  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    1/16

    Patrick Kelsey

    Manheim, PA

    October 23, 2014

    To: Federal Energy Regulatory Commission

    888 First Street, N.E.

    Washington, D.C. 20426

    Re: Atlantic Sunrise Project

    Docket No. PF14-8

    Proposing the CPL South Marietta Extension Alternative (Revision 2)

    0 Changes from Previous Revision

    The Columbia Gas Transmission Marietta Compressor Station was misidentified as the Texas

    Eastern Marietta Compressor Station. This reference point has been relabeled throughout.

    1 Introduction

    Previous analysis of the Western CPL South Alternative1identified significant co-location of that route

    with the existing Texas Eastern Marietta Extension2as well as the opportunity for increasing the extent

    of such co-location. The Texas Eastern Marietta Extension was constructed along an existing electric

    transmission line right-of-way between March and September 20113using a 100 ft wide constructionzone4that is readily identified in aerial imagery from September 2012 (see Attachment 1). Google

    Street View imagery from September and October 2013 indicates that the 100 ft wide clearings created

    for this project in forested areas remain devoid of trees (see Attachments 2 and 3)

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    2/16

    for this project in forested areas remain devoid of trees (see Attachments 2 and 3)

    2 The CPL South Marietta Extension Alternative

    The CPL South Marietta Extension Alternative is shown in Attachment 4, along with the corresponding

    portion of the current Central Penn Line South Primary Route5. It consists of the following components,

    beginning from the southern end and moving north:

    1.

    Interconnect with the Transco mainline adjacent to the existing Texas Eastern Marietta

    Extension metering and regulating station on Johnson Road in Lower Chanceford Township, York

    County

    2.

    Pipeline alignment paralleling the Texas Eastern Marietta Extension from the Transco mainline

    interconnect to a point in Lower Windsor Township, York County just south of Yorkana Borough

    3.

    Deviation from the Texas Eastern Marietta Extension route in the northwest corner of Lower

    Windsor Township, York County to avoid potential congestion along the existing right-of-way in

    Yorkana Borough near Bluestone Road

    4.

    Pipeline alignment paralleling the Texas Eastern Marietta Extension from a point in Lower

    Windsor Township, York County just north of Yorkana Borough to a point near Columbia Gas

    Transmissions Marietta Compressor Station on Depot Road in East Donegal Township,

    Lancaster County

    5.

    Pipeline alignment from a point near Columbia Gas Transmissions Marietta Compressor Station

    in East Donegal Township, Lancaster County to the current Central Penn Line South Primary

    Route near Milepost 35 at the border of Lancaster and Lebanon Counties, then continuing north

    along the current Central Penn Line South Primary Route.

    2 1

    Transco Mainline Interconnect

    The Transco mainline interconnect point for the CPL South Marietta Extension Alternative is in the

    immediate vicinity of the existing Texas Eastern Marietta Extension metering and regulating station as

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    3/16

    2 3 Yorkana Deviation

    Space constraints along the existing Texas Eastern Marietta Extension right-of-way near Bluestone Road

    in Yorkana Borough may preclude adding another pipeline in this location (see Attachment 7). To

    illustrate how this potential issue might be addressed, a deviation of the CPL South Marietta Extension

    Alternative from the Texas Eastern Marietta Extension route was developed for this area.

    This deviation departs from the Texas Eastern Marietta Extension alignment at a point in Lower Windsor

    Township just south of Yorkana Borough, and continues to the west and north of Yorkana Borough,

    along existing utility rights-of-way where possible, until it rejoins the Texas Eastern Marietta Extension

    route (see Attachment 8).

    If subsequent site analysis determines that such a deviation is not required, the overall length of the

    CPL South Marietta Extension Alternative would be reduced and its total co-located length would be

    increased.

    2 4 Yorkana to Columbia Gas Transmissions Marietta ompressor Station

    The CPL South Marietta Extension Alternative alignment from just north of Yorkana Borough to just

    south of the Susquehanna River crossing parallels the existing Texas Eastern Marietta Extension. This

    alignment was produced using the technique described in Section 2.2.

