COVER SHEET G - 0 REVISIONS Number: Date: Rev. By: Drawn By: Scale: Date: Project No: Dwg. No: Client: Consultant: Midwest Environmental Consulting Services, Inc. 4 Bonnie Lane Yorkville, IL 60560 Ph. 630.553.3989 Fax 630.553.3990 www.mec-us.com Project Designer: LIC #: Project Location: CONTRACTOR TO FIELD VERIFY ALL QUANTITIES: BM NTS 04-18-16 16-03-224 Sterling Towers East 2601 W. Reservoir Road Peoria, IL 61615 Housing Authority of Peoria 100 s. Richard Pryor Place Peoria, IL 61605 ASBESTOS ABATEMENT PROJECT DESIGN PREPARED ESPECIALLY FOR: HOUSING AUTHORITY OF PEORIA 100 S. RICHARD PRYOR PLACE PEORIA, IL 61605 PROJECT LOCATION: STERLING TOWERS EAST 2601 W. RESERVOIR ROAD PEORIA, IL 61615 MEC PROJECT #: 16-03-224-PD DRAWING INDEX GENERAL: G - 0 COVER SHEET G - 1 SCOPE OF WORK / GENERAL NOTES ASBESTOS ABATEMENT PLAN: ASB - 1 UNIT 504 - ASBESTOS ABATEMENT PLAN ASB - 2 UNIT 605 - ASBESTOS ABATEMENT PLAN ASB - 3 UNIT 704 - ASBESTOS ABATEMENT PLAN ASB - 4 UNIT 1004 - ASBESTOS ABATEMENT PLAN ASB - 5 UNIT 1104 - ASBESTOS ABATEMENT PLAN ASB - 6 UNIT 1105 - ASBESTOS ABATEMENT PLAN SITE LOCATION MAP NTS SITE PROJECT TIMELINE: PRE-BID WALK THROUGH: TUESDAY, APRIL 5, 2016 @ 2:00 P.M. BID DUE DATE: FRIDAY, APRIL 15, 2016 @ 2:00 P.M. PROJECT START: TBD PROJECT COMPLETION: TBD

Upload: phamkhanh

Post on 09-Jun-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ASBESTOS ABATEMENT PROJECT DESIGN - Peoria ... TO FIELD VERIFY ALL QUANTITIES: BM NTS 04-18-16 16-03-224 Sterling Towers East 2601 W. Reservoir Road Peoria, IL 61615 Housing Authority

COVER SHEET

G - 0

REVISIONS

Number: Date:

Rev. By:

Drawn By:

Scale:

Date:

Project No:

Dwg. No:

Client:

Consultant:

Midwest Environmental

Consulting Services, Inc.

4 Bonnie Lane

Yorkville, IL 60560

Ph. 630.553.3989

Fax 630.553.3990

www.mec-us.com

Project Designer:

LIC #:

Project Location:

CONTRACTOR TO FIELDVERIFY ALL QUANTITIES:

BM NTS

04-18-16

16-03-224

Sterling Towers East

2601 W. Reservoir Road

Peoria, IL 61615

Housing Authority of Peoria

100 s. Richard Pryor Place

Peoria, IL 61605

A S B E S T O S A B A T E M E N T P R O J E C T D E S I G N

PREPARED ESPECIALLY

FOR:

HOUSING AUTHORITY OF PEORIA

100 S. RICHARD PRYOR PLACE

PEORIA, IL 61605

PROJECT LOCATION:

STERLING TOWERS EAST

2601 W. RESERVOIR ROAD

PEORIA, IL 61615

MEC PROJECT #: 16-03-224-PD

DRAWING INDEX

GENERAL:

G - 0 COVER SHEET

G - 1 SCOPE OF WORK / GENERAL NOTES

ASBESTOS ABATEMENT PLAN:

ASB - 1 UNIT 504 - ASBESTOS ABATEMENT PLAN

ASB - 2 UNIT 605 - ASBESTOS ABATEMENT PLAN

ASB - 3 UNIT 704 - ASBESTOS ABATEMENT PLAN

ASB - 4 UNIT 1004 - ASBESTOS ABATEMENT PLAN

ASB - 5 UNIT 1104 - ASBESTOS ABATEMENT PLAN

ASB - 6 UNIT 1105 - ASBESTOS ABATEMENT PLAN

SITE LOCATION MAP

NTS

SITE

PROJECT TIMELINE:

PRE-BID WALK THROUGH: TUESDAY, APRIL 5, 2016 @ 2:00 P.M.

