aps construction update november · 2015-02-05 · 2 adobe acres elementary school address: 1724...

34
APS Construction Update November 2014

Upload: others

Post on 13-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

APS Construction UpdateNovember 2014

Page 2: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

2

Adobe Acres Elementary School

Address: 1724 Camino Del Valle SW

Year School First Opened: 1964

Project Scope: One renovated and one new building (with a total of 21,963 sq. ft.), that include:

A. New Building with 7 Kindergarten class rooms, 1 Art/Music multipurpose room/space square feet

B. New Artificial Turf Playground and Fenced Kindergarten Tot-lot

C. Renovated/expanded Kitchen/Cafeteria with bathrooms and Storage

Date of Completion:  Feb 2014

Budget: $5 million

Architect: RMKM

Contractor: T.A Cole & Sons

Page 3: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

3

Chaparral Elementary School

Address: 6325 Milne RD NWProject Scope: New Classroom wing, Kitchen 

Cafeteria, & Site/Field and traffic improvements • 21 Classroom wing addition

• 7 Kindergarten classrooms• 1 kindergarten level D Classroom• 1 Special education classroom• 5 Intensive support Classrooms• 1 Occupational / Physical therapy• 5 regular education classrooms• 1 fine arts classroom. 

• Site/traffic improvements • New Play field• New Playground• New Parent & Bus pick up drop off plus roadway 

construction• Kitchen Cafeteria Addition/renovation

• existing cafeteria and kitchen was enlarged• additional storage was added

Budget: $15.9 MillionProject Status: Construction 95% complete; Kitchen 

Cafeteria, field, and infrastructure currently in useEstimated Date of Completion: December 2014  Architect: Cherry / See/ ReamesGeneral Contractor: Shumate Contractors Inc. 

Page 4: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

4

New PreK‐8th Grade School in SW of Albuquerque

Address: 4050 118th Street SW 87121Square Footage: 245,437Project Description: New K‐8 school serving 

1,350 students.Budget: $48.6 millionProject Status: 60% construction completeEstimated Date of Completion: July 2015Architect: Jon Anderson ArchitectsGeneral Contractor: Bradbury Stamm

Page 5: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

5

West Mesa High School

Address: 6701 Fortuna Road NW

Year School First Opened: 1967

Project Scope: Classroom Building “M” Replacement. 2 phases for a total of 28 new classrooms.

• Phase 1 ‐ a three story classroom building with 17 classrooms. 

• Phase 2 ‐ a two story classroom building with 11 classrooms, situated just north of the three story building. 

Project Status: Construction Documents being developed

Estimated Date of Completion (both phases): January 2017

Total Project Cost:  $ 18.8 million

Architects: Mahlman Studio

General Contractor: TBD

Page 6: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

6

Rio Grande High School

Address: 2300 Arenal Rd SW

Year School First Opened: 1959

Project: 9th and 10th grade academies new classroom block; new permanent bus lane; new courtyards and patio, addition of site lighting for security; completion of fire lane loop; new tennis courts; addition of artificial turn for football and baseball fields; landscaping and fencing upgrades

Project Status: Design complete

Groundbreaking: Spring 2015

Est. Date of Completion: Summer 2016

Budget: $25 million 

Architect: Van H. Gilbert Architects

General Contractor: TBD

Page 7: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

7

Ventana Ranch Elementary School

Address: 6801 Ventana Village Rd NW

Year School First Opened: 2004

Project Description: Artificial turf field, landscaping and site work. A great asset to the school and the surrounding community. 

Est. Budget: $580,720

Project Status: Completing design

Groundbreaking: December 2014

Estimated Date of Completion: May 2015

General Contractor: TBD

Page 8: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

8

Marie Hughes Elementary School 

Address: 5701 Mojave NW

Year School First Opened: 1981Project Scope: School replacementPhase I: Demolition Play Areas and New 

Construction of 2 story Classroom Block

Phase 2: Demolish existing old classroom blocks, Portable removal, loop road/bus Drop‐Off/Parking construction and New Field/Playground construction

Status: Under design

Ground breaking: Summer 2015

Est. Date of Completion: July 2016

Budget: $21.9 million 

Architect: G. Don Dudley 

General Contractor: TBD

Page 9: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

9

Highland High School Rebuild

Address: 4700 Coal Avenue SE 87108

Year School First Opened: 1949 

Project: Highland HS new Classroom Block and PAC construction and Gym upgrade

Project Status: Under Design

Est. Groundbreaking: Phase I Summer 2016Est. Date of Completion: Phase I December 2017

