Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5" Page 1 of 52 STIP Agency Dist PID MPO/RTP O/Large City Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length (SLM) Ph Subph SFY SAC Fund Type Billing Code Obligation Group ALI - Qty STIP Phase Estimate Total Phase Encumbered STIP Phase Total Project Total STIP Reference ID FHWA 8 80516 OKI BUT BUT Oxford Connector Description: Re-route US 27 within Oxford to reduce vehicle-pedestrian conflict and maintain connection of US 27 to SR 73 . Work Type: New Construction Termini: US 27 to SR 73 Oxford, City of Air Quality Non-Exe DD Dtl Dsgn 2019 4R47 Federal HY20 Earmarks / High Priority $300,000 $0 $300,000 $2,453,143 2018stipID0545FDDD Ph subtotal: $300,000 $0 $300,000 $2,453,143 ENV Env PE Env PE 2018 2018 4R47 4R47 Federal Federal H640 HY20 Nt'l Cor Planning & Dev (NC Earmarks / High Priority $274,074 $3,176 $414,158 $414,158 $691,408 $691,408 $2,453,143 $2,453,143 2018stipID0545FDENV 2018stipID0545FDENV Ph subtotal: $277,250 $414,158 $691,408 $2,453,143 RW Acquis Acquis RW Serv 2019 2019 2018 4BG 4R47 4R47 Local Match Federal Federal 2 HY20 HY20 Local Match Earmarks / High Priority Earmarks / High Priority $18,000 $1,232,000 $200,000 $0 $0 $0 $1,450,000 $1,450,000 $1,450,000 $2,453,143 $2,453,143 $2,453,143 2018stipID0545FDRW 2018stipID0545FDRW 2018stipID0545FDRW Ph subtotal: $1,450,000 $0 $1,450,000 $2,453,143 96452 OKI BUT BUT CR 19 1.89 Cincinnati Dayton Description: Widening of Cincinnati Dayton Roa within the project termini, and realignment of Station Road with Lesourdsville West Chester Road, to improve its currently skewed intersection at Cincinnati Dayton Road. **This project will include construction activitie Work Type: Widening Termini: Cincinnati Dayton Road (CR-19): from West Chester Road to north of the Lesourdsville West Chester Road/Station Road intersection. BUTLER COUNTY ENGINEER Air Quality Exempt 1.36 CO CO Contr CO Contr CO Contr CO Contr CO Engr CO Engr CO Engr 2018 2018 2018 2018 2018 2018 2018 4TA7 4TA7 4TC7 LNT 4TA7 4TC7 LNT Federal Federal Federal Local Match Federal Federal Local Match M230 Z230 Z301 LNTP Z230 Z301 LNTP STBG STBG TAP/Enhancements Local Match STBG TAP/Enhancements Local Match $3,526,040 $1,893,984 $195,093 $2,970,587 $132,579 $13,657 $454,765 $0 $0 $0 $0 $0 $0 $0 $9,186,705 $9,186,705 $9,186,705 $9,186,705 $9,186,705 $9,186,705 $9,186,705 $10,496,167 $10,496,167 $10,496,167 $10,496,167 $10,496,167 $10,496,167 $10,496,167 2018stipID0546FDCO 2018stipID0546FDCO 2018stipID0546FDCO 2018stipID0546FDCO 2018stipID0546FDCO 2018stipID0546FDCO 2018stipID0546FDCO Ph subtotal: $9,186,705 $0 $9,186,705 $10,496,167 98771 OKI BUT BUT Fairfield ITS Phase 2 Description: Upgrades to the existing Central Traffic System with advanced technology including: •33 intersections: Pedestrian signals retrofitted with LED lenses & countdown modules•10 intersections: Count down pedestrian signal fixtures•11 intersections: Pedestrian Work Type: Traffic Management System Termini: City of Fairfield limits (signalized intersections, workstation, server locations) FAIRFIELD Air Quality Exempt 11.17 DD Dtl Dsgn Dtl Dsgn 2017 2017 4TB7 LNT Federal Local Match M40E LNTP CMAQ Local Match $50,000 $12,500 $0 $0 $62,500 $62,500 $3,133,319 $3,133,319 2018MODID0247FDDD 2018MODID0247FDDD Ph subtotal: $62,500 $0 $62,500 $3,133,319 ENV Env PE Env PE 2017 2017 4TB7 LNT Federal Local Match M40E LNTP CMAQ Local Match $150,000 $37,500 $0 $0 $187,500 $187,500 $3,133,319 $3,133,319 2018MODID0247FDENV 2018MODID0247FDENV Ph subtotal: $187,500 $0 $187,500 $3,133,319 Fairfield, City of Air Quality Exempt 11.17 CO CO Contr CO Contr CO Engr 2018 2018 2018 4TA7 LNT LNT Federal Local Match Local Match M230 LNTP LNTP STBG Local Match Local Match $2,133,974 $533,494 $186,723 $0 $0 $0 $2,854,191 $2,854,191 $2,854,191 $3,121,446 $3,121,446 $3,121,446 2018stipID0547FDCO 2018stipID0547FDCO 2018stipID0547FDCO Ph subtotal: $2,854,191 $0 $2,854,191 $3,121,446 98784 OKI BUT BUT CR 18 2.55 Princeton Rd Description: Widening the existing lane widths from 10 feet to 11 feet, adjusting the vertical profile, widening the paved shoulders to 5 feet, and installing edgeline rumble strips. Work Type: Widening Termini: Princeton Road (CR-18): from east of Jayfield Drive to west of SR-747 BUTLER COUNTY ENGINEER Air Quality Exempt 1.80 CO CO Contr CO Contr CO Engr CO Engr 2018 2018 2018 2018 4HB7 LNT 4HB7 LNT Federal Local Match Federal Local Match MS3E LNTP MS3E LNTP Highway Safety Imp Prog Local Match Highway Safety Imp Prog Local Match $1,598,480 $399,620 $111,920 $27,980 $0 $0 $0 $0 $2,138,000 $2,138,000 $2,138,000 $2,138,000 $2,191,733 $2,191,733 $2,191,733 $2,191,733 2018stipID0548FDCO 2018stipID0548FDCO 2018stipID0548FDCO 2018stipID0548FDCO Ph subtotal: $2,138,000 $0 $2,138,000 $2,191,733

Upload: others

Post on 20-Aug-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 1 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 80516 OKI BUT BUT Oxford Connector Description: Re-route US 27 within Oxford to

reduce vehicle-pedestrian conflict and maintain

connection of US 27 to SR 73 . Work Type:

New Construction Termini: US 27 to SR 73

Oxford, City of Air Quality Non-Exe DD Dtl Dsgn 2019 4R47 Federal HY20 Earmarks / High Priority $300,000 $0 $300,000 $2,453,143 2018stipID0545FDDD

Ph subtotal: $300,000 $0 $300,000 $2,453,143

ENV Env PE

Env PE

2018

2018

4R47

4R47

Federal

Federal

H640

HY20

Nt'l Cor Planning & Dev (NC

Earmarks / High Priority

$274,074

$3,176

$414,158

$414,158

$691,408

$691,408

$2,453,143

$2,453,143

2018stipID0545FDENV

2018stipID0545FDENV

Ph subtotal: $277,250 $414,158 $691,408 $2,453,143

RW Acquis

Acquis

RW Serv

2019

2019

2018

4BG

4R47

4R47

Local Match

Federal

Federal

2

HY20

HY20

Local Match

Earmarks / High Priority

Earmarks / High Priority

$18,000

$1,232,000

$200,000

$0

$0

$0

$1,450,000

$1,450,000

$1,450,000

$2,453,143

$2,453,143

$2,453,143

2018stipID0545FDRW

2018stipID0545FDRW

2018stipID0545FDRW

Ph subtotal: $1,450,000 $0 $1,450,000 $2,453,143

96452 OKI BUT BUT CR 19 1.89 Cincinnati

Dayton

Description: Widening of Cincinnati Dayton Road

within the project termini, and realignment of

Station Road with Lesourdsville West Chester

Road, to improve its currently skewed

intersection at Cincinnati Dayton Road. **This

project will include construction activitie Work

Type: Widening Termini: Cincinnati Dayton

Road (CR-19): from West Chester Road to

north of the Lesourdsville West Chester

Road/Station Road intersection.

BUTLER COUNTY

ENGINEER

Air Quality Exempt 1.36 CO CO Contr

CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

2018

2018

2018

2018

2018

2018

2018

4TA7

4TA7

4TC7

LNT

4TA7

4TC7

LNT

Federal

Federal

Federal

Local Match

Federal

Federal

Local Match

M230

Z230

Z301

LNTP

Z230

Z301

LNTP

STBG

STBG

TAP/Enhancements

Local Match

STBG

TAP/Enhancements

Local Match

$3,526,040

$1,893,984

$195,093

$2,970,587

$132,579

$13,657

$454,765

$0

$0

$0

$0

$0

$0

$0

$9,186,705

$9,186,705

$9,186,705

$9,186,705

$9,186,705

$9,186,705

$9,186,705

$10,496,167

$10,496,167

$10,496,167

$10,496,167

$10,496,167

$10,496,167

$10,496,167

2018stipID0546FDCO

2018stipID0546FDCO

2018stipID0546FDCO

2018stipID0546FDCO

2018stipID0546FDCO

2018stipID0546FDCO

2018stipID0546FDCO

Ph subtotal: $9,186,705 $0 $9,186,705 $10,496,167

98771 OKI BUT BUT Fairfield ITS Phase 2 Description: Upgrades to the existing Central

Traffic System with advanced technology

including: •33 intersections: Pedestrian signals

retrofitted with LED lenses & countdown

modules•10 intersections: Count down

pedestrian signal fixtures•11 intersections:

Pedestrian Work Type: Traffic Management

System Termini: City of Fairfield limits

(signalized intersections, workstation, server

locations)

FAIRFIELD Air Quality Exempt 11.17 DD Dtl Dsgn

Dtl Dsgn

2017

2017

4TB7

LNT

Federal

Local Match

M40E

LNTP

CMAQ

Local Match

$50,000

$12,500

$0

$0

$62,500

$62,500

$3,133,319

$3,133,319

2018MODID0247FDDD

2018MODID0247FDDD

Ph subtotal: $62,500 $0 $62,500 $3,133,319

ENV Env PE

Env PE

2017

2017

4TB7

LNT

Federal

Local Match

M40E

LNTP

CMAQ

Local Match

$150,000

$37,500

$0

$0

$187,500

$187,500

$3,133,319

$3,133,319

2018MODID0247FDENV

2018MODID0247FDENV

Ph subtotal: $187,500 $0 $187,500 $3,133,319

Fairfield, City of Air Quality Exempt 11.17 CO CO Contr

CO Contr

CO Engr

2018

2018

2018

4TA7

LNT

LNT

Federal

Local Match

Local Match

M230

LNTP

LNTP

STBG

Local Match

Local Match

$2,133,974

$533,494

$186,723

$0

$0

$0

$2,854,191

$2,854,191

$2,854,191

$3,121,446

$3,121,446

$3,121,446

2018stipID0547FDCO

2018stipID0547FDCO

2018stipID0547FDCO

Ph subtotal: $2,854,191 $0 $2,854,191 $3,121,446

98784 OKI BUT BUT CR 18 2.55 Princeton

Rd

Description: Widening the existing lane widths

from 10 feet to 11 feet, adjusting the vertical

profile, widening the paved shoulders to 5 feet,

and installing edgeline rumble strips. Work

Type: Widening Termini: Princeton Road

(CR-18): from east of Jayfield Drive to west of

SR-747

BUTLER COUNTY

ENGINEER

Air Quality Exempt 1.80 CO CO Contr

CO Contr

CO Engr

CO Engr

2018

2018

2018

2018

4HB7

LNT

4HB7

LNT

Federal

Local Match

Federal

Local Match

MS3E

LNTP

MS3E

LNTP

Highway Safety Imp Prog

Local Match

Highway Safety Imp Prog

Local Match

$1,598,480

$399,620

$111,920

$27,980

$0

$0

$0

$0

$2,138,000

$2,138,000

$2,138,000

$2,138,000

$2,191,733

$2,191,733

$2,191,733

$2,191,733

2018stipID0548FDCO

2018stipID0548FDCO

2018stipID0548FDCO

2018stipID0548FDCO

Ph subtotal: $2,138,000 $0 $2,138,000 $2,191,733

Page 2: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 2 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 98789 OKI BUT BUT CR113 1.00 Liberty