BID DUE DATE: FRIDAY, APRIL 15, 2016 @ 2:00 P.M.

PROJECT START: TBD

PROJECT COMPLETION: TBD

Page 2: ASBESTOS ABATEMENT PROJECT DESIGN - Peoria ... TO FIELD VERIFY ALL QUANTITIES: BM NTS 04-18-16 16-03-224 Sterling Towers East 2601 W. Reservoir Road Peoria, IL 61615 Housing Authority

SCOPE OF WORK /

GENERAL NOTES

G - 1

REVISIONS

Number: Date:

Rev. By:

Drawn By:

Scale:

Date:

Project No:

Dwg. No:

Client:

Consultant:

Midwest Environmental

Consulting Services, Inc.

4 Bonnie Lane

Yorkville, IL 60560

Ph. 630.553.3989

Fax 630.553.3990

www.mec-us.com

Project Designer:

LIC #:

Project Location:

CONTRACTOR TO FIELDVERIFY ALL QUANTITIES:

BM NTS

04-18-16

16-03-224

Sterling Towers East

2601 W. Reservoir Road

Peoria, IL 61615

Housing Authority of Peoria

100 s. Richard Pryor Place

Peoria, IL 61605

SCOPE OF WORK:

The Contractor shall follow all applicable IDPH, EPA, and OSHA rules and

regulations. The Contractor shall install plywood barriers and/or lock doors to isolate

the building in order to prevent access by unauthorized personnel.

Owner will be responsible for removing all moveable objects from rooms where floor

tile and floor tile mastic abatement is scheduled.

All waste shall be containerized and double bagged. Waste containers shall be

labeled and leak-proof. All equipment and double bagged/labeled waste shall be

transported from the work area directly to an enclosed, lockable, signed, and

poly-lined dumpster.

The owner will assist the Contractor with electrical shut downs and HVAC isolation

within the work area. The building owner shall be responsible for maintaining

appropriate life safety code requirements, including fire protection, for the building for

the duration of the project.

Clearance is to be by aggressive PCM and will follow requirements defined in

Sections 855.170 (b)(c)(d) and 855.470 of the 77 Illinois Administrative Code.

TYPICAL WORK AREAS

Contractor shall be responsible for the removal of drywall to the first furring strip

utilizing gross removal methods within the tented work areas specified on the

accompanying drawings.

Tented work areas shall consist of critical seals, one layer of 6-mil poly on the walls

and on surfaces not scheduled for abatement.

An attached 1-chamber air-lock shall be constructed to each tented work area.

The Contractor shall provide a manometer for each tented work area to ensure that a

negative pressure of 0.02" w.c. is maintained throughout the duration of the project.

All negative exhaust tubing shall be vented outside the building.

A remote 3-chamber decon shall be constructed and accessible for all tented work

areas.

All double bagged and labeled waste shall be transported from the work area in a

covered gondola. No waste shall be left within the building overnight.

In areas where water damage has occurred, and the ceiling is not delaminating, the

Contractor shall apply a drop cloth below the work area. the Contractor shall apply

white colored base encapsulant to the ceiling. The Contractor shall apply caulk to wall

edges at the completion of the encapsulation. When the drop cloth has been

removed, the Contractor shall thoroughly HEPA vacuum the floor area.

NOTES - GENERAL

1 Contractor is required to visit the project site in order to submit a bid.

2 Drawing identifies the scope of work and is identified as "WORK AREA".

3 Work will be completed using all applicable requirements.

4 The Owner will not accept any change orders based on the Contractor's failure

to recognize unique conditions.

5 All permits and fees that need to be filed, are the responsibility of the

Contractor. A copy of these permits and receipts shall be supplied to the

Owner's representative prior to start of work.

6 The replacement of the abated materials is not of this contract.

7 Contractor shall supply a licensed electrician to hook up electrical equipment if

need be.

8 It is the Owner's responsibility to remove all moveable objects.

9 Contractor to use only IDPH-licensed workers.

10 Contractor's IDPH-licensed supervisor must be on site at all times.

11 Contractor is responsible for supplying electrical power and water.

12 All negative air shall be exhausted outside the building.

13 Contractor shall be responsible for supplying adequate protection for workers.

14 Contractor shall comply with applicable building and safety requirements.

15 Clearance shall follow two 12-hour settling periods for each full containment

work area.

