SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION
FINAL 2019-2022
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
SORTED BY FUNDING CATEGORY
Prepared by: SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION
DIVISION OF PLANNING\ENGINEERING OFFICE OF PROJECT DEVELOPMENT
700 BROADWAY AVENUE PIERRE, SOUTH DAKOTA 57501
Attachment STIP #6B
South Dakota Transportation Improvement Program
Tentative 2019 - 2022
Report Date 08/23/2018By Category
¥¥
Interstate Maintenance Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
IM-NH 0909(46)406 4433
NH 0011(118)80 062V
I90 - Exit 406 SD11
(Corson/Brandon) Interchange;
SD11 - Fm Ash St. to the I90
Interchange in Brandon and 260th St
Intersection in Corson
Preliminary EngineeringMinnehaha* 0.5 I90E
I90W
SD11
0.000 2019 1.00 0.052
Also Funded In:
Item Category
State Highway System Urban Projects 0.026 1.00
Total Project Cost
0.078
IM 0907(84)297 0647 I90 - EBL Fm White Lake to
Plankinton
Pavement GrindingAurora 10.6 I90E 1.755 2019 2.00 1.930
IM 0906(71)278 04DG I90 - Strs, SD45S Interchange; SD25
Interchange, 5.5 E of SD50
Interchange Over 356 Ave; 6.0 E of
the Mt Vernon Interchange over I90;
SD25 Interchange
Polymer Chip Seal, Joint
Modification, Abutment, Column &
Bent Cap Repair
Brule
Davison
Hanson
0.0 I90E
I90W
0.479 2019 3.00 0.526
IM 0903(111)172 05D5 I90 - Strs 2.3 E of the SD63 N
Interchange; US83 S Interchange
Deck Overlay, Joints, Reset
Bearings, Trim Girder Ends
Jackson
Jones
0.0 I90E
I90W
0.691 2019 4.00 0.759
IM-FP-PH
2292(06)4
4778 I229 - Exit 5 (26th St. Intch/Yeager
Rd) in Sioux Falls; I229 - NB & SB
curve at Cliff Ave Interchange
Interchange Improvement; High
Friction Surface Treatment
Minnehaha* 0.4 I229N
I229S
10.567 2019 5.00 12.452
Also Funded In:
Item Category
Roadway Safety Improvement 0.416 35.00
Total Project Cost
12.868
IM 0907(81)308 04DM I90 - Str, SD258 over I90, Plankinton
Intch
Deck Replacement, Approach Slab
Replacement, Rehab Abutments &
Zone Painting
Aurora 0.0 I90E 1.413 2019 6.00 1.553
IM 0907(82)319 04DN I90 - Str, Exit 319 (Mt Vernon) Deck Replacement, Approach Slab
Replacement, Rehab Abutments &
Zone Painting
Davison 0.0 I90E 1.363 2019 7.00 1.498
¥ Costs reflect anticipated inflationPage 1 HC65Coding.rpt
By Category
¥¥
Interstate Maintenance Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
IM 0909(86)379 04DU
IM 0294(70)103 04DT
I90 - Strs, Over I90 1.2 E of Exit 379
(SD19); 4.8 W of Exit 390 (SD38);
2.1 W of Exit 396 (I29); I29 - Strs,
3.2 N of Minnehaha County Line, 5.0
S of Exit 109 (SD34); Exit 109
(SD34); Exit 114 (SD32)
Zone Painting, Girder RepairMinnehaha
Moody
0.0 I29N
I90E
0.659 2019 8.00 0.724
IM-NH 0299(75)185 04VY I29 - Strs, 8 N of US212; 4.8 S of the
SD20 Intch; 2 N of Codington Co
Line; 6.2 S of the US12 intch; 0.6 S
of the US12 Intch; US12 Intch; and 2
S of the Roberts Co Line
Polymer Chip SealCodington
Grant
Roberts
0.0 I29N
I29S
US12
0.809 2019 9.00 0.890
IM 0295(41)127 04W0 I29 Strs - 3.0 S of the US14
Interchange, SD324 Interchange & 2
N of US 14B Interchange
Abutment Repair, Polymer Chip
Seal
Brookings 0.0 I29N
I29S
0.692 2019 10.00 0.761
IM-NH
0903(110)132
04W1 I90 - Strs, Over Big Buffalo Crk 1.0 E
of the SD240S Interchange; Over
Fairview Rd and Over Co Rd 7.0 W
and 4.0 W of the SD73N
Interchange; SD73N Exit; Over a
county road 3 E of the SD73 N Intch;
Over White Willow Ck 1.3 W of the
Kadoka Intch; SD73 S Intch
Polymer Chip SealJackson 0.0 I90E
I90W
SD73
1.014 2019 11.00 1.115
IM-FP 0299(71)239 04D6 I29 - SBL, From S of Exit 242 to S of
the ND State Line
PCC Surfacing, Polymer Chip
Seal, Approach Slabs, Joint
Modifications, Approach
Modifications
Roberts* 13.0 I29S 12.339 2019 12.00 13.885
IM 0295(42)140 04W2 I29 - Strs, SD30 Interchange, SD28
Interchange
Deck Overlay, Joint Modification,
Approaches
Brookings
Deuel
0.0 I29N 0.915 2019 13.00 1.005
IM-PH 0294(71)121 05FF I29 N/S - Strs. 7 N SD32
Interchange; 1 S Brookings Co. Line;
2.2 N Moody Co. Line; 0.9 S US14
Interchange
High Friction Surface, Polymer
Chip Seal
Brookings
Moody
0.0 I29N
I29S
0.468 2019 14.00 0.515
Also Funded In:
Item Category
Roadway Safety Improvement 0.044 27.00
Total Project Cost
0.559
IM 0902(171)78 05YW Rapid City Area Interstate FencePennington 20.1 I90E 0.236 2019 15.00 0.260
¥ Costs reflect anticipated inflationPage 2 HC65Coding.rpt
By Category
¥¥
Interstate Maintenance Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
IM 0908(93)368 04DQ I90 - Str, Exit 368 (Canistota) Deck Replacement, Approach Slab
Replacement, Rehab Abutments &
Zone Painting
McCook 0.0 I90E 1.343 2019 16.00 1.476
IM 0901(197)23 05F2
P 0034(179)9 05EW
SD34 - Fm US85 to I90; I90 - Exit 23
Ramps
Mill & AC Resurfacing, Pipe WorkButte
Lawrence
* 18.1 I90E
I90W
SD34
0.189 2019 17.00 0.213
Also Funded In:
Item Category
Minor Arterial Projects 5.361 10.00
Total Project Cost
5.574
IM 0904(62)210 067N I90 EBL & WBL - Fm W of Exit 212
to E of Exit 226; 190 - Strs, Over
293 Ave 1.3 E of the US83 N Intch;
Over Sundance Road 3.6 E of the
US83 N Intch; US183 Interchange;
Over 300 Ave 7.5 E of the US83 N
Intch; Over 303 Ave 3 W of the
US183 S Intch; Over 305 Ave (W
Presho Intch); US183 Intch;
AC Resurfacing; Approach Slab
Replacement, Polymer Chip Seal,
Joints, Deck Overlaly
Lyman 16.9 I90E
I90W
16.376 2019 18.00 18.428
IM 0908(96)334 06J4 I90 - Fm E of the Davision/Hanson
County Line to W of the Humboldt
Exit at Various Locations
Mill & AC Resurfacing of Existing
Crossover & Construct Crossovers,
Ramp Crossovers, Ramp Detours
Davison
Hanson
McCook
1.4 I90E 1.228 2019 19.00 1.381
IM-P Z410(17) 06X8 Statewide Environmental Sensor Station
Deployment, Maintenance, and
Operation CY2019
Statewide 0.0 0.250 2019 20.00 0.275
Also Funded In:
Item Category
Special Projects 0.350 2.00
Total Project Cost
0.625
IM 0901(194)36 05W7 I-90 - Fm Exit 37 to 2 miles south of
Tilford, I-29 - Fm Exit 121 north to
Brookings
Dynamic Advisory Speed SignsBrookings
Meade
Moody
17.0 I29N
I29S
I90E
I90W
1.183 2019 21.00 1.301
Miles2019 60.999 98.0
¥ Costs reflect anticipated inflationPage 3 HC65Coding.rpt
By Category
¥¥
Interstate Maintenance Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
IM 0901(179)9 03R9 I90 - Strs, WB On Ramp over
Spearfish Crk, 0.3 W of US85N
Intch; Over False Bottom Crk, 1.0 E
of US14A Intch, 0.8 W of SD34 N
Interchange Over RR
Scour Protection, Berm RepairLawrence 0.0 I90E
I90W
0.361 2020 22.00 0.397
IM 2292(93)0 032L Solberg/Tallgrass Overpass Approach Slabs to Structure and
AC Surfacing
Lincoln 0.0 I229N
I229S
0.289 2020 23.00 0.317
IM 0903(105)131 04NJ I-90 - Pierre Region Crossroad ImprovementsJackson
Jones
Lyman
119.8 I90E
I90W
0.862 2020 24.00 0.993
IM 0902(112)59 6568 I90 - Exit 59, (LaCrosse Street) in
Rapid City
Interchange Reconstruction, PCC
Surfacing, Aux. Lane Addition (WB
& EB), Str Widening, Deck
Overlay, Approach Slabs
Pennington* 0.0 I90E
I90W
11.163 2020 25.00 12.960
Construction planned for 2020 & 2021.
IM 0901(181)0 04NH I-90 - Rapid City Region Crossroad ImprovementsJackson
Lawrence
Meade
Pennington
131.5 I90E
I90W
0.898 2020 26.00 1.009
IM 0908(92)357 04DP I90 - Str, Exit 357 (Bridgewater) Deck Replacement, Approach Slab
Replacement, Rehab Abutments &
Zone Painting
McCook 0.0 I90E 1.390 2020 27.00 1.528
IM-FP
0903(106)163
04D9 I90 - WBL, Fm E of the Belvidere
Exit to W of the Jackson/Jones Co.
Line; Str. Over I90, 2.5 SW of the
SD63 N Exit, Perault Road
Grading, PCC Surfacing, Pipe
Work; Approach Slabs & Remove
Asphalt Membrane Overlay
Jackson* 10.6 I90W 17.330 2020 28.00 19.051
IM-FP 0299(65)239 03W5 I29 - NBL, Fm South of Exit 242 to S
of the North Dakota State Line
PCC Surfacing; Polymer Chip
Seal, Approach Slabs, Joint
Modification, Approaches
Roberts* 13.0 I29N 12.331 2020 29.00 13.876
IM 0291(129)0 05HF I29 - Strs Over the Big Sioux River at
the Iowa/South Dakota State Line
Bridge Zone PaintingUnion 0.0 I29N
I29S
0.582 2020 30.00 0.639
¥ Costs reflect anticipated inflationPage 4 HC65Coding.rpt
By Category
¥¥
Interstate Maintenance Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
IM 0903(112)152 05TD I90 - Strs, Over SD248 P 2.2 E of
the SD73 S Intch; SD63 S Intch;
Over Brave Bull Rd 1.4 E of the
SD63 S Intch; SD63 N Intch; Over
Stamford Rd 2.3 E of the SD63 N
Intch;
Polymer Chip SealJackson 0.0 I90E
I90W
0.755 2020 31.00 0.830
IM-FP 0908(95)362 05HP I90 EBL - Fm 2 W of the Salem
Interchange to 2 Mi W of Humboldt;
I90 Strs - 0.6 W of the US81
Interchange Over W Fork of the
Vermillion River; I90 Strs - 2 E of
the US81 Interchange Over 448 Ave;
I90 Str - 2.1 W of the Minnehaha Co
Line Over theE Fork of the Vermillion
River; I90 Str - 1 W of the
Minnehaha Co Line Over 453 Ave
Remove and Replace PCCP,
Pipework, Replace Str; Deck
Overlay, Approach Slabs; Replace
Str; Polymer Chip Seal
McCook* 14.9 I90E 27.930 2020 32.00 31.428
Construction planned to begin in 2021.
IM 0907(85)334 06DJ I90 E&W - Fm E of Mitchell to E of
the James River
Remove & Replace PCCP, Pipe
Work
Davison
Hanson
0.6 I90E
I90W
1.282 2020 33.00 1.442
IM-P Z410(18) 06X9 Statewide Environmental Sensor Station
Deployment, Maintenance, and
Operation CY2020
Statewide 0.0 0.255 2020 34.00 0.280
Also Funded In:
Item Category
Special Projects 0.357 3.00
Total Project Cost
0.637
IM-FP 0299(69)213 02PV I29 NBL - Fm N of Exit 224 (Peever)
N to S of Exit 242; Service Rd Near
Exit 232 & Exit 232 NB Ramps; Rest
Area at Exit 213 on Interstate 29;
Strs: 1.4 N of the Peever Exit Over
Hines Creek; 1.8 N of the Peever
Exit Over Agency Creek; 0.8 N of the
SD10 Exit Over the Little Minn.
River; 5.5 NE of the SD10 Exit Over
a drainage ditch
PCC Surfacing of Mainline, Spot
Grading; AC Resurfacing of
Service Roads & Ramps; Lighting;
Polymer Chip Seal
Roberts* 15.3 I29N 16.074 2020 35.00 18.078
Construction planned to begin in 2021.
Miles2020 102.828 305.7
IM 0901(192)0 05MQ I90 EBL/WBL - Fm the Wyoming
Border to West of Exit 10
Pipe WorkLawrence 9.7 I90E
I90W
0.441 2021 36.00 0.495
¥ Costs reflect anticipated inflationPage 5 HC65Coding.rpt
By Category
¥¥
Interstate Maintenance Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
IM 0905(104)251 04NK I-90 - Mitchell Area Crossroad ImprovementsAurora
Brule
Davison
Hanson
Lyman
McCook
124.9 I90E
I90W
0.886 2021 37.00 0.974
IM 0903(109)174 04TJ I90 - Fm W of the Jackson/Jones
County Line E to 3 Mi W of Exit 201
(Draper)
Pipe WorkJackson
Jones
23.9 I90E
I90W
1.434 2021 38.00 1.612
IM-P 0901(193)7 04W4 I90 - Strs, Over Co Rd & Over
Spearfish Creek, 3.0 W & 0.3 W of
the US85N Interchange; Co Rd over
I90, 2.2 W of the SD34N
Interchange; Over RR, 0.8 W of
SD34N Interchange; SD34
Interchange; Over Whitewood Crk,
1.0 E of SD34N Interchange; Over
RR, 0.2 SE of US14A Interchange;
Co Rd Over I90, 3.2 NW of the
Tilford Interchange; The Tilford
Interchange; Co Rd over I90, 3.1
NW of the SD231 Interchange
Zone Painting, Diaphram Weld
Repair
Lawrence
Meade
0.0 I90E
I90W
SD34
1.559 2021 39.00 1.713
P 0013(38)108 04VD
IM-PH 0293(107)99 05F9
SD13 - 0.3 N of Flandreau Over the
Big Sioux River; I29 N/S - 1 N
SD115 Interchange; 1.2 N
Minnehaha Co. Line; 3.8 S SD34
Interchange; 3 S SD34 Interchange
High Friction Surface Treatment,
Polymer Chip Seal, Deck Repair,
Curb Repair, Approach Slabs, Joint
Replacement
Minnehaha
Moody
0.0 I29N
I29S
SD13
1.663 2021 40.00 1.828
Also Funded In:
Item Category
Bridge Projects 0.202 47.00
Roadway Safety Improvement 0.015 102.00
Total Project Cost
2.045
IM-FP
0903(108)163
04D7
P 0063(48)75 04Q2
I90 - EBL, Fm E of the Belvidere Exit
to W of the Jackson/Jones Co. Line;
Str. Over I90, 2.5 SW of the SD63 N
Exit, Perault Road; SD63 - Fm
Belvidere to North of I90 & Fm
SD248, N 0.3 Mi (near 1880 Town)
Grading, PCC Surfacing, Pipe
Work; Approach Slabs & Remove
Asphalt Membrane Overlay; Mill &
AC Resurfacing
Jackson* 11.6 I90E
SD63
17.060 2021 41.00 18.754
Also Funded In:
Item Category
Minor Arterial Projects 0.065 41.00
State Secondary Projects 0.316 17.00
Total Project Cost
19.135
¥ Costs reflect anticipated inflationPage 6 HC65Coding.rpt
By Category
¥¥
Interstate Maintenance Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
IM 2292(95)0 03RD I229 Corridor Median Lighting, Automatic Traffic
Recorders
Lincoln
Minnehaha
* 11.4 I229N
I229S
2.077 2021 42.00 2.391
IM 0908(97)362 05HQ I90 WBL - Fm 2 W of the Salem
Interchange to 2 Mi W of Humboldt;
190 Str - 0.6 W of the US81
Interchange Over the W Fork of the
Vermillion River; 190 Str - 2 E of the
US81 Interchange Over 448 Ave
Remove & Replace PCCP, Pipe
Work; Replace Str; Polymer Chip
Seal, Deck Overlay, Approach
Slabs
McCook* 14.9 I90W 28.476 2021 43.00 32.043
Construction planned to begin in 2022.
IM 0299(78)215 0652 I29 - Str.s 1.9 NE of SD15 over 460
Ave
Polymer Chip SealRoberts 0.0 I29N
I29S
0.090 2021 44.00 0.098
IM 0909(89)379 06G5 I90 - Fm W of Humboldt to Near
Hartford
Construct Crossovers, Ramp
Crossovers, Ramp Detours
Minnehaha 7.0 I90E 1.289 2021 45.00 1.450
IM-P Z410(19) 06XA Statewide Environmental Sensor Station
Deployment, Maintenance, and
Operation CY2021
Statewide 0.0 0.260 2021 46.00 0.286
Also Funded In:
Item Category
Special Projects 0.364 4.00
Total Project Cost
0.650
IM 2292(102)3 067Q I-229 Exit 3 to Exit 10 Crossover ImprovementsMinnehaha 8.2 I229N
I229S
2.773 2021 47.00 3.048
IM 0294(72)109 06X1 I29 - Exit 109 (Coleman Interchange) Interchange LightingMoody 0.6 I29N
I29S
0.246 2021 48.00 0.271
IM 0909(93)379 06XW
IM 0291(127)0 04NL
I-90 - Sioux Falls Area; I-29 -
Mitchell Region
Crossroad ImprovementsLincoln
Minnehaha
Moody
Union
183.6 I29N
I29S
I90E
I90W
0.689 2021 49.00 0.757
IM 0293(111)78 06X2 I29 - Exits 78, 81 & 83 Approach Slab Replacement,
Epoxy Chip Seal
Minnehaha 0.0 I29N 0.799 2021 50.00 0.974
IM 0902(175) 06Y4 Rapid City Area Wildlife FenceAreawide 0.0 0.246 2021 51.00 0.271
¥ Costs reflect anticipated inflationPage 7 HC65Coding.rpt
By Category
¥¥
Interstate Maintenance Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
Miles2021 66.965 395.8
IM 0904(60)201 04DK I90 - Strs, Over 279th Ave At the
Draper Intch; Over 282 Ave 3 E of
the Draper Intch; Over a creek 5.5 W
of the US83 N Intch; Over 286 Ave
4.7 W of the US83 N Intch;
Polymer Chip Seal, JointsJones 0.0 I90E
I90W
0.707 2022 52.00 0.777
IM 2291(01)10 01QA I229 - 60th St N Over I229 South of
I90
Replace Structure, Approach
Grading
Minnehaha 0.0 I229N
I229S
2.856 2022 53.00 3.291
IM 0299(73)232 03R6 I29 - Strs, SD10/I29 Intch: County
Road over I29, 2.0 N of SD10 Intch:
County Road over I29, 6.5 NE of
SD10 Intch: SD127/I29 Intch &
County Road over I29, 2.0 N of
SD127 Intch: Over BNSF RR 0.6 S
of US12 Intch
Zone PaintingRoberts 0.0 I29N
I29S
0.777 2022 54.00 0.854
IM 0297(40)193 04W5 SD20/I29 Interchange Deck ReplacementCodington 0.0 I29N 1.929 2022 55.00 2.120
IM-NH-P 0040(234) 04W7 I90 - Strs, 1.5 W of Exit 67 Over S
Gate Road & a Crk; 1.4 W of Exit 67
over RR Track; 4.0 E of the Box
Elder Interchange over 154th Ave;
0.5 W of SD240 Over RR; 0.3 E of
Wasta Over the Cheyenne River; 1.9
NW of the W Wall Interchange
Under Cedar Butte Road; 6.3 NW of
the SD240 S Interchange Over
Whitewater Crk; On the US014 WB
Off ramp at the I90 Interchange;
US14 – Str, US14 & I 90
Interchange; SD240 – Str, At the W
Wall Interchange Over I90
Zone PaintingJackson
Pennington
0.0 I90E
I90W
SD240
US14E
2.095 2022 56.00 2.303
IM 0905(109)227 05EF I90 EBL & WBL - Fm Presho to
Reliance; I90 - Strs, 2 E of US183
Over 308 Ave, 6 E of US183 Over
312 Ave, At the Kennebec Intch
Over SD273, 4.3 E of the Kennebec
Intch Over 319 Ave, At the Lyman
Intch Over 321st Ave, 4 W of the
Reliance Intch Over 324th Ave, At
the Reliance Intch Over SD248
Mill & AC Resurfacing, Pipe Work;
Polymer Chip Seal; Approach
Slabs
Lyman* 34.0 I90E
I90W
9.410 2022 57.00 10.594
¥ Costs reflect anticipated inflationPage 8 HC65Coding.rpt
By Category
¥¥
Interstate Maintenance Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
IM-FP 0901(195)32 021G I90 - EBL from Exit 32 (Sturgis) to
north of Exit 40 (Tilford)
Mainline Improvements &
Structures
Meade* 5.9 I90E 24.430 2022 58.00 29.153
IM-FP 0909(90)377 05T3 I90 WBL - Fm 2 Mi W of Humboldt
to 2 Mi E of Hartford; I90 WBL - Exit
379 (Humbolt); I90 Str - 0.4 W of
Exit 390 (SD38) Over a Creek
Remove and Replace PCCP
Surfacing; Replace Str, Approach
Grading, Surfacing, Correct
Clearance Deficiency; Work to be
Determined
McCook
Minnehaha
* 13.1 I90W 23.280 2022 59.00 26.992
Construction planned to begin in 2023.
IM 0909(91)394 065D I90 - Str. 2.1 W of I29 over 470 Ave Low Slump Dense Concrete
Overlay, Approach Guardrail
Minnehaha 0.0 I90E
I90W
0.326 2022 60.00 0.358
IM 0291(131)18 065L I29 Strs. at the Elk Point Interch; 0.2
N of the Elk Point Interch over RR
Polymer Chip Seal, Replace
Joints, Approach Slabs
Union 0.0 I29N
I29S
0.765 2022 61.00 0.841
IM 0299(79)222 065N
P 0010(149)359 06G4
I29 - Strs. 2 S. of the Peever Interch
(129 St); SD10 Interchange; SD10 -
Str 0.7 W of SD127 Over a Creek
Polymer Chip Seal, Replace
Approach Slabs, Joints, Approach
Guardrail; Polymer Chip Seal,
Replace Approach Slabs &
Approach Guardrail
Roberts 0.0 I29N
SD10
0.532 2022 62.00 0.585
Also Funded In:
Item Category
Bridge Projects 0.294 72.00
Total Project Cost
0.879
IM-P Z410(20) 06XC Statewide Environmental Sensor Station
Deployment, Maintenance, and
Operation CY2022
Statewide 0.0 0.265 2022 63.00 0.291
Also Funded In:
Item Category
Special Projects 0.371 5.00
Total Project Cost
0.662
IM 0293(106)77 03RA I29 - Exit 77 (41st Street
Interchange) in Sioux Falls
Interchange ModificationMinnehaha* 0.5 I29N
I29S
23.209 2022 64.00 26.275
IM 2292(98)6 04XK I229 Exit 9 (Benson Road)
Interchange; I229 - Strs. E 6th S &
Benson Road
Preliminary EngineeringMinnehaha* 0.0 I229N
I229S
0.000 2022 65.00 0.055
IM 2292(84)3 000S I229 - Exit 3 (Minnesota Ave) in
Sioux Falls
Preliminary EngineeringMinnehaha* 0.0 I229S 0.000 2022 66.00 0.055
¥ Costs reflect anticipated inflationPage 9 HC65Coding.rpt
By Category
¥¥
Interstate Maintenance Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
IM 2292(101)4 05HN I-229 Exit 4 (Cliff Ave) Interchange Preliminary EngineeringMinnehaha* 0.0 I229S 0.000 2022 67.00 0.055
IM 0909(92)387 06G8 I90 - County Road over I 90 at Exit
387 (Hartford Interchange)
Preliminary EngineeringMinnehaha* 0.0 I90E
I90W
0.000 2022 68.00 0.055
IM 0293(112)76 06VQ I29 - SBL Fm 57th St. to 49th St. in
Sioux Falls
Remove Riprap, Drainage
Improvements, Pipe Work
Minnehaha 0.6 I29S 0.703 2022 69.00 0.773
Miles2022 105.427 54.1
¥ Costs reflect anticipated inflationPage 10 HC65Coding.rpt
By Category
¥¥
Major Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-PH
0018(198)173
04XH US18 - Fm E of Vetal to the
Bennett/Todd County Line
Grading, Interim SurfacingBennett* 2.5 US18 0.455 2019 1.00 0.555
Also Funded In:
Item Category
Roadway Safety Improvement 2.115 2.00
Total Project Cost
2.670
NH 0083(79)45 04E7 US83 - Fm North of White River to N
of the Mellette/Jones Co Line
Grading, Interim Surfacing,
Structure Replacement over the
White & Little White River
Jones
Mellette
* 11.0 US83 17.345 2019 2.00 23.114
Construction planned to begin in 2020.
P 0010(91)358 028U
NH-P 0010(118)361 05EJ
SD10 - Fm the west city limits in
Sisseton to 458th Ave (8th Ave) East
in Sisseton & Fm 8th Ave E to
SD127; SD10 - Fm E of SD127 to E
of I29
SD10 - Grading, Roundabouts,
Replace Structure (RCBC) & AC
Surfacing; SD10 - AC Resurfacing
Roberts* 3.8 SD10 0.257 2019 3.00 0.314
Also Funded In:
Item Category
Minor Arterial Projects 0.314 6.00
State Highway System Municipal Projects 8.499 3.00
Total Project Cost
9.127
NH 0018(185)402 036W US18 - Fm US81 to SD19 AC SurfacingHutchinson
Turner
* 17.0 US18 5.264 2019 4.00 6.423
NH 0083(82)25 03RR
NH 0018(208)175 05TM
US83 - Fm the W Junction of US18
to the N Junction of SD44; US18 -
Fm the Bennett/Todd County Line to
White Horse
US83 - Mill & AC Resurfacing,
Drainage Improvement, Bridge
Berm Repair; US18 - Spot AC
Surfacing of Shoulders
Bennett
Mellette
Todd
55.1 US18
US83
7.417 2019 5.00 9.267
NH 0014(209)190 04WK
P 0063(00)142 05DY
NH 0034(186)154 05TN
US14 - Fm SD34 to E of Hayes;
SD34 - 16 Mi W of US14/SD63N;
SD34 - At the US14/SD63N Jct;
SD63 - Str 2.1 Miles S of the
Ziebach County Line
Mill & AC Resurfacing; Pipe Work;
Mill & AC Resurfacing; Pipe Work;
Replace RCBC Inlet Apron
Haakon
Stanley
12.9 SD34
SD63
US14
3.828 2019 6.00 4.778
Also Funded In:
Item Category
Minor Arterial Projects 0.065 11.00
Total Project Cost
4.843
Construction planned to begin in 2020.
NH 0018(201)62 04WL US18 - Fm the S Junction with
US385 to Oglala
Mill & AC Resurfacing, Pipe WorkFall River
Oglala Lakota
25.5 US18 5.883 2019 7.00 7.353
¥ Costs reflect anticipated inflationPage 11 HC65Coding.rpt
By Category
¥¥
Major Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0018(200)148 04WT US18 - Fm the W Junction with
SD73, Through Martin, to the E Jct
of SD73, & Fm W of Antelope
Road/242 Ave to the Bennett/Todd
Co Line
Mill & AC Resurfacing, ADA Curb
Ramp Upgrades, Pipe Work,Traffic
Signal Upgrades
Bennett 15.1 US18 3.629 2019 8.00 4.454
Construction planned to begin in 2020.
