architects project details - hiiraan · 2020-05-12 · geconsult client: project title: content :...
TRANSCRIPT
GSPublisherVersion 0.0.100.100
ARCHITECTS PROJECT DETAILSContent :Client: Project title:GeConsult
Office No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: Grant No.:
KIS062LUUQ YOUTH CENTREJUBALANDSTATE OFSOMALIA
ARCHITECTURALDRAWINGS
IOM/SSI
GSPublisherVersion 0.0.100.100
ARCHITECTS PROJECT DETAILSContent :Client: Project title:GeConsult
Office No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: Grant No.:
KIS062LUUQ YOUTH CENTREJUBALANDSTATE OFSOMALIA
ARCHITECTURALDRAWINGS
IOM/SSI
REHABILITATION OF LUUQ YOUTH CENTREGRANT NO.: - KIS062
SHEET NO. CONTENTSCOVER SHEET
INDEX SHEET
GPS COORDINATES
SITE PLAN
SET OUT PLAN
OFFICE BLOCK PLANS
OFFICE BLOCK ELEVATIONS
OFFICE BLOCK ELECTRICALS
OFFICE BLOCK MECHANICAL
OFFICE BLOCK ANALYSIS SHEETS
HALL FLOOR PLAN, ROOF PLAN & SECTION
HALL ELEVATIONS
HALL ELECTRICALS
SEPTIC TANK
BOUNDARY WALL DETAILS
3 DIMENSIONAL PROJECTIONS
01
03
02
04
05
06
07
08 -13
14
15
16
17
18
3D-01 to 3D-05
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
3.79361N, 42.54477E
INDEX SHEET
-- --
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
Prop
osed
Sep
ticTa
nkLo
catio
n
Com
pact
ed w
alkw
ays &
Pa
rkin
g MA
IN E
NTR
Y
OFF
ICES
& T
OIL
ETS
HA
LL
SITE PLAN
01 1:125
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
4,000
4,000
4,000
1,300
3,506
4,000
4,000
4,000
29,00
0
12,25
01,0
0030
03,2
0012
,250
29,00
0
4,000
4,000
4,000
4,800
4,000
4,000
4,000
37,000
37,000
4,0004,0004,0004,00070015,2009004,000
4,0001,68016,0003,1204,0004,0004,000
1,940
7,650
15,020 5,580
12,600
21,00
0
Prop
osed
Sep
ticTa
nkLo
catio
n
Com
pact
ed w
alkw
ays &
Pa
rkin
g MA
IN E
NTR
Y
OFF
ICES
& T
OIL
ETS
HA
LL
SET OUT PLAN
02 1:125
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
A B C D E
1
2
3
4
5
6
7
8
3,500
450
2,220
900
3,110
700
1,620
700
600
1,700
950
600
950
4,000
3,775
450
4,850
2,700
2,300
3,601
1,299
2,850
22,00
0
2,230 900 1,770 965 1,600345
1,200345
1,600 795 1,780 900 2,220 4,500
4,900 6,400 4,900 4,500
21,150
4,900 6,400 4,900 4,500
21,150
3,775
450
4,900
2,700
2,250
3,601
1,299
2,850
22,00
0
3,950
2,220
900
4,030
900
4,030
900
2,220
2,850
4,9501,7809002,220395
1,0001,2009001,0601,000395
2,2269002,223
3,000250
1,200
1,450250
2,750
Corridor
Corridor
CorridorRoom 3
Room 1 Room 2
Room 2
Room 2
Toilet
Toilet
Store
Ceramic tiles f.f.300mm x 300mm
open arch on top
Ceramic tiles f.f.300mm x 300mm
Ceramic tiles f.f.300mm x 300mm Ceramic tiles f.f.
