOWN IN THE ACCESS ROAD SECTION DETAILS.

3. PRIOR TO ANY EXCAVATION WORK WITHIN SEGMENTS 2A AND 3, A DOMINION PIPELINE REPRESENTATIVE SHALL BE CONTACTED AT TELEPHONE #315-735-8793 OR 'DIG SAFELY NEW YORK' AT 1-800-962-7962 A MINIMUM 72 HOURS PRIOR FOR COORDINATING LOCATES, AND THE PIPELINE EXPOSED UNDER THE DISCRETION AND SUPERVISION OF A DOMINION PIPELINE REPRESENTATIVE, TO DETERMINE THE ACTUAL BURIED DEPTH.

4. A SNOW FENCE BARRIER SHALL BE PLACED ALONG THE DESIGNATED CONSTRUCTION ACCESS ROADS WHICH ARE ADJACENT TO THE PIPELINE AS A VISUAL REMINDER TO CONSTRUCTION STAFF REGARDING THE APPROACH LIMITS TO THE PIPELINE.

SEGMENTS 2, 3, 2A &2A CONNECTOR FILING RJM JV CM

PSC COMMENT REVISION (FOR SEGMENT 1) RJM JV CM

REVISIONBY C< APP.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

DOMINION PIPELINE PROTECTIVE MEASURE REQUIREMENTS

DES. IDe I" I" IOATE SCALE

IIPPROVf:D APPROVED INDEX

APPROVED APPROVED to NOTE-016A

SPECIFICWETLAND REQUIREMENTS:

1. CONSTRUCTION ACCESS HAS BEEN DESIGNED TO MINIMIZE CROSSING OF WETLANDS. CONSTRUCTION EQUIPMENT MAY CROSS WETLANDS IF THERE IS A DESIGNATEDACCESS ROAD NOTEDON THE PROJECT PLANS.

2. VEHICULAR TRAFFIC SHALL BE LIMITED TO USE OF DESIGNATED ACCESS ROADS, WORK PAD AREAS OR STRINGING AREAS.

3. THE TOP 6 TO 12 INCHES OF THE WETLAND VEGETATIVE MAT OR ORGANIC SOIL LAYER SHALL BE SEPARATED DURING EXCAVATING ("DOUBLE-DITCHING") AND THIS LAYER REPLACED, AS NEAR AS POSSIBLE TO ITS ORIGINAL POSITION, DURING BACKFILLING.

4. EARTHWORK IN OR PROXIMATE TO WETLAND EDGES SHALL BE PERFORMED IN A MANNER THAT MAINTAINS THE WETLAND'S NATURAL WATER LEVELS DURING AND FOLLOWING CONSTRUCTION, OR AS DIRECTED BY THE ENVIRONMENTAL INSPECTOR.

5. EXCESS SPOILS IN DESIGNATED AREAS SHALL BE REMOVED FROM THE WETLAND AND DISPOSEDOF AT AN UPLAND SITE (NO BULLDOZING, BACK-BLADING, OR OTHERWISE SPREADING OF EXCESS SPOIL OVER THE WETLAND SURFACE).

6. TO AVOID PERTURBATION OF WETLAND SURFACES BEYONDTHE EXCAVATION LIMITS,NO BRUSH MOWING IS ALLOWED WITHIN ANY DEC OR FEDERAL (ACOE) REGULATED WETLAND EXCEPT WHERE THE CUTIING SITE IS DRY OR FROZEN SOLID AT THE TIME OF CUTTING.

7. THE CONTRACTOR SHALL AT THE DIRECTION OF THE ENVIRONMENTAL INSPECTORINSTALL AND MAINTAIN SILTATION FENCINGAND SEDIMENT BARRIERSWHEREVER EXCAVATION OR FILLING ACTIVITIES OCCUR ADJACENT TO OR WITHIN A WATERWAYOR WETLANDAREAS.