16 At the Owner's direction, the drywall ceilings will not be removed. All carpet

and carpet base will be disposed as ACM waste.

Page 3: ASBESTOS ABATEMENT PROJECT DESIGN - Peoria ... TO FIELD VERIFY ALL QUANTITIES: BM NTS 04-18-16 16-03-224 Sterling Towers East 2601 W. Reservoir Road Peoria, IL 61615 Housing Authority

TYPICAL FLOORPLAN - UNIT 504 UNIT 504 - ASBESTOS

ABATEMENT PLAN

ASB - 1

REVISIONS

Number: Date:

Rev. By:

Drawn By:

Scale:

Date:

Project No:

Dwg. No:

Client:

Consultant:

Midwest Environmental

Consulting Services, Inc.

4 Bonnie Lane

Yorkville, IL 60560

Ph. 630.553.3989

Fax 630.553.3990

www.mec-us.com

Project Designer:

LIC #:

Project Location:

CONTRACTOR TO FIELDVERIFY ALL QUANTITIES:

BM NTS

04-18-16

16-03-224

Sterling Towers East

2601 W. Reservoir Road

Peoria, IL 61615

Housing Authority of Peoria

100 s. Richard Pryor Place

Peoria, IL 61605

GENERAL NOTES:

1. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS

IN THE FIELD.

2. NEGATIVE AIR SHALL BE EXHAUSTED OUTSIDE THE WORK AREA.

3. TENTED WORK AREAS SHALL INCLUDE CRITICAL SEALS, ONE LAYER OF

4-MIL POLY ON THE WALLS, AND ONE LAYER OF 6-MIL POLY ON THE

FLOOR.

4. CONTRACTOR SHALL INSTALL A 1-CHAMBER AIR-LOCK TO THE TENTED

WORK AREA.

5. THE CONTRACTOR SHALL REMOVE DRYWALL TO THE FIRST FURRING

STRIP UTILIZING GROSS REMOVAL METHODS WITHIN A TENTED WORK

AREA.

6. CONTRACTOR SHALL APPLY A DROP CLOTH BELOW THE WORK AREA.

7. CONTRACTOR SHALL THOROUGHLY HEPA VACUUM THE FLOOR AREA.

8. CONTRACTOR SHALL APPLY WHITE COLORED BASE ENCAPSULANT TO

THE CEILING.

9. CONTRACTOR SHALL APPLY CAULK TO WALL EDGES AT THE

COMPLETION OF THE ENCAPSULATION.

10. LOCATIONS SPECIFIED IN RED NOT IN THE TENTED WORK AREAS SHALL

UTILIZE O & M.

ABATEMENT LEGEND:

LOCATION OF DRYWALL TO

BE REMOVED FROM CEILING

1-CHAMBER AIR-LOCK

1

TENTED WORK AREA

NEGATIVE AIR

N

N

5

REMOVE ≈5'X8' AREA

OF DRYWALL TO FIRST

CEILING JOIST

REMOVE

≈2'X2' AREA.

≈1'X6' AREA

2

TYP

3

6

7

8

9

TYP

6

7

8

9

N

N

1

1

1

≈1'X1' O & M

≈2'X8' O & M

≈1'X8' O & M

≈2'X3' O & M

X

X

X

X

X

3

5

5

4

≈1'X1' O & M

≈1'X1' O & M

≈1'X1' O & M

Page 4: ASBESTOS ABATEMENT PROJECT DESIGN - Peoria ... TO FIELD VERIFY ALL QUANTITIES: BM NTS 04-18-16 16-03-224 Sterling Towers East 2601 W. Reservoir Road Peoria, IL 61615 Housing Authority

TYPICAL FLOORPLAN - UNIT 605 UNIT 605 - ASBESTOS

ABATEMENT PLAN

ASB - 2

REVISIONS

Number: Date:

Rev. By:

Drawn By:

Scale:

Date:

Project No:

Dwg. No:

Client:

Consultant:

Midwest Environmental

Consulting Services, Inc.