NH 0212(173)397 04E9 US212 - Fm W of the S Junction of
SD15 to the Minn State Line; US212
- Str 1.1 W of the N SD15 Junction
Over Caine Ck
Mill & PCCP Overlay, Pipe Work;
Replace Structure (RCBC) &
Approach Grading
Deuel* 14.7 US212 13.527 2019 9.00 16.507
Also Funded In:
Item Category
Bridge Projects 0.865 15.00
Total Project Cost
17.372
NH 0012(207)247 05E2
P 0247(09)169 05TP
US12 - Fm SD247 to the West City
Limits of Ipswich; SD247 - Fm US12
N through Roscoe
AC Resurfacing, Pipe Work; Mill &
AC Resurfacing
Edmunds 15.1 SD247
US12
3.683 2019 10.00 4.712
Also Funded In:
Item Category
State Secondary Projects 0.162 7.00
Total Project Cost
4.874
NH 0281(116)173 05U2 US281 S - Fm SD20 N to the
Warner Road; US281 N&S - Fm
Warner Road to Aberdeen; US281
N&S - Fm Old US281 S of Wylie
Park to End of Div Hwy; US281 Str -
1.1 mi S of US12 over Foot Crk
Mill & AC Resurfacing, Pipe Work,
Upgrade End Blocks
Brown
Spink
* 30.4 US281
US281N
US281S
7.654 2019 11.00 9.340
NH 0046(72)277 067X SD46 - Fm US18 in Pickstown to
Wagner
Mill & AC ResurfacingCharles Mix 11.2 SD46 2.633 2019 12.00 3.292
NH 0083(86)000 068G US83 - Fm the Nebraska State Line
to Mission
Mill & AC ResurfacingTodd 21.2 US83 5.452 2019 13.00 6.813
NH 0016(90)37 068L US16 - Fm SD244 to S of theUS16B
S Jct in Hill City; US16 - Between
Hill City and Three Forks
Mill & AC ResurfacingPennington 3.4 US16 0.661 2019 14.00 0.806
Also Funded In:
Item Category
State Highway System Municipal Projects 0.070 5.00
Total Project Cost
0.876
¥ Costs reflect anticipated inflationPage 12 HC65Coding.rpt
By Category
¥¥
Major Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0018(209)373 04E5
NH 0037(155)36 06J5
US18 - Fm SD37 to SD25; SD37 -
Fm Bon Homme/Hutchinson County
Line to 2 mi N of US18
Mill & AC ResurfacingBon Homme
Hutchinson
21.0 SD37
US18
5.018 2019 15.00 6.272
NH 0018(218)339 06CQ US18 - Fm Lake Andes to the SD50
E Jct
Mill & AC ResurfacingCharles Mix 9.9 US18 2.132 2019 16.00 2.601
NH 0085(101)0 06VP US85 - Fm the Wyoming State Line
to Cheyenne Crossing
Fence Repair & ReplacementLawrence 16.2 US85 0.256 2019 17.00 0.312
Miles2019 106.913 286.0
NH 0034(192)124 05XJ SD34 - Near the Cheyenne River
Bridge
ROW AcquisitionHaakon 0.4 SD34 0.037 2020 18.00 0.046
NH 0014(220)239 05HX US14 - Fm Appx 7 Mi E of Pierre to
W of US83 N Junction
Crack & Seat, AC ResurfacingHughes* 5.8 US14 2.606 2020 19.00 3.258
NH 014A(20)29 04WC
NH 0085(96)16 05FG
US14A - Fm Cheyenne Crossing to
Deadwood via Lead and Central
City; US85 - At Cheyenne Crossing
Mill & AC Resurfacing, Pipe WorkLawrence 11.0 US14A
US85
1.629 2020 20.00 2.033
Also Funded In:
Item Category
State Highway System Municipal Projects 0.981 10.00
Total Project Cost
3.014
NH-PH
0050(114)324
04HN
PH 0018(190)348 04JX
PH 0281(108)35 04JE
NH 0046(75)282 06JY
US281 - Fm US18 to the Charles
Mix/Douglas County Line; US18 -
Fm the E Junction of SD50 to
US281; SD50 - Fm E Jct of US18 to
W of Wagner; SD46 - Intersection
with 388th Ave/BIA29 (Marty Road)
US281 - Shoulder Widening, Pipe
Work, Spot Grading; US18 -
Shoulder Widening, Pipe Work;
SD50 - Grading & AC Surfacing,
Lighting; SD46 - Intersection
Modification
Charles Mix
Douglas
* 12.9 SD46
SD50
US18
US281
2.451 2020 21.00 3.004
Also Funded In:
Item Category
Roadway Safety Improvement 13.898 63.00
Total Project Cost
16.902
NH 0050(100)411 023V SD50 WBL - Fm Vermillion to the
end of the divided lanes west of I29
Grading and PCCP SurfacingClay
Union
* 4.9 SD50W 7.605 2020 22.00 9.733
¥ Costs reflect anticipated inflationPage 13 HC65Coding.rpt
By Category
¥¥
Major Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0014(222)254 05E4 US14 - Fm E of Blunt to the
Hughes/Hyde County Line
Cold In Place Recycle; Pipe WorkHughes 13.0 US14 4.254 2020 23.00 5.317
NH 0012(213)159 05U6 US12 - Fm McLaughlin E 12 Miles Mill & AC Resurfacing, Pipe WorkCorson 14.2 US12 3.366 2020 24.00 4.108
Also Funded In:
Item Category
State Highway System Municipal Projects 0.235 8.00
Total Project Cost
4.343
NH 0085(98)56 05F1 US85 - Fm N of Belle Fourche to S
of SD168
Mill & AC Resurfacing, Pipe WorkButte 22.2 US85 8.293 2020 25.00 10.342
NH 0085(97)99 05EL US85 - Fm S of the Butte/Harding
Co Line to S of Buffalo
Mill & AC Resurfacing, Pipe WorkButte
Harding
12.6 US85 2.301 2020 26.00 2.807
NH 0012(214)330 05TW US12E - Fm Bristol to Webster;
US12, US12E&W - AC Segments
over Rush Lake
AC Resurfacing, Pipe Work; Mill &
AC Resurfacing
Day 13.8 US12
US12E
US12W
3.978 2020 27.00 4.972
NH 0079(75)27 05EM
NH 0018(219)40 06CN
SD79N - Fm N of the Custer/Fall
River County Line to the end of the
Divided Hwy S of Hermosa & SD79S
- Fm N of US18 to N of the Fall
River/Custer County Line; US18 -
Fm Hot Springs to W of SD79
Mill & AC Resurfacing, Pipe Work;
Mill & AC Resurfacing & Pipe Work
Custer
Fall River
27.5 SD79N
SD79S
US18
5.885 2020 28.00 7.334
NH 0281(118)217 05E8 US281 - Fm the N Junction of SD10
to the North Dakota State Line
Mill, Cold in Place Recycle, AC
Resurfacing
Brown 12.0 US281 5.660 2020 29.00 7.074
NH 0212(188)15 068U US212 - Fm E of Belle Fourche to
Nisland
AC Resurfacing, Install Turn LanesButte 13.4 US212 4.097 2020 30.00 5.121
NH 0018(216)420 06Q6 US18 - Fm SD19 to I29 Mill & AC Resurfacing, AC
Surfacing of Shoulders
Lincoln
Turner
14.5 US18 4.655 2020 31.00 5.681
Miles2020 70.830 178.2
NH 0012(218)387 05EK US12 - Fm Milbank to the MN State
Line
Mill & AC Resurfacing, Pipe Work,
Intersection Improvements
Grant 10.3 US12 3.890 2021 32.00 4.861
¥ Costs reflect anticipated inflationPage 14 HC65Coding.rpt
By Category
¥¥
Major Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0212(182)187 05EN
P 1804(49)292 05X8
US 212 - Fm LaPlant to the W
Junction of US83; SD1804 - Fm the
Agar Road N to the W US212 Jct
and Fm the E US212 Jct to West
Whitlock
US212 - Mill & AC Resurfacing,
Pipe work; SD1804 - Pipe Work
Dewey
Potter
Sully
46.3 SD1804
US212
6.761 2021 33.00 8.449
Also Funded In:
Item Category
State Secondary Projects 0.083 12.00
Total Project Cost
8.532
NH 0014(208)230 04XQ US14 - Fm W of SD1804 to W of the
US83 N Jct (Blunt Jct.)
AC Surfacing, Pipe WorkHughes 15.0 US14
US14E
US14W
1.592 2021 34.00 1.943
Also Funded In:
Item Category
State Highway System Urban Projects 0.683 11.00
Total Project Cost
2.626
NH 0083(80)44 04E8 US83 - From White River to S of
Murdo
AC Surfacing, ADA UpgradesJones
Mellette
* 23.3 US83 12.489 2021 35.00 15.608
NH 0050(117)407 04YU SD50 - From the divided lanes west
of Vermillion to the divided lanes
east of Vermillion
Mill, Grading & AC Surfacing,
Lighting & Str Repair
Clay 4.8 SD50
SD50E
SD50W
5.921 2021 36.00 7.590
NH 0018(205)52 04XT US18E - Fm Smithwick Road to the
S Jct of US385 on the Original
Lanes of the Heartland Expressway
Mill & AC Resurfacing;
Reconstruction of Select Vertical
Curves, AC Surfacing
Fall River* 9.7 US18E 6.920 2021 37.00 8.885
NH 0079(79)111 05TR
NH 0034(189)35 05TQ
SD34 - Fm Regency St. in Sturgis E
to E of SD79; SD79 - Fm SD34 to S
of the US212 S Jct
SD34 - Mill & AC Resurfacing,
Pipe Work; SD79 - Mill & AC
Resurfacing, Pipe Work, Replace
Str. (RCBC), Upgrade Bridge Rail,
Intersection Improvements
Butte
Meade
21.9 SD34
SD34E
SD34W
SD79
SD79N
SD79S
8.119 2021 38.00 10.110
Also Funded In:
Item Category
State Highway System Urban Projects 0.283 14.00
Total Project Cost
10.393
NH 0212(187)327 05TX US212 - Fm Doland to 6 W of Clark Mill, AC Resurfacing, Pipe WorkClark
Spink
10.8 US212 2.472 2021 39.00 3.089
¥ Costs reflect anticipated inflationPage 15 HC65Coding.rpt
By Category
¥¥
Major Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0212(186)114 05E7 US212 - Fm Faith to Dupree Mill & AC Resurfacing, Pipe WorkMeade
Ziebach
20.9 US212 5.133 2021 40.00 6.414
NH 0014(226)113 05U1 US14 - Fm E of Wall to Cottonwood;
US14 - 3.8 W of the Jackson Co
Line Over a Branch of Cottonwood
Creek
Mill & AC Resurfacing Pipe Work;
Replace Structure (RCBC) &
Approach Grading
Jackson
Pennington
14.1 US14 3.303 2021 41.00 4.031
Also Funded In:
Item Category
Bridge Projects 0.658 54.00
Total Project Cost
4.689
NH 0073(75)213 05RY SD73 - Fm the N SD20 Junction, N
15 Mi
Mill & AC Resurfacing, Pipe WorkPerkins 15.7 SD73 3.256 2021 42.00 4.068
NH 0081(103)6 04G5 US81 - Fm the End of the Divided
Lanes to 303rd Street North of
Yankton
Grading, Structure, & AC SurfacingYankton 3.4 US81 6.158 2021 43.00 7.514
Also Funded In:
Item Category
Bridge Projects 0.765 45.00
Total Project Cost
8.279
NH 0014(234)167 05E9 US14 - Fm Midland to SD34 Mill & AC Resurfacing, Pipe Work,
Bridge Rail
Haakon
Stanley
22.3 US14 5.742 2021 44.00 7.175
NH 0012(227)99 068A
P 0073(76)252 068C
US12 - Fm the Perkins/Corson Cnty
Line to Morristown; SD73 - Fm US12
to the ND State Line
Mill & AC Resurfacing, Pipe WorkCorson 13.7 SD73
US12
3.503 2021 45.00 4.377
Also Funded In:
Item Category
Minor Arterial Projects 0.340 45.00
Total Project Cost
4.717
NH 0012(226)190 068D US12 - Fm the Mobridge E City
Limits to W of the divided lanes at
US83; US12, & US12 E&W - Fm W
of the divided lanes West of Selby to
N of the divided lanes South of Selby
Cold In Place, AC Resurfacing, Mill
& AC Resurfacing, Pipe Work
Walworth* 21.7 US12
US12E
US12W
12.100 2021 46.00 14.765
Also Funded In:
Item Category
State Highway System Municipal Projects 0.434 16.00
Total Project Cost
15.199
¥ Costs reflect anticipated inflationPage 16 HC65Coding.rpt
By Category
¥¥
Major Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 014A(25)42 068K US14A - Fm E of the US85 N Jct to
the PCCP segment in Sturgis
Mill & AC Resurfacing, Pipe WorkLawrence
Meade
9.4 US14A 2.341 2021 47.00 2.856
Also Funded In:
Item Category
State Highway System Urban Projects 0.249 16.00
Total Project Cost
3.105
NH 0034(198)77 068T SD34 - Fm W of Union Center to W
of the SD73 W Jct
Mill & AC Resurfacing, Pipe WorkMeade 19.2 SD34 4.864 2021 48.00 6.079
NH 0018(203)333 04V9 US18 - Str. 0.8 N of Pickstown Over
Saint Francis Bay; US18 - Fm
Pickstown to Lake Andes
Replace Structure (Bridge) &
Approach Grading; Spot Grading,
Pipe Work & Interim Surfacing;
Intersection Improvements
Charles Mix 6.4 US18 1.736 2021 49.00 2.118
Also Funded In:
Item Category
Bridge Projects 3.053 50.00
Total Project Cost
5.171
Miles2021 119.932 288.9
NH 0012(219)294 05HT US12 EBL & WBL - Fm E of the
Aberdeen Airport to E of Bath
Remove & Replace PCCP
Surfacing, Grading, PCCP, Pipe
Work, Roadway Lighting
Brown* 3.8 US12E
US12W
11.140 2022 50.00 14.317
NH 0281(115)194 05DV US 281 - Str. 0.2 N of Junction US12
Over BNSF Railroad
Repair Embankment Settlement,
Approach Pavement and Approach
Slabs, Zone Painting
Brown 0.0 US281 0.172 2022 51.00 0.210
Also Funded In:
Item Category
Bridge Projects 0.718 59.00
Total Project Cost
0.928
NH 0012(197)183 04XF
P 1806(18)363 05M9
US12 - Str. 2.4 W of the Walworth
Co Line Over Claymore Ck & at the
S Junction of SD1806; SD1806 - Fm
1200' S of US12 to US12
US12 - Replace Structure (Bridge)
& Approach Grading, Intersection
Relocation/Improvements; SD1806
- Grading & AC Surfacing
Corson* 0.2 SD1806
US12
0.315 2022 52.00 0.384
Also Funded In:
Item Category
State Secondary Projects 0.368 20.00
Bridge Projects 2.186 67.00
Total Project Cost
2.938
¥ Costs reflect anticipated inflationPage 17 HC65Coding.rpt
By Category
¥¥
Major Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0018(211)332 05TT US18 - Fm Pickstown to Lake Andes Mill & AC ResurfacingCharles Mix 6.4 US18 1.911 2022 53.00 2.332
Also Funded In:
Item Category
State Highway System Municipal Projects 0.466 17.00
Total Project Cost
2.798
NH 0018(214)286 0687
P 0043(26)0 06D8
US18 - Fm Burke to E of SD43;
SD43 - Fm the Nebraska State Line
to the JCT with US18
Mill & AC Resurfacing, Pipe Work,
Intersection Improvements
Gregory 26.4 SD43
US18
6.019 2022 54.00 7.523
Also Funded In:
Item Category
State Secondary Projects 0.767 23.00
Total Project Cost
8.290
NH 0212(189)155 06CM US212 - Fm Eagle Butte to LaPlant Mill & AC Resurfacing, Intersection
Improvements, Pipe Work
Dewey 32.2 US212 7.312 2022 55.00 8.923
NH 0212(190)39 068V US212 - Fm SD79 in Newell to the
Maurine/Bixby Rd
Mill & AC Resurfacing, Pipe WorkButte
Meade
47.9 US212 12.571 2022 56.00 15.710
NH 0081(110)61 06J6 US81 - Fm SD38 to the McCook/
Miner County Line
Mill & AC Resurfacing, Pipe WorkMcCook 9.1 US81 2.113 2022 57.00 2.578
Also Funded In:
Item Category
State Highway System Municipal Projects 0.351 19.00
Total Project Cost
2.929
NH-P 0046(74)290 06J7
NH 0050(131)337 05E1
SD46 - Fm Wagner to SD37; SD50 -
Fm the E Jct with SD46 S towards
Avon
Mill & AC Resurfacing, Pipe Work,
Intersection Improvements
Bon Homme
Charles Mix
20.7 SD46
SD50
6.242 2022 58.00 7.617
Also Funded In:
Item Category
Minor Arterial Projects 2.603 64.00
Total Project Cost
10.220
NH 0012(273)301 06XE US12 - Various locations on US12
E&W in Brown County
Inslope RestorationBrown 1.9 US12E
US12W
0.351 2022 59.00 0.428
Miles2022 60.022 148.6
¥ Costs reflect anticipated inflationPage 18 HC65Coding.rpt
By Category
¥¥
Minor Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0034(164)270 040A SD34 - Fm the S Junction of SD47 E
to SD50
Pipe WorkBuffalo 4.0 SD34 2.277 2019 1.00 3.428
Construction planned to begin in 2020.
P 0249(02)73 04EE
P 0047(107)88 04ED
P 0034(169)269 04EC
SD249 - Fort Thompson to SD34;
SD47 - Big Bend Dam to Fort
Thompson; SD34 - Fm Ft Thompson
to SD 50
SD249 - Mill & AC Surfacing, Pipe
Work, Intersection Modifications;
SD47 - Mill & AC Surfacing, Pipe
Work; SD34 - Mill & AC
Resurfacing, Pipe Work
Buffalo
Lyman
8.9 SD249
SD34
SD47
2.022 2019 2.00 2.311
Also Funded In:
Item Category
State Highway System Municipal Projects 0.399 2.00
Total Project Cost
2.710
Construction planned to begin in 2020.
P-PH 0046(47)356 025D SD46 - Fm W of SD19/SD19A to W
of the Junction with I29
Spot Grading, Shoulder Widening,
Str.s, & Culvert Replacement Over
Ash & Blind Creek, Left Turn
Lanes; Replace Structure (Bridge)
and Approach Grading at the
Vermillion River, Full Depth
Reclaimation, Interim Surfacing
Clay
Lincoln
* 8.1 SD46 1.032 2019 3.00 1.259
Also Funded In:
Item Category
Bridge Projects 4.237 9.00
Roadway Safety Improvement 4.780 9.00
Total Project Cost
10.276
Construction planned to begin in 2020.
P 0034(171)312 04VU SD34 - Wessington Springs Landslide RepairJerauld 0.3 SD34 0.114 2019 4.00 0.146
P 0044(192)254 03RX SD44 - Fm Winner to SD47 Full Depth Reclaimation, AC
Resurfacing, Pipe Work
Gregory
Tripp
19.9 SD44 10.330 2019 5.00 12.909
P 0010(91)358 028U
NH-P 0010(118)361 05EJ
SD10 - Fm the west city limits in
Sisseton to 458th Ave (8th Ave) East
in Sisseton & Fm 8th Ave E to
SD127; SD10 - Fm E of SD127 to E
of I29
SD10 - Grading, Roundabouts,
Replace Structure (RCBC) & AC
Surfacing; SD10 - AC Resurfacing
Roberts* 3.8 SD10 0.257 2019 6.00 0.314
Also Funded In:
Item Category
Major Arterial Projects 0.314 3.00
State Highway System Municipal Projects 8.499 3.00
Total Project Cost
9.127
¥ Costs reflect anticipated inflationPage 19 HC65Coding.rpt
By Category
¥¥
Minor Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0020(145)240 03T1 SD20 - Fm US83 to Hoven Mill & AC Resurfacing; Pipe WorkWalworth 13.7 SD20 1.991 2019 7.00 2.492
P 0065(17)193 04ER SD65 - Fm SD20 E Jct (Isabel) to
the Grand River
Mill & AC ResurfacingCorson
Dewey
* 20.5 SD65 5.099 2019 8.00 5.099
P 0028(38)341 05EV SD28 - Fm the N Junction of US81
to the E City Limits of Estelline
Mill & AC Resurfacing, Pipe WorkHamlin 13.1 SD28 3.493 2019 9.00 4.261
Also Funded In:
Item Category
State Highway System Municipal Projects 0.178 4.00
Total Project Cost
4.439
IM 0901(197)23 05F2
P 0034(179)9 05EW
SD34 - Fm US85 to I90; I90 - Exit 23
Ramps
Mill & AC Resurfacing, Pipe WorkButte
Lawrence
* 18.1 I90E
I90W
SD34
4.290 2019 10.00 5.361
Also Funded In:
Item Category
Interstate Maintenance Projects 0.213 17.00
Total Project Cost
5.574
NH 0014(209)190 04WK
P 0063(00)142 05DY
NH 0034(186)154 05TN
US14 - Fm SD34 to E of Hayes;
SD34 - 16 Mi W of US14/SD63N;
SD34 - At the US14/SD63N Jct;
SD63 - Str 2.1 Miles S of the
Ziebach County Line
Mill & AC Resurfacing; Pipe Work;
Mill & AC Resurfacing; Pipe Work;
Replace RCBC Inlet Apron
Haakon
Stanley
12.9 SD34
SD63
US14
0.052 2019 11.00 0.065
Also Funded In:
Item Category
Major Arterial Projects 4.778 6.00
Total Project Cost
4.843
Construction planned to begin in 2020.
P 0034(00)240 05NJ SD34 - 1.5 miles E of 319th Ave in
Hughes County.
Pipe WorkHughes 0.8 SD34 0.106 2019 12.00 0.131
P 0013(42)115 04EV
P 0324(05)357 04F7
SD13 - Fm 7 mi N of Flandreau, N 6
mi; SD324 - Fm I29 to SD13
Mill and AC ResurfacingBrookings
Moody
14.4 SD13
SD324
1.282 2019 13.00 1.602
Also Funded In:
Item Category
State Secondary Projects 2.233 3.00
Total Project Cost
3.835
¥ Costs reflect anticipated inflationPage 20 HC65Coding.rpt
By Category
¥¥
Minor Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0020(166)41 05EU
P 0079(78)219 05UU
SD79 - Fm 15 N of the SD20 E
Junction to the ND State Line; SD20
- Fm 10 W of the W SD79 Jct to E of
Prairie City
Mill & AC Resurfacing, PipeworkHarding
Perkins
37.6 SD20
SD79
5.367 2019 14.00 6.866
Also Funded In:
Item Category
State Secondary Projects 2.969 5.00
Total Project Cost
9.835
P 0011(106)09 04EU
P 0050(124)423 05UF
SD11 - Fm Elk Point to SD50; SD50
- Fm SD11 E to the Iowa State Line
Mill & AC ResurfacingUnion 7.9 SD11
SD50
1.566 2019 15.00 1.956
P 1804(47)250 04X3
P 0204(06)178 05EA
SD1804 - Fm N of US14 to N of the
Hughes/Sully County Line; US14 -
Fm W of SD1804 to the US83 N Jct
(Blunt Jct.); SD204 - Across the
Oahe Dam
Mill, AC ResurfacingHughes
Stanley
Sully
16.7 SD1804
SD204
1.431 2019 16.00 1.802
Also Funded In:
Item Category
State Secondary Projects 2.237 8.00
Total Project Cost
4.039
Miles2019 50.002 200.7
P 0244(11)27 04FT SD244 - 3.2 mi S of US385 & 16
Over Palmer Gulch
Replace Structure (Bridge) and
Approach Grading, Turn Lanes &
Spot Grading
Pennington 0.4 SD244 0.388 2020 17.00 0.474
Also Funded In:
Item Category
Bridge Projects 1.915 26.00
Total Project Cost
2.389
P-PH 0046(60)346 04J5 SD46 - Fm Irene to W of
SD19/SD19A
Shoulder Widening, Replace Str.