B. PORTIONS OF WETLANDS THAT ARE TEMPORARILY DISTURBEDSHALL BE RESTORED AS FOLLOWS: A. SOILS WITHIN DISTURBED PORTION OF WETLANDS SHALL BE GRADEDTO CONFORM

WITH ADJACENT PORTIONSOF THE WETLANDS THAT HAVE NOT BEEN DISTURBED. B. IN LOCATIONS WHERE TEMPORARY ACCESS ACROSS WETLANDS HAS BEEN ACHIEVED

USING TEMPORARY FILL ATOP GEOTEXTILE FABRIC, THE FILL MUST BE REMOVEDALONG WITH THE FABRIC BENEATH IT. DISTURBEDWETLAND SOILS FORMERLY BENEATH THE FABRIC MAT SHALL BE GRADED AS IDENTIFIED IN BA.

C. TEMPORARILY DISTURBED PORTIONS OF WETLANDS DETAILED IN 4., BAAND BBSHALL BE RESEEDEDAND MULCHEDACCORDING TO THE "PERMANENTAND TEMPORARY SEEDING AND SITE PREPARATION REQUIREMENTS" PROVIDEDIN APPENDIX N.

9. DRAINAGEWAYS AND/OR FACILITIESMUST BE MAINTAINEDOPEN AND FREE OF DEBRIS AND/OR SOIL AT ALL TIMES.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

SPECIFIC WETLAND REQUIREMENTS

I,.DES. 10K IDATE SCALEI"SEGMENTS 2, 3, 2A & 2A CONNECTOR FlUNG JVa 06/13108 """ e" , APPROVED APPRDVED I~WEXPSC COMMENT REVISiON (FOR SEGMENT 1) N11127107 e""""

NOTE-017AAPP.NO. DA11' BY REVISION OK APPROVED ~PROVEO 'm

AGRICULTURAL LAND-RELATED RESTRICTIONS:

1. IN ACTIVE, LIVESTOCK-USE AREAS, ANY CHERRY TREE SLASH (TOXIC TO LIVESTOCK) GENERATED DURING CLEARING SHALL BE REMOVED AND DISPOSED OF IN A MANNER THAT DENIES ITS ACCESS TO LIVESTOCK.

2. WHERE BLASTING IS REQUIRED, MADING OR CONTROLLED BLASTING SHALL BE USED TO CONTAIN BLASTED ROCK FRAGMENTS. ALL BLASTED ROCK NOT USED AS BACKFILL SHALL BE REMOVED FROM CROPLANDS, HAYLANDS, AND IMPROVED PASTURELANDS.

3. WHERE REPEATED TEMPORARY ACCESS MAY BE NECESSARY ACROSS HAYLANDS, CROPLANDS, AND IMPROVED PASTURE LANDS, SUCH THAT SOIL COMPACTION OR MIXING MAY RESULT, THE CONTRACTOR SHALL BE DIRECTED TO REMOVE UP TO A MAXIMUM OF 12 INCHES OF TOP SOIL AND STOCKPILE SEPARATELY TO SEGREGATE THE "PLOW-LAYER" OF SOILS FROM THE LOWER SUBSOIL/SUBSTRATUM. THE CONTRACTOR SHALL EMPLOY SOIL SURVEY DEPTH-OF-SOIL INFORMATION AND ON FARM DATA TO DESIGNATE THE SITE-SPECIFIC DEPTH OF AGRICULTURAL TOP SOIL MATERIAL WHICH WILL BE PEELED OFF, STOCKPILED, AND RETURNED IN NATURAL SEQUENCE TO RESTORE THE ORIGINAL SOIL PROFILE. THE WIDTH OF TOPSOIL STRIPPING SHALL BE THE ACCESS PATHWAY AND CONSTRUCTION PORTION OF THE PERMANENT ROW AND SUCH PORTIONS OF THE TEMPORARY ACCESS ROW AS NECESSARY. IN AGRICULTURAL AREAS (STRUCTURES 13 -18), CONTRACTOR SHALL INSTALL TEMPORARY TIMBER MATS AT STRUCTURE SITES TO MINIMIZE COMPACTION. THE AREA SHALL BE RESTORED TO IT'S CONDITION PRIOR TO CONSTRUCTION OR BEDER.