Fairfield

Description: Installation of a two-way left turn

lane (TWLTL), modification to the vertical profile

south of Moselle Drive, widening the existing

paved shoulders to 5 feet, and installation of

lighting at intersections. Work Type:

Realignment Termini: Liberty Fairfield Rd

(CR-113): from the SB left turn lane at Princeton

Rd to the NB left turn lane at Millikin Rd

BUTLER COUNTY

ENGINEER

Air Quality Exempt 0.98 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4HB7

LNT

4HB7

LNT

Federal

Local Match

Federal

Local Match

MS3E

LNTP

MS3E

LNTP

Highway Safety Imp Prog

Local Match

Highway Safety Imp Prog

Local Match

$3,128,470

$782,117

$218,993

$54,748

$0

$0

$0

$0

$4,184,328

$4,184,328

$4,184,328

$4,184,328

$4,241,684

$4,241,684

$4,241,684

$4,241,684

2018stipID0549FDCO

2018stipID0549FDCO

2018stipID0549FDCO

2018stipID0549FDCO

Ph subtotal: $4,184,328 $0 $4,184,328 $4,241,684

100632 OKI BUT BUT IR 75 5.52 Description: Microsurfacing a portion of IR 75 in

Butler County. Work Type: Preventive

Maintenance Termini: BUT IR 75: SLM 5.52 -

7.05

ODOT SPONSORING

AGENCY

Air Quality Exempt 1.53 DD Dtl Dsgn 2021 LAB State 2 Labor - State Match $0 $0 $0 $0 2018MODID0471XXDD

Ph subtotal: $0 $0 $0 $0

ENV Env PE 2021 LAB State 2 Labor - State Match $0 $0 $0 $0 2018MODID0471XXENV

Ph subtotal: $0 $0 $0 $0

103317 OKI BUT BUT CR 238 2.59 Lanes Mill

D-B

Description: Replacement of a deteriorating

bridge with a structure type to be determined by

the design-build team. Roadway will be widened

to improve safety for motorists. Work Type:

Bridge Replacement Termini: Bridge No.

BUT-CR 238-0259 (SFN: 0930334) which

carries Lanes Mill Road over Four Mile Creek

BUTLER COUNTY

ENGINEER

Air Quality Exempt 0.08 CO CO Contr

CO Contr

CO Engr

CO Engr

2018

2018

2018

2018

4B87

LNT

4B87

LNT

Federal

Local Match

Federal

Local Match

Z233

LNTP

Z233

LNTP

STBG

Local Match

STBG

Local Match

$1,686,915

$88,785

$118,085

$6,215

$0

$0

$0

$0

$1,900,000

$1,900,000

$1,900,000

$1,900,000

$2,126,272

$2,126,272

$2,126,272

$2,126,272

2018stipID0550FDCO

2018stipID0550FDCO

2018stipID0550FDCO

2018stipID0550FDCO

Ph subtotal: $1,900,000 $0 $1,900,000 $2,126,272

DD Dtl Dsgn

Dtl Dsgn

Dtl Dsgn

2018

2018

2018

4B87

LAB

LNT

Federal

State

Local Match

Z233

2

LNTP

STBG

Labor - State Match

Local Match

$168,692

$2,976

$8,879

$0

$0

$0

$180,546

$180,546

$180,546

$2,126,272

$2,126,272

$2,126,272

2018stipID0550FDDD

2018stipID0550FDDD

2018stipID0550FDDD

Ph subtotal: $180,546 $0 $180,546 $2,126,272

ENV Env PE 2018 LAB State 2 Labor - State Match $16,864 $27,653 $44,517 $2,126,272 2018stipID0550FDENV

Ph subtotal: $16,864 $27,653 $44,517 $2,126,272

RW RW Serv 2018 LAB State 2 Labor - State Match $1,209 $0 $1,209 $2,126,272 2018stipID0550FDRW

Ph subtotal: $1,209 $0 $1,209 $2,126,272

103371 OKI BUT BUT/WAR But-War &

Western Row Rd

Description: Improvement to the existing

intersection of Butler Warren Road with Western

Row Road/Barret Road by converting from an

existing stop-controlled intersection to a modern

roundabout. Improvements include curb and

gutter, storm drainage, geometric improvemen

Work Type: Intersection Improvement Termini:

Intersection of Butler Warren Road with Western

Row Road / Barret Road

Mason, City of Air Quality Non-Exe 0.32 CO CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

4TB7

LNT

4TB7

LNT

Federal

Local Match

Federal

Local Match

Z400

LNTP

Z400

LNTP

CMAQ

Local Match

CMAQ

Local Match

$1,181,461

$295,365

$82,702

$20,676

$0

$0

$0

$0

$1,580,204

$1,580,204

$1,580,204

$1,580,204

$1,930,204

$1,930,204

$1,930,204

$1,930,204

2018stipID0551FDCO

2018stipID0551FDCO

2018stipID0551FDCO

2018stipID0551FDCO

Ph subtotal: $1,580,204 $0 $1,580,204 $1,930,204

RW Acquis

Acquis

RW Serv

2020

2020

2018

4TB7

LNT

LAB

Federal

Local Match

State

Z400

LNTP

2

CMAQ

Local Match

Labor - State Match

$280,000

$70,000

$1,428

$0

$0

$0

$351,428

$351,428

$351,428

$1,915,334

$1,915,334

$1,915,334

2018MODID0466FDRW

2018MODID0466FDRW

2018MODID0466FDRW

Ph subtotal: $351,428 $0 $351,428 $1,915,334

Page 3: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 3 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 103754 OKI BUT BUT IR 75 5.35 Description: Improve capacity on the exit ramps

at Interstate 75 and Tylersville Road, add an

eastbound right-turn lane on Tylersville at the

southbound ramps, and provide a positive offset

for the left-turn lanes into the Speedway gas

station and Gears Florist. Work Type:

Intersection Improvement Termini: IR 75 and

Tylersville Road exit ramps (NB and SB)

BUTLER COUNTY

ENGINEER

Air Quality Exempt 0.10 CO CO Contr

CO Contr

CO Engr

2018

2018

2018

4HJ7

LNT

LNT

Federal

Local Match

Local Match

ZS30

LNTP

LNTP

Not Grouped

Local Match

Local Match

$921,590

$102,399

$71,679

$0

$0

$0

$1,095,668

$1,095,668

$1,095,668

$1,111,286

$1,111,286

$1,111,286

2018AM02ID0076FDCO

2018AM02ID0076FDCO

2018AM02ID0076FDCO

Ph subtotal: $1,095,668 $0 $1,095,668 $1,111,286

104195 OKI BUT BUT SR 129 25.00 Liberty

Way

Description: Reconfiguration of the interchange

of SR-129 with Liberty Way and IR-75. SR-129

will be extended east to tie into Cox Road, north

of Liberty Way. Existing ramps connections will

also be reconfigured. Work Type: Interchange,

Reconstruction Termini: SR-129 interchange

with Liberty Way and IR-75; Cox Road north of

Liberty Way

BUTLER COUNTY

ENGINEER

Air Quality Non-Exe 1.71 CO CO Contr

CO Contr

CO Engr

2021

2021

2021

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

Bridge

Local Match

Local Match

$11,663,425

$11,663,425

$1,632,880

$0

$0

$0

$24,959,730

$24,959,730

$24,959,730

$25,426,130

$25,426,130

$25,426,130

2018AM10ID0306FDCO

2018AM10ID0306FDCO

2018AM10ID0306FDCO

Ph subtotal: $24,959,730 $0 $24,959,730 $25,426,130

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $24,960 $0 $24,960 $13,056,400 2018stipID0552FDDD

Ph subtotal: $24,960 $0 $24,960 $13,056,400

ENV Env PE 2018 LAB State 2 Labor - State Match $141,440 $0 $141,440 $13,056,400 2018stipID0552FDENV

Ph subtotal: $141,440 $0 $141,440 $13,056,400

RW RW Serv 2018 LAB State 2 Labor - State Match $50,000 $0 $50,000 $13,056,400 2018stipID0552FDRW

Ph subtotal: $50,000 $0 $50,000 $13,056,400

105057 OKI BUT BUT Oxford Area Trail Description: Construction of a 10 foot wide

asphalt multi-use trail on the southeast side of

Oxford, from Peffer Park (on US-27) to SR-73,

just east of the equestrian center. Work Type:

Bikeways Termini: New alignment: from US-27

at Peffer Park to SR-73 east of the Equestrian

Center

Oxford, City of Air Quality Exempt 0.12 CO CO Contr

CO Contr

CO Engr

2019

2019

2019

4TC7

LNT

LNT

Federal

Local Match

Local Match

Z302

LNTP

LNTP

TAP/Enhancements

Local Match

Local Match

$750,000

$1,110,070

$130,205

$0

$0

$0

$1,990,275

$1,990,275

$1,990,275

$2,013,159

$2,013,159

$2,013,159

2018AM11ID0362FDCO

2018AM11ID0362FDCO

2018AM11ID0362FDCO

Ph subtotal: $1,990,275 $0 $1,990,275 $2,013,159

106129 OKI BUT BUT Five Points

Roundabout

Description: Improving the existing five legged

intersection by converting to a modern

roundabout with curb and gutter, storm sewer,

and sidewalks. Work Type: Intersection

Improvement Termini: 5 Points Intersection

(Tylersville Road with Hamilton-Mason Road,

Hancock Avenue, Grand Boulevard, and Tuley

Road)

BUTLER COUNTY

ENGINEER

Air Quality Exempt 0.23 RW Acquis

Acquis

RW Serv

2020

2020

2018

4TA7

LNT

LAB

Federal

Local Match

State

Z230

LNTP

2

STBG

Local Match

Labor - State Match

$720,000

$180,000

$60,000

$0

$0

$0

$960,000

$960,000

$960,000

$2,643,533

$2,643,533

$2,643,533

2018AM11ID0363FDRW

2018AM11ID0363FDRW

2018AM11ID0363FDRW

Ph subtotal: $960,000 $0 $960,000 $2,643,533

Description: Improving the existing five legged

intersection by converting to a modern

roundabout with curb and gutter, storm sewer,

and sidewalks. Work Type: Intersection

Improvement (Safety) Termini: 5 Points

Intersection (Tylersville Road with

Hamilton-Mason Road, Hancock Avenue, Grand

Boulevard, and Tuley Road)

