Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering Retlif Testing Laboratories [email protected] Ronkonkoma, NY (631) 737-1500 Harleysville, PA (215) 256-4133 Goffstown, NH (603) 497-4600 Photo Goes Here

Upload: others

Post on 27-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Are you compliant? The new European EMC

Directive (2014/30/EU) deadline was April 20th

LOGO HERE

Richard J. Reitz

Director of Engineering

Retlif Testing Laboratories

[email protected]

Ronkonkoma, NY (631) 737-1500

Harleysville, PA (215) 256-4133

Goffstown, NH (603) 497-4600

Photo

Goes

Here

Page 2: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

What We’ll Cover

• General Provisions of the Directive

• Essential Requirements

• Obligations of Economic Operators

• Presumption of Conformity

• Harmonized Standards

• Conformity Assessment Procedures – Internal Production Control

– EU-Type Examination

– Fixed Installations

• Application of Annex II – Internal Production Control

• Declaration of Conformity

Page 3: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

General Provisions

• The Directive regulates the

electromagnetic compatibility of

equipment.

• The Directive is applicable to

‘equipment’ which is defined in

Chapter 1 Article 3 of the directive.

Page 4: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Exclusions

• The EMC Directive does not apply to:

– Equipment covered by the R&TTE

(1999/5/EC) or from June 13, 2016 the new

Radio Equipment Directive (RED)

(2014/53/EU).

– Aeronautical products, parts or appliances

referred to in Regulation (EC) No 216/2008.

– Amateur Radio Equipment.

Page 5: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Making Available / Putting Into

Service

• Member states are required to take all

appropriate measures to ensure that

equipment placed in service or made

available complies with the Directive.

Page 6: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Display and /or Demonstration

• Members State cannot create any

obstacles to display and/or

demonstration at trade fairs,

exhibitions etc.

Page 7: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Annex I

Essential Requirements 1. General requirements

Equipment shall be so designed and manufactured, having regard to the state of the art, as to ensure that:

a) the electromagnetic disturbance generated does not exceed the level above which radio and telecommunications equipment or other equipment cannot operate as intended.

b) it has a level of immunity to the electromagnetic disturbance to be expected in its intended use which allows it to operate without unacceptable degradation of its intended use.

2. Specific requirements for fixed installations

Installation and intended use of components

A fixed installation shall be installed applying good engineering practices and respecting the information on the intended use of its components, with a view to meeting the essential requirements set out in point 1.

Page 8: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Obligations of Economic Operators

• The directive defines the obligations of:

– Manufacturers

– Authorized Representatives

– Importers

– Distributors

Page 9: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Obligations of Manufacturers

• Design

• Documentation

• Conformity assessment

• Declaration and Labeling

• Instructions

• On going

Page 10: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Obligations of Authorized

Representatives

• The authorized representative cannot

assume responsibility for:

– Ensuring the design and manufacture of the

apparatus in accordance with the Directive.

– Drawing up the required technical

documentation.

Page 11: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Obligations of Importers

• Shall ensure that only compliant

equipment is placed on the market.

• Prior to placing on the market, shall

ensure that the appropriate conformity.

assessment procedure has been carried

out by the manufacturer.

Page 12: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Obligations of Distributors

• Obligations of distributors are identical to

those of importer, with the exception that

they do have to place their name and

postal address with the equipment.

Page 13: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Harmonized Standards

Published in the Official Journal of the European

Union

European

Standardisation

Organization

CEN

CENELEC

ETSI

Page 14: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Harmonized Standards

Published in the Official Journal of the European

Union

Reference and

Title of Standard

(Now EN)

Now EN

Page 15: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Harmonized Standards

Published in the Official Journal of the European

Union

Reference

of

Superseded

Standard

In this case,

A1:2010 has

been

adopted

Page 16: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Harmonized Standards

Published in the Official Journal of the European

Union

Date of Cessation

of Presumption of

Conformity of

Superseded

Standard

In this case

June 30

2011

Page 17: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

The 61000-4-X series of

standards are not published

in the OJ

Page 18: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Conformity Assessment

Procedures

• Compliance shall be demonstrated by

either of the following conformity

assessment procedures:

– Internal production control (Annex II).

– EU type examination followed by conformity

to type based on internal production control

(Annex III).

