architectures and foundations for c4isr - finse
TRANSCRIPT
SYSTEM LEDNING
”FINCOSE” 001025
Architectures andFoundations for the
Swedish Armed Forces’C4ISR Systems 2010
Johan H Bendz
Swedish Defense Materiel Administration
Joint Materiel Command
Systems Architecture Group
SYSTEM LEDNING
”FINCOSE” 001025
Table of Contents
• Background
• A New Defence
• A Need for Architecture
• Useful Findings
• The Architecture Project
• Challenges
SYSTEM LEDNING
”FINCOSE” 001025
We live in interesting times...
From now on, the only thingthat’s constant is change!
So, our #1 capability mustbe change management!
SYSTEM LEDNING
”FINCOSE” 001025
A New Set of Objectives
SwAF politically assigned objectives are
• International Peace-keeping Operations (UN, EU, NATO/PfP)
• Supporting Society
• Territorial Integrity
• Armed Aggression
SwAF Capabilities - 102 defined so far
SYSTEM LEDNING
”FINCOSE” 001025
An Epoch Shift
• A shift from one to four objectives
• A shift from predictable business togreat uncertainty
• A shift of focus from quantity to quality
• A shift of from Invasion Preparedness toPreparedness for Change
• A Swedish adaptation of RMA - the”Revolution in Military Affairs” concept
SYSTEM LEDNING
”FINCOSE” 001025
Revolution in Military Affairs RMA identifies 5 + 3 key capabilities
• BA - Battlespace Awareness
• DS - Decision Support
• C2 - Command & Control
• PR - Precision Response
• IA - Information Assurance
• FL - Focused Logistics
• DM - Dominant Manouver
• FDP - Full-DimensionalProtection
DS BA
PR (DM)
C2 (FL) IA(FDP)
RMA
SYSTEM LEDNING
”FINCOSE” 001025
”Just-in-time” becomes critical
We must field rapidlyassembled task forces
This requires a componentbased approach!
SYSTEM LEDNING
”FINCOSE” 001025
Rapid deployment
Component factoriesLead times: weeks - months - yearComponent life-cycles: months - years
Force factoriesLead times: days - weeksForce life-cycles: days - weeks - months - years
::::::4444444444
SOP
FOM
Warfighters
Sim
::::4444
FOM
Warfighters
Sim
SOP
SYSTEM LEDNING
”FINCOSE” 001025
Tailored Task Forces
• Rapidly composed from std components - inherently Joint• Components from different services (cultures), organizations and countries• Always deployed in ”partially validated” state• Tuned to adequate performance ”in the field”• Requires the warfighters to develop a new mindset (attitudes, culture)
::::4444
FOM
Warfighters
Sim
SOP
SYSTEM LEDNING
”FINCOSE” 001025
As everything goes ”joint”...
Multiple aspects are fusedto achieve superiority...
Increasing the apparentcomplexity of operations!
SYSTEM LEDNING
”FINCOSE” 001025
Complexity drivers• Policy
• Ever changing objectives and priorities
•Time• Rapid response - rapid deployment
• Technology• Opportunities of rapid commercial developments
• Politics• Multi-lateral interoperation
• Economics• Standards, COTS, reuse
SYSTEM LEDNING
”FINCOSE” 001025
Coping with complexity
Requires an Architecture approach
• Structured products• Functional domains
• Structured processes• Modelling and Simulation
• Structured information assets• Smart Product Models
SYSTEM LEDNING
”FINCOSE” 001025
Architecture definitionsn The study of, or concrete examples of, the
interplay of technical and aesthetic factors.(Sw Nat’l Encyclopedia Dictionary 1995)
n Art and science of building; design or styleof buildings. (Oxford ALDoCE 1974)
n The structure of components, theirrelationships, and the principles andguidelines governing their design andevolution over time. (IEEE STD 610.12)
SYSTEM LEDNING
”FINCOSE” 001025
Useful findingsArchitecture
• US DoD C4ISR Architecture Framework
• Norwegian Defence MACCIS, v1
Systems Engineering
• UK MoD DERA SE Reference Model
• World Class Systems Engineering, J Lake
Systems Life-Cycles, SLC
• ISO/IEC 15288 (CD2) SLC Processes
SYSTEM LEDNING
”FINCOSE” 001025
US DoD C4ISR ArchitectureFramework
Technical
Identifies Standardsand Conventions
Identifies Standardsand Conventions
Time-phasedTechnicalGuidance
Systems
Overlays Capabilities and Requirementsto Identified Standards
Overlays Capabilities and Requirementsto Identified Standards
Processing andInformationExchange
Requirements
Operational
Identifies WarfighterNeeds
Identifies WarfighterNeeds
Processing and InformationExchange Requirements
New TechnologicalCapabilities
SYSTEM LEDNING