(RCBC), Pipe Work, Spot Grading,
Interim Surfacing
Clay
Yankton
* 9.9 SD46 3.266 2020 18.00 3.986
Also Funded In:
Item Category
Roadway Safety Improvement 10.739 40.00
Total Project Cost
14.725
¥ Costs reflect anticipated inflationPage 21 HC65Coding.rpt
By Category
¥¥
Minor Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0022(63)370 05U9
P 0101(09)85 05UA
SD22 - Fm SD15 to the Minnesota
State Line; SD 101 - Fm SD 22 N to
Gary
Mill & AC Resurfacing, Spot
Grading, Pipe Work; Mill & AC
Resurfacing, Pipe Work
Deuel 16.3 SD101
SD22
3.120 2020 19.00 3.898
Also Funded In:
Item Category
State Secondary Projects 0.773 9.00
Total Project Cost
4.671
P 0048(12)371 05EQ
P 0011(107)23 05UJ
SD48 - Fm I29 to Just E of the Iowa
State Line; SD11 - Fm SD48 to 1 Mi
S of Alcester; SD48 - Str 1.5 E of SD
11 Over E Union Ck;
Mill, AC Resurfacing, Intersection
Improvements, Pipe Work; Berm
Repair & Riprap
Union 23.0 SD11
SD48
5.669 2020 20.00 6.997
Also Funded In:
Item Category
Bridge Projects 0.181 35.00
Total Project Cost
7.178
NH-P 0042(65)344 05F0 SD42 - Fm W of SD19 to the
Tea/Ellis Road
Mill, Full Depth Reclamation, AC
Surfacing; Shoulder Resurfacing,
Joint Seal, Intersection
Improvements
McCook
Minnehaha
* 16.1 SD42 6.675 2020 21.00 8.312
P 0034(181)313 03RY SD34 - Fm Wessington Springs to
the beginning of the concrete
segments in Woonsocket
Mill & AC Resurfacing, Pipe Work,
Intersection Improvements, Bridge
Rail
Jerauld
Sanborn
15.4 SD34 4.095 2020 22.00 5.117
P 0025(80)88 05J1 SD25 - Fm the E Junction of SD34
W of Howard, N to the
Miner/Kingsbury County Line
Mill and AC Resurfacing, Pipe
Work
Kingsbury
Miner
* 13.1 SD25 3.062 2020 23.00 3.826
P 0044(200)65 05J8 SD44 - Fm 1.2 mi W of Base Line
Road to Rapid Creek
Cold in Place Processing, AC
Resurfacing, Pipe Work
Pennington 9.4 SD44 3.262 2020 24.00 4.077
P-PH 0015(77)155 04K8
P- PH
0020(152)439
04UL
PP 0020(176)443 0628
SD15 - Fm the N Junction of US212
N to S Junction of SD20; SD20 - Fm
the S Junction of SD15 to the N
Junction. of SD15; SD20 - Near
Labolt SD, DOT 097530J BNSF
Railroad
Grading, Interim Surfacing,
Replace Strs; Signal Upgrades
Deuel
Grant
* 12.0 SD15
SD20
4.730 2020 25.00 5.771
Also Funded In:
Item Category
Railroad Crossing Improvement Projects 0.350 46.00
Roadway Safety Improvement 11.214 62.00
Total Project Cost
17.335
¥ Costs reflect anticipated inflationPage 22 HC65Coding.rpt
By Category
¥¥
Minor Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0183(26)39 05ED US183 - Fm US18 to I90 Full Depth Reclaimation, AC
Resurfacing, Pipe Work
Lyman
Tripp
35.8 US183 19.088 2020 26.00 23.855
P 0011(88)81 04EX SD11 - Fm the N City Limits of
Brandon to the Minnesota State Line
AC Resurfacing, & Mill, AC
Resurfacing, Intersection
Improvements, Approach Slabs,
Drop Inlets, Column Repair
Minnehaha 20.9 SD11 6.601 2020 27.00 8.055
Also Funded In:
Item Category
State Highway System Municipal Projects 0.115 9.00
Bridge Projects 0.105 43.00
Total Project Cost
8.275
P 0019(45)54 069J SD19 - Fm the W SD44 Jct to the W
SD42 Jct
Mill & AC Resurfacing, Intersection
Improvements, Approach Slabs
Minnehaha
Turner
10.3 SD19 2.382 2020 28.00 2.977
Miles2020 77.345 182.6
P 0037(141)11 04EY
P 0052(06)315 04F0
P 037P(05)11 05XF
SD37 - Fm N of Springfield to SD50;
SD52 - Fm SD37 to SD50; SD37P -
Fm SD37 to the W Springfield City
Limits
SD37P - Mill & AC Resurfacing;
SD52 - AC Surfacing; SD37 - Mill
& AC Resurfacing
Bon Homme* 22.2 SD37
SD37P
SD52
2.503 2021 29.00 3.216
Also Funded In:
Item Category
State Secondary Projects 4.769 15.00
State Highway System Municipal Projects 0.396 15.00
Total Project Cost
8.381
NH-P 0115(58)67 04ET SD115 - Fm US18 to Harrisburg Mill & AC Resurfacing, Pipe WorkLincoln 8.8 SD115 2.225 2021 30.00 2.782
P 0044(201)276 05GP SD44 - Fm E of SD47 to 6.5 Mi W of
the Platte/Winner (Missouri River)
Bridge
Slide RepairGregory 7.7 SD44 0.661 2021 31.00 0.826
P 0020(168)439 05J2
P 0015(84)155 05J3
SD15 - Fm the N Junction of US212
N to S Junction of SD20; SD20 - Fm
the S Junction of SD15 to the N
Junction. of SD15
AC SurfacingDeuel
Grant
12.0 SD15
SD20
4.477 2021 32.00 5.594
P 0020(167)363 05N2 SD20 - Fm E of Crocker to SD25 Erosion Repair and Pipe WorkClark 9.0 SD20 0.499 2021 33.00 0.622
¥ Costs reflect anticipated inflationPage 23 HC65Coding.rpt
By Category
¥¥
Minor Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0015(83)199 04XA SD15 - 1.2 W of SD123 over the
North Fork of the Whetstone River &
4.8 mi E of I29
Replace Structure (Bridge) &
Approach Grading; Replace
Sturcture (RCBC) & Approach
Grading
Roberts 0.0 SD15 2.079 2021 34.00 2.537
Also Funded In:
Item Category
Bridge Projects 1.463 46.00
Total Project Cost
4.000
P 0045(58)66 05U8 SD45 - Fm 6 Mi N of Kimball to 7 N
of SD34
Cold In Place Recycling & AC
Resurfacing, Pipe Work; Modify
Endblocks
Brule
Buffalo
21.9 SD45 7.580 2021 35.00 9.472
P 0028(41)365 05UC SD28 - Fm SD15 to the Minnesota
State Line
Mill & AC Resurfacing, Pipe WorkDeuel 11.4 SD28 2.428 2021 36.00 3.034
P 0028(39)278 04EP SD28 - Fm W of SD37 to the Clark
County Line
Mill, AC Resurfacing, Pipe WorkClark
Spink
18.0 SD28 3.896 2021 37.00 4.869
P 0047(113)42 05UN SD47 - Fm 2.5 Mi N of the
Gregory/Brule County Line to SD49
Mill & AC Resurfacing, Pipe WorkLyman 16.0 SD47 3.515 2021 38.00 4.392
P 0037(152)169 05UG SD37 - Fm Doland to Turton Mill & AC Resurfacing, Pipe WorkSpink 11.0 SD37 2.524 2021 39.00 3.154
P 0010(129)282 05UM SD10 - Fm US281 E 14 mi Mill & AC Resurfacing, Pipe WorkBrown 14.0 SD10 3.044 2021 40.00 3.807
IM-FP
0903(108)163
04D7
P 0063(48)75 04Q2
I90 - EBL, Fm E of the Belvidere Exit
to W of the Jackson/Jones Co. Line;
Str. Over I90, 2.5 SW of the SD63 N
Exit, Perault Road; SD63 - Fm
Belvidere to North of I90 & Fm
SD248, N 0.3 Mi (near 1880 Town)
Grading, PCC Surfacing, Pipe
Work; Approach Slabs & Remove
Asphalt Membrane Overlay; Mill &
AC Resurfacing
Jackson* 11.6 I90E
SD63
0.053 2021 41.00 0.065
Also Funded In:
Item Category
Interstate Maintenance Projects 18.754 41.00
State Secondary Projects 0.316 17.00
Total Project Cost
19.135
P 0020(172)66 05RX SD20 - Fm E of Prairie City to SD73 AC Resurfacing, Pipe WorkPerkins 30.9 SD20 6.147 2021 42.00 7.682
¥ Costs reflect anticipated inflationPage 24 HC65Coding.rpt
By Category
¥¥
Minor Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0034(190)55 05RC SD34 - 16.7 Mi NE Jct of SD79N Bank StabilizationMeade 0.0 SD34 0.799 2021 43.00 0.974
P 0022(72)348 05UD SD22 - Fm US81 to I29 Mill & AC Resurfacing & Pipe WorkDeuel
Hamlin
12.1 SD22 3.085 2021 44.00 3.856
NH 0012(227)99 068A
P 0073(76)252 068C
US12 - Fm the Perkins/Corson Cnty
Line to Morristown; SD73 - Fm US12
to the ND State Line
Mill & AC Resurfacing, Pipe WorkCorson 13.7 SD73
US12
0.273 2021 45.00 0.340
Also Funded In:
Item Category
Major Arterial Projects 4.377 45.00
Total Project Cost
4.717
P 0036(12)36 069U SD36 - Fm US16A to SD79 AC ResurfacingCuster 9.1 SD36 1.985 2021 46.00 2.481
P 0042(76)355 067T SD42 - Intersection of 463rd Ave
(Wall Lake); SD42 - Intersection of
Co. HWY 145
Construct Roundabout; ROWMinnehaha 0.0 SD42 1.595 2021 47.00 2.184
P 0065(19)164 06L0 SD65 - Fm US212 to the Grand
River
Pipe Work, Erosion ControlCorson
Dewey
Ziebach
45.7 SD65 0.403 2021 48.00 0.503
Miles2021 62.390 275.1
P 0036(11)41 05KK SD36 - Approximately 4 miles West
of the Junction with SD79
Slide RepairCuster 0.2 SD36 0.310 2022 49.00 0.344
P 0015(81)182 05J7
PS 0015(86)198 062A
SD15 - Fm the Grant/Roberts
County Line, N & W to W of I29.;
SD15 - N Side of Wilmont DOT
394493C SMRR Railroad
Mill & AC Overlay, Pipework;
Crossing Surface
Roberts 25.2 SD15 5.561 2022 50.00 6.950
Also Funded In:
Item Category
Railroad Crossing Improvement Projects 0.060 56.00
Total Project Cost
7.010
NH-P 0042(59)373 03TE SD42 - Fm the Big Sioux River
Bridge to the Iowa State Line
Grading, PCC Surfacing, Curb &
Gutter, Sidewalk, ADA, Storm
Sewer, Lighting, Signals, Approach
Slabs
Minnehaha* 4.9 SD42 20.985 2022 51.00 26.814
¥ Costs reflect anticipated inflationPage 25 HC65Coding.rpt
By Category
¥¥
Minor Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P-PH 0046(61)366 04JF
PP-PS 0046(71)381 062C
SD46 - Fm Beresford E 15 miles.;
SD 46 - 0.3 S of 298th St., DOT
381576D D&I Railroad
Grading, Interim Surfacing,
Replace Structure (RCBC) &
Replace Structure (Bridge),
Erosion Repair; Signal Upgrades &
Crossing Surface
Union* 15.8 SD46 2.452 2022 52.00 2.992
Also Funded In:
Item Category
Railroad Crossing Improvement Projects 0.250 57.00
Roadway Safety Improvement 21.753 124.00
Total Project Cost
24.995
P-PH 0046(66)334 04X4 SD46 - Fm US81 to Irene Grading & Interim Surfacing,
Replace Structure (RCBC),
Replace Structure (Bridge),
Intersection Lighting at US81/SD46
Yankton* 12.0 SD46 8.324 2022 53.00 10.158
Also Funded In:
Item Category
Roadway Safety Improvement 7.709 125.00
Total Project Cost
17.867
P 0020(169)326 05DW SD20 - Str. 5.2 E of Junction US
281
Repair Embankment Settlement,
Approach Pavement and Approach
Slabs
Spink 0.0 SD20 0.146 2022 54.00 0.187
P-PH 0015(82)167 05D9 SD15 - Fm the N Jct of SD20, N to
Milbank
Grading, Interim Surfacing &
Replace Strs.
Grant* 6.0 SD15 4.870 2022 55.00 5.943
Also Funded In:
Item Category
Roadway Safety Improvement 4.235 114.00
Total Project Cost
10.178
P 0044(211)200 04EM SD44 - Fm US83 to through Wood Mill & AC Resurfacing, Pipe WorkMellette 14.1 SD44 3.171 2022 56.00 3.961
P 0044(212)172 04X0 SD44 - Fm SD63 to the N Jct of
US83
Full Depth Reclamation, AC
Surfacing, Intersection
Improvements, Pipe Work
Mellette 22.9 SD44 10.996 2022 57.00 13.741
P 0025(86)55 06CV SD25 - Fm SD262 to SD38 Mill & AC Resurfacing, Pipe WorkHanson 6.0 SD25 1.617 2022 58.00 2.021
P 0020(189)181 06CY SD20 - Fm Trail City to US12 Mill & AC Resurfacing, Pipe WorkCorson
Dewey
11.0 SD20 2.587 2022 59.00 3.233
¥ Costs reflect anticipated inflationPage 26 HC65Coding.rpt
By Category
¥¥
Minor Arterial Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0047(117)67 069Q
P 0248(13)261 06YC
SD47 - From I90 to W of Ft
Thompson; SD248 - Fm Reliance to
I90
Mill & AC Resurfacing, Pipe WorkLyman 20.0 SD248
SD47
4.585 2022 60.00 5.731
Also Funded In:
Item Category
State Secondary Projects 0.319 27.00
Total Project Cost
6.050
P 0022(70)360 069C SD22 - Fm I29 to SD15 in Clear
Lake
Cold in Place Recycle & AC
Surfacing, Pipe Work, Intersection
Improvement
Deuel 9.6 SD22 3.648 2022 61.00 4.564
P 0026(04)230 04X5
P 0047(119)157 069F
SD26 - Fm SD47 to SD45; SD47 -
Fm N of SD26 to the US212 E Jct.
Mill & AC Resurfacing, Pipe WorkFaulk
Hand
Hyde
38.8 SD26
SD47
3.361 2022 62.00 4.199
Also Funded In:
Item Category
State Secondary Projects 5.364 21.00
Total Project Cost
9.563
P 0063(56)173 069R SD63 - Fm the US212 E Jct to N of
the Moreau River
Mill & AC Resurfacing, Pipe WorkDewey 16.7 SD63 3.641 2022 63.00 4.444
NH-P 0046(74)290 06J7
NH 0050(131)337 05E1
SD46 - Fm Wagner to SD37; SD50 -
Fm the E Jct with SD46 S towards
Avon
Mill & AC Resurfacing, Pipe Work,
Intersection Improvements
Bon Homme
Charles Mix
20.7 SD46
SD50
2.133 2022 64.00 2.603
Also Funded In:
Item Category
Major Arterial Projects 7.617 58.00
Total Project Cost
10.220
Miles2022 97.885 223.9
¥ Costs reflect anticipated inflationPage 27 HC65Coding.rpt
By Category
¥¥
State Secondary Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 1806(12)149 038Z SD1806 - Fm the Lyman/Stanley
county line N 14.7 miles; Str. 11.2
SE of US83 over Antelope Ck
Mill & AC Resurfacing, Pipe Work;
Deck Overlay, Approach Guardrail,
& Erosion Repair
Stanley 14.6 SD1806 4.888 2019 1.00 5.965
Also Funded In:
Item Category
Bridge Projects 0.369 24.00
Total Project Cost
6.334
Construction planned to begin in 2020.
P 0071(03)06 04FV
P 0071(10)0 3570
SD71 - Fm the Nebr State Line to S
of Hat Ck; SD71 - Str 0.5 mi S of
SD471 over a Creek
AC Surfacing & Pipe Work;
Replace Structure (RCBC) &
Approach Grading
Fall River* 17.5 SD71 2.193 2019 2.00 2.740
Also Funded In:
Item Category
Bridge Projects 1.152 13.00
Total Project Cost
3.892
P 0013(42)115 04EV
P 0324(05)357 04F7
SD13 - Fm 7 mi N of Flandreau, N 6
mi; SD324 - Fm I29 to SD13
Mill and AC ResurfacingBrookings
Moody
14.4 SD13
SD324
1.787 2019 3.00 2.233
Also Funded In:
Item Category
Minor Arterial Projects 1.602 13.00
Total Project Cost
3.835
P 0271(04)166 04X7 SD271 - Fm Java to the Campbell
County Line
AC ResurfacingWalworth 7.0 SD271 1.032 2019 4.00 1.290
P 0020(166)41 05EU
P 0079(78)219 05UU
SD79 - Fm 15 N of the SD20 E
Junction to the ND State Line; SD20
- Fm 10 W of the W SD79 Jct to E of
Prairie City
Mill & AC Resurfacing, PipeworkHarding
Perkins
37.6 SD20
SD79
2.376 2019 5.00 2.969
Also Funded In:
Item Category
Minor Arterial Projects 6.866 14.00
Total Project Cost
9.835
P 1804(48)292 05UV SD1804 - Fm the Agar Road N to
the W US212 Jct and Fm the E
US212 Jct to West Whitlock
Mill & AC Resurfacing, Pipe WorkPotter
Sully
15.4 SD1804 2.476 2019 6.00 3.094
¥ Costs reflect anticipated inflationPage 28 HC65Coding.rpt
By Category
¥¥
State Secondary Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0012(207)247 05E2
P 0247(09)169 05TP
US12 - Fm SD247 to the West City
Limits of Ipswich; SD247 - Fm US12
N through Roscoe
AC Resurfacing, Pipe Work; Mill &
AC Resurfacing
Edmunds 15.1 SD247
US12
0.130 2019 7.00 0.162
Also Funded In:
Item Category
Major Arterial Projects 4.712 10.00
Total Project Cost
4.874
P 1804(47)250 04X3
P 0204(06)178 05EA
SD1804 - Fm N of US14 to N of the
Hughes/Sully County Line; US14 -
Fm W of SD1804 to the US83 N Jct
(Blunt Jct.); SD204 - Across the
Oahe Dam
Mill, AC ResurfacingHughes
Stanley
Sully
16.7 SD1804
SD204
1.833 2019 8.00 2.237
Also Funded In:
Item Category
Minor Arterial Projects 1.802 16.00
Total Project Cost
4.039
Miles2019 20.690 138.3
P 0022(63)370 05U9
P 0101(09)85 05UA
SD22 - Fm SD15 to the Minnesota
State Line; SD 101 - Fm SD 22 N to
Gary
Mill & AC Resurfacing, Spot
Grading, Pipe Work; Mill & AC
Resurfacing, Pipe Work
Deuel 16.3 SD101
SD22
0.619 2020 9.00 0.773
Also Funded In:
Item Category
Minor Arterial Projects 3.898 19.00
Total Project Cost
4.671
P 0042(70)280 02R0 SD42 - Fm US281 to the
Aurora/Davison County Line
Mill & AC Resurfacing, Pipe WorkAurora 5.9 SD42 1.088 2020 10.00 1.359
P-PH 0052(05)315 04HK
P 037P(04)12 06K0
SD52 - Fm SD37 to SD50; SD37P -
Str. 0.19 Mi S of the SD37/SD37P
Intersection, Pine Street in
Springfield
SD52 - Grading, Interim Surfacing,
Replace Strs (RCBC), Extend
RCBC; SD37P - Structure and
Approach Grading, Replace
Structure (RCBC), Approach
Grading & Pipe Work
Bon Homme* 12.1 SD37P
SD52
6.175 2020 11.00 7.572
Also Funded In:
Item Category
Roadway Safety Improvement 10.180 49.00
Total Project Cost
17.752
Miles2020 9.704 34.3
¥ Costs reflect anticipated inflationPage 29 HC65Coding.rpt
By Category
¥¥
State Secondary Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0212(182)187 05EN
P 1804(49)292 05X8
US 212 - Fm LaPlant to the W
Junction of US83; SD1804 - Fm the
Agar Road N to the W US212 Jct
and Fm the E US212 Jct to West
Whitlock
US212 - Mill & AC Resurfacing,
Pipe work; SD1804 - Pipe Work
Dewey
Potter
Sully
46.3 SD1804
US212
0.067 2021 12.00 0.083
Also Funded In:
Item Category
Major Arterial Projects 8.449 33.00
Total Project Cost
8.532
P 0049(05)27 04F4 SD49 - Fm SD44 to SD47 Mill & AC Resurfacing, Pipe WorkLyman
Tripp
25.7 SD49 4.860 2021 13.00 6.217
P 1806(16)138 04XW SD1806 - Fm SD273 N 11.3 Mi. to
the Lyman/Stanley Co Line;
SD1806 - 6.4 NW of SD271 Over
Cedar Ck,6.7 NW of SD271 Over
Straight Ck.
Spot Grading, Mill & AC
Resurfacing, Pipe Work; Approach
Guardrail & Erosion Repair
Lyman
Stanley
11.0 SD1806 4.519 2021 14.00 5.648
P 0037(141)11 04EY
P 0052(06)315 04F0
P 037P(05)11 05XF
SD37 - Fm N of Springfield to SD50;
SD52 - Fm SD37 to SD50; SD37P -
Fm SD37 to the W Springfield City
Limits
SD37P - Mill & AC Resurfacing;
SD52 - AC Surfacing; SD37 - Mill
& AC Resurfacing
Bon Homme* 22.2 SD37
SD37P
SD52
3.819 2021 15.00 4.769
Also Funded In:
Item Category
Minor Arterial Projects 3.216 29.00
State Highway System Municipal Projects 0.396 15.00
Total Project Cost
8.381
P 1806(15)177 045K SD1806 - 3 Miles S of the US83
Junction South of Ft. Pierre
Drainage Improvement and
Erosion Repair
Stanley 0.0 SD1806 1.539 2021 16.00 1.953
IM-FP
0903(108)163
04D7
P 0063(48)75 04Q2
I90 - EBL, Fm E of the Belvidere Exit
to W of the Jackson/Jones Co. Line;
Str. Over I90, 2.5 SW of the SD63 N
Exit, Perault Road; SD63 - Fm
Belvidere to North of I90 & Fm
SD248, N 0.3 Mi (near 1880 Town)
Grading, PCC Surfacing, Pipe
Work; Approach Slabs & Remove
Asphalt Membrane Overlay; Mill &
AC Resurfacing
Jackson* 11.6 I90E
SD63
0.259 2021 17.00 0.316
Also Funded In:
Item Category
Interstate Maintenance Projects 18.754 41.00
Minor Arterial Projects 0.065 41.00
Total Project Cost
19.135
P 0047(112)248 05UT SD47 - Fm Eureka to the ND State
Line
AC Resurfacing, PipeworkMcPherson 12.1 SD47 2.580 2021 18.00 3.224
¥ Costs reflect anticipated inflationPage 30 HC65Coding.rpt
By Category
¥¥
State Secondary Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0053(09)10 069V SD53 - Fm US18, S 16 Mi Mill & AC Resurfacing & Pipe WorkTripp 16.0 SD53 2.985 2021 19.00 3.732
Miles2021 25.942 144.9
NH 0012(197)183 04XF
P 1806(18)363 05M9
US12 - Str. 2.4 W of the Walworth
Co Line Over Claymore Ck & at the
S Junction of SD1806; SD1806 - Fm
1200' S of US12 to US12
US12 - Replace Structure (Bridge)
& Approach Grading, Intersection
Relocation/Improvements; SD1806
- Grading & AC Surfacing
Corson* 0.2 SD1806
US12
0.288 2022 20.00 0.368
Also Funded In:
Item Category
Major Arterial Projects 0.384 52.00
Bridge Projects 2.186 67.00
Total Project Cost
2.938
P 0026(04)230 04X5
P 0047(119)157 069F
SD26 - Fm SD47 to SD45; SD47 -
Fm N of SD26 to the US212 E Jct.
Mill & AC Resurfacing, Pipe WorkFaulk
Hand
Hyde
38.8 SD26
SD47
4.292 2022 21.00 5.364
Also Funded In:
Item Category
Minor Arterial Projects 4.199 62.00
Total Project Cost
9.563
P 0022(74)333 05UP SD 22 - Fm Hazel E to US81N Mill & AC Resurfacing, Pipe WorkHamlin 13.5 SD22 2.592 2022 22.00 3.239
NH 0018(214)286 0687
P 0043(26)0 06D8
US18 - Fm Burke to E of SD43;
SD43 - Fm the Nebraska State Line
to the JCT with US18
Mill & AC Resurfacing, Pipe Work,
Intersection Improvements
Gregory 26.4 SD43
US18
0.629 2022 23.00 0.767
Also Funded In:
Item Category
Major Arterial Projects 7.523 54.00
Total Project Cost
8.290
P 0010(148)182 06D6 SD10 - Fm Pollock to the US83 N
Jct
Mill & AC Resurfacing, Pipe WorkCampbell 10.9 SD10
SD10E
SD10W
2.788 2022 24.00 3.483
P 0040(329)47 06D7 SD40 - Fm the SD79 N Jct to the
Cheyenne River
Mill & AC Resurfacing, Pipe WorkCuster 21.5 SD40 4.567 2022 25.00 5.701
¥ Costs reflect anticipated inflationPage 31 HC65Coding.rpt
By Category
¥¥
State Secondary Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0042(77)301 04F6 SD42 - Fm SD37 to Bridgewater Mill & AC Resurfacing, Pipe WorkDavison
Hanson
McCook
25.8 SD42 6.206 2022 26.00 7.747
P 0047(117)67 069Q
P 0248(13)261 06YC
SD47 - From I90 to W of Ft
Thompson; SD248 - Fm Reliance to
I90
Mill & AC Resurfacing, Pipe WorkLyman 20.0 SD248
SD47
0.262 2022 27.00 0.319
Also Funded In:
Item Category
Minor Arterial Projects 5.731 60.00
Total Project Cost
6.050
Miles2022 26.988 157.1
¥ Costs reflect anticipated inflationPage 32 HC65Coding.rpt
By Category
¥¥
State Highway System Urban Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
IM-NH 0909(46)406 4433
NH 0011(118)80 062V
I90 - Exit 406 SD11
(Corson/Brandon) Interchange;
SD11 - Fm Ash St. to the I90
Interchange in Brandon and 260th St
Intersection in Corson
Preliminary EngineeringMinnehaha* 0.5 I90E
I90W
SD11
0.000 2019 1.00 0.026
Also Funded In:
Item Category
Interstate Maintenance Projects 0.052 1.00
Total Project Cost
0.078
P 1358(02) 05C2
NH 2042(29) 06YQ
NH 0042(80)371 06YP
Six Mile Road - Fm 500' N of
Arrowhead Parkway, Arrowhead
Parkway - Fm 0.5 m W of Six Mile
Rd to Six Mile Rd; SD42 - Fm 0.5 m
W of Six Mile Rd to Willow Run Ent.
Grading, Storm Sewer, Curb &
Gutter & PCCP Surfacing, ROW,
Signals, Lighting
Minnehaha 0.4 SD42 5.963 2019 2.00 7.277
Also Funded In:
Item Category
Local Urban System Projects 7.882 3.00
Total Project Cost
15.159
Construction planned for 2020.
NH-P 0037(128)125 0271
NH 0014(200)345 04PK
SD37 - Fm 3rd St. N to 15th St.
North in Huron; Intersection of 21st
St & SD37 in Huron; US14 - At the
Intersection of SD37 in Huron
Urban Grading & PCC Surfacing,
Lighting, Intersection Improvement;
AC Surfacing & Turn Lane
Modification
Beadle* 1.4 SD37
SD37N
SD37S
US14E
US14W
6.826 2019 3.00 8.730
NH 0212(168)376 027Q US212 - Fm SD20 to US81 in
Watertown
Grading, PCCP Surfacing,
Replace Structure (Bridge), Curb &
Gutter, Sidewalk, ADA, Roadway
Lighting
Codington* 0.9 US212 7.772 2019 4.00 9.922
NH 0034(163)387 03TC SD34 - From the Washington
Ave/2nd St NE Intersection South to
the start of the Divided Highway in
Madison
Urban Grading, Storm Sewer, Curb
& Gutter, Sidewalk, Roadway
Lighting, ADA, PCC Surfacing
Lake 2.4 SD34
SD34E
SD34W
6.472 2019 5.00 8.272
NH 0044(167)44 027K
P 0231(13)79 03CP
SD231 (W Chicago/W Omaha) - Fm
Sheffer St to Mt View Rd (SD44) in
Rapid City; SD44 (W Omaha St) -
Fm Mt. View Rd to the start of the
divided lanes Near 12th St
Urban Grading, Storm Sewer, Curb
& Gutter, Sidewalk, Traffic Signals,
PCC Surfacing, Str Repair &
Widening Over Rapid Creek,
Lighting
Pennington* 1.2 SD231
SD231N
SD231S
SD44
SD44E
SD44W
10.317 2019 6.00 13.168
Construction Planned for 2019 and 2020.
¥ Costs reflect anticipated inflationPage 33 HC65Coding.rpt
By Category
¥¥
State Highway System Urban Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0445(00)74 06WX SD445 - Deadwood Ave and Krebs
Drive
Install Left Turn Lane at Deadwood
Ave & Krebs Dr
Pennington 0.2 SD445 0.000 2019 7.00 0.320
Miles2019 47.715 7.0
P-PH 0014(179)419 027B US14 - Fm Main Ave. to Medary
Ave. in Brookings & the Intersections
of US14 & 12th Ave,
Urban Grading, Curb & Gutter,
Storm Sewer, Traffic Signals, ADA,
Sidewalk, Roadway Lighting &
PCC Surfacing
Brookings 0.7 US14 2.344 2020 8.00 2.861
Also Funded In:
Item Category
Roadway Safety Improvement 0.750 50.00
Total Project Cost
3.611
NH 0014(194)227 03WN US14 - Missouri River Bridge at
Pierre
Replace Structure (Bridge),
Intersection Improvements
Hughes
Stanley
* 0.8 US14
US14E
US14W
35.383 2020 9.00 45.359
Construction planned to begin in 2021 through 2022.
Miles2020 48.220 1.5
NH 2042(28) 05UW Arrowhead Parkway - Fm Highline
Avenue to 0.5 m W of Six Mile Road
Grading, Storm Sewer, Curb &
Gutter, PCCP Surfacing, ROW,
Signals, and Lighting
Minnehaha 1.4 8.320 2021 10.00 10.153
Also Funded In:
Item Category
Local Urban System Projects 0.717 5.00
Total Project Cost
10.870
NH 0014(208)230 04XQ US14 - Fm W of SD1804 to W of the
US83 N Jct (Blunt Jct.)
AC Surfacing, Pipe WorkHughes 15.0 US14
US14E
US14W
0.560 2021 11.00 0.683
Also Funded In:
Item Category
Major Arterial Projects 1.943 34.00
Total Project Cost
2.626
NH 1157(02) 05C3
NH 0011(101)72 05C4
Veterans Parkway - Fm Arrowhead
Parkway N 1000' in Sioux Falls;
SD11 - Fm Arrowhead Parkway S
500' in Sioux Falls
Grading, Storm Sewer, Curb &
Gutter & PCCP Surfacing, ROW,
Signals, Lighting
Minnehaha 0.0 SD11N
SD11S
2.126 2021 12.00 2.595
Also Funded In:
Item Category
Local Urban System Projects 0.561 6.00
Total Project Cost
3.156
¥ Costs reflect anticipated inflationPage 34 HC65Coding.rpt
By Category
¥¥
State Highway System Urban Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0212(174)377 027D US212 - Fm US81 to 19th St. SE in
Watertown
Urban Grading, PCCP Surfacing,
Curb & Gutter, ADA, Lighting
Codington* 1.0 US212 6.306 2021 13.00 8.051
NH 0079(79)111 05TR
NH 0034(189)35 05TQ
SD34 - Fm Regency St. in Sturgis E
to E of SD79; SD79 - Fm SD34 to S
of the US212 S Jct
SD34 - Mill & AC Resurfacing,
Pipe Work; SD79 - Mill & AC
Resurfacing, Pipe Work, Replace
Str. (RCBC), Upgrade Bridge Rail,
Intersection Improvements
Butte
Meade
21.9 SD34
SD34E
SD34W
SD79
SD79N
SD79S
0.232 2021 14.00 0.283
Also Funded In:
Item Category
Major Arterial Projects 10.110 38.00
Total Project Cost
10.393
NH 0085(00)54 04P9
NH 0212(00)13 04PA
P 0034(191)9 05V0
US85 - Through Belle Fourche;
US212 - Through Belle Fourche;
SD34/US85 Intersection
ADA Curb Ramp Upgrades;
Intersection Improvements, Traffic
Signals
Butte 2.6 SD34
US212
US85
0.577 2021 15.00 0.739
NH 014A(25)42 068K US14A - Fm E of the US85 N Jct to
the PCCP segment in Sturgis
Mill & AC Resurfacing, Pipe WorkLawrence
Meade
9.4 US14A 0.203 2021 16.00 0.249
Also Funded In:
Item Category
Major Arterial Projects 2.856 47.00
Total Project Cost
3.105
Miles2021 22.753 51.3
NH 0014(185)229 026Z US14 - Fm Sioux Ave to the Divided
Hwy W of SD1804 in Pierre
Urban Grading, Roundabouts,
Curb & Gutter, ADA Upgrades,
Traffic Signals, Storm Sewer,
Roadway Lighting, Surfacing
Hughes* 1.3 US14 6.860 2022 17.00 8.761
Miles2022 8.761 1.3
¥ Costs reflect anticipated inflationPage 35 HC65Coding.rpt
By Category
¥¥
State Highway System Municipal Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 014A(15)41 04FA US14A - Fm Railroad Ave to E of the
Junction. of US85 in Deadwood
Mill & AC Resurfacing, ADA,
Traffic Signals, Joint Repair, Spall
Repair
Lawrence* 1.4 US14A 1.917 2019 1.00 2.457
P 0249(02)73 04EE
P 0047(107)88 04ED
P 0034(169)269 04EC
SD249 - Fort Thompson to SD34;
SD47 - Big Bend Dam to Fort
Thompson; SD34 - Fm Ft Thompson
to SD 50
SD249 - Mill & AC Surfacing, Pipe
Work, Intersection Modifications;
SD47 - Mill & AC Surfacing, Pipe
Work; SD34 - Mill & AC
Resurfacing, Pipe Work
Buffalo
Lyman
8.9 SD249
SD34
SD47
0.325 2019 2.00 0.399
Also Funded In:
Item Category
Minor Arterial Projects 2.311 2.00
Total Project Cost
2.710
Construction planned to begin in 2020.