Page 19: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Internal Production Control

• Electromagnetic Compatibility Assessment

• Technical Documentation

• Manufacturing

Page 20: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Annex III – Part A

EU – Type Examination

• A Notified Body examines the technical

design of an apparatus and verifies and

attests that the TECHNICAL DESIGN of

the apparatus meets the essential

requirements.

Page 21: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Annex III – Part A

EU – Type Examination

• The manufacturer lodges an application for EU-type examination with a single notified body.

• The application must specify the aspects of the essential requirements which are requested to be examined.

• Role of the Notified Body

• Manufacturers Obligation after EU-type examination

Page 22: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

EU Declaration of Conformity and

CE Marking

• The manufacturer shall draw up a written

EU declaration of conformity for an

apparatus model and keep it together with

the technical documentation.

• The manufacturer shall affix the CE

marking to each individual apparatus that

complies.

Page 23: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Fixed Installations

• For fixed installation, many of the detailed

requirements are not mandatory.

• Documentation must:

– Identify the fixed installation

– Its electromagnetic compatibility characteristics

– Indicate precautions

– Include the good engineering practices referred to

in point 2 of the essential requirements

Page 24: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Application of Annex II

Internal Production Control

• Electromagnetic Compatibility Assessment

– Selecting the appropriate standards

– Applying the appropriate test methods

– Operating conditions

– Configurations

– Performance criteria

Page 25: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Select the Appropriate Harmonized

Product Family Standard

Page 26: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering
Page 27: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Immunity Requirements

Derived from EN 61326-1 Table 1 Port Phenomenon Basic standard Test Value Performance

criterion

Enclosure Electrostatic discharge (ESD) IEC 61000-4-2 4 kV contact discharge B

8 kV air discharge

B

Electromagnetic Field IEC 61000-4-3 3 V/m (80 MHz to 1 GHz) A

3 V/m (1.4 GHz to 2.0 GHz) A

1 V/m (2.0 GHz to 2.7 GHz)

A

Power frequency magnetic field IEC 61000-4-8 3 A/m (50Hz, 60 Hz)f A

AC power Voltage dip IEC 61000-4-11 0 % during half cycle B

0 % during 1 cycle B

70 % during 25/30 cyclese

C

Short interruptions IEC 61000-4-11 0 % during 250/300 cyclese

C

Burst IEC 61000-4-4 1 kV (5/50 ns, 5 kHz)

B

Surge IEC 61000-4-5 0.5 kVa / 1 kVb

B

Conducted RF IEC 61000-4-6 3 V (150 kHz to 80 MHz) A

I/O signal/control (including

functional earth)

Burst IEC 61000-4-4 0.5 kVd (5/50 ns, 5 kHz)

B

Surge IEC 61000-4-5 1 kVb , c

B

Conducted RF IEC 61000-4-6 3 Vd (150 kHz to 80 MHz) A

a Line to line

b Line to ground

c Only in the case of long distance lines (See 3.10)

d Only in the case of lines > 3 m

e For example “25/30 cycles” means “25 cycles for 50 Hz test” or “30 cycles for 60 Hz test”

f Only to magnetically sensitive equipment

Page 28: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Emissions Limits

• Derived from Clause 7.2 of EN 61326-1:2013

The equipment shall be classified and respective information provided per the applicable group and class as specified within CISPR 11:2009.

For Class A equipment, the limits, the measuring methods and provisions of CISPR 11 apply.

For Class B equipment, the limits, the measuring methods and provisions of CISPR 11, IEC 61000-3-2 and IEC 61000-3-3 apply.

Page 29: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Normative References Preview courtesy BSI. Full Standard available at: http://shop.bsigroup.com/ProductDetail/?pid=000000000030291592

For dated

references, only the

edition cited applies.

IEC 61000-4-4: 2012

Page 30: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Application of Annex II

Internal Production Control

• Establish Technical Documentation.

• Ensure manufacturing processes.

• CE Mark

Page 31: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering
Page 32: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering

Summary

• The new Directive provides 2 paths to conformity.

• Harmonized standards are still the primary means to demonstrate compliance.

• Specific labeling and user information requirements defined.

• DoC and Technical Documentation must be completed and held, made available to authorities on request.

• Questions?

Page 33: Are you compliant? The new European EMC …...Are you compliant? The new European EMC Directive (2014/30/EU) deadline was April 20th LOGO HERE Richard J. Reitz Director of Engineering