arfco prof 12013 14.new copy
TRANSCRIPT
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 1/39
OFFICE L HORE
40-T, 2nd Floor, Commercial Area Phase-II, DHA Lahore Cantt, -
Contact: +92-42-35707689, +92-42-36187634
FAISALABAD
117-P, Koh-e-Noor Town Faisalabad, Contact: +92-41-8723989
[email protected] [email protected]
2013 – 2014
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 2/39
We Believe
ALWAYS ASSURING YOU THE BEST
ENGINEERING SERVICES ANDQUALITY WORKS
We believe that a project can be
won or lost before construction ever
begins. A Through and intensive
approach to pre-construction activities
can greatly affect the success of the
project. Preliminary budgeting,
scheduling, value engineering and
planning, combined with systematic
procurement and contracting practices
can minimize risk and maximum thereturn.
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 3/39
INDEX
• Introduction
• Contacts
• Membership
• NTN Number Cert
• Enlistment
• Bankers
• Staff
• Plant & Machinery
• RCC Pipe Factory
• Major Projects
• Financial States
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 4/39
M/S ARFCO Trading Construction established in
2000 and underlook variety of construction projects
through out the length and breath of the country
since its inception. After years of experience in
construction it has now achieved specialization in
construction and rehabilitation of Roads, Bridges,Buildings, Sewerage Works, Water Supply Systems
and Manufacturing the RCC Pipe.
INTRODUCTION
Chief Executive : RAHEEL ANWAR
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 5/39
CONTACTS
Head Office Lahore
40-T, 2nd
Floor, Commercial Area Phase-II, DHALahore Cantt
Branch Office Faisalabad
117-P, Koh-e- Noor Town Faisalabad
E-mail [email protected]
Contacts
+92-42-35707689
+92-42-36187634
+92-41-8723989
Fax: +92-42-5707689 Mob:0300-8658989
E-mail - [email protected]
www.arfco.pk
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 6/39
CONTACTS dddddddddddddddddd
ddddddddd
N I C
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 7/39
Pakistan Engineering Council
REGISTRATION
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 8/39
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 9/39
NTN CERTIFICATE
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 10/39
Capital Development Authority Islamabad
National Logistic Corporation (No Limit)
Punjab Highway Department
LDA TEPA, Government of Punjab
Faisalabad Development Authority
Lahore Development Authority
Punjab Housing Department, Govt of Punjab
C W Building Deptt, Govt of Punjab
DHA . Lahore.isb
DCL (Oil Gas), Islamabad
ENLISTMENT
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 11/39
Bank Alfalah, DHA Phase-II, Lahore
Askari Commercial Bank, Tufail
Road Lahore
Askari Commercial Bank, Line
Town, Mall Road Lahore Barlays, Phase-III, Z-Block, DHA
Lahore, Pakistan
Bank Alfalah, People Colony
Faisalabad
BANKERS
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 12/39
SITE STAFF
• Project Manager Two
• Site Engineer Four
• Sub Engineer Four
• Chief Surveyor One
• Surveyor Four
• Site Supervisor Four
• Helpers Eight
• Motor Grader(G-14) One
• Static Road Rollers Seven
• Sheep Road Rollers Five
• Vibratory Rollers Three
• Excavator Two
•
Bulldozer (D-6) One• Loader (2.0 m3) One
• P.T.R One
OPERATORS
Note: AS PER PROJECT REQUIREMENT,
MANPOWER WILL BE ENHANCED.
• Project Manager Two
• Site Engineer Four
• Sub Engineer Four
• Chief Surveyor One
• Surveyor Four
• Site Supervisor Four
• Helpers Eight
. OperatorFiftee
n
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 13/39
• Finance Manager One
• Quantity Surveyors Two
• Clerk One
• Computer Operator Four
• Office Boy Five
• S.Guard Ten
• Cook Three
• Cook- Helpers Five
OFFICE STAFF
Note: AS PER PROJECT REQUIREMENT,
MANPOWER WILL BE ENHANCED.
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 14/39
• Tar Boilers Four• Compressor One
Note: AS PER PROJECT REQUIREMENT,
MANPOWER WILL BE ENHANCED.
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 15/39
MACHINERY/PLANT
• Motor Grader(G-14) 2 Nos
• Static Road Rollers 6 Nos
• Sheep Road Rollers 5 Nos• Vibratory Rollers 3 Nos
• Excavator 1 Nos
• Bulldozer (D-6) 2 Nos
• Loader (2.0 m3) 1 Nos• P.T.R 1 Nos
• Tar Boilers 5 Nos
• Compressor 1 Nos
• Tractor Trolleys 8 Nos• Water Tankers 5 Nos
• Concrete Mizers (2 Bags Capacity) 2 Nos
• Tractor With Front Blades 7 Nos
• Dump Trucks 4 Nos• Transit Mixture Machine 4 Nos
Note: AS PER PROJECT REQUIREMENT, PLANT /
MACHINERY WILL BE PURCHASE/HIRED.
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 16/39
MACHINERY/PLANT
• Steel shuttering 25000sft
• Steel scaffolding 30tons
• Bar cutter 5 Nos
• Concrete Vibrators 3 Nos
• Diesel Generators 3 Nos• Concrete Mixer Machines 5 Nos
• Electric Welding set 3 Nos
• Campactor 4 Nos
Note: AS PER PROJECT REQUIREMENT, PLANT /
MACHINERY WILL BE PURCHASE/HIRED.
