aquanova leo plus user guide & operation instructions
DESCRIPTION
Abacus Healthcare Services Ltd, Unit 1 Millennium Way, High Carr Business Park, Newcastle-under-Lyme, ST5 7XE Tel: 01782 569330 Fax: 01782 569349 Sales: 0800 454810 www.abacushealthcare.co.uk [email protected]TRANSCRIPT
Aquanova Leo PlusProduct Care & User Operating Instructions
Abacus Healthcare Services Ltd, Unit 1 Millennium Way, High Carr Business Park, Newcastle-under-Lyme, ST5 7XETel: 01782 569330 Fax: 01782 569349 Sales: 0800 454810 www.abacushealthcare.co.uk e-mail: [email protected]
Minimum rim height 580mmLift range (combined) 400mmFill volume 220 LitresTime to fill 4.0 min at 2 bar pressureTotal weight (including 80kg patient) 280kgElectric/hydraulic motor 300 WattElectrical 24 Volt DC battery/transformerMinimum dimensions (w_h_l) 750_580_1700mmMaximum dimensions (w_h_l) 750_1280_1700mmInternal dimensions (rim) (w_d_l) 550_400_1500mmInternal dimensions (base) (w_d_l) 520_400_1480mmSafe working load (bath) 150kg
Technical Product Specification
Dimensions
1700mm 750mm
580mm 400mm
1700mm 750mm
980mm
550mm
1500mm
600mm
2
Fig. 1
AAbbaaccuuss HHeeaalltthhccaarree SSeerrvviiccee LLiimmiitteedd
COMMISSIONING CERTIFICATE
This is to confirm that the
Aquanova Leo Bath
Serial No: __________
at
______________________________________________________________________________
____________
has been commissioned on the __/__/____
the Guarantee expires on the __/__/____
Signed by: _____________________
Date: ________________________
Abacus Healthcare Services Ltd, Unit 1, Millennium Way, High Carr Business ParkNewcastle under Lyme, Staffordshire, ST5 7XE
Tel: 0870 770 8693 Fax: 0870 770 8698
email: [email protected]
3
Warranty
Our bath products are guaranteed for a period of twelve months from the date of commissioning.
All parts are covered against defects that may arise as the result of faulty materials, inferior workmanshipor construction.
The baths are not covered for any problems that may arise from the installation or site planning unlesscarried out by engineers from Abacus Healthcare Services Ltd.
Any consequence arising from unskilled or incorrect handling of the product is not covered by thisguarantee.
The following items, when supplied by Abacus Healthcare Services Ltd are guaranteed for a periodof twelve months from the date of supply for the parts only (labour costs are not covered).
• Taps and mixers
• Shower hoses, shower heads and shower brackets.
• Flexible pipes including waste outlet, hot and cold supply.
Hot and cold taps and mixer taps are proprietary fittings and as such carry a standard manufacturer’swarranty.
Note: Thermostatic mixing valves must be adjusted for the appropriate discharge temperature bythe installer. These require regular maintenance for which Abacus engineers are available.
• Electrical
All electrical components fitted to Aquanova baths are CE marked to comply with current EuropeanStandards.
Electrical items must not be replaced with alternative components without the authorisation of AbacusHealthcare Services Ltd.
Failure to obtain such authorisation will exempt the Company from any liability to action for further failure.
4
Safety Instructions
Always ensure the equipment is operated by trained staff.
Regularly clean the bath using non-abrasive cleaners.
Always ensure the mains electricity is switched on.
Always have the equipment serviced regularly (see Service Level Agreement).
Always keep users hands away from moving parts.
Always ensure the shower head is returned to it’s holder when not in use.
Never use the bath for any purpose other than that it has been designed.
Never leave the bath with the platform in a raised position.
Never allow other equipment such as hoists to contact the bath forcibly as this may cause damage.
Never allow items such as the shower head to remain beneath platform when raising the bath.
Whirlpool use and safety
Ensure you have a minimum of 50mm of water above the highest jet before switching on your whirlpool.
Check, especially after the children have used the bath, that they have not pushed small toys or otherobjects into the jets or suction fitting.
Check regularly that all debris is cleared from around the suction fitting.
Switch off your whirlpool at the RCCB after use.
Ensure that adequate access is left for maintenance and servicing.