BUTLER COUNTY

ENGINEER

Air Quality Exempt 0.23 CO CO Contr

CO Contr

CO Contr

CO Engr

2021

2021

2021

2021

4TA7

4TC7

LNT

LNT

Federal

Federal

Local Match

Local Match

Z230

Z301

LNTP

LNTP

Bridge

TAP/Enhancements

Local Match

Local Match

$1,198,640

$47,360

$1,204,779

$171,555

$0

$0

$0

$0

$2,622,334

$2,622,334

$2,622,334

$2,622,334

$3,599,342

$3,599,342

$3,599,342

$3,599,342

2018AM15ID0521FDCO

2018AM15ID0521FDCO

2018AM15ID0521FDCO

2018AM15ID0521FDCO

Ph subtotal: $2,622,334 $0 $2,622,334 $3,599,342

Page 4: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 4 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 106407 OKI BUT BUT CR 148 2.93 Description: Install multi-lane roundabout at

Wayne Madison and Hamilton Trenton Rd with

pedestrian accommodations Work Type:

Intersection Improvement Termini: BUT CR

148 at Wayne Madison and Hamilton Trenton

Road

BUTLER COUNTY

ENGINEER

Air Quality Exempt 0.01 DD Dtl Dsgn

Dtl Dsgn

Dtl Dsgn

2018

2020

2020

LAB

4HJ7

LNT

State

Federal

Local Match

2

ZS30

LNTP

Labor - State Match

Highway Safety Imp Prog

Local Match

$3,769

$11,083

$2,771

$0

$0

$0

$17,623

$17,623

$17,623

$2,151,327

$2,151,327

$2,151,327

2018MODID0463FDDD

2018MODID0463FDDD

2018MODID0463FDDD

Ph subtotal: $17,623 $0 $17,623 $2,151,327

ENV Env PE

Env PE

Env PE

2018

2018

2018

4BG

4HJ7

LAB

Local Match

Federal

State

2

2

Local Match

Un-Assigned Federal

Labor - State Match

$23,450

$93,800

$141,440

$0

$0

$0

$258,690

$258,690

$258,690

$2,397,827

$2,397,827

$2,397,827

2018AM02ID0077FDENV

2018AM02ID0077FDENV

2018AM02ID0077FDENV

Ph subtotal: $258,690 $0 $258,690 $2,397,827

RW Acquis

Acquis

RW Serv

RW Serv

RW Serv

2020

2020

2018

2020

2020

4HJ7

LNT

LAB

4HJ7

LNT

Federal

Local Match

State

Federal

Local Match

ZS30

LNTP

2

ZS30

LNTP

Highway Safety Imp Prog

Local Match

Labor - State Match

Highway Safety Imp Prog

Local Match

$64,400

$16,100

$6,082

$27,600

$6,900

$0

$0

$0

$0

$0

$121,082

$121,082

$121,082

$121,082

$121,082

$2,151,327

$2,151,327

$2,151,327

$2,151,327

$2,151,327

2018MODID0464FDRW

2018MODID0464FDRW

2018MODID0464FDRW

2018MODID0464FDRW

2018MODID0464FDRW

Ph subtotal: $121,082 $0 $121,082 $2,151,327

Description: Install multi-lane roundabout at

Wayne Madison and Hamilton Trenton Rd with

pedestrian accommodations Work Type:

Intersection Improvement (Safety) Termini:

BUT CR 148 at Wayne Madison and Hamilton

Trenton Road

BUTLER COUNTY

ENGINEER

Air Quality Exempt 0.01 CO CO Contr

CO Contr

CO Engr

2021

2021

2021

4HJ7

LNT

LNT

Federal

Local Match

Local Match

ZS30

LNTP

LNTP

Highway Safety Imp Prog

Local Match

Local Match

$1,368,311

$1,591,404

$207,180

$0

$0

$0

$3,166,895

$3,166,895

$3,166,895

$3,488,106

$3,488,106

$3,488,106

2018AM13ID0456FDCO

2018AM13ID0456FDCO

2018AM13ID0456FDCO

Ph subtotal: $3,166,895 $0 $3,166,895 $3,488,106

76289 OKI CLE CLE IR 275 10.15/8.95 Description: Reconstruct the interchange of

IR275/SR32 to accommodate 20 year projected

traffic. This will include work on SR32. Phase 1

and Phase 2 (PID 82309) have been combined

for construction including Aicholz structures.

Project includes Phase 1&2 right of way Work

Type: Major Reconstruction Termini:

Approximately 1.5 miles north of SR32 to 1.0

miles south of SR32

ODOT SPONSORING

AGENCY

CO Air Quality None 5.10 RW Utl Remb

Utl Remb

2014

2014

4BD7

4BK7

State

Federal

2

L010

State Funds (002)

Interstate Maintenance

$179,273

$1,613,460

$26,725,989

$26,725,989

$28,518,723

$28,518,723

$87,448,231

$87,448,231

2018MODID0206FDRW

2018MODID0206FDRW

Ph subtotal: $1,792,734 $26,725,989 $28,518,723 $87,448,231

82370 OKI CLE CLE SR 32 2.25 Description: Improve capacity and safety on a

portion of SR 32 by adding an interchange and

eliminating several at grade intersections and

drives. The new interchange will grade separate

Bach-Buxton and SR 32 and will include

improvements on Bach-Buxton between Aicho

Work Type: Section Improvement Termini: 0.2

miles east of Eastgate Blvd to Olive Branch

Stonelick Road.

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 2.73 DD Dtl Dsgn

Dtl Dsgn

2016

2016

4BD7

4BK7

State

Federal

2

L05E

State Funds (002)

National Highway System

$360,000

$1,440,000

$63,722

$63,722

$1,863,722

$1,863,722

$63,263,784

$63,263,784

2018MODID0211FDDD

2018MODID0211FDDD

Ph subtotal: $1,800,000 $63,722 $1,863,722 $63,263,784

82552 OKI CLE CLE TR 252 Clepper Ln

Extension

Description: Reconstruction of existing Clepper

Lane from the current intersection with Gate

Drive eastward and across Gleneste

Withamsville Road. Existing Clepper Lane will be

realigned and extended further east, and will tie

in with Bach-Buxton Road, to provide acce

Work Type: New Construction Termini:

Clepper Lane: from Gate Drive to Bach-Buxton

Road

Clermont County

Commissioners

Air Quality Non-Exe 0.40 CO CO Contr

CO Contr

CO Engr

2019

2019

2019

4TA7

LNT

LNT

Federal

Local Match

Local Match

M230

LNTP

LNTP

STBG

Local Match

Local Match

$5,000,000

$6,032,237

$772,257

$0

$0

$0

$11,804,494

$11,804,494

$11,804,494

$11,850,171

$11,850,171

$11,850,171

2018stipID0554FDCO

2018stipID0554FDCO

2018stipID0554FDCO

Ph subtotal: $11,804,494 $0 $11,804,494 $11,850,171

Page 5: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 5 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 82557 OKI CLE CLE CR171 Old SR74

Phase 1

Description: Improvements of approximately 1.06

miles of existing Old SR-74 providing safety and

capacity upgrades. Project improvements will

provide five lanes from Glen Este Withamsville

Road to Tealtown Road and 3 lanes from

Tealtown Road to Schoolhouse Road, 2'-4’

Work Type: Minor Widening Termini: Old

SR-74: from Schoolhouse Road to

Gleneste-Withamsville Road; Glen Este

Withamsville Road: from N Meijer drive to Old

SR-74

Clermont County

Commissioners

Air Quality Non-Exe 0.81 CO CO Contr

CO Contr

CO Engr

2019

2019

2019

4TA7

LNT

LNT

Federal

Local Match

Local Match

M230

LNTP

LNTP

STBG

Local Match

Local Match

$5,000,000

$8,102,137

$917,150

$0

$0

$0

$14,019,287

$14,019,287

$14,019,287

$14,065,210

$14,065,210

$14,065,210

2018stipID0555FDCO

2018stipID0555FDCO

2018stipID0555FDCO

Ph subtotal: $14,019,287 $0 $14,019,287 $14,065,210

99839 OKI CLE CLE SR 32 0.63 Bells

Ln/Old-74

Description: The project consists of upgrades to

the intersection of SR-32 with Bells Lane and

SR-32 with Old-SR 74, west of IR-275. As part

of the Aicholtz connector project (PID 82553),

the south leg of the Old SR-74 and SR-32

intersection will be closed. Traffic wi Work

Type: Intersection Improvement Termini: The

intersections of SR-32 with Bells Lane and

SR-32 with Old-SR 74 (west of IR-275)

Clermont County T.I.D. Air Quality Exempt 0.83 CO CO Contr

CO Contr

CO Engr

2018

2018

2018

4TB7

LNT

LNT

Federal

Local Match

Local Match

M400

LNTP

LNTP

CMAQ

Local Match

Local Match

$2,400,000

$1,211,185

$252,783

$0

$0

$0

$3,863,968

$3,863,968

$3,863,968

$3,900,560

$3,900,560

$3,900,560

2018AM01ID0030FDCO

2018AM01ID0030FDCO

2018AM01ID0030FDCO

Ph subtotal: $3,863,968 $0 $3,863,968 $3,900,560

103755 OKI CLE CLE SR 32 2.72 Description: Construct a third thru lane

eastbound along SR-32 from Glen Este

Withamsville Road to Olive Branch

Stonelick.Resurface and perform pavement

repair on a portion of SR 32 in Clermont County

between I-275 and the eastern Batavia corp limit.

Work Type: Section Improvement Termini:

CLE SR 32 SLM 2.72 to 4.98

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 2.26 CO CO Contr

CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

2019

2019

2019

2019

2019

2019

2019

4BC7

4HJ7

4PF7

4PS7

LAB

LAB

LAB

State

Federal

Federal

State

Federal

Federal

State

2

ZS30

2

ZS30

2

State Funds (002)

Not Grouped

Un-Assigned Federal

State Funds (002)

Un-Assigned Federal Labor

Highway Safety Imp Prog

Labor - State Match

$500,000

$4,500,000

$3,822,672

$955,668

$114,680

$315,000

$63,670

$0

$0

$0

$0

$0

$0

$0

$10,271,690

$10,271,690

$10,271,690

$10,271,690

$10,271,690

$10,271,690

$10,271,690

$10,317,255

$10,317,255

$10,317,255

$10,317,255

$10,317,255

$10,317,255

$10,317,255

2018AM02ID0078FDCO

2018AM02ID0078FDCO

2018AM02ID0078FDCO

2018AM02ID0078FDCO

2018AM02ID0078FDCO

2018AM02ID0078FDCO

2018AM02ID0078FDCO

Ph subtotal: $10,271,690 $0 $10,271,690 $10,317,255

103953 OKI CLE CLE CR 388 Description: Realigning Bach Buxton to align with

proposed SR32 interchange. This project will

include all clearing for PIDs 103953, 103954,

103955, & 103959. Design under PID 82370.

