Appendix to Annex 3 Procurement Plan I. General 1. Project Information Country : India Borrower : Government of India Project Name : National Hydrology Project Loan Credit No. : 2. Bank’s Approval Date of the Procurement Plan : 3. Date of General Procurement Notice : 4. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services Thresholds for Method of Procurement for procurement of goods, works and non-consulting services Procurement of Goods, Information technology and non consultancy services: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 3 million Limited Competitive Bidding (LIB) Must meet the requirements as per Para 3.2 of the Procurement Guidelines, and with prior agreement in PP with the Bank National Competitive Bidding (NCB) > USD 100,000 and up to USD 3 million Shopping Up to USD 100,000 (INR 6.5 m) Direct Must meet the requirements as per Para 3.7 of the Procurement Guidelines, and with prior agreement in PP with the Bank Framework Agreement Must meet the requirements as per Para 3.6 of the Procurement Guidelines, and with prior agreement in PP with the Bank Procurement of Works: Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 40 million National Competitive Bidding (NCB) > USD 100,000 and up to USD 40 million Comparison of three quotations / Shopping Up to USD 100,000 (INR 6.5 m) Force Account Must meet the requirements as per Para 3.9 of the Procurement Guidelines, and with prior agreement in PP with the Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 21-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Appendix to Annex 3

Procurement PlanI. General

1. Project InformationCountry : IndiaBorrower : Government of IndiaProject Name : National Hydrology Project Loan Credit No. :

2. Bank’s Approval Date of the Procurement Plan :

3. Date of General Procurement Notice :

4. Period Covered by this procurement plan : 18 months

II. Goods, Works, and Non-Consulting Services

Thresholds for Method of Procurement for procurement of goods, works and non-consulting services

Procurement of Goods, Information technology and non consultancy services:Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 3 million

Limited Competitive Bidding (LIB) Must meet the requirements as per Para 3.2 of the Procurement Guidelines, and with prior agreement in PP with the Bank

National Competitive Bidding (NCB) > USD 100,000 and up to USD 3 million

Shopping Up to USD 100,000 (INR 6.5 m)Direct Must meet the requirements as per Para 3.7 of the

Procurement Guidelines, and with prior agreement in PP with the Bank

Framework Agreement Must meet the requirements as per Para 3.6 of the Procurement Guidelines, and with prior agreement in PP with the Bank

Procurement of Works:Method of Procurement Thresholds for Methods International Competitive Bidding (ICB) > US Dollars 40 million

National Competitive Bidding (NCB) > USD 100,000 and up to USD 40 million

Comparison of three quotations / Shopping Up to USD 100,000 (INR 6.5 m)Force Account Must meet the requirements as per Para 3.9 of the

Procurement Guidelines, and with prior agreement in PP with the Bank

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Prior Review Thresholds: The following would be subject to Prior review of the Bank regardless of the Method of selection:

(a) Works: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 10 million

(b) Goods: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 2 million; and

The Prior Review Thresholds will be reviewed and updated during the implementation of the project, and modified based on the risk assessment.

1. In the case of contracts subject to prior review, Project Implementing Entity shall seek the Bank’s no objection before granting/agreeing to (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of works, goods, non-consulting services or consulting services, other significant changes to the terms and conditions of such that the contract,; (c) any variation order or amendment (except in cases of extreme urgency) which singly or combined with all variation orders or amendments previously issued, increase the original contract amount by more than 15 percent; or (d) the proposed termination of the contract..

A copy of all amendments to the contract shall be furnished to the Bank for its record.

2. Prequalification

Not Applicable

Domestic Preference: The provision of domestic preference is applicable in the evaluation of Goods only.

3. Reference to Procurement Manual

The procurement manual for the project is presently under preparation. SBDs agreed between the Project and Bank will be used for all works, goods, and non consultancy procurements.

4. Any Other Special Procurement Arrangements

The National bidding method for procurement and goods and works according to the above value thresholds will be conducted in accordance with paragraphs 3.3 and 3.4 of the Bank’s Procurement Guidelines and the following provisions:

(a) Only the model bidding documents for NCB agreed with the GOI task force (and as amended for time to time) shall be used for bidding.

(b) Invitations to bid shall be advertised in at least one widely circulated national daily newspaper (or on a widely used website or electronic portal with free national and international access along with an abridged version of the said advertisement published in a widely circulated

Page 3: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

national daily, among others, giving the website/electronic portal details from which the details of the invitation to bid can be downloaded) at least 30 days before the deadline for the submission of bids.

(c) No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises, or enterprises from any given state.

(d) Extension of bid validity shall not be allowed with reference to contracts subject to Bank prior review without the prior concurrence of the Bank (i) for the first request for extension if it is longer than four weeks and (ii) for all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of force majeure and circumstances beyond the control of the purchaser/employer).

(e) Rebidding shall not be carried out with reference to contracts subject to Bank prior review without the prior concurrence of the Bank. The system of rejecting bids outside a predetermined margin or ‘bracket’ of prices shall not be used in the project.

(f) Rate contracts entered into by the DGS&D will not be acceptable as a substitute for NCB procedures unless incorporation of right to audit and fraud corruption clauses. DGS&D contracts will be acceptable, however, for any procurement under the shopping procedures.

(g) Two or three envelope system will not be used (except when using the e-procurement system assessed and agreed by the Bank).

(h) No negotiations are conducted even with the lowest evaluated responsive bidders.

5. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule.

III. Selection of Consultants

1. Methods and Prior Review Threshold

Procurement methods of procurement of Consultants' Services (Firms)

Method of Procurement Thresholds for Methods Quality and Cost Based Selection (QCBS)Quality Based Selection (QBS) Must meet the requirements as per Para 3..2

to 3.4 of the Consultant GuidelinesSelection based on a Fixed Budget (FBS) Must meet the requirements as per Para 3.5 of

the Consultant Guidelines,

Selection Based on Least Cost Basis (LCS) Must meet the requirements as per Para 3.6 of the Consultant Guidelines,

Selection based on Consultant’s Qualification (CQ)

Estimated not to exceed USD 300,000, and must meet the requirements as per Para 3.7 of the Consultant Guidelines.

Page 4: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Single Source Selection (SSS) Must meet the requirements as per Para 3.8 to 3.11 of the Consultant Guidelines, and with prior agreement in PP with the Bank.

Procurement methods for Selection of Individual Consultants (IC)

Method of Procurement Thresholds for Methods Competitive Selection Must meet the requirements of Section V,

Para 5.1 to 5.5 of the Consultant Guidelines. Single Source Selection (SSS) Must meet the requirements of Section V,

Para 5.6 of the Consultant Guidelines and with prior agreement in PP with the Bank

*Shall meet the requirements as stated in Consultant Guidelines

Prior Review Thresholds:

(a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1 million.(b). Individual Consultant: all procurements estimated to cost more than USD 0.3 million

Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection.

Note: The Prior Review Thresholds will be reviewed during the implementation of the project and modified.

1. In the case of contracts subject to prior review, before agreeing to: (a) an extension of the stipulated time for performance of a contract; (b) any substantial modification of the scope of services, substitutions of key experts, or other significant changes to the terms and conditions of the contract; or (c) the proposed termination of the contract, the Borrower shall seek the Bank’s no objection. A copy of all amendments to the contract shall be furnished to the Bank for its record.

2. Short List comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than USD 800,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

3. The Request for Expression of Interest for consultancy services estimated to cost above USD 300,000 equivalent per contract for firms shall be advertised in UNDB online and World Bank external Website and in accordance with other provisions of Para 2.5 of the Consultant Guidelines

4. Any other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable]

Page 5: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

I. Implementing Agency Capacity Building Activities with Time Schedule

No Expected Outcome/Activity Description Estimated Duration

Date

1.ASCI training on Procurement Procedures arranged for Executive, Assistant Engineers who are responsible for Procurement – multiple trainings

2 weeks Continuous

2. Contract management training – multiple trainings 2 weeks Continuous

3. Customized training on Procurement Procedures arranged for Executive, Assistant Engineers who are responsible for Procurement – multiple trainings

1 week Continuous

Page 6: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 1

PROCUREMENT

PLANIndia : National Hydrology Project

General Information

Country: India Bank’s Approval Date of the Original Procurement Plan: 2017-11-03

Revised Plan Date(s): (comma delineated, leave blank if none)2018-09-28

Project ID: P152698 GPN Date:

Project Name: National Hydrology Project

Loan / Credit No: IBRD / 87250

Executing Agency(ies):Ministry of Water Resources RD-GR, National Institute of Hydrology, Roorkee, Sikkim - NHP, West Bengal Ground Water, Andhra Pradesh Ground Water, Bhakra Beas Management Board, Himachal Pradesh - NHP, Damodar Valley Corporation, Kerala Surface Water, Kerala Ground Water, Telengana Surface Water, Odisha Ground Water, Meghalaya - NHP, Rajasthan - NHP, Jharkhand - NHP, Survey of India, Andhra Pradesh Surface Water, Gujarat Surface Water, Telengana Ground Water, Assam-NHP, Gujarat Ground Water, Nagaland - NHP, Karnataka Surface Water, Chhattisgarh Ground Water, Chhattisgarh Surface Water, Tamil Nadu - NHP, Bihar Surface Water, Central Water and Power Research Station, Maharashtra Surface Water, West Bengal Surface Water, Punjab - NHP, Uttar Pradesh Ground Water, Central Water Commission - NHP, Goa - NHP, Madhya Pradesh - NHP, Bihar Ground Water, Uttar Pradesh Surface Water, Uttarakhand - NHP, Mizoram - NHP, Central Ground Water Board, Haryana - NHP, Manipur - NHP, Tripura - NHP, Maharashtra Ground Water, Central Pollution Control Board, National Remote Sensing Centre, Puducherry - NHP

WORKS

Activity Reference

No. / DescriptionLoan /

Credit No.Component Review Type Method

Market

Approach

Procurement

Process

Prequalificati

on (Y/N)

Actual

Amount

(US$)

Process

Status

Draft Pre-

qualification

Documents

Prequalification

Evaluation Report

Draft Bidding

Document /

Justification

Specific

Procurement Notice

/ Invitation

Bidding Documents

as Issued

Proposal

Submission /

Opening / Minutes

Bid Evaluation

Report and

Recommendation

for Award

Signed ContractContract

Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

IN-DVC-20023-CW-RFB /

Construction of water

Quality Lab

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2017-11-

30

2017-12-

05

2018-01-

16

2018-03-

31

2018-05-

05

2019-11-

01

IN-HIMACHAL PRADESH-

20159-CW-RFQ /

Renovation and allied

works for SDC Mandi

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-08-

10

2017-11-

28

2018-05-

27

IN-HIMACHAL PRADESH-

20392-CW-RFQ / Site Store

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

12

2018-01-

17

2018-07-

16

IN-ANDHRA PRADESH

SW-22044-CW-RFB /

Rennovation and repairs of

Data Centers

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

31

2017-11-

05

2017-12-

17

2018-01-

16

2018-02-

20

2018-08-

19

IN-TELENGANA GW-

23242-CW-RFB /

(i)Protection works (126)

for piezometers drilled

under HP-II in Southern

Telangana Region and

(ii)Rejuvenation of existing

piezometers (86) for

effective water level

measurements in

piezometers constructed

during HP I & II.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-10-

02

2017-11-

26

2018-02-

24

IN-TELENGANA GW-

23262-CW-RFQ / Civil

Works for Purpose Driven

Studies

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

05

2018-03-

19

2018-05-

18

IN-GUJARAT SW-23692-

CW-RFB / Civil Work for

Sub divisio / Section

Offices.

IBRD / 87250 PostRequest for

BidsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

01

2017-10-

15

2017-10-

30

2017-11-

15

2017-12-

30

2018-06-

30

IN-ODISHA (GW)-23843-

CW-RFQ /

Renovation/Repair of

existing divisional data

centre

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

05

2017-11-

30

2018-03-

31

IN-TELENGANA GW-

24093-CW-RFQ / (i)

Protection works (98) for

Peizometers drilled under

HP-II covering Cluster of

Eastern Telangana and

(ii) Rejuvenation of

existing piezometers (205)

for effective water level

measurements in

piezometers constructed

during HP I & II.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-09-

30

2017-11-

25

2018-02-

23

IN-TELENGANA GW-

24096-CW-RFQ / (i)

Protection works (76) for

Peizometers drilled under

HP-II covering Cluster of

Northern Telangana and

(ii) Rejuvenation of

existing piezometers (135)

for effective water level

measurements in

piezometers constructed

during HP I & II.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-09-

30

2017-11-

25

2018-02-

23

IN-MOWR RD-GR-28188-

CW-RFQ / Refurbishing

NPMU Office, Wood Work

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

20

2017-11-

01

2018-02-

09

IN-CHHATTISGARH SW-

29222-CW-RFQ /

Renovation of Sub

divisional Data Center &

office building 2 nos.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

11

2018-01-

06

2018-07-

05

IN-KERALA SW-29241-

CW-RFQ / NHP- Discharge

Measurement Equipment -

installation of Cableways

in 7 river gauge locations

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

25

2018-01-

13

2018-03-

14

IN-GUJARAT GW-25106-

CW-RFB / Improvement of

Existing Piezometers- 526

Nos

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

01

2017-10-

06

2017-11-

10

2017-11-

27

2018-01-

01

2018-06-

30

IN-MAHARASHTRA SW-

33224-CW-RFQ /

Renovation & furnishing of

existing Water Quality

Labs at Nashik &

Aurangabad in Godavari

basin of Marathwada

region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

05

2018-03-

02

2018-08-

29

IN-MAHARASHTRA SW-

33225-CW-RFQ /

Renovation and furnishing

of existing Water Quality

Labs at Pune and

Kolhapur in Krishna basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

05

2018-03-

02

2018-08-

29

IN-MAHARASHTRA SW-

33226-CW-RFQ /

Renovation and furnishing

of existing Water Quality

Lab at Thane in West

flowing rivers in Konkan

basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

05

2018-03-

02

2018-08-

29

IN-MAHARASHTRA SW-

33227-CW-RFQ /

Renovation & furnishing of

existing Water Quality

Labs at Nagpur in

Godavari basin of

Vidharbha region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

05

2018-03-

02

2018-08-

29

IN-MAHARASHTRA SW-

33234-CW-RFQ /

Establishment and

Furnishing of New Water

Quality Level II Lab For

Tapi Basin at Jalgaon.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-MAHARASHTRA SW-

33257-CW-RFQ / River

Cross Section Survey for

rivers on South of

Panchganga river of

Krishna Basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

31

2018-05-

26

2018-11-

22

IN-MAHARASHTRA SW-

33259-CW-RFQ /

Renovation & furnishing of

Divisional Data Center of

Amravati Division.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-MAHARASHTRA SW-

33262-CW-RFQ /

Renovation of Sub

Divisional Data Center of

Akola Sub Division under

H P Division, Amaravati.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-MAHARASHTRA SW-

33264-CW-RFQ /

Renovation of Sub

Divisional Data Center of

Jalgaon Sub Division

under H P Division,

Amaravati.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-MAHARASHTRA SW-

33265-CW-RFQ /

Renovation of Sub

Divisional Data Center of

Dhule Sub Division under

H P Division, Amaravati.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-MAHARASHTRA SW-

33267-CW-RFQ /

Renovation & furnishing of

Divisional & Sub-Divisional

Data Centers of

Aurangabad Division.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-MAHARASHTRA SW-

33268-CW-RFQ /

Renovation and furnishing

of divisional and sub-

divisional data centres

under Nagpur Division

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-MAHARASHTRA SW-

33270-CW-RFQ /

Renovation and furnishing

of divisional data centre of

Pune Division.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-MAHARASHTRA SW-

33273-CW-RFQ /

Renovation and furnishing

of sub-divisional data

centres under Pune

Division.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-MAHARASHTRA SW-

33277-CW-RFQ /

Renovation and furnishing

of Divisional and Sub-

divisional Data centre of

Thane Division.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-MAHARASHTRA SW-

33365-CW-RFB /

Renovation of Jalvidnyan

Bhavan, Nashik for State

Water Data Center &

Training Center.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

26

2017-12-

31

2018-02-

11

2018-03-

13

2018-04-

17

2018-10-

14

Page 7: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 2

IN-WEST BENGAL GW-

37311-CW-RFQ /

DRILLING AND

INSTALLATION OF 18

NEW NESTED (3 WELLS

PER NEST) GW

MONITORING WELLS IN

THREE MULTI-LAYERED

AQUIFERS AND

CONSTRUCTION OF 18

PROTECTION WORKS

FOR DWLR IN NINE

COASTAL BLOCKS OF

PURBA MEDINIPUR

DISTRICT, WEST

BENGAL

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

27

2017-12-

25

2018-01-

09

IN-WEST BENGAL GW-

37349-CW-RFQ / Protection

Works for 5 Automatic

Raingauge Station (ARS)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

28

2017-12-

26

2018-01-

10

IN-WEST BENGAL GW-

37354-CW-RFB / Protection

Works for 5 Automatic

Water Level recorder

(AWLR) & Velocity Sensor

(VS)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2017-11-

24

2017-11-

29

2017-12-

06

2017-12-

27

2018-01-

10

2018-01-

25

IN-KERALA SW-29250-

CW-RFQ / NHP -

Rennovation of Knowledge

Centres- Upgradation of

Training Centre, Thrissur

2017-18

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

05

2018-02-

20

2018-05-

21

IN-WEST BENGAL SW-

38559-CW-RFB /

Construction of State

Data Center at Kolkata

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2017-12-

18

2017-12-

20

2018-01-

22

2018-02-

08

2018-03-

04

2019-03-

04

IN-KERALA SW-39093-

CW-RFQ / NHP-Shifting of

River gauge station at

Cheruthuruthy to

Vazhalikkavu Check dam

under Hydrology Section,

Wadakkanchery

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

20

2018-02-

14

2018-03-

31

IN-KERALA SW-39107-

CW-RFQ / NHP-

Construction of steps for

river gauge station at

Vettilappara -

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

22

2018-02-

16

2018-03-

18

IN-KERALA SW-39108-

CW-RFQ / NHP- Protection

of Kurumali River Gauge

station

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

18

2018-02-

12

2018-03-

29

IN-KERALA SW-39111-

CW-RFQ / NHP- Protection

of Aloor River Gauge

station

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

20

2018-02-

14

2018-03-

16

IN-KERALA SW-39132-

CW-RFQ / NHP- Protection

work for installation of

Bank Operated Cable Way

at Karikkadavu river

gauge station

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

29

2018-02-

09

2018-03-

26

IN-WEST BENGAL GW-

37305-CW-RFQ /

CONSTRUCTION OF 25

NOS PROTECTION

WORKS FOR DWLR AT

25 NOS EXISTING

GROUNDWATER

MONITORING WELLS IN

WEST BENGAL

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

17

2018-01-

14

2018-02-

28

IN-WEST BENGAL GW-

37300-CW-RFQ /

DRILLING AND

INSTALLATION OF 20

NOS GROUNDWATER

MONITORING WELLS

AND CONSTRUCTION OF

20 NOS. PROTECTION

WORKS FOR DWLR

TELEMETRY SYSTEM IN

WEATHERED ZONE OF

HARD ROCK AREAS OF

PURULIA DISTRICT,

WEST BENGAL

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

17

2018-01-

10

2018-02-

24

IN-WEST BENGAL SW-

38561-CW-RFB /

Construction of Control

Room for SCADA of

Tilpara Barrage

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-01-

31

2018-03-

21

2018-09-

17

IN-WEST BENGAL SW-

38558-CW-RFB /

Construction of Control

Room for SCADA of

Durgapur Barrage

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-01-

17

2018-03-

09

2018-09-

05

IN-SOI-44988-CW-DIR /

Establishment of

production facility for

1:25k geodatabase

processing. Work involves

civil and electrical

renovation in existing

building. Work being

executed through CPWD

as per WB guidelines at

NGDC/ DMC, Dehradun.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

09

2018-02-

14

2018-03-

07

2018-03-

12

2018-03-

20

2018-03-

31

IN-SOI-44996-CW-DIR /

Establishment of

production facility for

1:25k geodatabase

processing. Work involves

civil and electrical

renovation in existing

building. Work being

executed through CPWD

as per WB guideline at

GISTC/ UK&WUP GDC,

Dehradun.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

09

2018-02-

14

2018-03-

07

2018-03-

12

2018-03-

20

2018-03-

31

IN-SOI-45002-CW-DIR /

Establishment of

production facility for 0.5m

DEM data processing.

Work involves civil and

electrical renovation in

existing building. Work

being executed through

CPWD as per WB

guidelines at G&RB office

of Survey of India in

Dehradun.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

09

2018-02-

14

2018-03-

07

2018-03-

12

2018-03-

20

2018-03-

31

IN-TAMIL NADU -46686-

CW-RFQ / Improvements

to Data Centre in Ground

Water Division and Sub-

Divisional Data Centre at

Salem Ground Water sub

division, Ground water

circle office & Division

campus at Thanjavur

District.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

12

2018-04-

02

2018-05-

31

IN-TAMIL NADU -46681-

CW-RFQ / Repairs and

Renovation works to

Regional and Division Data

Processing Centres at

Thallakulam in Madurai

District & Data Processing

Centres at Paramakudi

Ground Water Subdivision

office in Ramanathapuram

District. .

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

01

2018-03-

15

2018-05-

14

IN-TAMIL NADU -46688-

CW-RFQ / Improvements

to Data Processing Centre

at Ground Water Divisions

at Tharamani, Cuddalore

and Vellore.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

31

2018-03-

15

2018-06-

18

IN-KERALA SW-39133-

CW-RFQ / NHP- Fencing

of Kunnamangalam rain

gauge station

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

29

2018-03-

01

2018-03-

22

IN-KERALA SW-39109-

CW-RFQ / NHP-

Renovation of Vanimel

River Gauge station

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

29

2018-03-

01

2018-03-

22

IN-KERALA SW-39110-

CW-RFQ / NHP: Civil

works at Kaithapram River

gauge station for

upgrading to RTDAS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

29

2018-03-

01

2018-03-

22

IN-KERALA SW-39112-

CW-RFQ / Fencing work of

Chooral rain Gauge station

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

05

2018-03-

08

2018-03-

23

IN-KERALA SW-39113-

CW-RFQ / NHP - Fencing

of Thillenkeri rain gauge

station

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

05

2018-03-

08

2018-03-

23

IN-KERALA SW-39114-

CW-RFQ / NHP - Fencing

work of Payyavoor rain

gauge station

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

07

2018-03-

10

2018-03-

25

IN-TAMIL NADU -46834-

CW-RFQ / Improvements

to TAWS station at Upper

Anicut in Trichy, Ooty and

Valparai in Coimbatore

District.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

12

2018-04-

02

2018-05-

31

IN-JHARKHAND -47260-

CW-RFB / construction of

piezometers in different

districts of jharkhand

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-03-

14

2018-03-

16

2018-04-

13

2018-05-

11

2018-05-

23

2018-11-

19

IN-TAMIL NADU -46732-

CW-RFQ / Improvements

to the Standard

Rainguage Stations at

Sivagangai taluk Office in

Sivagangai and at

Karaikudi taluk Office in

Sivagangai District.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

31

2018-03-

15

2018-05-

14

Page 8: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 3

IN-TAMIL NADU -46744-

CW-RFQ / Improvements

to the Standard

Rainguage Stations at

Poonimangadu and

Dharanivaraghapuram in

Thiruvallur, Palur and

Thirukoilur in Cuddalore

and Villupuram

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

30

2018-03-

13

2018-05-

14

IN-BIHAR GW-50060-CW-

RFB / renovation of office

for NHP-III at chief

engineer office, patna

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

22

2018-06-

29

2018-08-

28

IN-WEST BENGAL GW-

37344-CW-RFQ / Protection

Works for 5 Automatic

Weather Station (AWS)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

29

2017-12-

27

2018-01-

11

IN-SOI-23030-CW-RFB /

Lidar Survey- Acquisition

and processing including

setting up of geospatial

data production centre

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-11-

01

2017-11-

06

2017-12-

18

2018-01-

17

2018-02-

21

2018-08-

20

IN-UTTAR PRADESH SW-

50743-CW-RFB / Supply,

Installation, Testing,

Commissioning, Training,

Dissemination, Operation

and maintenance of

SCADA System at Okhla

Barrage and Head

Regulator of Agra Canal,

New Delhi

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2018-02-

23

2018-02-

23

2018-03-

17

2018-04-

30

2018-05-

25

2026-02-

24

IN-MAHARASHTRA SW-

33475-CW-RFB /

Establishment of SPMU

with furnishing of Building

& Equipments at

Jalvidnyan Bhavan,

Nashik.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

01

2018-08-

06

2018-09-

17

2018-10-

17

2018-11-

21

2019-05-

20

IN-UTTARAKHAND-53107-

CW-RFB / Renovation

Work of Water Quality

Lab. at IRI Roorkee under

national Hydrology Project

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-06-

18

2018-06-

19

2018-06-

20

2018-06-

23

2018-06-

25

2018-06-

26

IN-UTTARAKHAND-53112-

CW-RFB / Renovation

Work of Water Quality

Lab. at Irrigation Office,

Haldwani under National

Hydrology Project

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-06-

14

2018-06-

15

2018-06-

16

2018-06-

19

2018-06-

21

2018-06-

22

IN-UTTARAKHAND-53151-

CW-RFB / Construction of

State Water Informatics

Centre building at Roorkee

under NHP

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-06-

12

2018-06-

13

2018-06-

14

2018-06-

17

2018-06-

19

2019-04-

20

IN-HIMACHAL PRADESH-

54274-CW-RFB / Deep

piezometers (civil work)

with DWLR with ODEX

Method (44 nos.)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-03-

19

2018-03-

19

2018-04-

20

2018-07-

20

2018-08-

18

2019-08-

18

IN-HIMACHAL PRADESH-

54493-CW-RFB / Supply of

G&D Bank Operated Cable-

way (BOC)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-03-

22

2018-03-

27

2018-05-

08

2018-08-

07

2018-09-

11

2019-09-

11

IN-HIMACHAL PRADESH-

54498-CW-RFB /

Construction of 12 nos. of

deep/shallow wells

(Observation Wells ) by

Rotary Drilling Method.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-03-

29

2018-04-

03

2018-05-

15

2018-08-

14

2018-09-

18

2019-03-

17

IN-HIMACHAL PRADESH-

20162-CW-RFQ / Providing

and Fixing of Staff Gauge

, Gauge Plate in various

G&D Sites in

HP.(Activities of similar

nature have been clubbed)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

12

2018-07-

31

2019-01-

27

IN-ASSAM -28007-CW-

RFQ / Renovation and

construction of Divisional

Data Centre

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-10-

14

2017-12-

09

2018-06-

07

IN-CWPRS-61019-CW-RFB

/ Construction of

observatory room for

Automatic Weather Station

(AWS) under NHP in

CWPRS, Kdk, Pune-24

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

26

2018-07-

21

2019-01-

17

IN-ASSAM -44713-CW-

RFB / Construction of

State Data Centre

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2018-01-

19

2018-01-

24

2018-03-

07

2018-05-

20

2018-06-

24

2018-12-

21

IN-MADHYA PRADESH-

18230-CW-RFQ /

Benchmark and RL

surveys

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

05

2018-07-

31

2019-01-

27

IN-MADHYA PRADESH-

18234-CW-RFQ / River

Cross section of River

monitoring sites

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

05

2018-07-

31

2019-01-

27

IN-MADHYA PRADESH-

61561-CW-RFQ /

Rennovation works - State

Data Centre

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

05

2018-08-

30

2019-02-

26

IN-MADHYA PRADESH-

61564-CW-RFQ /

Rennovation works -

Bhopal Circle Data Centre

of Groundwater

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

05

2018-08-

30

2019-02-

26

IN-

BIHAR/WRD/FMISC/NHP-

SW/W-NCB-01 /

Construction of Water

Knowledge Center, Bihar

at Patna as Hydrology

Project Center all

complete.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-12-

31

2019-01-

05

2019-02-

16

2019-05-

01

2019-06-

05

2021-06-

04

IN-SOI-61871-CW-RFQ /

Establishment of

production facility for 3-5m

DEM

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

21

2018-09-

15

2019-03-

14

IN-SOI-62132-CW-RFB /

Setting up Production

Centre for PDO

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

16

2018-07-

21

2018-09-

01

2018-11-

14

2018-12-

19

2019-06-

17

IN-CGWB-32465-CW-RFB

/ Construction of 60 nos

Piezometers- Tamilnadu

and Puducherry.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-06-

01

2018-06-

06

2018-07-

18

2018-09-

30

2018-11-

04

2019-05-

03

IN-CGWB-39815-CW-RFB

/ Procurement of DWLR

with Water quality probes

and with Telemetry

(Supply, installation, real-

time data acquisition &

maintenance)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-10-

15

2018-10-

20

2018-12-

01

2019-02-

13

2019-03-

20

2019-09-

16

IN-CWPRS-62533-CW-RFB

/ Preparation of site for

setting up of Automatic

Weather System under

NHP at CWPRS,Pune-24

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

26

2018-07-

21

2019-01-

17

IN-DVC-19989-CW-RFB /

Construction of hydrological

data center of DVC

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2017-07-

10

2017-07-

15

2017-08-

26

2017-11-

08

2017-12-

13

2019-06-

11

IN-KARNATAKA SW-

26473-CW-RFQ / Up

gradation of State Data

Center:- Repair &

Renovation of office and

other allied works

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope64,512.19 Signed

2017-08-

29

2017-09-

15

2017-11-

14

IN-CWPRS-63501-CW-RFB

/ Construction of 2D

flumes under NHP at

CWPRS Kdk Pune 24

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

26

2018-07-

21

2019-01-

17

IN-CWPRS-63509-CW-RFB

/ Chain link fencing for

bore well near canal

automation division under

NHP at CWPRS Pune

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

26

2018-07-

21

2019-01-

17

IN-CWPRS-63854-CW-RFQ

/ Infrastructure facility for

NHP Lab at CWPRS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

29

2018-07-

24

2019-01-

20

IN-CWPRS-63966-CW-RFQ

/ Internal and external

painting including some

civil works in HMC

Division

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

29

2018-07-

24

2019-01-

20

IN-CWPRS-63967-CW-RFQ

/ Internal and external

painting with some

horticulture development

for CMRT Division

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

29

2018-07-

24

2019-01-

20

IN-CWPRS-63968-CW-RFQ

/ Painting of canal

automation office and

laboratory under NHP at

CWPRS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

29

2018-07-

24

2019-01-

20

IN-CWPRS-63969-CW-RFQ

/ Providing & fixing

informatory name boar

along road side at CWPRS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

29

2018-07-

24

2019-01-

20

IN-MANIPUR -41468-CW-

RFB / Construction of

state hydrological data

centre at water resources

department campus,

lamphel, Manipur

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-08-

25

2018-08-

30

2018-10-

01

2018-10-

09

2018-10-

15

2020-04-

15

NHP-2018-2019-TR-388850-

CW-NCB-DE / Construction

of Water Data Center

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-10-

31

2018-11-

05

2018-12-

17

2019-03-

01

2019-04-

05

2019-10-

02

Page 9: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 4

NHP-2018-2019-TR-776064-

CW-SH-QU / Drilling of

Piezometer

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

04

2018-12-

30

2019-06-

28

NHP-2018-2019-APGW-

212910 / Protection works

for Piezometers

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

17

2018-09-

22

2018-11-

03

2019-01-

16

2019-02-

20

2019-08-

19

NHP-2018-2019-APGW-

423400 / Drilling of

Piezometers

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

24

2018-09-

29

2018-11-

10

2019-01-

23

2019-02-

27

2019-08-

26

NHP-2018-2019-APGW-

235012 / Construction of

State Data Center for SW

and GW

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

24

2018-09-

29

2018-11-

10

2019-01-

23

2019-02-

27

2019-08-

26

NHP-2018-2019-ML-426354-

CW-NCB-SE / Construction

of Data Centre

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-08-

11

2018-09-

22

2018-12-

05

2019-01-

09

2019-07-

08

NHP-2018-2019-TSGW-

339383 / Protection works

to Piezometers of less than

50 m drilled under HP-II

in Southern Region

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-11-

10

2019-01-

09

NHP-2018-2019-TSGW-

946553 / Protection works

to Piezometers of less than

50 m drilled under HP-II

in Northern Region

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

16

2018-11-

11

2019-01-

10

NHP-2018-2019-TSGW-

834014 / Protection works

to Piezometers less than

50m drilled under HP-II

in Eastern Telangana

Region

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

17

2018-11-

12

2019-01-

11

NHP-2018-2019-TSGW-

564746 / Rejuvenation of

Existing PZ for effective

water level monitoring

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-01-

23

NHP-2018-2019-TSGW-

903276 / Upgradation of

State Data , Training cum

Information Centre

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-10-

08

2018-10-

13

2018-11-

24

2019-02-

06

2019-03-

13

2019-09-

09

NHP-2018-2019-TSGW-

721719 / Civil works for

Purpose Driven Studies

(Yr1)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

15

2018-12-

10

2019-06-

08

NHP-2018-2019-KASW-

842629-CW-SH-QU /

Rejuvenation of existing

peizometers-Package 1

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

07

2018-09-

01

2019-02-

28

NHP-2018-2019-KASW-

470717-CW-SH-QU /

Rejuvenation of existing

peizometers-Package 2

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

12

2018-09-

06

2019-03-

05

NHP-2018-2019-KASW-

955198-CW-SH-QU /

Rejuvenation of existing

peizometers-Package 3

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

17

2018-09-

11

2019-03-

10

NHP-2018-2019-KASW-

724042-CW-SH-QU /

Rejuvenation of existing

peizometers-Package 4

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

22

2018-09-

16

2019-03-

15

NHP-2018-2019-KASW-

316354-CW-SH-QU /

Rejuvenation of existing

peizometers-Package 5

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

28

2018-09-

22

2019-03-

21

NHP-2018-2019-KASW-

809404-CW-SH-QU /

Acoustics

works,improvements

works,civil & electrification

etc.,, to class rooms at

ESTC,KERS& other works

at WQ labs

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

01

2018-09-

26

2019-03-

25

NHP-2018-2019-KASW-

774493-CW-SH-QU /

Improvements to Main

building , KERS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-KASW-

624324-CW-SH-QU /

Improvements to Hostel

building (Block-I) of KERS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-11-