300mm x 300mm
Ceramic tiles f.f.300mm x 300mm
Ceramic tiles f.f.300mm x 300mm
Ceramic tiles f.f.300mm x 300mm
Ceramic tiles f.f.300mm x 300mm
Ceramic tiles f.f.300mm x 300mm
Ceramic tiles f.f.300mm x 300mm
Ceramic tiles f.f.300mm x 300mm
PorchCeramic tiles f.f.300mm x 300mm
E-01
E-02
E-03
E-04
OFFICE BLOCK FLOOR PLAN
03 1:120
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
A B C D E
8 7 6 5 4 3 2 1
1 2 3 4 5 6 7 8
E D C B A
4,899 6,400 4,900 4,500
4504,850 2,700 2,300 3,601 1,299 2,850
4,500 4,900 6,400 4,899
450
3,600
450
3,600
450
3,600
450
3,600
200mm thick R.C. Slab roof
New 900mm (W) X 2300mm(H) steel casement windowsto fabricators details
New 1600mm (W) X 2300mm(H) steel casement windows tofabricators details
New 1600mm (W) X2400mm (H) steel doubledoor to fabricators details
200mm thick R.C. Slab roof
New 900mm (W) X 2300mm(H) steel casement windows tofabricators details
450mm thick masonry walls,plastered and painted to approval
200mm thick R.C. Slab roof
New 900mm (W) X2300mm (H) steelcasement windows tofabricators details
New 900mm (W) X 2400mm (H) steelswing door to fabricators details
Floor Level
Roof Level
G.L+450
+4,050
Floor Level
Roof Level
G.L+450
+4,050
Floor Level
Roof Level
G.L+450
+4,050
Floor Level
Roof Level
G.L+450
+4,050
ELEVATION E-01
ELEVATION E-02
ELEVATION E-03
ELEVATION E-04
OFFICE BLOCK ELEVATIONS
04 1:120
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
3,000250
1,200
2502,750
3,000250
1,200
2502,750
Corridor
Corridor
CorridorRoom 3
Room 1 Room 2
Room 2
Room 2
Toilet
Toilet
Store
open arch on top
Porch
Corridor
Corridor
CorridorRoom 3
Room 1 Room 2
Room 2
Room 2
Toilet
Toilet
Store
open arch on top
Porch
OFFICE BLOCK LIGHTING LAYOUT OFFICE BLOCK POWER LAYOUT
LEGEND1 gang 1 way switch
4 gang 1 way switch
Twin Socket with switch
4 way conumer unit
Lighting mains
Lighting circuits
Power circuits
OFFICE BLOCK ELECTRICALS
06 1:120
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
Ball Valve
Gate Valve
Ball Valve
Gate Valve
Corridor
Corridor
CorridorRoom 3
Room 1 Room 2
Room 2
Room 2
Toilet
Toilet
Store
open arch on top
Porch
Corridor
Corridor
CorridorRoom 3
Room 1 Room 2
Room 2
Room 2
Toilet
Toilet
Store
open arch on top
Porch
750mm x 650mmMANHOLE
750mm x 650mmMANHOLE
750mm x 650mmMANHOLE
INSPECTIONCHAMBER
INSPECTIONCHAMBER
32mm Ø pvc piping
OFFICE BLOCK PLUMBING LAYOUT OFFICE BLOCK DRAINAGE LAYOUT
Ball Valve
Gate Valve
Ball Valve
Gate Valve
OFFICE BLOCK MECHANICALS
07 1:120
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
R.C. SLAB ROOF
Cut off the tree branches extending ontothe R.C. slab roof of the building.
Clear all accumulated leafs and othermaterial from the roof, scrub all loosematerial until clean.
Fill chipped off areas with approvedConcrete mix to structural engineersapproval.
Hack and remove all eroded plaster,Providing 25mm thick protective cementand sand screed, laid to fall towardsdrains.
OFFICE BLOCK ANALYSIS SHEET 01
08 --
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
R.C. SLAB ROOF
Cut off the tree branches extending ontothe R.C. slab roof of the building.
Clear all accumulated leafs and othermaterial from the roof, scrub all loosematerial until clean.
Fill chipped off areas with approvedConcrete mix to structural engineersapproval.
Hack and remove all eroded plaster,provide 15mm thick cement plasterand approved waterprofing tominimize deteroriation.
OFFICE BLOCK ANALYSIS SHEET 02
09 --
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
INTERNAL WALLS
The following is the scope of works to becarried out on walls:
Hacking and removing all erodedplaster, provide 15mm thick cementplaster for external and 12mm thickcement plaster for internal, after thatpainting to approval.
The plinth at the base of the building tobe cleaned, filled with approvedcement, plastered and painted toapproval
OFFICE BLOCK ANALYSIS SHEET 03
10 --
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
TOILETS
Hack and remove all eroded plaster, clean and scrub offdebri and fix 150mm x 150mm wall tile up to 1800mm heightfrom floor finish.