    The CPL South Marietta Extension Alternative crosses the Susquehanna River alongside the crossing of

    an existing Texas Eastern 36 inch gas pipeline. The alignment for the final 1500 ft down to the river on

    the York County side, the crossing, and on to a point near the Columbia Gas Transmission Marietta

    Compressor Station on the Lancaster County side follows the location of the existing Texas Eastern

    pipeline (see Attachment 9).

    2 5

    Lancaster County

    The remainder of the CPL South Marietta Extension Alternative route proceeds as directly as possible to

    the Central Penn Line South Primary Route near Milepost 35 at the border of Lancaster and Lebanon

    Counties From the point where it crosses PA 283 to where it joins the current Central Penn Line South

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    4/16

    The CPL South Marietta Extension Alternative is significantly further to the west of the Mount Joy

    Wellhead Protection Area than the original Central Penn Line South Primary Route was (see Attachment

    107). At the point of closest approach, the CPL South Marietta Extension Alternative is approximately5,200 ft from the Mount Joy Wellhead Protection Area, increasing to approximately 6,200 ft of

    separation at the northern end and 7,100 ft of separation at the southern end. The configuration of the

    CPL South Marietta Extension Alternative relative to the Mount Joy Wellhead Protection Area allows

    unlimited expansion of that protection area to the north, east and south without approaching the route.

    It also allows the protection area to expand to the west an additional 3,000 ft (its approximate current

    width) while still maintaining a separation of over 2,000 ft.

    3

    Metrics

    Several major characteristics measured for each route are compared in the following tables. Table 1

    presents the results for the CPL South Marietta Extension Alternative as described above, using the

    Yorkana deviation. Table 2 shows the changes that would occur if it turns out the Yorkana deviation is

    not required. All of the measurements for the CPL South Primary Route are for the portion of that route

    that would be replaced by the CPL South Marietta Extension Alternative. It should be noted that nearly

    all of the forested land crossed by the CPL South Marietta Extension Alternative is already completely or

    substantially cleared, whereas all of the forested land crossed by the Central Penn Line South Primary

    Route would have to be cleared.

    As Table 1 shows, compared to the corresponding portion of the current Central Penn Line South

    Primary Route, the CPL South Marietta Extension Alternative would deliver a 21.1 mile increase in total

    length co-located with existing linear utilities.

    In exchange, 4.8 additional miles of pipeline would have to be constructed. Although the CPL South

    Marietta Extension Alternative is longer, it interconnects with the Transco mainline sufficiently furthersouth than the Central Penn Line South Primary Route for the distance between compressor stations

    (proposed Station 610 and existing Station 195) to remain essentially unchanged between the two

    lt ti

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    5/16

    Table 1. Route Metrics if Yorkana Deviation is Used

    Metric CPL South

    Primary

    Route

    CPL South

    Marietta

    Extension

    Alternative

    Change

    Length of Corresponding Segment to Transco (miles) 35.0 39.8 +4.8

    Length of Corresponding Segment to Station 195 (miles) 43.6 43.8 +0.2

    Length Adjacent to Interstate Pipeline ROW (miles) 0.4 25.8 +25.4

    Length Adjacent to Electric Transmission Line ROW (miles) 5.3 1.0 -4.3

    Total Length Co-located (miles) 5.7 26.8 +21.1

    Forested Land Crossed (miles) 4.4 9.9 +5.5

    Forest Interior Crossed (miles) 0.3 0 -0.3

    Agricultural Land Crossed (miles) 29.5 28.2 -1.3

    Karst Terrain Crossed (miles) 17.2 10.7 -6.5

    Table 2. Route Metrics if Yorkana Deviation is not UsedMetric CPL South

    Primary

    Route

    CPL South

    Marietta

    Extension

    Change

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    6/16

    4 Additional Advantages

    Much of the CPL South Marietta Extension Alternative could be considered a solved problem due to

    the recent completion of the Texas Eastern Marietta Extension. Texas Eastern was able to build the

    Marietta Extension pipeline facilities ahead of schedule and under budget8, indicating reduced execution

    risk for like projects in the same area (notably, none of the forecast contingency expenses materialized).

    The alignment sheets and archeological, historical, and geological survey data contained in the CP09-68

    docket will no doubt be of value, potentially reducing many from-scratch efforts along this route to less

    intensive reuse/augment/verify tasks.