Do not switch on your whirlpool without any water in the bath since this will damage the whirlpool pump.
Do not use large amounts of standard bubble bath in the water since this will fill the room with soapbubbles.
Do not run unmixed hot water directly on to the suction fitting.
Do not let anything cover the suction fitting during use, especially you.
Do not try to put your finger in a jet whilst the whirlpool is working.
Do not leave children unattended in the bath with the whirlpool system switched on.
Do not wash your hair in a bath fitted with a whirlpool system when the system is working.
Do not wash animals in a bath fitted with a whirlpool system.
Do not modify your whirlpool in any way. This would result in the guarantee becoming invalid and couldresult in the system becoming dangerous.
Maintenance
After each use: Dissolve a sterilising tablet into the bath water prior to sending the water to waste.Clean the bath and fittings using a soft cloth and non abrasive cleaner with anti-bacterial agent.
Monthly: Whirlpool sanitisation using Abacus Healthcare approved cleaner.
Annually: Servicing by an approved company in accordance with the manufacturer’s instructions.
5
Operating Instructions
1. To close the pop up waste rotate the chrome turn handle clockwise until the wasteplug locates in the outlet (fig. 2).
2. Fill the bath with water to your required level.The platform may be tilted to observe the depthof water (fig. 3).
3. Check the temperature of the water.
4. Lower the bath rim to the level of the platform(fig. 4).There is an option to set the bath on installationto be used with a portable hoist in addition tothe ambulant, ceiling track hoist and wheel chairtransfer.
A: Ambulant
B: Ceiling Track Hoist
C: Mobile/Portable Hoist
D: Wheelchair
6
Fig. 2
Fig. 4
Fig. 3
A
B
C
D
Fig. 5
Operating Instructions (continued) Using Built-in Hoist
7
Fig. 8
Fig. 7
Fig. 6
Fig. 9
5. Allow/assist the bather to transfer into the sling.
6. Raise the sling by pressing and holding the
icon on the membrane pad on the bath
rim.
7. When the sling is higher than the bath rim, turn
the sling onto the line of the bath (you will need to
raise the bather’s legs to clear the bath rim (fig.6).
8. Lower the sling to the level of the platform bypressing and holding the icon.
9. Raise the bath full of water, to the appropriate
height by pressing and holding the icon
on the membrane pad on the bath rim (fig. 7)
10. When bathing is completed, lower the bath full
of water by pressing and holding the icon
on the membrane pad on the bath rim (fig. 8)
11. Raise the sling to the full height by pressingand holding the icon.
12. When the sling is higher than the bath rim,turn the sling to one of the positions outside thebath. 90° or 180° to the centreline of the bath.
13. Lower the sling to the required height totransfer the bather by pressing and holding the
icon on the membrane pad on the bath
rim (fig.9)
14. Assist to towel dry/dress the bather.
15. Empty the bath using the pop up waste turning handle.
16. Make the bath ready for the next bather (clean, disinfect etc).
Operating Instructions (continued) Platform Only
8
Fig. 11
Fig. 10
5b. Allow/assist the bather to transfer onto theplatform (a bed transfer for an ambulant bather)(fig. 5).
6b. Raise the bath, full of water, around the platform and bather by pressing and holding the
icon (fig. 10).
7b. When bathing is completed lower the bath
full of water to below the level of the platform by
pressing and holding the icon on the
membrane pad on the bath rim (fig. 11).
The platform may be used for drying/dressing
prior to transfer (or at anytime).
8b. Assist to towel dry/dress the bather.
9b. Allow/assist the bather to transfer off the platform (see transfers - fig. 5).
10b. Empty the bath using the pop up waste turning handle.
11b. Make the bath ready for the next bather (clean, disinfect etc).
Locking Devices
Platform Locking Device
1. The platform locking device is designed toconnect the platform to one stainless steelplatform support post during bathing. It willprevent the platform pivoting when the bath (if full of water) is raised.
2. Identify where the support post with ahorizontal groove is situated (fig. 12).
3. Place the locking device between the end ofthe bath and the support post you haveidentified.
4. Holding the locking device with the crankedend upwards (fig. 13), slide the device along theplatform with the length of the device below theplatform (fig.14).
5. Continue to slide the locking device along theplatform until it engages with the groove on thesupport post (fig. 14).
6. Check the platform is locked and will not raisewhen the bath rises.
NOTE: Do not raise the platform to attach thelocking device.