Install 300mm x 300mmm ceramic tiles on the floor.
Provide and fix all sanitary wares as indicated on drawings
OFFICE BLOCK ANALYSIS SHEET 04
11 --
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
FLOORING
Hack existing floor finish off.
Clean and clear debri on the floor readyfor floor tiles installation
Fix 300mm x 300mm ceramic floor tiles onthe floor.
OFFICE BLOCK ANALYSIS SHEET 05
12 --
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
DOORS & WINDOWS
Demolish and remove all existing doors and windows while maintainingthe size of the opening. Where the opening edges have chipped off orare eroded, fix with approoved material as per Structural Engineer'sadvice.
Provide and fit Steel casement windows as per schedule.
Provide and fit all external and internal doors as per the scheduleprovided
OFFICE BLOCK ANALYSIS SHEET 06
13 --
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
1
2
A B
7,800
16,00
0
FALL
150m
m x
150
mm
G.I.
She
et G
utte
r
28 gauge Box profileG.I. Sheet Roof
1
2
A B
800200
6,600200
200
1,450
1,200
1,600
1,600
1,150
1,600
1,150
1,600
1,600
1,200
1,450
200
16,00
0
7,800
800200
6,600200
7,800
16,00
0
4,000
3,900
3,900
4,000
+450
200mm thickHollow blocks wall
300mm x 300mmCeramic tiles f.f.
HALL
E-01
E-02
E-03
E-04
HALL FLOOR & ROOF PLAN
14 1:100
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
B A 1 2
A B 2 1
6,800 15,800
6,800 15,800
1,000
2,300
1,6001,200
2,360
34060
0
1,600 1,600 1,200
2,400
300 60
0
2,300
2,300
450
3,700
28 gauge box profile G.I.sheet roof on sawn timber
truss at 15 degrees roof pitch
New 1600mm (W) X2400mm (H) steel doubledoor to fabricators details
New 1600mm (W) X 2300mm(H) steel casement windows tofabricators details
200mm thick hollowblock masonry wall,
plastered and painted toarchitect's approval
200mm thick hollow block masonrywall, plastered and painted to
architect's approval
ELEVATION E-01 ELEVATION E-02
ELEVATION E-03 ELEVATION E-04
Floor Level
Roof Level
G.L+450
+4,150
Floor Level
Roof Level
G.L+450
+4,150
Floor Level
Roof Level
G.L+450
+4,150
HALL ELEVATIONS
15 1:100
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
1
2
A B
1
2
A B
800200
6,600200
200
1,450
1,200
1,600
1,600
1,150
1,600
1,150
1,600
1,600
1,200
1,450
200
16,00
0
7,800
800200
6,600200
7,800
16,00
0
4,000
3,900
3,900
4,000
800200
6,600200
200
1,450
1,200
1,600
1,600
1,150
1,600
1,150
1,600
1,600
1,200
1,450
200
16,00
0
7,800
800200
6,600200
7,800
16,00
0
4,000
3,900
3,900
4,000
HALL LIGHTING HALL POWER
HALL ELECTRICALS
16 1:100
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
GSPublisherVersion 0.0.100.100
GSPublisherVersion 0.7.100.100
ARCHITECTURALDRAWINGS
Client: Implementation PartnerARCHITECTS
GeConsultARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Office No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILSContent:
REHABILITATION OF GOOFGUDUUD MCH
REHABILITATION
GOOF GUDUUDADMINISTRATION
SHEET NO. REVISION
Project title
Drawn by:Checked by:
W.DHassan Abdisamad
SOMALIASTABILIZATIONINITIATIVE (SSI)
Y-Y
Y-Y
X-X X-X
150
1,4
00
150
100
350
120
150
120
150
450
100
550
250
400
400
150
500
250
1,000
600
200
150
450
150
150 600 200
200 3,200 200
GL
IL
GL
150mm THKBLOCK WORK
F2
12mm WATER PROOF CEMENT-SAND PLASTER