Work Type: Roadway Improvement (Safety)

Termini: Bach Buxton to Marina Drive

ODOT SPONSORING

AGENCY

Air Quality Exempt 4.49 RW Acquis

Acquis

RW Serv

2020

2020

2018

4BD7

4BK7

LAB

State

Federal

State

002

002

State Funds (002)

Un-Assigned Federal

Labor - State Match

$200,000

$800,000

$12,088

$0

$0

$0

$1,012,088

$1,012,088

$1,012,088

$6,182,277

$6,182,277

$6,182,277

2018AM15ID0522FDRW

2018AM15ID0522FDRW

2018AM15ID0522FDRW

Ph subtotal: $1,012,088 $0 $1,012,088 $6,182,277

103954 OKI CLE CLE 32-3.50 Description: Proposed interchange at SR32 and

Bach Buxton. Design under PID 82370. Work

Type: Interchange, New Termini: Bach Buxon

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.01 RW Acquis

Acquis

RW Serv

RW Serv

RW Serv

2019

2019

2018

2019

2019

4BD7

4BK7

LAB

4BD7

4BK7

State

Federal

State

State

Federal

2

Z001

2

2

Z001

State Funds (002)

National Hwy Performance P

Labor - State Match

State Funds (002)

National Hwy Performance P

$912,000

$3,648,000

$13,815

$90,530

$362,120

$0

$0

$0

$0

$0

$5,026,465

$5,026,465

$5,026,465

$5,026,465

$5,026,465

$26,502,466

$26,502,466

$26,502,466

$26,502,466

$26,502,466

2018AM08ID0258FDRW

2018AM08ID0258FDRW

2018AM08ID0258FDRW

2018AM08ID0258FDRW

2018AM08ID0258FDRW

Ph subtotal: $5,026,465 $0 $5,026,465 $26,502,466

103955 OKI CLE CLE CR 171 (Old SR74) Description: Old SR74 improvements to allow for

added capacity needs from the proposed

interchange. Design under PID 82370. Work

Type: Roadway Major Rehab Termini: Old SR

74 Schoolhouse to SR 32

ODOT SPONSORING

AGENCY

Air Quality Exempt 1.82 RW Acquis 2020 4BD7 State 002 State Funds (002) $150,000 $0 $755,181 $5,757,710 2018AM15ID0523FDRW

Page 6: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 6 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 103955 OKI CLE CLE CR 171 (Old SR74) Description: Old SR74 improvements to allow for

added capacity needs from the proposed

ODOT SPONSORING

AGENCY

Air Quality Exempt 1.82 RW Acquis

RW Serv

2020

2018

4BK7

LAB

Federal

State

Z240

002

STBG

Labor - State Match

$600,000

$5,181

$0

$0

$755,181

$755,181

$5,757,710

$5,757,710

2018AM15ID0523FDRW

2018AM15ID0523FDRW

Ph subtotal: $755,181 $0 $755,181 $5,757,710

103956 OKI CLE CLE 32-2.65 Description: Westbound 3rd lane with concrete

barrier median. Design under PID 82370. This

is part 2 of PID 103954. Work Type: Add

Through Lane(s) Termini: Westbound 32

ODOT SPONSORING

AGENCY

Air Quality Exempt 2.33 RW Acquis

Acquis

2020

2020

4BD7

4BK7

State

Federal

002

Z001

State Funds (002)

National Hwy Performance P

$50,000

$200,000

$0

$0

$250,000

$250,000

$8,810,000

$8,810,000

2018AM15ID0524FDRW

2018AM15ID0524FDRW

Ph subtotal: $250,000 $0 $250,000 $8,810,000

103959 OKI CLE CLE 32-2.88 Description: Ramp from SR32 East Bound to

Clepper Lane. Design under PID 82370. Work

Type: Interchange Improvement (Safety)

Termini: EB 32 ramp to Clepper Lane

ODOT SPONSORING

AGENCY

Air Quality Exempt 2.10 RW Acquis

Acquis

2020

2020

4BD7

4BK7

State

Federal

002

Z001

State Funds (002)

National Hwy Performance P

$500,000

$2,000,000

$0

$0

$2,500,000

$2,500,000

$4,640,000

$4,640,000

2018AM15ID0525FDRW

2018AM15ID0525FDRW

Ph subtotal: $2,500,000 $0 $2,500,000 $4,640,000

104712 OKI CLE CLE VAR ITS Phase 3 Description: Interconnect and upgrade of traffic

signals in Clermont County including new

controllers, LED signal and pedestrian heads,

battery backup systems, video detection,

emergency vehicle preemption, and installation

of Rectangular Rapid Flashing Beacons (RRFB)

Work Type: Signals Termini: 95 signalized

intersections in Clermont County, OH

Clermont County T.I.D. Air Quality Exempt 0.74 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TB7

LNT

LNT

Federal

Local Match

Local Match

Z400

LNTP

LNTP

CMAQ

Local Match

Local Match

$1,863,136

$465,784

$163,024

$0

$0

$0

$2,491,944

$2,491,944

$2,491,944

$2,517,376

$2,517,376

$2,517,376

2018stipID0558FDCO

2018stipID0558FDCO

2018stipID0558FDCO

Ph subtotal: $2,491,944 $0 $2,491,944 $2,517,376

105055 OKI CLE CLE Pierce Twp Park Paths Description: Construction of sidewalk and

multi-use trail to extend the existing trail network

into the southwest portion of Pierce Township

Park. In addition, relocation of existing multi-use

trail along the south side of Locust Corner Road

to improve safety for user Work Type:

Bikeways Termini: Pierce Township Park (961

Locust Corner Road)

Pierce, Township of (Clermont

County)

Air Quality Exempt 0.17 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4BG

4TC7

LAB

Local Match

Federal

Local Match

2

Z301

2

Local Match

TAP/Enhancements

Labor - Local Match

$46,909

$187,635

$23,454

$0

$0

$0

$257,998

$257,998

$257,998

$257,998

$257,998

$257,998

2018stipID0559FDCO

2018stipID0559FDCO

2018stipID0559FDCO

Ph subtotal: $257,998 $0 $257,998 $257,998

106413 OKI CLE CLE SR 132 8.46 Description: Install a modern roundabout at

SR-132 and Chapel Rd. Work Type:

Intersection Improvement Termini: CLE at SR

132 and Chapel Road

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.40 CO CO Contr

CO Engr

2021

2021

4HJ7

LAB

Federal

Federal

Un-Assigned Federal

Un-Assigned Federal Labor

$1,124,502

$78,715

$0

$0

$1,203,217

$1,203,217

$1,729,020

$1,729,020

2018AM02ID0079FDCO

2018AM02ID0079FDCO

Ph subtotal: $1,203,217 $0 $1,203,217 $1,729,020

DD Dtl Dsgn

Dtl Dsgn

2018

2019

LAB

4HJ7

State

Federal

2 Labor - State Match

Un-Assigned Federal

$24,960

$49,303

$0

$0

$74,263

$74,263

$1,729,020

$1,729,020

2018AM02ID0079FDDD

2018AM02ID0079FDDD

Ph subtotal: $74,263 $0 $74,263 $1,729,020

ENV Env PE

Env PE

2018

2018

4HJ7

LAB

Federal

State 2

Un-Assigned Federal

Labor - State Match

$100,100

$141,440

$0

$0

$241,540

$241,540

$1,729,020

$1,729,020

2018AM02ID0079FDENV

2018AM02ID0079FDENV

Ph subtotal: $241,540 $0 $241,540 $1,729,020

RW Acquis

RW Serv

RW Serv

2019

2018

2019

4HJ7

LAB

4HJ7

Federal

State

Federal

2

Un-Assigned Federal

Labor - State Match

Un-Assigned Federal

$100,000

$60,000

$50,000

$0

$0

$0

$210,000

$210,000

$210,000

$1,729,020

$1,729,020

$1,729,020

2018AM02ID0079FDRW

2018AM02ID0079FDRW

2018AM02ID0079FDRW

Ph subtotal: $210,000 $0 $210,000 $1,729,020

Page 7: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 7 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 107292 OKI CLE CLE US 50/SR 132

Intersections

Description: Improvement of the intersections of

US-50 with SR-132 in Owensville. Improvements

include the addition of turn lanes, curb, sidewalk,

storm sewer, curb ramps, and upgrades to the

existing traffic signals. Work Type: Intersection

Improvement Termini: Intersections of US-50

with SR-132 (two intersections)

Owensville, Village of Air Quality Exempt 0.30 DD Dtl Dsgn

Dtl Dsgn

2021

2021

4TB7

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

$118,800

$29,700

$0

$0

$148,500

$148,500

$1,965,154

$1,965,154

2018AM04ID0160FDDD

2018AM04ID0160FDDD

Ph subtotal: $148,500 $0 $148,500 $1,965,154

ENV Env PE

Env PE

2021

2021

4TB7

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

$40,000

$10,000

$0

$0

$50,000

$50,000

$1,965,154

$1,965,154

2018AM04ID0160FDENV

2018AM04ID0160FDENV

Ph subtotal: $50,000 $0 $50,000 $1,965,154

77922 CLI CLI SR 729 2.85/9.50/13.29 Description: Replace the existing superstructure

and widen Bridge No. CLI-729-1329, SFN:

1403788. Bridge carries SR 729 over Wilson

Creek in the Village of Sabina. Replace Bridges

CLI-729-0285 and CLI-729-0950. Resurface SR

729 from Lees Creek to US 22/SR 3. Work

Type: Bridge Repair Termini: At 0.53 miles

north of US 22

ODOT SPONSORING

AGENCY

Air Quality Exempt 10.69 RW Acquis

RW Serv

2019

2019

4PS7

LAB

State

State

2

2

State Funds (002)

Labor - State Match

$25,000

$40,000

$0

$0

$65,000

$65,000

$3,410,520

$3,410,520

2018stipID0618FDRW

2018stipID0618FDRW

Ph subtotal: $65,000 $0 $65,000 $3,410,520

103910 CLI CLI CR 12 0.00 Antioch

Road

Description: Reconstruction of approximately

2,000 feet of Antioch Road (CR-12) including

improving the horizontal and vertical alignment

and widening lane and shoulder widths. In

addition, new pavement markings, raised

pavement markers, Work Type: Realignment

Termini: Antioch Road (CR-12): from the

Highland County Line to approximately 250 feet

north of Moore Road

CLINTON COUNTY

ENGINEER

Air Quality Exempt 0.25 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4HB7

LNT

4HB7

LNT

Federal

Local Match

Federal

Local Match

ZS30

LNTP

ZS30

LNTP

Highway Safety Imp Prog

Local Match

Highway Safety Imp Prog

Local Match

$645,120

$161,280

$64,480

$16,120

2018MODID0424FDCO

2018MODID0424FDCO

2018MODID0424FDCO

2018MODID0424FDCO

Ph subtotal: $887,000 $0 $0 $0

Description: Reconstruction of approximately

2,000 feet of Antioch Road (CR-12) including

improving the horizontal and vertical alignment

and widening lane and shoulder widths. In

addition, new pavement markings, raised

pavement markers, and signage will be installed.