P 0010(91)358 028U
NH-P 0010(118)361 05EJ
SD10 - Fm the west city limits in
Sisseton to 458th Ave (8th Ave) East
in Sisseton & Fm 8th Ave E to
SD127; SD10 - Fm E of SD127 to E
of I29
SD10 - Grading, Roundabouts,
Replace Structure (RCBC) & AC
Surfacing; SD10 - AC Resurfacing
Roberts* 3.8 SD10 6.421 2019 3.00 8.499
Also Funded In:
Item Category
Major Arterial Projects 0.314 3.00
Minor Arterial Projects 0.314 6.00
Total Project Cost
9.127
P 0028(38)341 05EV SD28 - Fm the N Junction of US81
to the E City Limits of Estelline
Mill & AC Resurfacing, Pipe WorkHamlin 13.1 SD28 0.146 2019 4.00 0.178
Also Funded In:
Item Category
Minor Arterial Projects 4.261 9.00
Total Project Cost
4.439
NH 0016(90)37 068L US16 - Fm SD244 to S of theUS16B
S Jct in Hill City; US16 - Between
Hill City and Three Forks
Mill & AC ResurfacingPennington 3.4 US16 0.057 2019 5.00 0.070
Also Funded In:
Item Category
Major Arterial Projects 0.806 14.00
Total Project Cost
0.876
Miles2019 11.603 30.6
P 016A(14)55 04PG US16A - Through Keystone US16A - Mill & AC Resurfacing &
ADA Curb Ramp Upgrades
Pennington 1.3 US16A 0.914 2020 6.00 1.141
¥ Costs reflect anticipated inflationPage 36 HC65Coding.rpt
By Category
¥¥
State Highway System Municipal Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0050(111)231 6953 SD50 - Fm K St to I-90 at
Chamberlain
Regrading to 3 Lanes (I90 to
Sorensen Drive), Mill, AC
Resurfacing, Slide Area Repair,
Pipe Work, Lighting
Brule 3.6 SD50 6.772 2020 7.00 8.460
NH 0012(213)159 05U6 US12 - Fm McLaughlin E 12 Miles Mill & AC Resurfacing, Pipe WorkCorson 14.2 US12 0.192 2020 8.00 0.235
Also Funded In:
Item Category
Major Arterial Projects 4.108 24.00
Total Project Cost
4.343
P 0011(88)81 04EX SD11 - Fm the N City Limits of
Brandon to the Minnesota State Line
AC Resurfacing, & Mill, AC
Resurfacing, Intersection
Improvements, Approach Slabs,
Drop Inlets, Column Repair
Minnehaha 20.9 SD11 0.094 2020 9.00 0.115
Also Funded In:
Item Category
Minor Arterial Projects 8.055 27.00
Bridge Projects 0.105 43.00
Total Project Cost
8.275
NH 014A(20)29 04WC
NH 0085(96)16 05FG
US14A - Fm Cheyenne Crossing to
Deadwood via Lead and Central
City; US85 - At Cheyenne Crossing
Mill & AC Resurfacing, Pipe WorkLawrence 11.0 US14A
US85
0.803 2020 10.00 0.981
Also Funded In:
Item Category
Major Arterial Projects 2.033 20.00
Total Project Cost
3.014
Miles2020 10.932 51.0
NH 0385(48)35 028Z
NH 0018(184)39 03TH
NH 018B(02)40 06DE
US18 - Fm US385 to the Hot
Springs City Limits; US385 - Fm
US18 to Summerville St. in Hot
Springs; US18B - Str 300' west of
US18.
Urban Reconstruction, PCC
Surfacing, Curb & Gutter,
Sidewalk, Roadway Lighting,
Traffic Signals; Grading, PCC
Surfacing, Lighting, Curb & Gutter,
Str, Approach Slab; Approach Slab
Fall River* 2.2 US18
US18B
US385
14.363 2021 11.00 18.866
NH 0212(165)224 039L US212 - Through Gettysburg Urban Grading, PCC Surfacing,
ADA Upgrades, Storm Sewer,
Roadway Lighting
Potter* 1.7 US212 8.321 2021 12.00 10.644
¥ Costs reflect anticipated inflationPage 37 HC65Coding.rpt
By Category
¥¥
State Highway System Municipal Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0018(193)252 04FD
P 0044(185)253 04FE
US18 - Fm W of Monroe St to
Lincoln St in Winner, US18E&W -
From Lincoln St to 3rd St in Winner,
& US18 - From 3rd St to 7th St in
Winner; SD44 - From the Junction
with US18 to Plum St
Urban Reconstruction; Reconstruct
to PCCP, Intersection
Improvement
Tripp* 1.4 SD44
US18
US18E
US18W
4.659 2021 13.00 6.081
NH 0018(191)250 03TK
P 0044(188)253 04F9
SD44 - Fm Plum St to W of Sale
Barn Rd/317th Ave in Winner; US18
- Fm W of the Str Over Dog Ear Ck
To W of Monroe St in Winner
SD44 - Grading, Shoulder
Widening, Sidewalk, Lighting, PCC
Surfacing, & Mill & PCC Overlay
US18 - Reconstruct to PCCP
Tripp* 2.5 SD44
US18
5.303 2021 14.00 6.925
Construction planned to begin in 2022.
P 0037(141)11 04EY
P 0052(06)315 04F0
P 037P(05)11 05XF
SD37 - Fm N of Springfield to SD50;
SD52 - Fm SD37 to SD50; SD37P -
Fm SD37 to the W Springfield City
Limits
SD37P - Mill & AC Resurfacing;
SD52 - AC Surfacing; SD37 - Mill
& AC Resurfacing
Bon Homme* 22.2 SD37
SD37P
SD52
0.317 2021 15.00 0.396
Also Funded In:
Item Category
Minor Arterial Projects 3.216 29.00
State Secondary Projects 4.769 15.00
Total Project Cost
8.381
NH 0012(226)190 068D US12 - Fm the Mobridge E City
Limits to W of the divided lanes at
US83; US12, & US12 E&W - Fm W
of the divided lanes West of Selby to
N of the divided lanes South of Selby
Cold In Place, AC Resurfacing, Mill
& AC Resurfacing, Pipe Work
Walworth* 21.7 US12
US12E
US12W
0.356 2021 16.00 0.434
Also Funded In:
Item Category
Major Arterial Projects 14.765 46.00
Total Project Cost
15.199
Miles2021 43.346 51.7
NH 0018(211)332 05TT US18 - Fm Pickstown to Lake Andes Mill & AC ResurfacingCharles Mix 6.4 US18 0.382 2022 17.00 0.466
Also Funded In:
Item Category
Major Arterial Projects 2.332 53.00
Total Project Cost
2.798
NH 0016(89)41 060L US16 - 0.1 Mile East of
US16/US16B Intersection on Spring
Creek
Bank StabilizationPennington 0.0 US16 0.226 2022 18.00 0.276
¥ Costs reflect anticipated inflationPage 38 HC65Coding.rpt
By Category
¥¥
State Highway System Municipal Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0081(110)61 06J6 US81 - Fm SD38 to the McCook/
Miner County Line
Mill & AC Resurfacing, Pipe WorkMcCook 9.1 US81 0.288 2022 19.00 0.351
Also Funded In:
Item Category
Major Arterial Projects 2.578 57.00
Total Project Cost
2.929
NH 0018(217)209 06X5 US18 - Fm E of the US83 Jct East Replace Roadway LightingTodd 1.1 US18 0.296 2022 20.00 0.361
Miles2022 1.454 16.6
¥ Costs reflect anticipated inflationPage 39 HC65Coding.rpt
By Category
¥¥
Bridge Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0047(99)89 039V SD47 - Str 0.3 NE of the Big Bend
Dam Over Soldier Creek
Scour ProtectionBuffalo 0.0 SD47 0.452 2019 1.00 0.452
NH 014A(14)38 04FX US14A - 2 mi N of US85 over
Deadwood Ck
Replace Structure (RCBC) &
Approach Grading
Lawrence 0.1 US14A 1.027 2019 2.00 1.313
P 0040(00)18 04UY Regionwide Rapid City Region Bridge
Rehabilitation
Regionwide 0.0 0.000 2019 3.00 1.248
NH 0018(00)101 06JC US18 - Str Over Cheyenne Creek Partial RCBC ReplacementOglala Lakota 0.0 US18 0.000 2019 4.00 0.624
NH 0012(176)399 03U2
P 0022(41)352 03U3
US12 - Str 0.6 E of SD109 Over the
Whetstone River Diversion Channel;
SD22 - Str 3.2 E of US81 Over the
Big Sioux River
Fatigue Retrofit, Replace Torn
Diaphragm Lower Chords, & Cover
Plate Repair; Fatigue Retrofit
Grant
Hamlin
0.0 SD22
US12
0.174 2019 5.00 0.212
P 0010(00)17 04UQ Regionwide Aberdeen Region Bridge
Rehabilitation
Regionwide 0.0 0.000 2019 6.00 0.312
P 0020(00)17 04UR Regionwide Mitchell Region Bridge
Rehabilitation
Regionwide 0.0 0.000 2019 7.00 0.312
P 0030(00)17 04UT Regionwide Pierre Region Bridge RehabilitationRegionwide 0.0 0.000 2019 8.00 0.312
P-PH 0046(47)356 025D SD46 - Fm W of SD19/SD19A to W
of the Junction with I29
Spot Grading, Shoulder Widening,
Str.s, & Culvert Replacement Over
Ash & Blind Creek, Left Turn
Lanes; Replace Structure (Bridge)
and Approach Grading at the
Vermillion River, Full Depth
Reclaimation, Interim Surfacing
Clay
Lincoln
* 8.1 SD46 3.472 2019 9.00 4.237
Also Funded In:
Item Category
Minor Arterial Projects 1.259 3.00
Roadway Safety Improvement 4.780 9.00
Total Project Cost
10.276
Construction planned to begin in 2020.
P 0042(58)311 03AN SD42 - 7.5 E of the Davison Co Line
over the James River
Replace Structure (Bridge) &
Approach Grading
Hanson 0.8 SD42 4.962 2019 10.00 6.363
¥ Costs reflect anticipated inflationPage 40 HC65Coding.rpt
By Category
¥¥
Bridge Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0037(132)157 03TX
P 0037(140)140 04FH
SD37 - 4.9 mi S of the Spink Co Line
over the James River; SD37 - Str. 6
S of US212 Over a Creek
Replace Structure (Bridge) and
Approach Grading; Scour
Protection
Beadle
Spink
0.8 SD37 2.956 2019 11.00 3.786
P 0020(130)295 03TW
P 0026(03)250 04FK
SD26 - 2.8 mi W of SD45 Over
Shaefer Ck; SD20 - Str. 0.8 S of
SD45N Over a Creek & Str. 3.3 E of
the Faulk Co Line Over Snake Creek
Replace Structure (Bridge) and
Approach Grading; Scour
Protection, Column Repair
(58-033-060)
Faulk
Hand
Spink
0.4 SD20
SD26
1.220 2019 12.00 1.556
P 0071(03)06 04FV
P 0071(10)0 3570
SD71 - Fm the Nebr State Line to S
of Hat Ck; SD71 - Str 0.5 mi S of
SD471 over a Creek
AC Surfacing & Pipe Work;
Replace Structure (RCBC) &
Approach Grading
Fall River* 17.5 SD71 0.898 2019 13.00 1.152
Also Funded In:
Item Category
State Secondary Projects 2.740 2.00
Total Project Cost
3.892
P 00SW(54) 04V6 Statewide 2019 Bridge Inspection CostsStatewide 0.0 0.952 2019 14.00 1.161
NH 0212(173)397 04E9 US212 - Fm W of the S Junction of
SD15 to the Minn State Line; US212
- Str 1.1 W of the N SD15 Junction
Over Caine Ck
Mill & PCCP Overlay, Pipe Work;
Replace Structure (RCBC) &
Approach Grading
Deuel* 14.7 US212 0.709 2019 15.00 0.865
Also Funded In:
Item Category
Major Arterial Projects 16.507 9.00
Total Project Cost
17.372
NH 0014(213)415 05DA
NH 014B(172)419 05DC
P 0022(59)379 05DD
US14E - Str 1.9 E of Volga Over the
Big Sioux River; US14 B - Strs 2.0
W of I29 Interchange Over Six Mile
Ck, 1.6 W of I29 Interchange over
East Branch of Six Mile Ck & 1.4 E
of I 29 Interchange Over Deer Ck;
SD22 - Str 8.7, 9.3 & 11.4 E of SD15
Over Cobb Ck
Epoxy Chip Seal, Weld Repair
(20-193-160), Repair Appr. Slab &
Replace Joints (06-119-150)
Brookings
Deuel
0.0 SD22
US14B
US14E
US14W
0.798 2019 16.00 0.972
NH 0014(214)346 05DE US14, US14 E&W - Str. 0.5 E of
SD37 Over Ravine Lake (2), 1.3 E of
SD37 Over James River, 1.4 E of
SD37 (Commercial Route), 2.8 E of
Cavour Over Pearl Crk, & 2.7 W of
Iroquois
Polymer Chip Seal & Joint
Replacement
Beadle 0.0 US14
US14E
US14W
0.489 2019 17.00 0.597
¥ Costs reflect anticipated inflationPage 41 HC65Coding.rpt
By Category
¥¥
Bridge Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0258(00)277 05DF SD258 - Str. 0.3 N of Plankinton
Interchange Over Snow Ck
RCBC RehabilitationAurora 0.0 SD258 0.000 2019 18.00 0.087
P 0044(197)196 05FU SD44 - Str 0.7 W of US83 Over the
Little White River
Polymer Chip Seal, Joint
Replacement
Mellette 0.0 SD44 0.158 2019 19.00 0.194
P 0010(119)183 05DH
P 0063(00)186 05DN
P 0065(18)199 05DP
SD10 - Str 1.0 E of Pollock Over
Lake Pocasse; SD63 - Str 13 N of
Junction US212 over the Moreau
River; SD65 - Str. 0.4 N of Dewey
County Line Over Firesteel Ck
Polymer Chip Seal; Polymer Chip
Seal; Pourable Joint Seal
Campbell
Corson
Dewey
0.0 SD10
SD63
SD65
0.235 2019 20.00 0.287
NH 0079(73)35 05DQ
P 0040(235)43 05DR
SD79N&S - Str 2.7 N of Fall River
County Line Over Beaver Ck; SD40 -
Str 4.4 W of Junction SD79 Over
Battle Ck
Polymer Chip Seal and Column
Repair; Replace Compression
Seals and Polymer Chip Seal
Custer 0.0 SD40
SD79N
SD79S
0.218 2019 21.00 0.267
P 0037(150)0 05FT SD37 - Missouri River Bridge at
Niobrara/Running Water
Epoxy Chip Seal (South Dakota
Share)
Bon Homme 0.0 SD37 0.392 2019 22.00 0.479
NH 0085(99)92 05V2 US85 - Strs, 5.8 S of the
Butte/Harding Co Line; 8.4 S of the
Butte/Harding Co Line
Zone Painting, Joint RepairButte 0.0 US85 0.220 2019 23.00 0.267
P 1806(12)149 038Z SD1806 - Fm the Lyman/Stanley
county line N 14.7 miles; Str. 11.2
SE of US83 over Antelope Ck
Mill & AC Resurfacing, Pipe Work;
Deck Overlay, Approach Guardrail,
& Erosion Repair
Stanley 14.6 SD1806 0.303 2019 24.00 0.369
Also Funded In:
Item Category
State Secondary Projects 5.965 1.00
Total Project Cost
6.334
Construction planned to begin in 2020.
Miles2019 27.424 57.0
P 0030(00)18 04UX Regionwide Pierre Region Bridge RehabilitationRegionwide 0.0 0.000 2020 25.00 0.216
¥ Costs reflect anticipated inflationPage 42 HC65Coding.rpt
By Category
¥¥
Bridge Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0244(11)27 04FT SD244 - 3.2 mi S of US385 & 16
Over Palmer Gulch
Replace Structure (Bridge) and
Approach Grading, Turn Lanes &
Spot Grading
Pennington 0.4 SD244 1.570 2020 26.00 1.915
Also Funded In:
Item Category
Minor Arterial Projects 0.474 17.00
Total Project Cost
2.389
NH 0012(175)106 03UA
NH 0212(161)135 03UC
P 0063(46)146 03UD
P 0063(45)144 03WC
US12 - Str.s 6.7 E of the Perkins Co
Line Over Hay Ck; US212 - Str.s 0.5
W of Dupree Over Bear Ck; SD63 -
Str 1.7 N of the Haakon Co Line
Over Dupree Ck; SD63 - Str 0.5 S of
the Ziebach/Haakon Co Line Over
Hermaphrodite Ck
Scour ProtectionCorson
Haakon
Ziebach
0.0 SD63
US12
US212
0.711 2020 27.00 0.743
NH 0083(75)39 03UE
NH 0018(183)247 03UF
P 0183(22)2 03UG
P 0044(181)257 03UH
P 0049(04)35 03UK
US83 - Str.s 2.3 S of SD44E Over a
creek & 3.1 N of the Mellette Co Line
Over Horse Ck; US18 - Str.s 3.9 E of
US183 Over Big Hollow Ck & 2 SE
of Winner Over W Branch of
Thunder Ck; US183 - Str 2.2 N Of
the Neb State Line Over the Keya
Paha River; SD44 - Str 4 E of US18
Over Thunder Ck; SD49 - Str 7 S oh
Hamill Over a creek
Scour Protection and/or Column
Repair
Mellette
Tripp
0.0 SD44
SD49
US18
US183
US83
0.828 2020 28.00 1.009
NH 0085(84)36 03U6
NH 0079(70)127 03U8
US85 - Str.s 2 N of Belle Fourche
Over Crow Creek, 0.6 NE of US212
over Indian Ck, & 0.3 S of I90 Over
Miller Ckk; SD79 - Str 2 N of the
Meade Co Line Over the Belle
Fourche River
Scour Protection and/or Column
Repair
Butte
Lawrence
0.0 SD79
US85
US85S
0.610 2020 29.00 0.744
P 016A(08)59 04FU US16A WB & EB - Over US16E at
the Keystone Interchange
Bridge RehabilitationPennington 0.0 US16AE
US16AW
2.157 2020 30.00 3.163
NH 0212(183)33 05FN US212 - Str 2.3 W of SD79 Over
Owl Ck.
Replace Structure (Bridge) and
Approach Grading
Butte* 0.0 US212 3.300 2020 31.00 4.223
NH 0012(187)107 04FL US12 - Strs 7.9 mi E of the Perkins
Co Line & 0.2 mi W of SD65S over
the Burlington Northern RR
Replace Structure (Bridge) and
Approach Grading
Corson 2.3 US12 6.570 2020 32.00 8.016
P 00SW(58) 05FP Statewide 2020 Bridge Inspection CostsStatewide 0.0 0.971 2020 33.00 1.184
¥ Costs reflect anticipated inflationPage 43 HC65Coding.rpt
By Category
¥¥
Bridge Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0010(123)273 03AM SD10 - 5.8 W of US281 over Dry
Run Creek & 2.9 W of US281 over
the Elm River
Replace Structure (Bridge) &
Approach Grading
Brown 0.0 SD10 2.989 2020 34.00 3.826
P 0048(12)371 05EQ
P 0011(107)23 05UJ
SD48 - Fm I29 to Just E of the Iowa
State Line; SD11 - Fm SD48 to 1 Mi
S of Alcester; SD48 - Str 1.5 E of SD
11 Over E Union Ck;
Mill, AC Resurfacing, Intersection
Improvements, Pipe Work; Berm
Repair & Riprap
Union 23.0 SD11
SD48
0.149 2020 35.00 0.181
Also Funded In:
Item Category
Minor Arterial Projects 6.997 20.00
Total Project Cost
7.178
NH 0019(42)0 05GX SD19 - Str 4.1 S of Vermillion Over
the Missouri River
Anchor Bolts, Joints, Epoxy Chip
Seal on South Dakota Side
Clay 0.0 SD19 0.688 2020 36.00 0.839
LR 2020( ) 05GT Structure Preservation Projects
Throughout South Dakota
2020 Structure PreservationStatewide 0.0 5.218 2020 37.00 6.367
NH 0044(203)39 05Q8 SD44 - Str 4.1 SW of Jct SD231
Over Rapid Creek
Zone Painting, Replace Open
Joints, Repair Spalling at Barrier
Joints and Edge of Slab, Deck
Overlay
Pennington 0.0 SD44 0.291 2020 38.00 0.354
P 0030(33)361 05V3 SD30 - Str 3.4 E of I29 over Six Mile
Creek; 0.8 W of I29 over N Branch
of Deer Ck;
LSDC Overlay, Upgrade Bridge
Rail, Approach Guardrail
Brookings 0.0 SD30 0.499 2020 39.00 0.608
P 0248(11)145 05V5 SD248 - Str, 1.0 E of Cactus Flats
Over Big Buffalo Creek & 1.4 W of
Kadoka Over White Willow Creek
Replace Strs (Bridge), Approach
Grading
Jackson 0.0 SD248 3.541 2020 40.00 4.321
NH 0281(120)185 0673
NH 0012(225)248 067A
US281 - Strs 3.5 N Jct SD10 E over
Maple River; 0.2 N Jct US12 over
BNSF Railroad; 6.7 and 8.8 S of Jct
US12 over Moccasin Ck; US12 - Str
0.5 E of Roscoe over BNSF Railroad
Polymer Chip SealBrown
Edmunds
0.0 US12
US281
US281N
US281S
0.432 2020 41.00 0.527
NH 0018(213)45 06DQ US18 WBL - Str 1.0 S of SD79 N Jct
Over the Cheyenne River
Abutment, Berm, Joint Repair,
Approach Slabs, Bridge Ends and
Approach Pavement
Fall River 0.0 US18E
US18W
0.641 2020 42.00 0.782
¥ Costs reflect anticipated inflationPage 44 HC65Coding.rpt
By Category
¥¥
Bridge Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0011(88)81 04EX SD11 - Fm the N City Limits of
Brandon to the Minnesota State Line
AC Resurfacing, & Mill, AC
Resurfacing, Intersection
Improvements, Approach Slabs,
Drop Inlets, Column Repair
Minnehaha 20.9 SD11 0.086 2020 43.00 0.105
Also Funded In:
Item Category
Minor Arterial Projects 8.055 27.00
State Highway System Municipal Projects 0.115 9.00
Total Project Cost
8.275
Miles2020 39.123 46.6
P 0020(160)04 04FR SD20 - 4.2 & 5.0 mi E of the
Montana State Line Over the Little
Missouri River & Over Valley Creek
& 14.8 E of the E US85 Junction
Over Sioux Creek
Replace Structure (Bridge) and
Approach Grading
Harding* 0.0 SD20 5.693 2021 44.00 7.282
NH 0081(103)6 04G5 US81 - Fm the End of the Divided
Lanes to 303rd Street North of
Yankton
Grading, Structure, & AC SurfacingYankton 3.4 US81 0.627 2021 45.00 0.765
Also Funded In:
Item Category
Major Arterial Projects 7.514 43.00
Total Project Cost
8.279
P 0015(83)199 04XA SD15 - 1.2 W of SD123 over the
North Fork of the Whetstone River &
4.8 mi E of I29
Replace Structure (Bridge) &
Approach Grading; Replace
Sturcture (RCBC) & Approach
Grading
Roberts 0.0 SD15 1.199 2021 46.00 1.463
Also Funded In:
Item Category
Minor Arterial Projects 2.537 34.00
Total Project Cost
4.000
P 0013(38)108 04VD
IM-PH 0293(107)99 05F9
SD13 - 0.3 N of Flandreau Over the
Big Sioux River; I29 N/S - 1 N
SD115 Interchange; 1.2 N
Minnehaha Co. Line; 3.8 S SD34
Interchange; 3 S SD34 Interchange
High Friction Surface Treatment,
Polymer Chip Seal, Deck Repair,
Curb Repair, Approach Slabs, Joint
Replacement
Minnehaha
Moody
0.0 I29N
I29S
SD13
0.166 2021 47.00 0.202
Also Funded In:
Item Category
Interstate Maintenance Projects 1.828 40.00
Roadway Safety Improvement 0.015 102.00
Total Project Cost
2.045
P 00SW(60) 05FQ Statewide 2021 Bridge Inspection CostsStatewide 0.0 0.990 2021 48.00 1.208
¥ Costs reflect anticipated inflationPage 45 HC65Coding.rpt
By Category
¥¥
Bridge Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
LR 2021( ) 05GU Structure Preservation Projects
Throughout South Dakota
2021 Structure PreservationStatewide 0.0 5.411 2021 49.00 6.603
NH 0018(203)333 04V9 US18 - Str. 0.8 N of Pickstown Over
Saint Francis Bay; US18 - Fm
Pickstown to Lake Andes
Replace Structure (Bridge) &
Approach Grading; Spot Grading,
Pipe Work & Interim Surfacing;
Intersection Improvements
Charles Mix 6.4 US18 2.503 2021 50.00 3.053
Also Funded In:
Item Category
Major Arterial Projects 2.118 49.00
Total Project Cost
5.171
P 0044(204)363 05Q9
NH 0018(210)390 05QA
SD44 - Strs, 15 Mi E of SD37 Over
the James Ri; 9 W of US81 over
Wolf Ck; 3.3 W of SD19 Over SD
Owned RR; US18 - Str, 0.6 E of
Olivet Over James River.