10

2019-05-

09

NHP-2018-2019-KASW-

899118-CW-SH-QU / GD

housing(reconstruction)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-KASW-

688310-CW-SH-QU /

Upgrading

Divisional/Subdivisional

data processing centers-

package1

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-KASW-

352806-CW-SH-QU /

Upgrading

Divisional/Subdivisional

data processing centers-

package 2

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-KASW-

639841-CW-SH-QU /

Upgrading

Divisional/Subdivisional

data processing centers-

package 3

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

04

2018-12-

30

2019-06-

28

NHP-2018-2019-KASW-

462160-CW-SH-QU / Rain

gauge housing -

reconstruction-package 4

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

05

2018-11-

30

2019-05-

29

NHP-2018-2019-KASW-

831126-CW-SH-QU / Rain

gauge housing -

reconstruction-package 6

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CWPRS-

599274-CW-NCB-DE /

Upgradation of Current

meter rating facility

(CMRT

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-11-

30

2018-12-

05

2019-01-

16

2019-03-

31

2019-05-

05

2019-11-

01

NHP-2018-2019-CGWB-

450136 / construction of

piezometers in costal area

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-06-

25

2018-06-

30

2018-08-

11

2018-10-

24

2018-11-

28

2019-05-

27

NHP-2018-2019-DVC-

210903-CW-NCB-DE /

Construction of Water

Quality Lab and its

Furnishing.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

10

2018-08-

15

2018-09-

26

2018-12-

09

2019-01-

13

2020-07-

11

NHP-2018-2019-SK-979458-

CW-NCB-DE / Construction

of State Data center

building

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

18

2018-07-

24

2018-08-

24

2018-09-

04

2018-10-

23

2021-10-

02

NHP-2018-2019-RJ-106903-

CW-NCB-DE / State data

center

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

16

2018-08-

21

2018-10-

02

2018-12-

15

2019-01-

19

2019-07-

18

NHP-2018-2019-RJ-354417-

CW-SH-QU / Regional data

center

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

20

2018-09-

14

2019-03-

13

NHP-2018-2019-RJ-214021-

CW-SH-QU / District data

center

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

20

2018-09-

14

2019-03-

13

NHP-2018-2019-RJ-968644

/ Construction , Renovation

& modernisation of

knowledge center

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

09

2018-07-

14

2018-08-

25

2018-11-

07

2018-12-

12

2019-06-

10

NHP-2018-2019-CPCB-

469831 / Renovation of

Data Centre at CPCB,

Delhi

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-10-

05

2018-11-

16

2019-01-

29

2019-03-

05

2019-09-

01

IN-DVC-19989-CW-RFB-2

/ Construction of Hydrology

Control Room at DVC

Maithon under NHP.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

25

2018-07-

30

2018-09-

10

2018-11-

23

2018-12-

28

2020-06-

25

NHP-2018-2019-ML-967673-

CW-SH-SCB / Construction

of piezometers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

08

2018-11-

03

2019-05-

02

NHP-2018-2019-UPGW-

177029-CW-NCB-SE /

INSTALLATION OF

BLOCKWISE KEY

PIEZOMETERS

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-06-

24

2018-06-

29

2018-08-

16

2018-10-

29

2018-12-

03

2019-12-

03

NHP-2018-2019-JH-372935-

CW-NCB-DE / Civil Works

for Construction of state

data and training

centre,WQ LAB,HIS

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-12-

27

2019-01-

02

2019-01-

30

2019-02-

12

2019-02-

27

2019-03-

29

NHP-2018-2019-JH-395497-

CW-NCB-DE / Construction

of piezometers

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

14

2018-09-

19

2018-10-

15

2018-10-

29

2018-11-

19

2019-03-

19

NHP-2018-2019-RJ-483550

/ Establishment of SPMU (

Renovation/ civil work)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-KLGW-

429114 / Platform

construction and protective

cover

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-KLGW-

170872 / Fencing for

piezometers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

Page 10: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 5

NHP-2018-2019-KASW-

926942-CW-SH-QU / Rain

gauge housing -

reconstruction-package 8

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

30

2018-12-

25

2019-06-

23

NHP-2018-2019-KASW-

944031-CW-SH-QU /

Upgrading state data

centre : package 1

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-09-

24

2019-03-

23

NHP-2018-2019-KASW-

336011-CW-SH-QU /

Upgradation of state data

centre: Package 2

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-KASW-

571476-CW-SH-QU / Rain

gauge housing-

reconstruction : Package 1

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

20

2018-10-

15

2019-04-

13

NHP-2018-2019-KASW-

226919-CW-SH-QU / Rain

gauge housing -

reconstruction-package 2

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

04

2018-10-

30

2019-04-

28

NHP-2018-2019-KASW-

890233-CW-SH-QU / Rain

gauge housing -

reconstruction-package 3

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-KASW-

664517-CW-SH-QU / Rain

gauge housing -

reconstruction-package 5

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

15

2018-12-

10

2019-06-

08

NHP-2018-2019-KASW-

254133-CW-SH-QU / Rain

gauge housing -

reconstruction-package 7

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

25

2018-12-

20

2019-06-

18

NHP-2018-2019-NIH-

193022-CW-NCB-SE /

Construction of Regional

Centre

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-11-

10

2019-05-

09

NHP-2018-2019-AS-219985

/ CONSTRUCTION OF

BUILDING FOR NEW GD

AND GDS SITES

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

15

2018-11-

20

2019-01-

01

2019-01-

31

2019-03-

07

2019-09-

03

NHP-2018-2019-AS-735672

/ RENOVATION &

CONSTRUCTION OF

DIVISIONAL DATA

CENTER(LAID,BARPETA)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

10

2018-05-

05

2018-11-

01

NHP-2018-2019-AS-545673

/ RENOVATION &

CONSTRUCTION OF

DIVISIONAL DATA

CENTER(UAID,JORHAT)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

11

2018-05-

06

2018-11-

02

NHP-2018-2019-AS-802077

/ RENOVATION &

CONSTRUCTION OF

DIVISIONAL DATA

CENTER(CID,BADARPUR)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2019-05-

27

NHP-2018-2019-AS-819736

/ CONSTRUCTION OF

STATE DATA CENTRE

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

20

2018-10-

21

2018-10-

21

2018-08-

10

2018-12-

30

2019-03-

14

2019-04-

18

2020-10-

09

NHP-2018-2019-KLSW-

513398 / Construction and

repair of cable ways

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2018-10-

31

NHP-2018-2019-NL-768029

/ Construction of State

data Centre(SDC) at

Kohima

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

31

2018-08-

05

2018-09-

06

2018-11-

10

2018-12-

15

2019-12-

10

NHP-2018-2019-NL-278303

/ Construction of Hydrology

Project Convention

Centre(HPCC) at Dimapur

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

31

2018-08-

14

2018-09-

15

2018-11-

19

2018-12-

24

2020-06-

16

NHP-2018-2019-GJSW-

143223 / Civil and

Furnishing work for

Establishment of Flood

Management Cell.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

10

2018-11-

09

2019-03-

09

IN-TELENGANA SW-

39866-CW-RFB /

Infrastructure _Works -

Interior Works for State &

Regional Data Centers

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-12-

20

2017-12-

25

2018-02-

05

2018-03-

07

2018-04-

11

2018-10-

08

IN-TELENGANA SW-

38228-CW-RFB / Civil

Works for Construction of

Regional Data Center

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-12-

20

2017-12-

25

2018-02-

05

2018-03-

07

2018-04-

11

2018-10-

08

NHP-2018-2019-MZ-306433-

CW-NCB-DE / Vertical

extension of C.E Building

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

29

2018-09-

03

2018-10-

15

2018-11-

14

2018-12-

19

2019-06-

17

NHP-2018-2019-MZ-553109-

CW-NCB-DE / Construction

of Data Centre for

Southern division

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-11-

28

2018-12-

03

2019-01-

14

2019-03-

29

2019-05-

03

2019-10-

30

NHP-2018-2019-KLGW-

746971 / Piezometer-

shallow

IBRD / 87250 Post Force Account Direct

0.00

Pending

Implement

ation

2018-09-

25

2018-10-

05

2018-11-

04

2018-11-

14

NHP-2018-2019-WBGW-

404833 / Construction of

Nested (3 nos.) GW

Monitoring wells including

Protection works in 3-tier

multi-aquifer system of

coastal area

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

02

2018-09-

07

2018-10-

19

2019-01-

01

2019-02-

05

2019-08-

04

NHP-2018-2019-WBGW-

229468 / Construction of

GW Monitoring Wells

including Protection works

in weathered zone of hard

rock area

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

02

2018-09-

07

2018-10-

19

2019-01-

01

2019-02-

05

2019-08-

04

NHP-2018-2019-WBGW-

447564 / Interior Works in

GW Hydrology Training

Centre (GWHTC)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-WBGW-

457978 / Interior Works

for State GW Informatics

Centre (SGWIC)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-PY-609320

/ Construction / Renovation

of Testing Lab

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

22

2018-11-

17

2019-03-

31

NHP-2018-2019-PY-794290

/ Civil Works for

Renovation of GW&SWDC

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

22

2018-11-

17

2019-03-

31

NHP-2018-2019-MN-

507826 / Furnishing of

water quality lab

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

02

2018-10-

28

2019-04-

26

IN-PUNJAB -75610-CW-

RFQ / Restoration of 700

no. ground water

observation wells already

installed in various

districts of Punjab State

under World bank Aided

Hydrology Project Phase -

II (3 Pkgs)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

28

2018-10-

22

2019-04-

20

IN-PUNJAB -54238-CW-

RFQ / RESTORATION OF

700 No. GROUND WATER

OBSERVATION WELLS

ALREADY INSTALLED IN

PUNJAB STATE UNDER

WORLD BANK AIDED

HYDROLOGY PROJECT

PHASE - II.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-03-

25

2018-05-

20

2018-11-

16

IN-CWPRS-69317-CW-RFB

/ : Internal and External

Painting work along with

some horticulture

development for CMRT

division at CWpRS

Khadakwasla, pune_24

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

IN-CWPRS-69318-CW-RFB

/ Renovation and

upgradation of family

suites and hostels at

CWPRS Guest House

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-11-

25

2019-05-

24

NHP-2018-2019-CWPRS-

205497-CW-NCB-SE /

Infrastructure facilities for

NHP Laboratory at

CWPRS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

807626-CW-NCB-SE /

Renovation of family suites

at CWPRS Guest House

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

450346-CW-NCB-SE /

Renovation of Hostel

Building CWPRS Guest

House

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-11-

25

2019-05-

24

NHP-2018-2019-CWPRS-

717414-CW-DC-DC / Civil

Works for Telemetry

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

155250-CW-NCB-SE /

Construction of Bore well

& fencing- GW

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-11-

25

2019-05-

24

NHP-2018-2019-CWPRS-

511223-CW-NCB-SE /

Construction of AWS site

and switch room

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

05

2019-01-

30

2019-07-

29

Page 11: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 6

NHP-2018-2019-CWPRS-

646589-CW-NCB-SE /

Desilting and minor

repairs of Water

recirculation systems

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CWPRS-

873052-CW-NCB-SE /

Renovation of water

control gates including civil

structures in Water

recirculation system

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CWPRS-

455337-CW-NCB-SE /

Supply, installation,

Testing and commissioning

of Booster pump set in

the existing MS pipe line

including civil works

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

05

2019-01-

30

2019-07-

29

NHP-2018-2019-CWPRS-

204908-CW-NCB-SE /

Renovation of 100 cusecs

return channel at Ch.0.0

m near Kirkatwadi nala

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

02

2018-11-

27

2019-05-

26

NHP-2018-2019-CWPRS-

802145-CW-NCB-SE /

Renovation of CMC

division building

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CWPRS-

827974-CW-NCB-SE /

Construction: Isolation &

acoustical treatment,

lighting arrangement.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

20

2019-01-

15

2019-07-

14

NHP-2018-2019-CWPRS-

285970-CW-NCB-SE /

Upgradation of various

Electrical Installations at

CWPRS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

376515-CW-NCB-SE /

Internal and external

painting including some

civil works in HMC Div.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

844940-CW-NCB-SE /

Construction of

Experimental Flume

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

364043-CW-NCB-SE /

Renovation of PMU Office

(civil and electrical work)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-11-

25

2019-05-

24

NHP-2018-2019-CWPRS-

861195-CW-NCB-DE /

Construction of Test Tank

Facility- SW

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

15

2019-02-

09

2019-08-

08

NHP-2018-2019-CWPRS-

503695-CW-NCB-SE / Lab

Interior-Civil works- AWS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

24

2019-01-

19

2019-07-

18

IN-CWPRS-79567-CW-RFQ

/ Lab Interior-Electrical

fittings - AWS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CWPRS-

446382-CW-NCB-SE /

Construction of Test Tank-

GW

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

17

2018-12-

12

2019-06-

10

NHP-2018-2019-MZ-807289

/ Vertical Extension of

C.E. Building

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

28

2018-10-

03

2018-11-

14

2018-12-

14

2019-01-

18

2019-07-

17

GOODS

Activity Reference

No. / DescriptionLoan /

Credit No.Component Review Type Method

Market

Approach

Procurement

Process

Prequalificati

on (Y/N)

Actual

Amount

(US$)

Process

Status

Draft Pre-

qualification

Documents

Prequalification

Evaluation Report

Draft Bidding

Document /

Justification

Specific

Procurement Notice

/ Invitation

Bidding Documents

as Issued

Proposal

Submission /

Opening / Minutes

Bid Evaluation

Report and

Recommendation

for Award

Signed ContractContract

Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

IN-NIH ROORKEE-16148-

GO-RFB / Desktop

Computers (20),

Workstation (1), Digital

Photocopier (1), Blade

Server (2), Projector (1)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-10-

03

2017-11-

28

2018-03-

15

IN-SIKKIM -16384-GO-

RFQ / Procurement of 4

Computers, Printers and 2

Laptops (IT Equipment)

to set up SPMU Office as

approved in the AWP 2016-

2017 and 2017-18. The

WID are 728, 729, 2734,

2735 and 2736.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope7,248.69 Completed

2017-06-

10

2017-06-

23

2017-06-

28

17335-GO-RFB /

PROCUREMENT OF

MANUAL OBSERVATION

INSTRUMENTS (Portable

Current Meter & Eco

Sounder & GPS)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

13

2017-10-

16

2017-10-

26

IN-WEST BENGAL-GW-

17345-GO-RFB /

PROCUREMENT OF

WATER QUALITY

TESTING INSTRUMENTS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

13

2017-10-

16

2017-10-

26

IN-WEST BENGAL GW-

17346-GO-RFB /

PROCUREMENT OF IT

EQUIPMENTS (Computers

& Laptop with Software &

Peripherals) FOR HYDRO

INFORMATICS CENTRE

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

13

2017-10-

16

2017-10-

26

IN-WEST BENGAL GW-

17349-GO-RFB /

PROCUREMENT OF IT

EQUIPMENTS LCD

(Projector and Screen/LED

TV & Photocopier) FOR

HYDRO INFORMATICS

CENTRE

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

13

2017-10-

16

2017-10-

26

IN-SIKKIM -17740-GO-

RFQ / Procurement of

Office Furniture /

Furnishing as per AWP

2016-17 vide UID No 131.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope2,350.56 Completed

2017-06-

12

2017-06-

24

2017-06-

29

IN-ANDHRA PRADESH

GW-18140-GO-RFQ /

Procurement of Air

Conditioners for State and

District Data Centers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-06-

15

2017-06-

15

2017-06-

15

IN-ANDHRA PRADESH

GW-18141-GO-RFQ /

Procurement of Ground

Water Monitoring

Equipment

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-06-

15

2017-06-

15

2017-06-

15

IN-ANDHRA PRADESH

GW-18149-GO-RFQ /

Procurement of DGPS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-06-

15

2017-06-

28

2017-07-

27

IN-BBMB-18706-GO-RFQ /

Procurement of Articulating

Pickup vehicle (Multi

utility)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

11

2017-10-

29

2018-01-

27

IN-MOWR RD-GR-19666-

GO-RFQ / IT Equipment

for National Project

Management Unit

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-07-

09

2017-08-

16

2017-11-

04

IN-HIMACHAL PRADESH-

19979-GO-RFQ / supply of

ground water sampling

pump

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

15

2017-12-

18

2018-06-

16

IN-DVC-19985-GO-RFQ /

Procurement of IT

hardware & software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope6,072.37

Under

Implement

ation

2017-07-

15

2017-09-

09

2018-03-

08

IN-HIMACHAL PRADESH-

20070-GO-RFQ / supply of

bore hole camera

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

15

2017-12-

18

2018-06-

16

IN-HIMACHAL PRADESH-

20073-GO-RFQ / supply of

total station

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

16

2017-12-

20

2018-06-

18

IN-KERALA SW-20846-

GO-RFQ / Procurement of

bridge outfit - 10 Nos

(2016-17 and 2017-18)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

17

2018-01-

05

2018-02-

04

IN-KERALA GW-20103-

GO-RFQ / Computer

Purchase

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-07-

30

2017-09-

24

2018-03-

23

IN-HIMACHAL PRADESH-

20120-GO-RFQ / Supply of

Auto level

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

16

2017-12-

20

2018-06-

18

IN-TELENGANA SW-

20126-GO-RFQ /

Procurement of Survey

Instruments like Total

Station, Auto Levels and

GPS Hand sets

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-09-

06

2017-11-

01

2018-04-

30

IN-TELENGANA SW-

20131-GO-RFQ /

Procurement of office

furniture for Central Data

center and Regional Data

Center

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-10-

08

2017-12-

03

2018-06-

01

Page 12: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 7

IN-HIMACHAL PRADESH-

20136-GO-RFQ / Supply of

Computers along with

software and accessories

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-07-

19

2017-09-

13

2018-03-

12

IN-KERALA SW-20141-

GO-RFQ / Current Meter

with accessories-Digital

type - 9 Nos

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

02

2018-01-

11

2018-02-

10

IN-KERALA SW-20143-

GO-RFQ / NHP-

Procurement of Staff

Gauge and Auto graphic

Water Level recorder. Staff

Gauge in 44 River Gauge

Stations. Each station

require Staff Gauge of

different length of 1m,

1.5m and 2 m. AWLR - 1

No

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-11-

02

2017-12-

28

2018-01-

27

IN-HIMACHAL PRADESH-

20157-GO-RFQ /

Procurement of Water

Quality Equipment &

accessories for existing lab

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-08-

08

2017-11-

27

2018-05-

26

IN-ODISHA (GW)-21788-

GO-RFQ / Procurement of

Desktop Computer with

OS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

28

2017-11-

23

2018-03-

31

IN-TELENGANA SW-

20163-GO-RFQ / Purchase

of Computers with

software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope14,495.27 Signed

2017-09-

20

2017-11-

15

2018-05-

14

IN-HIMACHAL PRADESH-

20296-GO-RFQ /

computer/laptop/printers

etc. for state (FY:2017-18)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

16

2018-03-

06

2018-09-

02

IN-HIMACHAL PRADESH-

20297-GO-RFQ / Non ITC

Equipments ( UPS 5Kw 1

no. & 1Kw 10 nos. ,

colored photocopier 2nos.

scanner 6 nos. etc.)

FY:2017-18

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

16

2017-12-

20

2018-06-

18

IN-HIMACHAL PRADESH-

20377-GO-RFQ /

Information Brochure

(FY:2017-18)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

20

2018-05-

15

2018-11-

11

IN-HIMACHAL PRADESH-

20381-GO-RFQ / ADCP

above 25 meter

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

15

2017-11-

20

2018-01-

01

2018-01-

31

2018-03-

07

2018-09-

03

IN-HIMACHAL PRADESH-

20382-GO-RFQ / ADCP

Crane mounted vehicle

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

20

2018-02-

23

2018-08-

22

IN-HIMACHAL PRADESH-

20384-GO-RFQ /

Procurement of Water

Quality Equipment /

Accessories (FY:2017-18)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-04-

18

2018-10-

15

IN-HIMACHAL PRADESH-

20389-GO-RFQ / Supply of

Discharge measurement

equipment & accessories

(FY:2107-18)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

25

2018-01-

12

2018-07-

11

IN-KERALA SW-20508-

GO-RFQ / Procurement of

Computers, printers and

UPS (2016-17) and 2017-18

Computers - 31 Nos Work

station -2 nos A4 printers-

25 nos and UPS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-11-

13

2018-01-

22

2018-03-

08

IN-RAJASTHAN -21107-

GO-RFQ / Manual Rain

Gauge equipment with

measuring glass. 45 Nos

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope67.11 Completed

2017-07-

20

2017-08-

10

2017-09-

09

IN-JHARKHAND -21432-

GO-RFQ / Purchase of

computers,

printer,scanner,laptop with

AMC.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

20

2017-11-

08

2017-12-

23

IN-JHARKHAND -21445-

GO-RFQ / Resistivitymeter

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

26

2017-11-

14

2017-12-

29

IN-SOI-21678-GO-RFQ /

Furniture for PDO

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

05

2017-10-

31

2018-04-

29

IN-ANDHRA PRADESH

SW-21930-GO-RFQ /

Purchase of Non ICT

equipment for WQ labs &

Data Centers

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

20

2018-01-

15

2018-07-

14

IN-ANDHRA PRADESH

GW-18144-GO-RFQ /

Procurement of Geo-

Physical survey equipment

for field surveys

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

25

2017-11-

18

2017-12-

19

IN-ODISHA (GW)-21932-

GO-RFQ / laptop with OS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

02

2017-10-

28

2018-03-

31

IN-ODISHA (GW)-21937-

GO-RFQ / printer

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

02

2017-10-

28

2018-03-

31

IN-ANDHRA PRADESH

SW-21938-GO-RFQ /

Current Meter with

accessories

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

16

2018-02-

10

2018-08-

09

IN-ANDHRA PRADESH

SW-21946-GO-RFQ /

Procurement of Softwares

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

05

2017-12-

31

2018-06-

29

IN-ODISHA (GW)-21941-

GO-RFQ / power supply &

on-line UPS for data

centre

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

02

2017-10-

28

2018-03-

31

IN-ODISHA (GW)-21962-

GO-RFQ / training

equipment/LCD projector &

screen

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

04

2017-10-

30

2018-03-

31

IN-ODISHA (GW)-21973-

GO-RFQ / microsoft

office(multi user lic.)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

05

2017-10-

31

2018-03-

31

IN-ODISHA (GW)-21977-

GO-RFQ / antivirus

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

05

2017-10-

31

2018-03-

31

IN-GUJARAT SW-22075-

GO-RFQ / Air conditioner-2

Nos. for GERI

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

06

2017-11-

13

2018-01-

11

IN-JHARKHAND -22182-

GO-RFQ / Establishment

of SPMU IT infrastructure,

furniture etc

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

05

2017-10-

17

2017-12-

01

IN-ODISHA (GW)-22530-

GO-RFQ / Handheld GPS

units

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

25

2017-10-

20

2018-03-

31

IN-ODISHA (GW)-22548-

GO-RFQ / GW Monitoring

Equipment Kit ( WL

indicator, measuring tape,

Stop watch)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

25

2017-10-

20

2018-03-

31

IN-GUJARAT SW-22865-

GO-RFQ / PH Analyzer

Micro Processor based -3

nos. for GERI

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

11

2017-11-

17

2018-01-

15

IN-GUJARAT SW-22875-

GO-RFQ / EC-TDS

Analyzer Micro Processor

based - 3 nos for GERI.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

11

2017-11-

17

2018-01-

15

IN-GUJARAT SW-22877-

GO-RFQ / Turbidimeter -3

nos for GERI

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

11

2017-11-

17

2018-01-

15

IN-GUJARAT SW-22878-

GO-RFQ / U V Spectro

Photometer-1 no for GERI

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

11

2017-11-

17

2018-01-

15

IN-SOI-23021-GO-RFB /

Additional Hardware and

Software for updation

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-11-

01

2017-11-

06

2017-12-

18

2018-01-

17

2018-02-

21

2018-08-

20

IN-TELENGANA GW-

23217-GO-RFQ /

Procurement of Borehole

Logging Equipment with

AMC Support

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-09-

11

2017-11-

10

2018-01-

09

IN-GUJARAT SW-23216-

GO-RFQ / Flame

Photometer -1 no. for W.Q.

lab GERI.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

05

2018-02-

07

2018-03-

05

IN-GUJARAT SW-23218-

GO-RFQ / Ion meter -1

no. for W. Q. lab GERI

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

05

2018-02-

07

2018-03-

05

IN-GUJARAT SW-23219-

GO-RFB / Procurement of

office furniture for Water

Quality lab GERI

IBRD / 87250 PostRequest for

BidsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

16

2017-09-

01

2017-09-

22

2017-10-

07

2017-11-

07

2018-03-

15

Page 13: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 8

IN-TELENGANA GW-

23260-GO-RFQ / To create

resource material (Annual

Reports, pamphlets,

Brochure, posters, audio

visuals, documentaries

etc.,)on water conservation

& management awareness

creation to water users

(IEC) & Resource material

for PDS & DSS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

03

2018-03-

18

2018-04-

17

IN-TELENGANA GW-

23278-GO-RFQ /

Procurement and

Installation of ACs (10) for

SDC and Conference Hall

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

05

2018-01-

10

2018-02-

09

IN-SIKKIM -18127-GO-

DIR / Procurement of 2

vehicles vide PID 82 of

Procurement Plan 2017-18.

by direct contracting of

Mahindra Bolero, a time

tested and suitable for

Hilly terrain condition of

Sikkim.