Work Type: Realignment Termini: Antioch

Road (CR-12): from the Highland County Line to

approximately 250 feet north of Moore Road

CLINTON COUNTY

ENGINEER

Air Quality Exempt 0.25 DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $3,623 $0 $3,623 $933,740 2018stipID0619FDDD

Ph subtotal: $3,623 $0 $3,623 $933,740

ENV Env PE 2018 LAB State 2 Labor - State Match $20,531 $0 $20,531 $933,740 2018stipID0619FDENV

Ph subtotal: $20,531 $0 $20,531 $933,740

RW RW Serv 2018 LAB State 2 Labor - State Match $6,044 $0 $6,044 $933,740 2018stipID0619FDRW

Ph subtotal: $6,044 $0 $6,044 $933,740

106338 CLI CLI CR 12 7.96 Antioch

Road

Description: Reconstruct approximately 3300' of

Antioch Road, improving horizontal and vertical

curves as well as widening the pavement and

berms and removing fixed objects from the clear

zone. Work includes associated striping, RPM

and signing safety improvements. Work Type:

Section Improvement Termini: Antioch Road

(CR-12): from TR 154 to 3,300 feet north of TR

154

CLINTON COUNTY

ENGINEER

Air Quality Exempt 0.63 CO CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

4HB7

LNT

4HB7

LNT

Federal

Local Match

Federal

Local Match

ZS30

LNTP

ZS30

LNTP

Not Grouped

Local Match

Not Grouped

Local Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

2018MODID0448XXCO

2018MODID0448XXCO

2018MODID0448XXCO

2018MODID0448XXCO

Page 8: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 8 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

Ph subtotal: $0 $0 $0 $0

FHWA 8 101018 D08 D08 OSS FY2018 Description: Overhead Sign Support Inspections

in the District. Work Type: Signs Termini:

Districtwide

ODOT SPONSORING

AGENCY

Air Quality Exempt DD Dtl Dsgn 2018 4PS7 State 2 State Funds (002) $600,000 $0 $600,000 $600,000 2018stipID0620FDDD

Ph subtotal: $600,000 $0 $600,000 $600,000

101860 D08 D08 BS Major FY2018 Description: This project is to seal Major Bridges

within District 8. Work Type: Bridge

Maintenance/Repair (NEW) Termini: Major

Bridges in D8

ODOT SPONSORING

AGENCY

Air Quality Exempt CO CO Contr

CO Contr

CO Contr

CO Engr

2018

2018

2018

2018

4BT7

4PF7

4PS7

LAB

State

Federal

State

State

2

Z001

2

2

State Funds (002)

National Hwy Performance P

State Funds (002)

Labor - State Match

$1,995,118

$45,624

$11,406

$265,000

$0

$0

$0

$0

$2,317,148

$2,317,148

$2,317,148

$2,317,148

$2,449,648

$2,449,648

$2,449,648

$2,449,648

2018stipID0621FDCO

2018stipID0621FDCO

2018stipID0621FDCO

2018stipID0621FDCO

Ph subtotal: $2,317,148 $0 $2,317,148 $2,449,648

77793 MVRPC GRE GRE SR 4 0.89 Description: Replace the existing concrete slabs

and abutments of Bridge Nos. GRE-4-0090 L/R,

SFNs: 2900033 and 2900068. The new slabs

shall be constructed on the existing piers.

Bridges carry SR 4 over Union Rd. Work

Type: Bridge Repair Termini: At Township Rd.

168 (Union Rd.)

ODOT SPONSORING

AGENCY

Air Quality Exempt CO CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

4PF7

4PS7

LAB

LAB

Federal

State

Federal

State

L1C0

2

L1C0

2

Bridge

State Funds (002)

Bridge

Labor - State Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

2018stipID0505XXCO

2018stipID0505XXCO

2018stipID0505XXCO

2018stipID0505XXCO

Ph subtotal: $0 $0 $0 $0

80468 MVRPC GRE GRE US 35 4.26 Description: Eliminate at-grade intersections at

Factory Road/Shakertown Road and Valley

Road by constructing new interchanges. Work

Type: Interchange, New Termini: US 35 at

Factory Road and US 35 at Valley Road

DISTRICT 8 PRODUCTION CO Air Quality None 0.06 DD Dtl Dsgn 2014 4B47 Federal L05E National Highway System $2,340,207 $100,779 $2,440,986 $112,267,058 2018MODID0208FDDD

Ph subtotal: $2,340,207 $100,779 $2,440,986 $112,267,058

82970 MVRPC GRE GRE US 35 2.32 Description: Microsurface a portion of US 35 in

Greene County from the Beavercreek Corp to

the US 35 By-Pass Work Type: Minor

Rehabilitation - Pavement Prmy Sys Termini:

US 35: SLM 2.32 to SLM 7.35

ODOT SPONSORING

AGENCY

Air Quality Exempt 5.03 DD Dtl Dsgn 2019 LAB State 2 Labor - State Match $16,364 $0 $16,364 $1,594,482 2018stipID0506FDDD

Ph subtotal: $16,364 $0 $16,364 $1,594,482

ENV Env PE 2019 LAB State 2 Labor - State Match $92,728 $0 $92,728 $1,594,482 2018stipID0506FDENV

Ph subtotal: $92,728 $0 $92,728 $1,594,482

87094 MVRPC GRE GRE SR 72 0.00 Description: Resurface and perform pavement

repair on SR 72 in Greene County from the

Clinton County line to north of the US 35

interchange. Work Type: Minor Rehabilitation -

Pavement Gnrl Sys Termini: GRE SR 72: from

0 to 8.71

ODOT SPONSORING

AGENCY

Air Quality Exempt 8.71 CO CO Contr

CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

CO Engr

2018

2018

2018

2018

2018

2018

2018

2018

4PF7

4PF7

4PF7

4PS7

LAB

LAB

LAB

LAB

Federal

Federal

Federal

State

Federal

Federal

Federal

State

L25E

M001

M232

2

L25E

M001

M232

2

STP

National Hwy Performance P

STP

State Funds (002)

STBG

National Hwy Performance P

STBG

Labor - State Match

$1,489,994

$69,504

$31,191

$397,672

$44,700

$2,085

$936

$11,930

$0

$0

$0

$0

$0

$0

$0

$0

$2,048,012

$2,048,012

$2,048,012

$2,048,012

$2,048,012

$2,048,012

$2,048,012

$2,048,012

$2,079,148

$2,079,148

$2,079,148

$2,079,148

$2,079,148

$2,079,148

$2,079,148

$2,079,148

2018AM01ID0026FDCO

2018AM01ID0026FDCO

2018AM01ID0026FDCO

2018AM01ID0026FDCO

2018AM01ID0026FDCO

2018AM01ID0026FDCO

2018AM01ID0026FDCO

2018AM01ID0026FDCO

Ph subtotal: $2,048,012 $0 $2,048,012 $2,079,148

87185 MVRPC GRE GRE US 35 11.94 Description: Resurface and perform pavement

repair on a portion of US in Greene County

around Xenia Work Type: Minor Rehabilitation

- Pavement Prmy Sys Termini: GRE US 35:

from SLM 11.94 to 14.46

ODOT SPONSORING

AGENCY

Air Quality Exempt 2.52 DD Dtl Dsgn 2019 LAB State 2 Labor - State Match $24,960 $0 $24,960 $4,241,863 2018stipID0508FDDD

Ph subtotal: $24,960 $0 $24,960 $4,241,863

Page 9: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 9 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 87185 MVRPC GRE GRE US 35 11.94 Description: Resurface and perform pavement

repair on a portion of US in Greene County

ODOT SPONSORING

AGENCY

Air Quality Exempt 2.52 ENV Env PE 2019 LAB State 2 Labor - State Match $141,440 $0 $141,440 $4,241,863 2018stipID0508FDENV

Ph subtotal: $141,440 $0 $141,440 $4,241,863

93532 MVRPC GRE GRE Sugarcreek SRTS 12

Feedwire

Description: Part 1: Extend existing path from

Intermediate School south to existing path by

water tower on east side of Upper Bellbrook

Road to connect to school sidewalk. Part 2:

Construct a shared use path along Upper

Bellbrook Road from Feedwire to Kable's Mill Dr

Work Type: Add Sidewalks Termini: Upper

Bellbrook Rd. from existing path to School and

from Feedwire to Kables Mill.

Sugarcreek, Township of Air Quality Exempt 0.80 RW Acquis

RW Serv

RW Serv

2015

2015

2015

4SC7

4SC7

LAB

Federal

Federal

State

LU2E

2

STP

Un-Assigned Federal

Labor - State Match

$6,500

$10,000

$1,727

$0

$0

$0

$18,227

$18,227

$18,227

$662,771

$662,771

$662,771

2018MODID0221FDRW

2018MODID0221FDRW

2018MODID0221FDRW

Ph subtotal: $18,227 $0 $18,227 $662,771

93536 MVRPC GRE GRE Yellow Spr. SRTS

Sidewalks

Description: Provide sidewalk along Yellow

Springs Fairfield Pike from Fair Acres Drive to

Winter St and along Winter from Pleasant to

Yellow Springs Fairfield Pike. Work Type: Add

Sidewalks Termini: Yellow Springs Fairfield

Pike from Fair Acres Drive to Winter St; Winter

from Pleasant to Yellow Springs Fairfield Pike

Yellow Springs, Village of Air Quality Exempt 0.10 CO CO Contr

CO Engr

CO Engr

2018

2018

2018

4SC7

LAB

LAB

Federal

Federal

State

LU2E

M303

2

STBG/Safe Routes to School

TAP/Enhancements

Labor - State Match

$182,000

$14,560

$3,640

$0

$0

$0

$200,200

$200,200

$200,200

$385,307

$385,307

$385,307

2018stipID0509FDCO

2018stipID0509FDCO

2018stipID0509FDCO

Ph subtotal: $200,200 $0 $200,200 $385,307

RW Acquis

RW Serv

2016

2016

4SC7

4SC7

Federal

Federal

LU2E

LU2E

STP

STP

$33,600

$55,500

$0

$0

$89,100

$89,100

$385,307

$385,307

2018MODID0222FDRW

2018MODID0222FDRW

Ph subtotal: $89,100 $0 $89,100 $385,307

94174 MVRPC GRE GRE SR 72 14.48 Description: Resurfacing and pavement repairs

on SR 72 in Greene County from the north corp

of Jamestown to the Clark County line Work

Type: Minor Rehabilitation - Pavement Gnrl Sys

Termini: GRE SR 72: SLM 14.48 to 19.01

ODOT SPONSORING

AGENCY

Air Quality Exempt 4.39 CO CO Contr

CO Contr

CO Engr

CO Engr

2020

2020

2020

2020

4PF7

4PS7

LAB

LAB

Federal

State

Federal

State

M232

2

M232

2

STBG

State Funds (002)

STBG

Labor - State Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

2018stipID0510XXCO

2018stipID0510XXCO

2018stipID0510XXCO

2018stipID0510XXCO

Ph subtotal: $0 $0 $0 $0

94254 MVRPC GRE GRE IR 675 0.00 Description: Resurfacing and pavement repair

on a portion of I-675 in Greene County from the

Montgomery Co. line to almost North Fairfield

Road. Project also includes bridge overlays,

approach slabs, and joint work on mainline and

overhead bridges within these limits. Work

Type: Minor Rehabilitation - Pavement Prmy Sys

Termini: GRE IR 675: SLM 0 to 9.48

ODOT SPONSORING

AGENCY

Air Quality Exempt 9.58 DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $14,706 $0 $14,706 $17,317,487 2018stipID0511FDDD