Joint Repair, Bent Cap, Column
Repair, Zone Painting, Replace
Approach Curb, Abutment, Anchor
Bolt, Grout Pad Repair, Replace
Curb on Approaches, Abutment
Anchor Bolts, Zone Painting,
Column, Abutment and/or Curb
Repair
Hutchinson
Turner
0.0 SD44
US18
0.731 2021 51.00 0.891
P 0324(06)358 05QC SD324 - Str, 0.8 E I29 Interchange
Over Medary Ck
LSDC Overlay, Replace Approach
Slabs, Joints and Upgrade Bridge
Rail and End Blocks
Brookings 0.0 SD324 0.577 2021 52.00 0.705
NH 0014(227)327 05QD US14 - Str, 2 NW of Wolsey Over
Cain Ck
Replace Approach Slabs, Joints
and Guardrail
Beadle 0.0 US14 0.192 2021 53.00 0.234
NH 0014(226)113 05U1 US14 - Fm E of Wall to Cottonwood;
US14 - 3.8 W of the Jackson Co
Line Over a Branch of Cottonwood
Creek
Mill & AC Resurfacing Pipe Work;
Replace Structure (RCBC) &
Approach Grading
Jackson
Pennington
14.1 US14 0.539 2021 54.00 0.658
Also Funded In:
Item Category
Major Arterial Projects 4.031 41.00
Total Project Cost
4.689
NH 014A(21)41 04VE US14A - At the Junction of US85
South Over Whitewood Creek
Polymer Chip Seal, Joint
Replacement, Repair/Rehab
Abutment, Erosion Repair
Lawrence 0.0 US14A 1.409 2021 55.00 1.720
NH 0281(121)154 067C US281 - Strs 0.5 N of US212 over
Turtle Ck; 5.8 N of US212 over
Snake Ck
LSDC Overlay, Replace Approach
Rail and Slabs
Spink 0.0 US281 0.586 2021 56.00 0.714
¥ Costs reflect anticipated inflationPage 46 HC65Coding.rpt
By Category
¥¥
Bridge Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0044(210)291 06E1 SD44 - Missouri River Bridge Preliminary EngineeringCharles Mix 0.0 SD44 0.066 2021 57.00 0.081
NH 0034(183)123 05FV
P 0063(53)144 05QE
SD34 - Str Over the Cheyenne
River; SD63 - Str, Ziebach-Haakon
County Line Over the Cheyenne
River
LSDC Overlay,Bolted Splices &
Zone Painting; Zone Painting and
Collect Drainage Under Open
Joints
Haakon
Ziebach
0.0 SD34
SD63
1.556 2021 58.00 1.898
Miles2021 27.477 23.9
NH 0281(115)194 05DV US 281 - Str. 0.2 N of Junction US12
Over BNSF Railroad
Repair Embankment Settlement,
Approach Pavement and Approach
Slabs, Zone Painting
Brown 0.0 US281 0.588 2022 59.00 0.718
Also Funded In:
Item Category
Major Arterial Projects 0.210 51.00
Total Project Cost
0.928
P 0050(90)295 6497 SD50 - 5.3 S of SD44E & 4.1 & 4.3
S of Geddes over Pease Creek
Deck Overlay, Approach Guardrail
& Approach Pavement
Charles Mix 0.0 SD50 0.558 2022 60.00 0.680
NH 0018(204)446 04VA US18 - 2.0 West of Canton Over a
Creek
Scour Protection at RCBC Outlet &
Clean Inlet
Lincoln 0.0 US18 0.108 2022 61.00 0.131
P 0050(118)226 04V8 SD50 - 5.4 N of the I90 Loop Over
Bad Hand Creek
Scour Protection at RCBC OutletBrule 0.0 SD50 0.091 2022 62.00 0.110
P 0011(94)86 04VC SD11 - 5.2 N of the I90 Interchange
Over West Pipestone Creek
Epoxy Chip Seal and Column
Repair
Minnehaha 0.0 SD11 0.098 2022 63.00 0.120
NH 0034(177)56 04VF SD34 - 17.6 NE of SD79 Over the
Belle Fourche River
PS Girder RepairMeade 0.0 SD34 0.070 2022 64.00 0.085
P 0079(72)145 04X8 SD79 - 4.9 S of SD168 over North
Willow Ck
Epoxy Chip Seal, Joints, Abutment
Repair, Berm Repair, Joints, Reset
Bearings, Upgrade Bridge Rail
Butte 0.0 SD79 0.405 2022 65.00 0.495
P 0040(230)38 04X9 SD40 - 0.3 E of Hayward Over Battle
Ck
Epoxy Chip SealPennington 0.0 SD40 0.097 2022 66.00 0.118
¥ Costs reflect anticipated inflationPage 47 HC65Coding.rpt
By Category
¥¥
Bridge Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0012(197)183 04XF
P 1806(18)363 05M9
US12 - Str. 2.4 W of the Walworth
Co Line Over Claymore Ck & at the
S Junction of SD1806; SD1806 - Fm
1200' S of US12 to US12
US12 - Replace Structure (Bridge)
& Approach Grading, Intersection
Relocation/Improvements; SD1806
- Grading & AC Surfacing
Corson* 0.2 SD1806
US12
1.792 2022 67.00 2.186
Also Funded In:
Item Category
Major Arterial Projects 0.384 52.00
State Secondary Projects 0.368 20.00
Total Project Cost
2.938
P 00SW(61) 05FR Statewide 2022 Bridge Inspection CostsStatewide 0.0 1.031 2022 68.00 1.259
P 016A(10)37 04G1 US16A - 1 mi W of SD36 Over
Grace Coolidge Creek
Replace Structure (RCBC) &
Approach Grading
Custer 0.0 US16A 0.910 2022 69.00 1.163
NH 0212(184)143 04XG US212 - 1.8 E of the Ziebach Co
Line Over Little Bear Creek
Replace Structure (Bridge) &
Approach Grading
Dewey 0.0 US212 2.665 2022 70.00 3.408
LR 2022( ) 05GV Structure Preservation Projects
Throughout South Dakota
2022 Structure PreservationStatewide 0.0 5.428 2022 71.00 6.624
IM 0299(79)222 065N
P 0010(149)359 06G4
I29 - Strs. 2 S. of the Peever Interch
(129 St); SD10 Interchange; SD10 -
Str 0.7 W of SD127 Over a Creek
Polymer Chip Seal, Replace
Approach Slabs, Joints, Approach
Guardrail; Polymer Chip Seal,
Replace Approach Slabs &
Approach Guardrail
Roberts 0.0 I29N
SD10
0.241 2022 72.00 0.294
Also Funded In:
Item Category
Interstate Maintenance Projects 0.585 62.00
Total Project Cost
0.879
BR NBIS(48) 06A5
BR NBIS(00) 06A6
Missouri River Bridges at: I90 & I90L
at Chamberlain; SD44, SD19 near
Vermillion; SD1806 and US12 near
Mobridge; US14 at Pierre; US212
west of Gettysburg; Pedestrian
Walkway at Yankton
Underwater Bridge InspectionsBrule
Charles Mix
Clay
Corson
Hughes
Potter
Walworth
Yankton
0.0 I90E
I90EL
SD1806
SD19
SD44
US12
US14E
US212
0.194 2022 73.00 0.238
PCN 06A6 The City of Yankton will be reimbursing the SD Dept. of Transportation for the cost of this
inspection.
¥ Costs reflect anticipated inflationPage 48 HC65Coding.rpt
By Category
¥¥
Bridge Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0085(102)26 06XM US85 - Strs. 0.1 NE, 0.6 NE & 0.8
NE of Jct US 385 over Whitewood
Ck
Bridge Rail PaintingLawrence 0.0 US85 0.210 2022 74.00 0.256
Miles2022 17.885 0.2
¥ Costs reflect anticipated inflationPage 49 HC65Coding.rpt
By Category
¥¥
Railroad Crossing Improvement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PP-PS 1286(13) 05RW Holly Blvd. in Brandon SD, DOT
186712R, E&E Railroad
Signal Upgrades, Approach Work,
Crossing Surface Rehabilitation,
CE
Minnehaha 0.0 0.288 2019 1.00 0.320
PP-PS 7670(09) 0617 Ball Park Road, in Sturgis,
DOT199693B RCP&E Railroad
Signals, Crossing Surface,
Sidewalk, Approach, CE
Meade 0.0 0.180 2019 2.00 0.200
PP 0022(62) 05RK Ellis & Eastern Railroad - Fm
Brandon To Ellis
Replace Crossbuck SignsMinnehaha 0.0 0.036 2019 3.00 0.040
PP-PS
0212(170)376
04CA US212 in Watertown, crossing
075504H, BNSF
Upgrade Signal System and
Crossing Surface Rehabilitation,
CE
Codington 0.0 US212 0.333 2019 4.00 0.370
PP-PS
0010(127)358
05RJ SD10 - In Sisseton SD,
DOT#394515A, SMRR
Upgrade Signal System and
Crossing Surface Rehabilitation,
CE
Roberts 0.0 SD10 0.225 2019 5.00 0.250
PS 0012(210) 05RP Sisseton Milbank Railroad - Crossing
Upgrades, Roberts & Marshall
County
Crossing Surface Rehabilitation,
CE
Marshall
Roberts
0.0 0.360 2019 6.00 0.400
PP-PS
0034(185)387
05RF SD34 - In Madison SD, DOT#
381200J, BNSF
Upgrade Signal System and
Crossing Surface Rehabilitation
Lake 0.0 SD34 0.315 2019 7.00 0.350
PS 000S(371) 05VD Statewide 2019 Railroad Inventory
Compilation & Analysis
Statewide 0.0 0.037 2019 8.00 0.041
PS 000S(372) 05VH Statewide 2019 Preliminary Engineering for
Railroad Safety Projects
Statewide 0.0 0.043 2019 9.00 0.048
PP-PS
0037(153)128
0626 SD37 in Huron, DOT 075419T
RCP&E Railroad
Signal Upgrades and Crossing
Surface
Beadle 0.0 SD37 0.234 2019 10.00 0.260
PP-PS 4718(04) 0624 15th Street in Yankton, DOT
382257N BNSF Railroad
Upgrade Signals, Upgrade
Crossing, Approach, CE
Yankton 0.0 0.176 2019 11.00 0.195
PP-PS 2284(05) 064A 8th Ave NE in Aberdeen, DOT
067590L, BNSF
Replace Signals, Crossing
Surface, Approach, CE
Brown 0.0 0.333 2019 12.00 0.370
¥ Costs reflect anticipated inflationPage 50 HC65Coding.rpt
By Category
¥¥
Railroad Crossing Improvement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PP-PS 2255(10) 064C N Roosevelt St in Aberdeen, DOT
067589S, BNSF
Replace Signals, Crossing, City
Approach and CE
Brown 0.0 0.333 2019 13.00 0.370
PP 0034(194)396 064E SD34 in Wentworth SD, DOT
075187F, BNSF
Signal Upgrades, CELake 0.0 SD34 0.113 2019 14.00 0.125
PP 1186(09) 064F W 60th St. N in Sioux Falls, DOT
097244D, BNSF
Signal Upgrades, CEMinnehaha 0.0 0.113 2019 15.00 0.125
PP 0028(42)313 064G SD28 in Willow Lake, DOT
097346W, BNSF
Signal Upgrades, CEClark 0.0 SD28 0.113 2019 16.00 0.125
PP 0011(112)55 064K SD11 in Canton, DOT 385875Y,
BNSF
Signal Upgrades, CELincoln 0.0 SD11 0.113 2019 17.00 0.125
PP 0044(206)393 064L SD44 in Parker, DOT 385927N,
BNSF
Signal Upgrades, CETurner 0.0 SD44 0.113 2019 18.00 0.125
PP 8063(17) 064Q Main St. in Parker, DOT 385929C,
BNSF
Signal Upgrades, CETurner 0.0 0.113 2019 19.00 0.125
PP 0081(109)45 064T US81 Near Dolton, DOT 385957F,
BNSF
Signal Upgrades, CEHutchinson 0.0 US81 0.113 2019 20.00 0.125
PP 0015(87)175 065T SD15 in Milbank, DOT 393640J,
BNSF
Signal Upgrades, CEGrant 0.0 SD15 0.113 2019 21.00 0.125
PP 0040(318)48 065V SD40 in Hermosa, DOT190235G,
RCP&E
Install Signals, CECuster 0.0 SD40 0.162 2019 22.00 0.180
PP 0020(178)318 066A SD20 in Northville, DOT189455F,
RCP&E
Install Signals, CESpink 0.0 SD20 0.162 2019 23.00 0.180
PP 0240(14)127 066C SD240 E&W (W S Blvd) in Wall,
DOT 190051G, RCP&E
Signal Upgrades, CEPennington 0.0 SD240E
SD240W
0.198 2019 24.00 0.220
PP 6596(01) 066D W 4th Ave in Wall, DOT 190050A,
RCP&E
Upgrade Bungalow and Signal
Equipment
Pennington 0.0 0.090 2019 25.00 0.100
¥ Costs reflect anticipated inflationPage 51 HC65Coding.rpt
By Category
¥¥
Railroad Crossing Improvement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PP 0015(88)198 066J SD15 in Wilmot, DOT 394493C,
SMRR
Install Signals, CERoberts 0.0 SD15 0.131 2019 26.00 0.145
PP 0273(08)62 066K SD273 in Kennebec, DOT 386141B,
DSRC
Install Signals, CELyman 0.0 SD273 0.126 2019 27.00 0.140
PP 0047(115)70 066L SD47 in Reliance, DOT 386126Y,
DSRC
Install Signals, CELyman 0.0 SD47 0.126 2019 28.00 0.140
PP 0045(59)58 066Q SD45 W of Kimball, DOT 386092G,
DSRC
Install Signals, CEBrule 0.0 SD45 0.126 2019 29.00 0.140
PP 0203(03)53 066R SD203 E of Plankinton, DOT
386061H, DSCR
Install Signals, CEAurora 0.0 SD203 0.126 2019 30.00 0.140
PS 6364(07) 066T 258th St. in Minnehaha County, DOT
381686N, D&I
Upgrade Crossing, Approach
Work, CE
Minnehaha 0.0 0.045 2019 31.00 0.050
PS 6148(04) 066U 254th St. in Minnehaha County, DOT
381691K, D&I
Upgrade Crossing, Approach
Work, CE
Minnehaha 0.0 0.045 2019 32.00 0.050
PS 8050(75) 066V 248th St. in Minnehaha County, DOT
381703C, D&I
Upgrade Crossing, Approach
Work, CE
Minnehaha 0.0 0.045 2019 33.00 0.050
PH-PS 3230(05) 01DJ Box Elder - Pennington Co Rd 14-16
- Radar Hill Rd Intersection and
Commercial Gate Road Intersection;
Radar Hill Road, S of Hwy1416
Intersection, DOT#190122B, RCP&E
Railroad
Intersection Reconstruction, Add
Turn Lanes; Crossing Surface
Rehabilitation, Approach Work &
Relocate Existing Signals
Pennington 0.0 0.045 2019 34.00 0.050
Also Funded In:
Item Category
Roadway Safety Improvement 3.383 10.00
Total Project Cost
3.433
Coordinate with PCN 05RH
PP 0010(136)321 066G
PP-PS 0027(11)230 06K1
PS 8046(05) 070K
SD27 in Britton DOT 394614X,
DMV&WRR; SD10 in Britton,
DOT394616L, DMV&W; 8th St in
Britton DOT 394615E; DMV&W RR
Install Railroad Signals, Upgrade
Crossing Surface, Sidewalk,
Approach Work, CE
Marshall 0.0 SD10
SD27
0.779 2019 35.00 0.865
¥ Costs reflect anticipated inflationPage 52 HC65Coding.rpt
By Category
¥¥
Railroad Crossing Improvement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PP-PS 3720(05) 06NL Spruce Street in Mitchell, DOT
382394V BNSF
Signal Upgrades, Crossing Surface
Upgrades, City Approach and CE
Davison 0.0 0.360 2019 36.00 0.400
PP 0050(130)381 06NU SD50 in Yankton, DOT 382261D
BNSF
Signal Upgrades & CEYankton 0.0 SD50 0.117 2019 37.00 0.130
PS 8050(79) 06NM Ladelle St in Dell Rapids, DOT
381713H D&I
Crossing Surface Upgrade, City
Approach and CE
Minnehaha 0.0 0.072 2019 38.00 0.080
PS 8050(80) 06NN Orleans Street in Dell Rapids DOT
381714P D&I
Crossing Surface Upgrade, City
Approach and CE
Minnehaha 0.0 0.045 2019 39.00 0.050
PP 6265(01) 06NP 423 Avenue N. of Britton, DOT
394618A DMV&W
Install Lighting at CrossingMarshall 0.0 0.027 2019 40.00 0.030
PP 6393(01) 06XV 469 Ave (White Street) in Burbank
DOT 382147D, BNSF
Signal UpgradesClay 0.0 0.072 2019 41.00 0.080
Miles2019 7.434 0.0
PP-PS 1310(11) 061U 6th Street in Sioux Falls, DOT
097881H BNSF Railroad
Signal Upgrades, Sidewalk,
Approach, CE
Minnehaha 0.0 0.147 2020 42.00 0.150
PP-PS 0022(58) 05K1 West Ave, 186646F and 10th Street
186645Y, E&E Railroad
Rehabilitation of Crossing
Surfaces, Signal Upgrades,
Approach, CE
Minnehaha 0.0 0.450 2020 43.00 0.500
PS 000S(374) 05VE Statewide 2020 Railroad Inventory
Compilation & Analysis
Statewide 0.0 0.037 2020 44.00 0.041
PS 000S(375) 05VJ Statewide 2020 Preliminary Engineering for
Railroad Safety Projects
Statewide 0.0 0.043 2020 45.00 0.048
¥ Costs reflect anticipated inflationPage 53 HC65Coding.rpt
By Category
¥¥
Railroad Crossing Improvement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P-PH 0015(77)155 04K8
P- PH
0020(152)439
04UL
PP 0020(176)443 0628
SD15 - Fm the N Junction of US212
N to S Junction of SD20; SD20 - Fm
the S Junction of SD15 to the N
Junction. of SD15; SD20 - Near
Labolt SD, DOT 097530J BNSF
Railroad
Grading, Interim Surfacing,
Replace Strs; Signal Upgrades
Deuel
Grant
* 12.0 SD15
SD20
0.315 2020 46.00 0.350
Also Funded In:
Item Category
Minor Arterial Projects 5.771 25.00
Roadway Safety Improvement 11.214 62.00
Total Project Cost
17.335
Miles2020 1.089 12.0
PS 8050(71) 05RE Marion Rd, 1.5 mi NW of Sioux
Falls, DOT# 097254J, BNSF
Upgrade Crossing Surface,
Approach Work, CE
Minnehaha 0.0 0.035 2021 47.00 0.040
PP-PS 1261(11) 02HW Cliff Ave. by 20th St. in Sioux Falls;
BNSF, DOT #075474T
Upgrade Signals, Crossing Surface
Rehabilitation, Approach, PE, CE
Minnehaha 0.0 0.900 2021 48.00 1.000
PP-PS 1261(10) 011B Cliff Ave. by 14th St. in Sioux Falls,
DOT#381-656W, BNSF
Upgrade Signals, Crossing Surface
Rehabilitation, Approach
Improvement, PE, CE
Minnehaha 0.0 0.450 2021 49.00 0.500
PS 000S(384) 06A7 Statewide 2021 Preliminary Engineering for
Railroad Safety Projects
Statewide 0.0 0.043 2021 50.00 0.048
PS 000S(383) 06A8 Statewide 2021 Railroad Inventory
Compilation & Analysis
Statewide 0.0 0.038 2021 51.00 0.042
LR 2021(00)0 06E2 Various Locations Throughout South
Dakota
2021 Statewide Railroad Crossing
Projects
Statewide 0.0 0.905 2021 52.00 1.006
This project is a "funding placeholder" to show any difference between the total amount programmed and the
estimated annual programmed amount.
PP 0081(111)119 06NQ US81 Crossing in Arlington, DOT
197451Y RCP&E
Install GatesKingsbury 0.0 US81 0.072 2021 53.00 0.080
Miles2021 2.716 0.0
¥ Costs reflect anticipated inflationPage 54 HC65Coding.rpt
By Category
¥¥
Railroad Crossing Improvement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PS 1186(08) 04A7 60th St. N. in Sioux Falls,
DOT#381679D, D&I Railroad
Railroad Crossing Rehabilitation,
Approach, CE
Minnehaha 0.0 0.090 2022 54.00 0.100
LR 2022(00)0 06E3 Various Locations Throughout South
Dakota
2022 Statewide Railroad Crossing
Projects
Statewide 0.0 1.995 2022 55.00 2.217
This project is a "funding placeholder" to show any difference between the total amount programmed and the
estimated annual programmed amount.
P 0015(81)182 05J7
PS 0015(86)198 062A
SD15 - Fm the Grant/Roberts
County Line, N & W to W of I29.;
SD15 - N Side of Wilmont DOT
394493C SMRR Railroad
Mill & AC Overlay, Pipework;
Crossing Surface
Roberts 25.2 SD15 0.054 2022 56.00 0.060
Also Funded In:
Item Category
Minor Arterial Projects 6.950 50.00
Total Project Cost
7.010
P-PH 0046(61)366 04JF
PP-PS 0046(71)381 062C
SD46 - Fm Beresford E 15 miles.;
SD 46 - 0.3 S of 298th St., DOT
381576D D&I Railroad
Grading, Interim Surfacing,
Replace Structure (RCBC) &
Replace Structure (Bridge),
Erosion Repair; Signal Upgrades &
Crossing Surface
Union* 15.8 SD46 0.225 2022 57.00 0.250
Also Funded In:
Item Category
Minor Arterial Projects 2.992 52.00
Roadway Safety Improvement 21.753 124.00
Total Project Cost
24.995
PS 000S(393) 06NR Statewide 2022 Railroad Inventory
Compilation & Analysis
Statewide 0.0 0.037 2022 58.00 0.041
PS 000S(394) 06NT Statewide 2022 Preliminary Engineering for
Railroad Safety Projects
Statewide 0.0 0.043 2022 59.00 0.048
Miles2022 2.716 41.0
¥ Costs reflect anticipated inflationPage 55 HC65Coding.rpt
By Category
¥¥
Local Urban System Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 1358(05) 05JE
P 1225(06) 05JF
26th Street from Cleveland Avenue
to 1,050 feet West of Southeastern
Avenue in Sioux Falls; Southeastern
Avenue from Klondike Trail to South
Lighthouse Place in Sioux Falls
Grading, Intersection
Improvements, Storm Sewer, Curb
& Gutter, PCCP and AC Surfacing,
Signals, Lighting, Permanent
Signing, Sidewalk, Structure
Minnehaha* 0.0 14.345 2019 1.00 19.500
P 8050(76) 06KC From the intersection of S Highline
Ave. and E Arrowhead Parkway,
extending S and then W to E 18th
St. in Sioux Falls
Shared Use Path for Arrowhead
Parkwy
Minnehaha 0.0 0.365 2019 2.00 0.445
P 1358(02) 05C2
NH 2042(29) 06YQ
NH 0042(80)371 06YP
Six Mile Road - Fm 500' N of
Arrowhead Parkway, Arrowhead
Parkway - Fm 0.5 m W of Six Mile
Rd to Six Mile Rd; SD42 - Fm 0.5 m
W of Six Mile Rd to Willow Run Ent.
Grading, Storm Sewer, Curb &
Gutter & PCCP Surfacing, ROW,
Signals, Lighting
Minnehaha 0.4 SD42 6.459 2019 3.00 7.882
Also Funded In:
Item Category
State Highway System Urban Projects 7.277 2.00
Total Project Cost
15.159
Construction planned for 2020.
Miles2019 27.827 0.4
P 1360(02) 06JQ 85th Street (270th Street) - Fm
Sundowner Avenue E 1 mile to
Tallgrass Avenue in Sioux Falls
Preliminary EngineeringLincoln* 1.0 0.000 2020 4.00 0.250
Miles2020 0.250 1.0
NH 2042(28) 05UW Arrowhead Parkway - Fm Highline
Avenue to 0.5 m W of Six Mile Road
Grading, Storm Sewer, Curb &
Gutter, PCCP Surfacing, ROW,
Signals, and Lighting
Minnehaha 1.4 0.588 2021 5.00 0.717
Also Funded In:
Item Category
State Highway System Urban Projects 10.153 10.00
Total Project Cost
10.870
NH 1157(02) 05C3
NH 0011(101)72 05C4
Veterans Parkway - Fm Arrowhead
Parkway N 1000' in Sioux Falls;
SD11 - Fm Arrowhead Parkway S
500' in Sioux Falls
Grading, Storm Sewer, Curb &
Gutter & PCCP Surfacing, ROW,
Signals, Lighting
Minnehaha 0.0 SD11N
SD11S
0.460 2021 6.00 0.561
Also Funded In:
Item Category
State Highway System Urban Projects 2.595 12.00
Total Project Cost
3.156
¥ Costs reflect anticipated inflationPage 56 HC65Coding.rpt
By Category
¥¥
Local Urban System Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
Miles2021 1.278 1.4
P 1400(16) 05NF
P 1423(07) 06Y0
P 8050(81) 06XY
41st Street In Sioux Falls - Fm W of
Marion Rd to Shirley Ave; Marion
Road - Fm 39th St to 43rd St in
Sioux Falls; Shirley Ave - Fm 41st St
to W Shirley Place in Sioux Falls
Grading, Traffic Signals, Curb &
Gutter, Sidewalk, PCCP Paving,
Storm Sewer, ADA Upgrade,
Lighting, Pavement Markings,
ROW; Urban Construction; Urban
Reconstruction
Minnehaha 1.3 12.129 2022 7.00 14.800
P 1186(00) 00KD 60th St. N from I-29 to N. 4th Ave.
in Sioux Falls
PEMinnehaha* 2.0 0.000 2022 8.00 0.200
Miles2022 15.000 3.3
¥ Costs reflect anticipated inflationPage 57 HC65Coding.rpt
By Category
¥¥
Safe Routes To School Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P SRTS(46) 06AA Statewide 2019 Safe Routes To School Non
Infrastructure
Statewide 0.0 0.020 2019 1.00 0.020
P SRTS(44) 04P3 Wood P.E., Non Infrastructure and
Construct New Sidewalk
Mellette 0.0 0.062 2019 2.00 0.062
Miles2019 0.082 0.0
P SRTS(47) 06AC Statewide 2020 Safe Routes To School Non
Infrastructure
Statewide 0.0 0.020 2020 3.00 0.020
Miles2020 0.020 0.0
P SRTS(48) 06AD Statewide 2021 Safe Routes To School Non
Infrastructure
Statewide 0.0 0.020 2021 4.00 0.020
Miles2021 0.020 0.0
P SRTS(49) 06TF Statewide 2022 Safe Routes to School Non
Infrastructure
Statewide 0.0 0.020 2022 5.00 0.020
Miles2022 0.020 0.0
¥ Costs reflect anticipated inflationPage 58 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 8039(16) 02UM Various County Roads in Kingsbury
County
Signing & DelineationKingsbury 0.0 1.310 2019 1.00 1.746
NH-PH
0018(198)173
04XH US18 - Fm E of Vetal to the
Bennett/Todd County Line
Grading, Interim SurfacingBennett* 2.5 US18 1.904 2019 2.00 2.115
Also Funded In:
Item Category
Major Arterial Projects 0.555 1.00
Total Project Cost
2.670
P-PH 6147(12) 02SN Day County #01 from 142 St. on the
S side of at Waubay, S 2 miles on
446 Ave., East 1 mile on 144 St.,
and S 3 miles on 447 Ave. to 147 St.
RSI Category Day Co. Rd. #1 (447th
Ave.) Between 145th St. and 147th
St.
Grading, Base Course, AC
Surfacing, RSI Category - Grading
to Correct Horizontal & Vertical
Alignment, Reduce Shoulder Drop
Off, & Lengthen Pipe.
Day 6.0 0.450 2019 3.00 0.500
Also Funded In:
Item Category
County Secondary and Off System Projects 3.200 2.00
Total Project Cost
3.700
Total = $2.58; STPw/Match = $1.445; Local or SIB = $0.635; RSI = $0.5
PH 8055(30) 02UW Various County, City & Township
Roads in Roberts County & Tribal
Roads in Marshall & Day Counties
Signing & DelineationDay
Marshall
Roberts
0.0 2.318 2019 4.00 3.090
PH 8046(03) 03BC Various County, City, & Township
Roads in Marshall County
Signing & DelineationMarshall 0.0 1.009 2019 5.00 1.345
PH 8010(26) 02UJ Various County, City, & Township
Roads in Butte County
Signing & DelineationButte 0.0 0.793 2019 6.00 1.057
PH 8031(05) 03BB Various County, City, & Township
Roads in Hanson County
Signing & DelineationHanson 0.0 0.652 2019 7.00 0.870
PH 0037(147)067 05K4 Junction of SD37 with 256th Street,
258th Street, 259th Street, and
260th Street.
Intersection ImprovementsDavison 0.0 SD37 1.181 2019 8.00 1.312
¥ Costs reflect anticipated inflationPage 59 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P-PH 0046(47)356 025D SD46 - Fm W of SD19/SD19A to W
of the Junction with I29
Spot Grading, Shoulder Widening,
Str.s, & Culvert Replacement Over
Ash & Blind Creek, Left Turn
Lanes; Replace Structure (Bridge)
and Approach Grading at the
Vermillion River, Full Depth
Reclaimation, Interim Surfacing
Clay
Lincoln
* 8.1 SD46 4.780 2019 9.00 4.780
Also Funded In:
Item Category
Minor Arterial Projects 1.259 3.00
Bridge Projects 4.237 9.00
Total Project Cost
10.276
Construction planned to begin in 2020.
