Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner::
Somali Stabilization Initiative(SSI)
Rehabilitation of a Stadium inHudur (Grant No. BAI071)
IOM
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875
Implementation Partner::
SHEET NO. CONTENT
Somali Stabilization Initiative(SSI)
Rehabilitation of a Stadium inHudur (Grant No. BAI071)
IOM
A-01
A-02
A-03
A-04
A-05
A-06
A-07
A-08
GPS Coordinates
Site Plan
Set Out Plan
Rehabilitation Notes 01
Rehabilitation Notes 02
Rehabilitation Notes 03
Rehabilitation Notes 04
Rehabilitation Notes 05
A-09
A-10
E-01
E-02
Power Distribution Layout
Stadium Electrical Details
Spectator Stands
Mosque, Changing rooms & Washrooms
A-11
Door & Window Schedule
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
4°07'03.7"N 43°53'25.5"E
Rehabilitation of a Stadium inHudur (Grant No. BAI071)
IOM [SSI]
GPS COORDINATES
A-01 N/A
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
125M
155M
116M
145M
14M
A
ABCDEF
Changing rooms
Washrooms
Spectator Stand
Guard House
Mosque
Football pitch
ENTRY 1
ENTRY 2
B B C
D
D
E
F
SITE PLAN
A-02 1:500Rehabilitation of a Stadium inHudur (Grant No. BAI071)
IOM [SSI]
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
125M
155M
116M
145M
14M
26.7M 105M 26.6M
50.7
M60
M13
.7MA
ABCDEF
Changing rooms
Washrooms
Spectator Stand
Guard House
Mosque
Football pitch
ENTRY 1
ENTRY 2
B B C
D
D
E
F
SET OUT PLAN
A-03 1:500Rehabilitation of a Stadium inHudur (Grant No. BAI071)
IOM [SSI]
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
43,000
1,10
01,
100
1,10
01,
100
1,10
01,
100
4,90
0
11,5
00
6,10
0
18,000
600
600
600
600
600
600
600
3,16
0
4002,400
4002,400
4002,400
4002,400
4002,400
4002,400
400
2,70
0
ELEVATION E-01
ELEVATION E-02
SPECTATOR STAND PLAN
E-01
E-02
SPECTATOR STAND DETAILS
A-04 1:140Rehabilitation of a Stadium inHudur (Grant No. BAI071)
IOM [SSI]
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
11,380
3,00
01,
500
900
2,16
580
02,
300
1,843 8,943 595
10,6
65
200
2,40
01,
200
3,00
01,
765
900
2,40
080
01,
800
10,6
65
11,380
11,380
1,20
02,
800
1,150 1,500 1,200 2,300 1,200 1,500 1,150
10,000
4,00
0
2,60
0
200
1,70
02,20
03,
000
6,500
1,50
03,
000
4,50
0
2001,416
2001,334
2001,382
2001,368
200
6,500
ELEVATION E-01 ELEVATION E-02
E-01
E-02
G.LFloor Level +200
Porch Level +2600
Parapet Level +3800
MOSQUE FLOOR PLANG.L
Floor Level +200
Porch Level +2600
Parapet Level +3800
G.LFloor Level +200
Sill Level +1700
Lintel Level +2200
Roof Level +3000
G.LFloor Level +200
Sill Level +1700
Lintel Level +2200
Roof Level +2800
CHANGING ROOMS FLOOR PLAN
ELEVATION E-01 ELEVATION E-02
ROOF PLAN
Mosque
Porch
ChangingRoom 1
ChangingRoom 2
E-01
E-02
FALL
FALL FALL
FALL
FALL
G.LFloor Level +200
Roof Level +3000
ELEVATION E-01
Front Wall Level +2600
G.LFloor Level +200
Roof Level +3000
ELEVATION E-02
Front Wall Level +2600
E-01
E-02
ROOF PLAN
LATRINES FLOOR PLAN
MOSQUE, CHANGING ROOMS & WASHROOMS
A-05 1:140Rehabilitation of a Stadium inHudur (Grant No. BAI071)
IOM [SSI]
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
IMAGE DIMENSIONS QUANTITY DESCRIPTION
2200MM (H)X
900 (W)
1200MM (H)X
800 (W)
2200MM (H)X
800 (W)8
6
2
STEEL PANEL SWING DOORS WITH 3 NO. BUSH HINGESAND A LOCKABLE DEAD LOCK LATCH TO FABRICATOR'SDETAILS AND ARCHITECT'S APPROVAL(Door dimensions to be confirmed from the existingopening sizes by fabricator before fabrication)
STEEL PANEL SWING DOORS WITH 3 NO. BUSH HINGESAND A LOCKABLE DEAD LOCK LATCH TO FABRICATOR'SDETAILS AND ARCHITECT'S APPROVAL(Door dimensions to be confirmed from the existingopening sizes by fabricator before fabrication)
PRECAST CONCRETE VENTILATION BLOCKS TOFABRICATOR'S DETAILS AND ARCHITECT'S APPROVAL(Window dimensions to be confirmed from the existingopening sizes by fabricator before fabrication)
LOCATION
CHANGINGROOMS ANDMOSQUE
MOSQUE
LATRINES
500MM (H)X
1200 (W)2
PRECAST CONCRETE VENTILATION BLOCKS TOFABRICATOR'S DETAILS AND ARCHITECT'S APPROVAL(Window dimensions to be confirmed from the existingopening sizes by fabricator before fabrication)
CHANGINGROOMS
22400MM (H)
X900 (W)
MOSQUE
STEEL FRAME SWING DOORS WITH 3 NO. BUSH HINGESAND A LOCKABLE DEAD LOCK LATCH TO FABRICATOR'SDETAILS AND ARCHITECT'S APPROVAL(Door dimensions to be confirmed from the existingopening sizes by fabricator before fabrication)
Rehabilitation of a Stadium inHudur (Grant No. BAI071)
IOM [SSI]
DOOR & WINDOW SCHEDULE
A-06 N/A
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
REHABILITATION NOTES
A-07 N/A
1
2
3
4
BEFORE
AFTER
REHABILITATION NOTES
Cut and Fill uneven ground and open pit, compact and mark the pitchto approval.