”FINCOSE” 001025
Production Utilization Support RetirementDevelopment Concept
System of Interest
Production Utilization Support RetirementDevelopmentConcept
Concept System
Production Utilization Support RetirementDevelopment Concept
Development System
Production Utilization Support RetirementDevelopment Concept
Production System
Production Utilization Support RetirementDevelopment Concept
Utilization System
Production Utilization Support RetirementDevelopment Concept
Retirement System
Production Utilization Support RetirementDevelopment Concept
Support System
Enabling System services to System of Interest
System of Interest requirementsfor enabling services
NEED FOR SERVICESFROM A
SYSTEM OF INTEREST
NEED FOR SERVICESFROM A
SYSTEM OF INTEREST
SYSTEM OF INTERESTSERVICES TO ITS
ENVIRONMENT
SYSTEM OF INTERESTSERVICES TO ITS
ENVIRONMENT
ISO/IEC 15288 System Life-CycleProcesses
SYSTEM LEDNING
”FINCOSE” 001025
Table of Contents
• Background
• The Architecture Project
• Project Focus
• Levels of Abstraction
• Current reasoning
• Challenges
SYSTEM LEDNING
”FINCOSE” 001025
Project Context00-07 2002 2004 2010
Utkast 1
Avvecklas
OminriktasAnpassasFörslag
Målsättn Demon-stratorer
2007
TTEM Byggnation
Målbild
FAS 1 FAS 2 FAS 3
HIT00
Demon-stratorer
Arkitektur•Verksamhet•System•Teknik•Utv-miljö
Design/utv/anskaffning•Lednpl•Sbsyst•Lednstöd•Sensorer•Plattformar•Verksamhets-•lednings syst
Närtidsåtg•Lednpl•Lednstöd•Sbsyst
Arvet•Lednpl•Sbsyst•Lednstöd•Sensorer•Plattformar•Vapensys•Verksamhets-•lednings syst
SYSTEM LEDNING
”FINCOSE” 001025
Policies
AssignmentsDoctrinesObjectives
Projects
OrganisationTeamsTask Forces
People
CompetencesTrainingExperience
Products
ArchitecturesComponentsConstr./rules Processes
Rôles & resp.Models,Methods &Tools
PEKB
Product Evolution Knowledge Base
5P-model
SYSTEM LEDNING
”FINCOSE” 001025
Architecture Project Basis 1
C4ISRPEKB
Product evolutionprocesses
Product Information
SwAF C4ISR(Operationalproducts)
SYSTEM LEDNING
”FINCOSE” 001025
Levels of Abstraction
The project produces results on threelevels of abstraction
• Meta-Architecture
• Reference Architecture for C4ISR -a System-of-Systems approach
• Target Architectures for yr 2005SwAF C4ISR demonstrators:
• ”Air & Sea”
• ”Ground Combat (Int’l Operations)”
SYSTEM LEDNING
”FINCOSE” 001025
Meta-Architecture
The Architecture Framework
• Architecture principles & philosophy
• Product Evolution Knowledge Base
• Product structures & -models
• Standards
• Process structures & -models
• Criteria for selecting methods & tools
• Infrastructure issues
SYSTEM LEDNING
”FINCOSE” 001025
Influences
US DoDArchitectureFramework
NATOC3
ArchitectureFramework
ISO/IEC10746
RM-ODP
ISO/IEC10303 STEP(PDM)
ISO/IEC15288 System
Life-CycleProcesses
SwAFArchitectureFramework
NOR/SWEMACCIS
SYSTEM LEDNING
”FINCOSE” 001025
The Knowledge Base
Our ability to master the complexity of future SwAF C4ISR systemsrequires the use of a Smart Product Data Model approach to Life-Cycle Information Management. The SPDM is capable of providingmultiple views to satisfy the needs of various stakeholders.
SYSTEM LEDNING
”FINCOSE” 001025
Principal viewpoints
Systems
Enterprise
Tech
nica
l
Org
anis
atio
nal
SYSTEM LEDNING
”FINCOSE” 001025
Organizational independence
F1 F2 F3 F4 F5 F6 F7 F8 F9
Functions
J2 J6J4 J9
J3
Org A
QR
R2R1
PL
DGOrg B
SYSTEM LEDNING
”FINCOSE” 001025
Architecture Models 1
O E
K
Processes
Doctrines
IP
S
Products
T
The material (real) world
Capabilities
Man
Roles
Organizations
The immaterial (virtual)descriptive world
Technical components
Individuals
Baseline
Context Partners
Component-descriptions (PDM)
Situation Specific System
PEDM
SYSTEM LEDNING
”FINCOSE” 001025
Architecture Models 2
Services
Pol. Tasks
Capa-bilities
E SMissions
System(s)
SituationSpecificReq’s
SitSyst
O TMateriel
Technicalcomponents
Products
Role-components
Organizations
Task Force
Status Status
Baseline Baseline
Individuals
Situation Specific
KomponentbeskrivningarComponent DescriptionsComponent Descriptions
Functions
SYSTEM LEDNING
”FINCOSE” 001025
Use of Architectures
O E
S
T
Baseline
ComponentDescriptions (PDM)
OAOA
TATA
EAEA
Situation Specific System
PEDMSASA
SYSTEM LEDNING
”FINCOSE” 001025
BaselineBaseline of SitSyst for Operation E43
Comp42711876376476518
33033128028119823….
