Assessing the Market for Renewable Energy An IEA Methodology (draft)
Istanbul, Turkey
16 June 2015
Adam Brown Renewable Energy Division IEA
© OECD/IEA 2014
RE Assessment Method
© OECD/IEA 2015 2
Builds on other assessment methodologies (e.g. WB RISE)
Potential to cover electricity, heat and transport
Covers financial issues in more detail
Scoring of each factor via objective criteria
Traffic light system
No overall score since
factors not additive and weighting is arbitrary
one factor can kill deployment
© OECD/IEA 2014
What sets the pace and cost of RE market development
Resource Potential
RE Costs
RE Deployment
Overall Policy Framework
Non economic measures
Drivers
Enabling Context
Remuneration Adequacy
Finance
Grid access and integration
© OECD/IEA 2014
1. Identify priority technologies and market opportunities in a country
2. Look at levels and rate of deployment and costs of energy generation and compare with local and international benchmarks
3. Review enabling framework to identify barriers and best practice examples
Major steps
4
© OECD/IEA 2014
Technology Priorities – RE Electricty
© OECD/IEA 2015 5
RE Electricity
Wind
Solar
Bioenergy
Hydro
Geothermal
Ocean Biogas
Ag residues
MSW
Wood
Sewage
PV CSP
Offshore
Onshore
1-10 MW
>10MW
<1 MW
Wave Tidal
• Residential
• Commercial
• Utility
• Off-grid
© OECD/IEA 2014
1. Is there a suitable resource to enable significant and cost competitive deployment?
Is there a good physical resource?
Is there a well researched resource assessment
What fraction of resource is already exploited?
2. Leader or follower?
Is the technology widely deployed globally?
Is there willingness to invest in new technology development and deployment?
Priority Setting
© OECD/IEA 2015 6
© OECD/IEA 2014
• Predictable and rapidly adaptive incentives
• Focus on non-economic barriers
• Manage total support costs
• System integration Market design and expose RE to competition
• Publicacceptance
Time
Depl
oym
ent
Initiation Take-off Mainstreaming
Gene
ratio
n Pr
ices
International benchmark prices
Key Criteria How is the market growing? How much does it cost?
Where on the deployment journey?
RE Costs
RE
Deployment
© OECD/IEA 2014
Level of deployment
Generation and growth rate
National target?
International or regional benchmarks?
Deployment Is the market growing in line with expectations?
0
5
10
15
20
25
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
TWh/y
Deployment National Target External Benchmark Trajectory
RE Costs
RE
Deployment
© OECD/IEA 2014
Price of specific RE source
Benchmark cost (regional, global)
Comparison with alternative supply?
Cost of support as % of market cost
Impact on subsidies or taxes
Cost of RE – National Perspective How do costs of RE compare internationally? Are support costs affordable?
© OECD/IEA 2015 9
0
50 000
100 000
150 000
200 000
250 000
300 000
350 000
400 000
450 000
500 000
Aus
tria
Can
ada
Cze
ch R
epub
lic
Den
mar
k
Fran
ce
Ger
man
y
Gre
ece
Hun
gary
Irel
and
Kore
a
Luxe
mbo
urg
Net
herl
ands
Port
ugal
Slov
ak R
epub
lic
Spai
n
Swit
zerl
and
Turk
ey
Aus
tral
ia
Bel
gium Ital
y
Japa
n
Pola
nd
Swed
en
Uni
ted
King
dom
Bra
zil
Indi
a
Chi
na
Finl
and
Nor
way
Sout
h A
fric
a
Uni
ted
Stat
es
Icel
and
Mex
ico
New
Zea
land
Nor
way
Rus
sia
RA
I [U
SD/M
W p
er y
ear]
mainly FITs/FIPs mainly TGCs none
Onshore wind: Remuneration Adequacy Indicator
JapanAustralia
Belgium
Czech Republic
France
Germany
Greece
Italy
Slovak Republic
Spain0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
16.00%
18.00%
20.00%
0.00% 0.50% 1.00% 1.50% 2.00% 2.50% 3.00%
Tota
l pre
miu
ms
[as
shar
e of
who
lsal
e va
lue
of t
otal
ann
ual
gene
rati
on]
Additional share in total generation in 2010
Line for premium of 600% over market price
Line for premium of 800% over market price
Ad
dit
ion
al to
tal p
rem
ium
s
[sh
are
of
wh
ole
sale
valu
e o
f 2
00
9 t
ota
l
an
nu
al
gen
erati
on
Additional PV share in total generation in 2010
RE Costs
RE
Deployment
© OECD/IEA 2014
Is there a specific ghg target?
Is local air quality a priority?
Is demand growing?
Is energy access an issue?
Energy security?
Importer?
Dependence on particular sources
Economic development
Potential to increase value of exports?
Drivers How can RE contribute to national energy goals?
© OECD/IEA 2015 10
Enabling Context
© OECD/IEA 2014
Is RE included in the national energy plan?
Are there clear targets for short, medium and long term?
Is there a credible and detailed action plan?
Overall Policy Framework
Enabling Context
© OECD/IEA 2014
National Factors
Ease of doing business
Country credit rating
Currency volatility
Debt and equity finance available locally?
Are national or international development banks active?
Finance Can finance for projects be made available at reasonable rates?
Enabling Context
© OECD/IEA 2014
Are clear and predictable remuneration levels in place?
Are these sufficient to stimulate investment (i.e. remuneration>LCOE)?
Is the off-taker reliable?
Are there clear indications about future market?
Remuneration – Developer Perspective
Enabling Context
© OECD/IEA 2014
Is permitting system transparent and efficient?
Is guidance on permitting available?
Are permitting times monitored?
How long does permitting take?
How many agencies involved?
Is a supply chain in place?
Are key components manufactured locally?
Is there local experience of installation and maintenance?
Are standards or certification in place?
Is there a skills base?
Is there a recognised centre of expertise?
Is education and skill training under way?
Is there a public information campaign re renewables?
Non economic measures Are measures to tackle non economic barriers in place?
© OECD/IEA 2015 14
Enabling Context
© OECD/IEA 2014
Grid access and integration Is there fair grid access? Are steps in hand to integrate renewables?
© OECD/IEA 2015 15
Initiation Is grid access allowed?
Are grid connection costs transparent?
Are renewables included in grid development plans?
Take off Is the regulatory framework appropriate?
Grid connections codes
Forecasting
Dispatch rules
Has an integration study been carried out?
Mainstreaming Are investment plans in place to ensure sufficient flexibility?
Enabling Context
© OECD/IEA 2014
Technology Bioenergy Geothermal Solar PV Solar CSP Wind Ocean
Priority
Deployment
Cost
Drivers
Policy
Framework
Finance
Remuneration
Adequacy
Non economic
issues
Access and
integration
Example Assessment - Electricity
© OECD/IEA 2015 16