Ph subtotal: $14,706 $0 $14,706 $17,317,487

ENV Env PE 2018 LAB State 2 Labor - State Match $83,333 $45,308 $128,641 $17,317,487 2018stipID0511FDENV

Ph subtotal: $83,333 $45,308 $128,641 $17,317,487

RW RW Serv 2018 LAB State 2 Labor - State Match $173 $0 $173 $17,317,487 2018stipID0511FDRW

Ph subtotal: $173 $0 $173 $17,317,487

GRE IR 675 0.00 - Pt. 1 Description: Part 1 - Resurfacing and pavement

repair on a portion of I-675 in Greene County

from the Montgomery Co. line to almost North

Fairfield Road. Project also includes bridge

overlays, approach slabs, and joint work on

mainline and overhead bridges within thes

Work Type: Minor Rehabilitation - Pavement

Prmy Sys Termini: GRE IR 675: SLM 0 to

9.48

ODOT SPONSORING

AGENCY

Air Quality Exempt 9.69 CO CO Contr

CO Contr

CO Contr

CO Engr

2020

2020

2020

2020

4CP7

4PF7

4PS7

LAB

State

Federal

State

Federal

2

M001

2

M001

State Funds (002)

National Hwy Performance P

State Funds (002)

National Hwy Performance P

$289,025

$22,203,648

$2,467,072

$1,173,709

$0

$0

$0

$0

$26,292,769

$26,292,769

$26,292,769

$26,292,769

$26,436,289

$26,436,289

$26,436,289

$26,436,289

2018AM12ID0406FDCO

2018AM12ID0406FDCO

2018AM12ID0406FDCO

2018AM12ID0406FDCO

Page 10: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 10 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 94254 MVRPC GRE GRE IR 675 0.00 - Pt. 1 Description: Part 1 - Resurfacing and pavement

repair on a portion of I-675 in Greene County

ODOT SPONSORING

AGENCY

Air Quality Exempt 9.69 CO CO Engr 2020 LAB State 2 Labor - State Match $159,315 $0 $26,292,769 $26,436,289 2018AM12ID0406FDCO

Ph subtotal: $26,292,769 $0 $26,292,769 $26,436,289

96668 MVRPC GRE GRE US 35 20.94 Description: Microsufacing a portion of US 35 in

Greene County from the interchange with Old

US 35 to the Fayette County Line. All ramps

within the projects limits are included in the

project. Work Type: Preventive Maintenance

Termini: GRE US 35: from SLM 20.94 to 27.23

ODOT SPONSORING

AGENCY

Air Quality Exempt 6.29 DD Dtl Dsgn 2020 LAB State 2 Labor - State Match $24,960 $0 $24,960 $2,244,312 2018stipID0512FDDD

Ph subtotal: $24,960 $0 $24,960 $2,244,312

ENV Env PE 2020 LAB State 2 Labor - State Match $141,440 $0 $141,440 $2,244,312 2018stipID0512FDENV

Ph subtotal: $141,440 $0 $141,440 $2,244,312

96680 MVRPC GRE GRE US 35 1.12 Description: Minor pavement rehabilitation with

pavement repair on US 35 in Greene County

near the interchange with I-675. All ramps within

the project limits are to be included. Work

Type: Minor Rehabilitation - Pavement Prmy Sys

Termini: GRE US 35: from SLM 1.12 to 2.32

ODOT SPONSORING

AGENCY

Air Quality Exempt 1.20 DD Dtl Dsgn 2020 LAB State 2 Labor - State Match $24,960 $0 $24,960 $1,609,790 2018stipID0513FDDD

Ph subtotal: $24,960 $0 $24,960 $1,609,790

ENV Env PE 2020 LAB State 2 Labor - State Match $141,440 $0 $141,440 $1,609,790 2018stipID0513FDENV

Ph subtotal: $141,440 $0 $141,440 $1,609,790

98081 MVRPC GRE GRE US 42 10.29 Description: Project will convert the existing

intersection of US-42 (N. Columbus Street) and

E. Church Street to a modern roundabout.

Pedestrian facilities, curb and gutter, and storm

sewer system will be constructed as part of the

improvements. Work Type: Intersection

Improvement Termini: Intersection of US-42

and East Church Street

Xenia, City of Air Quality Exempt 0.30 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4BG

4TA7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

M230

38

2

Local Match

STP

STBG

Labor - Local Match

$209,663

$628,988

$44,030

$14,677

$0

$0

$0

$0

$897,356

$897,356

$897,356

$897,356

$987,003

$987,003

$987,003

$987,003

2018AM06ID0203FDCO

2018AM06ID0203FDCO

2018AM06ID0203FDCO

2018AM06ID0203FDCO

Ph subtotal: $897,356 $0 $897,356 $987,003

98125 MVRPC GRE GRE CR 46 0.00 National

Road

Description: Widening for a 400' right turn lane

from Grange Hall Rd to Colonel Glenn Hwy,

extension of the second NB thru-lane on National

Road, north of Colonel Glenn Hwy, signal

modifications at Colonel Glenn & National Road,

milling and resurfacing of the entire p Work

Type: Widening Termini: Grange Hall Rd: from

650 ft south of Col. Glenn Hwy to Col. Glenn;

National Rd from Col. Glenn to Beavercreek

northern corp. limit

Beavercreek, City of Air Quality Exempt 0.27 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4TA7

LNT

4TA7

LNT

Federal

Local Match

Federal

Local Match

M230

LNTP

M230

LNTP

STBG

Local Match

STBG

Local Match

$836,000

$209,000

$58,520

$14,630

$0

$0

$0

$0

$1,118,150

$1,118,150

$1,118,150

$1,118,150

$1,383,103

$1,383,103

$1,383,103

$1,383,103

2018stipID0515FDCO

2018stipID0515FDCO

2018stipID0515FDCO

2018stipID0515FDCO

Ph subtotal: $1,118,150 $0 $1,118,150 $1,383,103

98146 MVRPC GRE GRE CR 142 1.21

Dayton-Xenia Rd

Description: Widening of Dayton-Xenia Road

(CR-142) from East Lynn Drive to Woods Drive

to provide a center two way left turn lane,

addition of sidewalks along both sides of the

roadway, installation of curb and gutter and

storm sewer improvements. On-street parking w

Work Type: Widening Termini: Dayton-Xenia

Road (CR-142): from East Lynn Drive to Woods

Drive

Beavercreek, City of Air Quality Exempt 0.57 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TB7

LNT

LNT

Federal

Local Match

Local Match

M40E

LNTP

LNTP

CMAQ

Local Match

Local Match

$2,225,600

$1,168,189

$237,565

$0

$0

$0

$3,631,354

$3,631,354

$3,631,354

$4,145,392

$4,145,392

$4,145,392

2018AM10ID0298FDCO

2018AM10ID0298FDCO

2018AM10ID0298FDCO

Ph subtotal: $3,631,354 $0 $3,631,354 $4,145,392

RW Acquis

Acquis

2019

2019

4TB7

LNT

Federal

Local Match

M40E

LNTP

CMAQ

Local Match

$360,000

$90,000

$8,529

$8,529

$458,529

$458,529

$3,490,778

$3,490,778

2018stipID0516FDRW

2018stipID0516FDRW

Page 11: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 11 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

Ph subtotal: $450,000 $8,529 $458,529 $3,490,778

FHWA 8 98157 MVRPC GRE GRE CR 1/54 3.85/2.34 Description: Conversion of the existing

intersection of Kauffman Avenue and Colonel

Glenn Highway from a signal-controlled

T-intersection to a modern roundabout (Part 1).

**This project includes construction of PID

98160 as Part 2.** Work Type: Intersection

Improvement Termini: Intersection of Kauffman

Avenue and Colonel Glenn Highway in Fairborn,

OH

Fairborn, City of Air Quality Exempt 0.32 CO CO Contr

CO Contr

CO Contr

CO Engr

2019

2019

2019

2019

4HJ7

4TA7

LNT

LNT

Federal

Federal

Local Match

Local Match

ZS30

M23E

LNTP

LNTP

Highway Safety Imp Prog

STBG

Local Match

Local Match

$300,000

$1,447,472

$2,379,284

$288,873

$0

$0

$0

$0

$4,415,629

$4,415,629

$4,415,629

$4,415,629

$4,450,896

$4,450,896

$4,450,896

$4,450,896

2018AM11ID0358FDCO

2018AM11ID0358FDCO

2018AM11ID0358FDCO

2018AM11ID0358FDCO

Ph subtotal: $4,415,629 $0 $4,415,629 $4,450,896

98158 MVRPC GRE GRE SR 444 7.53 Broad St Description: Widening of Broad Street (SR-444)

from 2 to 3 lanes to provide a center turn lane,

installation of curb and gutter and storm sewer,

and installation of sidewalk on both sides of the

roadway. Work Type: Minor Widening

Termini: Broad Street (SR-444): from Sandhill

Road to Spangler Road

Fairborn, City of Air Quality Exempt 0.51 CO CO Contr

CO Contr

CO Engr

2019

2019

2019

4TA7

LNT

LNT

Federal

Local Match

Local Match

M23E

LNTP

LNTP

STBG

Local Match

Local Match

$959,365

$805,810

$123,562

$0

$0

$0

$1,888,737

$1,888,737

$1,888,737

$1,918,362

$1,918,362

$1,918,362

2018AM11ID0359FDCO

2018AM11ID0359FDCO

2018AM11ID0359FDCO

Ph subtotal: $1,888,737 $0 $1,888,737 $1,918,362

98160 MVRPC GRE GRE SR 444 2.20 Kauffman

Ave

Description: The project consists of widening

Kauffman Avenue (SR-444), from Dayton Yellow

Springs Road to Lindberg Drive, from 3 lanes to

4 lanes. Also replacement of the existing traffic

signal at Kauffman and Garland with mast arms,

re Work Type: Minor Widening Termini:

Kauffman Avenue (SR-444): from Dayton Yellow

Springs Road to Lindberg Drive

Fairborn, City of Air Quality Exempt 1.20 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4TA7

LNT

4TA7

LNT

Federal

Local Match

Federal

Local Match

M23E

LNTP

M23E

LNTP

STBG

Local Match

STBG

Local Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

2018stipID0519XXCO

2018stipID0519XXCO

2018stipID0519XXCO

2018stipID0519XXCO

Ph subtotal: $0 $0 $0 $0

98161 MVRPC GRE GRE Creekside Trail

Resurfacing

Description: Apply 1.5 inches of asphalt over the

existing surface course. Installation of a 3' wide

topsoil berm against new pavement with seed,

fertilizer, and mulch. Application of thermoplastic

pavement markings with silica sand for skid

resistance. Full depth pav Work Type:

Bikeways Termini: Creekside Trail: from Alpha

Road in Beavercreek Township to Xenia Station

in Xenia; Spur behind Xenia Town Square Mall

Greene County Park District Air Quality Exempt CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4BG

4TC7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

M301

38

2

Local Match

TAP/Enhancements

TAP/Enhancements

Labor - Local Match

$112,500

$337,500

$4,171

$13,829

$0

$0

$0

$0

$468,000

$468,000

$468,000

$468,000

$479,238

$479,238

$479,238

$479,238

2018AM02ID0067FDCO

2018AM02ID0067FDCO

2018AM02ID0067FDCO

2018AM02ID0067FDCO

Ph subtotal: $468,000 $0 $468,000 $479,238

98162 MVRPC GRE GRE Bikeway Rehab Phase

2

Description: Project will fill all cracks on bike

paths, sealcoat all asphalt sections of paths with

an approved agricultural bio-based

101-Agril-Road treatment product, and perform

full depth repairs as needed. Work Type:

Bikeways Termini: LMR Tr: Yellow Sp. Fairfield

Rd - Clark CL; X-J Conn: Washington St -

Jasper Pk; Creekside Tr: Alpha Rd to

Montgomery CL

Greene County Park District Air Quality Exempt CO CO Contr

CO Contr

CO Engr

2017

2017

2017

4BG

4TC7

LAB

Local Match

Federal

Local Match

2

M301

2

Local Match

TAP/Enhancements

Labor - Local Match

$15,948

$47,844

$2,552

$0

$0

$0

$66,344

$66,344

$66,344

$69,533

$69,533

$69,533

2018MODID0240FDCO

2018MODID0240FDCO

2018MODID0240FDCO

Ph subtotal: $66,344 $0 $66,344 $69,533

Page 12: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 12 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 98576 MVRPC GRE GRE Sugarcreek SRTS 14

Feedwire

Description: Construct a shared use path along

Feedwire Road from from Eden Meadows Way

to the Middle School drive east of Adam's Place.