Budget: $14,790,014

Architect: SMPC

General Contractor: TBD

Page 10: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

10

Albuquerque High School Commons

Address: 800 Odelia Road NE 87102

Year School First Opened: 1916

Project: Commons/Cafeteria/Classroom Renovation and Addition/ Music Classrooms

Project Status: 95% Construction Documents

Est. Groundbreaking: Summer 2016

Est. Date of Completion: Dec. 2017

Budget: $14,155,777

Architect: Jon Anderson

General Contractor: TBD

Page 11: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

11

Sandia HS Science Classroom Block/Library

Address: 7801 Candelaria NE, Albuq, NM 87110 

Year School First Opened: 1958

Project: Two new buildings (with a total of 75,350 sq. ft.), that include:A. New Science and Math Academy (57,592 

square feet, three stories)B. New Library ‐ 17,758 square feet, two stories‐

the new Library Building includes computer labs, small group study rooms, and a graphic arts production studio. 

C. New Softball Field‐provides a new natural sod field with greatly improved dugouts, practice cages, concessions, and storage facilities.

Project Status: Completed May 2014

Budget: $ 21,106,354

Architect: Mahlman Studio

General Contractor: HB Construction

Page 12: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

12

La Cueva HS ISP/GYM

Address: 7801 Wilshire NE 87122

Year School First Opened: 1986Project Scope:  The project consists of 3 distinct parts:Part I : Addition of an ISP facility to serve special education programsPart II : Addition of a weight roomPart III : Renovation of the existing weight room

Project Status: Design approval

Est. Date of Groundbreaking: Summer 2016

Est. Date of Completion: Fall 2017

Budget: $10,149,891

Architect: RMKM

General Contractor: TBD

Page 13: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

13

Dolores Gonzales ES Classroom Block

Address: 900 Atlantic St SW

Year School First Opened: 1975

Project Scope: 

New 21 Classroom Block  to include and Art/Music and 4 Kindergarten Classrooms

Cafeteria expansion

Restroom remodel

New Playground

Project Status: Under construction

Est. Date of Completion: December  2014

Total Budget: $7.9 million

Architect: Westwork Architects

General Contractor: Shumate Constructors Inc.

Page 14: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

14

The Career Enrichment Center (CEC) and Early College Academy (ECA)

Address: 807 Mountain Road NEAlbuquerque, NM  87102Project Square Footage: 20,230Project Scope:

2 Science Labs 2 Prep areas

EMT lab 1 prep area

2 language Classrooms 2 Multi Purpose Classrooms Food Prep Teaching Space Multi Purpose PE/Functions space Electrical Transformer Flatwork/sidewalks/ADA Recycling/Garbage Receptacle area

Project Status: Under constructionEst. Completion Date: Spring 2016Total Budget: $5.5million

Architect: Lee Gamelsky Architects

General Contractor: TBD

Page 15: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

15

Food Services Central Kitchen and Storage

Address: 800 Louisiana Blvd. NE

Square Footage: 100,000

Project: Renovation of a 100,000 square foot facility into a food processing facility/commercial kitchen/warehouse for APS Food services

Project Status: Under Construction

Est. Date of Completion: December 2014

Budget: $14.2 million

Architect: Studio SW Architects

Contractor: Gerald A. Martin, LTD

Page 16: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

16

eCademy/New Futures Cafeteria/Commons

Address: 5300 Cutler Ave NE 

Year School First Opened: 1915 (old AHS Site) 

Project Scope:

Cafeteria/Commons eCademy & New‐futures

Site development

Infrastructure 

Date of Completion: March 2014

Budget: $3.8 million 

Architect: Gregory Hicks

General Contractor: Anchor Built 

Page 17: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

17

Valley HS Rebuild

Address: 1505 Candelaria NW 87107

Year School First Opened: 1954

Project Scope: The master plan requires building " S " be razed and to construct a new classroom addition consisting of a new Crime, Law, & Protection Classroom building. 