IBRD / 87250 Post Direct Selection Direct

24,176.32 Completed2017-08-

03

2017-08-

04

2017-08-

19

2017-10-

03

IN-GUJARAT SW-23676-

GO-RFQ / GPS Hand held

Type2 - 2 nos.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00 Canceled

2017-10-

15

2017-12-

10

2018-01-

31

IN-ODISHA (GW)-23848-

GO-RFQ / cost of

infrastructure and

furnishing of spmu

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

08

2017-12-

03

2018-03-

31

IN-TELENGANA GW-

24074-GO-RFQ / Basic

Field equipment for field

officers for Strengthening

Manual Observations -

32units (Each unit

Consists of WL Indicators

-2, Geological Survey Kits-

2, Infiltrometre-1, 100m

Mesuring Tapes-5, 50m

Measuring Tapes-5, Dumpy

Level -1)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-09-

21

2017-11-

16

2017-12-

16

IN-GUJARAT GW-24238-

GO-RFQ / Analytical

Digital Balance-3 nos for

WQ lab.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

29

2017-10-

25

2017-11-

17

IN-GUJARAT GW-24242-

GO-RFQ / Manual Ground

Water Level Indicator - 10

nos

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

28

2017-10-

06

2017-11-

02

IN-GUJARAT GW-24245-

GO-RFQ / Resistivity

Meter (Terameter Multi

Electrode) - 1 No.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

03

2017-12-

28

2018-01-

28

IN-GUJARAT GW-24253-

GO-RFQ / Deep Resistivity

Meter - 1 no.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

08

2017-10-

26

2017-11-

09

IN-GUJARAT GW-24255-

GO-RFQ / Borehole

Camera - 1 no

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

22

2017-11-

27

2017-12-

27

IN-GUJARAT GW-24268-

GO-RFQ / Laptop - 3

nos.(Through GEM)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

18

2017-10-

27

2017-11-

27

IN-GUJARAT SW-24269-

GO-RFB / Procurement of

ADCP - 3 nos

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2017-09-

01

2017-09-

06

2017-10-

18

2017-12-

31

2018-02-

04

2018-08-

03

IN-GUJARAT GW-24273-

GO-RFQ / Desktop

Computers - 10 nos.

(Through GEM)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

19

2017-11-

07

2017-11-

27

IN-GUJARAT GW-24276-

GO-RFQ / Workstations -

2 nos (Through GEM)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

28

2017-11-

23

2017-12-

23

IN-GUJARAT GW-24281-

GO-RFQ / Tablet - 14

nos.,Through Government

E Market(GEM)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

03

2017-11-

13

2017-11-

28

IN-GUJARAT GW-24283-

GO-RFQ / Portable

External Hard Disk - 6

nos. (Through GEM)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

18

2017-10-

31

2017-11-

27

IN-GUJARAT GW-24517-

GO-RFQ / Procurement of

B/W Printers - 10 nos.

And Colour Printer A3

Size - 1 no. (Through

GEM)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

19

2017-11-

07

2017-11-

27

IN-GUJARAT GW-24520-

GO-RFQ / Multi function

of Colour Printer cum

Scanner cum Copier of A3

Size - 1 no. And Copier

Machine - 1 no.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

03

2017-11-

21

2017-12-

12

IN-NAGALAND -26244-

GO-RFQ / IT Equipment

and Accesories

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope5,667.11 Signed

2017-08-

26

2017-08-

30

2017-09-

04

IN-KARNATAKA SW-

26380-GO-RFQ /

Procurement of

Computers(18 nos) through

GEM Portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope22,115.75 Completed

2017-08-

29

2017-08-

29

2017-08-

29

IN-KARNATAKA SW-

26472-GO-RFQ /

Procurement of Laptops

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope8,846.30 Completed

2017-08-

29

2017-08-

29

2017-08-

29

IN-NAGALAND -26982-

GO-RFQ / Purchase of

Vehicle

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope23,424.44 Signed

2017-09-

05

2017-09-

09

2017-09-

14

IN-MEGHALAYA -27690-

GO-RFQ / Procurement of

2 laptops

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope1,164.61 Completed

2017-09-

16

2017-11-

11

2018-05-

10

IN-CHHATTISGARH GW-

28951-GO-DIR /

Procurement of colour

printer.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2017-09-

18

2017-09-

23

2017-10-

28

2018-04-

26

IN-CHHATTISGARH GW-

28952-GO-DIR /

Procurement of A4 printer.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2017-09-

18

2017-09-

23

2017-10-

28

2018-04-

26

IN-CHHATTISGARH GW-

28954-GO-DIR /

Procurement of Digital

Copier Multifunctional.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2017-09-

18

2017-09-

23

2017-10-

28

2018-04-

26

IN-CHHATTISGARH GW-

28960-GO-DIR /

Procurement of Tablet

computer.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2017-09-

18

2017-09-

23

2017-10-

28

2018-04-

26

IN-KERALA SW-29067-

GO-RFQ / Procurement of

Echo sounder - 1 No

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

03

2017-12-

29

2018-01-

28

IN-KERALA SW-29071-

GO-RFQ / NHP-

Procurement of Water

Quality Lab Equipment for

Level II Lab 2017-18.

Procurement of p H

Analyser-1No, EC-TDS

Analyser- 1No and Ion

Analyser-1 No for Level II

Lab.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-11-

20

2018-01-

15

2018-02-

14

IN-KERALA SW-29073-

GO-RFQ / NHP-

Procurement of Total

Station - 2 nos

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

30

2018-01-

10

2018-02-

09

IN-KERALA SW-29081-

GO-RFQ / NHP-

Procurement of Automatic

Level - 3 Nos (2016-17

and 2017-18)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

10

2017-12-

29

2018-01-

28

IN-CHHATTISGARH SW-

29146-GO-RFQ /

Procurement of Standard

Raingauge.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

04

2017-12-

30

2018-06-

28

IN-CHHATTISGARH SW-

29149-GO-DIR /

Procurement of

Airconditioners.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

04

2017-12-

30

2018-06-

28

IN-CHHATTISGARH SW-

29152-GO-DIR /

Procurement of Online

UPS 15 KVA.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

04

2017-12-

30

2018-06-

28

IN-CHHATTISGARH SW-

29206-GO-RFQ /

Procurement 0f floor

scrubber machine.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

04

2017-12-

30

2018-06-

28

IN-KERALA SW-29209-

GO-RFQ / NHP-

Procurement of Differential

GPS - 2 Nos

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

30

2018-01-

10

2018-02-

09

IN-KERALA SW-29211-

GO-RFQ / NHP -

Procurement of Data base

server and accessories for

WRIS and RTDAS and

other IT equipment 2017-

18

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

20

2018-01-

22

2018-02-

21

IN-KERALA SW-29213-

GO-RFQ / NHP -

Procurement of data from

various offices for the

development of WRIS.

2017-18

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

05

2018-01-

30

2018-07-

29

IN-CHHATTISGARH SW-

29216-GO-DIR /

Procurement of LCD

Projetor.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

04

2017-12-

30

2018-06-

28

IN-CHHATTISGARH SW-

29219-GO-DIR /

Procurement of 1 no

Vehicle.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

11

2017-12-

06

2018-06-

04

Page 14: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 9

IN-KERALA SW-29223-

GO-RFQ / NHP -

Procurement of furniture

for Training centre 2017-

18. This work will be

started after completing 80

percentage of renovation

work

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

19

2018-05-

14

2018-06-

13

IN-KERALA SW-29228-

GO-RFQ / NHP - Purchase

of vehicle for SPMU - 1

No

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

16

2018-01-

11

2018-02-

10

IN-KERALA SW-29244-

GO-RFQ / NHP-

Procurement of Water

Quality Lab Equipment for

level I Labs 2016-17 and

2017-18. Procurement of

Analytical Balance-5 Nos,

WQ Analyser-5Nos, p H

Analyser-1 No, EC-TDS

Analyser-1 No, Distillation

Apparatus- 1No, DO

measuring equipment- 1No

for Level

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-11-

05

2018-01-

14

2018-02-

13

IN-KERALA SW-29249-

GO-RFQ / NHP -

Procurement of furniture

for regional data centre,

divisional data centre, sub

divisional data centres and

field offices

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

27

2018-02-

05

2018-03-

07

IN-TAMIL NADU -29283-

GO-RFQ / Package I

Water Quality Equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

03

2017-11-

28

2017-12-

27

IN-JHARKHAND -21804-

GO-RFQ / Purchase of

DGPS (1 numbers).

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

11

2017-11-

30

2018-01-

14

IN-TAMIL NADU -29575-

GO-RFQ / Pacakge IV

DWLR Telemetry, DWLR

Telemetry with water

quality prob

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

03

2017-11-

28

2017-12-

27

IN-NIH ROORKEE-30957-

GO-RFB / Gas

Chromatograph Mass

Spectrometer 01, Dedicated

Auto Titrator 01, TOC

Analyser 01

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2017-10-

27

2017-11-

01

2017-12-

13

2018-02-

25

2018-04-

01

2018-09-

28

IN-NIH ROORKEE-30965-

GO-RFB / Element

Analyser (Dual Carbon C

13 Isotope analyser) 01,

Tritium Enrichment unit

01, Normal Scintillation

Counter 01, Liquid

Nitrogen Plant 01.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2017-10-

27

2017-11-

01

2017-12-

13

2018-02-

25

2018-04-

01

2018-09-

28

IN-CWPRS-31044-GO-RFQ

/ Procurement of 16 nos.

of LaserJet Multi-function

Printers through

Government e Market

(GeM)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope6,539.18 Completed

2017-11-

04

2017-12-

30

2018-06-

28

IN-CWPRS-31046-GO-RFQ

/ Procurement of 26 nos.

of Personal Computers (i-7

& i-5) through Government

e Market (GeM)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

11

2018-01-

06

2018-07-

05

IN-CWPRS-31047-GO-RFQ

/ Procurement of Multi

Media LED Projector- 1

No. through Government e

Market(GeM)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope841.27 Completed

2017-11-

15

2018-01-

10

2018-07-

09

IN-CWPRS-31049-GO-RFQ

/ Procurement of 14 nos.

of Inverter Split Air

Conditioners (2T & 1.5T)

through Government e

Market(GeM)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

11

2018-01-

06

2018-07-

05

IN-CWPRS-31050-GO-RFQ

/ Procurement of

Refrigerator ( 2 Door/300

Liters) -1 through

Government e

Market(GeM)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

11

2018-01-

06

2018-07-

05

IN-CHHATTISGARH GW-

31279-GO-RFQ /

procurement of NON IT

Equipment ( Airconditoner

& Refrigerator ) for

Divisional data center

under PP 2017-18

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

20

2018-01-

15

2018-07-

14

IN-CHHATTISGARH GW-

31280-GO-RFQ /

Procurement of online UPS

15 KVA UNDER PP 2017-

18

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

20

2018-01-

15

2018-07-

14

IN-CHHATTISGARH GW-

31282-GO-RFQ /

Procurement of Vehicle

under PP 2017-18

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

20

2018-01-

15

2018-07-

14

IN-CWPRS-31378-GO-RFQ

/ Procurement of Office

Furniture( 10 various

types of Items) through

Government e Market

(GeM)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

11

2018-01-

06

2018-07-

05

IN-GUJARAT GW-25110-

GO-RFB / Procurement of

Telemetry Digital Water

Level Recorder - 526 Nos .

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

01

2017-10-

06

2017-11-

10

2017-11-

27

2018-01-

01

2018-06-

30

IN-KERALA SW-31525-

GO-RFQ / Procurement of

Journals

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2017-10-

25

2017-10-

30

2017-12-

04

2018-01-

03

IN-WEST BENGAL GW-

31748-GO-RFQ /

PROCUREMENT OF

REAL-TIME HYDRO-

METEOROLOGICAL AND

HYDROLOGICAL

INSTRUMENTS (Current

Meter, Eco-Sounder and

Resistivity Meter)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

18

2017-11-

07

2017-12-

07

IN-WEST BENGAL GW-

31752-GO-RFQ /

PROCUREMENT OF

WATER QUALITY

TESTING INSTRUMENTS

(UV Spectrophotometer)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

18

2017-11-

10

2017-12-

10

IN-MAHARASHTRA SW-

33198-GO-RFQ / Up

gradation & Renovation of

Existing Real Time Data

Acquisition System

(RTDAS) for Tapi Basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

05

2018-01-

30

2018-07-

29

IN-MAHARASHTRA SW-

33201-GO-RFB /

Upgradation & Renovation

of Existing Real Time

Data Acquisition System

(RTDAS) for Godavari

Basin in Marathwada

Region.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

25

2017-12-

30

2018-02-

10

2018-03-

12

2018-04-

16

2018-10-

13

IN-MAHARASHTRA SW-

33206-GO-RFQ /

Upgradation & Renovation

of Existing Real Time

Data Acquisition System

(RTDAS) system for

Godavari River Basin In

Vidharbha Region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

27

2018-04-

24

2018-10-

21

IN-MAHARASHTRA SW-

33205-GO-RFB / Expansion

of existing Real Time Data

Acquisition System

(RTDAS) established in HP

II for remaining area of

South of Panchganga in

Krishna basin.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

22

2018-02-

27

2018-04-

10

2018-05-

10

2018-06-

14

2018-12-

11

IN-MAHARASHTRA SW-

33209-GO-RFB / SCADA

system for reservoir

operation of Waghur

Barrage in Tapi basin.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

19

2018-03-

24

2018-05-

05

2018-06-

04

2018-07-

09

2019-01-

05

IN-MAHARASHTRA SW-

33212-GO-RFB /

Procurement of 4 no. of

River Surveyor Instrument

(Acoustic Doppler Current

Profiler) for 4 basins.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

30

2017-12-

05

2018-01-

16

2018-02-

15

2018-03-

22

2018-09-

18

IN-MAHARASHTRA SW-

33220-GO-RFQ / Special 5

Vans to all Basins for

lowering ADCP For

Discharge Measurements

over the Bridge.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

05

2018-03-

02

2018-08-

29

IN-MAHARASHTRA SW-

33221-GO-RFQ /

Procurement of Portable

Water Quality Sondes for

Water Quality Labs in the

State.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

05

2018-04-

30

2018-10-

27

IN-MAHARASHTRA SW-

33229-GO-RFQ / Providing

& supplying consumables

(Chemicals & Glasswares)

for Water Quality Lab at

Jalgaon in Tapi basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

20

2018-05-

15

2018-11-

11

IN-MAHARASHTRA SW-

33230-GO-RFQ / Providing

& supplying consumables

(Chemicals & Glasswares)

for Water Quality Labs at

Nashik and Aurangabad in

Godavari basin of

Marathwada region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

05

2018-03-

02

2018-08-

29

Page 15: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 10

IN-MAHARASHTRA SW-

33231-GO-RFQ / Providing

and supplying consumables

(Chemicals & Glasswares)

for Water Quality Lab at

Nagpur in Godawari basin

of Vidharbh region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

05

2018-03-

02

2018-08-

29

IN-MAHARASHTRA SW-

33232-GO-RFQ / Providing

and supplying consumables

(Chemicals & Glasswares)

for Water Quality Labs at

Pune and Kolhapur in

Krishna basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

05

2018-03-

02

2018-08-

29

IN-MAHARASHTRA SW-

33233-GO-RFQ / Providing

and supplying consumables

(Chemicals and

Glasswares) for Water

Quality Lab at Thane in

West flowing rivers of

Konkan basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

05

2018-03-

02

2018-08-

29

IN-MAHARASHTRA SW-

33240-GO-RFQ /

Procurement of equipment

for existing Water Quality

Labs at Nashik and

Aurangabad in Godavari

basin of Marathwada

region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

20

2018-02-

14

2018-08-

13

IN-MAHARASHTRA SW-

33241-GO-RFQ /

Procurement of equipment

for existing Water Quality

Lab at Nagpur in

Godawari basin Vidharbh

region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

20

2018-02-

14

2018-08-

13

IN-MAHARASHTRA SW-

33242-GO-RFQ /

Procurement of equipment

for existing Water Quality

Lab at Pune and Kolhapur

in Krishna basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

20

2018-02-

14

2018-08-

13

IN-MAHARASHTRA SW-

33243-GO-RFQ /

Procurement of equipment

for existing Water Quality

Lab at Thane in West

flowing rivers of Konkan

basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

20

2018-02-

14

2018-08-

13

IN-MAHARASHTRA SW-

33248-GO-RFQ /

Procurement and fixing of

existing manual hydromet

observation network

equipment in Tapi basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

25

2018-01-

20

2018-07-

19

IN-MAHARASHTRA SW-

33250-GO-RFQ /

Procurement & fixing of

existing manual hydromet

observation network

equipment in Godavari

Basin of Marathwada

Region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

25

2018-01-

20

2018-07-

19

IN-MAHARASHTRA SW-

33251-GO-RFQ /

Procurement and fixing of

existing manual hydro met

observation network

equipment in Godavari

basin of Vidharbha Region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

25

2018-01-

20

2018-07-

19

IN-MAHARASHTRA SW-

33252-GO-RFQ /

Procurement and fixing of

existing manual hydromet

observation network

equipment in Krishna

basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

25

2018-01-

20

2018-07-

19

IN-MAHARASHTRA SW-

33253-GO-RFQ /

Procurement and fixing of

existing manual hydromet

observation network

equipment for west flowing

rivers in Kokan basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

25

2018-01-

20

2018-07-

19

IN-MAHARASHTRA SW-

33280-GO-RFQ /

Integration of Existing

RTDAS system for Tapi

basin in regional & State

data centres including

Divisional & Sub

Divisional Data Center.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

24

2018-05-

19

2018-11-

15

IN-MAHARASHTRA SW-

33284-GO-RFQ /

Integration of Existing

RTDAS system for

Godavari basin in

Marathwada region in

regional & state data

centres.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

24

2018-05-

19

2018-11-

15

IN-MAHARASHTRA SW-

33287-GO-RFQ /

Integration of Existing

RTDAS system for

Godavari basin in

Vidharbha region in

regional & state data

centres.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

24

2018-05-

19

2018-11-

15

IN-MAHARASHTRA SW-

33341-GO-RFB /

Upgradation of existing

hydrology project web site

with State level portal for

RTDAS and development

of state chapter of India-

WRIS.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

12

2018-02-

17

2018-03-

31

2018-04-

30

2018-06-

04

2018-12-

01

IN-MAHARASHTRA SW-

33345-GO-RFQ / Providing

Video Conferencing facility

at Jalvidnyan Bhavan,

Nashik, and field offices

under Hydrology Project.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

23

2018-02-

17

2018-08-

16

IN-MAHARASHTRA SW-

33362-GO-RFB /

Development of

Modern/Smart irrigation

System of reservoir &

canal operation based on

real time information for

Tillari project.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

19

2018-03-

24

2018-05-

05

2018-06-

04

2018-07-

09

2019-01-

05

IN-MAHARASHTRA SW-

33458-GO-RFQ /

Establishment of E class

room with furnishing at

Jalvidnyan Bhavan,

Nashik.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

24

2018-07-

19

2019-01-

15

IN-MAHARASHTRA SW-

33463-GO-RFQ /

Institutional Modernization

Support, including IT

systems & software.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

07

2018-03-

04

2018-08-

31

IN-MAHARASHTRA SW-

23034-GO-DIR / Purchase

of 2 vehicles in final

phase through EGems out

of 6 as approval of 2

accorded by the

Maharashtra state. 4

vehicles will be purchased

through EGems after

approval from Maharashtra

state.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

26

2017-10-

26

2018-03-

31

IN-SIKKIM -35707-GO-

RFQ / RFQ for one Total

Station(UID 108)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope13,229.69 Completed

2017-12-

15

2018-02-

07

2018-08-

06

IN-SIKKIM -35726-GO-

DIR / Request for

quotations for 4 numbers

of acoustic Doppler velocity

meter ( Hand Held

Current Meter) against

UID 111

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope14,316.34 Completed

2017-12-

10

2018-03-

07

2018-09-

03

IN-TELENGANA GW-

24071-GO-RFQ / Basic

Field equipment for field

officers for Strengthening

Manual Observations (98

GPS - 3 Units for Each

District Offices(31Districts)

and 5 units for Head

Office)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

08

2018-01-

20

2018-02-

20

IN-TELENGANA GW-

24088-GO-DIR /

Procurement of IT

Equipment for Data

Centres (Desktops,

Printers, Laptops, HDDs,

A0 Plotter etc) through

GEM

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-12-

09

2018-01-

27

2018-02-

26

IN-SIKKIM -36085-GO-

DIR / Procurement of One

vehicle vide UID 88 of

Procurement Plan 2016-17.

by direct contracting of

Mahindra Bolero, a time

tested and suitable for

Hilly terrain condition of

Sikkim

IBRD / 87250 Post Direct Selection Direct

11,574.59 Completed2017-11-

09

2017-11-

14

2017-12-

19

2018-06-

17

IN-JHARKHAND -36309-

GO-RFQ / Purchase of

computers,Laptop,Printer,An

tivirus

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

14

2018-03-

11

2018-04-

08

IN-WEST BENGAL SW-

36326-GO-RFQ /

Procurement and

installation of Photocopier

and Printers for the

State Project Management

Unit of National Hydrology

Project

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope25,355.32 Signed

2017-11-

14

2017-12-

08

2018-01-

07

IN-WEST BENGAL SW-

36330-GO-RFQ /

Procurement and

Installation of Desktop PC

with peripherals for the

State Project Management

Unit of National Hydrology

Project

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope19,082.30 Signed

2017-11-

14

2017-12-

09

2018-01-

08

Page 16: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 11

IN-PUNJAB -33503-GO-

RFQ / Purchase of Renault

Duster RXL MT 106Ps

Petrol BS4 5 Seater for

water resourcews bhawan

mohali

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

19

2017-11-

21

2018-01-

10

IN-PUNJAB -32261-GO-

RFB / Supply, Installation,

Testing Commissioning and

Maintenance of RTDAS for

selected Rivers, Head

Works and Dams for

Surface Water sector in

Punjab and Supply,

Installation, Testing

Commissioning and

Maintenance of AWS

under e-Procurement

system.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

14

2017-12-

21

2018-01-

25

2018-02-

23

2018-03-

30

2018-09-

26

IN-UTTAR PRADESH

GW-36938-GO-RFQ / Water

Level Sounder, Hand held

GPS, or alike devices

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

04

2018-01-

11

2018-01-

31

IN-UTTAR PRADESH

GW-36953-GO-RFQ /

Development/strengthening

of IT infrastructure at

field division level

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

06

2018-01-

20

2018-02-

19

IN-CWPRS-31045-GO-RFQ

/ Procurement of 22 nos.

of 1 KVA/400VAH Line

Interactive Uninterruptible

Power Supply through

Government e

Market(GeM)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope3,379.42 Completed

2017-11-

21

2018-01-

16

2018-07-

15

IN-TELENGANA GW-

37063-GO-RFB / WQ Lab

Equpiment Up gradation

at Hyderabad and

Karimnagar

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

27

2017-12-

02

2017-12-

23

2018-01-

09

2018-02-

02

2018-04-

04

IN-UTTAR PRADESH

GW-37066-GO-DIR /

Procurement of 4 no basic

ArcGIS software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

11

2018-02-

01

2018-03-

02

IN-UTTAR PRADESH

GW-37068-GO-RFQ /

Development of Ground

Water Atlas of Uttar

Pradesh ( Urban and

Rural )

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

03

2018-02-

24

2018-03-

26

IN-UTTAR PRADESH

GW-37074-GO-RFQ /

Development of mobile app

for field/ Community based

monitoring and

dissemination

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-11-

29

2018-01-

24

2018-05-

24

IN-UTTAR PRADESH

GW-37081-GO-RFQ /

Development of library and

E-library

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

20

2018-02-

08

2018-03-

10

IN-UTTAR PRADESH

GW-37154-GO-RFQ / "To

prepare resource material (

Annual

Reports,pamphlets,Brochure,

posters, audio

visuals,documentaries etc.,)

on water conservation &

management awareness

creation to water users

(information education &

communication )"

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

29

2018-02-

19

2018-03-

06

IN-WEST BENGAL GW-

37289-GO-RFQ /

PROCUREMENT OF 20

DWLR /ABSOLUTE

PRESSURE TYPE WITH

TELEMETRY FOR NEW

GROUNDWATER

MONITORING WELLS IN

WEATHERED ZONE OF

HARD ROCK AREA,

PURULIA DIST, WEST

BENGAL

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-11-

27

2017-12-

25

2018-01-

09

IN-WEST BENGAL GW-

37292-GO-RFQ /

PROCUREMENT OF 25

NOS DWLR /ABSOLUTE

PRESSURE TYPE WITH

TELEMETRY FOR 25

NOS EXISTING

GROUNDWATER

MONITORING WELLS IN

WEST BENGAL

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

27

2017-12-

25

2018-01-

09

IN-WEST BENGAL GW-

37369-GO-RFQ / Purchase

of IT Equipment

(Computers, workstations

& Laptop with Software &

Printer, Plotter &

Photocopier)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

27

2017-12-

19

2017-12-

26

IN-WEST BENGAL GW-

37373-GO-RFQ /

Procurement of two nos.

Hand-held GPS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

26

2017-12-

22

2017-12-

29

IN-SIKKIM -37684-GO-

RFQ / Procurement of 5

nos. of Rain Gauge

manual as per UID 107

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope745.27 Completed

2017-12-

10

2018-02-

15

2018-08-

14

IN-DVC-38048-GO-RFQ /

Procurement of 01 (one)

no. Server for WaterWare

Software under National

Hydrology Project (NHP).

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope12,005.28

Under

Implement

ation

2017-11-

28

2018-01-

23

2018-07-

22

IN-KERALA SW-20115-

GO-RFQ / Current Meter

with accessories- Cup Type-

46 Nos

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-10-

30

2018-01-

10

2018-02-

09

IN-KERALA SW-28944-

GO-RFB / The Supply,

Installation, Testing,

Training, Commissioning,

Operation and Maintenance

of Hydrological Information

System for Kerala State

2017-18.(

Telecommunication system

changed to INSAT as per

the direction of NPMU)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

28

2017-11-

18

2017-12-

16

2018-01-

13

2018-02-

17

2019-02-

17

IN-WEST BENGAL SW-

38546-GO-RFB /

Procurement of Discharge

measuring Equipment

(ADCP)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope69,656.41 Signed

2017-12-

06

2017-12-

06

2017-12-

27

2018-01-

07

2018-01-

30

2018-05-

30

IN-HIMACHAL PRADESH-

20302-GO-RFQ /

Procurement of GIS .

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-05-

24

2018-05-

29

2018-07-

19

2018-10-

11

IN-WEST BENGAL SW-

39196-GO-RFQ /

Procurement of ITC

equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope6,494.50 Signed

2017-12-

11

2018-01-

26

2018-03-

12

IN-WEST BENGAL GW-

37356-GO-RFQ /

Procurement of one ADCP

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-02-

05

2018-03-

05

2018-03-

20

IN-CHHATTISGARH SW-

28469-GO-DIR /

Procurement of 8 nos

Desktop computer.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

25

2018-02-

19

2018-08-

18

IN-CHHATTISGARH SW-

28850-GO-DIR /

Procurement of 3 nos

Laptop.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

26

2018-02-

20

2018-08-

19

IN-CHHATTISGARH SW-

28851-GO-DIR /

Procurement of 10 nos A4

printer.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

26

2018-02-

20

2018-08-

19

IN-CHHATTISGARH SW-

28853-GO-DIR /

procurement of Digital

copier multifunctional 1

no.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

26

2018-02-

20

2018-08-

19

IN-CHHATTISGARH SW-

28855-GO-DIR /

Procurement of scanner.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

26

2018-02-

20

2018-08-

19

IN-CHHATTISGARH SW-

29221-GO-DIR /

Procurement of ArC GIS

software 1no.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

03

2018-03-

31

2018-09-

27

IN-CWC-NHP-10546-GO-

DIR / Extension/Up-

gradation of eSWIS

IBRD / 87250 Prior Direct Selection Direct

0.00 Canceled2017-12-

21

2017-12-

21

2018-01-

25

2018-07-

24

IN-DVC-38058-GO-RFB /

Procurement of Automated

Pipe Flow measurement

sensors for drinking/

industrial water supply for

40 nos. of consumers with

GSM telemetry.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

01

2018-02-

06

2018-03-

20

2018-04-

19

2018-05-

24

2026-05-

22

IN-DVC-38032-GO-RFB /

Supply, installation,

testing, commissioning and

maintenance of Real Time

Data Acquisition System

(RTDAS) of DVC under

National Hydrology Project

(NHP).

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-01-

10

2018-01-

15

2018-02-

26

2018-03-

28

2018-05-

02

2026-04-

30

IN-KARNATAKA SW-

26476-GO-RFQ /

Procurement of Bridge

outfits-06 numbers for

carrying out the current

meter gauging .