4 Bonnie Lane

Yorkville, IL 60560

Ph. 630.553.3989

Fax 630.553.3990

www.mec-us.com

Project Designer:

LIC #:

Project Location:

CONTRACTOR TO FIELDVERIFY ALL QUANTITIES:

BM NTS

04-18-16

16-03-224

Sterling Towers East

2601 W. Reservoir Road

Peoria, IL 61615

Housing Authority of Peoria

100 s. Richard Pryor Place

Peoria, IL 61605

GENERAL NOTES:

1. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS

IN THE FIELD.

2. NEGATIVE AIR SHALL BE EXHAUSTED OUTSIDE THE WORK AREA.

3. TENTED WORK AREAS SHALL INCLUDE CRITICAL SEALS, ONE LAYER OF

4-MIL POLY ON THE WALLS, AND ONE LAYER OF 6-MIL POLY ON THE

FLOOR.

4. CONTRACTOR SHALL INSTALL A 1-CHAMBER AIR-LOCK TO THE TENTED

WORK AREA.

5. THE CONTRACTOR SHALL REMOVE DRYWALL TO THE FIRST FURRING

STRIP UTILIZING GROSS REMOVAL METHODS WITHIN A TENTED WORK

AREA.

6. CONTRACTOR SHALL APPLY A DROP CLOTH BELOW THE WORK AREA.

7. CONTRACTOR SHALL THOROUGHLY HEPA VACUUM THE FLOOR AREA.

8. CONTRACTOR SHALL APPLY WHITE COLORED BASE ENCAPSULANT TO

THE CEILING.

9. CONTRACTOR SHALL APPLY CAULK TO WALL EDGES AT THE

COMPLETION OF THE ENCAPSULATION.

ABATEMENT LEGEND:

LOCATION OF DRYWALL TO

BE REMOVED FROM CEILING

1-CHAMBER AIR-LOCK

1

TENTED WORK AREA

NEGATIVE AIR

N

N

1

3

4

5

≈18'X1' ENCAPSULANT

ALONG WALL.

CAULK AT CEILING

EDGE

6

7

8

9

2

TYP

5

REMOVE ≈4'X8' SHEET OF

DRYWALL FROM WALL

TO KEEP

Page 5: ASBESTOS ABATEMENT PROJECT DESIGN - Peoria ... TO FIELD VERIFY ALL QUANTITIES: BM NTS 04-18-16 16-03-224 Sterling Towers East 2601 W. Reservoir Road Peoria, IL 61615 Housing Authority

TYPICAL FLOORPLAN - UNIT 704 UNIT 704 - ASBESTOS

ABATEMENT PLAN

ASB - 3

REVISIONS

Number: Date:

Rev. By:

Drawn By:

Scale:

Date:

Project No:

Dwg. No:

Client:

Consultant:

Midwest Environmental

Consulting Services, Inc.

4 Bonnie Lane

Yorkville, IL 60560

Ph. 630.553.3989

Fax 630.553.3990

www.mec-us.com

Project Designer:

LIC #:

Project Location:

CONTRACTOR TO FIELDVERIFY ALL QUANTITIES:

BM NTS

04-18-16

16-03-224

Sterling Towers East

2601 W. Reservoir Road

Peoria, IL 61615

Housing Authority of Peoria

100 s. Richard Pryor Place

Peoria, IL 61605

GENERAL NOTES:

1. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS

IN THE FIELD.

2. NEGATIVE AIR SHALL BE EXHAUSTED OUTSIDE THE WORK AREA.

3. TENTED WORK AREAS SHALL INCLUDE CRITICAL SEALS, ONE LAYER OF

4-MIL POLY ON THE WALLS, AND ONE LAYER OF 6-MIL POLY ON THE

FLOOR.

4. CONTRACTOR SHALL INSTALL A 1-CHAMBER AIR-LOCK TO THE TENTED

WORK AREA.

5. THE CONTRACTOR SHALL REMOVE DRYWALL TO THE FIRST FURRING

STRIP UTILIZING GROSS REMOVAL METHODS WITHIN A TENTED WORK

AREA.

6. CONTRACTOR SHALL APPLY A DROP CLOTH BELOW THE WORK AREA.

7. CONTRACTOR SHALL THOROUGHLY HEPA VACUUM THE FLOOR AREA.

8. CONTRACTOR SHALL APPLY WHITE COLORED BASE ENCAPSULANT TO

THE CEILING.

9. CONTRACTOR SHALL APPLY CAULK TO WALL EDGES AT THE

COMPLETION OF THE ENCAPSULATION.

10. LOCATIONS SPECIFIED IN RED NOT IN THE TENTED WORK AREAS SHALL

UTILIZE O & M.