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 17/39
LIGHT VEHICLES
• Hyundai Shahzore 3 Nos
• Toyota Dala 4 Nos
• Cars 2 Nos
• Motorcycle 8 Nos
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 18/39
MAJOR PROJECTS
Our firm has completed the works awarded by
NLC, DHA & Oil & Gas Deptt Public Health ,C&W
Punjab ,Private Sector Industrial &
Housing,Sector,costing to Rs.900 Million. The
performance and quality of work of Our firm
remains satisfactory upto the entire satisfaction of
official of NLC Engineers, Project Control Lahore.
Detail of projects is appended below: -
DHA Sector ‘G’ Extension
DHA Rohi Nallah (Bridge & Road)
Hardstanding at Wahgah Border Terminal
DHA Boys College Road Works DHA Air Avenue Ph-VIII (Roads,
Sewerage System & Water Supply)
Earth filling at DHA Ph-V
Supply of RCC pipes to NLC projects
DHA Projs Parkview, DHA-VI
Building Work awarded by Oil & Gas
Deptt, Kunnar Plant Hyderabad
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 19/39
COMPLETE PROJECTS
Arfco Trading & Construction has completed
the works awarded by NLC, DHA & Oil & Gas Deptt
costing to Rs.900 Million. The performance and
quality of work of our firm remains satisfactory
upto the entire satisfaction of official of NLC
Engineers, Project Control Lahore. Detail of projects
is appended below: - DHA Rohi Nallah (Bridge & Road)
Hardstanding at Wahgah Border Terminal
Construction Of R.C.C Cover Shed At
NLC Dry Port Thokar Niaz Baig Lhr.
Construction Of Leftover Portion Main
Boulevard
DHA Sector ‘G’ Extension DHA Boys
College Road Works
DHA Air Avenue Ph-VIII (Roads,
Sewerage System & Water Supply)
Defense Housing Authority (Phase VIIIEx-Park View Sector G Road Works)
Construction Of Underground Parking
(Ex-Park View DHA Phase VIII)
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 20/39
COMPLETE PROJECTS
Defense Housing Authority (Phase - VIII Ex-
Park View) Sector – C.
Defense Housing Authority(Phase - VII
Dev of Water Tank and Staff Room).
Defense Housing Authority (Phase - VIII
(Ex – Park View) Block – G,D&F.
Defense Housing Authority (Phase - VIII
(Ex – Park View) Block – J Road Works.
Defense Housing Authority (Phase- VIII)
(Ex – Park View) Block – G & H Road Works.
Defense Housing Authority Villas (Phase - VIII)
Road Works.
Defense Housing AuthorityVillas(Phase - VIII)
Sector – C Ext , Road Works.
Defense Housing Authority (Phase – VIII)
Block – F Road Works.
Defense Housing Authority Villas (Phase - VIII)
Block – A Road Works.
Ring Road (Package - 03.07.08 & 09)
R.C.C Wall (6.5’) 9 Killometers’’ Supply Of RCC Pipes To NLC Projects.
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 21/39
COMPLETE PROJECTS
Masha-Allah Industry Faisalabad
Zaheer Textile Faisalabad
Iqra Textile Faisalabad
Building Structural Construction Work
Staff Quarters Construction Work ..
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 22/39
WORK IN PROGRESS
Defense Housing Authority (Main
Bulovered Phase VI Road Works)
Defense Housing Authority (Phase VIIDev of Water Tank and Staff Room)
Defense Housing Authority (Phase VIIIEx-Park View Sector G Road Works)
Defense Housing Authority (Phase VIIIEx-Park View Sector C Road Works of Villas)
Ring Road (Package – 9 RoadConstruction Harbanspura Canal
Ring Road (Package - 03.07.08 & 09)R.C.C Wall (6.5’) 9 Killometers’’
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 23/39
Ring Road (Package – 9)Road Construction Of Interchange AtHarbanspura Canal Crossing To AirPort Access Road – R.C.C Wall (6.5) 9Kilometers.
Ring Road ( Package – 03)
Construction Of Road Portion FromNiazi Chowk To Mehmood Booti(Widening Of Service Road)Entrance &Exist Ramps City & River Side.
Filling of under Ground Parking Ph,8
…………DHA.Lahore .
Construction of Road / Street Areadevelopment Scheme-!! , Gojra.
WORK IN PROGRESS
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 24/39
RCC PIPE FACTORY
RCC pipe factory established in Feb 2008 &have the capacity to make 120 pipes per day ofdifferent sizes. The machinery involved formaking pipes include: -
1x Welding Plant1x Steel Molder
1x Generator Set
3x Peter Engine
1x Large Mixer Machine
1x Tube well1x Water Pond 200 ft x 200 ft
16x Labour
1x Tractor with Tlr for transportation
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 25/39
RCC PIPE FACTORY
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 26/39
RCC PIPE FACTORY
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 27/39
ROHI NALLAH BRIDGE DHA
LAHORE
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 28/39
ASPHALT WORK DHA
PHASE-V LAHORE
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 29/39
OGDCL WORKS
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 30/39
DHA WORKS
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 31/39
DHA WORKS
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 32/39
DHA WORKS
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 33/39
DHA WORKS
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 34/39
Ring Road Lahore
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 35/39
Ring Road Lahore
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 36/39
DHA PH,8 FILLING
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 37/39
DHA PH,8
8/11/2019 Arfco Prof 12013 14.New Copy
http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 38/39
We are also proud of our goodreputation which has been
earned through many years of
personal commitment
Chief Executive
RAHEEL ANWAR
M/S ARFCO TRADING CONSTRUCTION