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope4,521.99 Completed

2017-08-

29

2017-10-

25

2018-01-

07

IN-KARNATAKA SW-

26478-GO-RFQ /

Procurement of Current

Meter Gauging equipment

with accessories.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope12,245.55 Completed

2017-08-

29

2017-10-

18

2017-12-

18

Page 17: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 12

IN-KARNATAKA SW-

41966-GO-RFQ /

Procurement of

photocopiers for divisional

and subdivisional data

centes(A3.3.03.01)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope12,622.34 Completed

2018-01-

02

2018-01-

02

2018-01-

02

IN-KARNATAKA SW

1970-GO-RFQ /

Procurement of IT

equipments(computers-

13,laptop-03&printers-04)

for KERS training center.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope14,633.13 Completed

2018-01-

02

2018-01-

02

2018-01-

02

IN-KARNATAKA SW

1978-GO-RFQ /

Procurement of vehicles for

circle officers-2 nos

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope16,604.46 Completed

2018-01-

02

2018-01-

02

2018-01-

02

IN-SIKKIM -42253-GO-

RFQ / Procurement of 4

numbers of Hand held

GPS UID 120 by RFQ

since registration under

eGeM is not possible due

to Aadhar issues

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope1,792.18 Completed

2018-01-

08

2018-03-

05

2018-09-

01

IN-NAGALAND -42428-

GO-RFQ / purchase of

two(2) nos of handheld

GPS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope1,494.91 Signed

2018-01-

04

2018-01-

24

2018-01-

31

IN-KARNATAKA SW-

42645-GO-RFQ /

Procurement of Bolero

Camper PS4WD (utility

vehicle) for the vehicle

mounted crane.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope17,647.23 Completed

2018-01-

06

2018-01-

27

2018-07-

26

IN-KARNATAKA SW-

42648-GO-RFQ /

Procurement of UPS for

divisional and subdivisional

offices.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope15,481.02 Completed

2018-01-

06

2018-01-

27

2018-07-

26

IN-CWPRS-43247-GO-RFQ

/ Steel tape (100 m)for

water level measuring in

borehole-1 No.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

20

2018-03-

17

2018-09-

13

IN-CWPRS-44373-GO-RFQ

/ Glassware and Chemicals

for Water Quality Lab

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

02

2018-05-

28

2018-11-

24

IN-ASSAM -27692-GO-

RFQ / Total Station

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-10-

08

2017-12-

03

2018-06-

01

IN-ASSAM -26120-GO-

RFB / Silt Laboratory

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

09

2017-12-

04

2018-06-

02

IN-ASSAM -27985-GO-

RFQ / Procurement of

GPS -Hand Held and

Differential GPS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-10-

09

2017-12-

04

2018-06-

02

IN-ASSAM -27990-GO-

RFQ / Procurement of

Flow Tracker

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

24

2018-03-

21

2018-09-

17

IN-MADHYA PRADESH-

44740-GO-RFB / RTDAS

for Madhya Pradesh-Ganga

Basin(Chambal,Sindh

Betwa,Son,Tons,Dhasan

and ken sub-basins)

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-05-

31

2018-08-

16

2018-08-

16

2018-06-

05

2018-10-

25

2019-01-

07

2019-02-

11

2020-08-

04

IN-MADHYA PRADESH-

44742-GO-RFB / DWLR

Telemetry in Piezometers

in Madhya Pradseh

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-05-

14

2018-07-

30

2018-07-

30

2018-05-

19

2018-10-

08

2018-12-

21

2019-01-

25

2020-07-

18

IN-KARNATAKA SW-

26480-GO-RFQ /

Procurement of hydro-

meteorological instruments

for FCS stations-manual

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

29

2017-11-

09

2018-01-

15

IN-KARNATAKA SW-

26479-GO-RFQ /

Procurement of Standard

Rain Gauges -manual

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

29

2017-11-

07

2018-01-

15

IN-KARNATAKA SW-

45012-GO-RFQ / Providing

and supplying additional

Hard Disks, RAM, Modems

with the necessary server

interface to the existing

server and up gradation of

Rainfall receiving

applications.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

22

2018-02-

12

2018-03-

21

IN-KERALA SW-20580-

GO-RFQ / Procurement of

Water Quality Sondes for

PDS - 4 Nos

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

29

2018-03-

26

2018-04-

25

IN-KERALA SW-31524-

GO-RFQ / Procurement of

Meteorological Equipment -

SRG-28 Nos , FRP bottle-

30 Nos, Measuring Jar -

44 Nos, Plastic Container-

30 Nos, Overflow Jar- 14

Nos, Pan Evaporimeter-1

No,Pan Evaporimeter

measuring Jar-5 Nos,

Stevenson Screen -Large-4

Nos& Small- 5 N

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

20

2018-01-

29

2018-02-

28

IN-TAMIL NADU -46723-

GO-RFQ / Providing

furniture to Data

processing centres in

Ground Water Division

office, Madurai ,

Tirunelveli and Ground

Water Circle office,

Madurai.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

01

2018-03-

13

2018-05-

12

IN-TAMIL NADU -46726-

GO-RFQ / Providing

Furnitures to Data

Processing Centres in

Ground Water Division

office at Thanjavur, Salem

and Ground Water Circle

office,Thanjavur.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

12

2018-04-

02

2018-05-

31

IN-WEST BENGAL SW-

38548-GO-RFB /

Procurement of Survey

Instruments (1 no. RTK-

DGPS and 4 nos. GPS-

Hand held)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope51,901.20 Signed

2018-02-

12

2018-03-

15

2018-05-

14

IN-NAGALAND -26984-

GO-DIR / purchase of GIS

software

IBRD / 87250 Post Direct Selection Direct

37,530.50 Signed2017-09-

04

2017-09-

05

2017-09-

08

2017-09-

13

IN-WEST BENGAL SW-

48181-GO-RFQ /

Procurement of Survey

Instruments (2 nos. Total

Station and 4 nos. Digital

Level)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-02-

12

2018-03-

15

2018-05-

14

IN-ASSAM -26226-GO-

RFQ / Procurement of

Laptops with software and

Printer

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-09-

21

2017-11-

03

2018-05-

02

IN-CWPRS-49185-GO-RFQ

/ Procurement of 3 Nos. of

A3 size Monochrome

LaserJet Multi-Function

Printers through

Government-E- Market

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope1,982.93 Signed

2018-03-

03

2018-04-

28

2018-10-

25

IN-TAMIL NADU -49552-

GO-RFQ / Providing

Furnitures to Data

Processing Centres in

Ground Water Division

office,Cuddalore,

Vellore,Chennai and

Gauging Division office,

Chennai.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

05

2018-04-

30

2018-10-

29

IN-TAMIL NADU -42599-

GO-DIR / Procurement of

field vehicles for data

collection

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

16

2018-03-

13

2018-05-

14

IN-WEST BENGAL GW-

37327-GO-RFQ /

Procurement and

Installation of 5 Automatic

Weather Stations (AWS)

and 5 Automatic rain

gauge Station( ARS)

including 2 years warranty

& 5 years AMC including

insurance

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

17

2018-01-

14

2018-01-

29

IN-KARNATAKA SW-

51640-GO-RFQ /

Procurement of All in one

Printers for Divisional and

Subdivisional offices.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope2,919.28 Completed

2018-02-

28

2018-02-

28

2018-04-

09

IN-CWPRS-51670-GO-RFQ

/ Electronic Water Level

Sounder-1 No.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

20

2018-05-

15

2018-11-

11

IN-CWPRS-51704-GO-RFQ

/ Pen Type Coliform (Total

and Fecal) Detection Unit

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-01-

02

2019-02-

27

2019-08-

26

IN-CWPRS-51699-GO-RFQ

/ Fuming Chamber

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

04

2018-05-

30

2018-11-

26

IN-CWPRS-51689-GO-RFQ

/ Fabrication of

Environmental Chamber

with automation and

generator set.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

04

2018-05-

30

2018-11-

26

IN-CWPRS-51692-GO-RFQ

/ Water Quality Sensors

with data logger

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

04

2018-05-

30

2018-11-

26

Page 18: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 13

IN-CWPRS-51695-GO-RFQ

/ Standard Solutions for

Water Quality Lab

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

19

2019-02-

13

2019-08-

12

IN-CWPRS-51697-GO-RFQ

/ Laboratory Equipments (

Hot Plate,Muffle Furnance,

Water Bath (20Litres),High

Precession Balance, Water

Demeneralizer/Distilled

Water Production Systems

)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

04

2018-05-

30

2018-11-

26

IN-CWPRS-51705-GO-RFQ

/ Equipments for Audio

Video studio(HD Camera

with accessories-1

No.,Tripod -2 Nos., 50"

LED TV with Speaker

with Stand- 1No. , Head

Phone- 4 Nos., Mic

Lavalier wireless 2

Nos.,Lights for field 3

Nos., Set of cables

Audio/Video)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

04

2018-05-

30

2018-11-

26

IN-CWPRS-51683-GO-RFQ

/ Ground water Level

Sensor without Vent and

With Vent tube

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

04

2018-05-

30

2018-11-

26

IN-CWPRS-51707-GO-RFQ

/ S/I/T/C of

Electromagnetic flow

meters(4 Nos. of various

sizes

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

05

2018-06-

30

2018-12-

27

IN-CWPRS-51720-GO-RFQ

/ Procurement of Battery

Operated Fork Lift

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

04

2018-08-

29

2019-02-

25

IN-CWPRS-51848-GO-RFQ

/ Procurement of Personal

Computers (i-5 ) - 12 Nos.

through Government E

Market

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

17

2018-05-

12

2018-11-

08

IN-MAHARASHTRA SW-

33199-GO-RFB / Real Time

Data Acquisition System

(RTDAS) with Civil Work

for Godavari Basin in

Marathwada Region.

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Review

2018-05-

08

2018-05-

13

2018-06-

24

2018-09-

06

2018-10-

11

2019-04-

09

IN-MAHARASHTRA SW-

33592-GO-RFB / Operation

and Maintenance of Real

Time Data Acquisition

System for Krishna and

Bhima River Basins in

Maharashtra.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-05-

08

2018-05-

13

2018-06-

24

2018-09-

06

2018-10-

11

2019-04-

09

IN-MAHARASHTRA SW-

33197-GO-RFB / Real Time

Data Acquisition System

(RTDAS) with Civil Work

for Tapi Basin.

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2018-05-

08

2018-05-

13

2018-06-

24

2018-09-

06

2018-10-

11

2019-04-

09

IN-UTTARAKHAND-53341-

GO-RFB / Supply of water

Quality testing equipment

for water quality lab at

Roorkee & Haldwani.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-06-

14

2018-06-

15

2018-06-

16

2018-06-

19

2018-06-

21

2018-06-

22

IN-ANDHRA PRADESH

GW-53564-GO-RFQ /

Procurement of Air

Conditioners for District

Data Centers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

04

2018-05-

30

2018-11-

26

IN-KERALA SW-53800-

GO-RFQ / Equipments for

PDS study (Image

Processing Study) CCD

Camera - 1 No, RLS with

integrated RLS data logger-

1 No, Procurement of laser

distance measuring

equipment,Echosounder - 1

No

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-03-

18

2018-05-

02

2018-06-

01

IN-KERALA SW-53802-

GO-RFQ / Water Quality

Lab Equipment -

Assessment of Water

Quality status of Thrissur

Corporation (PDS)- Pre

programmed

Spectrophometer- 1No,

Dissolved oxygen meter -

1No

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

19

2018-05-

03

2018-06-

02

IN-HIMACHAL PRADESH-

20223-GO-RFQ / GPS

Handheld (GPS of both

the FY:2016-17 & FY 2017-

18 have been clubbed)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

02

2018-06-

21

2018-07-

30

IN-HIMACHAL PRADESH-

30202-GO-RFB / Supply,

Installation, Testing,

Commissioning and

Maintenance of RTDAS

for selected Automatic

Weather Stations

Automatic Rain Gauges,

AWLR (Radar type above

30m) sites in HP and

integrate with Data

Center (VSAT) located at

Mandi, in Himachal

Pradesh

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-03-

28

2018-03-

28

2018-05-

19

2018-08-

17

2018-09-

24

2019-09-

24

IN-NAGALAND -54278-

GO-RFQ / Purchase of

Computer software and

accessories

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope1,125.92 Signed

2018-03-

15

2018-03-

23

2018-03-

28

IN-PUNJAB -30139-GO-

RFQ / Supply and

Installation of Audio-Video

Instrument at Ground

Floor Conference Hall and

Video Conferencing

Instrument at First Floor

Committee Room.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00 Canceled

2017-12-

05

2018-01-

23

2018-03-

09

IN-HIMACHAL PRADESH-

20391-GO-RFQ / G&D

BOC

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-09-

25

2018-01-

15

2018-07-

14

IN-PUNJAB -33512-GO-

RFQ / procurement of 15

no. of laptops for water

resources bhawan mohali.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

30

2017-12-

23

2018-03-

23

IN-PUNJAB -37524-GO-

RFQ / procurement of A0

scanner for water

resources bhawan mohali

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

26

2017-12-

16

2018-01-

30

IN-HIMACHAL PRADESH-

20217-GO-RFQ / Supply of

AWLR Radar Type above

30 meters (FY:2017-18)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-08-

15

2017-11-

20

2018-05-

19

IN-HIMACHAL PRADESH-

20155-GO-RFQ / Supply of

Auto Current Meters

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

27

2017-12-

30

2018-06-

28

IN-ANDHRA PRADESH

GW-18146-GO-RFQ /

Procurement of Handheld

GPS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-06-

15

2017-06-

26

2017-07-

24

IN-MEGHALAYA -20421-

GO-DIR / Procurement of

vehicles for SPMU

IBRD / 87250 Post Direct Selection Direct

22,929.35 Completed2018-05-

01

2018-05-

06

2018-06-

10

2018-12-

07

IN-SOI-60735-GO-RFB /

Procurement of 02 nos.

Relative gravimeters for

geoid modeling.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-04-

25

2018-04-

25

2018-05-

28

2018-06-

27

2018-07-

28

2018-09-

26

IN-SOI-60751-GO-RFB /

Procurement of Absolute

gravimeter (01 no.) for

geoid modeling

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-04-

25

2018-04-

25

2018-05-

28

2018-06-

27

2018-07-

28

2018-09-

26

IN-SOI-21533-GO-RFB /

Gravimeters for Survey of

India

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-01-

12

2018-01-

17

2018-02-

28

2018-03-

30

2018-05-

04

2018-10-

31

IN-MIZORAM -61332-GO-

RFQ / Purchased of 16

No. mini UPS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61352-GO-

RFQ / Purchase of

inspection vehicle- 3 Nos

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61338-GO-

RFQ / Supply and

Installation of High Speed

internet facility

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61341-GO-

RFQ / Purchase of 7 Nos

Printer by shopping

method

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61340-GO-

RFQ / Purchase of 5

Desktop Computers by

Shopping Method using E5

document

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61333-GO-

RFQ / Purchase of 1

Copier + Printer +

Scanner

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61336-GO-

RFQ / Purchase of 3

laptops by shopping

method using E5 document

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61350-GO-

RFQ / Purchase of 3nos

Projector & 2nos Screen

by Shopping Method using

E5 document

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

Page 19: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 14

IN-MIZORAM -61349-GO-

RFQ / Purchase of 1no

Still Camera, Lens &

Flash by Shopping Method

using E5 document

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61345-GO-

RFQ / Purchase of

Television by Shopping

Method using E5 document

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61343-GO-

RFQ / Purchase of Sound

System by Shopping

Method using E5 document

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61339-GO-

RFQ / Purchase of I.T

Equipment like 4 Desktop

Computers, 3 nos Laptops,

15 nos Antivirus, 3 nos

Laser printers and 1 no

Printer + Scanner by

Shopping method using E5

document

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61351-GO-

RFQ / Purchase of

Intercom by shopping

method using E5 document

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MIZORAM -61334-GO-

RFQ / Purchase of Office

Furniture by Shopping

Method using E5 document

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

01

2018-05-

01

IN-MADHYA PRADESH-

18280-GO-RFQ /

Procurement of IT

equipments work

stations(06),Desktop

computer(14),Printers(14),U

PS(14),Scanners(05)Laptop(0

5),External Hard Disks(03)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

05

2018-10-

31

2019-04-

29

IN-MADHYA PRADESH-

18597-GO-RFQ /

Procurement of Water

Quality Lab Equipment-

Flame Photometer(1No.),UV

Spectrophotmeter(2No.),CO

D Digester(1No.),Hot Air

Oven(1No.) &

Deionizer(3No.)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

26

2018-07-

21

2019-01-

17

IN-MADHYA PRADESH-

19071-GO-RFQ /

Furnishing Divisional /

Sub Divisional with Non

ITC equipment-SW

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

05

2018-10-

31

2019-04-

29

IN-MADHYA PRADESH-

18239-GO-RFQ /

Procurement of Total

Station(01 No.),Auto

Levels(03 no.)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

21

2018-07-

16

2019-01-

12

IN-MADHYA PRADESH-

18428-GO-RFQ /

Procurement of Bridge

outfits for flow

measurement

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

20

2018-08-

15

2019-02-

11

IN-MADHYA PRADESH-

18427-GO-RFQ /

Procurement of Digital

Current Meters(30Nos.)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

20

2018-08-

15

2019-02-

11

IN-MADHYA PRADESH-

61566-GO-RFQ / Purchase

of 1 Vehicle for State level

SPMU

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

05

2019-01-

30

2019-07-

29

IN-MADHYA PRADESH-

61567-GO-RFQ /

Digitisation of

Reports/Documents-GW

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

04

2018-07-

30

2019-01-

26

IN-MADHYA PRADESH-

61661-GO-RFQ /

Furnishing State Data

Centre with Non ITC

equipment & procurement

of ACs(4No.)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

05

2018-10-

31

2019-04-

29

IN-MADHYA PRADESH-

61670-GO-RFQ / Softwares

for Data Centre- Antivirus

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

05

2018-09-

30

2019-03-

29

IN-MADHYA PRADESH-

61671-GO-RFB / Canal

SCADA for Major

Reservoir-Samrat Ashok

Sagar

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-12-

31

2019-01-

05

2019-02-

16

2019-05-

01

2019-06-

05

2019-12-

02

IN-MADHYA PRADESH-

18610-GO-RFQ /

Procurement of Field

Survey Equipments

Theodolite (3No.) and

Diffrential GPS(1 No.)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-08-

04

2017-09-

29

2018-03-

28

IN-NIH ROORKEE-61685-

GO-RFB / TRIPLE

QUADRUPOLE GC-MS

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-05-

31

2018-05-

31

2018-07-

12

2018-09-

24

2018-10-

29

2019-03-

22

IN-MAHARASHTRA SW-

33514-GO-RFB / Real Time

Data Acquisition System

(RTDAS) with Civil Work

for Godavari Basin in

Vidarbha Region.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-05-

08

2018-05-

13

2018-06-

24

2018-07-

24

2018-08-

28

2019-02-

24

IN-SOI-29487-GO-RFQ /

Procurement of mid level

workstations for PDO

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

11

2017-12-

07

2018-06-

05

IN-SOI-21535-GO-RFB /

Procurement of Survey

Instruments for Geoid

modelling

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2017-09-

01

2017-09-

06

2017-10-

18

2017-11-

17

2017-12-

22

2018-06-

20

IN-SOI-21608-GO-RFB /

Procurement of Laptops for

PDO

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

05

2017-10-

31

2018-04-

29

IN-SOI-21601-GO-RFB /

Purchase of vehicles for

PDO

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

05

2017-10-

31

2018-04-

29

IN-SOI-22187-GO-RFQ /

Procurement of 01 flat bed

scanner

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-09-

05

2017-10-

31

2018-04-

29

IN-SOI-61763-GO-RFQ /

Procurement of 10 plotters

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

09

2018-08-

04

2019-01-

31

IN-SOI-61764-GO-RFQ /

Procurement of 05 drum

scanners

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

09

2018-08-

04

2019-01-

31

IN-SOI-22160-GO-RFQ /

Printing Consumables

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00 Canceled

2017-09-

06

2017-11-

01

2018-04-

30

IN-SOI-23020-GO-DIR /

Cost of Satellite imagery

for updation of

geodatabase

IBRD / 87250 Post Direct Selection Direct

0.00 Canceled2018-01-

01

2018-01-

11

2018-02-

15

2018-08-

14

IN-SOI-22995-GO-RFQ /

Setting up of Production

facility-Conference room,

electrification, partitioning,

computer table, chairs etc

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00 Canceled

2017-09-

06

2017-11-

01

2018-04-

30

IN-SOI-23002-GO-RFB /

Setting up of Production

facility at multiple

locations- Conference room,

office furniture and other

petty items etc

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-11-

01

2017-11-

06

2017-12-

18

2018-01-

17

2018-02-

21

2018-08-

20

IN-SOI-22165-GO-RFB /

Setting up of Geospatial

Data Production Centres-

all hardwares including

servers, storage,

workstations, firewall, ext

HDD, related s/w, and

Non-IT infrastructures

including electrification,

networking, partioning,DG

sets, UPS etc at multiple

locations

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-11-

01

2017-11-

06

2017-12-

18

2018-01-

17

2018-02-

21

2018-08-

20

IN-SOI-23693-GO-RFQ /

Procurement of scanners,

printers and plotters for

PDO

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

16

2018-08-

11

2019-02-

07

IN-SOI-23006-GO-RFB /

Scanners and Plotters -

three for multiple locations

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-11-

01

2017-11-

06

2017-12-

18

2018-01-

17

2018-02-

21

2018-08-

20

IN-SOI-61868-GO-RFB /

Setting up of Continuously

Operating Reference

System (CORS)

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-07-

10

2018-07-

15

2018-08-

26

2018-11-

08

2018-12-

13

2019-06-

11

IN-SOI-61869-GO-RFB /

Procurement of PCs,

workstations, laptops and

office software for 1:25k

gdb

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-06-

25

2018-06-

30

2018-08-

11

2018-10-

24

2018-11-

28

2019-05-

27

IN-SOI-61870-GO-RFB /

Establishment of H/W

infrastructure for

Geospatial Data Centre for

1:25k geodatabase

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

02

2018-07-

07

2018-08-

18

2018-10-

31

2018-12-

05

2019-06-

03

IN-SOI-61872-GO-RFB /

Procurement of PCs,

workstations,laptops,

scanners, plotters, firewall,

servers, storage devices

with related software for 3-

5m DEM

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-06-

25

2018-06-

30

2018-08-

11

2018-10-

24

2018-11-

28

2019-05-

27

Page 20: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 15

IN-KARNATAKA SW-

57627-GO-RFQ /

Procurement of 32

numbers of Autographic

Rainguages (with charts).

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

09

2018-04-

09

2018-05-

31

IN-KARNATAKA SW-

57628-GO-RFQ /

Procurement of Current

meters.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope12,385.60 Completed

2018-04-

09

2018-04-

09

2018-05-

15

IN-KARNATAKA SW-

57620-GO-RFQ /

Reconstruction of

Rainguage Stations (Civil

Works)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

09

2018-04-

09

2018-04-

30

IN-CGWB-41317-GO-RFB /

Procurement of Laptop-5

Nos

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope2,956.97 Completed

2018-05-

11

2018-05-

14

2018-05-

14

IN-CGWB-62234-GO-RFQ

/ Procurement of 1 color

photocopier

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

20

2018-08-

15

2018-09-

30

IN-CGWB-39830-GO-RFQ

/ Procurement of IT

equipment-02 printer

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope558.52 Completed

2018-05-

15

2018-05-

19

2018-05-

20

IN-

BIHAR/WRD/FMISC/NHP-

SW/G-NCB-01 / RTDAS for

River Basins and

Dams/Reservoirs including

Civil Work.

(River Basins: Mahananda,

Gandak, Sone, Punpun and

Kiul-Harohar and Eighteen

Dam/Reservoir)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

31

2018-08-

10

2018-09-

21

2018-12-

04

2019-01-

08

2025-01-

08

IN-

BIHAR/WRD/FMISC/NHP-

SW/G-S-01 / Establishment

Cost and Furnishing of

SPMU

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope4,278.06 Signed

2018-05-

11

2018-08-

08

2018-09-

22

IN-RAJASTHAN -40425-

GO-RFB / RTDAS for

State of Rajasthan

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-05-

16

2018-05-

21

2018-07-

12

2018-09-

09

2018-10-

14

2019-07-

11

IN-CWPRS-63141-GO-RFQ

/ Procurement of testing

equipment for Water

Level Sensors -3 Nos &

data logger

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

03

2018-08-

28

2019-02-

24

IN-CWPRS-63269-GO-RFQ

/ Procurement of Surfer

Software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

05

2018-07-

31

2019-01-

27

IN-CWPRS-63278-GO-RFQ

/ Procurement of TerrSet

Software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

05

2018-07-

31

2019-01-

27

IN-CWPRS-63292-GO-RFQ

/ Procurement of

STATISTICA Software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

05

2018-07-

31

2019-01-

27

IN-CGWB-62237-GO-RFQ

/ Procurement of 5 laptop

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

11

2018-10-

27

2018-11-

16

IN-CWPRS-63499-GO-RFQ

/ Procurement of OTT C-2-

small current meters with

digital counter and all

necessary accessories

including propeller No.4

etc. complete - 3 Nos.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

05

2018-09-

30

2019-03-

29

IN-CWPRS-63500-GO-RFQ

/ Procurement of L-type

Pitot Tubes with digital

read out for Water-2 Nos.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

05

2018-09-

30

2019-03-

29

IN-DVC-63505-GO-DIR /

Procurement of Cartosat

2.5m steroids pair

GIS/Satellite Imageries

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-09-

17

2018-09-

22

2018-10-

27

2019-04-

25

IN-CWPRS-63504-GO-RFQ

/ Procurement of L-type

Pitot Tubes with digital

read out for Air-2 Nos.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

05

2018-09-

30

2019-03-

29

IN-CWPRS-63972-GO-RFQ

/ Procurement of Digital

Multi-meters with Trend

Capture -2 Nos. from

Local Market

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

29

2018-07-

24

2019-01-

20

IN-CWPRS-63973-GO-RFQ

/ Procurement of Colour

Laserjet Multi-function

Printer - 1 No. by calling

limited quotations from

Local Market

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

29

2018-07-

24

2019-01-

20

IN-CWPRS-63974-GO-RFQ

/ Procurement of Peristaltic

Pump - 1 No. by calling

Limited Quotations from

Local Market

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

29

2018-07-

24

2019-01-

20

IN-MAHARASHTRA SW-

64924-GO-RFB / Real Time

Data Acquisition System

(RTDAS) with Civil Work

for Godavari Basin in

Vidarbha Region.

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-06-

25

2018-06-

30

2018-08-

11

2018-10-

24

2018-11-

28

2019-05-

27

IN-NIH ROORKEE-65126-

GO-RFQ / Laptop (6 nos.)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

16

2018-08-

11

2019-02-

07

IN-MAHARASHTRA SW-

33208-GO-RFB / Real Time

Data Acquisition System

(RTDAS) with Civil Work

for West flowing rivers in

Kokan Basin.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-09-

01

2018-09-

06

2018-10-

18

2018-12-

31

2019-02-

04

2019-08-

03

IN-HARYANA -33286-GO-

RFB / Purchase of

Laptops, Computers with

Software, Printer with

Scanner and external hard

disk 2 TB

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

17

2018-02-

11

2018-08-

10

NHP-2018-2019-MOWR-

213650-GO-DC-DC /

Procurement of Image

Processing software

(ERDAS) for India WRIS

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-06-

05

2018-06-

10

2018-07-

15

2019-01-

11

NHP-2018-2019-MOWR-

568010-GO-DC-DC /

Procurement of GIS

software (Arc Server 1 &

Desktop 2)

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-06-

27

2018-07-

02

2018-08-

06

2019-02-

02

NHP-2018-2019-MOWR-

984029-GO-SH-QU /

Procurement of LED light

for NPMU Office

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

11

2018-08-

06

2019-02-

02

NHP-2018-2019-MOWR-

671657-GO-SH-QU /

Procurement of Server for

the development of e-

SWIS/IndiaWRIS/MIS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

20

2018-06-

15

2018-12-

12

NHP-2018-2019-MOWR-

109303-GO-SH-QU /

Purchase of software for

daily office running like

Antivirus, Office, Windows

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

11

2018-08-

06

2019-02-

02

NHP-2018-2019-MOWR-

268940-GO-SH-QU /

Procurement of AC for the

NPMU Office

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

20

2018-07-

15

2019-01-

11

IN-SOI-61767-GO-DIR /

Procurement of stereo

satellite imagery for

creation of 3-5m DEM of

gap areas.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-05-

21

2018-05-

26

2018-06-

30

2018-12-

27

IN-SOI-61766-GO-DIR /

Procurement of satellite

imagery for updation of

1:25k geodatabase.