This section of path will also include the

installation of a crosswalk at Adam’s Place and

on Feedwire Road at the Roger Scott/Ede

Work Type: Bikeways Termini: Feedwire Road

from Eden Meadows Way to the Middle School

drive east of Adam's Place

Sugarcreek, Township of Air Quality Exempt 0.55 CO CO Contr

CO Engr

CO Engr

2019

2019

2019

4SC7

LAB

LAB

Federal

Federal

State

M300

M300

2

TAP/Enhancements

TAP/Enhancements

Labor - State Match

$225,700

$18,056

$4,514

$0

$0

$0

$248,270

$248,270

$248,270

$476,972

$476,972

$476,972

2018AM04ID0156FDCO

2018AM04ID0156FDCO

2018AM04ID0156FDCO

Ph subtotal: $248,270 $0 $248,270 $476,972

RW Acquis

RW Serv

2017

2017

4SC7

4SC7

Federal

Federal

M300

M300

TAP/Enhancements

TAP/Enhancements

$58,500

$52,500

$0

$0

$111,000

$111,000

$463,995

$463,995

2018MODID0242FDRW

2018MODID0242FDRW

Ph subtotal: $111,000 $0 $111,000 $463,995

99489 MVRPC GRE GRE SR 4 1.54 Description: Project is to replace two parallel

culverts (one Corrugated Metal Pipe = 8' 7" x 5'

11" and one Concrete pipe = 6' diameter) that

are 192' long under SR 4 near Bath Rd. The

project to install a 125' right turn lane with a 50'

taper on Bath Rd. to southbou Work Type:

Culvert Construction/Reconstr/Repair Termini:

GRE SR 4 - SLM 1.54

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.07 CO CO Contr

CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

2018

2018

2018

2018

2018

2018

2018

4BC7

4HJ7

4PF7

4PS7

LAB

LAB

LAB

State

Federal

Federal

State

Federal

Federal

State

2

ZS30

M001

2

M001

ZS30

2

State Funds (002)

Not Grouped

National Hwy Performance P

State Funds (002)

National Hwy Performance P

Highway Safety Imp Prog

Labor - State Match

$28,000

$112,000

$1,224,480

$306,120

$85,714

$11,200

$24,228

$0

$0

$0

$0

$0

$0

$0

$1,791,742

$1,791,742

$1,791,742

$1,791,742

$1,791,742

$1,791,742

$1,791,742

$2,084,283

$2,084,283

$2,084,283

$2,084,283

$2,084,283

$2,084,283

$2,084,283

2018AM02ID0068FDCO

2018AM02ID0068FDCO

2018AM02ID0068FDCO

2018AM02ID0068FDCO

2018AM02ID0068FDCO

2018AM02ID0068FDCO

2018AM02ID0068FDCO

Ph subtotal: $1,791,742 $0 $1,791,742 $2,084,283

100826 MVRPC GRE GRE SR 235 10.75/11.10 Description: Rehabilitate bridge GRE-235-1075

by zone painting, replacing bearings, and

updating guardrail.Rehabilitate bridge

GRE-235-1110 by replacing the existing

superstructure. Work Type: Bridge Repair

Termini: GRE-235-1075 - GRE-235-1110

ODOT SPONSORING

AGENCY

Air Quality Exempt CO CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

4PF7

4PS7

LAB

LAB

Federal

State

Federal

State

M001

2

M001

2

National Hwy Performance P

State Funds (002)

National Hwy Performance P

Labor - State Match

$3,468,000

$867,000

$346,800

$86,700

$0

$0

$0

$0

$4,768,500

$4,768,500

$4,768,500

$4,768,500

$5,384,900

$5,384,900

$5,384,900

$5,384,900

2018stipID0523FDCO

2018stipID0523FDCO

2018stipID0523FDCO

2018stipID0523FDCO

Ph subtotal: $4,768,500 $0 $4,768,500 $5,384,900

ENV Env PE

Env PE

Env PE

2018

2018

2018

4PF7

4PS7

LAB

Federal

State

State

Z001

2

2

National Hwy Performance P

State Funds (002)

Labor - State Match

$306,000

$76,500

$141,440

$0

$0

$0

$523,940

$523,940

$523,940

$5,384,900

$5,384,900

$5,384,900

2018stipID0523FDENV

2018stipID0523FDENV

2018stipID0523FDENV

Ph subtotal: $523,940 $0 $523,940 $5,384,900

Description: Rehabilitate bridge GRE-235-1075

over Mud Run by replacing the existing

superstructure and protecting the

piling.Rehabilitate bridge GRE-235-1110 over the

Mad River by zone painting, replacing bearings,

updating guardrail, and stabilizing the stream

chann Work Type: Bridge Preservation

Termini: GRE-235-1075 - GRE-235-1110

ODOT SPONSORING

AGENCY

Air Quality Exempt DD Dtl Dsgn

Dtl Dsgn

Dtl Dsgn

2018

2020

2020

LAB

4PF7

4PS7

State

Federal

State

2

Z001

2

Labor - State Match

National Hwy Performance P

State Funds (002)

$24,960

$35,615

$8,904

$0

$0

$0

$69,479

$69,479

$69,479

$5,445,387

$5,445,387

$5,445,387

2018AM13ID0453FDDD

2018AM13ID0453FDDD

2018AM13ID0453FDDD

Ph subtotal: $69,479 $0 $69,479 $5,445,387

Page 13: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 13 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 100924 MVRPC GRE GRE CR 40 1.27 Kemp Rd

Widening

Description: Widening of Kemp Road to three

lanes from Grange Hall Road to Meadowcourt

Drive. Addition of curb and gutter and storm

sewer system. An 8' wide sidewalk will be

constructed on the north side of the roadway

and a 5' wide sidewalk will be constructed on the

Work Type: Roadway Improvement (Safety)

Termini: Kemp Road: from Grange Hall Road to

Meadowcourt Drive

Beavercreek, City of Air Quality Exempt 0.45 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

Bridge

Local Match

Local Match

$987,610

$1,902,629

$202,317

$0

$0

$0

$3,092,556

$3,092,556

$3,092,556

$3,149,214

$3,149,214

$3,149,214

2018MODID0489FDCO

2018MODID0489FDCO

2018MODID0489FDCO

Ph subtotal: $3,092,556 $0 $3,092,556 $3,149,214

100925 MVRPC GRE GRE CR 36 1.13 Indian

Ripple

Description: Widening of the south side of Indian

Ripple Road from Darst Road to Marydale Drive

to extend the second eastbound through lane.

Installation of curb and gutter and storm sewer

system, lighting, and a 5' wide sidewalk along the

south side of the roadway. A Work Type:

Widening Termini: Indian Ripple Road: from

Darst Road to Marydale Drive

Beavercreek, City of Air Quality Exempt 0.20 CO CO Contr

CO Contr

CO Engr

2018

2018

2018

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

Not Grouped

Local Match

Local Match

$338,250

$325,684

$66,393

$0

$0

$0

$730,327

$730,327

$730,327

$767,697

$767,697

$767,697

2018AM02ID0069FDCO

2018AM02ID0069FDCO

2018AM02ID0069FDCO

Ph subtotal: $730,327 $0 $730,327 $767,697

100929 MVRPC GRE GRE CR 71 3.51

Shakertown Rd Ext

Description: Relocation and extension of

Shakertown Road from Greystone Drive to

Factory Road and realigment of Alpha Belbrook

Road to intersect Shakertown Road west of

Factory Road. The existing intersection of

Shakertown Road and US-35 will be eliminated

as a result Work Type: New Construction

Termini: Shakertown Rd from Greystone Dr to

Factory Rd; Alpha Bellbrook Rd from 0.2 mi W of

Factory Rd to Factory Rd

Beavercreek, City of Air Quality Non-Exe 0.68 CO CO Contr

CO Contr

CO Engr

2019

2019

2019

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

Not Grouped

Local Match

Local Match

$1,722,700

$1,995,117

$260,247

$0

$0

$0

$3,978,064

$3,978,064

$3,978,064

$4,725,311

$4,725,311

$4,725,311

2018AM02ID0070FDCO

2018AM02ID0070FDCO

2018AM02ID0070FDCO

Ph subtotal: $3,978,064 $0 $3,978,064 $4,725,311

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $5,950 $0 $5,950 $3,380,517 2018stipID0526FDDD

Ph subtotal: $5,950 $0 $5,950 $3,380,517

ENV Env PE 2018 LAB State 2 Labor - State Match $33,715 $0 $33,715 $3,380,517 2018stipID0526FDENV

Ph subtotal: $33,715 $0 $33,715 $3,380,517

RW Acquis

Acquis

RW Serv

2018

2018

2018

4TA7

LNT

LAB

Federal

Local Match

State

Z230

LNTP

2

STBG

Local Match

Labor - State Match

$490,000

$210,000

$7,582

$0

$0

$0

$707,582

$707,582

$707,582

$3,380,517

$3,380,517

$3,380,517

2018stipID0526FDRW

2018stipID0526FDRW

2018stipID0526FDRW

Ph subtotal: $707,582 $0 $707,582 $3,380,517

101410 MVRPC GRE GRE SR 235 7.21 Description: FY2019 Urban Paving in the city of

Fairborn on a portion of SR 235 (Xenia Dr) from

Broad St. to just past E. Dayton Drive. Work

Type: Resurfacing, Undivided System

Termini: SR 235: SLM 7.21-7.54

Fairborn, City of Air Quality Exempt 0.76 CO CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

2019

2019

2019

2019

2019

2019

4BG

4PF7

4PF7

LAB

LAB

LAB

Local Match

Federal

Federal

Federal

Federal

Local Match

2

M001

Z240

M001

Z240

2

Local Match

National Hwy Performance P

Not Grouped

National Hwy Performance P

STBG

Labor - Local Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

2018MODID0430XXCO

2018MODID0430XXCO

2018MODID0430XXCO

2018MODID0430XXCO

2018MODID0430XXCO

2018MODID0430XXCO

Ph subtotal: $0 $0 $0 $0

Page 14: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 14 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 101498 MVRPC GRE GRE CR 99 0.56 YSF Road Description: Resurfacing of Yellow Springs