Introduce a chainlink barrier between spectators and players,with support columns at 3M centre to centre
Scrape off all loose material on spectator stand's walls, fill cracks andworn out plaster then paint to architect's approval. Raise back wall tomatch shade height for security purposes.
Scrape off all loose material from the worn out spectator stand floorand rescreed and finish to architect's approval.
5
21
3
4
5
Provide and install 4 No. pitch floodlights. 1 at every corner of the field.
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
REHABILITATION NOTES
A-08 N/A
1
2
3BEFORE
AFTER
REHABILITATION NOTES
Introduce a 12mm chipboard ceiling in the changingrooms. Paint to approval.
Replace broken ventilation blocks and repaint to thechanging rooms to approval.
Existing doors in good condition, only repainting isrequired.
2
3
1
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
1
2
3
4
BEFORE
AFTER
REHABILITATION NOTES
Cut and Fill uneven ground and open pit, compact to approval.
Introduce a chainlink barrier between spectators and players,with support columns at 3M centre to centre
Provide and install 4 No. pitch floodlights. 1 at every corner of the field.
Extend the perimeter wall an extra 600mm high and install razor wire for extra security in the pitch.
1
2
3
54
5 Scrape off all loose material on the mosque's wall, fill in cracks n dentsthen paint to approval.
REHABILITATION NOTES
A-09 N/A
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
1
2
3
4
REHABILITATION NOTES
Cut and Fill uneven ground and open pit, compact to approval.
Introduce a chainlink barrier between spectators and players,with support columns at 3M centre to centre
Provide and install 4 No. pitch floodlights. 1 at every corner of the field.
Extend the perimeter wall an extra 600mm high and install razor wire for extra security in the pitch.
12
3
4
BEFORE
AFTER
REHABILITATION NOTES
A-10 N/A
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
2
1
3
4
1
2
3
4BEFORE
AFTER
REHABILITATION NOTES
Cut and Fill uneven ground and open pit, compact to approval.
Introduce a chainlink barrier between spectators and players,with support columns at 3M centre to centre
Provide and install 4 No. pitch floodlights. 1 at every corner of the field.
Extend the perimeter wall an extra 600mm high and install razor wire for extra security in the pitch.
REHABILITATION NOTES
A-11 N/A
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
125M
155M
116M
FLOODLIGHTS SWITCH
MAIN DISTRIBUTIONBOARD
FLOODLIGHT
FLOODLIGHTFLOODLIGHT
FLOODLIGHT
DISTRIBUTIONBOARD
DISTRIBUTIONBOARD
ENTRY 2
STADIUM POWER DISTRIBUTION LAYOUT
E-01 1:500Rehabilitation of a Stadium inHudur (Grant No. BAI071)
IOM [SSI]
GSPublisherVersion 0.21.100.100
Client: Project title:
ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.
PROJECT DETAILS Drawing Tittle:
Drawn by: Sheet No. Scale:
Revision No.
Checked by:
Date:
Hassan Abdisamad
November 2017
ARCHITECTURE & ENGINEERING CONSULTANTS
[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS
--
A.K
MOSQUE ELECTRICAL LAYOUTLATRINES ELECTRICAL LAYOUT
CHANGING ROOMS ELECTRICAL LAYOUT
TWIN SOCKET WITH SWITCHES
4FT FLOURESCENT LIGHT
2 GANG 1 WAY SWITCH
1 GANG 1 WAY SWITCH
CEILING MOUNTED LIGHT POINT
INTERNAL LIGHTING CURCUIT
INTERNAL POWER DISTRIBUTION CURCUIT
SECURITY LIGHTING CURCUIT
EXTERNAL POWER DISTRIBUTION CURCUIT
POWER DISTRIBUTION BOARD
MAIN CONSUMER POWER UNIT
4 GANG 1 WAY SECURITY LIGHTING SWITCH
SECURITY LIGHTING FLOODLIGHTS
LEGEND
STADIUM ELECTRICAL LAYOUT
E-02 1:500Rehabilitation of a Stadium inHudur (Grant No. BAI071)
IOM [SSI]