IBRD / 87250 Post Direct Selection Direct - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

10

2018-07-

10

2018-07-

20

2018-07-

25

IN-WEST BENGAL SW-

38540-GO-RFB / Supply

Installation Testing

Commissioning and

Maintenance of Real Time

Data

Acquisition System

(RTDAS) with telemetry of

Irrigation and Waterways

Department West Bengal

Under National Hydrology

Project And Integrate with

Data Center located at

Kolkata

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-07-

25

2018-07-

25

2018-08-

27

2018-09-

17

2018-10-

08

2019-10-

08

IN-WEST BENGAL SW-

38555-GO-RFB / Supply,

installation, testing,

commissioning, training

and maintenance of

Automatic Operation of

Durgapur Barrage along

with collection, storage and

dissemination of data

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

04

2018-09-

09

2018-10-

12

2018-10-

30

2018-11-

27

2019-11-

27

IN-PUNJAB -68853-GO-

RFQ / Procurement of 2

no. Vento (Volkswagen)

(TLP metallic) for Water

Resources Organisation ,

Punjab, SAS Nagar

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

15

2018-07-

17

2018-09-

05

IN-ANDHRA PRADESH

SW-21943-GO-RFQ /

Procurement of Total

Stations

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

15

2018-09-

09

2019-03-

08

Page 21: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 16

NHP-2018-2019-APSW-

785008 / Water Quality

Lab Equipment

Procurement

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-07-

16

2018-07-

21

2018-09-

01

2018-10-

01

2018-11-

05

2019-05-

04

NHP-2018-2019-APSW-

558278 / Procurement of

ADCP Equipment

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

28

2018-09-

02

2018-10-

14

2018-11-

13

2018-12-

18

2019-06-

16

NHP-2018-2019-APSW-

986420 / Procurement of

Auto CAD

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

08

2018-11-

03

2019-05-

02

NHP-2018-2019-TR-115304-

GO-SH-DE / Procurement

of Total station and

handheld GPS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

05

2018-09-

30

2019-03-

29

NHP-2018-2019-TR-184071-

GO-SH-QU / Procurement

of office Furnitures and

equipments

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

25

2018-09-

19

2019-03-

18

NHP-2018-2019-TR-537492-

GO-SH-QU / procurement

of AC & Fans

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

25

2018-09-

19

2019-03-

18

NHP-2018-2019-TR-588114-

GO-SH-QU / Procurement

of Diesel Generator

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

25

2018-09-

19

2019-03-

18

NHP-2018-2019-TR-284354-

GO-SH-QU / Procurement

of IT equipments

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

25

2018-09-

19

2019-03-

18

NHP-2018-2019-WBSW-

351943-GO-SH-QU /

Procurement of Laptops

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-07-

20

2018-08-

24

2018-09-

24

NHP-2018-2019-WBSW-

998845-GO-DC-DC /

Procurement of PLAXIS-3D

Software

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

25

2018-07-

25

2018-08-

13

2018-09-

12

NHP-2018-2019-WBSW-

354063-GO-DC-DC /

Procurement of HYPACK

Software

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

25

2018-07-

25

2018-08-

13

2018-09-

12

NHP-2018-2019-WBSW-

317529-GO-DC-DC /

Procurement of Geo-Slope

and Geo-Studio software

IBRD / 87250 Post Direct Selection Direct

0.00

Under

Implement

ation

2018-07-

25

2018-07-

25

2018-08-

13

2018-09-

12

NHP-2018-2019-WBSW-

816546-GO-SH-QU /

Procurement of Hardware

for State-WRIS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

05

2019-01-

12

2019-03-

13

NHP-2018-2019-WBSW-

714477-GO-SH-QU /

Procurement of Non ITC

equipment for Data Center

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

06

2019-01-

14

2019-02-

13

NHP-2018-2019-APGW-

371695 / Procurement of

Air Conditioners and

Furniture for 17 data

centers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

14

2018-09-

08

2019-03-

07

NHP-2018-2019-APGW-

195430 / Procurement of

IT Hardware

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

23

2018-07-

28

2018-09-

08

2018-11-

21

2018-12-

26

2019-06-

24

NHP-2018-2019-APGW-

547481 / Procurement of

Water Quality Equipment

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

11

2018-10-

06

2019-04-

04

NHP-2018-2019-GA-216692-

GO-NCB-DE / RT-DAS

Goa

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

07

2018-09-

12

2018-10-

24

2019-01-

06

2019-02-

10

2019-08-

09

NHP-2018-2019-GA-131350-

GO-SH-SCB /

Computers,Printers with

Scanner, Network-Attached-

Storage

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

27

2018-10-

22

2019-04-

20

NHP-2018-2019-GA-716919-

GO-NCB-SE /

Computers,Laptop,Printers

with Scanner

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-02-

16

2019-04-

13

2019-10-

10

NHP-2018-2019-GA-698560-

GO-SH-QU / Water

Quality Equipment for

Labs

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-02-

23

2019-04-

20

2019-10-

17

NHP-2018-2019-GA-223965-

GO-SH-QU / Furnishing

Divisional / sub-divisional

Centre & SPMU

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-02-

24

2019-04-

21

2019-10-

18

IN-GOA -39865-GO-RFB /

Supply, Installation, testing

and commissioning of Real

Time Data Acquisition

System for Tillari

Irrigation Canal System

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2018-01-

19

2018-01-

24

2018-03-

07

2018-06-

19

2018-07-

24

2019-03-

21

NHP-2018-2019-ML-265245-

GO-SH-QU / ArcGIS

IBRD / 87250 Post Direct Selection Direct

0.00

Under

Implement

ation

2018-07-

02

2018-07-

07

2018-08-

11

2019-02-

07

NHP-2018-2019-ML-127591-

GO-SH-LM / Procurement

of PCs and printers for

Data Centre

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-08-

11

2018-10-

06

2019-04-

04

NHP-2018-2019-ML-560924-

GO-SH-QU / Procurement

of ground water monitoring

equipments

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

10

2018-12-

05

2019-06-

03

NHP-2018-2019-ML-524253-

GO-SH-LM / Bridge outfit

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

08

2019-02-

02

2019-08-

01

NHP-2018-2019-TSGW-

261629-GO-SH-QU / Basic

field equipment for field

officers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

28

2018-09-

22

2018-11-

21

NHP-2018-2019-TSGW-

127898 / IT Equipment for

Data Centres -

Communication equipment

(Tabs)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

16

2018-09-

10

2018-11-

09

NHP-2018-2019-TSGW-

619408 / IT Equipment for

Data Centres - computers

& laptops

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

16

2018-09-

10

2018-11-

09

NHP-2018-2019-TSGW-

551441 / IT Equipment for

Data Centres - Printer

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

16

2018-09-

10

2018-11-

09

NHP-2018-2019-TSGW-

983848 / IT Equipment for

Data Centres - UPS

System

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

16

2018-09-

10

2018-11-

09

NHP-2018-2019-TSGW-

664034 / A/Cs 2T for Data

Centres and Water Quality

Labs

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

09

2018-11-

04

2019-01-

03

NHP-2018-2019-TSGW-

965817 / Updation of

existing Water Quality

Labs at Hyderabad &

Karimnagar

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

28

2018-10-

23

2018-12-

22

NHP-2018-2019-TSGW-

167277 / Procurement of

SOI Toposheets

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

20

2018-07-

25

2018-08-

29

2019-02-

25

NHP-2018-2019-TSGW-

953596 / To create

resource material (Annual

Reports,pamplets,Brochure,p

osters,audiovisuals,documen

taries etc) on water

conservation &

management awareness

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

27

2018-12-

22

2019-02-

20

NHP-2018-2019-TSGW-

218424 / Procurement of

equipment for Tanks as

Source for regional

Groundwater Recharge

using Managed Aquifer

Storage & Recovery (ASR)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

20

2018-10-

15

2018-12-

14

NHP-2018-2019-TSGW-

553646 / Software for Data

Center - GIS software

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

25

2018-07-

30

2018-09-

03

2019-03-

02

NHP-2018-2019-TSGW-

319070 / Software for Data

Center - Other software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

13

2018-10-

08

2018-12-

07

NHP-2018-2019-JH-923973-

GO-SH-QU / Softwares for

data centre

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-01-

08

2019-02-

19

2019-03-

19

NHP-2018-2019-JH-846701-

GO-SH-QU / Printers with

scanners

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

22

2018-07-

10

2018-08-

24

NHP-2018-2019-JH-919411-

GO-SH-QU / Purchase of

Computers,

Laptops,External Hard disk

etc.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

16

2018-10-

03

2018-11-

26

IN-MIZORAM -61335-GO-

DIR / Procurement of Mini

Bus

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

13

2018-07-

13

2018-07-

13

2018-07-

13

Page 22: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 17

NHP-2018-2019-KASW-

403993-GO-NCB-DE /

RTDAS: Procurement of

TRG & AWS through

eportal

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-08-

11

2018-09-

22

2018-12-

05

2019-01-

09

2019-07-

08

NHP-2018-2019-KASW-

963084-GO-NCB-DE /

DWLR for Ground Water

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

23

2018-07-

28

2018-09-

08

2018-11-

21

2018-12-

26

2019-06-

24

NHP-2018-2019-KASW-

154455-GO-SH-QU / IT

equipment for data centre-

Computers: through GEM

portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

02

2018-09-

27

2019-03-

26

NHP-2018-2019-KASW-

130432-GO-SH-QU / IT

equipment for data centre-

Copier / photocopier:

through GEM portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

03

2018-09-

28

2019-03-

27

NHP-2018-2019-KASW-

535118-GO-SH-QU / IT

equipment for data centre-

Networking / Internet

facilities

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-KASW-

695345-GO-SH-QU / IT

equipment for data centre-

Plotter: through GEM

portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

28

2018-09-

22

2019-03-

21

NHP-2018-2019-KASW-

460794-GO-SH-QU / IT

equipment for data centre-

Scanners: through GEM

portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

28

2018-09-

22

2019-03-

21

NHP-2018-2019-KASW-

929749-GO-SH-QU / IT

equipment for data centre-

Server: through GEM

portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

28

2018-09-

22

2019-03-

21

NHP-2018-2019-KASW-

355280-GO-SH-QU / IT

equipment for data centre-

Storage and backup

devices: through GEM

portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

08

2018-11-

03

2019-05-

02

NHP-2018-2019-KASW-

475013-GO-SH-QU / IT

equipment for data centre-

UPS system: through GEM

portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-KASW-

811349-GO-SH-QU / IT

equipment for data centre-

Video wall/LED display:

through GEM portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

15

2018-12-

10

2019-06-

08

NHP-2018-2019-KASW-

509421-GO-SH-QU / IT

equipment for data centre-

WorkStations: through

GEM portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

28

2018-09-

22

2019-03-

21

NHP-2018-2019-KASW-

704320-GO-SH-QU / IT

equipment for data centre-

Laptops: through GEM

portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-09-

24

2019-03-

23

NHP-2018-2019-KASW-

735425-GO-SH-QU / IT

equipment for data centre-

Printer: through GEM

portal

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

14

2018-11-

09

2019-05-

08

NHP-2018-2019-KASW-

599620-GO-SH-QU /

SCADA for barrages &

reserviors:package1

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-KASW-

365600-GO-NCB-DE /

SCADA for barrages &

reserviors: Package 2:

Malaprabha & Bhadra

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

04

2018-09-

09

2018-10-

21

2019-01-

03

2019-02-

07

2019-08-

06

NHP-2018-2019-KASW-

258058-GO-SH-QU / Bridge

Outfits

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-KASW-

151156-GO-SH-QU / Lab

equipments for KERS WQ

,divisional WQ labs

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-11-

25

2019-05-

24

NHP-2018-2019-KASW-

134605-GO-SH-QU / Lab

equipments for munirabad

WQ, subdisional WQ labs

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

15

2018-12-

10

2019-06-

08

NHP-2018-2019-KASW-

929140-GO-SH-QU /

Furnishing State/basin

informatic centre :Pakage I

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

11

2018-12-

06

2019-06-

04

NHP-2018-2019-KASW-

643814-GO-SH-QU /

Furnishing of data centre

KERS:package 1

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-KASW-

345314-GO-SH-QU /

Procurement of Current

meters

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-08-

15

2018-10-

10

2019-04-

08

NHP-2018-2019-KASW-

873395-GO-SH-QU /

Procurement of Standard

Rain Gauges

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-KASW-

106288-GO-SH-QU /

Furnishing

divisional/subdivisional data

centre package1

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

12

2018-11-

07

2019-05-

06

NHP-2018-2019-KASW-

290284-GO-SH-QU /

Furnishing

divisional/subdivisional data

centre package:2

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

03

2018-10-

29

2019-04-

27

NHP-2018-2019-KASW-

648504-GO-SH-QU /

Procurement of Remote

sensing data

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

14

2019-01-

09

2019-07-

08

NHP-2018-2019-CWPRS-

993138-GO-NCB-DE /

Procurement of Underwater

Electrical Resistivity

Imaging System and GPS

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-06-

20

2018-07-

20

2018-08-

31

2018-11-

13

2018-12-

18

2019-02-

16

NHP-2018-2019-CWPRS-

517454-GO-NCB-DE /

Enhancement of Costal

Field Data Collection

Capabilities for sustainable

development of coastal

hydrology-Procuring

Waverider Buoys with

accessories

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

18

2018-08-

18

2018-09-

29

2018-12-

12

2019-01-

16

2019-07-

15

NHP-2018-2019-CWPRS-

989419-GO-SH-QU / Digital

Event Counter

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

27

2018-12-

22

2019-06-

20

NHP-2018-2019-CWPRS-

224212-GO-SH-QU / Small

current meters

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

16

2018-10-

11

2018-12-

10

NHP-2018-2019-CWPRS-

514362-GO-SH-QU / 0.2

HP/ 0.25 HP Pumps

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

07

2018-09-

01

2019-02-

28

NHP-2018-2019-CWPRS-

919911-GO-SH-QU /

Weighing Balance

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-11-

10

2019-05-

09

NHP-2018-2019-CWPRS-

533745-GO-SH-QU /

Glasswares

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

132720-GO-SH-QU /

STATISTICA Software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CWPRS-

536851-GO-SH-QU /

SURFERv14 Software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

23

2018-09-

06

2018-11-

05

NHP-2018-2019-CWPRS-

400680-GO-SH-QU /

Terrset (Idrisi)-Image

Processing Software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

18

2018-09-

06

2018-11-

05

NHP-2018-2019-CWPRS-

654895-GO-SH-QU / Lab

equipments (Ion Selective

Electrodes)- PDS (WQ)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

25

2018-11-

20

2019-05-

19

NHP-2018-2019-CWPRS-

460974-GO-SH-QU / Steel

tape for water level

measuring in the bore hole-

TCCF (GW)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

21

2018-10-

16

2019-04-

14

NHP-2018-2019-CWPRS-

654967-GO-SH-QU / Water

Level Monitoring System-

TCCF (GW)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

24

2019-01-

19

2019-07-

18

NHP-2018-2019-TSGW-

448681 / Resource material

for PDS & DSS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

17

2019-01-

12

2019-03-

28

Page 23: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 18

NHP-2018-2019-CGWB-

931501-GO-NCB-DE /

DWLR Procurement

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-10-

30

2018-11-

04

2018-12-

16

2019-02-

28

2019-04-

04

2019-10-

01

NHP-2018-2019-CGWB-

420194-GO-SH-QU / Centre

of excellence for GW

modelling

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-03-

20

2019-05-

15

2019-11-

11

NHP-2018-2019-CGWB-

951078-GO-SH-QU /

Procurement of Laptops

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

21

2018-11-

16

2019-05-

15

NHP-2018-2019-CGWB-

470405-GO-SH-QU /

Procurement of Color

Photocopier

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

05

2018-11-

30

2019-05-

29

NHP-2018-2019-DVC-

247675-GO-SH-QU /

Procurement of 01 no.

Xerox machine

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2018-12-

15

NHP-2018-2019-DVC-

218077-GO-NCB-DE /

Procurement of Automated

Pipe Flow Measurement

sensors for drinking /

industrial water supply for

40 nos of consumers with

GSM telemetry

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

15

2018-07-

20

2018-08-

31

2018-11-

13

2018-12-

18

2019-12-

18

NHP-2018-2019-DVC-

370770 / Procurement of

Printer for the data

centre.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

30

2018-10-

25

2018-11-

24

NHP-2018-2019-SK-583221-

GO-SH-QU / Manual

Standard Rain Gauge

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

16

2018-09-

15

2018-12-

14

NHP-2018-2019-SK-883565-

GO-SH-QU / GD

stations(CM AND

ACCESSORIES)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

16

2018-09-

15

2018-12-

14

NHP-2018-2019-SK-333559-

GO-SH-QU / Furnishing of

divisional and sub

divisional offices

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

16

2018-09-

15

2019-03-

31

NHP-2018-2019-SK-579431-

GO-SH-QU / WQ Field Kit

1

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

16

2018-09-

15

2018-12-

14

NHP-2018-2019-UK-533091

/ Procurement of Handheld

GPS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

28

2018-07-

23

2019-01-

19

NHP-2018-2019-NIH-

107727-GO-SH-QU / Copier

/ photocopier

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

06

2018-12-

01

2019-05-

30

NHP-2018-2019-NIH-

888075-GO-SH-QU /

Plotter/Printer

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

06

2018-12-

01

2019-05-

30

NHP-2018-2019-NIH-

989202-GO-SH-QU / Server

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

06

2018-12-

01

2019-05-

30

NHP-2018-2019-NIH-

204542-GO-SH-QU /

WorkStations

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

06

2018-12-

01

2019-05-

30

NHP-2018-2019-NIH-

108835-GO-SH-QU / Travel

Stationery and Computer

Consumables , Misc

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

06

2018-08-

31

2019-02-

27

NHP-2018-2019-NIH-

880926-GO-SH-QU /

Radiocarbon Dating Line

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

20

2018-10-

15

2019-04-

13

NHP-2018-2019-NIH-

934679-GO-SH-QU /

Syringe Pump

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

04

2018-10-

30

2019-04-

28

NHP-2018-2019-NIH-

241231-GO-SH-QU / Laptop

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

10

2018-06-

05

2018-12-

02

NHP-2018-2019-NIH-

190238-GO-DC-DC /

GeoChemist Work Bench

Software

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

04

2018-10-

30

2019-04-

28

NHP-2018-2019-NIH-

724684-GO-DC-DC / VMOD

FLEX Software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-01-

04

2019-03-

01

2019-08-

28

NHP-2018-2019-NIH-

731166-GO-SH-QU / Laptop

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

20

2018-09-

14

2019-03-

13

NHP-2018-2019-NIH-

538584-GO-SH-QU /

Camera

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-NIH-

825174-GO-SH-QU /

Handheld GPS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-NIH-

637041-GO-DC-DC / WQ

Software

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-08-

30

2018-09-

04

2018-10-

09

2019-04-

07

NHP-2018-2019-NIH-

335053-GO-SH-QU /

Portable pH & EC Meter

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

20

2018-10-

15

2019-04-

13

NHP-2018-2019-NIH-

452255-GO-SH-QU / Laptop

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

20

2018-09-

14

2019-03-

13

NHP-2018-2019-NIH-

197101-GO-SH-QU /

Desktop

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

20

2018-09-

14

2019-03-

13

NHP-2018-2019-NIH-

853608-GO-SH-QU /

Printers

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

20

2018-10-

15

2019-04-

13

NHP-2018-2019-NIH-

371795-GO-SH-QU / Water

Level Meter

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-NIH-

538573-GO-SH-QU /

Camera

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

20

2018-10-

15

2019-04-

13

NHP-2018-2019-NIH-

803917-GO-DC-DC /

Softwares

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

20

2018-10-

15

2019-04-

13

NHP-2018-2019-NIH-

934561-GO-SH-QU /

Portable pH & EC Meter

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-NIH-

172815-GO-SH-QU / Digital

Burette

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-NIH-

518596-GO-SH-QU / Flame

Photometer

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

04

2018-10-

30

2019-04-

28

NHP-2018-2019-NIH-

225835-GO-SH-QU / Cut

Throat Flume / V-Notch

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-NIH-

335077-GO-SH-QU /

Desktop Workstation,

Laptop Workstation,

Desktop-5nos.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-NIH-

477025-GO-SH-QU /

Handheld GPS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-NIH-

685156-GO-SH-QU /

Camera

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-NIH-

469053-GO-SH-QU / Mini

Disk Infiltrometer

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-NIH-

108582-GO-SH-QU /

Portable Soil & Water

Testing Kit

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

20

2018-10-

15

2019-04-

13

NHP-2018-2019-NIH-

716566-GO-ICB-DE / Triple

Quadrupole GC-MS

IBRD / 87250 PostRequest for

Bids

Open -

International

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-08-

04

2018-09-

15

2018-11-

28

2019-01-

02

2019-07-

01

NHP-2018-2019-NIH-

170551-CS-SSS-SSS /

Development of Advanced

Courses

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-WBSW-

877397-GO-DC-DC /

Procurement of ARC-GIS

Software

IBRD / 87250 Post Direct Selection Direct

0.00

Under

Implement

ation

2018-07-

19

2018-07-

25

2018-08-

16

2018-09-

15

NHP-2018-2019-RJ-398027-

GO-NCB-DE / Discharge

measurement equipment

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-07-

01

2018-07-

06

2018-08-

17

2018-10-

30

2018-12-

04

2019-06-

02

NHP-2018-2019-RJ-302457-

GO-SH-QU / Manual SRG

(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

15

2018-09-

09

2019-03-

08

NHP-2018-2019-RJ-573302-

GO-NCB-DE / SCADA and

gate sensors for other

dams

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-07-

01

2018-07-

06

2018-08-

17

2018-10-

30

2018-12-

04

2019-06-

02

Page 24: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 19

NHP-2018-2019-RJ-270099-

GO-SH-QU / LCD screen

for conference /meetin

room and procurement of

video conference

facility(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-RJ-436351-

GO-SH-QU / Software for

data center(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-RJ-759763-

GO-SH-QU /

Software/models

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

15

2018-09-

09

2019-03-

08

NHP-2018-2019-RJ-596058

/ Communication

equipment for data

center(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-RJ-551788

/ Plotter/ printers for data

center (2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-RJ-416392

/ Scanner for data center

(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-RJ-293051

/ Servers for data center

(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

06

2019-01-

31

2019-07-

30

NHP-2018-2019-RJ-235140

/ Storage and back up

devices for data center

(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-RJ-651934

/ Handheld GPS ( 2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-RJ-632856

/ DWLR with telemetry

GSM

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-09-

20

2018-11-

01

2019-01-

14

2019-02-

18

2019-08-

17

NHP-2018-2019-RJ-581558

/ Software for data

center(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-RJ-801730

/ Development of

Information brochures(2018-

19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

21

2018-10-

16

2019-04-

14

NHP-2018-2019-RJ-330361

/ Servers for hosting

website and data

services(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-RJ-294757

/ Internet charges for

hosting(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-RJ-334890

/ Communication system

for data exchange among

agencies

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-RJ-909517

/ Establishment cost of

SPMU ( Furnishing/

Furniture)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-RJ-997858

/ Furnishing of center

IMTI kota

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

09

2018-07-

14

2018-08-

25

2018-11-

07

2018-12-

12

2019-06-

10

NHP-2018-2019-RJ-537251

/ Installation of network,

cabling etc & Training

equipment/ LCD projector

and screen

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-MHGW-

434875-GO-SH-QU / IT

Equipement for data centre

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-CPCB-

828332 / Water Quality

Kit

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-09-

29

2019-03-

28

NHP-2018-2019-CPCB-

530430 / Procurement of

Computers and Laptops

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CPCB-

130439 / Procurement of

Photocopier

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CPCB-

254999 / Procurement of

Fax Machine

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CPCB-

785943 / Procurement of

Scanner

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CPCB-

147435 / Procurement of

Printer

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CPCB-

587141 / Procurement of

Network/Internet Facility

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CPCB-

900370 / Procrement of

Storage and Backup

Devices

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-ML-390072-

GO-SH-SCB / DGPS and

Handheld GPS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

11

2018-10-

06

2019-04-

04

NHP-2018-2019-ML-879264-

GO-SH-SCB / Current

meters with accessories

and ORGs

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

11

2018-10-

06

2019-04-

04

NHP-2018-2019-ML-577403-

GO-SH-SCB / Water

Quality Sondes

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

11

2018-10-

06

2019-04-

04

NHP-2018-2019-ML-589832-

GO-NCB-SE / Supply &

Installation of DWLR with

telemetry

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

06

2018-12-

01

2019-05-

30

NHP-2018-2019-DVC-

851940-GO-SH-DE /

Procurement of Survey

instruments.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2018-12-

28

NHP-2018-2019-DVC-

668297-GO-SH-DE /

Procurement of Hand Held

current meter.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

11

2018-10-

06

2018-11-

05

NHP-2018-2019-DVC-

381001-GO-DC-DC /

Procurement of GIS

software under NHP

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-06-

18

2018-06-

23

2018-07-

28

2018-08-

12

NHP-2018-2019-DVC-

991380-GO-NCB-DE /

Procurement of Discharge

Management Equipment

(ADCP).