ABATEMENT LEGEND:

LOCATION OF DRYWALL TO

BE REMOVED FROM CEILING

1-CHAMBER AIR-LOCK

1

TENTED WORK AREA

NEGATIVE AIR

N

1

N

N

1

5

REMOVE

≈4'X6' AREA.

4

3

6

7

8

9

3

6

7

8

9

5

REMOVE

≈1'X1' AREA.

TYP

5

REMOVE

≈1'X4' AREA.

≈1'X4'

O & M

≈1'X1'

X

X

X

≈1'X1'

O & M

≈1'X1'

O & M

≈3'X8'

O & M

X

≈1'X1'

O & M

Page 6: ASBESTOS ABATEMENT PROJECT DESIGN - Peoria ... TO FIELD VERIFY ALL QUANTITIES: BM NTS 04-18-16 16-03-224 Sterling Towers East 2601 W. Reservoir Road Peoria, IL 61615 Housing Authority

TYPICAL FLOORPLAN - UNIT 1004 UNIT 1004 - ASBESTOS

ABATEMENT PLAN

ASB - 4

REVISIONS

Number: Date:

Rev. By:

Drawn By:

Scale:

Date:

Project No:

Dwg. No:

Client:

Consultant:

Midwest Environmental

Consulting Services, Inc.

4 Bonnie Lane

Yorkville, IL 60560

Ph. 630.553.3989

Fax 630.553.3990

www.mec-us.com

Project Designer:

LIC #:

Project Location:

CONTRACTOR TO FIELDVERIFY ALL QUANTITIES:

BM NTS

04-18-16

16-03-224

Sterling Towers East

2601 W. Reservoir Road

Peoria, IL 61615

Housing Authority of Peoria

100 s. Richard Pryor Place

Peoria, IL 61605

GENERAL NOTES:

1. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS

IN THE FIELD.

2. NEGATIVE AIR SHALL BE EXHAUSTED OUTSIDE THE WORK AREA.

3. TENTED WORK AREAS SHALL INCLUDE CRITICAL SEALS, ONE LAYER OF

4-MIL POLY ON THE WALLS, AND ONE LAYER OF 6-MIL POLY ON THE

FLOOR.

4. CONTRACTOR SHALL INSTALL A 1-CHAMBER AIR-LOCK TO THE TENTED

WORK AREA.

5. THE CONTRACTOR SHALL REMOVE DRYWALL TO THE FIRST FURRING

STRIP UTILIZING GROSS REMOVAL METHODS WITHIN A TENTED WORK

AREA.

6. CONTRACTOR SHALL APPLY A DROP CLOTH BELOW THE WORK AREA.

7. CONTRACTOR SHALL THOROUGHLY HEPA VACUUM THE FLOOR AREA.

8. CONTRACTOR SHALL APPLY WHITE COLORED BASE ENCAPSULANT TO

THE CEILING.

9. CONTRACTOR SHALL APPLY CAULK TO WALL EDGES AT THE

COMPLETION OF THE ENCAPSULATION.

ABATEMENT LEGEND:

LOCATION OF DRYWALL TO

BE REMOVED FROM CEILING

1-CHAMBER AIR-LOCK

1

TENTED WORK AREA

NEGATIVE AIR

N

N

1

3

6

7

8

9

5

REMOVE

≈1'X1' AREA &

WALL EDGE.

2

4

Page 7: ASBESTOS ABATEMENT PROJECT DESIGN - Peoria ... TO FIELD VERIFY ALL QUANTITIES: BM NTS 04-18-16 16-03-224 Sterling Towers East 2601 W. Reservoir Road Peoria, IL 61615 Housing Authority

UNIT 1104 UNIT 1104 - ASBESTOS

ABATEMENT PLAN

ASB - 5

REVISIONS

Number: Date:

Rev. By:

Drawn By:

Scale:

Date:

Project No:

Dwg. No:

Client:

Consultant:

Midwest Environmental

Consulting Services, Inc.

4 Bonnie Lane

Yorkville, IL 60560

Ph. 630.553.3989

Fax 630.553.3990

www.mec-us.com

Project Designer:

LIC #:

Project Location:

CONTRACTOR TO FIELDVERIFY ALL QUANTITIES:

BM NTS

04-18-16

16-03-224

Sterling Towers East

2601 W. Reservoir Road

Peoria, IL 61615

Housing Authority of Peoria

100 s. Richard Pryor Place

Peoria, IL 61605

GENERAL NOTES:

1. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS

IN THE FIELD.