PH-PS 3230(05) 01DJ Box Elder - Pennington Co Rd 14-16
- Radar Hill Rd Intersection and
Commercial Gate Road Intersection;
Radar Hill Road, S of Hwy1416
Intersection, DOT#190122B, RCP&E
Railroad
Intersection Reconstruction, Add
Turn Lanes; Crossing Surface
Rehabilitation, Approach Work &
Relocate Existing Signals
Pennington 0.0 3.045 2019 10.00 3.383
Also Funded In:
Item Category
Railroad Crossing Improvement Projects 0.050 34.00
Total Project Cost
3.433
Coordinate with PCN 05RH
PH 0037(139)11 04HJ SD37 - Fm N of Springfield to SD50 SD37 - Shoulder Widening, Culvert
Extensions, Pipe Work, Replace
Str (RCBC)
Bon Homme* 8.6 SD37 7.470 2019 11.00 8.300
PH 0010(106) 04HT Various locations on the State
System in the Aberdeen Region
Durable Pavement MarkingRegionwide 0.0 0.312 2019 12.00 0.312
PH 0020(147) 04HU Various locations on the State
System in the Mitchell Region
Durable Pavement MarkingRegionwide 0.0 0.572 2019 13.00 0.572
PH 0030(23) 04HV Various locations on the State
System in the Pierre Region
Durable Pavement MarkingRegionwide 0.0 0.229 2019 14.00 0.229
PH 0040(220) 04HW Various locations on the State
System in the Rapid City Region
Cold Plastics Durable Pavement
Marking
Regionwide 0.0 0.208 2019 15.00 0.208
PH 0040(221) 04HX Various locations on the State
System in the Rapid City Region
Sprayable Durable Pavement
Marking
Regionwide 0.0 0.338 2019 16.00 0.338
¥ Costs reflect anticipated inflationPage 60 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 000S(338) 04HY Public Traveled Roads Statewide 2019 Preliminary Engineering for
Conducting Road Safety Audit
Reviews (RSAR)
Statewide 0.0 0.028 2019 17.00 0.031
PH 00SW(84) 04J0 Statewide 2019 Local Government Traffic
Engineering Services Performed
by the SDDOT Traffic & Safety
Engineer and Provide Traffic
Ccontrol Devices
Statewide 0.0 0.120 2019 18.00 0.120
NH 0016(92)61 070G US16 E&W - Jct of Neck Yoke Rd
by Reptile Gardens
Roadway LightingPennington 0.4 US16E
US16W
0.099 2019 19.00 0.121
PH 000S(342) 04J1 Public Traveled Roads Statewide 2019 Preliminary Engineering for
Roadway Safety Improvement
Statewide 0.0 0.122 2019 20.00 0.135
PH 00SW(25) 04Y3 Statewide Preliminary Engineering to be
Started in 2019 for Roadway
Safety Projects.
Statewide 0.0 1.311 2019 21.00 1.457
PH 00SW(30) 057F Various Locations Statewide 2019 Corridor Signal TimingStatewide 0.0 0.208 2019 22.00 0.208
PH 1400(10) 00YE City of Sioux Falls - Western & 41st
St.
Install Right Turn Lane EB to SB,
Widen S Leg For Additional Lt Turn
Lane, PE, ROW
Minnehaha 0.0 0.791 2019 23.00 0.878
PH 014A(19)31 04XJ US14A - 2 E of US85 (Cheyenne
Crossing)
Grading and AC SurfacingLawrence 0.8 US14A 1.821 2019 24.00 2.023
PH 0040(334) 05W5 Various Locations on the state and
local systems in the Rapid City
Region
High Friction Surface TreatmentLawrence
Meade
Pennington
* 1.8 I190S
I90E
I90W
US14A
US16E
0.871 2019 25.00 0.968
¥ Costs reflect anticipated inflationPage 61 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 000S(392) 06NE Various Locations on the state and
local systems in the Aberdeen,
Pierre, and Mitchell Regions
High Friction Surface TreatmentDay
Lyman
Minnehaha
1.0 I29N
I29S
I90W
SD47
US12E
US12W
1.002 2019 26.00 1.113
IM-PH 0294(71)121 05FF I29 N/S - Strs. 7 N SD32
Interchange; 1 S Brookings Co. Line;
2.2 N Moody Co. Line; 0.9 S US14
Interchange
High Friction Surface, Polymer
Chip Seal
Brookings
Moody
0.0 I29N
I29S
0.040 2019 27.00 0.044
Also Funded In:
Item Category
Interstate Maintenance Projects 0.515 14.00
Total Project Cost
0.559
PH 0020(179) 06AK Mitchell Region Centerline Rumble StripesLake
McCook
Minnehaha
Moody
Yankton
32.0 SD115
SD34
US81
0.832 2019 28.00 0.832
PH 0010(137) 06AL Aberdeen Region Centerline Rumble StripesBrookings
Codington
Deuel
Hamlin
Kingsbury
41.0 US14
US212
US81
1.144 2019 29.00 1.144
PH 0040(320) 06AM Rapid City Region Centerline Rumble StripesButte
Custer
Lawrence
Pennington
39.6 US16
US212
US385
US85
1.144 2019 30.00 1.144
PH 00SW(66) 06AX Various Locations Statewide 2019 Snow FenceStatewide 0.0 0.094 2019 31.00 0.104
PH 0034(188)368 05W8
PH 0019(44)95 060F
SD34 - Intersections with 437th Ave,
461st Ave, 462nd Ave (Wentworth
Corner), 463rd Ave, 464th Ave
(Chester Corner) & Dakota Ethanol
Plant; SD19 - Intersection with 236th
(Hillside Corner)
Intersection ImprovementsLake
Miner
0.0 SD19
SD34
1.704 2019 32.00 1.892
¥ Costs reflect anticipated inflationPage 62 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 0010(154) 06U0 Various locations in the Aberdeen
Region
Transverse Rumble Strips at Stop
Controlled Intersections
Beadle
Brookings
Brown
Buffalo
Day
Deuel
Edmunds
Grant
Hamlin
Hand
Marshall
McPherson
Miner
Roberts
0.0 SD10
SD101
SD109
SD127
SD158
SD21
SD22
SD239
SD25
SD253
SD26
SD27
SD28
SD324
SD37
SD45
SD50
US14B
US281
US81
0.140 2019 33.00 0.156
PH 0012(271)288 06W7 US12 through Aberdeen Install Adaptive Signal Control
System
Brown 0.0 US12 1.144 2019 34.00 1.144
IM-FP-PH
2292(06)4
4778 I229 - Exit 5 (26th St. Intch/Yeager
Rd) in Sioux Falls; I229 - NB & SB
curve at Cliff Ave Interchange
Interchange Improvement; High
Friction Surface Treatment
Minnehaha* 0.4 I229N
I229S
0.375 2019 35.00 0.416
Also Funded In:
Item Category
Interstate Maintenance Projects 12.452 5.00
Total Project Cost
12.868
PH 0010(128) 05W9 Aberdeen Region Intersection Sight Distance
Improvements
Regionwide 0.0 0.094 2019 36.00 0.104
PH 0031(46) 06YE Various Intersections in the Pierre
Area
Pedestrian Crossing ImprovementsHughes 0.0 US14
US14B
0.047 2019 37.00 0.052
Miles2019 44.243 142.2
¥ Costs reflect anticipated inflationPage 63 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 0010(147) 05HC Various Paved County and City
Roads in the Aberdeen Region
Signing & DelineationEdmunds
Hamlin
McPherson
0.0 0.387 2020 38.00 0.669
PH 00SW(52) 05M6 Various Paved County and City
Roads in the Pierre and Rapid City
Regions
Signing & DelineationCorson
Dewey
Haakon
Harding
Jackson
Jones
Lawrence
Mellette
Oglala Lakota
Perkins
Sully
Todd
Tripp
Walworth
Ziebach
0.0 0.553 2020 39.00 0.921
P-PH 0046(60)346 04J5 SD46 - Fm Irene to W of
SD19/SD19A
Shoulder Widening, Replace Str.
(RCBC), Pipe Work, Spot Grading,
Interim Surfacing
Clay
Yankton
* 9.9 SD46 9.665 2020 40.00 10.739
Also Funded In:
Item Category
Minor Arterial Projects 3.986 18.00
Total Project Cost
14.725
PH 0020(177) 04HG Various Locations in the Mitchell
Region
Interstate Median Protection for
Mitchell Region
Regionwide* 0.0 1.061 2020 41.00 1.061
PH 0040(317) 062J Various Locations in the Rapid City
Region
Interstate Median Protection for
Rapid City Region
Regionwide 0.0 1.061 2020 42.00 1.061
PH 0010(138) 06DU Various Locations in the Aberdeen
Region
Interstate Median Protection for
Aberdeen Region
Regionwide 0.0 1.061 2020 43.00 1.061
PH 0020(187) 06JK Various Paved County and City
Roads in the Mitchell Region
Signing & DelineationBon Homme
Buffalo
Hutchinson
Jerauld
Moody
0.0 0.579 2020 44.00 0.966
¥ Costs reflect anticipated inflationPage 64 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 0030(39) 06JL Pierre Region Centerline Rumble StripesHughes
Sully
Todd
31.5 US14
US18
US83
0.849 2020 45.00 0.849
PH 8004(02) 04HQ Various County, City, & Township
Roads in Bennett County
Signing & DelineationBennett 0.0 0.541 2020 46.00 0.722
PH 8052(71) 04L4 Various County, City, & Township
Roads in Pennington County
Signing & DelineationPennington 0.0 1.540 2020 47.00 2.200
PH 8017(08) 04KC Various County, City, & Township
Roads in Custer County
Signing & DelineationCuster 0.0 0.857 2020 48.00 1.173
P-PH 0052(05)315 04HK
P 037P(04)12 06K0
SD52 - Fm SD37 to SD50; SD37P -
Str. 0.19 Mi S of the SD37/SD37P
Intersection, Pine Street in
Springfield
SD52 - Grading, Interim Surfacing,
Replace Strs (RCBC), Extend
RCBC; SD37P - Structure and
Approach Grading, Replace
Structure (RCBC), Approach
Grading & Pipe Work
Bon Homme* 12.1 SD37P
SD52
9.162 2020 49.00 10.180
Also Funded In:
Item Category
State Secondary Projects 7.572 11.00
Total Project Cost
17.752
P-PH 0014(179)419 027B US14 - Fm Main Ave. to Medary
Ave. in Brookings & the Intersections
of US14 & 12th Ave,
Urban Grading, Curb & Gutter,
Storm Sewer, Traffic Signals, ADA,
Sidewalk, Roadway Lighting &
PCC Surfacing
Brookings 0.7 US14 0.750 2020 50.00 0.750
Also Funded In:
Item Category
State Highway System Urban Projects 2.861 8.00
Total Project Cost
3.611
PH 0010(107) 04JL Various locations on the State
System in the Aberdeen Region
Durable Pavement MarkingRegionwide 0.0 0.318 2020 51.00 0.318
PH 0020(151) 04JM Various locations on the State
System in the Mitchell Region
Durable Pavement MarkingRegionwide 0.0 0.584 2020 52.00 0.584
PH 0030(24) 04JN Various locations on the State
System in the Pierre Region
Durable Pavement MarkingRegionwide 0.0 0.233 2020 53.00 0.233
¥ Costs reflect anticipated inflationPage 65 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 0040(222) 04JP Various locations on the State
System in the Rapid City Region
Cold Plastics Pavement MarkingRegionwide 0.0 0.212 2020 54.00 0.212
PH 0040(223) 04JQ Various locations on the State
System in the Rapid City Region
Sprayable Pavement MarkingRegionwide 0.0 0.345 2020 55.00 0.345
PH 00SW(20) 04JR Public Traveled Roads Statewide 2020 Preliminary Engineering for
Conducting Road Safety Audit
Reviews (RSAR)
Statewide 0.0 0.029 2020 56.00 0.032
PH 00SW(18) 04JT Public Traveled Roads Statewide 2020 Preliminary Engineering for
Roadway Safety Improvement
Statewide 0.0 0.124 2020 57.00 0.138
PH 00SW(23) 04RM Statewide 2020 Local Government Traffic
Engineering Services Performed
by the SDDOT Traffic & Safety
Engineer and Provide Traffic
Ccontrol Devices
Statewide 0.0 0.122 2020 58.00 0.122
PH 0028(37)329 04JY SD28 - Fm US81 W 11 mi Through
Lake Norden
Shoulder Widening, Culvert
Extensions, Pipe Work, Spot
Grading
Hamlin* 11.2 SD28 8.687 2020 59.00 8.687
Construction planned to begin in 2021.
PH 00SW(24) 04Y4 Statewide Preliminary Engineering to be
Started in 2020 for Roadway
Safety Projects.
Statewide 0.0 1.337 2020 60.00 1.486
PH 00SW(31) 057G Various Locations Statewide 2020 Corridor Signal TimingStatewide 0.0 0.212 2020 61.00 0.212
P-PH 0015(77)155 04K8
P- PH
0020(152)439
04UL
PP 0020(176)443 0628
SD15 - Fm the N Junction of US212
N to S Junction of SD20; SD20 - Fm
the S Junction of SD15 to the N
Junction. of SD15; SD20 - Near
Labolt SD, DOT 097530J BNSF
Railroad
Grading, Interim Surfacing,
Replace Strs; Signal Upgrades
Deuel
Grant
* 12.0 SD15
SD20
10.092 2020 62.00 11.214
Also Funded In:
Item Category
Minor Arterial Projects 5.771 25.00
Railroad Crossing Improvement Projects 0.350 46.00
Total Project Cost
17.335
¥ Costs reflect anticipated inflationPage 66 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-PH
0050(114)324
04HN
PH 0018(190)348 04JX
PH 0281(108)35 04JE
NH 0046(75)282 06JY
US281 - Fm US18 to the Charles
Mix/Douglas County Line; US18 -
Fm the E Junction of SD50 to
US281; SD50 - Fm E Jct of US18 to
W of Wagner; SD46 - Intersection
with 388th Ave/BIA29 (Marty Road)
US281 - Shoulder Widening, Pipe
Work, Spot Grading; US18 -
Shoulder Widening, Pipe Work;
SD50 - Grading & AC Surfacing,
Lighting; SD46 - Intersection
Modification
Charles Mix
Douglas
* 12.9 SD46
SD50
US18
US281
12.752 2020 63.00 13.898
Also Funded In:
Item Category
Major Arterial Projects 3.004 21.00
Total Project Cost
16.902
PH 00SW(59) 05GL Various Locations Statewide 2020 Snow FenceStatewide 0.0 0.096 2020 64.00 0.106
PH 8059(05) 04JK Various County, City, & Township
Roads in Stanley County
Signing & DelineationStanley 0.0 0.505 2020 65.00 0.674
PH 0020(181) 06C4 Mitchell Region Intersection ImprovementsRegionwide 0.0 0.191 2020 66.00 0.212
PH 0010(140) 06C5 Aberdeen Region Intersection ImprovementRegionwide 0.0 0.191 2020 67.00 0.212
PH 0040(322) 06C6 Rapid City Region Intersection ImprovementsRegionwide 0.0 0.191 2020 68.00 0.212
PH 0020(190) 06JE Various Locations in the Mitchell
Region
Intersection ImprovementsCharles Mix
Davison
Lake
Lincoln
Minnehaha
0.0 SD11
SD37
SD38
SD44
US81
1.433 2020 69.00 1.592
PH 0040(332) 06K3 Various Locations in the Rapid City
Region
Turn Lane ConstructionFall River
Pennington
0.0 SD79S
US18
0.573 2020 70.00 0.637
PH 000S(395) 06TT Various locations on the local
system in the Rapid City and Pierre
Region
Rumble Stripes and High Grade
Polymer Pavement Markings
Regionwide 40.0 0.424 2020 71.00 0.424
PH 0020(192) 06TU Various locations on the local
system in the Mitchell Region
Rumble Stripes and High Grade
Polymer Pavement Markings
Regionwide 40.0 0.424 2020 72.00 0.424
¥ Costs reflect anticipated inflationPage 67 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 0010(155) 06TV Various locations on the local
system in the Aberdeen Region
Rumble Stripes and High Grade
Polymer Pavement Markings
Regionwide 40.0 0.424 2020 73.00 0.424
PH 0044(213)312 06TW Jct SD44/SD50 E of Platte Intersection ImprovementsCharles Mix 0.0 SD44 0.287 2020 74.00 0.318
PH 0010(156) 06TX Various locations in the Aberdeen
Region
Radar Speed Feedback SignsRegionwide 0.0 0.096 2020 75.00 0.106
PH 0020(193) 06TY Various locations in the Mitchell
Region
Radar Speed Feedback SignsRegionwide 0.0 0.096 2020 76.00 0.106
PH 0020(194) 06U1 Various locations in the Mitchell
Region
Transverse Rumble Strips at Stop
Controlled Intersections
Regionwide 0.0 0.143 2020 77.00 0.159
Miles2020 75.439 210.3
PH 0030(34) 062G Various Locations in the Pierre
Region
Interstate Median Protection for
Pierre Region
Regionwide 0.0 1.082 2021 78.00 1.082
PH 8030(14) 04LA Various County, City, & Township
Roads in Hand County
Signing & DelineationHand 0.0 1.534 2021 79.00 2.045
PH 0020(180) 06AE Various Locations in the Mitchell
Region
Guardrail EliminationRegionwide 0.0 0.487 2021 80.00 0.541
PH 0030(35) 06AF Various Locations in the Pierre
Region
Guardrail EliminationRegionwide 0.0 0.487 2021 81.00 0.541
PH 0010(139) 06AG Various Locations in the Aberdeen
Region
Guardrail EliminationRegionwide 0.0 0.487 2021 82.00 0.541
PH 0040(321) 06AH Various Locations in the Rapid City
Region
Guardrail EliminationRegionwide 0.0 0.487 2021 83.00 0.541
PH 0010(151) 06K2 Various Locations in the Watertown
Area.
Intersection ImprovementsBrookings
Codington
0.0 SD20
US14
US81
1.776 2021 84.00 1.973
¥ Costs reflect anticipated inflationPage 68 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 8041(19) 04L7 Various County, City, & Township
Roads in Lawrence County
Signing & Delineation - Gravel
Roads ONLY
Lawrence 0.0 0.842 2021 85.00 1.122
PH 8029(24) 04LC Various County, City, & Township
Roads in Hamlin County
Signing & Delineation - Gravel
Roads ONLY
Hamlin 0.0 0.875 2021 86.00 1.166
PH 8034(31) 04K9 Various County, City, & Township
Roads in Hutchinson County
Signing & Delineation - Gravel
Roads ONLY
Hutchinson 0.0 1.167 2021 87.00 1.555
PH 0010(115) 04KE Various locations on the State
System in the Aberdeen Region
Durable Pavement MarkingRegionwide 0.0 0.325 2021 88.00 0.325
PH 0020(162) 04KF Various locations on the State
System in the Mitchell Region
Durable Pavement MarkingRegionwide 0.0 0.595 2021 89.00 0.595
PH 0030(29) 04KG Various locations on the State
System in the Pierre Region
Durable Pavement MarkingRegionwide 0.0 0.238 2021 90.00 0.238
PH 0040(231) 04KH Various locations on the State
System in the Rapid City Region
Cold Plastics Durable Pavement
Marking
Regionwide 0.0 0.216 2021 91.00 0.216
PH 0040(232) 04KJ Various locations on the State
System in the Rapid City Region
Sprayable Durable Pavement
Marking
Regionwide 0.0 0.352 2021 92.00 0.352
PH 000S(355) 04KK Public Traveled Roads Statewide 2021 Preliminary Engineering for
Conducting Road Safety Audit
Reviews (RSAR)
Statewide 0.0 0.029 2021 93.00 0.032
PH 00SW(85) 04KL Statewide 2021 Local Government Traffic
Engineering Services Performed
by the SDDOT Traffic & Safety
Engineer and Provide Traffic
Control Devices
Statewide 0.0 0.124 2021 94.00 0.124
PH 000S(357) 04KM Public Traveled Roads Statewide 2021 Preliminary Engineering for
Roadway Safety Improvement
Statewide 0.0 0.127 2021 95.00 0.141
PH 000S(358) 04KN Various Locations Statewide Guardrail ReplacementStatewide* 0.0 1.082 2021 96.00 1.082
¥ Costs reflect anticipated inflationPage 69 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P-PH 0034(170)350 04KR SD34 - Fm Sanborn/Miner County
Line E to 425th Ave Near Roswell
Shoulder Widening, Structure
Replacements, Pipe Work
Miner 7.0 SD34 9.249 2021 97.00 9.249
PH 0018(192)390 04KT US18 - Fm E of the James River to
US81
Shoulder Widening, Spot Grading,
Pipe Work
Hutchinson* 11.7 US18 10.929 2021 98.00 10.929
PH 00SW(17) 04Y5 Statewide Preliminary Engineering to be
Started in 2021 for Roadway
Safety Projects.
Statewide 0.0 1.364 2021 99.00 1.515
PH 00SW(32) 057J Various Locations Statewide 2021 Corridor Signal TimingStatewide 0.0 0.216 2021 100.00 0.216
PH 0044(184)330 04K0 SD44 - Fm the E Junction with
US281 to SD37 at Parkston
Shoulder Widening, AC Surfacing
of Shoulders, Pipe Work, Extend
Culvert (RCBC), Upgrade Bridge
Approach Guard Rail
Douglas
Hutchinson
* 17.8 SD44 15.067 2021 101.00 15.067
P 0013(38)108 04VD
IM-PH 0293(107)99 05F9
SD13 - 0.3 N of Flandreau Over the
Big Sioux River; I29 N/S - 1 N
SD115 Interchange; 1.2 N
Minnehaha Co. Line; 3.8 S SD34
Interchange; 3 S SD34 Interchange
High Friction Surface Treatment,
Polymer Chip Seal, Deck Repair,
Curb Repair, Approach Slabs, Joint
Replacement
Minnehaha
Moody
0.0 I29N
I29S
SD13
0.014 2021 102.00 0.015
Also Funded In:
Item Category
Interstate Maintenance Projects 1.828 40.00
Bridge Projects 0.202 47.00
Total Project Cost
2.045
PH 8009(03) 04L8 Various County, City, & Township
Roads in Buffalo County
Signing & Delineation - Gravel
Roads ONLY
Buffalo 0.0 0.197 2021 103.00 0.262
PH 8065(19) 04KA Various County, City, & Township
Roads in Walworth County
Signing & Delineation - Gravel
Roads ONLY
Walworth 0.0 0.724 2021 104.00 0.966
PH 00SW(67) 06AY Various Locations Statewide 2021 Snow FenceStatewide 0.0 0.097 2021 105.00 0.108
PH 8041(20) 05F8 Nemo Rd - Horizontal curve at
Pennington/Meade Co line
PE, CE, ROW, GradingMeade
Pennington
1.0 3.068 2021 106.00 3.408
¥ Costs reflect anticipated inflationPage 70 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 000S(396) 06TQ Various Locations on the state and
local systems in the Aberdeen,
Pierre, and Mitchell
High Friction Surface TreatmentRegionwide 1.5 0.974 2021 107.00 1.082
PH 0040(335) 06TR Various Locations on the state and
local systems in the Rapid City
Region
High Fiction Surface TreatmentRegionwide 1.5 0.974 2021 108.00 1.082
Miles2021 58.111 40.5
PH 8062(07) 04KD Various County, City, & Township
Roads in Tripp County
Signing & Delineation - Gravel
Roads ONLY
Tripp 0.0 1.733 2022 109.00 2.311
PH 8005(13) 04HR Various County, City, & Township
Roads in Bon Homme County
Signing & Delineation - Gravel
Roads ONLY
Bon Homme 0.0 0.747 2022 110.00 0.997
PH 8053(23) 04L9 Various County, City, & Township
Roads in Perkins County
Signing & Delineation, - Gravel
Roads ONLY
Perkins 0.0 0.739 2022 111.00 1.826
PH 8023(07) 05WN Various County, City, & Township
Roads in Edmunds County
Signing & Delineation - Gravel
Roads ONLY
Edmunds 0.0 1.251 2022 112.00 1.667
NH-PH 0385(51)87 03VD US385 - Fm 1.5 mi N of US16 E to
Pactola Dam; US385 - Str 3.6 N of
US16 E over Horse Creek
Shoulder Widening, Pipe Work &
Spot Grading; Replace Str (RCBC)
& Approach Grading
Pennington* 8.2 US385 14.681 2022 113.00 16.313
P-PH 0015(82)167 05D9 SD15 - Fm the N Jct of SD20, N to
Milbank
Grading, Interim Surfacing &
Replace Strs.
Grant* 6.0 SD15 3.811 2022 114.00 4.235
Also Funded In:
Item Category
Minor Arterial Projects 5.943 55.00
Total Project Cost
10.178
PH 0010(116) 04RN Various locations on the State
System in the Aberdeen Region
Durable Pavement MarkingRegionwide 0.0 0.331 2022 115.00 0.331
PH 0020(150) 04RP Various locations on the State
System in the Mitchell Region
Durable Pavement MarkingRegionwide 0.0 0.607 2022 116.00 0.607
PH 0030(30) 04RQ Various locations on the State
System in the Pierre Region
Durable Pavement MarkingRegionwide 0.0 0.243 2022 117.00 0.243
¥ Costs reflect anticipated inflationPage 71 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 0040(233) 04RT Various locations on the State
System in the Rapid City Region
Sprayable Durable Pavement
Marking
Regionwide 0.0 0.359 2022 118.00 0.359
PH 00SW(86) 04RV Statewide 2022 Local Government Traffic
Engineering Services Performed
by the SDDOT Traffic & Safety
Engineer and Provide Traffic
Ccontrol Devices
Statewide 0.0 0.127 2022 119.00 0.127
PH 000S(351) 04RW Public Traveled Roads Statewide 2022 Public Traveled Roads
Statewide
Statewide 0.0 0.129 2022 120.00 0.144
PH 000S(352) 04RX Various Locations Statewide Guardrail ReplacementStatewide* 0.0 1.104 2022 121.00 1.104
PH 00SW(87) 04Y6 Statewide Preliminary Engineering to be
Started in 2022 for Roadway
Safety Projects.