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

25

2019-01-

20

2019-07-

19

NHP-2018-2019-DVC-

975293-GO-SH-DE /

Furnishing of Data Centre

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-02-

17

2019-04-

14

2020-04-

13

NHP-2018-2019-DVC-

756876 / Procurement of

Laptops and Desktops for

Data Centre at Maithon

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

05

2018-09-

30

2018-10-

30

NHP-2018-2019-APSW-

661926-GO-NCB-SE /

RTDAS Procurement

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-07-

17

2018-07-

20

2018-08-

24

2018-09-

23

2018-10-

28

2019-07-

25

NHP-2018-2019-APSW-

114780 / Purchase of ICT

Equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

05

2018-11-

30

2019-05-

29

NHP-2018-2019-APSW-

551308 / Furnishing

Divisional / Sub Divisional/

Lab offices With Non-ICT

Equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

06

2018-12-

01

2019-05-

30

NHP-2018-2019-APSW-

670483 / Printing

Brouchers

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-APSW-

970837 / Procurement of

Software

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

08

2018-11-

03

2019-05-

02

NHP-2018-2019-APSW-

514172 / Purchase of ICT

Equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

05

2018-11-

30

2019-05-

29

NHP-2018-2019-APSW-

394165 / Purchase of ICT

Equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

05

2018-11-

30

2019-05-

29

NHP-2018-2019-APSW-

879202 / Purchase of ICT

Equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

05

2018-11-

30

2019-05-

29

NHP-2018-2019-APSW-

584105 / Purchase of ICT

Equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

05

2018-11-

30

2019-05-

29

NHP-2018-2019-APSW-

109151 / Purchase of ICT

Equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

05

2018-11-

30

2019-05-

29

NHP-2018-2019-TSSW-

983793 / Bridge outfits

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

Page 25: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 20

NHP-2018-2019-TSSW-

711857 / WQ Field Kit 1

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

23

2018-11-

18

2019-05-

17

NHP-2018-2019-TSSW-

952433 / Current Meter

with accessories

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

29

2018-10-

24

2019-04-

22

NHP-2018-2019-TSSW-

997812 / Furnishing Sub

Divisional Data centres

with Non ITC equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-01-

27

2019-03-

24

2019-09-

20

NHP-2018-2019-TSSW-

176935 / Furnishing

Divisional Data centres

with Non ITC equipment

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-01-

27

2019-03-

24

2019-09-

20

NHP-2018-2019-TSSW-

922045 / Procurement of

office furniture for Central

Data Center & Regional

Data Center

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

02

2019-01-

27

2019-07-

26

NHP-2018-2019-TSSW-

453471 / Furnishing of

Data center and Region

data center

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

16

2019-02-

10

2019-08-

09

NHP-2018-2019-TSSW-

481604 / DAS for Godavari

and Krishna in TS(only

Sensors and Telemetry

Systems inclusive of

respective civil

construction) including

Data Center requirements

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

31

2018-08-

05

2018-09-

16

2018-11-

29

2019-01-

03

2019-07-

02

NHP-2018-2019-TSSW-

832499 / Purchase of

Software-Antivirus

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

10

2018-11-

05

2019-05-

04

NHP-2018-2019-TSSW-

431169 / Servers for

Hosting Website and Data

Services

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-01-

27

2019-03-

24

2019-09-

20

NHP-2018-2019-UPGW-

185362-GO-SH-QU /

Procurement of Digital

Data Logger mounted on

vehicle (Geophysical

Equipment)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

16

2018-08-

21

2018-09-

20

2018-10-

10

2018-11-

14

2018-12-

14

NHP-2018-2019-UPGW-

875446-CW-SH-QU /

Development of mobile app

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

20

2018-09-

10

2019-01-

08

NHP-2018-2019-UPGW-

342327-GO-DC-DC /

Software for Data Center

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-08-

14

2018-08-

14

2018-10-

13

2018-11-

12

NHP-2018-2019-UPGW-

414496-GO-DC-DC /

Upgradation of existing

Remote Sensing Lab

alongwith procurement of

SOI Toposheets (Hard copy

& digital data) and

sattellite data, Geological

Maps

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

25

2018-07-

25

2018-10-

23

2018-12-

22

NHP-2018-2019-JH-861607-

GO-SH-DE / Procurement

of Office Furniture

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

27

2018-10-

15

2018-11-

16

NHP-2018-2019-JH-919830-

GO-NCB-DE / ADCP and

other accessories

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

11

2018-09-

18

2018-10-

23

2018-11-

08

2018-11-

30

2019-01-

15

NHP-2018-2019-JH-684716-

GO-SH-DE / Handheld

current meters with

accessories

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

15

2018-12-

17

2019-01-

31

NHP-2018-2019-JH-928273-

GO-SH-SCB / Purchase of

DGPS and GPS Handheld

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

16

2018-09-

14

2018-10-

15

NHP-2018-2019-JH-595199-

GO-SH-SCB /

Resistivitymeter

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

16

2018-10-

22

2018-12-

06

NHP-2018-2019-HRSW-

989048-GO-NCB-DE /

Procurement of ADCP for

canals

IBRD / 87250 PostRequest for

BidsLimited

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

13

2018-08-

27

2018-09-

12

2018-09-

21

2018-09-

28

2024-09-

24

NHP-2018-2019-HRSW-

446162-GO-NCB-DE /

Installation of RTDAS in

Haryana

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-10-

08

2018-11-

19

2019-02-

01

2019-03-

08

2019-09-

04

NHP-2018-2019-HRSW-

604635-GO-SH-QU /

Procurement of AC

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-06-

08

2018-07-

18

2018-08-

01

NHP-2018-2019-HRSW-

345588-GO-NCB-DE /

SCADA for HKB Barrage

including O&M

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-08-

27

2018-09-

20

2018-10-

02

2018-10-

08

2024-10-

02

NHP-2018-2019-HRSW-

413810-GO-SH-QU /

Procurement of Work

stations

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-11-

10

2019-05-

09

NHP-2018-2019-HRSW-

636444-GO-SH-QU /

Procurement of laptops

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

19

2018-10-

14

2019-04-

12

NHP-2018-2019-HRSW-

977832-GO-SH-QU /

Procurement of computers

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-HRSW-

859568-GO-SH-QU /

Procurement of printer

with scanner

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-HRSW-

466265-GO-SH-QU /

Procurement of printer

with scanner

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-05-

09

2018-05-

16

2018-05-

18

NHP-2018-2019-HRSW-

241802-GO-SH-QU /

Procurement of

communication

services(broadband,leaseline,

MPLS,etc)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

13

2018-12-

08

2019-06-

06

NHP-2018-2019-HRSW-

872563-GO-SH-QU /

Procurement of external

hard disks 2TB

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-HRSW-

238689-GO-SH-QU /

Procurement of office

furniture

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-HRSW-

607826-GO-SH-QU /

Training equipment/LCD

projector and screen

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-HRSW-

424444 / Vehicle mounted

crane for ADCP

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

11

2019-01-

06

2019-07-

05

NHP-2018-2019-GJSW-

308586 / Procurement of

ADCP-3 nos and

Bathymetric Survey of

Ukai Reservoir.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-10-

08

2018-11-

15

2018-12-

07

2018-12-

24

2019-06-

24

NHP-2018-2019-GJSW-

282480 / Procurement of

GPS â€" Hand held Type2-

2 no

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

08

2018-11-

15

2019-01-

15

NHP-2018-2019-GJSW-

869184 / Chemicals,

Glassware and other

consumable items for GERI

lab.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-11-

20

2019-02-

20

NHP-2018-2019-GJSW-

996497 / Procurement of

Boat with Outboard

Engine-1 no

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-09-

29

2018-10-

31

2018-11-

30

2018-12-

15

2019-06-

15

IN-RAJASTHAN -72381-

GO-RFB / Medium and

deep piezometer

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-09-

20

2018-11-

01

2019-01-

14

2019-02-

18

2019-08-

17

NHP-2018-2019-RJ-274571-

GO-NCB-DE / Canal

SCADA

IBRD / 87250 PriorRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

15

2018-07-

20

2018-08-

31

2018-11-

13

2018-12-

18

2019-06-

16

NHP-2018-2019-RJ-854780-

GO-SH-QU / Computer for

data center( 2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-RJ-796471

/ Laptops for data

center(2018-19)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

IN-ANDHRA PRADESH

SW-21936-GO-RFQ / ADCP

Carrying Vehicles and

Other inspection Vehicles

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00 Canceled

2017-12-

26

2018-02-

20

2018-08-

19

IN-JHARKHAND -21443-

GO-RFQ / Purchase of

GPS (10 nos)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

11

2017-11-

30

2018-01-

14

NHP-2018-2019-KLGW-

891280 / IT equipments-

desktop computers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-KLGW-

341034 / Handheld GPS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

01

2018-09-

26

2019-03-

25

Page 26: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 21

NHP-2018-2019-KLGW-

462066 / IT equipments-

Audio visual

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

04

2018-10-

30

2019-04-

28

NHP-2018-2019-KLGW-

224157 / Lab equipments

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

21

2018-10-

16

2019-04-

14

NHP-2018-2019-KLGW-

992950 / Lab equipments

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

20

2018-09-

14

2019-03-

13

NHP-2018-2019-KLGW-

562650 / Pahlmlets/GW

year books/awareness

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2019-05-

27

NHP-2018-2019-KLGW-

912195 / IT equipments-

Communication equipment

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-KLGW-

679062 / IT equipments-

Photocopier

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-KLGW-

420492 / IT equipments-

printer/plotter

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-KLGW-

891308 / IT equipments-

scanner

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-KLGW-

623599 / IT equipments-

storage and backup device

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-KLGW-

810820 / IT equipments-

Laptop computers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-KLGW-

365669 / IT equipments-

server

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-11-

10

2019-05-

09

NHP-2018-2019-KLGW-

339117 / IT equipments-

Workstation computers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-KLGW-

805987 / IT equipments-

UPS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-KLGW-

485006 / IT equipments-

videoconferencing unit

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-KLGW-

992750 / Supply and

installation of

DWLR(telemetry) and

Supply and installation of

DWLR(telemetry)with EC

probe

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-10-

06

2018-11-

17

2019-01-

30

2019-03-

06

2024-09-

05

NHP-2018-2019-KASW-

678575-GO-DC-DC /

Software Upgradation: ARC-

GIS

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

25

2018-07-

30

2018-09-

03

2019-03-

02

NHP-2018-2019-KASW-

768303-GO-SH-QU /

Furnishing State/basin

informatic centre :Package

II

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

10

2019-01-

05

2019-07-

04

NHP-2018-2019-KASW-

538330-GO-SH-QU /

Furnishing of data centre

KERS:package 2

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-UPGW-

850626-GO-SH-QU /

Procurement of storage

and backup devices

through GeM

(Development/

strensthening of IT

infrastructure at field

division level and at SDC,

RDC @ SDC)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

04

2018-08-

06

2018-09-

05

NHP-2018-2019-UPGW-

568007-GO-SH-QU /

Procurement of Copier /

photocopier through GeM

(Development/ strenthening

of IT infrastructure at

field division level and at

SDC, RDC and SDC)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

13

2018-07-

19

2018-08-

01

NHP-2018-2019-UPGW-

800607-GO-SH-QU /

procurement of Networking

/ Internet facilities

(Development/

strensthening of IT

infrastructure at field

division level and at SDC,

RDC and SDC)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

13

2018-07-

19

2018-09-

17

NHP-2018-2019-UPGW-

140208-GO-SH-QU /

procurement of

Plotter/Printer through

GeM (Development/

strensthening of IT

infrastructure at field

division level and at SDC,

RDC and SDC)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

20

2018-07-

23

2018-09-

21

NHP-2018-2019-UPGW-

226915-GO-SH-QU /

Procurement of Scanners

through GeM

(Development/

strengthening of IT

infrastructure at field

division level and at SDC,

RDC and SDC)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

20

2018-08-

25

2018-10-

24

NHP-2018-2019-UPGW-

981379-GO-SH-QU /

Procurement of UPS

systemr through GeM

(Development/

strensthening of IT

infrastructure at field

division level and at SDC,

RDC and SDC)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

14

2018-09-

13

2018-11-

12

NHP-2018-2019-UPGW-

594966-GO-SH-QU /

Procurement of

workstations through GeM

(Development/

strensthening of IT

infrastructure at field

division level and at SDC,

RDC and SDC)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

21

2018-09-

10

2018-11-

09

NHP-2018-2019-UK-541991

/ Procurement of ADCP

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

18

2018-10-

18

2019-01-

16

NHP-2018-2019-NIH-

503451-GO-NCB-DE / EC

Probes for Salinity

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-04-

01

2018-04-

06

2018-05-

18

2018-07-

31

2018-09-

04

2019-03-

03

NHP-2018-2019-NIH-

236582-GO-NCB-DE / Auto

Titrator Potentiometeric

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-06-

20

2018-06-

25

2018-08-

06

2018-10-

19

2018-11-

23

2019-05-

22

NHP-2018-2019-NIH-

825129-GO-NCB-DE / TOC

Analyzer

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-06-

22

2018-06-

27

2018-08-

08

2018-10-

21

2018-11-

25

2019-05-

24

NHP-2018-2019-NIH-

864594-GO-NCB-DE /

Normal Scintillation

Counter

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-06-

26

2018-07-

01

2018-08-

12

2018-10-

25

2018-11-

29

2019-05-

28

NHP-2018-2019-NIH-

896867-GO-NCB-DE /

Liquid Nitrogen Plant

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-01-

23

2018-01-

28

2018-03-

11

2018-05-

24

2018-06-

28

2018-12-

25

NHP-2018-2019-NIH-

931387-GO-NCB-DE /

CHNS Analyser with

Biomass Converter

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-04-

01

2018-04-

06

2018-05-

18

2018-07-

31

2018-09-

04

2019-03-

03

NHP-2018-2019-NIH-

279015-GO-NCB-DE / Ion

Chromotographm, Water

Purification System

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

01

2018-09-

06

2018-10-

18

2018-12-

31

2019-02-

04

2019-08-

03

NHP-2018-2019-NIH-

437156-GO-NCB-DE /

Microwave digester

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-04-

23

2018-04-

28

2018-06-

09

2018-08-

22

2018-09-

26

2019-03-

25

NHP-2018-2019-NIH-

541114-GO-NCB-DE /

Element Analyser

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-05-

01

2018-05-

06

2018-06-

17

2018-08-

30

2018-10-

04

2019-04-

02

NHP-2018-2019-NIH-

310418-GO-NCB-DE /

Furniture and Furnishings

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-10-

06

2018-11-

17

2018-12-

17

2019-01-

21

2019-07-

20

NHP-2018-2019-NIH-

432805-GO-NCB-DE /

Multi-Probe Meter,

Magnetic Stirrer, Digital

Titrator, Weighing Balance,

Deep Lab Freezer

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

15

2018-07-

20

2018-08-

31

2018-11-

13

2018-12-

18

2019-06-

16

NHP-2018-2019-NIH-

604606-GO-NCB-DE / Data

Logger (TLC)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

15

2018-08-

20

2018-10-

01

2018-12-

14

2019-01-

18

2019-07-

17

NHP-2018-2019-NIH-

119698-GO-NCB-DE /

Automatic WL Recorder &

Conductivity Logger

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-04-

01

2018-04-

06

2018-05-

18

2018-07-

31

2018-09-

04

2019-03-

03

NHP-2018-2019-NIH-

741431-GO-NCB-DE /

Multi-Parameter Ion

Analyser

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-04-

01

2018-04-

06

2018-05-

18

2018-07-

31

2018-09-

04

2019-03-

03

NHP-2018-2019-NIH-

384746-GO-NCB-DE / WQ

Equipments

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-08-

04

2018-09-

15

2018-11-

28

2019-01-

02

2019-07-

01

Page 27: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 22

NHP-2018-2019-NIH-

908192-GO-NCB-DE / Soil

Monitoring Probes

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

15

2018-08-

20

2018-10-

01

2018-12-

14

2019-01-

18

2019-07-

17

NHP-2018-2019-NIH-

166446-GO-NCB-DE /

Aquameter

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

15

2018-08-

20

2018-10-

01

2018-12-

14

2019-01-

18

2019-07-

17

NHP-2018-2019-NIH-

320919-GO-DC-DC /

Satellite, Meteorological &

Geological Data

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

15

2018-07-

20

2018-08-

24

2019-02-

20

NHP-2018-2019-NIH-

371269-GO-NCB-DE /

Handheld GPS

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

30

2018-09-

04

2018-10-

16

2018-12-

29

2019-02-

02

2019-08-

01

NHP-2018-2019-NIH-

161213-GO-DC-DC /

Satellite Data

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

15

2018-07-

20

2018-08-

24

2019-02-

20

NHP-2018-2019-NIH-

444196-GO-NCB-DE / Rain

Gauges

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-08-

04

2018-09-

15

2018-10-

15

2018-11-

19

2019-05-

18

NHP-2018-2019-NIH-

247027-GO-NCB-DE / UV

Spectrophotometer

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

30

2018-09-

04

2018-10-

16

2018-12-

29

2019-02-

02

2019-08-

01

NHP-2018-2019-NIH-

664627-GO-NCB-DE /

Water Purification System

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

30

2018-09-

04

2018-10-

16

2018-12-

29

2019-02-

02

2019-08-

01

NHP-2018-2019-NIH-

898480-GO-NCB-DE / Soil

Moisture Probe

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-09-

20

2018-11-

01

2019-01-

14

2019-02-

18

2019-08-

17

NHP-2018-2019-NIH-

610130-GO-NCB-DE / Air

Pycnometer

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-04-

01

2018-04-

06

2018-05-

18

2018-07-

31

2018-09-

04

2019-03-

03

NHP-2018-2019-NIH-

378613-GO-NCB-DE /

Tension Infiltrometer

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

15

2018-07-

20

2018-08-

31

2018-11-

13

2018-12-

18

2019-06-

16

NHP-2018-2019-NIH-

428585-GO-DC-DC / Visual

MODFLOW

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

20

2018-10-

15

2019-04-

13

NHP-2018-2019-NIH-

522571-GO-DC-DC / Soil

Data

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

30

2018-08-

04

2018-09-

08

2019-03-

07

NHP-2018-2019-WBSW-

664351-GO-SH-SCB /

Procurement of 2 nos

Velocity Radars

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

22

2018-10-

17

2019-01-

15

IN-NIH ROORKEE-72911-

GO-RFQ / ArcGIS Software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

22

2018-11-

17

2019-05-

16

NHP-2018-2019-MHGW-

722642-GO-NCB-DE /

Procurement Of DWLR

Telemetry for existing GW

Monitoring Wells

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

22

2018-11-

17

2019-05-

16

NHP-2018-2019-MHGW-

512749-GO-NCB-DE /

Video Conferencing

Equipment

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-10-

05

2018-11-

16

2018-12-

16

2019-01-

20

2019-07-

19

NHP-2018-2019-CWC-

271725 / Purchase of Very

High End workstation

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

03

2018-03-

31

2018-09-

27

NHP-2018-2019-CWC-

899489 / Purchase of High

End Workstation

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

12

2018-04-

09

2018-10-

06

NHP-2018-2019-CWC-

339996 / Purchase of Low

End Workstation

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

10

2018-04-

07

2018-10-

04

NHP-2018-2019-CWC-

505631 / Purchase of Low

End Workstation

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

25

2018-09-

19

2019-03-

18

NHP-2018-2019-CWC-

311885 / Purchase of Low

End Workstation

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

29

2018-09-

23

2019-03-

22

NHP-2018-2019-CWC-

792477 / Purchase of

Audio Visual Equipments

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

05

2018-09-

30

2019-03-

29

NHP-2018-2019-CWC-

257334 / Purchase of

Computers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

02

2018-05-

28

2018-11-

24

NHP-2018-2019-CWC-

849131 / Purchase of

Laptop

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-CWC-

950004 / Purchase of

Networking/Internet

Facility

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

10

2018-11-

05

2019-05-

04

NHP-2018-2019-CWC-

758674 / Purchase of

Plotter

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-02-

14

2018-04-

11

2018-10-

08

NHP-2018-2019-CWC-

727479 / Purchase of

Printer (Color)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

02

2018-05-

28

2018-11-

24

NHP-2018-2019-CWC-

284992 / Purchase of

Printer (Color)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

07

2018-10-

02

2019-03-

31

NHP-2018-2019-CWC-

677124 / Purchase of

Scanner (A4 size)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

01

2018-05-

27

2018-11-

23

NHP-2018-2019-CWC-

603110 / Purchase of

Scanner (A3 size)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

10

2018-10-

05

2019-04-

03

NHP-2018-2019-CWC-

707424 / Purchase of UPS

(7.5 KV)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

02

2018-05-

28

2018-11-

24

NHP-2018-2019-CWC-

411639 / Purchase of UPS

(1 KV)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

18

2018-10-

13

2019-04-

11

NHP-2018-2019-CWC-

393223 / Purchase of

Video Conferencing

equipments

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-04-

18

NHP-2018-2019-CWC-

400691 / Purchase of

Video wall/LED Display

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

02

2018-05-

28

2018-11-

24

NHP-2018-2019-CWC-

373476 / Purchase of

Video wall/LED Display

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

02

2018-05-

28

2018-11-

24

NHP-2018-2019-CWC-

566260 / Purchase of

Photocopier multi-functional

Machine A3 (Color)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

01

2018-05-

27

2018-11-

23

NHP-2018-2019-CWC-

755564 / Purchase of

Photocopier Digital

multifunctional Machine

office Machine (Color)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

01

2018-05-

27

2018-11-

23

NHP-2018-2019-CWC-

944587 / Purchase of

Photocopier Multifunctional

(B&W)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-04-

01

2018-05-

27

2018-11-

23

NHP-2018-2019-CWC-

325815 / Purchase of

photocopier

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

11

2019-02-

05

2019-08-

04

NHP-2018-2019-CWC-

921128 / Purchase of office

Furniture

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

11

2019-02-

05

2019-08-

04

NHP-2018-2019-CWC-

720626 / Purchase of Arc

GIS

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-08-

01

2018-08-

06

2018-09-

10

2019-03-

09

NHP-2018-2019-CWC-

393150 / Purchase of

Image processing software

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

06

2018-10-

01

2019-03-

30

NHP-2018-2019-CWC-

119701 / Procurement of

WQ lab equipment and

other accessories

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

10

2018-09-

15

2018-10-

27

2019-01-

09

2019-02-

13

2019-08-

12

NHP-2018-2019-CWC-

315559 / Purchase of

RTDAS ( AWLR, ARG,

AWS & V-SAT)

IBRD / 87250 PriorRequest for

Bids

Open -

International

Single Stage -

Two Envelope0.00

Under

Review

2018-10-

18

2018-10-

23

2018-12-

04

2019-02-

16

2019-03-

23

2019-09-

19

NHP-2018-2019-NRSC-

247471 / Procurement of

workstation for conducting

trainings at NRSC

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

24

2018-08-

29

2018-10-

10

2018-12-

23

2019-01-

27

2019-07-

26

NHP-2018-2019-NRSC-

762502 / Procurement of

High-end Workstations for

the geo-spatial data

analysis under NRSC

studies

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

24

2018-08-

29

2018-10-

10

2018-12-

23

2019-01-

27

2019-07-

26

Page 28: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 23

NHP-2018-2019-NRSC-

284215 / Procurement of

NAS Storage for archival

and post-processing geo-

spatial data generated

under NHP

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

14

2018-09-

19

2018-10-

31

2019-01-

13

2019-02-

17

2019-08-

16

NHP-2018-2019-NRSC-

296999 / Desktop

Computers for NHP NRSC

Activities

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

29

2018-10-

24

2019-04-

22

NHP-2018-2019-NRSC-

191994 / Hydrological

Modelling Software

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

19

2018-11-

14

2019-05-

13

NHP-2018-2019-NRSC-

828419 / Instrumentation

for Field Experiments

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-10-

05

2018-10-

10

2018-11-

21

2019-02-

03

2019-03-

10

2019-09-

06

NHP-2018-2019-NRSC-

728302 / Laptops for NHP

NRSC activities

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

29

2018-10-

24

2019-04-

22

NHP-2018-2019-AS-233071

/ SILT SAMPLER

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2019-05-

27

NHP-2018-2019-AS-641643

/ SUPPLY

INSTALLATION,

TESTINBG,COMMISSIONI

NG AND MAINTENANCE

OF REAL TIME DATA

ACQUISITION

SYSTEM(RTDAS) OF

ASSAM UNDER

NATIONAL HYDROLOGY

PROJECT(NHP)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

09

2018-10-

19

2018-10-

19

2018-08-

08

2018-12-

28

2019-03-

12

2019-04-

16

2020-10-

07

NHP-2018-2019-AS-198046

/ CURRENT METER

WITH ACCESSORIES

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-11-

25

2019-05-

24

NHP-2018-2019-AS-334606

/ NORMAL CURRENT

METER

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-11-

25

2019-05-

24

NHP-2018-2019-AS-217347

/ COMPUTER FOR

DIVISIONAL

DATACENTRE(FOR

UAID,DIBRUGARH;

CAID,MANGALDA;

LAID,BARPETA ROAD;

CID,BADARPUR)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-AS-120135

/ SILT LABORATORY

EQUIPMENT

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2019-05-

27

NHP-2018-2019-AS-538096

/ STANDARD

RAINGAUGE (MANUAL)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

20

2019-01-

15

2019-07-

14

NHP-2018-2019-AS-926083

/ COPIER CUM PRINTER

FOR DIVISIONAL

DATACENTRE(FOR

UAID,DIBRUGARH;

CAID,MANGALDA;

LAID,BARPETA ROAD;

CID,BADARPUR)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-AS-918689

/ STORAGE AND

BACKUP DEVICE FOR

DIVISIONAL DATA

CENTRE(FOR

UAID,DIBRUGARH;

CAID,MANGALDA;

LAID,BARPETA ROAD;

CID,BADARPUR)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

20

2019-01-

15

2019-07-

14

NHP-2018-2019-AS-188246

/ UPS SYSTEM FOR

DIVISIONAL DATA

CENTRE(FOR

UAID,DIBRUGARH;

CAID,MANGALDA;

LAID,BARPETA ROAD;

CID,BADARPUR)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-AS-913575

/ PROCUREMENT OF

OFFICE CHAIR (FOR

UAID,DIBRUGARH;

CAID,MANGALDA;

LAID,BARPETA ROAD;

CID,BADARPUR)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-AS-457892

/ PROCUREMENT OF

OFFICE TABLE FOR

DIVISIONAL DATA

CENTRE(FOR

UAID,DIBRUGARH;

CAID,MANGALDA;

LAID,BARPETA ROAD;

CID,BADARPUR)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-AS-869160

/ PROCUREMENT OF

OFFICE ALMIRAH FOR

DIVISIONAL DATA

CENTRE(FOR

UAID,DIBRUGARH;

CAID,MANGALDA;

LAID,BARPETA ROAD;

CID,BADARPUR)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-AS-486608

/ PROCUREMENT OF

OFFICE VISITORS CHAIR

FOR DIVISIONAL DATA

CENTRE (FOR

UAID,DIBRUGARH;

CAID,MANGALDA;

LAID,BARPETA ROAD;

CID,BADARPUR)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-AS-189173

/ PROCUREMENT OF

COMPUTER FOR STATE

DATA CENTRE

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-AS-841042

/ PROCUREMENT OF

COPIER/PRINTER FOR

STATE DATA CENTRE

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-AS-594136

/ PROCUREMENT OF

STORAGE AND BACKUP

DEVICE FOR STATE

DATA CENTRE

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-KLSW-

233047 / Arc GIS

softwares & related

Extensions,

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-08-

23

2018-08-

28

2018-10-

02

2018-11-

01

NHP-2018-2019-KLSW-

530747 / Current Meter

with accessories- Cup Type

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

27

2018-10-

22

2018-11-

21

NHP-2018-2019-KLSW-

634146 / Procurement of

Bridge outfit

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

27

2018-10-

22

2018-11-

21

NHP-2018-2019-KLSW-

428087 / Water Quality

Lab Equipment for Level

II Lab including PDS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2018-12-

19

NHP-2018-2019-KLSW-

650136 / Analytical

Balance Digital and Water

Quality analyser for Level

I Labs.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

22

2018-10-

17

2018-11-

16

NHP-2018-2019-KLSW-

551818 / Procurement of

Automatic Level

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2018-11-

19

NHP-2018-2019-KLSW-

860160 / Procurement of

Video Conference Facility

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

27

2018-10-

22

2018-12-

21

NHP-2018-2019-KLSW-

266968 / Procurement of

IT Equipment for data

centres (Lap top computers

-3 Nos and Work station-

7 Nos)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

28

2018-10-

23

2018-11-

22

NHP-2018-2019-KLSW-

849490 / Furnishing

regional data centre

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

21

2018-10-

16

2018-11-

15

NHP-2018-2019-NL-345762-

GO-SH-QU / Purchase of

Currentmeter

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

21

2018-09-

15

2018-10-

15

NHP-2018-2019-NL-551923

/ purchase of desktop

computer

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-07-

21

2018-09-

01

2018-09-

15

NHP-2018-2019-NL-396302

/ Furnishing of SDC

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-01-

20

2019-03-

17

2019-04-

01

IN-HARYANA -33337-GO-

RFB / Purchase of Vehicle

Mounted Crane

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2018-03-

15

2018-03-

20

2018-05-

01

2018-07-

14

2018-08-

18

2019-02-

14

IN-HARYANA -33281-GO-

RFQ / Procurement of ACs

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2018-02-

20

2018-02-

25

2018-04-

08

2018-06-

21

2018-07-

26

2019-01-

22

IN-HARYANA -33357-GO-

RFQ / Training equipment

/ LCD projector and screen

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2018-02-

20

2018-02-

25

2018-04-

08

2018-06-

21

2018-07-

26

2019-01-

22

IN-HARYANA -33274-GO-

RFQ / Purchase of ADCP

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2017-12-

01

2017-12-

06

2018-01-

17

2018-04-

01

2018-05-

06

2018-11-

02

Page 29: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 24

IN-HARYANA -33254-GO-

RFB / Supply and

installation of AWLR and

Digital Rain Gauges(DRG)

with Telemetry including

civil works

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2017-11-

21

2017-11-

26

2018-01-

07

2018-03-

23

2018-04-

27

2018-10-

24

IN-HARYANA -33355-GO-

RFQ / Work stations

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-03-

05

2018-04-

30

2018-10-

27

IN-HARYANA -33361-GO-

RFB / Servers

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2017-12-

18

2017-12-

23

2018-02-

03

2018-04-

18

2018-05-

23

2018-11-

19

NHP-2018-2019-GJSW-

640010 / RTDAS System

for AWS, AWLR etc.

IBRD / 87250 PriorRequest for

Bids

Open -

International

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

21

2018-08-

28

2018-10-

15

2018-11-

26

2018-12-

20

2019-12-

20

NHP-2018-2019-GJSW-

450483 / Procurement of

Furniture for

Establishment of Flood

Management Cell

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

22

2019-01-

16

2019-04-

16

NHP-2018-2019-GJSW-

563433 / WQ lab

equipments - Flame

Photometer-1,Ion meter-1,

UV Visible

Spectrophotometer-1,EC-

TDS Analyser-3,PH

Analyser-3,Turbidimeter-

3,Refriger-1,Oven-1

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

20

2019-02-

20

IN-HARYANA -33278-GO-

RFB / SCADA system for

Barrages

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2017-11-

20

2017-11-

25

2018-01-

06

2018-03-

21

2018-04-

25

2018-10-

22

IN-TELENGANA SW-

44737-GO-RFB /

Procurement of ADCP

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-03-

05

2018-03-

10

2018-04-

21

2018-05-

21

2018-06-

25

2018-12-

22

IN-TELENGANA SW-

39972-GO-RFB / Video

Conference facility

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-02-

20

2018-02-

25

2018-04-

08

2018-05-

08

2018-06-

12

2018-12-

09

IN-TELENGANA SW-

39969-GO-RFQ /

Procurement of office

furniture for Central Data

Center & Regional Data

Center

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-12-

23

2018-02-

17

2018-08-

16

IN-TELENGANA SW-

39974-GO-RFB /

Hydrological Instruments

(Sensors & Telemetry

Systems) including DAS

software

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-12-

30

2018-01-

04

2018-02-

15

2018-03-

17

2018-04-

21

2018-10-

18

IN-TELENGANA SW-

39968-GO-RFQ / IT

Equipment with Software -

IT Equipment with

Software,

Computer&Laptops,

Printers, Plotters &

Scanners, Antivirus,

Servers for Hosting

Website

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-01-

01

2018-02-

26

2018-08-

25

IN-TELENGANASW-24378-

GO-RFQ / Current Meters

with accessories

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-10-

15

2017-12-

10

2018-06-

08

IN-TELENGANASW-24379-

GO-RFQ / Boats with

outboard engines

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-12-

13

2018-02-

07

2018-08-

06

IN-TELENGANA SW-

24381-GO-RFQ / Bridge

outfits

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-02-

17

2018-04-

14

2018-10-

11

IN-TELENGANA SW-

24387-GO-RFQ / Water

Quality Field Kit

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-02-

11

2018-04-

08

2018-10-

05

IN-TELENGANA SW-

24389-GO-RFQ / Surveying

Instruments - Differential

GPS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-02-

21

2018-04-

18

2018-10-

15

IN-TELENGANA SW-

24397-GO-RFQ / Power

supply & Online UPS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-10-

28

2017-12-

23

2018-06-

21

NHP-2018-2019-TR-670877-

GO-NCB-SE / Acoustic

Dopller Current Profiler

(ADCP)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-09-

20

2018-11-

01

2019-01-

14

2019-02-

18

2019-08-

17

NHP-2018-2019-TR-641570-

GO-DC-DC / Arc GiS

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-08-

15

2018-08-

20

2018-09-

24

2019-03-

23

NHP-2018-2019-MZ-884831-

GO-SH-LM / Purchase of

AC

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

24

2018-10-

19

2019-04-

17

NHP-2018-2019-MZ-312776-

GO-SH-LM / Purchase of

Water Cooler

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

24

2018-10-

19

2019-04-

17

NHP-2018-2019-MZ-819537-

GO-SH-LM / Purchase of

Computers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

24

2018-10-

19

2019-04-

17

NHP-2018-2019-MZ-822378-

GO-SH-LM / Purchase of

Copier/photocopier

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

24

2018-10-

19

2019-04-

17

NHP-2018-2019-MZ-936163-

GO-SH-LM / Purchase of

printers

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

24

2018-10-

19

2019-04-

17

NHP-2018-2019-MZ-976354-

GO-SH-LM / Procurement

of sound system for

Committee Room

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

28

2018-03-

25

2018-09-

21

NHP-2018-2019-MZ-814911-

GO-SH-LM / Procurement

of equipment like wading

suit etc

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

08

2019-01-

03

2019-07-

02

NHP-2018-2019-MZ-155566-

GO-SH-QU / Establishment

of SRG

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

06

2019-01-

01

2019-06-

30

NHP-2018-2019-MZ-152509-

GO-SH-QU / Procurement

of current meters

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

27

2019-05-

26

NHP-2018-2019-MZ-387512

/ Procurement of DG set

for Data centre

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

05

2018-11-

30

2019-05-

29

IN-APSW-21435-GO-RFQ /

Purchase of ICT

Equipments, Cloud

Computing & Training

equipments etc - Lumpsum

Provision under shopping

for the FY 2017-18

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

21

2017-12-

16

2018-06-

14

NHP-2018-2019-APSW-

807113 / Procurement of

ARCGIS

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-08-

01

2018-08-

06

2018-09-

10

2019-03-

09

NHP-2018-2019-GA-351866-

GO-SH-QU / Levels.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

27

2018-12-

22

2019-06-

20

NHP-2018-2019-GA-806791-

GO-SH-QU / Establishment

of SPMU.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-01-

19

2019-03-

16

2019-09-

12

NHP-2018-2019-WBGW-

808028 / RTDAS (AWS &

ARS)_WB(GW)

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

10

2018-09-

15

2018-10-

27

2019-01-

09

2019-02-

13

2019-08-

12

NHP-2018-2019-WBGW-

676348 / Procurement of

Satellite Imagery

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-WBGW-

931362 / Procurement of

DGPS & Handheld GPS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-WBGW-

158474 / Procurement of

Water Quality Equipment

for Labs

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-WBGW-

803704 / Procurement of

IT Equipment

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-WBGW-

595296 / Procurement of

Current Meter, Resistivity

Meter and Echo Sounder

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-WBGW-

638781 / Setting up of

Hydrogeological Laboratory

and Library in GW

Hydrology Training Centre

(GWHTC)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-05-

14

NHP-2018-2019-WBGW-

892102 / Establishment of

a Physical Server including

sStorage, Racks & UPS in

State GW Informatics

Centre (SGWIC)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-WBGW-

340435 / Laptop for

PDS_Arsenic (As)