Bath Locking Device
1. All Aquanova baths with a Membrane Keypadhave a lock sequence to prevent unauthoriseduse.
2. To lock the bath, press the two locking keyssimultaneously (fig. 15).
3. Check the lock sequence is set by trying tooperate the bath.
4. To unlock the bath, press the two locking keysagain simultaneously.
5. Check that the bath is operating.
9
Locking Keys
Fig. 12
Fig. 13
Fig. 14
Fig. 15
Horizontal Groove
Platform Support Post
Locking Device
Bath Platform
10
Service Level Agreement
As the manufacturer of your bath we are able to offer a unique range of services, which, due to themodular construction of the bath will extend the working life of the bath and provide a cost effectivesolution to protect your investment by offering the prospect of upgrading your bath to the latestspecification.
Abacus Service Plans
There are three foundation plans, which can be added to or modified to personalise service cover to meetthe needs of the individual customer. They are based on an evergreen contract, which will be renewedautomatically so that cover is always in place.
Minimum Cover
Recommended: Where the usage is relatively low and bathing facilities whilst important are not critical ona daily basis.
Comprises:
• Includes one full service visit each year
• Cover available Mon – Fri, 09:00 to 17:00
• All labour costs for the pre-planned service
• All consumable costs for service
• All travel to and from site
• 10% discount on list price of Engineer Call out, Labour & Parts
• Supplying Certificate of Maintenance
• Supply of LOLER Certificate where type requires this test
• Priority response
Does not include:
• Emergency call out response time
• Non consumable parts
• Time limited repair
• Agreed contract KPI’s
• Out of hours contact numbers
Standard Cover
Recommended: Where the bath has regular usage of up to 4 times daily. Although it may not be the onlybathing facility its loss could compromise client or patient care.
• Includes two full service visits each year
• All labour costs for the pre-planned services
• All consumable costs for both services
• Unlimited breakdown cover for labour
• Unlimited breakdown cover for parts (includes 1 off like for like tap replacement)
• Engineer call out
• All travel to and from site
• Supplying Certificate of Maintenance
• Supply of LOLER Certificate where type requires this test
• Priority response given to contract customers over non- contract customers
• Guaranteed call out response within 5 working days
• Guaranteed fix within 10 days
• Option of 4 year contract with a new bath includes 1 new shell
• Option of 4 year contract with a new bath includes 2 replacement like for like tap units
• Option of 4 year contract with a new bath includes up to 4 off replacement panels even for damage caused by misuse and/or accident
Comprehensive Cover
Recommended: Where the bath has regular usage of over 4 times daily. It may be the only bathing facilityand its loss could compromise significantly client or patient care. In this situation where the bath must beavailable at all times comprehensive cover brings peace of mind as well as extending the life of the bath.
Service as for Standard Cover plus:
• On request refresher training for staff twice per annum
• Service call out available Mon – Fri, 08:00 to 18:00
• Guaranteed emergency call out response within 16 working hours
• Guaranteed supply and repair fix within 5 working days
• Failure to meet agreed call out KPI refunds the equivalent of one weeks service plan
• Failure to meet agreed repair fix KPI refunds 5% of contract price up to 50% of total service plan price.