Statewide 0.0 1.391 2022 122.00 1.546
PH 00SW(33) 057K Various Locations Statewide 2022 Corridor Signal TimingStatewide 0.0 0.221 2022 123.00 0.221
P-PH 0046(61)366 04JF
PP-PS 0046(71)381 062C
SD46 - Fm Beresford E 15 miles.;
SD 46 - 0.3 S of 298th St., DOT
381576D D&I Railroad
Grading, Interim Surfacing,
Replace Structure (RCBC) &
Replace Structure (Bridge),
Erosion Repair; Signal Upgrades &
Crossing Surface
Union* 15.8 SD46 19.578 2022 124.00 21.753
Also Funded In:
Item Category
Minor Arterial Projects 2.992 52.00
Railroad Crossing Improvement Projects 0.250 57.00
Total Project Cost
24.995
P-PH 0046(66)334 04X4 SD46 - Fm US81 to Irene Grading & Interim Surfacing,
Replace Structure (RCBC),
Replace Structure (Bridge),
Intersection Lighting at US81/SD46
Yankton* 12.0 SD46 6.939 2022 125.00 7.709
Also Funded In:
Item Category
Minor Arterial Projects 10.158 53.00
Total Project Cost
17.867
PH 8016(10) 04HP Various County, City, & Township
Roads in Corson County
Signing & Delineation - Gravel
Roads ONLY
Corson 0.0 1.176 2022 126.00 1.568
¥ Costs reflect anticipated inflationPage 72 HC65Coding.rpt
By Category
¥¥
Roadway Safety Improvement
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
PH 00SW(68) 06C0 Various Locations Statewide 2022 Snow FenceStatewide 0.0 0.099 2022 127.00 0.110
NH PH
0012(229)263
06C7 US12 – Fm Ipswich to the Divided
Highway W of Aberdeen
Intersection Improvements,
Passing Lanes, Lighting
Brown
Edmunds
* 20.2 US12 11.651 2022 128.00 12.944
PH 000S(397) 06U6 Various locations on the local
system in the Rapid City and Pierre
Region
Rumble Stripes and High Grade
Polymer Pavement Markings
Regionwide 40.0 0.442 2022 129.00 0.442
PH 0020(196) 06U7 Various locations on the local
system in the Mitchell Region
Rumble Stripes and High Grade
Polymer Pavement Markings
Regionwide 40.0 0.442 2022 130.00 0.442
PH 0010(157) 06U8 Various locations on the local
system in the Aberdeen Region
Rumble Stripes and High Grade
Polymer Pavement Markings
Regionwide 40.0 0.442 2022 131.00 0.442
PH 00SW(88) 06W8 Public Traveled Roads Statewide 2022 Preliminary Engineering for
Conducting Road Safety Audit
Reviews (RSAR)
Statewide 0.0 0.030 2022 132.00 0.033
Miles2022 77.474 182.2
¥ Costs reflect anticipated inflationPage 73 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-P 0031(29) 042G Various Locations in the Pierre Area Pipe WorkHaakon
Stanley
19.5 SD1806
SD63
US83
1.190 2019 1.00 1.452
IM-NH-P 0022(60) 05L6 Various Routes in the Sioux Falls
Area
Chip SealLincoln
Miner
Minnehaha
Moody
21.9 I29N
I29S
I90E
I90W
SD11
SD17
SD34
0.416 2019 2.00 0.508
IM-NH-P 0021(151) 041F Various Locations in the Mitchell
Area
Pipe WorkDavison
McCook
0.2 I90E
SD37
SD42
1.818 2019 3.00 2.218
NH-P 0023(37) 041Q Various Locations in the Yankton
Area
Pipe WorkBon Homme
Charles Mix
Hutchinson
Yankton
0.0 SD44
SD46
SD50
0.190 2019 4.00 0.232
IM-NH-P 0022(44) 041K Various Locations in the Sioux Falls
Area
Pipe WorkLake
Minnehaha
Moody
0.0 I29S
SD11
SD13
SD32
US81
0.434 2019 5.00 0.701
NH-P 0011(80) 040T Various Locations in the Aberdeen
Area
Culvert RepairBrown
Day
Marshall
48.2 SD25
SD27
US281
1.157 2019 6.00 1.707
P 0033(16) 042A Various Locations in the Winner
Area
Culvert LiningAreawide 0.0 0.309 2019 7.00 0.500
P 0042(53) 042F Various Locations in the Belle
Fourche Area
Culvert RepairAreawide 0.460 2019 8.00 0.743
¥ Costs reflect anticipated inflationPage 74 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-P 0011(110) 05XU Various Routes in the Aberdeen
Area
Rout and SealBrown
Day
Edmunds
McPherson
46.3 SD253
SD37
SD45
US12E
US281
US281N
US281S
0.318 2019 9.00 0.388
IM-NH-P 0040(316) 05XV Various Routes in the Rapid City
Region
Rout and SealButte
Harding
Lawrence
Meade
Pennington
66.3 I190N
I190S
I90E
I90W
SD34
SD44
SD44E
SD44W
SD79
0.548 2019 10.00 0.669
P 0013(48) 05XW Various Routes in the Huron Area Rout and SealBuffalo
Hand
13.1 SD45 0.089 2019 11.00 0.109
IM-P 0021(166) 05XX Various Routes in the Mitchell Area Rout and SealBuffalo
Douglas
Hutchinson
McCook
Minnehaha
Moody
82.4 I29N
I29S
I90E
I90W
SD34
SD42
SD44
SD50
0.792 2019 12.00 0.967
NH-P 0031(39) 05XY Various Routes in the Pierre Area Rout and SealHaakon
Hughes
Jackson
Lyman
Potter
Stanley
* 37.8 SD20
SD63
US14
US14B
US14EB
US14WB
US83
US83N
US83S
0.401 2019 13.00 0.489
¥ Costs reflect anticipated inflationPage 75 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-P 0023(50) 05Y0 Various Routes in the Yankton Area Rout and SealClay
Lincoln
Union
12.6 SD11
SD46
SD50
SD50E
SD50EL
SD50W
SD50WL
0.089 2019 14.00 0.109
NH-P 0011(108) 05Y1 Various Routes in the Aberdeen
Area
Asphalt Surface TreatmentBrown
Day
Faulk
Marshall
Spink
112.5 SD20
SD25
SD27
SD37
US12E
US212
US281N
2.973 2019 15.00 3.628
NH-P 0043(22) 05Y3 Various Routes in the Custer Area Asphalt Surface TreatmentCuster
Oglala Lakota
Pennington
46.5 SD391
SD40
SD407
US18
1.235 2019 16.00 1.506
NH-P 0013(47) 05Y4 Various Routes in the Huron Area Asphalt Surface TreatmentClark
Spink
44.0 SD20
SD25
SD26
SD28
US212
US281
1.164 2019 17.00 1.420
NH-P 0021(165) 05Y5 Various Routes in the Mitchell Area Asphalt Surface TreatmentAurora
Charles Mix
Douglas
Gregory
Hanson
Hutchinson
Jerauld
Sanborn
99.1 SD1804
SD224
SD38
SD44
SD50
US18
US281
2.620 2019 18.00 3.197
¥ Costs reflect anticipated inflationPage 76 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-P 0032(31) 05Y6 Various Routes in the Mobridge Area Asphalt Surface TreatmentCampbell
Edmunds
Walworth
Ziebach
62.6 SD65
US12
US12E
US12W
US83
US83N
US83S
1.755 2019 19.00 2.141
NH-P 0031(38) 05Y7 Various Routes in the Pierre Area Asphalt Surface TreatmentHaakon
Hughes
Jackson
Potter
Stanley
Sully
111.9 SD1804
SD1806
SD20
SD34
US14
US212
2.958 2019 20.00 3.609
NH-P 0041(160) 05Y8 Various Routes in the Rapid City
Area
Asphalt Surface TreatmentLawrence
Pennington
40.3 SD240
SD44
US85
1.065 2019 21.00 1.301
IM-P 0012(217) 05Y9 Various Routes in the Watertown
Area
Asphalt Surface TreatmentBrookings
Clark
Codington
Grant
Hamlin
Roberts
68.7 I29N
I29S
SD109
SD20
SD21
SD28
SD30
2.204 2019 22.00 2.689
P 0033(28) 05YA Various Routes in the Winner Area Asphalt Surface TreatmentJackson
Lyman
Mellette
20.3 SD44
SD53
SD63
0.537 2019 23.00 0.655
NH-P 0023(51) 05YC Various Routes in the Yankton Area Asphalt Surface TreatmentHutchinson
Turner
Union
Yankton
49.8 I29L
SD11
SD44
US18
US81
1.315 2019 24.00 1.605
¥ Costs reflect anticipated inflationPage 77 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-P 0011(109) 05YD Various Routes in the Aberdeen
Area
Pavement RestorationBrown
Day
Faulk
32.8 SD25
SD45
US12
US12E
US12W
US212
1.931 2019 25.00 2.357
NH-P 0040(315) 05YE Various Routes in the Rapid City
Region
Pavement RestorationCuster
Fall River
Lawrence
Pennington
40.5 SD244
SD36
SD79
SD79N
SD79S
US16
US16A
US16AE
US16AW
US18
US385
US85
3.101 2019 26.00 3.785
NH 0013(46) 05YF Various Routes in the Huron Area Pavement RestorationBeadle
Kingsbury
7.8 US14 0.455 2019 27.00 0.555
IM-NH-P 0021(163) 05YG Various Routes in the Mitchell Area Pavement Restoration, Shoulder
Work
Davison
Hanson
Sanborn
34.2 I90E
I90W
SD34
SD34E
SD34W
SD37
SD37N
SD37S
3.905 2019 28.00 4.765
NH-P 0012(216) 05YH Various Routes in the Watertown
Area
Pavement RestorationGrant
Hamlin
Kingsbury
19.0 SD15
US81
1.115 2019 29.00 1.361
NH 0033(27) 05YJ Various Routes in the Winner Area Pavement RestorationJones
Tripp
8.0 US18
US83
0.497 2019 30.00 0.607
¥ Costs reflect anticipated inflationPage 78 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-P 0021(164) 05YK Various Routes in the Mitchell Area Pavement Grinding; Install
Centerline Rumble Strips
Clay
Davison
Hanson
Hutchinson
Yankton
33.1 SD37
SD38
SD50W
0.735 2019 31.00 0.896
NH-P 0011(114) 06E9 Various Locations Throughout the
Aberdeen Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 32.00 0.520
NH-P 0012(223) 06EF Various Locations Throughout the
Watertown Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 33.00 0.520
NH-P 0013(53) 06EJ Various Locations Throughout the
Huron Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 34.00 0.520
NH-P 0022(68) 06EN Various Locations Throughout the
Sioux Falls Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.213 2019 35.00 0.260
NH-P 0023(54) 06ET Various Locations Throughout the
Yankton Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.213 2019 36.00 0.260
NH-P 0021(168) 06EX Various Locations Throughout the
Mitchell Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.213 2019 37.00 0.260
NH-P 0032(33) 06F2 Various Locations Throughout the
Mobridge Area
2019 Areawide Pipe Work
Projects
Areawide 0.0 0.213 2019 38.00 0.260
NH-P 0031(43) 06F6 Various Locations Throughout the
Pierre Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.213 2019 39.00 0.260
NH-P 0033(30) 06FA Various Locations Throughout the
Winner Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.213 2019 40.00 0.260
NH-P 0042(74) 06FF Various Locations Throughout the
Belle Fourche Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 41.00 0.520
NH-P 0041(162) 06FJ Various Locations Throughout the
Rapid City Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 42.00 0.520
¥ Costs reflect anticipated inflationPage 79 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-P 0043(24) 06FN Various Locations Throughout the
Custer Area
2019 Areawide Pipe Work ProjectsAreawide 0.0 0.427 2019 43.00 0.520
P 0032(36) 06YD Various Routes in the Mobridge Area Rout and SealCampbell
Walworth
35.2 SD1804 0.240 2019 44.00 0.293
P 0030(43) 070F Various Routes in the Pierre Region Micro-SurfacingDewey
Haakon
Stanley
Ziebach
47.8 SD63 1.711 2019 45.00 2.088
Miles2019 53.930 1,262.4
NH-P 0033(15) 041V Various Locations in the Winner
Area
Pipe WorkLyman
Mellette
Todd
Tripp
40.5 SD47
SD49
US83
0.461 2020 46.00 0.699
P 0022(45) 041L Various Locations in the Sioux Falls
Area
Pipe WorkAreawide 0.0 0.311 2020 47.00 0.503
NH-P 0022(77) 06Y8 Various Routes in the Sioux Falls
Area
Asphalt Surface TreatmentLincoln 3.8 SD11 0.102 2020 48.00 0.124
IM-NH-P 0022(76) 06Y9 Various Routes in the Sioux Falls
Region
Pavement RestorationLincoln
Minnehaha
42.7 I29N
I29S
I90E
I90W
SD115
SD115N
SD115S
SD38
SD38E
SD38W
SD42
US18
2.562 2020 49.00 3.126
NH-P 0011(115) 06EA Various Locations Throughout the
Aberdeen Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 50.00 0.531
¥ Costs reflect anticipated inflationPage 80 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-P 0012(224) 06EG Various Locations Throughout the
Watertown Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 51.00 0.531
NH-P 0013(54) 06EK Various Locations Throughout the
Huron Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 52.00 0.531
NH-P 0022(69) 06EP Various Locations Throughout the
Sioux Falls Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 53.00 0.265
NH-P 0023(55) 06EU Various Locations Throughout the
Yankton Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 54.00 0.265
NH-P 0021(169) 06EY Various Locations Throughout the
Mitchell Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 55.00 0.265
NH-P 0032(34) 06F3 Various Locations Throughout the
Mobridge Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 56.00 0.265
NH-P 0031(44) 06F7 Various Locations Throughout the
Pierre Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 57.00 0.265
NH-P 0033(31) 06FC Various Locations Throughout the
Winner Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.218 2020 58.00 0.265
NH-P 0042(75) 06FG Various Locations Throughout the
Belle Fourche Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 59.00 0.531
NH-P 0041(163) 06FK Various Locations Throughout the
Rapid City Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 60.00 0.531
IM 0041(171) 06YA Various Routes in the Rapid City
Area
Pavement RestorationMeade
Pennington
22.1 I190N
I190S
I90E
I90W
1.328 2020 61.00 1.619
NH-P 0043(25) 06FP Various Locations Throughout the
Custer Area
2020 Areawide Pipe Work ProjectsAreawide 0.0 0.435 2020 62.00 0.531
¥ Costs reflect anticipated inflationPage 81 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0011(141) 06FR
P 0013(146) 06WW
Various Locations Throughout the
Aberdeen & Huron Areas
2020 Regionwide Approach Slab
Repair
Areawide
Regionwide
0.0 0.870 2020 63.00 1.061
P 0020(182) 06FU Various Locations Throughout the
Mitchell Region
2020 Regionwide Approach Slab
Repair
Regionwide 0.0 0.870 2020 64.00 1.061
P 0040(323) 06FY Various Locations Throughout the
Rapid City Region
2020 Regionwide Approach Slab
Repair
Regionwide 0.0 0.870 2020 65.00 1.061
NH 0012(00)289 04PF
NH 0011(119) 06VM
US12 - Through Aberdeen; Various
Locations in the Aberdeen Area
ADA Curb Ramp Upgrades; Joint
and Spall Repair
Brown 11.3 US12
US281
US281N
US281S
0.835 2020 66.00 1.019
Also Funded In:
Item Category
Americans with Disabilities Act (ADA) 1.906 2.00
Total Project Cost
2.925
P 0011(143) 06YF Various routes in the Aberdeen Area Rout and SealBrown 23.0 SD37 0.160 2020 67.00 0.195
NH 0042(81) 06YG Various Routes in the Belle Fourche
Area
Rout and SealButte
Harding
Perkins
54.1 SD73
US12
US85
0.377 2020 68.00 0.459
NH 0013(155) 06YH Various Routes in the Huron Area Rout and SealBeadle
Kingsbury
12.3 US14
US14E
US14W
0.086 2020 69.00 0.105
NH-P 0021(171) 06YJ Various Routes in the Mitchell Area Rout and SealBrule
Charles Mix
Douglas
Gregory
Hanson
Jerauld
McCook
69.0 SD38
SD44
SD45
SD46
US18
US281
0.480 2020 70.00 0.586
NH 0031(47) 06YK Various Locations in the Pierre Area Rout and SealJackson
Stanley
23.9 SD73
US14
0.167 2020 71.00 0.203
¥ Costs reflect anticipated inflationPage 82 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0041(170) 06YL Various Routes in the Rapid City
Area
Rout and SealLawrence 6.5 US385 0.046 2020 72.00 0.055
NH-P 0012(277) 06YN Various Routes in the Watertown
Area
Rout and SealCodington 11.5 SD20
US212
US81
0.080 2020 73.00 0.098
P 0033(33) 06YR Various Locations in the Winner
Area
Rout and SealJackson
Lyman
Tripp
15.6 SD44
US183
0.108 2020 74.00 0.133
IM-NH-P 0023(57) 06YT Various Locations in the Yankton
Area
Rout and SealClay
Lincoln
34.4 I29N
I29S
SD19
0.339 2020 75.00 0.413
NH-P 0011(142) 06YU Various Locations in the Aberdeen
Area
Asphalt Surface TreatmentBrown
Edmunds
Faulk
Marshall
McPherson
Roberts
83.1 SD10
SD25
SD253
SD37
SD45
US212
2.241 2020 76.00 2.735
P 0042(82) 06YV Various Locations in the Belle
Fourche Area
Asphalt Surface TreatmentButte
Harding
44.4 SD34
SD79
1.197 2020 77.00 1.461
NH-P 0043(29) 06YW Various Locations in the Custer Area Asphalt Surface TreatmentCuster
Fall River
18.5 US16A
US18E
0.499 2020 78.00 0.609
NH-P 0013(154) 06YX Various Locations in the Huron Area Asphalt Surface TreatmentBeadle
Buffalo
Faulk
Hand
Spink
34.8 SD28
SD45
US14
US212
0.937 2020 79.00 1.144
P 0021(172) 06YY Various Locations in the Mitchell
Area
Asphalt Surface TreatmentBuffalo
McCook
30.8 SD34
SD42
SD50
0.831 2020 80.00 1.015
¥ Costs reflect anticipated inflationPage 83 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0032(37) 0700 Various Routes in the Mobridge Area Asphalt Surface TreatmentCampbell
Dewey
Walworth
45.3 SD1804
SD20
1.221 2020 81.00 1.490
NH-P 0031(48) 0701 Various Routes in the Pierre Area Asphalt Surface TreatmentHaakon
Jackson
13.8 SD63
US14
0.371 2020 82.00 0.453
NH 0041(172) 0702 Various Routes in the Rapid City
Area
Asphalt Surface TreatmentMeade 17.4 SD34 0.468 2020 83.00 0.571
IM-NH-P 0012(278) 0703 Various Routes in the Watertown
Area
Asphalt Surface TreatmentBrookings
Codington
Deuel
Hamlin
Moody
Roberts
63.6 I29N
I29S
SD127
SD28
US81
1.714 2020 84.00 2.092
NH-P 0033(34) 0704 Various Routes in the Winner Area Asphalt Surface TreatmentBennett
Jackson
Mellette
Pennington
Tripp
53.1 SD240
SD377
SD44
SD73
1.430 2020 85.00 1.746
NH-P 0023(58) 0705 Various Routes in the Yankton Area Asphalt Surface TreatmentClay
Lincoln
Union
Yankton
30.1 SD11
SD153
SD19
SD46
SD50
SD50E
SD50EL
SD50W
SD50WL
SD52
0.811 2020 86.00 0.989
NH 0011(144) 0706 Various Routes in the Aberdeen
Area
Crack LevelingEdmunds 14.7 US12 0.112 2020 87.00 0.137
NH 0042(83) 0707 Various Routes in the Belle Fourche
Area
Crack LevelingHarding 20.5 US85 0.157 2020 88.00 0.191
¥ Costs reflect anticipated inflationPage 84 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH 0013(156) 0708 Various Routes in the Huron Area Pavement RestorationBeadle
Hand
20.3 US14 1.218 2020 89.00 1.487
NH 0021(173) 070A Various Routes in the Mitchell Area Pavement RestorationAurora
Gregory
McCook
19.5 US18
US281
US81
1.537 2020 90.00 1.875
NH 0031(49) 070C Various Routes in the Pierre Area Pavement RestorationHughes 7.2 US14 0.433 2020 91.00 0.528
NH-P 0023(59) 070D Various Routes in the Yankton Area Pavement RestorationHutchinson
McCook
Union
Yankton
19.2 I29L
SD46
SD50
US81
US81N
US81S
1.729 2020 92.00 2.110
Miles2020 37.929 907.0
LR 2021(00)0 06KJ 2021 Pavement Preservation
Projects Throughout South Dakota
Pavement PreservationStatewide 0.0 20.681 2021 93.00 25.236
This project is a "funding placeholder" to show any difference between the total amount programmed and the
estimated annual programmed amount.
NH-P 0011(117) 06EC Various Locations Throughout the
Aberdeen Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 94.00 0.541
NH-P 0012(228) 06EH Various Locations Throughout the
Watertown Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 95.00 0.541
NH-P 0013(56) 06EL Various Locations Throughout the
Huron Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 96.00 0.541
NH-P 0022(71) 06EQ Various Locations Throughout the
Sioux Falls Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 97.00 0.271
NH-P 0023(56) 06EV Various Locations Throughout the
Yankton Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 98.00 0.271
¥ Costs reflect anticipated inflationPage 85 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-P 0021(170) 06F0 Various Locations Throughout the
Mitchell Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 99.00 0.271
NH-P 0032(35) 06F4 Various Locations Throughout the
Mobridge Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 100.00 0.271
NH-P 0031(45) 06F8 Various Locations Throughout the
Pierre Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 101.00 0.271
NH-P 0033(32) 06FD Various Locations Throughout the
Winner Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.222 2021 102.00 0.271
NH-P 0042(78) 06JP Various Locations Throughout the
Belle Fourche Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 103.00 0.541
NH-P 0041(168) 06FL Various Locations Throughout the
Rapid City Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 104.00 0.541
NH-P 0043(27) 06FQ Various Locations Throughout the
Custer Area
2021 Areawide Pipe Work ProjectsAreawide 0.0 0.444 2021 105.00 0.541
IM-NH-P 0012(276) 06FT Various Locations Throughout the
Watertown Area
2021 Regionwide Approach Slab
Repair
Regionwide 0.0 0.888 2021 106.00 1.082
P 0020(186) 06FV Various Locations Throughout the
Mitchell Region
2021 Regionwide Approach Slab
Repair
Regionwide 0.0 0.888 2021 107.00 1.082
P 0300(31) 06FX Various Locations Throughout the
Pierre Region
2021 Regionwide Approach Slab
Repair
Regionwide 0.0 0.888 2021 108.00 1.082
P 0040(331) 06G0 Various Locations Throughout the
Rapid City Region
2021 Regionwide Approach Slab
Repair
Regionwide 0.0 0.888 2021 109.00 1.082
Miles2021 34.436 0.0
NH-P 0043(28) 06UX Various Locations Throughout the
Custer Area
2022 Areawide Pipe Work ProjectsAreawide 0.0 0.497 2022 110.00 0.552
¥ Costs reflect anticipated inflationPage 86 HC65Coding.rpt
By Category
¥¥
Pavement Preservation Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
LR 2022(00)0 06LA 2022 Pavement Preservation
Projects Throughout South Dakota
Pavement PreservationStatewide 0.0 22.793 2022 111.00 27.814
This project is a "funding placeholder" to show any difference between the total amount programmed and the
estimated annual programmed amount.
P 0020(195) 06UQ Various Locations Throughout the
Mitchell Region
2022 Regionwide Approach Slab
Repair
Regionwide 0.0 0.905 2022 112.00 1.104
NH-P 0041(169) 06UR Various Locations Throughout the
Rapid City Area
2022 Areawide Pipe Work ProjectsAreawide 0.0 0.453 2022 113.00 0.552
NH-P 0042(79) 06UT Various Locations Throughout the
Belle Fourche Area
2022 Areawide Pipe Work ProjectsAreawide 0.0 0.453 2022 114.00 0.552
NH-P 0011(120) 06WA Various Locations Throughout the
Aberdeen Area
2022 Areawide Pipe Work ProjectsAreawide 0.0 0.453 2022 115.00 0.552
NH-P 0012(272) 06WC Various Locations Throughout the
Watertown Area
2022 Areawide Pipe Work ProjectsAreawide 0.0 0.453 2022 116.00 0.552
NH-P 0013(115) 06WD Various Locations Throughout the
Huron Area
2022 Areawide Pipe Work ProjectsAreawide 0.0 0.453 2022 117.00 0.552
P 0030(42) 06WE Various Locations Throughout the
Pierre Region
2022 Regionwide Approach Slab
Repair
Regionwide 0.0 0.905 2022 118.00 1.104
P 0040(336) 06WF Various Locations Throughout the
Rapid City Region
2022 Regionwide Approach Slab
Repair
Regionwide 0.0 0.905 2022 119.00 1.104
Miles2022 34.438 0.0
¥ Costs reflect anticipated inflationPage 87 HC65Coding.rpt
By Category
¥¥
Miscellaneous
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
SS FY19(02) 05HH DBE Supportive Services for CY19 DBE Supportive Services for CY19Statewide 0.0 0.121 2019 1.00 0.134
P DBEC(24)19 05HJ DBEC Certification Services
Statewide for CY2019
DBEC Certification Services
Statewide for CY2019
Statewide 0.0 0.061 2019 2.00 0.068
SS FY19(03) 05HK On The Job Training and Support
Services (OJT/SS) Work Program
Anticipated funding for FY2019 On
The Job Training and Support
Services (OJT/SS) Work Program
Statewide 0.0 0.038 2019 3.00 0.043
P 000S(00)27 05HL Statewide Wetland Mitigation BankingStatewide 0.0 0.000 2019 4.00 1.040
P 000S(380) 065Q Statewide NSTI Program Grant for FY2019Statewide 0.0 0.019 2019 5.00 0.021
P 00SW(55)214 04C4 Brown County near Aberdeen Wetland Bank Site ConstructionBrown 0.0 0.929 2019 6.00 1.032
P 00SW(63) 065G Turner County Near Davis, SE 1/4 &
NE 1/4, SEC 36, T98N, R52W
Wetland Bank Site ConstructionTurner 0.0 1.099 2019 7.00 1.220
Miles2019 3.558 0.0
SS FY20(02) 05WU DBE Supportive Services for CY20 DBE Supportive Services for CY20Statewide 0.0 0.123 2020 8.00 0.137
P DBEC(25)20 05WV DBEC Certification Services
Statewide for CY2020
DBEC Certification Services
Statewide for CY2020
Statewide 0.0 0.063 2020 9.00 0.069
SS FY20(03) 05WW On The Job Training and Support
Services (OJT/SS) Work Program
Anticipated funding for FY2020 On
The Job Training and Support
Services (OJT/SS) Work Program
Statewide 0.0 0.039 2020 10.00 0.044
P 000S(00)28 05WX Statewide Wetland Mitigation BankingStatewide 0.0 0.000 2020 11.00 1.061
P 000S(381) 06DG Statewide NSTI Program Grant for FY2020Statewide 0.0 0.019 2020 12.00 0.021
¥ Costs reflect anticipated inflationPage 88 HC65Coding.rpt
By Category
¥¥
Miscellaneous
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
Miles2020 1.332 0.0
P 000S(00)29 06CC Statewide Wetland Mitigation BankingStatewide 0.0 0.000 2021 13.00 1.082
P DBEC(26)21 06C8 DBEC Certification Services
Statewide for CY2021
DBEC Certification Services
Statewide for CY2021
Statewide 0.0 0.065 2021 14.00 0.073
SS FY21(02) 06C9 DBE Supportive Services for CY21 DBE Supportive Services for CY21Statewide 0.0 0.130 2021 15.00 0.144
SS FY21(03) 06CA On The Job Training and Support
Services (OJT/SS) Work Program
Anticipated funding for FY2021 On
The Job Training and Support
Services (OJT/SS) Work Program
Statewide 0.0 0.044 2021 16.00 0.049
P 000S(382) 06DK Statewide NSTI Program Grant for FY2021Statewide 0.0 0.019 2021 17.00 0.022
Miles2021 1.370 0.0
P 000S(00)30 06KK Statewide Wetland Mitigation BankingStatewide 0.0 0.000 2022 18.00 1.104
P DBEC(27)22 06KP DBEC Certification Services
Statewide for CY2022
DBEC Certification Services
Statewide for CY2022
Statewide 0.0 0.066 2022 19.00 0.074
SS FY22(02) 06KT On The Job Training and Support
Services (OJT/SS) Work Program
Anticipated funding for FY2022 On
The Job Training and Support
Services (OJT/SS) Work Program
Statewide 0.0 0.045 2022 20.00 0.050
P 000S(398) 06WG Statewide NSTI Program Grant for FY2022Statewide 0.0 0.020 2022 21.00 0.022
Miles2022 1.250 0.0
¥ Costs reflect anticipated inflationPage 89 HC65Coding.rpt
By Category
¥¥
Recreational Trails Program Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NRT FY19(01) 0500 Statewide 2019 Various Recreation Trails
Projects
Statewide 0.0 0.983 2019 1.00 1.200
Miles2019 1.200 0.0
NRT FY20(01) 0501 Statewide 2020 Various Recreation Trails
Projects
Statewide 0.0 0.983 2020 2.00 1.200
Miles2020 1.200 0.0
NRT FY21(01) 0502 Statewide 2021 Various Recreation Trails
Projects
Statewide 0.0 0.205 2021 3.00 0.250
NH 0083(87)42 06L6 US83 - Fm Pony Street in Horse
Creek N to White River
Shared Use Path Construction and
Lighting
Mellette 2.2 US83 0.777 2021 4.00 0.948
Miles2021 1.198 2.2
NRT FY22(01) 0503 Statewide 2022 Various Recreation Trails
Projects
Statewide 0.0 1.040 2022 5.00 1.269
Miles2022 1.269 0.0
¥ Costs reflect anticipated inflationPage 90 HC65Coding.rpt
By Category
¥¥
County Secondary and Off System Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 6209(11) 042U From US212 at Faulkton, N 10.4 mi.
on 353 Ave. to SD20 (Co. Hwy 11,
Wecota Road)
Milling, Base Course, Gravel, Pipe,
AC Overlay (0.4 mi. in Faulkton)
Faulk 10.4 1.504 2019 1.00 2.754
Total = $2.7: $1.8 = STP/Match, Local = $0.9
P-PH 6147(12) 02SN Day County #01 from 142 St. on the
S side of at Waubay, S 2 miles on
446 Ave., East 1 mile on 144 St.,
and S 3 miles on 447 Ave. to 147 St.
RSI Category Day Co. Rd. #1 (447th
Ave.) Between 145th St. and 147th
St.
Grading, Base Course, AC
Surfacing, RSI Category - Grading
to Correct Horizontal & Vertical
Alignment, Reduce Shoulder Drop
Off, & Lengthen Pipe.
