atlas-lal meeting 18/01/2017 · 2017. 1. 18. · cern slowly back since thursday january 5th. atlas...

17
ATLAS-LAL meeting 18/01/2017 18/01/2017 1

Upload: others

Post on 12-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

ATLAS-LAL meeting 18/01/2017

18/01/2017 1

Page 2: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

18/01/2017 2

Page 3: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

ATLAS news

CERN slowly back since Thursday January 5th.

ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges Manuel’s (LAL) contribution

Reprocessing with Release 21 will start in February. Goal to finish 2016 Data+MC before new Run begins

Two questions to be settled for the Chamonix Workshop (23-25/01)Running conditions ?( μ and Instantaneous Lumi) in

2017. First indications μpeak~60 and L=2 e34 . Beam energy in 2018? (13.5 or 14 TeV)https://indico.cern.ch/event/598990/ and https://indico.cern.ch/event/604020/

18/01/2017 3

Page 4: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

18/01/2017 4

Dave Charlton https://indico.cern.ch/event/604020/

Page 5: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

18/01/2017 5

Page 6: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

News : ATLAS-LAL

1) Article in LAL-news on the MW measurement (thanks Zhiqing !) 2) We got a PostDoc on HGTD activities ! Call for applications should

be launched soon3)The selection procedure for the PostDoc on Hgg in ongoing4) The 1-year remaining Post-Doc contract on Hbb is filled ! Daniel

Buescher, fresh PhD from Fribourg will join us from March on.5) Over the 5 proposed PhD theses, we have 4 candidates. NPAC

pushes to find candidates for the 5th one.6) HGTD+Lar Phase 2 at SC (16/01). See Laurent’s talk

18/01/2017 6

Page 7: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

The new persons to join ATLAS-LAL soon • 1) Daniel Buescher ANR Hbb (12months) from 01/03

• 2)Pierre-Alexander Duverne M1 (Dirk) for 6 months (2days/week)

• 3) Tasneem Abdallah M1 6 mois (David+Dimitris), already here WELCOME !

• 4) Sebastian Van Vilsen M1 (Marc)

• 5) Cristina Agapopoulou pre-thesis HGTD+SS (Nikola) from 1/03

• 6) Konie pre-thesis Hbb (Nicolas) from 1/03

• 7) Aishik Gosh pre-thesis ML H4l (David) from 01/03

• 8) Hicham Atmani Pre-thesis MW (Zhiqing+Louis) from 01/03

• 9) Kunlin Han joint thesis (Zhiqing)

• 10) HH thesis (Marc) ****

• 11) Hgg ANR PostDoc in process of selection ****

• 12) Manuel Guth M2 NPAC from 8/02 (with Nikola)

• 13) Sabrina Zacharias M1 Pixel (with Abdenour)

• 14) Krunal Gedia M1 X March (with Rei)

• 15) Paul Klein Cesure Supelec February (with David and at CERN)

• 16) Aaron White Michigan U. From May->September

18/01/2017 7

Page 8: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

Name Contract Start date Office

Daniel Buescher PostDoc Hbb 1st March 2017 158b (with Rei)

Pierre-Alexandre Duverne M1 9st January 2017 142 (with Marc)

Tasnim Abdallah Master 9th January 2017 128 (with RD)

Cristina Agapopoulou M2 1st March 2017 148 (with JB)

Aishik Gosh M2 1st March 2017 158a (with Dimitri)

Hicham Atmani M2 1st March 2017 157 (with Weimin)

Kunlin Han Joint thesis 15th March 2017 164

Manuel Guth M2 2nd February 2017 164

Sabrina Zacharias M1 9th January 160 (with Tasneem R)

Sebastian Van Vilsen M1 9th January 2017 144 (with Laurent D.)

