Atlantic Technical Management 2006
1
SUNOCO LOGISTICS&
ATLANTIC TECHNICAL MANAGEMENT,
A PARTNERSHIP FOR MANAGING MARINE RISKS
![Page 2: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/2.jpg)
Atlantic Technical Management 2006
2
![Page 3: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/3.jpg)
Atlantic Technical Management 2006
3
SEATIGER 1979
![Page 4: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/4.jpg)
Atlantic Technical Management 2006
4
Sunoco Logistics Partners L.P.
• Master Limited Partnership (SXL on NYSE)– Sunoco Inc. as General Partner
• Owner/Operator of Pipelines and Terminals– 4,600 Miles of Pipeline– 28.3 million bbls Terminal Storage Capacity– 12.5 million bbls @ Nederland Terminal
• Required Flexible Marine Risk Management Program to Meet Customer Needs but still;
• Maintain Strong Commitment to Manage Marine Risk
![Page 5: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/5.jpg)
Atlantic Technical Management 2006
5
Atlantic Technical Management
• 10 Years in Managing Marine Risks• Over 2,000 SIRE Ship Inspections• Experience with Different Oil Majors• Background in Managing Ship/Shore
Interface• Commitment to Marine Risk Management
with the SIRE Inspection Program• Understanding of the SLP Risk
Management Requirements
![Page 6: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/6.jpg)
Atlantic Technical Management 2006
6
PREPARATIONS
• Designing a Risk Matrix
• Establishing the “Bottom Line”
• Developing the Computer System
• Starting at Zero
• Internal Customers
• External Customers
• SIRE Documentation
![Page 7: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/7.jpg)
Atlantic Technical Management 2006
7
START UP
• Grandfather Phase
• Attendances
• No inspections
• Complaints
• First “No”
![Page 8: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/8.jpg)
Atlantic Technical Management 2006
8
INFORMATION FLOW
• Customer Request – Ship/Date/Cargo• Scheduler Reviews Database – Approved/Rejected/Unavailable• Contact ATM – Rejected/Unavailable• ATM Screen – Port State & Casualty Data & Sire Report
– Most Current Sire Report – 6 months or less
– If report is Negative/Lacks Information – Review Next Report
– If outstanding questions – Contact owner/operator
– Review Complete – Approved/Rejected – Update Site
• ATM Contacts Scheduler then Scheduler Contacts Customer• Goal – Full Process in One Hour
![Page 9: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/9.jpg)
Atlantic Technical Management 2006
9
SCREENING PROCESS
Open Vetting Site & Select Vessel
Review Any Terminal Feedback on Site
Review Port State Data
Review Casualty Data
Pull Down Most Current SIRE Report
Enter Data on SITE Including SIRE #
Contact Scheduler
![Page 10: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/10.jpg)
Atlantic Technical Management 2006
10
RISK CRITERIA
• Structural – CAP 1 or 2
• Ballast Tank Integrity
• IG Operations
• Safety Procedures
• Safe Mooring Operations
• Pumproom Entry Procedures
• Communications
![Page 11: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/11.jpg)
Atlantic Technical Management 2006
11
APPROVAL PROCESS
• Vessel Approved for Single Trip to Berth• Inspection at berth - SLP/SIRE Inspector• Processed as per SIRE requirements• Response from Owners evaluated• Any Feedback from Terminal• If acceptable, “no inspection” for up to 1
year• Ships over 20 years max 6 months
![Page 12: Atlantic Technical Management 2006 1 SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS](https://reader030.vdocument.in/reader030/viewer/2022032708/56649e7d5503460f94b8000a/html5/thumbnails/12.jpg)
Atlantic Technical Management 2006
12
CONCLUSIONS
• All Ships Screened
• New Ships Screened by Sire/PSI/Casualty
• Approved for Single Trip to Berth
• Successful Inspection Up to 1 Year
• Terminal Feedback Important