Progress so far:
• A module has been built at VECC with materials from China• Bill and others inspected the system with good signal
• All measurements were taken so-far between strips
• Issues:• Could not measure timing as the system had problem• I-V was reasonable
• A new setup is made where triggers are taken from scintillator pair
• Timing measurement is by a CAMAC TDC (25 pico-sec)• Charge spectra by using an ORTEC MCA (12bit, 10V) 04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 2
1. All the raw materials like PCB , honeycomb boards, glasses are cleaned with alcohol.2. Honeycomb boards and PCB are glued with araldite and kept under pressure.3. Outer glass having graphite coating is placed on the top of PCB.4. Fishing lines are placed on it with the help of nylon screws to maintain the uniform separation.5. Smaller glass plate is placed on the top of the outer glass.6. Step 4 and 5 is repeated until the assembly is complete.7. Another PCB pasted with honeycomb board is placed on the top to finish the fabrication.
Fabrication of MRPC in VECC:
Steps of fabrication:
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 3
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 4
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 5
Gas Mixture : Freon/iso-Butane = 95/504/11/23 MTD Workshop, Beijing, 12-13 April, 2012 6
DAQ system
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 7
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 8
Current seems to be high ??
Test Results:I-V Characteristics
Temperature being lowered04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 9
LED Thr=75 mV
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 10
50 cm x 25 cm x 1 cm
50 cm x 25 cm x 1 cm
Scintillator
MTD Prototype
Sc 1
Sc 2
Master Trigger Signal = Sc1. AND. Sc2
Efficiency = MTD count coincidence with Master Trigger
Master Trigger Count
Time Resolution : START with Master TriggerSTOP by MTD
Measurement Setup:
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 11
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 12
Charge Spectra for different voltages (Gated with two scintillator coincidence)
12200 V12400 V
12600 V
12800 V
13000 V
13400 V
13600 V
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 13
Time Spectra at 6300 Volt
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 14
Time correlation of two neighboring strips at 6300 Volt
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 15
Plan:We are about to build 20 MTD modules
Material Procurement status:
1.PCB & Glass : Under Procurement – expected in 3 months2.Fishing Line : From CERN3.Graphite : Licron Crystal (resistivity ~ 10-20 MΩ/ )4.Gas Box : One is working and another is being made5.Screws : Can be made locally
Possible to use HPTDC based VME modules. Any help (programme/etc.)on this regard will be helpful
After procurement, we are planning to finish all the module fabricationand shipment by the end of this year.
04/11/23 MTD Workshop, Beijing, 12-13 April, 2012 16
Summary and proposal
• New numbers on efficiency and charge are reasonable• Noise is high relative to Tsinghua numbers (low threshold at VECC?)• Detailed extraction (after subtraction of scintillator contribution) of time resolution is underway• Procurement of materials are in good shape.
Proposal: For further detailed testing and validation, we propose to dispatch the system to a MTD centre in USA. This will test our system and we will also learn how to ship the modules.