Day 6.0 2.623 2019 2.00 3.200
Also Funded In:
Item Category
Roadway Safety Improvement 0.500 3.00
Total Project Cost
3.700
Total = $2.58; STPw/Match = $1.445; Local or SIB = $0.635; RSI = $0.5
P 000S(00)219 04LU Various Locations in the Rapid City
Region
County Pavement MarkingRegionwide 0.0 0.000 2019 3.00 0.156
$0.156 - State funds at 60/40 (State - $0.094, County - $0.062)
P 000S(00)220 04LV Various Locations in the Aberdeen
Region
County Pavement MarkingRegionwide 0.0 0.000 2019 4.00 0.264
$0.264 - State funds at 60/40 (State - $0.158, County - $0.106)
P 000S(00)225 04LW Various Locations in the Mitchell
Region
County Pavement MarkingRegionwide 0.0 0.000 2019 5.00 0.372
$0.372 - State funds at 60/40 (State - $0.223, County - $0.149)
P 000S(00)226 04LX Various Locations in the Pierre
Region
County Pavement MarkingRegionwide 0.0 0.000 2019 6.00 0.042
$0.042 - State funds at 60/40 (State - $0.025, County - $0.017)
P 6480(04) 5777 Sheridan Lake Road from Jct. of
US385 to Alberta Road
Grading, Base Course, C&G, AC
Surfacing
Pennington 9.7 4.453 2019 7.00 9.500
Total = $9.5; STP/Match = $5.434; Local Funds = $4.066
Miles2019 16.288 26.1
¥ Costs reflect anticipated inflationPage 91 HC65Coding.rpt
By Category
¥¥
County Secondary and Off System Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 0043(00) 049U Fm SD471 to Provo W and NW to
Igloo apppx. 2 mi
Grading, Gravel Surfacing, ROW,
Obliteration of Existing Roadway
and Strs.
Fall River 2.0 0.000 2020 8.00 3.003
P 000S(00)221 04LY Various Locations in the Rapid City
Region
County Pavement MarkingRegionwide 0.0 0.000 2020 9.00 0.156
$0.156 - State funds at 60/40 (State - $0.094, County - $0.062)
P 000S(00)222 04M0 Various Locations in the Aberdeen
Region
County Pavement MarkingRegionwide 0.0 0.000 2020 10.00 0.264
$0.264 - State funds at 60/40 (State - $0.158, County - $0.106)
P 000S(00)223 04M1 Various Locations in the Mitchell
Region
County Pavement MarkingRegionwide 0.0 0.000 2020 11.00 0.372
$0.372 - State funds at 60/40 (State - $0.223, County - $0.149)
P 000S(00)224 04M2 Various Locations in the Pierre
Region
County Pavement MarkingRegionwide 0.0 0.000 2020 12.00 0.042
$0.042 - State funds at 60/40 (State - $0.025, County - $0.017)
Miles2020 3.837 2.0
P 000S(00)225 04M3 Various Locations in the Rapid City
Region
County Pavement MarkingRegionwide 0.0 0.000 2021 13.00 0.156
$0.156 - State funds at 60/40 (State - $0.094, County - $0.062)
P 000S(00)226 04M4 Various Locations in the Aberdeen
Region
County Pavement MarkingRegionwide 0.0 0.000 2021 14.00 0.264
$0.264 - State funds at 60/40 (State - $0.158, County - $0.106)
P 000S(00)227 04M5 Various Locations in the Mitchell
Region
County Pavement MarkingRegionwide 0.0 0.000 2021 15.00 0.372
$0.372 - State funds at 60/40 (State - $0.223, County - $0.149)
P 000S(00)228 04M6 Various Locations in the Pierre
Region
County Pavement MarkingRegionwide 0.0 0.000 2021 16.00 0.042
$0.042 - State funds at 60/40 (State - $0.025, County - $0.017)
Miles2021 0.834 0.0
¥ Costs reflect anticipated inflationPage 92 HC65Coding.rpt
By Category
¥¥
Local Bridge Replacement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
BRO 8027(29) 00QR Structure 2 W & 0.1 S of SD44/SD47
Over a Creek SN 27-030-081
Structure & Approach GradingGregory 0.2 0.227 2019 1.00 0.284
BRF 6403(09) 02JT Structure 0.6W & 0.1S of Rochford
over Rapid Creek SN 52-162-272
Structure & Approach GradingPennington 0.2 0.320 2019 2.00 0.400
BRO 8042(09) 6093 Structure 8 S & 1.6 E of Lennox
Over Snake Creek SN 42-036-190
Structure & Approach GradingLincoln 0.2 0.227 2019 3.00 0.284
BRO 8052(49) 6890 0.4 E & 0.3 N of Hill City Over Major
Lake Spillway (City Owned) SN
52-245-404
Structure & Approach GradingPennington 0.2 0.227 2019 4.00 0.284
BRO 8017(05) 00Z3 Structure 0.2N of Hermosa over a
creek (Structure owned by City of
Hermosa) SN 17-434-018
Structure & Approach GradingCuster 0.2 0.227 2019 5.00 0.284
BRO 8027(31) 02E9 Structure 1S & 0.1W of Herrick over
a creek SN 27-169-280
Structure & Approach GradingGregory 0.2 0.256 2019 6.00 0.320
BRO 8068(13) 04N4 Structure 7.6N & 2.3E of Lesterville
over a creek SN 68-043-014
Structure & Approach GradingYankton 0.0 0.747 2019 7.00 0.934
BRF 6332(02) 05LX Structure 6.1E of Center over the
East Fork of the Vermillion River
(245 St.) SN 44-191-010
Structure & Approach GradingMcCook 0.2 0.339 2019 8.00 0.423
P NBIS(38) 04MA Statewide 2019 Bridge Inspections, Scour
Analysis
Statewide 0.0 0.960 2019 9.00 1.200
BRO 8052(00)16-2 05R2 Structure Cherry & E St. James
(Cherry Ave.) in Rapid City over
Rapid Creek SN 52-427-308
Structure Preservation - Bridge
Improvement Grant (BIG) Projects
Pennington 0.0 0.000 2019 10.00 0.150
BIG Cap = $120,000
BRO 8052(00)16-1 05R1 Structure 0.1N of 12th & Omaha on
Twelfth St. in Rapid City over Rapid
Creek SN 52-408-298
Structure Preservation - Bridge
Improvement Grant (BIG) Projects
Pennington 0.0 0.000 2019 11.00 0.230
BIG Cap = $184,000
¥ Costs reflect anticipated inflationPage 93 HC65Coding.rpt
By Category
¥¥
Local Bridge Replacement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
BRO 8049(00) 02EC Structure 5S & 6.6W of Howard over
Rock Creek SN 49-094-180
Structure & Approach GradingMiner 0.2 0.000 2019 12.00 0.634
BRO 8041(00) 01KP Structure 2E & 5.5N of Spearfish
over the Redwater River SN
41-110-008
Structure & Approach GradingLawrence 0.2 0.000 2019 13.00 0.469
BRO 8041(00) 01KN Structure 4.5N & 2W of Spearfish
over the Redwater River SN
41-070-012
Structure & Approach GradingLawrence 0.2 0.000 2019 14.00 0.469
BRO 8040(00) 02EF Structure at 111 Garfield Ave. in
Madison over Park Creek (City
owned) SN 40-132-132
Structure & Approach GradingLake 0.2 0.000 2019 15.00 0.580
BRO 8030(00) 04M7 Structure 5E & 18.7S of Miller, on
365 Ave., over a creek SN
30-210-447
Structure & Approach GradingHand 0.2 0.000 2019 16.00 0.284
BRO 8014(00) 5756 Structure 7.5E & 5.1S of Irene over
Frog Creek on Norwegian Ave. just
S. of 302 St. SN 14-075-051
Structure & Approach GradingClay 0.2 0.000 2019 17.00 0.530
BRO 8003(09) H086 7.6 S & 2 W of Cavour Over Pearl
Creek SN 03-310-256
Structure & Approach GradingBeadle 0.2 0.320 2019 18.00 0.400
BRO 8002(11) 03F4 Structure 5E & 4.1N of Plankinton,
on 391 Ave., over a creek SN
02-210-109
Structure & Approach GradingAurora 0.2 0.280 2019 19.00 0.350
BRO 8002(00) 043K Structure 5E & 2.6N of Plankinton
over a creek (391 Ave.) SN
02-210-124
Structure & Approach GradingAurora 0.2 0.000 2019 20.00 0.400
BRF 6591(07) 05LV Structure 1.5N of Worthing over
Beaver Creek SN 42-080-107
Structure & Approach GradingLincoln 0.2 0.500 2019 21.00 0.625
BRF 6463(00)16-1 05QV Structure 0.2W & 0.3N of Burdock
on Co. Rd 21 over a creek SN
24-029-014
Structure Preservation - Bridge
Improvement Grant (BIG) Projects
Fall River 0.0 0.000 2019 22.00 0.237
BIG Cap = $189,684.80
¥ Costs reflect anticipated inflationPage 94 HC65Coding.rpt
By Category
¥¥
Local Bridge Replacement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
BRF 6418(00) 02ER Structure 7S & 2.6E of Carthage
over Rock Creek SN 49-096-090
Structure & Approach GradingMiner 0.2 0.000 2019 23.00 0.350
BRF 6377(00) 03H9 Structure 4W & 2.8S of Fairview, on
482 Ave., over a creek SN
42-180-223
Structure & Approach GradingLincoln 0.2 0.000 2019 24.00 0.630
BRF 6358(04) 01WJ Structure 3S & 1.7W of Chancellor
over the Vermillion River SN
63-194-120
Structure & Approach GradingTurner 0.2 0.976 2019 25.00 1.220
BRF 6319(00)17-4 06HT Structure 7.9S of Brookings on 471st
Ave. over a creek SN 06-169-239
Structure Replacement - Bridge
Improvement Grant (BIG) Project
Brookings 0.2 0.000 2019 26.00 1.348
BIG Cap = $1,078,600
BRF 6304(00) 02EG Structure at 509 Center St. E in
Madison over Madison Creek (City
owned) SN 40-131-132
Structure & Approach GradingLake 0.2 0.000 2019 27.00 0.400
BRF 6259(06) 03GU Structure 0.5E of White Horse, over
a creek SN 21-313-140
Structure & Approach Grading,
ROW, Utilities
Dewey 0.2 0.472 2019 28.00 0.590
BRF 6140(08) 01DX Structure 2.9N of Witten over
Cottonwood Creek SN 62-080-201
Structure & Approach GradingTripp 0.2 0.416 2019 29.00 0.520
BRO 8058(00) 05LY Structure 2.2N & 0.1E of Athol over
Snake Creek (162 St.) SN
58-061-140
Structure & Approach GradingSpink 0.2 0.000 2019 30.00 0.520
BRF 1618(00)16-3 05R3 Structure 1.8N of Jct of US16B on
Cambell St. in Rapid City over a
creek SN 52-430-312
Structure Preservation - Bridge
Improvement Grant (BIG) Projects
Pennington 0.0 0.000 2019 31.00 0.358
BIG Cap = $286,000
BRO 8044(08) 02E2 Structure 8.5 S & 1.1 E of Montrose
over the East Fork of the Vermillion
River SN 44-221-090
Structure & Approach GradingMcCook 0.2 0.680 2019 32.00 0.850
BRO 8018(07) 03GR Structure 2W & 13.4S of Mitchell, on
407 Ave., over South Fork of Twelve
Mile Creek SN 18-130-234
Structure & Approach GradingDavison 0.2 0.280 2019 33.00 0.350
¥ Costs reflect anticipated inflationPage 95 HC65Coding.rpt
By Category
¥¥
Local Bridge Replacement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
BRF 6197(02) 04VJ Structure 8E & 2.6S of Parkston
over North Branch of Dry Creek SN
34-140-096 (27760 418 Ave.)
Structure & Approach GradingHutchinson 0.2 0.624 2019 34.00 0.780
BRF 3103(00)18-2 06V7 Structure on State Line East of
Hudson on 294th Street over the Big
Sioux River SN 42-244-255
Structure Preservation - Bridge
Improvement Grant
Lincoln 0.2 0.000 2019 35.00 0.319
BIG Cap = $255,400
BRF 3710(00)18-1 06V8 Structure 0.4N of Junction I-90 Loop
in Mitchell on Sanborn St. over SD
owned RR SN 18-149-095 (City
Owned)
Structure Preservation - Bridge
Improvement Grant
Davison 0.2 0.000 2019 36.00 0.966
BIG Cap = $773,000
BRF 6152(00)18-2 06VA 12E of Hermosa on Spring Creek
Cutoff over Spring Creek SN
17-547-020
Structure Preservation - Bridge
Improvement Grant
Custer 0.2 0.000 2019 37.00 0.114
BIG Cap = $91,300
BRF 6167(00)17-1 06HK Structure 5W & 26.6S of Bison on
Bixby Road over Moreau River SN
53-195-556
Structure Preservation - Bridge
Improvement Grant (BIG) Projects
Perkins 0.2 0.000 2019 38.00 0.267
BIG Cap = $195,600
BRF 6230(00)18-1 06V3 Structure 0.5S & 6.5W of Big Stone
on 145 St. over the North Fork
Whetstone River SN 26-309-029
Structure Preservation - Bridge
Improvement Grant
Grant 0.2 0.000 2019 39.00 0.411
BIG Cap = $328,500
BRF 6230(00)18-2 06V4 Structure 0.6S & 2.4W of Big Stone
on 165 St. over the Whetstone River
SN 26-352-030
Structure Preservation - Bridge
Improvement Grant
Grant 0.2 0.000 2019 40.00 0.369
BIG Cap = $295,600
BRF 6230(00)18-3 06V5 Structure 1S & 1.5W of Big Stone on
485 Ave. over the Burlington
Northern RR SN 26-360-032
Structure Preservation - Bridge
Improvement Grant
Grant 0.2 0.000 2019 41.00 0.477
BIG Cap = $382,000
BRF 6251(00)18-1 06VK Structure 4N of Columbia on 396th
Ave. over the James River SN
07-200-184
Structure Replacement - Bridge
Improvement Grant
Brown 0.2 0.000 2019 42.00 1.879
BIG Cap = $939,700
¥ Costs reflect anticipated inflationPage 96 HC65Coding.rpt
By Category
¥¥
Local Bridge Replacement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
BRF 6312(00)18-1 06VH Structure 4S & 2.3W of Brookings on
216th Street over the Big Sioux River
SN 06-147-200
Structure Replacement - Bridge
Improvement Grant
Brookings 0.2 0.000 2019 43.00 1.623
BIG Cap = $811,800
BRF 6319(00)18-2 06VJ Structure 7.8S of Brookings on 471st
Street over the Big Sioux River SN
06-169-238
Structure Replacement - Bridge
Improvement Grant
Brookings 0.2 0.000 2019 44.00 2.086
BIG Cap = $1,042,900
BRF 6472(00)17-1 06HU Structure 3S & 1E of Westport on
123rd St. over the Elm River SN
07-120-230
Structure Replacement - Bridge
Improvement Grant (BIG) Project
Brown 0.2 0.000 2019 45.00 1.812
BIG Cap = $818,900
BRF 6546(00)18-1 06V6 Structure 1.6S & 0.6E of Canton on
283rd St. over the Big Sioux River
SN 42-175-153
Structure Preservation - Bridge
Improvement Grant
Lincoln 0.2 0.000 2019 46.00 0.314
BIG Cap = $251,400
BRO 8003(00)17-2 06HR Structure 1E & 5.8S of Cavour on
410 Ave. over Middle Pearl Creek
SN 03-340-238
Structure Replacement - Bridge
Improvement Grant (BIG) Projects
Beadle 0.2 0.000 2019 47.00 0.545
BIG Cap = $358,600
BRO 8014(00) 6868 Structure 0.6 S & 15 E of Irene Over
Ash Creek SN 14-150-006
Structure & Approach GradingClay 0.2 0.000 2019 48.00 0.400
BRO 8015(38) 04YH Structure 11.4W and 2S of South
Shore, on 159 St., over ther Big
Sioux River SN 15-166-050
Structure & Approach GradingCodington 0.2 0.560 2019 49.00 0.700
BRO 8017(00)18-1 06V9 Structure 11E & 2S of Fairburn on
Bison Lane over French Creek SN
17-540-147
Structure Preservation - Bridge
Improvement Grant
Custer 0.2 0.000 2019 50.00 0.155
BIG Cap = $124,300
BRO 8017(00)18-3 06VL Structure 2S & 10.5E of Fairburn on
E. French Creek Rd. over French
Creek SN 17-535-143
Structure Replacement - Bridge
Improvement Grant
Custer 0.2 0.000 2019 51.00 0.582
BIG Cap = $465,500
¥ Costs reflect anticipated inflationPage 97 HC65Coding.rpt
By Category
¥¥
Local Bridge Replacement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
BRO 8018(00)17-1 06HW Structure 15W & 5.9N of Mitchell on
394th Ave. over Firesteel Creek SN
18-000-041
Structure Replacement - Bridge
Improvement Grant (BIG) Project
Davison 0.2 0.000 2019 52.00 0.971
BIG Cap = $776,400
BRO 8018(00)17-2 06HV Structure 1.5S & 1W of Loomis on
404th Ave. over Firesteel Creek SN
18-100-052
Structure Replacement - Bridge
Improvement Grant (BIG) Project
Davison 0.2 0.000 2019 53.00 1.150
BIG Cap = $846,400
BRO 8024(00)18-1 06VF Structure at Jennings and River in
Hot Springs on Jennings Ave. over
the Fall River SN 24-292-033 (City
Owned)
Structure Replacement - Bridge
Improvement Grant
Fall River 0.2 0.000 2019 54.00 1.512
BIG Cap = $1,209,800
BRO 8053(00)18-1 06VC Structure 15.9E & 12.4S of Bison on
Foster Road over Thunder Butte
Creek SN 53-399-414
Structure Preservation - Bridge
Improvement Grant
Perkins 0.2 0.000 2019 55.00 0.191
BIG Cap = $152,700
BRO 8056(00) 02E3 Structure 0.5E & 3.4N of Artesian
over a creek SN 56-210-096
Structure & Approach GradingSanborn 0.2 0.000 2019 56.00 0.480
BRO 8064(00)17-2 06HY Structure 5.4E & 1.5S of Alcester on
484th Ave. on a creek SN
64-144-055
Structure Replacement - Bridge
Improvement Grant (BIG) Project
Union 0.2 0.000 2019 57.00 0.846
BIG Cap = $439,900
BRO 8069(00)17-1 06HQ Structure 5.5N & 8.5W of Red Elm
on IRR Co. Rd over Flint Rock Creek
SN 69-030-234
Structure Preservation - Bridge
Improvement Grant (BIG) Projects
Ziebach 0.2 0.000 2019 58.00 0.301
BIG Cap = $215,700
Miles2019 36.157 10.4
BRO 8024(14) 02E8 Structure 4E & 1.8N of Edgemont
over abandoned RR line SN
24-162-102
Structure & Approach GradingFall River 0.2 0.966 2020 59.00 1.208
P NBIS(39) 04MC Statewide 2020 Bridge Inspections, Scour
Analysis
Statewide 0.0 1.680 2020 60.00 2.100
¥ Costs reflect anticipated inflationPage 98 HC65Coding.rpt
By Category
¥¥
Local Bridge Replacement Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
Miles2020 3.308 0.2
P NBIS(40) 04MD Statewide 2021 Bridge Inspections, Scour
Analysis
Statewide 0.0 0.960 2021 61.00 1.200
Miles2021 1.200 0.0
P NBIS(42) 04MG Statewide 2022 Bridge Inspections, Scour
Analysis
Statewide 0.0 1.680 2022 62.00 2.100
Miles2022 2.100 0.0
¥ Costs reflect anticipated inflationPage 99 HC65Coding.rpt
By Category
¥¥
Special Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
EM 6403(06) 00CL South Rochford Rd fm Rochford SW
to Deerfield Rd
Grading, Drainage, Base Course,
Asphalt Concrete, & PE For
Structure #52-162-272
Pennington 9.5 8.355 2019 1.00 10.196
Total Project Estimated at $10.4 mill. ($7.65 in Earmark Funds, & $2.35 in Local Funds & $0.4 in Bridge
Funds.)
IM-P Z410(17) 06X8 Statewide Environmental Sensor Station
Deployment, Maintenance, and
Operation CY2019
Statewide 0.0 0.286 2019 2.00 0.350
Also Funded In:
Item Category
Interstate Maintenance Projects 0.275 20.00
Total Project Cost
0.625
Miles2019 10.546 9.5
IM-P Z410(18) 06X9 Statewide Environmental Sensor Station
Deployment, Maintenance, and
Operation CY2020
Statewide 0.0 0.292 2020 3.00 0.357
Also Funded In:
Item Category
Interstate Maintenance Projects 0.280 34.00
Total Project Cost
0.637
Miles2020 0.357 0.0
IM-P Z410(19) 06XA Statewide Environmental Sensor Station
Deployment, Maintenance, and
Operation CY2021
Statewide 0.0 0.298 2021 4.00 0.364
Also Funded In:
Item Category
Interstate Maintenance Projects 0.286 46.00
Total Project Cost
0.650
Miles2021 0.364 0.0
IM-P Z410(20) 06XC Statewide Environmental Sensor Station
Deployment, Maintenance, and
Operation CY2022
Statewide 0.0 0.304 2022 5.00 0.371
Also Funded In:
Item Category
Interstate Maintenance Projects 0.291 63.00
Total Project Cost
0.662
Miles2022 0.371 0.0
¥ Costs reflect anticipated inflationPage 100 HC65Coding.rpt
By Category
¥¥
Highway Systems Management
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P 00SW(00)2019 050K Statewide Right of Way AcquisitionStatewide 0.0 0.000 2019 1.00 2.000
Miles2019 2.000 0.0
P 00SW(00)2020 050L Statewide Right of Way AcquisitionStatewide 0.0 0.000 2020 2.00 2.000
Miles2020 2.000 0.0
P 00SW(00)2021 050G Statewide Right of Way AcquisitionStatewide 0.0 0.000 2021 3.00 2.000
Miles2021 2.000 0.0
P 00SW(00)2022 050J Statewide Right of Way AcquisitionStatewide 0.0 0.000 2022 4.00 2.000
Miles2022 2.000 0.0
¥ Costs reflect anticipated inflationPage 101 HC65Coding.rpt
By Category
¥¥
Transportation Alternative Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
LR 2019(00)0 05KD Various Locations Throughout South
Dakota
2019 Statewide Transportation
Alternative Program Projects
Statewide 0.0 1.721 2019 1.00 2.100
This project is a "funding placeholder" to show any difference between the total amount programmed and the
estimated annual programmed amount.
P TAPU(19) 062K In Aberdeen 15th Ave. Trail from
Dakota St. N to Second St. N.
PE, CE and Construction of
Shared Use Path
Brown 0.0 0.432 2019 2.00 0.527
P TAPR(23) 062Q In Custer Extending from the
Intersection of Eleventh St. and the
Custer State Park Spur Trail of the
Mickelson Trail and Ending at the
Custer School Complex on Bluebell
Lane.
PE, CE and Construction of
Shared Use Path
Custer 0.0 0.432 2019 3.00 0.634
P TAPU(20) 062L In Piedmont N 2nd St from City Hall
to Piedmont Valley Elementary
School and 3rd St from Chestnut St
to Main St.
PE, CE and Construction of
Sidewalk
Meade 0.0 0.216 2019 4.00 0.264
P TAPU(23) 06Y5 In Harrisburg, on the North Side of
Willow St./CR110, from East of
SD115 to East of Columbia St.
Shared Use Path ConstructionLincoln 1.4 0.443 2019 5.00 0.750
PE completed under P TAPU(01) PCN 04Q8.
Miles2019 4.275 1.4
P TAPR(12) 05CD Whitewood - Along Laurel St. from
Meade St. to Custer St.
PE, CE and Construction of
Shared Use Path
Lawrence 0.1 0.150 2020 6.00 0.183
P TAPU(15) 05CC Rapid City - Along I-190 and SD44 /
Omaha St., from approximately 850
feet North of the Rapid Creek Bridge
along I190, to N. Mount Rushmore
Rd.
PE, CE and Construction of
Shared Use Path
Pennington 0.5 0.138 2020 7.00 0.169
LR 2020(00)0 05X2 Various Locations Throughout South
Dakota
2020 Statewide Transportation
Alternative Program Projects
Statewide 0.0 0.561 2020 8.00 0.684
This project is a "fund placeholder" to show any difference between the total amount programmed and the
estimated annual programmed amount.
¥ Costs reflect anticipated inflationPage 102 HC65Coding.rpt
By Category
¥¥
Transportation Alternative Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
P TAPU(21) 06N6 North Sioux City along Streeter Drive
between River Drive and Bruneau
Drive
CE and Construction of Shared
Use Path
Union 0.4 0.219 2020 9.00 0.292
P TAPU(22) 06N7 Crooks along West Avenue from
Main St. to Executive Ave.
CE and Construction of Shared
Use Path & Install RR Crossing
Minnehaha 0.0 0.297 2020 10.00 0.362
P TAPR(27) 06NA Salem along Dakota Street from
Essex Ave. to Center Ave., Center
Ave. from Dakota St. to Main St. and
Main St from Center Ave to Lightner
Ave.
CE and Construction of Shared
Use Path
McCook 0.0 0.379 2020 11.00 0.510
P TAPR(28) 06NC Faulkton Various Sites Along US212
from 12th Ave to 9th Ave. and 9th
Ave. from US 212 to Faulkton Ave.
and 10th Ave from US212 to Court
St. and Court St. from 11th ave. to
10th Ave.
CE and Construction of a 5'
sidewalk
Faulk 0.0 0.095 2020 12.00 0.119
P TAPR(29) 06ND Valley Springs along Valley Drive
from Lynx St. to Broadway Ave.
CE and Construction of Shared
Use Path
Minnehaha 0.0 0.109 2020 13.00 0.133
Miles2020 2.452 1.0
P TAPU(09) 04UA Rapid City - On the east side of
Cambell St. from the end of the side
path south of Rocker Dr., N to E.
Omaha St./Hwy. 44.
PE, CE and Construction of
Shared Use Path
Pennington 0.9 0.470 2021 14.00 0.573
LR 2021(00)0 06L1 Various Locations Throughout South
Dakota
2021 Statewide Transportation
Alternative Program Projects
Statewide 0.0 1.788 2021 15.00 2.182
This project is a "funding placeholder" to show any difference between the total amount programmed and the
estimated annual programmed amount.
Miles2021 2.755 0.9
LR 2022(00)0 06L2 Various Locations Throughout South
Dakota
2022 Statewide Transportation
Alternative Program Projects
Statewide 0.0 2.258 2022 16.00 2.755
This project is a "funding placeholder" to show any difference between the total amount programmed and the
estimated annual programmed amount.
¥ Costs reflect anticipated inflationPage 103 HC65Coding.rpt
By Category
¥¥
Transportation Alternative Projects
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
Miles2022 2.755 0.0
¥ Costs reflect anticipated inflationPage 104 HC65Coding.rpt
By Category
¥¥
Americans with Disabilities Act (ADA)
Item Location of Project Type of ImprovementProject Number PC # County Length RouteFederal
Funds
Fiscal
YearTotal
Cost(Mil $)
NH-P 0011(00)77 04PE SD11 - Fm Aspen Blvd in Brandon,
N to Hemlock Ave in Corson
Sidewalk, ADA Curb Ramp
Upgrades & Signal Upgrade
Minnehaha 2.1 SD11 0.000 2019 1.00 0.780
Miles2019 0.780 2.1
NH 0012(00)289 04PF
NH 0011(119) 06VM
US12 - Through Aberdeen; Various
Locations in the Aberdeen Area
ADA Curb Ramp Upgrades; Joint
and Spall Repair
Brown 11.3 US12
US281
US281N
US281S
0.000 2020 2.00 1.906
Also Funded In:
Item Category
Pavement Preservation Projects 1.019 66.00
Total Project Cost
2.925
NH 0018(00)447 04PC US18 - Through Canton ADA Curb Ramp UpgradesLincoln 1.3 US18 0.000 2020 3.00 0.327
Miles2020 2.233 12.6
P 0040(00)32 04PH SD40 - Through Keystone ADA Curb Ramp Upgrades,
Sidewalks
Pennington 1.2 SD40 0.000 2021 4.00 0.207
NH 0044(00)46 04PD SD44 - Fm LaCrosse St to
Covington St in Rapid City
ADA Curb Ramp Upgrades,
Intersection Improvement,
Sidewalk
Pennington 3.4 SD44 0.000 2021 5.00 5.114
Miles2021 5.321 4.6
¥ Costs reflect anticipated inflationPage 105 HC65Coding.rpt