Project Status: 95% construction documents complete

Est. Groundbreaking: Phase I Summer 2016Est. Date of Completion: Phase I Fall 2017

Budget: $7,194,644

Architect: Huitt Zollars

General Contractor: TBD

Page 18: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

18

Manzano HS Rebuild

Address: 12200 Lomas Blvd. NE 87112

Year School First Opened: 1961

Project Scope:  Preliminary Scope is  Physical Education wing Additions and Renovations.

Project Status: 50% Construction Documents

Est. Groundbreaking: Phase I Summer 2015Est. Date of Completion: Phase I Fall 2016

Budget: $14,844,920

Architect: Studio SW

General Contractor: TBD

Page 19: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

19

Mountain View ES Rebuild

Address: 5317 Second St. SW 87105

Year School First Opened: 1952

Project Scope: Demolition and replacement of all buildings on the campus except for mini‐gym and Kindergarten classroom building. New facilities will include 25 classrooms, library, health office, parent center, cafeteria/kitchen, administration area, and related support spaces.

Project Status: 50% Construction Documents

Est. Groundbreaking: Summer 2015Est. Date of Completion: Dec. 2016

Budget: $21,173,547

Architect: Gregory Hicks

General Contractor: TBD

Page 20: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

20

RFK Charter Multipurpose/PE/Gym

Address: 4300 Blake Rd SW

Year School First Opened: 2001

Project Scope: Multi Purpose Facility

Multi media center

Physical educational Gymnasium/Community space combo

Full Auto Body Shop 

Project Status: Under construction

Est. Date of Completion: Jan 2015

Budget: $5.4 million 

Architect: DWL Architects

General Contractor: Anchor Built 

Page 21: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

21

Montezuma TurfAddress: 3100 Indian School NE 87106 

Year School First Opened: 1953

Project Scope: Montezuma Elementary School Community Turf Field consists of approximately 24,000 square feet of an artificial turf field bordered by a concrete walking path, low water use landscaping and trees.  The following components were installed: Artificial turf field; Concrete walking path; Low water use landscaping and trees; Pre‐engineered steel shade structure; Concrete plaza Infrastructure including electrical, parking and landscape; Picnic table; Seating; Trash receptacles and Fencing

Project Status: Complete

Date of Completion: August 2014

Budget: $ 360,000

General Contractor: Westwind Landscape

Page 22: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

22

MacArthur Elementary School

Address: 1100 MacArthur Rd NW

Year School First Opened: 1948

Project Scope: 12,373 Square foot addition/renovation

• Kindergarten Classrooms & Play Lot

• Cafeteria Addition / Kitchen Upgrades

• Improve Site Lighting for Security

• Install Security Fencing

• Site Improvements

Budget: $4,309,277

Project Status: Under construction

Est. Date of Completion: Spring 2015

Architect: Wright & Hammer

General Contractor: Anchorbilt

Page 23: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

23

McKinley Middle School

Address: 4500 Comanche NE

Year School First Opened: 1956

Project Scope:Classroom block AdditionDrainage/Infrastructure

Project Status: Under construction

Est. Date of Completion:  Aug 2015

Budget: $ 6,196,182

Architect: NCA

Contractor: Shumate Constructors

Page 24: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

24

Eldorado High SchoolAddress: 11300 Montgomery Blvd NE

Year School First Opened: 1970‐71

Project Scope:Renovation of:

MathHumanitiesFine Arts

Project Status: Under Construction

Est. Date of Completion: July 2015

Total Budget: $4.4 million 

Architect: Van H. Gilbert Architects

General Contractor: ESA Construction Inc. 

Page 25: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

25

Del Norte High School

Address: 5323 Montgomery Blvd NE 

Year school First Opened: 1964‐65

Project Scope:a) Phase 4 Industrial Fine Arts Building ‐completeb) Phase 5 Cafeteria demolition and roof