Distribution in

Groundwater & As

Contamination in Food-

Chain

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

Page 30: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 25

NHP-2018-2019-WBGW-

855409 / Software for

PDS_Arsenic (As)

Distribution in

Groundwater & As

Contamination in Food-

Chain

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-WBGW-

537847 / Equipments for

PDS_Arsenic (As)

Distribution in

Groundwater & As

Contamination in Food-

Chain

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-PY-575878

/ Furnishing of Testing

Lab

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-02-

15

2019-04-

12

2019-10-

09

NHP-2018-2019-PY-890871

/ Supply and Installation

of RTDAS

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

15

2018-10-

20

2018-12-

01

2018-12-

31

2019-02-

04

2019-08-

03

IN-KERALA SW-74735-

GO-RFB / Procurement of

ADCP

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

12

2018-09-

17

2018-10-

29

2018-11-

28

2019-01-

02

2019-07-

01

NHP-2018-2019-UPSW-

988325-GO-NCB-DE /

RTDAS for Vindhyanchal

Region for Surface Water

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

27

2018-10-

02

2018-11-

13

2019-01-

26

2019-03-

02

2024-03-

01

NHP-2018-2019-UPSW-

320396-GO-NCB-DE /

RTDAS for Bundelkhand

Region for Surface Water

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

27

2018-10-

02

2018-11-

13

2019-01-

26

2019-03-

02

2024-03-

01

NHP-2018-2019-UPSW-

124234-GO-SH-QU / ADCP

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-10-

25

2018-12-

06

2019-02-

18

2019-03-

25

2019-09-

21

NHP-2018-2019-UPSW-

820116-GO-NCB-DE / HIS

for Gandak Canal System

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-12-

20

2018-12-

25

2019-02-

05

2019-04-

20

2019-05-

25

2024-05-

24

NHP-2018-2019-UPSW-

583881 / SCADA Sytem

for Okhla Barrage & Its

Regulators

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-08-

29

2018-09-

03

2018-10-

15

2018-12-

28

2019-02-

01

2024-01-

31

NHP-2018-2019-UPSW-

229665 / Control Room for

Okhla Barrage

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

03

2018-10-

29

2019-04-

27

NHP-2018-2019-PB-442654-

GO-DC-DC / System

Upgrade and VC

Equipmen- 25 no Desktop

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-09-

24

2019-03-

23

NHP-2018-2019-PB-539986-

GO-DC-DC / System

Upgrade and VC

Equipment -25 no UPS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-09-

24

2019-03-

23

NHP-2018-2019-PB-191178-

GO-DC-DC / System

Upgrade and VC

Equipment- 25 No Printers

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-09-

24

2019-03-

23

NHP-2018-2019-PB-237118-

GO-DC-DC / Procurement

of Office Furniture, Fans

etc- 25 No Fans

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-09-

24

2019-03-

23

NHP-2018-2019-PB-527765-

GO-NCB-DE / DWLR with

Telemetry without Water

Quality-505 DWLR with 2

No Server & protective

cage at each site etc

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

04

2018-09-

09

2018-10-

21

2019-01-

03

2019-02-

07

2019-08-

06

NHP-2018-2019-PB-694710-

GO-SH-QU / Water

Quality Probes -

Procurement of 6 no

Probes

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

30

2018-12-

25

2019-06-

23

NHP-2018-2019-PB-924275-

GO-NCB-DE / RTDS for

Surface Water- AWS 05

No, AWLR 16 No, Server

2 No

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-10-

08

2018-10-

13

2018-11-

24

2019-02-

06

2019-03-

13

2019-09-

09

NHP-2018-2019-PB-301167-

GO-NCB-SE / Procurement

of ADCP-3 number ADCP

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2019-03-

29

2019-04-

03

2019-05-

15

2019-07-

28

2019-09-

01

2020-02-

28

NHP-2018-2019-PB-365966-

GO-NCB-DE / Laboratory

equipments for 2 Labs-

Gas Chromatograph, Ion

Chromatograph, Deioniser,

Nephlometer, COD digester

Etc

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-11-

16

2018-11-

21

2019-01-

02

2019-03-

17

2019-04-

21

2019-10-

18

NHP-2018-2019-PB-648725-

GO-NCB-DE / Real Time

Discharge Measurement of

Sirhind Canal System for

Irrigation Monitoring and

Management

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2019-01-

31

2019-02-

05

2019-03-

19

2019-06-

01

2019-07-

06

2020-01-

02

NHP-2018-2019-NRSC-

787622 / High-end

Computer Server for NRSC-

NHP data

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

10

2018-09-

15

2018-10-

27

2018-11-

26

2018-12-

31

2019-06-

29

NHP-2018-2019-UK-707948

/ RTDAS for Uttarakhand

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-08-

07

2018-08-

12

2018-08-

24

2018-10-

08

2018-10-

22

2019-04-

20

NHP-2018-2019-GJGW-

209177 / Procurement of

Resistivity Meter - 5 Nos.

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

16

2019-01-

15

NHP-2018-2019-GJGW-

642126 / Procurement of

Water Quality Equipments

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-10-

30

2018-12-

14

NHP-2018-2019-GJGW-

560697 / Procurement of

Workstation - 4Nos

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

19

2018-10-

06

2018-10-

27

NHP-2018-2019-GJGW-

681508 / Procurement of

Internet Dongle-5 Nos

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

24

2018-10-

22

2018-10-

29

NHP-2018-2019-GJGW-

109366 / Procurement of

Server-1 Nos

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

21

2019-01-

04

2019-02-

04

NHP-2018-2019-GJGW-

728379 / Procurement of

Desktop computer (14

Nos),Laptop (4 Nos),B& W

Printers(7 Nos),Colour

Printer (1 No)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

08

2018-10-

22

2018-11-

12

NHP-2018-2019-GJGW-

640834 / Procurement of

Multi-functional B & W

Photocopier (2 Nos), Multi-

functional Color

Photocopier (1 No)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-10-

04

2018-10-

16

NHP-2018-2019-GJGW-

178548 / Procurement of

DWLR with Telemetry -

526 Nos and Improvement

of Existing Piezometer

IBRD / 87250 PostRequest for

BidsLimited

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

12

2018-10-

12

2018-11-

12

2018-12-

11

2019-01-

08

2020-01-

08

NHP-2018-2019-GJGW-

329482 / Upgradation of

Arc-GIS Software - 2 Nos

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-11-

27

2018-12-

02

2019-01-

06

2019-02-

05

NHP-2018-2019-MN-

543631 / GPS HAND

HELD

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

15

2018-10-

10

2019-04-

08

NHP-2018-2019-MN-

638974 / ADCP &

accessories

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

10

2018-09-

15

2018-10-

27

2018-11-

26

2018-12-

31

2019-06-

29

NHP-2018-2019-MN-

544531 / MANUAL

RAINGAUGE AND

CURRENT METER WITH

ACCESSORIES

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

03

2018-10-

29

2019-04-

27

NHP-2018-2019-MN-

687315 / PROCESSING

SOFTWARE-ARC GIS

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-09-

25

2018-09-

30

2018-11-

04

2019-05-

03

NHP-2018-2019-GJSW-

263510 / Procurement of

Multifunction machine -6

no (Printer/Scanner/Fax).

(through eGEM)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

05

2018-09-

07

2018-09-

30

NHP-2018-2019-PB-204052-

GO-NCB-DE / System

Upgrade and VC

Equipment-Supply and

Installation of Audio-Video

Instrument & Video

Conferencing Instrument

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

18

2018-09-

23

2018-11-

04

2019-01-

17

2019-02-

21

2019-08-

20

NHP-2018-2019-PB-933393-

GO-NCB-DE / Design,

Supply, Installation,

Testing And

Commissioning Including

Warranty and Maintenance

of 75 Kw Grid Tied Roof

Top Solar PV Plant At

State Data Centre, Water

Resources Bhawan, Sector

68, Mohali

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

05

2018-09-

25

2018-11-

06

2019-01-

19

2019-02-

23

2019-06-

23

NHP-2018-2019-MZ-455852-

GO-SH-SCB / Procurement

of ADCP

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

06

2019-01-

01

2019-06-

30

Page 31: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 26

IN-PUNJAB -32222-GO-

RFB / Supply, Fixing and

Placing of Office Furniture

at State Data Centre,

Water Resources Bhawan,

Sector 68, S.A.S. Nagar

(Mohali).

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-10-

18

2017-10-

25

2017-11-

27

2017-12-

26

2018-01-

30

2018-07-

27

IN-PUNJAB -54284-GO-

RFB / Supply &

Installation of Audio

Video Instrument at

Ground Floor Conference

Hall and Video

Conferencing Instrument at

First Floor Committee

Room.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00 Canceled

2018-03-

19

2018-03-

26

2018-04-

25

2018-06-

01

2018-06-

21

2018-08-

06

IN-CWPRS-76326-GO-RFQ

/ Supply installation,testing

and commissioning of 3

nos electrically operated

butterfly valves for

operation of constant head

tank (CHT)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

15

2019-02-

09

2019-08-

08

IN-CWPRS-76327-GO-RFQ

/ Supply,

installation,testing and

commissioning of 2 nos of

variable frequency drivers

(starters)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

25

2019-02-

19

2019-08-

18

IN-CWPRS-76328-GO-RFQ

/ Data Acquisition system

for flow monitoring and

control

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

25

2019-02-

19

2019-08-

18

IN-MAHARASHTRA SW-

76368-GO-RFB / Real Time

Data Acquisition System

(RTDAS) with Civil Work

for Tapi Basin.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-08-

31

2018-09-

05

2018-10-

17

2018-12-

30

2019-02-

03

2019-08-

02

NHP-2018-2019-TSSW-

855121 / Procurement of

ADCP

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-TSSW-

713223 / Boats with

Outboard engines

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-02-

19

2019-04-

16

2019-10-

13

NHP-2018-2019-TSSW-

551816 / Procurement of

High resolution Satellite

Products

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-09-

25

2018-09-

30

2018-11-

04

2019-05-

03

NHP-2018-2019-TSSW-

914321 / Purchase of GIS

Software

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-09-

05

2018-09-

10

2018-10-

15

2019-04-

13

NHP-2018-2019-GJSW-

763326 / Procurement of

RiverWare Licence - 3

Nos.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-09-

07

2018-09-

18

2018-10-

12

2018-11-

11

NHP-2018-2019-MZ-703723-

GO-SH-LM / Purchase

Video Conference

Equipment

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

14

2018-11-

09

2019-05-

08

NHP-2018-2019-MZ-664502

/ Purchase of IT

equipment (scanner, UPS

system , work station and

Internet facility)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

31

2018-10-

26

2019-04-

24

NHP-2018-2019-MN-

500441 / Surveying

Equipment (Total Station)

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Under

Implement

ation

2018-08-

29

2018-10-

24

2019-04-

22

NHP-2018-2019-CWPRS-

173750-GO-SH-DE /

Radiation Sensor Testing

Set up

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-01-

20

2019-03-

17

2019-09-

13

NHP-2018-2019-CWPRS-

300655-GO-NCB-DE /

Goods procurement related

to Developing Audio-Video

Recording Studio

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

04

2018-12-

30

2019-06-

28

NHP-2018-2019-CWPRS-

894892-GO-NCB-DE / AWS

along with Rain guage,

Data logger & Telemetry

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

314683-GO-SH-SCB /

Remote Access Terminal

with spares & accessories

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

189826-GO-SH-DE / L-type

pitot tube for Water and

Air

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

317498-GO-SH-DE /

Acoustic Doppler

Velocimeter

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

05

2019-01-

30

2019-07-

29

NHP-2018-2019-CWPRS-

328662-GO-SH-DE / Digital

Water Level Recorder

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

05

2019-01-

30

2019-07-

29

NHP-2018-2019-CWPRS-

537515-GO-SH-DE /

Fuming chamber

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

503991-GO-SH-DE /

Fabrication of

Environmental Chamber

with automation and

generator set

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

154847-GO-SH-DE / WQ

Monitor with data logger

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

270382-GO-SH-DE / Lab

Equipments-1 (WQ)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

883730-GO-SH-QU /

Standard Solutions

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

337925-GO-SH-DE / Lab

Equipments-2 (WQ)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

666082-GO-SH-DE /

Environmental Chamber

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

02

2018-11-

27

2019-05-

26

NHP-2018-2019-CWPRS-

118695-GO-SH-DE /

Electronic Display For

AWS Data

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

457360-GO-SH-DE / Wind

Tunnel Equipment

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

16

2018-12-

11

2019-06-

09

NHP-2018-2019-CWPRS-

740428-GO-SH-DE /

Temperature Sensor Test

Equipment

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

14

2019-01-

09

2019-07-

08

NHP-2018-2019-CWPRS-

659610-GO-SH-DE /

Pressure Sensor Calibrator

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CWPRS-

296829-GO-SH-DE / Rain

gauge testing set up

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CWPRS-

306163-GO-SH-DE /

Portable Raingauge Tester

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-01-

20

2019-03-

17

2019-09-

13

NHP-2018-2019-CWPRS-

440389-GO-SH-DE /

Installation of magnetic

flow meter on model canal

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

459736-GO-SH-DE /

Portable Two Channel

Clamp on Ultrasonic Flow

Meter

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

10

2018-12-

05

2019-06-

03

NHP-2018-2019-CWPRS-

616099-GO-SH-DE / Supply

Installation Testing and

Commissioning of Variable

speed DC Drives

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

30

2018-12-

25

2019-06-

23

NHP-2018-2019-CWPRS-

847979-GO-SH-DE / Supply

and fixing of Electro-

magnetic flow meters

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2019-05-

27

NHP-2018-2019-CWPRS-

300343-GO-SH-QU /

Software for Surge

Analysis

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

25

2019-01-

20

2019-07-

19

NHP-2018-2019-CWPRS-

479481-GO-SH-DE /

Procurement of Battery

Operated Forklift

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

15

2018-12-

10

2019-06-

08

NHP-2018-2019-CWPRS-

563019-GO-SH-QU /

Glasswares and Chemicals

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2019-05-

27

IN-CWPRS-79714-GO-RFQ

/ Cross section data-PDS

(WQ)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

24

2019-01-

19

2019-07-

18

IN-CWPRS-79712-GO-RFQ

/ Meteorological data-PDS

(WQ)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

24

2019-01-

19

2019-07-

18

Page 32: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 27

IN-CWPRS-79711-GO-RFQ

/ R.S. Imageries-PDS (WQ)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

24

2019-01-

19

2019-07-

18

IN-CWPRS-79709-GO-RFQ

/ Water Quality data-PDS

(WQ)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

24

2019-01-

19

2019-07-

18

NHP-2018-2019-CWPRS-

480258-GO-NCB-SE /

Furniture for family suites,

hostels at CWPRS Guest

house

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

13

2018-12-

08

2019-06-

06

NHP-2018-2019-CWPRS-

524188-GO-SH-DE /

Upgradation of existing

River Surveyor Acoustic

Doppler Current Profiler

(ADCP) M-9 type

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

613536-GO-SH-DE /

Procurement of River

Surveyor Acoustic Doppler

Current Profiler (ADCP)

with accessories

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2019-05-

27

NHP-2018-2019-CWPRS-

530734-GO-SH-DE /

Procurement of Heavy

Duty generator Set for

Centenary complex building

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

14

2018-12-

09

2019-06-

07

NHP-2018-2019-CWPRS-

223741-GO-SH-DE /

Testing Equipment for

Water Level Sensors-TCCF

(SW)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

04

2018-12-

30

2019-06-

28

NHP-2018-2019-CWPRS-

415267-GO-NCB-DE /

Furniture-Office/ Lab

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

562996-GO-SH-DE / Split

Ac (2 Ton)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

26

2019-05-

25

NHP-2018-2019-CWPRS-

878193-GO-SH-DE / Split

AC(1.5 Ton)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CWPRS-

499111-GO-SH-DE / Split

AC

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

NHP-2018-2019-CWPRS-

832144-GO-SH-DE /

Refrigerator

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-11-

25

2019-05-

24

NHP-2018-2019-CWPRS-

104881-GO-SH-DE / A4

MF Printer

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

24

2019-01-

19

2019-07-

18

NHP-2018-2019-CWPRS-

695620-GO-SH-DE / A3

MF Printer

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

08

2019-02-

02

2019-08-

01

NHP-2018-2019-CWPRS-

657595-GO-SH-DE / A3

MF Printer

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

08

2019-02-

02

2019-08-

01

NHP-2018-2019-CWPRS-

788074-GO-SH-DE /

Personal Computers (i-5)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

24

2018-12-

19

2019-06-

17

NHP-2018-2019-CWPRS-

615656-GO-SH-DE /

Personal Computers (i-7)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

27

2018-12-

22

2019-06-

20

NHP-2018-2019-CWPRS-

732748-GO-SH-DE /

Industrial PCs

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

05

2018-12-

31

2019-06-

29

NHP-2018-2019-CWPRS-

647389-GO-SH-DE /

Ground water level sensor

without vent and with

vent- TCCF (GW)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

733321-GO-SH-DE /

Electronic water level

Sounder-TCCF (GW)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

820540-GO-SH-DE / UPS

(5 KVA)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-CWPRS-

450929-GO-SH-DE / UPS

(1 KVA)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

29

2018-11-

24

2019-05-

23

NHP-2018-2019-MZ-655826

/ Procurement of Video

Conferencing equipment

(Display Units)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2019-05-

27

NHP-2018-2019-MZ-153623

/ Procurement of Video

Conferencing equipment

(chairs & tables)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2019-05-

27

NHP-2018-2019-MZ-426075

/ Procurement of DG set

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

05

2018-12-

31

2019-06-

29

NHP-2018-2019-MZ-618659

/ Procurement of DG Set

Housing

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

28

2019-05-

27

NON CONSULTING SERVICES

Activity Reference

No. / DescriptionLoan /

Credit No.Component Review Type Method

Market

Approach

Procurement

Process

Prequalificati

on (Y/N)

Actual

Amount

(US$)

Process

Status

Draft Pre-

qualification

Documents

Prequalification

Evaluation Report

Draft Bidding

Document /

Justification

Specific

Procurement Notice

/ Invitation

Bidding Documents

as Issued

Proposal

Submission /

Opening / Minutes

Bid Evaluation

Report and

Recommendation

for Award

Signed ContractContract

Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

IN-BBMB-18692-NC-DIR /

O&M of RTDSS Developed

under HP-II by M/DHI on

Mike Software

IBRD / 87250 Prior Direct Selection Direct

0.00

Pending

Implement

ation

2017-06-

30

2017-07-

14

2017-08-

17

2018-08-

17

IN-HIMACHAL PRADESH-

20303-NC-RFQ /

Information Product

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-03-

20

2018-05-

15

2018-11-

11

IN-ANDHRA PRADESH

SW-21951-NC-RFQ / AMC

contact for Existing Rain

Gauge Stations

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-11-

05

2017-12-

31

2018-06-

29

IN-ANDHRA PRADESH

SW-21957-NC-RFQ /

Printing & Publications

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-10-

21

2017-12-

16

2018-06-

14

IN-GUJARAT SW-24284-

NC-RFB / Bathymatric

Survey of Ukai Reservoir.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-08-

15

2017-09-

01

2017-09-

30

2017-10-

05

2017-11-

15

2018-06-

30

IN-MAHARASHTRA SW-

32436-NC-RFQ / Digitize

paper data, documents,

design, drawing and

scanned reports for Tapi

basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

06

2018-03-

03

2018-08-

30

IN-MAHARASHTRA SW-

32444-NC-RFQ / Digitize

paper data, documents,

design, drawing & scanned

reports for Godawari basin

of Marathwada region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

06

2018-03-

03

2018-08-

30

IN-MAHARASHTRA SW-

32448-NC-RFQ / Digitize

paper data, documents,

design drawings and

scanned reports for

Godawari basin of

Vidharbha region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

06

2018-03-

03

2018-08-

30

IN-MAHARASHTRA SW-

32450-NC-RFQ / Digitize

paper data, documents,

design, drawings and

scanned reports for

Krishna basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

06

2018-03-

03

2018-08-

30

IN-MAHARASHTRA SW-

32453-NC-RFQ / Digitize

paper data, documents,

design, drawing and

scanned reports for West

Flowing Rivers of Konkan

region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

06

2018-03-

03

2018-08-

30

IN-MAHARASHTRA SW-

33477-NC-RFQ / Hiring

charges for vehicles during

implementation of NHP for

Amravati Division.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

09

2018-02-

03

2018-08-

02

IN-MAHARASHTRA SW-

33479-NC-RFQ / Hiring

charges for vehicles during

Implementation of NHP for

Godavari basin of

Marathwada region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

09

2018-02-

03

2018-08-

02

IN-MAHARASHTRA SW-

33482-NC-RFQ / Hiring

charges for vehicles during

implementation of NHP for

Krishna Basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

09

2018-02-

03

2018-08-

02

IN-MAHARASHTRA SW-

33483-NC-RFQ / Hiring

charges for vehicles during

Implementation of NHP for

Godavari basin for

Vidharbha region.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

09

2018-02-

03

2018-08-

02

Page 33: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 28

IN-MAHARASHTRA SW-

33485-NC-RFQ / Hiring

charges for vehicles during

Implementation of NHP for

West flowing rivers of

Kokan basin.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

09

2018-02-

03

2018-08-

02

IN-JHARKHAND -36311-

NC-RFQ / Hiring of

vehicles

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2017-12-

24

2018-02-

18

2018-03-

11

IN-DVC-38264-NC-RFQ /

Pre Monsoon Survey of

river cross-section to

prepare Area-Elevation

Chart for calculation of

river discharge and gauge

fixing on River Damodar

and Barakar under NHP.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope2,444.66

Under

Implement

ation

2017-11-

30

2018-01-

25

2018-07-

24

IN-DVC-38266-NC-RFQ /

River cross section survey

from D/S of Konar &

Tenughat Dam upto U/S of

Panchet Dam and from

D/S of Panchet Dam to

Damodar Bridge on river

Damodar.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope12,814.59

Under

Implement

ation

2017-11-

30

2018-01-

25

2018-04-

25

IN-DVC-38267-NC-RFQ /

Hiring of 3 nos Data

Entry Operators

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope10,113.64

Under

Implement

ation

2017-12-

06

2018-01-

31

2019-01-

31

IN-DVC-38272-NC-RFQ /

Operation and maintenance

of Hydrological sites of

DVC under National

Hydrology Project (NHP)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope89,395.03

Under

Implement

ation

2017-11-

30

2018-01-

25

2020-01-

25

IN-SOI-51084-NC-RFB /

Providing Services for

Generation of GIS ready

database for river

basins/deltas covering area

of approximately 803402

sq. kms.

IBRD / 87250 PriorRequest for

Bids

Open -

International

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-03-

12

2018-04-

06

2018-05-

21

2018-08-

03

2018-09-

07

2020-02-

29

IN-SOI-51103-NC-RFB /

Provision of services for

Acquisition, Processing and

Delivery of DEM and

Digital Ortho-Image

IBRD / 87250 PriorRequest for

Bids

Open -

International

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-03-

12

2018-04-

11

2018-05-

26

2018-09-

08

2018-10-

13

2019-08-

09

IN-MAHARASHTRA SW-

33464-NC-DIR /

Installation of Internet

lease line and its

recurrent charges for

Divisional data center for

Tapi basin.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

31

2018-08-

05

2018-09-

09

2019-03-

08

IN-MAHARASHTRA SW-

33466-NC-DIR /

Installation of Internet

lease line & its recurrent

charges of Data Center for

Godavari basin in

Marathwada region.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

31

2018-08-

05

2018-09-

09

2019-03-

08

IN-MAHARASHTRA SW-

33470-NC-DIR /

Installation of Internet

lease line and its

recurrent charges for

Divisional data center for

Krishna basin.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

31

2018-08-

05

2018-09-

09

2019-03-

08

IN-MAHARASHTRA SW-

33468-NC-DIR /

Installation of Internet

lease line and its

recurrent charges for

Divisional data center for

Godavari basin in

Vidharbha region.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

31

2018-08-

05

2018-09-

09

2019-03-

08

IN-MAHARASHTRA SW-

33472-NC-DIR /

Installation of Internet

lease line and its

recurrent charges for

Divisional data center for

West flowing rivers in

Kokan basin

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

31

2018-08-

05

2018-09-

09

2019-03-

08

IN-MAHARASHTRA SW-

33474-NC-DIR /

Installation of Internet

lease line & its recurrent

charges for Basin

Simulation Division data

center.

IBRD / 87250 Post Direct Selection Direct

0.00

Pending

Implement

ation

2018-07-

31

2018-08-

05

2018-09-

09

2019-03-

08

IN-

BIHAR/WRD/FMISC/NHP-

SW/NC-RFB-01 /

Conducting River Cross-

Section Survey of Chandan

River for Chandan Dam

Break Analysis.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-12-

31

2019-01-

05

2019-02-

16

2019-05-

01

2019-06-

05

2019-12-

02

IN-CGWB-62250-NC-RFQ

/ Hiring of 2 Nos vehicles

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2018-05-

11

2018-05-

16

2018-11-

12

IN-WEST BENGAL SW-

38551-NC-RFB / Field

Surveys related with

Benchmark and RL

Surveys

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

03

2018-12-

01

2018-12-

31

IN-WEST BENGAL SW-

38552-NC-RFB /

Bathymetric Survey in

Sundarban Estuaries

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

27

2018-08-

25

2018-09-

24

NHP-2018-2019-APSW-

439382 / Development of

Water Atlas

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2016-10-

06

2016-12-

01

2017-05-

30

NHP-2018-2019-WBSW-

330978-NC-SH-QU /

Geneartion of rating curve

at Jalpaiguri on river

Teesta

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

25

2018-08-

28

2018-10-

27

NHP-2018-2019-WBSW-

747669-NC-SH-QU /

Establishment of State

WRIS and integration with

National WRIS

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

31

2018-10-

15

2019-02-

12

NHP-2018-2019-WBSW-

758134-NC-SH-QU /

Bathymetric Survey in

Sundarban Estuaries

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

01

2018-12-

12

2019-02-

10

NHP-2018-2019-WBSW-

968183-NC-SH-QU /

Bathymetric Survey of

medium reservoirs in

Purulia

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

01

2018-09-

17

2019-01-

15

NHP-2018-2019-APGW-

130792 / Printing of year

book

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

08

2018-11-

03

2019-05-

02

NHP-2018-2019-APGW-

691010 / Digitization of

old reports

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

08

2018-11-

03

2019-05-

02

NHP-2018-2019-GA-798437-

NC-NCB-DE / AMC for 5

yrs for instruments

installed under HP-II

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-09-

10

2018-09-

15

2018-10-

27

2019-01-

09

2019-02-

13

2019-08-

12

NHP-2018-2019-ML-281079-

NC-SH-LM / Geo-

referencing of monitoring

wells

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

10

2018-12-

05

2019-06-

03

NHP-2018-2019-JH-628571-

NC-SH-QU / Time to time

survey of river cross

sections where GDs are

established

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

05

2018-12-

24

2019-02-

07

NHP-2018-2019-JH-522893-

NC-SH-QU / Hiring of

vehicles

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

24

2018-10-

15

2018-11-

16

NHP-2018-2019-JH-772380-

NC-SH-QU / Hiring of

Non-Technical Staff such

as assistants,accountant,

Data Entry Operator,

Program assistant, Multi

Tasking Staff, Field Staff

etc

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

03

2018-11-

26

2018-12-

26

NHP-2018-2019-JH-839564-

NC-SH-QU /

Digitization/Scanning of

reports, documents

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-11-

19

2019-02-

18

NHP-2018-2019-JH-119283-

NC-SH-QU / River Cross

section Surveys

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

03

2018-12-

17

2019-01-

30

NHP-2018-2019-JH-307342-

NC-SH-QU / Hiring of

Technical Expert such as

GIS, RS, IT, MIS,

Procurement, Modeller, geo-

physist, chemist, GW

modeller, Laboratory staff

etc

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

23

2019-02-

18

2019-03-

20

NHP-2018-2019-KASW-

314165-CW-SH-QU /

Bathymetric survey of

reserviors

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

13

2018-11-

08

2019-05-

07

NHP-2018-2019-DVC-

578685 / Sedimentation

survey of 4 nos Reservoirs

of DVC which are

Maithon, Panchet, Tilaiya

& Konar.