• Option of emergency call out service available 0800 to 220011
58
5960
61
62
59
6059
63
59
60
68
69
68
67
67
66
66
61
62
61
64
64
Key No. Part No. Description58 ZAQ303 Ram - 180 Degree RH 3 pos Scorpio Plus58A ZAQ304 Ram - 180 Degree LH 3 pos Scorpio Plus58B ZAQ361 Ram - 180 Degree RH 3 position Scorpio 58C ZAQ362 Ram - 180 Degree LH 3 position Scorpio 58D ZAQ672 Ram 360° non locking LH (Leo/Leo Plus)58E ZAQ673 Ram 360° non locking RH (Leo & Leo Plus)59 ZAQ328 Washer - Hydraulic Dowty 3/8 BSP60 ZAQ324 Adaptor - 1/4 x 3/8 Male/Male61 ZAQ326 Elbow - 1/4 x 1/4 BSP Swivel Nut62 ZAQ332 Hose - 800mm Hydraulic63 ZAQ330 Filter - Hydraulic For Ram64 ZAQ331 Hose - 400mm Hydraulic66 ZAQ325 Adaptor - 1/4 x 1/4 BSP Male/Female67 ZAQ323 Adaptor - 1/4 x 1/4 BSP Male/Male68 ZAQ329 Washer - 1/4 In. BSP Dowty69 ZAQ307 Pump Assembly 200 Watt - Seat
Ram and Pump Assembly 1
12
58
5960
61
62
59
605971
59
60
6868
69
68
70
6767
66
66
66
61 61
62
65
65
61
64
64
Ram and Pump Assembly 2
Key No. Part No. Description58 ZAQ303 Ram - 180 Degree RH 3 pos Scorpio Plus58A ZAQ304 Ram - 180 Degree LH 3 pos Scorpio Plus58B ZAQ361 Ram - 180 Degree RH 3 position Scorpio 58C ZAQ362 Ram - 180 Degree LH 3 position Scorpio 58D ZAQ672 Ram 360° non locking LH (Leo/Leo Plus)58E ZAQ673 Ram 360° non locking RH (Leo & Leo Plus)59 ZAQ328 Washer - Hydraulic Dowty 3/8 BSP60 ZAQ324 Adaptor - 1/4 x 3/8 Male/Male61 ZAQ326 Elbow - 1/4 x 1/4 BSP Swivel Nut62 ZAQ332 Hose - 800mm Hydraulic63 ZAQ330 Filter - Hydraulic For Ram64 ZAQ331 Hose - 400mm Hydraulic65 ZAQ331 Hose - 400mm Hydraulic66 ZAQ325 Adaptor - 1/4 x 1/4 BSP Male/Female67 ZAQ323 Adaptor - 1/4 x 1/4 BSP Male/Male68 ZAQ329 Washer - 1/4 In. BSP Dowty69 ZAQ307 Pump Assembly 200 Watt - Seat70 ZAQ702 Pressure Relief Unit71 ZAQ327 Swivel ‘T’ 1/4 BSP Female/Female
13
14
58F
5960
61
62
59
605971
59
60
6868
69
68
70
6767
66
66
66
61 61
62
65
65
61
64
64
Key No. Part No. Description58F ZAQ787 Ram - 180 Degree 3 position Universal59 ZAQ328 Washer - Hydraulic Dowty 3/8 BSP60 ZAQ324 Adaptor - 1/4 x 3/8 Male/Male61 ZAQ326 Elbow - 1/4 x 1/4 BSP Swivel Nut62 ZAQ332 Hose - 800mm Hydraulic63 ZAQ330 Filter - Hydraulic For Ram64 ZAQ331 Hose - 400mm Hydraulic65 ZAQ331 Hose - 400mm Hydraulic66 ZAQ325 Adaptor - 1/4 x 1/4 BSP Male/Female67 ZAQ323 Adaptor - 1/4 x 1/4 BSP Male/Male68 ZAQ329 Washer - 1/4 In. BSP Dowty69 ZAQ307 Pump Assembly 200 Watt - Seat70 ZAQ702 Pressure Relief Unit71 ZAQ327 Swivel ‘T’ 1/4 BSP Female/Female
Ram and Pump Assembly 3
15
Fault FindingS
ympt
om
The
bath
will
noto
pera
te
The
cont
rolb
utto
nsdo
notw
ork
The
seat
isst
uck
atth
eto
p
The
reis
aw
ater
leak
The
reis
ahy
drau
licoi
llea
k
Wat
erte
mpe
ratu
reva
riabl
e
*Tel
eph
on
e08
7077
086
93-
Ser
vice
Dep
artm
ent
The
bath
shel
lwill
notg
odo
wn
The
supp
lyto
the
batte
rych
arge
rha
sbe
enin
terr
upte
dC
heck
that
the
batte
rych
arge
rha
sno
tbee
nsw
itche
dof
f
Che
ckth
atth
eba
ttery