Project Status: Cafeteria under Construction

Est. Date of Completion: (phase 5) Fall 2015

Budget: $11.5 million 

Architect: Dekker/ Perich/Sabatini 

General Contractor: T.A Cole & Sons

Page 26: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

26

Reginald Chavez ES

Address: 2700 Mountain Road NW 87104

Year School First Opened: 1955

Project Scope: 25,454 square foot addition

New 10 classroom block and library, including new kindergarten classrooms

Project Status: Under Bid for Construction

Est. Date of Completion: Spring 2016

Budget: $7.4 million

Architect: Cherry/See/Reames

General Contractor: TBD

Page 27: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

27

Collet Park Elementary School

Address: 2100 Morris NE

Year School First Opened: 1961

Project Scope: 19,249 square foot addition/renovation

Kindergarten Classroom block

Administration expansion 

Project Status: Under Construction

Est. Date of Completion: Feb 2016

Budget: $6.2 million 

Architect: Vigil & Associates 

General Contractor: T.A Cole & Sons

Page 28: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

28

Comanche Elementary School

Address: 3505 Pennsylvania NE 87110

Project Square Footage: 13,976 square feet

Project Scope:Kindergarten Addition

5 Kindergarten Classrooms

Administration Renovation

Fine Arts Addition

1 Music/Fine Arts classroom

Relocation & Upgrade of existing utilities

New Fire suppression sprinkler system

Increased site work

Total Project Budget: $6.9 Million

Est. Date of Completion: Summer 2015

Architect: PA Architects

General Contractor: T.A. Cole

Page 29: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

Wherry Elementary School

29

Address: 25000 E Kirtland AFBYear School First Opened: 1952Project Scope: New school construction and renovation Project Status: RFP DesignEst. Date of Completion: Dec 2016Budget: $16.25 million 

Architect: Fanning Bard TatumGeneral Contractor: TBD

Page 30: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

Wilson Middle School

30

Address: 1138 Cardenas Dr SEYear School First Opened: 1953Project Scope: Entire Renovations to the 1953 2‐story  building including the cafeteria, administration, classrooms, kitchen, library, and other incidental spaces

Project Status: Under constructionEst. Date of Completion: March 2015

Budget: $10.6 million 

Architect: Huitt‐ZollarsGeneral Contractor: HB Construction

Page 31: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

31

Projects in Design now for Construction 2015

1. Aztec Complex‐Special Education and Autism Center Preliminary Scope: Major Interior Renovation and Site WorkTotal Project Budget – $ 7,600,000.00

2. Ernie Pyle MSPreliminary Scope: Classroom Addition; Renovation of the 300 wing into an Art Complex; Misc HVAC work throughout the schoolTotal Project Budget: $9,260,004.00

3. Marie Hughes ESPreliminary Scope: Cafeteria/Kitchen/Classroom Addition and some site work. Total Project Budget: $8,475,010.00

4. Mountain View ESPreliminary Scope: Replace Older BuildingsTotal Project Budget: $21,173,547

Page 32: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

32

Projects in Design now for Construction 2015

11. Jefferson MSPreliminary Scope: Music Classroom Addition and RenovationTotal Project Budget: $2,218,695.00

12. Madison MSPreliminary Scope: Gymnasium/locker room RenovationTotal Project Budget: $1,521,445.00

13. Manzano High SchoolPreliminary Scope: Physical Education wing Additions and Renovations.Total Project Budget: $9,699,645.00

14. Jackson Middle SchoolSpecialized Lab Addition & Old Wing Replacement and RenovationTotal Project Budget: $12,335,939

Page 33: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

33

Projects in Design now for Construction 20155. Reginald Chavez ES

Preliminary Scope: Kinder Addition and Replacement of Classroom BuildingsTotal Project Budget – $7,415,261.00

6. Rio Grande High SchoolPreliminary Scope: Restructuring of the campus and the construction of 9th and 10th grade academies.Total Project Budget: $25,255,234.00

7. Valley High SchoolPreliminary Scope: Raze Building “S” and Construct new classroom in its place.Total Project Budget: $6,620,487.00

8. West Mesa High School Preliminary Scope: Replace Classroom Wing “M”Total Project Budget: $ 18,782,829.00

9. Atrisco ESPreliminary Scope: Re‐roofing and Classroom Replacement

Total Project Budget: $9,854,543.00

Page 34: APS Construction Update November · 2015-02-05 · 2 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and

34

Projects in Design now for Construction 2016

10.  Early Childhood Facility PrototypePreliminary Scope: To design and construct an early childhood facility that will combine pre‐k education and day care services. To be replicated on up to ten sites over the next 4 years. This is the first one.Total Project Budget – $4,563,750

11.  Montgomery Complex Training and Meeting Facility: Preliminary Scope: District training facility for teachers, staff with appropriate IT labs and meeting spaces for up to 500.Total Project Budget – $ 10,088,572