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Under

Implement

ation

2018-07-

15

2018-07-

20

2018-08-

31

2018-11-

13

2018-12-

18

2019-12-

18

NHP-2018-2019-RJ-566978

/ River cross section

surveys

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-08-

04

2018-09-

15

2018-11-

28

2019-01-

02

2019-07-

01

NHP-2018-2019-RJ-474314

/ Data digitization

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-07-

30

2018-08-

04

2018-09-

15

2018-11-

28

2019-01-

02

2019-07-

01

Page 34: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 29

IN-DVC-38268-NC-RFQ /

Sedimentation Survey of 4

nos. Reservoirs of DVC

which are at Maithon,

Panchet, Tilaiya & Konar

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-12-

20

2018-02-

14

2019-02-

14

NHP-2018-2019-DVC-

779735-NC-SH-DE / Survey

work related to

development of Inflow

Forecasting system from

D/S of Durgapur Barrage

upto outfall of Damodar

River.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-03-

15

NHP-2018-2019-DVC-

559899-NC-SH-DE / Hiring

of 3 nos. data entry

operator under NHP

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

20

2019-01-

15

2020-01-

15

NHP-2018-2019-DVC-

266749-NC-SH-DE / Pre

monsoon River cross

section survey work at

different hydrological sites

of DVC on river damodar

and barakar.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

05

2018-09-

30

2018-10-

30

NHP-2018-2019-DVC-

308378-NC-SH-DE /

Establishment of Bench

mark and Gauge staff

near the Radar sites

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-02-

13

NHP-2018-2019-DVC-

889370-NC-SH-DE / River

cross section survey of

Lower Damodar

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

20

2018-11-

15

2019-03-

15

NHP-2018-2019-DVC-

574266-CS-QCBS-NAT /

Development of Web

application for Damodar

catchment including

reservoirs.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-02-

06

2019-03-

28

2019-04-

27

NHP-2018-2019-APSW-

952886 / Digitization of

Reports

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

31

2018-11-

05

2018-12-

17

2019-01-

16

2019-02-

20

2019-08-

19

NHP-2018-2019-APSW-

683760 / Updating Level

Area Capacity Tables

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

30

2018-10-

05

2018-11-

16

2018-12-

16

2019-01-

20

2019-07-

19

NHP-2018-2019-APSW-

920867 / River Cross

Section Surveys Using

ADCP equopment

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

01

2018-10-

06

2018-11-

17

2018-12-

17

2019-01-

21

2019-07-

20

NHP-2018-2019-TSSW-

174819 / Digitization of

Data / Scanning of

Reports, Documents

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

18

2019-01-

13

2019-07-

12

NHP-2018-2019-TSSW-

388008 / Digitization of

Spatial Layers

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

23

2019-02-

17

2019-08-

16

NHP-2018-2019-TSSW-

815693 / Digitization of

Historical data

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-12-

16

2019-02-

10

2019-08-

09

NHP-2018-2019-TSSW-

509658 / Development of

videos and other

information

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-02-

27

2019-04-

24

2019-10-

21

NHP-2018-2019-TSSW-

418502 / Production of info

materials and Brochures

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-03-

03

2019-04-

28

2019-10-

25

NHP-2018-2019-TSSW-

595505 / Upgrade existing

database to e-SWIS

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2019-02-

23

2019-04-

20

2019-10-

17

NHP-2018-2019-UPGW-

646305-NC-SH-QU /

Development / Procurement

of Spatial Databases

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

NHP-2018-2019-UPGW-

300500-NC-SH-QU /

UPDATION OF WEBSITE

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

06

2018-12-

01

2019-05-

30

NHP-2018-2019-JH-843692-

NC-NCB-DE / RTDAS

system

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

Two Envelope0.00

Pending

Implement

ation

2018-08-

31

2018-09-

06

2018-10-

23

2019-01-

17

2019-02-

26

2019-03-

28

IN-ANDHRA PRADESH

SW-21933-NC-RFQ /

Digitization / Scanning of

Reports, Documents

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-01-

15

2018-03-

12

2018-09-

08

NHP-2018-2019-KLGW-

180325 / Mapping of GW

quality in the industrial

belt of Ernakulam district

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

21

2018-10-

16

2019-04-

14

NHP-2018-2019-KLGW-

423895 / Digitisation of

Data /Reports/Maps etc

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

25

2018-10-

20

2019-06-

17

NHP-2018-2019-KLGW-

542034 / RL survey

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

06

2018-12-

01

2019-05-

30

IN-KARNATAKA SW-

72864-NC-RFQ /

Digitization of spatial

layers(create maps): job

work

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

17

2019-01-

12

2019-07-

11

IN-KARNATAKA SW-

72862-NC-RFQ /

Digitization/scanning of

reports,documents,existing

maps: job work

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-11-

07

2019-01-

02

2019-07-

01

NHP-2018-2019-UPGW-

269603-NC-NCB-SE /

HIRING OF VEHICLES

FOR PROJECT

IBRD / 87250 PostRequest for

BidsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-07-

06

2018-08-

20

2018-09-

19

2018-10-

04

2018-11-

08

2019-11-

08

NHP-2018-2019-WBSW-

971187-NC-SH-QU /

Generation of rating curves

for river Kangsabati and

river Rupnarayan

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

08

2018-09-

07

2019-09-

07

NHP-2018-2019-WBSW-

137049-NC-SH-QU /

Digitization of historical

data, documents and

reports etc.

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-08-

08

2018-09-

26

2019-03-

25

NHP-2018-2019-NRSC-

539558 / Procurement of

High Resolution ALTM

DEM for flood forecasting

and inundation simulations

for Tapi River Basin

IBRD / 87250 Post Force Account Direct

0.00

Pending

Implement

ation

2018-10-

01

2018-10-

01

2018-10-

01

2018-10-

01

NHP-2018-2019-NRSC-

110495 / Procurement of

archived High Resolution

ALTM DEM for flood

forecasting and inundation

simulations for Godavari

River Basin

IBRD / 87250 Post Force Account Direct

0.00

Pending

Implement

ation

2018-09-

14

2018-09-

14

2018-09-

14

2018-09-

14

NHP-2018-2019-NRSC-

599443 / Procurement of

addtional area High

Resolution ALTM DEM for

flood forecasting and

inundation simulations for

Godavari River Basin

IBRD / 87250 Post Force Account Direct

0.00

Pending

Implement

ation

2018-11-

01

2018-11-

01

2018-11-

01

2018-11-

01

IN-TELENGANA SW-

24399-NC-RFQ /

Digitisation of Data

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-12-

17

2018-02-

11

2018-08-

10

IN-TELENGANA SW-

20164-NC-RFQ /

Digitization of Historical

Data

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00 Canceled

2017-09-

17

2017-11-

12

2018-05-

11

NHP-2018-2019-WBGW-

494325 / Web Hosting for

NHP_WB(GW)

IBRD / 87250 PostRequest for

QuotationsOpen - National

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

06

2018-11-

01

2019-04-

30

IN-KERALA SW-74736-NC-

RFQ / Establishing Bench

Marks in RTDAS sites

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-09-

15

2018-10-

27

2018-11-

26

NHP-2018-2019-MN-

631907-NCS-RQ / Water

quality through outsourcing

IBRD / 87250 PostRequest for

QuotationsLimited

Single Stage -

One Envelope0.00

Pending

Implement

ation

2018-10-

20

2018-12-

15

2019-06-

13

CONSULTING FIRMSActivity Reference

No. / DescriptionLoan /

Credit No.Component Review Type Method

Market

Approach

Contract TypeActual

Amount

(US$)

Process

StatusTerms of Reference

Expression of

Interest Notice

Short List and

Draft Request for

Proposals

Request for

Proposals as

Issued

Opening of

Technical Proposals

/ Minutes

Evaluation of

Technical Proposal

Combined

Evaluation Report

and Draft

Negotiated

Contract

Signed ContractContract

Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

IN-MOWR RD-GR-9255-

CS-QCBS / Consultancy for

Technical Assistance and

Management Consultants

(TAMC).

IBRD / 87250 Prior

Quality And

Cost-Based

Selection

Open -

International

0.00Under

Implementation2017-03-08

2017-03-

08

2017-03-

08

2017-03-

08

2017-03-

08

2017-04-

12

2017-05-

17

2018-05-

17

IN-HIMACHAL PRADESH-

20293-CS-INDV / SCADA

Automation of Tube-wells

(FY:2017-18)

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2017-12-15

2018-01-

05

2018-02-

18

2018-03-

20

2018-04-

24

2018-10-

21

IN-HIMACHAL PRADESH-

20378-CS-INDV / DSS for

Sub River Basin Giri

River, Sal (Chamba) , Gaj

and Banoor Khad

(Kangra)Seer Khad &

Dehra and Developing

Water Storage Capacity of

Seasonal Stream in

Himachal Pradesh

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2017-12-11

2018-01-

01

2018-02-

14

2018-03-

14

2018-04-

13

2018-05-

18

2018-06-

22

2019-06-

22

Page 35: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 30

IN-MEGHALAYA -20423-

CS-CQS / Consultancy

services for design of State

Data Centre

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

15,293.96 Completed 2017-07-132017-08-

03

2017-09-

16

2017-10-

16

2017-11-

20

2018-05-

19

IN-ANDHRA PRADESH

SW-22030-CS-QCBS /

Development of IWRM &

Decision support systems

IBRD / 87250 Prior

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2017-11-30

2017-12-

21

2018-02-

03

2018-03-

03

2018-04-

02

2018-05-

07

2018-06-

11

2019-06-

11

IN-ANDHRA PRADESH

SW-22040-CS-CQS / River

cross section surveys

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2017-11-30

2017-12-

21

2018-02-

03

2018-03-

05

2018-04-

09

2018-10-

06

IN-TELENGANA GW-

23248-CS-QCBS /

Consultancy Services for

Study to delineate basin

wise subsurface geometry

in 3D using existing data

and evaluation of aquifer

characteristics in

Telangana region to

develop comprehensive

ground water Atlas

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-01-18

2018-02-

08

2018-03-

24

2018-04-

21

2018-05-

21

2018-06-

25

2018-07-

30

2021-07-

29

IN-ASSAM -24094-CS-CQS

/ Consultancy service for

State Data Centre

(3.5Lakh is approved in

annual work plan for 2016-

17)

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2017-08-07

2017-08-

21

2017-09-

11

2017-09-

14

2017-09-

20

2019-03-

14

IN-

BIHAR/WRD/FMISC/NHP-

SW/CS-CQS-01 / Planning,

Designing and

Architectural Layout of

Water Knowledge Center,

Bihar at Patna.

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

31,898.73 Signed 2017-11-302017-11-

30

2018-01-

14

2018-02-

13

2018-03-

20

2018-05-

19

IN-MOWR RD-GR-31816-

CS-QCBS / Consultancy

services for hiring

Technical Assistance and

management Consultancy

IBRD / 87250 Prior

Quality And

Cost-Based

Selection

Open -

International

18,521,033.83 Signed 2017-10-122017-10-

12

2017-10-

12

2017-10-

12

2017-10-

12

2017-10-

12

2017-10-

12

2018-10-

12

IN-WEST BENGAL GW-

32653-CS-QCBS / Web

Hosting for NHP_WB(GW)

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2017-10-26

2017-11-

02

2017-11-

14

2017-11-

21

2017-11-

28

2017-12-

12

2017-12-

18

2018-01-

17

IN-MAHARASHTRA SW-

33228-CS-QCBS / NABL

Accreditation of Existing

Water Quality Labs in

State.

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-01-31

2018-02-

21

2018-04-

06

2018-05-

04

2018-06-

03

2018-07-

08

2018-08-

12

2019-08-

12

IN-MAHARASHTRA SW-

33349-CS-QCBS /

Development of Mobile

Application for RTSF &

ROS of Krishna & Bhima

Basin.

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2017-12-25

2018-01-

15

2018-02-

28

2018-03-

28

2018-04-

27

2018-06-

01

2018-07-

06

2019-07-

06

IN-MAHARASHTRA SW-

33356-CS-QCBS /

Comprehensive River Basin

Planning for Water

Management of Entire

Godavari Basin in

Marathwada Region with

compatibility to proposed

IWRM study up to

Jayakwadi Dam.

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-02-26

2018-03-

19

2018-05-

02

2018-05-

30

2018-06-

29

2018-08-

03

2018-09-

07

2019-09-

07

IN-MAHARASHTRA SW-

33358-CS-QCBS / River

Basin planning for Water

management for Godavari

Basin in Vidharbha Region

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-02-26

2018-03-

19

2018-05-

02

2018-05-

30

2018-06-

29

2018-08-

03

2018-09-

07

2019-09-

07

IN-MAHARASHTRA SW-

33360-CS-QCBS / River

Basin planning for Water

management for Krishna

Basin.

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-03-31

2018-04-

21

2018-06-

04

2018-07-

02

2018-08-

01

2018-09-

05

2018-10-

10

2019-10-

10

IN-MAHARASHTRA SW-

33488-CS-QCBS / Up

gradation of existing Web

Portal for RTDAS & ROS.

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-01-01

2018-01-

22

2018-03-

07

2018-04-

04

2018-05-

04

2018-06-

08

2018-07-

13

2019-07-

13

IN-SIKKIM -18688-CS-

CQS / Procurement of

Architectural Consultant

vide PID no:84 of PP 2016-

17, is proposed in CQS

method as advised by

NPMU and WB Officials

at Guwahati Workshop on

5-9th June.

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Under

Implementation2017-08-03

2017-09-

08

2017-09-

22

2017-09-

26

2017-10-

12

2018-02-

09

IN-CWC-NHP-12586-CS-

QCBS / To equip MoWR,

RD&GR, CWC, CGWB and

states with rational water-

related assessment and

planning at basin level,

through the development

and application for 3

basins in India (Godavari

Basin, Krishna Basin and

Mahanadi Basin).

IBRD / 87250 Prior

Quality And

Cost-Based

Selection

Open -

International

0.00 Canceled 2017-12-212017-12-

21

2017-12-

21

2018-01-

18

2018-02-

17

2018-03-

24

2018-04-

28

2019-04-

28

IN-CWC-NHP-40711-CS-

QCBS / Cost Estimate of

IWRM Study of Krishna &

Godavari River Basin for

Package-I(Krishna &

Godawari Basin)

IBRD / 87250 Prior

Quality And

Cost-Based

Selection

Open -

International

0.00Under

Implementation2017-12-21

2017-12-

21

2017-12-

22

2018-01-

19

2018-02-

18

2018-03-

25

2018-04-

29

2019-04-

29

IN-CWC-NHP-40721-CS-

QCBS / Cost Estimate of

IWRM Study of Krishna &

Godavari River Basin for

Package-II(Mahanadi Basin)

IBRD / 87250 Prior

Quality And

Cost-Based

Selection

Open -

International

0.00Under

Implementation2017-12-21

2017-12-

21

2017-12-

22

2018-01-

19

2018-02-

18

2018-03-

25

2018-04-

29

2019-04-

29

IN-DVC-38274-CS-QCBS /

Inflow Forecasting system

and Stream flow

measurement for Damodar

Basin upto outfall of

Damodar River

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00 Canceled 2018-01-152018-02-

05

2018-03-

21

2018-04-

18

2018-05-

18

2018-06-

22

2018-07-

27

2019-07-

27

IN-UTTARAKHAND-53352-

CS-CQS / Consultancy

services for Planning,

Designing and

Architectural layout of

State Water Informatics

Center (SWIC) at Roorkee

under National Hydrology

Project.

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-06-11

2018-06-

12

2018-06-

14

2018-06-

15

2018-06-

17

2019-04-

10

IN-KERALA SW-59043-CS-

CQS / Hiring of

Consultancy Services for

preparation of bankable

report for Rejuvenation of

Meenachil, Periyar,

Bharathapuzha, Kallayi &

Valapattanam Rivers and

Sasthamkotta, Ashtamudi

& Vembanad Lakes

through cleaning and

removal of wastes

IBRD / 87250 Post

Consultant

Qualification

Selection

Open -

International

0.00Pending

Implementation2018-04-13

2018-05-

04

2018-06-

17

2018-07-

17

2018-08-

21

2019-02-

17

IN-MIZORAM -59384-CS-

CQS / Selection of

Consultant for Design &

Supervision of Southern

Divisional Centre.

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-04-16

2018-04-

16

2018-04-

16

2018-04-

16

2018-04-

16

2018-10-

13

IN-ANDHRA PRADESH

GW-59608-CS-CQS /

Consultancy services for

Planning, Designing and

Architectural Layout for

construction of State Data

Center for both Surface

Water & Ground Water

and Water Audit

Department under National

Hydrology Project

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-04-17

2018-05-

08

2018-06-

21

2018-07-

21

2018-08-

25

2019-02-

21

IN-ANDHRA PRADESH

GW-53541-CS-QCBS /

Draft EoI for Consultancy

services for Planning,

Designing and

Architectural Layout for

construction of State Data

Centre for both Surface

Water & Ground Water

and Water Audit

Department under National

Hydrology Project

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00 Canceled 2018-03-262018-04-

16

2018-05-

30

2018-06-

27

2018-07-

27

2018-08-

31

2018-10-

05

2019-10-

05

IN-SOI-21568-CS-QCBS /

Procurement, Contract

Management and Project

Management Specialists

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00 Canceled 2017-11-012017-11-

22

2018-01-

05

2018-02-

02

2018-03-

04

2018-04-

08

2018-05-

13

2019-05-

13

IN-SOI-21539-CS-QCBS /

Consultant for setting up

of H/w infrastructure for

geospatial data production

centres

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00 Canceled 2017-07-242017-07-

24

2017-09-

06

2017-10-

04

2017-11-

03

2017-12-

08

2018-01-

12

2019-01-

12

IN-SOI-23705-CS-QCBS /

MIS assistant at PDO

IBRD / 87250 PostQuality And

Cost-Based

Selection

Open - National

0.00 Canceled 2017-09-012017-09-

22

2017-11-

05

2017-12-

03

2018-01-

02

2018-02-

06

2018-03-

13

2019-03-

13

IN-

BIHAR/WRD/FMISC/NHP-

SW/CS-QCBS-02 /

Development of Sone

Canal Asset Management

System for Irrigation

Management (using Online

Web based Monitoring

system and GIS

Techniques) and as a

Decision Support Tool

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-12-31

2019-01-

21

2019-03-

06

2019-04-

03

2019-05-

03

2019-06-

07

2019-07-

12

2021-01-

12

IN-SOI-23001-CS-QCBS /

Hiring of technical

resources for spatial data

editing and processing and

QA/QC -10m DTM

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00 Canceled 2017-09-012017-09-

22

2017-11-

05

2017-12-

03

2018-01-

02

2018-02-

06

2018-03-

13

2019-03-

13

IN-

BIHAR/WRD/FMISC/NHP-

SW/CS-QCBS-01 /

Development of

Embankment Asset

Management System for

Gandak River basin with

structuring of a Master

module.

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Under

Implementation2018-05-22

2018-06-

12

2018-07-

26

2018-08-

23

2018-09-

22

2018-10-

27

2018-12-

01

2020-03-

01

Page 36: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 31

NHP-2018-2019-MOWR-

547786-NC-NCB-DE /

Engagement of Audit firm

for Internal Audit (for 3

Years duration)

IBRD / 87250 PostLeast Cost

SelectionOpen - National

0.00Pending

Implementation2018-07-25

2018-08-

15

2018-09-

28

2018-10-

26

2018-11-

25

2018-12-

30

2019-02-

03

2019-08-

02

NHP-2018-2019-APSW-

320900 / Development of

Website and Mobile app

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-10-01

2018-10-

22

2018-12-

05

2019-01-

04

2019-02-

08

2019-08-

07

NHP-2018-2019-APGW-

307654 / Design of District

Data Centers at Chittoor

and Eluru

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-09-03

2018-09-

24

2018-11-

07

2018-12-

07

2019-01-

11

2019-07-

10

NHP-2018-2019-GA-682090-

CS-QCBS-NAT / Study of

river/coastal zone

interaction, erosion

problems due to changing

river flows, etc

IBRD / 87250 Prior

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-12-07

2018-12-

28

2019-02-

10

2019-03-

10

2019-04-

09

2019-05-

14

2019-06-

18

2020-06-

17

NHP-2018-2019-TSGW-

954549 / Development of

website, Village GW

estimation software, data

entry & analysis software,

mobile app design, creation

& automation of central

DB

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-09-10

2018-10-

01

2018-11-

14

2018-12-

12

2019-01-

11

2019-02-

15

2019-03-

22

2020-03-

21

NHP-2018-2019-TSGW-

995210 / Comprehensive

Planing for interiors and

Architecture for DDCs,

SDC and Training cum

Information Centres

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-07-23

2018-08-

13

2018-09-

26

2018-10-

26

2018-11-

30

2019-01-

14

NHP-2018-2019-JH-309381

/ Consultancy Services for

Designing, Drawing and

Architectural Layout for

Construction of state data

and training center

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-07-30

2018-08-

06

2018-08-

27

2018-09-

10

2018-10-

08

2018-11-

22

NHP-2018-2019-CWPRS-

555102-CS-FBS-NAT /

Consultancy Services: PDS

for SW GW interaction

IBRD / 87250 PostFixed Budget

SelectionOpen - National

0.00Pending

Implementation2018-08-20

2018-09-

10

2018-10-

24

2018-11-

21

2018-12-

21

2019-01-

25

2019-03-

01

2020-02-

29

NHP-2018-2019-CWPRS-

710523-CS-QCBS-INT /

Consultancy-Setting up

TCCF for Hydro-met-WQ

instruments

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open -

International

0.00Pending

Implementation2019-01-03

2019-01-

24

2019-03-

09

2019-04-

06

2019-05-

06

2019-06-

10

2019-07-

15

2020-07-

14

NHP-2018-2019-SK-962040-

CS-LCS-NAT / Consultancy

services for developing

Website

IBRD / 87250 PostLeast Cost

SelectionOpen - National

0.00Pending

Implementation2018-10-24

2018-10-

26

2018-11-

12

2018-11-

27

2018-11-

29

2018-12-

03

2018-12-

24

2019-03-

24

NHP-2018-2019-RJ-601794-

CS-QCBS-NAT /

Development of mobile

application

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-07-30

2018-08-

20

2018-10-

03

2018-11-

02

2018-12-

07

2019-06-

05

NHP-2018-2019-RJ-796152-

CS-QCBS-NAT / Create on

line e-library

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-08-01

2018-08-

22

2018-10-

05

2018-11-

04

2018-12-

09

2019-06-

07

NHP-2018-2019-RJ-444765-

CS-QCBS-NAT / River

basin management

IBRD / 87250 Prior

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-07-30

2018-08-

20

2018-10-

03

2018-10-

31

2018-11-

30

2019-01-

04

2019-02-

08

2020-02-

08

NHP-2018-2019-RJ-316692

/ Consultancy services for

developing website

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-09-01

2018-09-

22

2018-11-

05

2018-12-

05

2019-01-

09

2019-07-

08

NHP-2018-2019-RJ-289949

/ Study of water

availability, Dynamic land

use land cover pattern and

water quality for Bisalpur

project

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-07-30

2018-08-

20

2018-10-

03

2018-10-

31

2018-11-

30

2019-01-

04

2019-02-

08

2020-02-

08

NHP-2018-2019-RJ-760744

/ Consultancy for design,

architecture etc.

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-08-16

2018-09-

06

2018-10-

20

2018-11-

19

2018-12-

24

2019-06-

22

NHP-2018-2019-MHGW-

296042-CS-LCS-NAT /

Development and

maintenance of hydrology

project web site

IBRD / 87250 PostLeast Cost

SelectionOpen - National

0.00Pending

Implementation2018-12-30

2019-01-

20

2019-03-

05

2019-04-

02

2019-05-

02

2019-06-

06

2019-07-

11

2020-01-

07

NHP-2018-2019-CPCB-

397370 / Development of

Web bases system for data

entry

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-08-16

2018-09-

06

2018-10-

20

2018-11-

17

2018-12-

17

2019-01-

21

2019-02-

25

2020-02-

25

NHP-2018-2019-CPCB-

519933 / Bench marking of

Quality Assurance in

Water Quality labs

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-12-30

2019-01-

20

2019-03-

05

2019-04-

02

2019-05-

02

2019-06-

06

2019-07-

11

2020-07-

10

NHP-2018-2019-CPCB-

748617 / Consultancy for

survey, identification and

preparation of Nationwide

compendium based on

Basin sub basin Inventory

of water Pollution

IBRD / 87250 Prior

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-07-25

2018-08-

15

2018-09-

28

2018-10-

26

2018-11-

25

2018-12-

30

2019-02-

03

2020-02-

03

NHP-2018-2019-TSSW-

277192 / Consultancy

services for hosting website

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2019-01-09

2019-01-

30

2019-03-

15

2019-04-

14

2019-05-

19

2019-11-

15

NHP-2018-2019-RJ-320952-

CS-SSS-SSS /

Establishment of state

chapter WRIS including

integration with India

WRIS

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-07-05

2018-07-

26

2018-09-

08

2018-10-

06

2018-11-

05

2018-12-

10

2019-01-

14

2020-01-

14

NHP-2018-2019-RJ-977784

/ Purpose driven study for

demand based irrigation

and command area

management using remote

sensing and other

innovative technologies

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-07-30

2018-08-

20

2018-10-

03

2018-10-

31

2018-11-

30

2019-01-

04

2019-02-

08

2020-02-

08

IN-ANDHRA PRADESH

SW-21934-CS-LCS /

Consultancy Services for

Hosting Website &

Maintenance

IBRD / 87250 PostLeast Cost

SelectionOpen - National

0.00 Canceled 2017-11-152017-12-

06

2018-01-

19

2018-02-

16

2018-03-

18

2018-04-

22

2018-05-

27

2018-11-

23

NHP-2018-2019-KLGW-

185873-CS-SSS-SSS /

Development of mobile

APPS

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-11-01

2018-11-

22

2019-01-

05

2019-02-

04

2019-03-

11

2019-09-

07

NHP-2018-2019-KLGW-

288382 / Management of

GW pumping for Irrigation

with special reference to

calcified zones in Palakkad

district

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-09-24

2018-10-

15

2018-11-

28

2018-12-

28

2019-02-

01

2019-07-

31

NHP-2018-2019-CWC-

750657 / Physical Based

Mathematical modeling for

sediment rate estimation

and sediment transport in

the river basin

IBRD / 87250 PriorLeast Cost

Selection

Open -

International

0.00Pending

Implementation2018-09-28

2018-10-

19

2018-12-

02

2018-12-

30

2019-01-

29

2019-03-

05

2019-04-

09

2019-10-

06

NHP-2018-2019-CWC-

841056 / Development of

Regional models for water

availability

IBRD / 87250 PostLeast Cost

Selection

Open -

International

0.00Pending

Implementation2018-10-29

2018-11-

19

2019-01-

02

2019-01-

30

2019-03-

01

2019-04-

05

2019-05-

10

2019-11-

06

NHP-2018-2019-CWC-

218376 / Basin wise EHP

Model for medium & long

term forecasting

IBRD / 87250 PriorLeast Cost

Selection

Open -

International

0.00Pending

Implementation2018-08-31

2018-09-

21

2018-11-

04

2018-12-

02

2019-01-

01

2019-02-

05

2019-03-

12

2019-09-

08

NHP-2018-2019-CWC-

266557 / 2D Stream-flow

forecasting system

including inundation

modelling

IBRD / 87250 PriorLeast Cost

Selection

Open -

International

0.00Pending

Implementation2019-09-24

2019-10-

15

2019-11-

28

2019-12-

26

2020-01-

25

2020-02-

29

2020-04-

04

2020-10-

01

NHP-2018-2019-AS-485181

/ Planning & Designing of

State Data Centre,

CONSTRUCTION OF

STATE DATA CENTRE

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2017-10-17

2017-11-

07

2017-12-

21

2018-01-

20

2018-02-

24

2018-08-

23

NHP-2018-2019-AS-638684

/ CREATION OF STATE

CHAPTER WRIS

INCLUDING HARDWARE

AND SOFTWARE SUCH

AS GIS AND IMAGE

PROCESSING SOFTWARE

ETC.

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00Pending

Implementation2018-07-30

2018-08-

20

2018-10-

03

2018-10-

31

2018-11-

30

2019-01-

04

2019-02-

08

2020-02-

08

IN-TELENGANA SW-

25088-CS-CQS /

Development of Videos

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00 Canceled 2018-01-272018-02-

17

2018-04-

02

2018-05-

02

2018-06-

06

2018-12-

03

IN-TELENGANA SW-

24402-CS-CQS / Website

Development & Hosting

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00 Canceled 2017-11-202017-12-

11

2018-01-

24

2018-02-

23

2018-03-

30

2018-09-

26

IN-TELENGANA SW-

24426-CS-QCBS / IWRM

for Godavari & Krishna

Basin by developing River

basin modeling (including

supply of Hardware and

Software), Development of

Data Ware Housing and

Data Mining of

Hydrological data and

Development

IBRD / 87250 Post

Quality And

Cost-Based

Selection

Open - National

0.00 Canceled 2018-01-102018-01-

31

2018-03-

16

2018-04-

13

2018-05-

13

2018-06-

17

2018-07-

22

2019-07-

22

IN-TELENGANA SW-

25078-CS-CQS /

Preparation of Master Plan

of river basins on GIS

Platform( including supply

of Hardware and software)

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00 Canceled 2017-11-162017-12-

07

2018-01-

20

2018-02-

19

2018-03-

26

2018-09-

22

NHP-2018-2019-WBGW-

568037 / Aquifer

Assessment & Budgeting

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-09-01

2018-09-

22

2018-11-

05

2018-12-

05

2019-01-

09

2019-07-

08

NHP-2018-2019-WBGW-

833494 / Public Alert:

Block Level GW

Availability

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-09-01

2018-09-

22

2018-11-

05

2018-12-

05

2019-01-

09

2019-07-

08

Page 37: Appendix to Annex 3 Procurement Plandocuments.worldbank.org/curated/en/151231538126682911/pdf/India-SOUTH-ASIA-P152698...3. The Request for Expression of Interest for consultancy services

Page 32

NHP-2018-2019-WBGW-

752894 / DSS Development

for Integrated GW

Management in Minor

Irrigation

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-09-01

2018-09-

22

2018-11-

05

2018-12-

05

2019-01-

09

2019-07-

08

NHP-2018-2019-WBGW-

250911 / Establishment of

State GW Resources

Information System i.e.

WB_GWRIS

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-09-01

2018-09-

22

2018-11-

05

2018-12-

05

2019-01-

09

2019-07-

08

NHP-2018-2019-WBGW-

161732 / Regional GIS

based Spatial Information

Developement

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2018-09-01

2018-09-

22

2018-11-

05

2018-12-

05

2019-01-

09

2019-07-

08

NHP-2018-2019-TSSW-

290829 / Development of

Mobile Applications

IBRD / 87250 Post

Consultant

Qualification

Selection

Open - National

0.00Pending

Implementation2019-01-22

2019-02-

12

2019-03-

28

2019-04-

27

2019-06-

01

2019-11-

28

INDIVIDUAL CONSULTANTS