2. NEGATIVE AIR SHALL BE EXHAUSTED OUTSIDE THE WORK AREA.

3. TENTED WORK AREAS SHALL INCLUDE CRITICAL SEALS, ONE LAYER OF

4-MIL POLY ON THE WALLS, AND ONE LAYER OF 6-MIL POLY ON THE

FLOOR.

4. CONTRACTOR SHALL INSTALL A 1-CHAMBER AIR-LOCK TO THE TENTED

WORK AREA.

5. THE CONTRACTOR SHALL REMOVE DRYWALL TO THE FIRST FURRING

STRIP UTILIZING GROSS REMOVAL METHODS WITHIN A TENTED WORK

AREA.

6. CONTRACTOR SHALL APPLY A DROP CLOTH BELOW THE WORK AREA.

7. CONTRACTOR SHALL THOROUGHLY HEPA VACUUM THE FLOOR AREA.

8. CONTRACTOR SHALL APPLY WHITE COLORED BASE ENCAPSULANT TO

THE CEILING.

9. CONTRACTOR SHALL APPLY CAULK TO WALL EDGES AT THE

COMPLETION OF THE ENCAPSULATION.

ABATEMENT LEGEND:

LOCATION OF DRYWALL TO

BE REMOVED FROM CEILING

1-CHAMBER AIR-LOCK

1

TENTED WORK AREA

NEGATIVE AIR

N

3

5

6

7

8

REMOVE ≈3X5 AREA

OF DRYWALL TO FIRST

CEILING JOIST

N

1

2

4

Page 8: ASBESTOS ABATEMENT PROJECT DESIGN - Peoria ... TO FIELD VERIFY ALL QUANTITIES: BM NTS 04-18-16 16-03-224 Sterling Towers East 2601 W. Reservoir Road Peoria, IL 61615 Housing Authority

UNIT 1105 UNIT 1105 - ASBESTOS

ABATEMENT PLAN

ASB - 6

REVISIONS

Number: Date:

Rev. By:

Drawn By:

Scale:

Date:

Project No:

Dwg. No:

Client:

Consultant:

Midwest Environmental

Consulting Services, Inc.

4 Bonnie Lane

Yorkville, IL 60560

Ph. 630.553.3989

Fax 630.553.3990

www.mec-us.com

Project Designer:

LIC #:

Project Location:

CONTRACTOR TO FIELDVERIFY ALL QUANTITIES:

BM NTS

04-18-16

16-03-224

Sterling Towers East

2601 W. Reservoir Road

Peoria, IL 61615

Housing Authority of Peoria

100 s. Richard Pryor Place

Peoria, IL 61605

GENERAL NOTES:

1. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS

IN THE FIELD.

2. NEGATIVE AIR SHALL BE EXHAUSTED OUTSIDE THE WORK AREA.

3. TENTED WORK AREAS SHALL INCLUDE CRITICAL SEALS, ONE LAYER OF

4-MIL POLY ON THE WALLS, AND ONE LAYER OF 6-MIL POLY ON THE

FLOOR.

4. CONTRACTOR SHALL INSTALL A 1-CHAMBER AIR-LOCK TO THE TENTED

WORK AREA.

5. THE CONTRACTOR SHALL REMOVE DRYWALL TO THE FIRST FURRING

STRIP UTILIZING GROSS REMOVAL METHODS WITHIN A TENTED WORK

AREA.

6. CONTRACTOR SHALL APPLY A DROP CLOTH BELOW THE WORK AREA.

7. CONTRACTOR SHALL THOROUGHLY HEPA VACUUM THE FLOOR AREA.

8. CONTRACTOR SHALL APPLY WHITE COLORED BASE ENCAPSULANT TO

THE CEILING.

9. CONTRACTOR SHALL APPLY CAULK TO WALL EDGES AT THE

COMPLETION OF THE ENCAPSULATION.

ABATEMENT LEGEND:

LOCATION OF DRYWALL TO

BE REMOVED FROM CEILING

1-CHAMBER AIR-LOCK

1

TENTED WORK AREA

NEGATIVE AIR

N

N

1

REMOVE

≈2'X2' AREA.

2

3

4

5

6

7

8

9