char
ger
has
notb
een
switc
hed
off
Che
ckth
atth
eba
ttery
char
ger
has
notb
een
switc
hed
off
Fol
low
proc
edur
efo
rch
ecki
ngth
eke
ypad
oper
atio
nab
ove
Fol
low
proc
edur
efo
rch
ecki
ngth
eke
ypad
oper
atio
nab
ove
Fol
low
proc
edur
efo
rch
ecki
ngth
eke
ypad
oper
atio
nab
ove
Fol
low
proc
edur
efo
rch
ecki
ngth
eke
ypad
oper
atio
nab
ove
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Che
ckw
ater
tem
pera
ture
byus
ing
ath
erm
omet
er
Che
ckth
esu
pply
flow
and
wat
erte
mpe
ratu
reus
ing
ath
erm
omet
er
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Insp
ectt
heba
thsh
ellf
orda
mag
e-
ifth
eba
thha
sa
show
eran
dpl
atfo
rmlo
okfo
rsi
gns
oftr
appi
ng
Che
ckth
eor
igin
ofth
ew
ater
and
posi
tion
rela
tive
toth
eba
th
Che
ckth
esh
ower
dive
rtor
onth
eta
pan
dth
eco
nnec
tions
ofth
esh
ower
hose
/sho
wer
head
Con
tact
Aba
cus
Hea
lthca
reS
ervi
ces
Ltd*
Che
ckth
atth
eba
ttery
char
ger
has
notb
een
switc
hed
off
Che
ckth
atth
eke
ypad
has
notb
een
lock
edby
pres
sing
the
two
lock
ing
keys
sim
ulta
neou
sly
toun
lock
the
bath
-se
e
Pag
e5,
Fig
4.Tr
yto
rais
eth
eba
thag
ain
bypr
essi
ngth
eba
thra
isin
gic
on-
see
Pag
e7,
Poi
nt6
Fig
9.If
this
fails
repe
atth
ispr
oced
ure
once
mor
e.
The
batte
rych
arge
rha
sfa
iled
The
batte
ries
have
lost
thei
rch
arge
orha
vefa
iled
The
cont
rolb
oxha
sfa
iled
Par
toft
helif
ting
mec
hani
smha
sfa
iled
The
reis
abr
oken
elec
tric
alco
nnec
tion
inth
esy
stem
The
reis
abr
oken
mec
hani
calc
ompo
nent
inth
esy
stem
The
keyp
ad/a
irsw
itch/
pend
antc
ontr
olha
sfa
iled
The
keyp
ad/a
irsw
itch/
pend
antc
ontr
olha
sfa
iled
The
ram
/pum
pset
has
faile
d(s
eals
/loss
ofhy
drau
licflu
id)
The
pum
pm
otor
has
faile
d(b
urne
dou
t/con
tam
inat
ed
with
oil)
The
wat
ersu
pply
toth
eba
thha
sfa
iled
(dam
aged
brok
enpi
peor
conn
ectio
n)
Att
hesh
ower
this
may
beth
edi
vert
oror
conn
ectio
ns
hose
/han
dset
The
reis
ada
mag
ed/b
roke
npi
peor
conn
ectio
nin
the
hydr
aulic
syst
em
The
tem
pera
ture
cont
rolh
asfa
iled
(req
uire
dad
just
ing
/cle
anin
g/re
plac
ing)
The
keyp
ad/a
irsw
itch/
pend
antc
ontr
olha
sfa
iled
The
bath
shel
lmay
have
beco
me
deta
ched
from
the
uppe
rfr
ame
The
bath
isfit
ted
with
sing
leac
ting
scis
sor
liftr
ams
The
oils
eals
onth
ese
atra
mha
vebe
com
eda
mag
ed
The
reis
dam
age
onth
esc
isso
rlif
tram
s
The
hot/c
old
supp
lyha
sbe
enin
terr
upte
d
The
bath
shel
lis
dam
aged
The
liftin
gm
echa
nism
may
have
over
ridde
nth
elim
it
switc
hes
Pos
sibl
eC
ause
Fau
ltF
indi
ngP
roce
dure
Aries 1700 Aries 1800 Pisces
Gemini Leo Leo Plus
Scorpio Scorpio Plus Scorpio Fixed Height
Diana Ceiling Hoist Portable Hoist
Wash Hand BasinBalena Changing Bench
Abacus Healthcare Services Ltd, Unit 1 Millennium Way, High Carr Business Park, Newcastle-under-Lyme, ST5 7XETel: 01782 569330 Fax: 01782 569349 Sales: 0800 454810 www.abacushealthcare.co.uk e-mail: [email protected]
SBAQ09 Issue 05 - 28.03.11