GL
A
12mm WATER PROOFCEMENT -SAND RENDERING
B C
TWL
INLET MANHOLEOUTLET MANHOLE
GL
450X600mm MANHOLECOVER AND FRAME
200mm THKBLOCK WORK
12mm WATER PROOFCEMENT-SAND PLASTER
WATER LEVEL
E
450X600mm MANHOLECOVER AND FRAME
GL
6" PERFORATED CLAY ORPITCH FIBRE PIPES 600mmLONG WITH 50mm OPEN JOINTS
GL
POLYTHENE SHEET ORANY OTHER APPROVEDMATERIAL
COMPACTED MURRAM
CRUSHED STONES
FRENCH DRAIN DETAIL
PLAN WITH COVERSLAB REINFORCEMENT
450X600mmMANHOLE COVER
BA
D
C
E
TO FRENCH DRAIN ORSOAK PIT AS SPECIFIED
1350
1350
1350
1350
3300
LITRES
900
CAPACITY
900
NUMBEROF
PERSONS
750
300
600
900
GALLONS
1200
1500 6800
11-20
21-30
400
5440 31-40
UPTO TO 10
DIMENSIONS IN MILLIMETRES
1300
3200
F
750
D2200
4080
2720
1360
EA C
950
850
600 2900
3500
700
1400
1300
1100
900
1400
1300
1200
1100
6800
5440
4080
2720
1360
41-50 1000
900
F2B300
150mm THK STONEBLOCKS TO DRAIN INVERT
'H' DEPTH OF SOAK PIT AS SPECIFIEDOR DIRECTED BY DRAWING
SOAK PIT DETAIL
1000 C/C
GL
150mm THKCONC. BLOCKS
GL
'H'V
arrie
s
SECTION Y-YSECTION X-X
NOTES1. CONCRETE TO BE 1:2;3 3/4" GRADED AND TO BE ACCORDING
TO GENERAL SPECIFICATION.2. REINFORCEMENT TO BE MILD STEEL TO BS 785.3. MINIMUM COVER TO BARS SHALL BE 25mm.4. 1:2 CEMENT SAND RENDERING ON WALLS AND SCUM BAFFLES.
LIGHTLY COMPACTEDSUITABLE SPORT FILLINGS
C1 4 • INLET PIPE 10mm • MAIN BAR
8mm • MAIN BAR AT300mm C/C
C1 4 • OUTLET PIPE
200mm thBLOCK WORK
100mm th. CONCRETEFOUNDATION MIX 1:3:6
200mm th.BLOCK WORK
150 mm CONCRETE 1:2:4 - 3/4 GRADED
12mm • MAIN BARS AT 300mm CENTRES
8mm • DISTR. BARS AT 200mm CENTRES
12mm • BARS AT 150mmCENTRES BOTH WAYS
12mm • MAIN BARSAT 200mm CENTRES
8mm • MAIN BAR AT200mm C/C
12mm • MAIN BARS AT 300mm CENTRES
TO SOAK PIT
14
SEPTIC TANK
17 1:100
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
4,000 4,000
300X300x2800mmR.C columns
200mm thick concretehollow blocks walling
BOUNDARY WALL - FOOTING LAYOUT
A
A
B
B
200
D.O.S
2,700
200
2,500
600x200mm deep R.C stripfoundation to S.E details `
Rubble stone
200mm thick concretehollow block walling with50mm thick coping
G.LG.L
SECTION A-A
200
D.O.S
2,800
200
2,600
600x200mm deep R.C stripfoundation to S.E details `
Rubble stone
200mm thick concretehollow block walling with50mm thick coping
G.LG.L
SECTION B-B
3600x2700 mmhigh steel gate
1000x2700mmhigh steel gate
ACCESS GATE
300x300x2800mm High R.CBoundary wall with 50mm
thick coping
2,700mm high masonry block wallwith 50mm thick coping plastered andpainted to approval
4,000 4,000 4,000 4,000
BOUNDARY WALL - ELEVATION
BOUNDARY WALL DETAILS
18 1:100
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
3 DIMENSIONAL PROJECTION
3D-01 N/A
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
3 DIMENSIONAL PROJECTION
3D-02 N/A
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
3 DIMENSIONAL PROJECTION
3D-03 N/A
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
3 DIMENSIONAL PROJECTION
3D-04 N/A
ARCHITECTURAL DRAWINGS
GSPublisherVersion 0.0.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked & Approved by:
Date:
Hassan Abdisamad
July 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner: --
A. KaranjaJUBALANDSTATE OFSOMALIA
LUUQ YOUTH CENTRE-KIS062IOM/SSI
3 DIMENSIONAL PROJECTION
3D-05 N/A
ARCHITECTURAL DRAWINGS