4. AS DIRECTED BYTHE ENVIRONMENTAL INSPECTOR, COMPACTED AGRICULTURAL SOILS SHALL BE BROKEN UP WITH DEEP TILLAGE DEVICES (SUCH AS A DEEP-SHANK HEAVY DUTY SUBSOILER, A PARAPLOW, OR A PARATILL) DOWN TO THE BODOM OF ACTUAL COMPACTION (IN AREAS WHERE TOPSOIL HAS BEEN TEMPORARILY REMOVED, THE COMPACTED SUBSOILS SHALL BE BROKEN UP BEFORE RETURN OF THE TOPSOIL) - ALL DEEP TILLAGE ACTIVITY SHALL BE CONDUCTED ONLY DURING PERIODS OF LOW SOIL MOISTURE.

5. AFTER THE RELATIVE SOIL MOISTURE OF THE AFFECTED RIGHT-OF-WAY HAS RETURNED TO EQUILIBRIUM WITH THE ADJACENT OFF RIGHT-OF-WAY LAND, SUBSOIL COMPACTION TESTS SHALL BE MADE BOTH ON AND OFF OF THE RIGHT-OF-WAY IN ACCORDANCE WITH RECOMMENDATIONS FOR THE SOIL TYPE OF AFFECTED AGRICULTURAL FIELD USING AN APPROPRIATE SOIL PENETROMETER. THE SUBSOIL COMPACTION READINGS WITHIN THE RIGHT-OF-WAY SHALL BE COMPARED WITH THOSE OF THE ADJACENT OFF RIGHT-OF-WAY PORTION OF THE AFFECTED FARM FIELD/SOIL UNIT TO DETERMINE IF THE DECOMPACTION OF THE AFFECTED "B" HORIZON HAS RESULTED IN A COMPACTION LEVEL NO GREATER THAN THAT OF THE UNAFFECTED LAND. WHERE NECESSARY, ADDITIONAL DEEP TILLAGE ACTIVITY SHALL BE UNDERTAKEN DURING PERIODS OF RELATIVELY LOW SOIL MOISTURE TO ENSURE THE DESIRED MITIGATION AND PREVENT ADDITIONAL SUBSURFACE COMPACTION.

6. BEFORE REPLACING TOPSOIL, ALL FOUR INCH OR LARGER ROCKS AND STONES WHICH ARE UPLIFTED FROM SUBSOIL, OR FRACTURED BEDROCK AS A RESULT OF CONSTRUCTION AND/OR DEEP TILLAGE ACTIVITIES, SHALL BE REMOVED FROM IMPACTED AGRICULTURAL LANDS.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

AGRICULTURAL LAND-RELATED RESTRICTIONS

, 0611311)/3 "M SEGMENTS 2, J. 2A & 2A CONNECTOR FILING JV CM DES lOR ITR. ICK IDATE SCALE

1 111271D7 RJM PSC COMMENT REVISION (FOR SEGMENT 1) JV CM APPROVED APPROVED INDEX

NO. DATE BY REVISION CK. APP. APPROVED APPRO'IiED " NOTE-018A

7. IN SITUATIONS WHERE IMPORTED SOIL MATERIALS ARE NEEDED FOR BACKFILL, SUCH MATERIALS SHALL BE OF SIMILAR TEXTURE TO EXISTING SOILS (UNDER NO CIRCUMSTANCES SHALL THE SOIL SURFACE OF ANY HAYLANDS, CROPLANDS, OR IMPROVED PASTURE ADJACENT TO THE EXCAVATION AND CONSTRUCTION AREA BE USED TO SUPPLEMENT BACKFILL OR COVER MATERIAL.