Ver4
7B333
2311
12B12B
27
….
BL-3111---
101029
-….
Role-
FXT---
QRT----
KRVRTT
….
ProdJJWKLWAXXAXXAXX
-BTTBTTGTRGTRKPR
-….
Func3.1.44.2.12.1.72.1.72.1.7
6.14.54.56.26.2
19.1….
Serv301941232078207820796202400940096344634510049533
….
SYSTEM LEDNING
”FINCOSE” 001025
Component Descriptions
ComponentID
ComponentID
E-attributesE-attributes
S-attributesS-attributesO-attributesO-attributes
T-attributesT-attributes
Sec-attributes
M&S-attributes
M&S-attributes
I-attributes
SYSTEM LEDNING
”FINCOSE” 001025
Reference Model
C4ISRReferenceArchitecture
Demon-stratorArchitecture2005
••••••••ISO 12207
IEEE 1220
SE COE
Jini CORBA
ATCCIS AQUA
Meta-architecture
IEEE 1516 (HLA)
ISO 10303 (STEP)
UML
DoD/NATO UJTL
OODA
IEEE 1516 (HLA)
ISO 10303 (STEP)
UML
IEEE 1516 (HLA)
ISO 10303 (STEP)
UML
IEEE 1516 (HLA)
ISO 15288
UML
Enterprise VP Systems VP Technical VP Process VP
ASN-1
ISO RM-ODP ISO RM-ODP
SYSTEM LEDNING
”FINCOSE” 001025
Reference Architecture for C4ISR
• A System-of-Systems approach
• A macro-level template for C4ISR systems
• Provides general principles for break- down and aggregation of systems
• Identifies domain-specific products and infrastructure components
• Preparing for other domains
SYSTEM LEDNING
”FINCOSE” 001025
Functional Areas
3.1
3.2
3.3
3.4
3.5
F 3
F 2F 1
F 4
F 5
F 6
F 7
F 8
F 9
F10
4.14.24.34.4
9.19.2
C2
1. Personell2. Intelligence3. C2 3.1 Ground 3.2 Air 3.3 Maritime 3.4 Combat 3.5 C2IW4. Logistics 4.1 Support 4.2 Transport 4.3 Medical 4.4 Infrastructure5. Planning6. Communications7. Training8. Production9. CIMIC 9.1 Civilian 9.2 Military10. Staff Cmd
SYSTEM LEDNING
”FINCOSE” 001025
Generic Activities
OBSERVE OBSERVE
ORIENT ORIENT
DECIDE DECIDE
PLAN PLAN MONITOR MONITOR
ANALYSE ANALYSE
FunctionsF1-F10
FunctionsF1-F10
SYSTEM LEDNING
”FINCOSE” 001025
Domain Architecture - SVP
FunctionalSystems
C2-system
IntelligenceSystem
OrientationSystem
Decision Support System
Transmission System
National Information Infrastructure
SensorSystem
ResponseSystem
ExternalSystems
V O E
N
T
I D
LF B
SYSTEM LEDNING
”FINCOSE” 001025
Demonstrator Architecture(s)
Expected Characteristics of SwAF C4ISRDemonstrator Architectures
• Component based
• Loosely coupled interfaces
• Open & standards based
• Network oriented
• Non-hierarchical information structure
SYSTEM LEDNING
”FINCOSE” 001025
Table of Contents
• Background
• The Architecture Project
• Project Focus
• Levels of Abstraction
• Current reasoning
• Challenges
SYSTEM LEDNING
”FINCOSE” 001025
CHALLENGES
• Evolutionary development
• M&S-based systems management
• IT Defence System
SYSTEM LEDNING
”FINCOSE” 001025
Evolutionary development• Constant change requires constant
adaptations
• Evolution occurs in increments
• Evolution requires mutations (creativity)
• Mutation is promoted in a heterogenousenvironment
• Thus we must encourage ”dissimilarities”and be capable of handling them
• BTW - International Cooperation requiresthe same capabilities
SYSTEM LEDNING
”FINCOSE” 001025
CISE - SBA - SBT - C4ISR
OpInfo
Resourcemodels
Decision Support for Acquisition
Coalition Capability &Interoperability Assessment
Training &Education
Deployment
STEP
SBDSBA
SBDCISE
FederationDesign
ComponentDesign
SBD SBT
TrainingLab
HLA HLA
HLAHLA
STEP
C4I MethodsLab
SBD C4ISR
SYSTEM LEDNING
”FINCOSE” 001025
IO - IA - IW
IT IT defencedefence system system
IT-IT-weaponsweapons
Info-&IT-Info-&IT-platformsplatforms
IT-IRSIT-IRS
InfoOpInfoOpcommandcommand
InfrastructureInfrastructure
Flow controlFlow control
InfoSecInfoSecInfoSec C2WCC22WW