    While both routes contend with elevation changes throughout their southern extents, it is readily

    apparent from Attachment 4 that the large portion of the CPL South Marietta Extension Alternative that

    is co-located with the Texas Eastern Marietta Extension is characterized by long, straight pipeline

    segments, whereas the corresponding portion of the Central Penn Line South Primary Route is

    characterized by numerous changes in direction. It seems reasonable to anticipate that construction of

    the CPL South Marietta Extension Alternative would require simpler site surveying and reduced and/or

    simplified on-site pipe-forming.

    5

    Conclusion

    The Commission encourages construction in existing rights-of-way on the basic theory that impacts,

    small and large, would be minimized9. The CPL South Marietta Extension Alternative provides a

    significant increase in total length co-located with existing rights-of-way in exchange for what appears to

    be a minor increase in total project pipeline facilities. It seems entirely possible, indeed, probable, that

    this alternative route would substantially minimize project impacts.

    I ask that the Commission encourage the construction of the CPL South Marietta Extension Alternative

    over the construction of the current Central Penn Line South Primary Route.

    Please contact me with any questions or requests for reference material via phone at 484.437.9962 or

    i il t k l @i

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    7/16

    Attachment 1

    Aerial imagery from September 2012 showing portion of Texas Eastern Marietta Extension construction zone near Craley Road

    100 ft wide clearing created during

    Marietta Extension construction

    Road patch at Texas Eastern Marietta

    Extension crossing Point

    100 ft wide Marietta Extension

    construction zone

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    8/16

    Attachment 2

    Google Street View image from September 2013 looking north along Texas Eastern Marietta Extension from Burkholder Road

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    9/16

    Attachment 3

    Google Street View image from October 2013 looking south along Texas Eastern Marietta Extension from Gun Club Road

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    10/16

    Attachment 4

    CPL South Marietta Extension Alternative and corresponding portion of CPL South Primary Route

    CPL South Marietta Extension

    Alternative

    Transco Mainline

    CPL South Primary Route

    To Leidy

    Line

    CPL South Marietta Extension Alternative CPL South Primary Route Co-location with existing linear utilities

    1. Transco Mainline Interconnect

    2. Paralleling Texas Eastern Marietta Extension

    3. Yorkana Deviation

    4. Paralleling Texas Eastern Marietta Extension

    5. Lancaster County Alignment

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    11/16

    Attachment 5

    CPL South Marietta Extension Alternative Transco mainline interconnect point

    CPL South Marietta

    Extension Alternative

    Transco Mainline

    Potential Locations for CPL South Marietta

    Extension Alternative Transco Interconnect Facility

    To Station 195

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    12/16

    Attachment 6

    Example of the difference between tracking the Texas Eastern Marietta Extension alignment and the adjacent power line

    Adjacent power line

    CPL South Marietta

    Extension Alternative

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    13/16

    Attachment 7

    Potentially congested area near Bluestone Road in Yorkana Borough, York County

    Electrical Transmission Towers

    Texas Eastern

    Marietta Extension

    Potentially

    Congested Area

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    14/16

    Attachment 8

    CPL South Marietta Extension Alternative deviation from the Texas Eastern Marietta Extension route in Lower Windsor Township,

    near Yorkana Borough, York County

    Departs Texas Eastern

    Marietta ExtensionAlignment Here

    CPL South Marietta

    Extension Alternative

    Returns to Texas Eastern

    Marietta Extension

    Alignment Here

    Texas Eastern

    Marietta Extension

    Potentially

    Congested Area

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    15/16

    Attachment 9

    CPL South Marietta Extension Alternative Susquehanna River crossing

    Departs Texas Eastern

    Alignment Here

    CPL South MariettaExtension Alternative

    Columbia Gas Transmission

    Marietta Compressor Station

    Parallels Existing 36

    Texas Eastern Line

    Texas Eastern Marietta Extension

    Pig Launch/Recovery Facility

  • 8/10/2019 Atlantic Sunrise CPL South Marietta Extension Alternative

    16/16

    Attachment 10

    CPL South Marietta Extension Alternative, northern portion, including distance from Mount Joy Wellhead Protection Area

    CPL South Marietta

    Extension Alternative

    Current Central Penn Line

    South Primary Route

    Same as Original Central Penn Line

    South Primary Route

    Mount Joy Wellhead

    Protection Area