B. IN HAYLANDS, CROPLANDS, AND IMPROVED PASTURELANDS WHERE BEDROCK SPOIL MATERIAL IS SUITABLE FOR EXCAVATION BACKFILL, SAID AREAS MAY ONLY BE BACKFILLED TO THE TOP OF THE BEDROCK (TO BE FOLLOWED BY THE ORIGINAL SOIL PROFILE OF SUBSOIL AND THEN THE ORIGINALLY STOCKPILED TOPSOIL).

9. DEPTH OF TOPSOIL COVER OVER THE COMPLETED EXCAVATIONS IN ACTIVE AGRICULTURAL LANDS SHALL BE MAINTAINED COMMENSURATE WITH THE IMMEDIATELY ADJOINING SOIL PROFILE.

10. THE SEPARATION BETWEEN ANY SUBSURFACE HEADER OR TILE DRAIN AND THE UNDERGROUND COMPONENTS OF THE TRANSMISSION LINE FACILITIES SHALL BE AT LEAST 12 INCHES; 36 INCHES OF SEPARATION SHALL APPLY TO OPEN SURFACE DRAINAGE DITCHES.

11. IN REPAIRING ANY DAMAGED DRAINAGE LINES, KNITIED FILTER COVERING SHALL GENERALLY NOT BE USED AROUND CORRUGATED PLASTIC TUBING (TO AVOID POTENTIAL SILT ACCUMULATION AND SEAL-OFF DRAINAGE LINES).

12. FARM OPERATORS SHALL BE GIVEN TIMELY NOTICE PRIOR TO BLASTING ON FARM PROPERTY.

13. ALL FENCING, GATES, SURFACE AND SUBSURFACE DRAINAGE SYSTEMS, AND ANY OTHER STRUCTURES DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL CONDITION.

14. IMMEDIATELY FOLLOWING CONSTRUCTION ACTIVITY, THE RIGHT-OF-WAY AND RESPECTIVE WORK AREAS SHALL BE THOROUGHLY AND SAFELY CLEARED OF TRASH, NUTS, BOLTS, SPIKES, WIRE, PLASTICS, TIRES, MATS, PACKAGING, CORDAGE, PIECES OF STEEL, AND OTHER ASSORTED ITEMS.

15. THE FUNCTIONS SERVED BY ACTIVE FARM FENCES AND GATES THAT ARE AFFECTED BY THE CONSTRUCTION, WHETHER ON THE TEMPORARY CONSTRUCTION EASEMENT OR THE OWNER'S ROW, SHALL BE TEMPORARILY SUSTAINED THROUGHOUT ALL PHASES OF CONSTRUCTION AND SUCH SEGMENTS OF AFFECTED FENCES AND GATES SHALL BE REBUILT BY THE CONTRACTOR TO LIKE-NEW CONDITION UPON COMPLETION OF CONSTRUCTION. THIS WILL INCLUDE THE REQUIREMENT TO CONSTRUCT TEMPORARY LIVESTOCK FENCING AROUND WORK AREAS LOCATED WITHIN ACTIVE PASTURES TO ENSURE THE SAFETY OF L1VESTOCKAND/OR CREATE ADDITIONAL TEMPORARY PASTURE AREAS OUTSIDE THE WORK AREA AS REPLACEMENT FOR THE DISTURBED PASTURE LAND.

16. AS DIRECTED BYTHE ENVIRONMENTAL INSPECTOR, LIVESTOCK CROSSINGS MUST BE INSTALLED IN THE CONSTRUCTION AREA WITHIN ACTIVE PASTURE AREAS.

NIAGARA MOHAWK POWER CORPORATION SYRACUSE, N.Y.

NOTES & RESTRICTIONS

AGRICULTURAL LAND-RELATED RESTRICTIONS

DES. 1m IDATE SCALEI" I"2 06113108 RJM SEGMENTS 2, 3. 2A s 2A CONNECTOR FlUNG JV eM

JV eM APPROVED APPROVED INDEX1 11/27/07 RJM PSC COMME1'll REViSION (FOR SEGMENT 1)

NOTE-019ACK. APP,NO. DATE BY REVISION APPROVED AP"'ROVFD "