Assets Returned From LeaseProject: 0307-01-003

Bill Cody Black BeltSeptember 25, 2003

Page 2: Assets Returned From Lease Project: 0307-01-003 Bill Cody Black Belt September 25, 2003

2

Background

IKON assets remain with at customer locations after lease obligations are met

Nationally, 84,000 assets are tied to contract terminations yearly; 20,000 are in the West Region

Recovery rate in West Region is 88%, translating to 2,400 assets not being recovered.

Non-recovered assets at customer locations represent lost revenue opportunity from a wholesale and retail perspective with associated margin impacts

Six Sigma Process will focus on improving the recovery rate for the West to 95% thus providing IKON with incremental revenue and margin

Page 3: Assets Returned From Lease Project: 0307-01-003 Bill Cody Black Belt September 25, 2003

3

Project Charter & Uncovered Opportunities

Project Charter Identified Revenue Opportunity of $1.8 million with 95% Recovery Rate Achievement

Based on further analysis - opportunity potential in excess of $3.5 million

Original Data Excluded Total Region (old Southwest District basis)

Current Process Review Activities have Identified Additional Opportunities (still to be Validated):

Headcount: Headcount: currently 9 Associates involved within Phoenix CCC

Process benchmark in NER utilizes 2 Associates for similar volume

Cycle Time: No current measures in place for Cycle Time

Assets remain “unrecovered” in excess of 1 year

Reduction in Cycle Time generates earlier Revenue/Margin recognition

Page 4: Assets Returned From Lease Project: 0307-01-003 Bill Cody Black Belt September 25, 2003

4

Process Discovery

Current Process Focused Solely to Asset Recovery based on IOS Capital Direction which Encompasses only 6% of the Lease End Recovery Base

No Centralized Process or Ownership to Insure all Assets are Accounted => Multiple Touch Points with Minimal Interactions

Poor Process Communication between Recovery Team and Field Organizations including Supply Chain

Process Redundancies Identified creating Potential Unnecessary Manual Inputs

Page 5: Assets Returned From Lease Project: 0307-01-003 Bill Cody Black Belt September 25, 2003

5

Project Improvement Focus

Process Capability will be Improved from Current Output utilizing fewer Associates: Standardize Process and Centralize Ownership to CCC Elimination of Redundancies currently Required

E.g. Individual Pickup Order Generation for Multiple Machines located in same Location (Process Capable - validated in Northeast and Midwest Regions)

Strengthen Communication links with Key Constituents (CCC/CC/Marketplace) through improved Process Outputs

Ongoing Process Model Validation through Key Measures and Controls

Page 6: Assets Returned From Lease Project: 0307-01-003 Bill Cody Black Belt September 25, 2003

6

Next Steps

Benchmark Detailed NER Process Capability to Determine West Region Output Potential

Validation of Process Inputs and Ranking of Each Measurement System Development focused to

Volume, Defect Detection and Cycle Time Measures Analyze Data Collected to Isolate Areas of Immediate

Focus Implement Appropriate Changes Sooner than Later

when Data Supports

Page 7: Assets Returned From Lease Project: 0307-01-003 Bill Cody Black Belt September 25, 2003

7

QUESTIONS?