Krunal Gedia X 1st March 150 (with Nikola M)

Paul Klein Cesure Supelec Fevrier 127 + CERN

Konie NPAC 1st March 127

Aaron White Thesis exchange 15th Maty 154a (with Michel)

Still 3 to come (HH theses + Hgg PostDoc +HGTD PostDoc) 18/01/2017 8

Page 9: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

Accounts LAL Initial Residual

Mission 3022 253401 16898 E

Ph1 Upgr 5510 28495 26394 E

Ph2 Upgr 5540 LAR+HGTD

10391 3078 E

Ph2 Upgr 5530 ITK 22725 8770 E

Fonction 55FO 14602 -2551 E

Total 52589 E

Account at CERNT146200 for 2016

Expenses in 2016

Upgr Ph1 LAR 5405 SF

Upgr Ph2 LAR 1132 SF

Upgr Ph2 HGTD 4376 SF

Upgr Ph2 ITK 5516 SF

Total 16429 SF15354 E

2016 finances: Budget status

We should be able to use the final residual to cover other expenses ( Stages..)

18/01/2017 9

Page 10: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

News : LAL

ASPRO canceled in January

SEILLAC meeting : From 3-5 of May. Arrival on 2/05.

Started the CILO meetings with representatives from 5 laboratories to discuss about refondation (=“possible forms of collaboration between them”).

ATLAS representatives : Dirk & Lydia

See Dirk’s report later

18/01/2017 10

Page 11: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

LAL-ATLAS The Shifts saga

Received only few expressed engagements

---Marc :21 pixel ACR shifts

---David : Reconstruction C3 shifts

--- Rei : ACR C1 shifts

--- Lydia : Luminosity DQ C2 shifts

-Waiting commitments from all the others !

All possibilities : https://twiki.cern.ch/twiki/bin/viewauth/Atlas/OtpShiftClasses

During January : several public calls for preparation.

1118/01/2017

Page 12: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

News : ATLAS-In2p3

1) Laurent Serin will be the next ATLAS-IN2P3 responsible from March on, taking over from Isabelle.

2) Upgrades : Meeting at Lyon among the project leaders/lab to fix a proposal for the French contributions. Report in the next meeting

3) Patrice Verdier sent us the budget he allocates to ATLAS

Type Demanded Allocated

Missions (all labs) 1224 kE 855 kE

Lar Phase 1 148 kE 40 kE

Calo+HGTD+Pixels 597 kE 375 kE

Total 1969 kE 1303 kE

18/01/2017 12

Page 13: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

18/01/2017 13

Isab

elle

’s p

rop

osa

l las

t n

igh

t :

to D

iges

t

MISSIONS : Allocated/demanded 65->76% for large groups. LAL : 67%

Page 14: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

18/01/2017 14

Page 15: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

18/01/2017 15

Page 16: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

Following this proposal we will have 174kE of missions (184-taxes) in 2017 instead of 253kE in 2016 (68%)

---In 2017 we have test beams and run periods

---8 Conveners-ships

Dimitri+Nicolas till March, RD+David+JB+Nikola till November, Laurent+Dirk

--- We will try to contribute more on shifts

Very difficult to handle…

Discussion today with Isabelle and Friday with the other groups

It seems mandatory that we have to limit further our travels.

keeping this in mind, please send me your foreseen travels for the next months (till May?).

18/01/2017 16

Page 17: ATLAS-LAL meeting 18/01/2017 · 2017. 1. 18. · CERN slowly back since Thursday January 5th. ATLAS detector is opened from both sides. Consolidation works ongoing. ATLAS acknowledges

AoB

Delivered the LAL-wishes card for the Special (and still confidential) event to thank our Management for his ending mandate. The event will take place durint ATLAS week (the 15th of February). Need to know the nb of participating persons. ***don’t go at CERN only for this! ***

CILO topical meetings –assemblees etc will take some time but our participation is realy needed. Please try to participate, the evolution of our Lab is a concern for all of us.

Gautier was to take a picture of the group for the ATLAS site (see his slides later)

18/01/2017 17