Fairfield Road from Spangler Road to the

eastern Fairborn corporation limit. In addition,

construction of multi-use trail, sidewalk, curb and

gutter, addition of a traffic signal at Black Lane, a

Rectangular Rapid Flashing Be Work Type:

Mill and Fill Termini: Yellow Springs Fairfield

Road: from Spangler Road to the eastern

Fairborn corporation limit

Fairborn, City of Air Quality Exempt 0.98 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

Bridge

Local Match

Local Match

$1,163,745

$1,342,742

$186,428

$0

$0

$0

$2,692,915

$2,692,915

$2,692,915

$2,720,469

$2,720,469

$2,720,469

2018AM12ID0407FDCO

2018AM12ID0407FDCO

2018AM12ID0407FDCO

Ph subtotal: $2,692,915 $0 $2,692,915 $2,720,469

101771 MVRPC GRE GRE CR 502 1.12 Maple

Ave

Description: Widening of Maple Avenue to

provide bike lanes, pavement repair and

resurfacing, upgrade of traffic signals at two

intersections, installation of rectangular rapid

flashing beacons (RRFBs) at unsignalized

pedestrian crossings, and application of new

pavem Work Type: Minor Rehabilitation -

Pavement Gnrl Sys Termini: Maple Avenue:

from Doris Drive to Dayton Drive

Fairborn, City of Air Quality Exempt 1.14 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

STBG

Local Match

Local Match

$1,297,344

$2,516,909

$266,998

$0

$0

$0

$4,081,251

$4,081,251

$4,081,251

$4,105,871

$4,105,871

$4,105,871

2018AM11ID0360FDCO

2018AM11ID0360FDCO

2018AM11ID0360FDCO

Ph subtotal: $4,081,251 $0 $4,081,251 $4,105,871

102060 MVRPC GRE GRE US 35 6.24 Description: Add a right turn lane on the north leg

of the intersection at Valley and Trebein roads.

Work Type: Turn Lane Addition Termini: GRE

US 35 6.24

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.20 CO CO Contr

CO Contr

CO Engr

CO Engr

2018

2018

2018

2018

4BC7

4HJ7

LAB

LAB

State

Federal

Federal

State

2

MS3E

MS3E

2

State Funds (002)

Highway Safety Imp Prog

Highway Safety Imp Prog

Labor - State Match

$23,647

$212,823

$21,282

$2,365

$0

$0

$0

$0

$260,117

$260,117

$260,117

$260,117

$315,271

$315,271

$315,271

$315,271

2018stipID0530FDCO

2018stipID0530FDCO

2018stipID0530FDCO

2018stipID0530FDCO

Ph subtotal: $260,117 $0 $260,117 $315,271

102421 MVRPC GRE GRE US 35 4.30 Description: Construct superstreets at the

US-35 with Factory and Orchard. Work Type:

Intersection Improvement Termini: US 35

Intersections with Factory & Orchard

ODOT SPONSORING

AGENCY

Air Quality Exempt 1.30 CO CO Contr

CO Contr

CO Contr

CO Contr

CO Contr

CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

CO Engr

CO Engr

CO Engr

CO Engr

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

4BC7

4BG

4HJ7

4R27

4R47

4R47

4R57

4TA7

LAB

LAB

LAB

LAB

LAB

LAB

LAB

State

Local Match

Federal

Federal

Federal

Federal

Federal

Federal

Federal

Federal

Federal

Federal

Federal

Local Match

State

2

2

ZS30

RPE9

RPF9

RPS9

RPS9

Z230

38

RPE9

RPF9

RPS9

ZS30

2

2

State Funds (002)

Local Match

Not Grouped

Not Grouped

Not Grouped

Not Grouped

Not Grouped

Not Grouped

STBG

Not Grouped

Not Grouped

Not Grouped

Highway Safety Imp Prog

Labor - Local Match

Labor - State Match

$652,500

$1,444,350

$5,872,500

$334,509

$92,240

$189,658

$1,676,870

$2,803,739

$196,261

$23,416

$129,536

$7,579

$411,075

$101,104

$45,675

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$13,981,012

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

$16,939,793

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

2018AM04ID0157FDCO

Ph subtotal: $13,981,012 $0 $13,981,012 $16,939,793

DD Dtl Dsgn

Dtl Dsgn

2019

2019

4BC7

4HJ7

State

Federal

2

ZS30

State Funds (002)

Highway Safety Imp Prog

$87,500

$787,500

$0

$0

$875,000

$875,000

$16,760,793

$16,760,793

2018stipID0531FDDD

2018stipID0531FDDD

Ph subtotal: $875,000 $0 $875,000 $16,760,793

RW Acquis

Acquis

Utl Remb

Utl Remb

2018

2018

2018

2018

4B47

STM

4BC7

4HJ7

Federal

State

State

Federal

Z001

2

2

ZS30

National Hwy Performance P

State Funds (002)

State Funds (002)

Highway Safety Imp Prog

$752,000

$188,000

$30,000

$270,000

$82,474

$82,474

$82,474

$82,474

$1,134,474

$1,134,474

$1,134,474

$1,134,474

$16,760,793

$16,760,793

$16,760,793

$16,760,793

2018stipID0531FDRW

2018stipID0531FDRW

2018stipID0531FDRW

2018stipID0531FDRW

Ph subtotal: $1,240,000 $82,474 $1,134,474 $16,760,793

Page 15: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 15 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 102746 MVRPC GRE GRE US 42 0263/2021 Description: Replace Bridge GRE-42-0263 that

carries US 42 over the Little Miami Bikepath and

a private drive. Widen bridge to match approach

roadway width. Bridge length may be reduced.

Rehabilitate GRE-42-2021 over North Fork

Massies Creek by installing a rigid over Work

Type: Bridge Replacement Termini: GRE US

42 0263/2021 SFNs 2900785 & 2901080

ODOT SPONSORING

AGENCY

Air Quality Exempt DD Dtl Dsgn

Dtl Dsgn

Dtl Dsgn

2019

2020

2020

LAB

4PF7

4PS7

State

Federal

State

2

Z232

2

Labor - State Match

STBG

State Funds (002)

$24,960

$56,000

$14,000

$0

$0

$0

$94,960

$94,960

$94,960

$3,027,710

$3,027,710

$3,027,710

2018stipID0532FDDD

2018stipID0532FDDD

2018stipID0532FDDD

Ph subtotal: $94,960 $0 $94,960 $3,027,710

ENV Env PE

Env PE

Env PE

2019

2020

2020

LAB

4PF7

4PS7

State

Federal

State

2

Z232

2

Labor - State Match

STBG

State Funds (002)

$141,440

$224,000

$56,000

$0

$0

$0

$421,440

$421,440

$421,440

$3,027,710

$3,027,710

$3,027,710

2018stipID0532FDENV

2018stipID0532FDENV

2018stipID0532FDENV

Ph subtotal: $421,440 $0 $421,440 $3,027,710

RW Acquis 2020 4PS7 State 2 State Funds (002) $15,000 $0 $15,000 $3,027,710 2018stipID0532FDRW

Ph subtotal: $15,000 $0 $15,000 $3,027,710

103492 MVRPC GRE GRE CR 1 1.30 Col Glenn

Streetsc

Description: Installation of decorative hardscape

elements such as a brick pavers, seating walls,

and decorative vehicular and pedestrian lighting.

Installation of a missing section of sidewalk on

the south side of Colonel Glenn Highway.

Reconstruction of the existing Work Type: Add

Sidewalks Termini: Colonel Glenn Highway

from Zink Road to 500 feet east of Presidential

Drive

Beavercreek, City of Air Quality Exempt 0.41 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TC7

LNT

LNT

Federal

Local Match

Local Match

Z301

LNTP

LNTP

TAP/Enhancements

Local Match

Local Match

$693,000

$531,000

$85,680

$0

$0

$0

$1,309,680

$1,309,680

$1,309,680

$1,342,523

$1,342,523

$1,342,523

2018AM08ID0254FDCO

2018AM08ID0254FDCO

2018AM08ID0254FDCO

Ph subtotal: $1,309,680 $0 $1,309,680 $1,342,523

103493 MVRPC GRE GRE CR 36 1.26 Sidewalks Description: Construction of an 8 foot wide side

path along the north side of Indian Ripple Road

from Harbert Drive to Grange Hall Road. In

addition, construction of a 5 foot wide sidewalk

on the south side of Indian Ripple Road from

east of Marydale Drive to Grange H Work

Type: Add Sidewalks Termini: Indian Ripple

Road: from Harbert Drive to Grange Hall Road

Beavercreek, City of Air Quality Exempt 0.42 CO CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

4TC7

LNT

4TC7

LNT

Federal

Local Match

Federal

Local Match

Z301

LNTP

Z301

LNTP

TAP/Enhancements

Local Match

TAP/Enhancements

Local Match

$318,000

$212,000

$31,800

$21,200

$0

$0

$0

$0

$583,000

$583,000

$583,000

$583,000

$604,022

$604,022

$604,022

$604,022

2018stipID0534FDCO

2018stipID0534FDCO

2018stipID0534FDCO

2018stipID0534FDCO

Ph subtotal: $583,000 $0 $583,000 $604,022

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $2,739 $0 $2,739 $604,022 2018stipID0534FDDD

Ph subtotal: $2,739 $0 $2,739 $604,022

ENV Env PE 2018 LAB State 2 Labor - State Match $15,520 $0 $15,520 $604,022 2018stipID0534FDENV

Ph subtotal: $15,520 $0 $15,520 $604,022

RW RW Serv 2018 LAB State 2 Labor - State Match $2,763 $0 $2,763 $604,022 2018stipID0534FDRW

Ph subtotal: $2,763 $0 $2,763 $604,022

103590 MVRPC GRE GRE CR 40 0.99 Kemp

Interconnect

Description: Installation of fiber optic

interconnect cable along Kemp Road from

Grange Hall Road to Hanes Road,

reconstruction of the existing traffic signal at

Kemp Road and Turnbull Road, signal head

upgrades, installation of battery backup

systems, video vehicle d Work Type: Traffic

Control (Safety) Termini: Kemp Road: from

Grange Hall Road to Hanes Road

Beavercreek, City of Air Quality Exempt 2.06 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

Bridge

Local Match

Local Match

$429,000

$263,251

$69,225

$0

$0

$0

$761,476

$761,476

$761,476

$778,219

$778,219

$778,219

2018AM14ID0483FDCO

2018AM14ID0483FDCO

2018AM14ID0483FDCO

Ph subtotal: $761,476 $0 $761,476 $778,219

Page 16: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 16 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 103676 MVRPC GRE GRE CR 54 4.82 Central

Ave

Description: Resurfacing of Central Avenue from

Slip Lane (south of Xenia Drive) to Broad Street.

Pavement repair will be performed as needed.

Work Type: Minor Rehabilitation - Pavement

Gnrl Sys Termini: Central Avenue: from Slip

Lane (south of Xenia Drive) to Broad Street

Fairborn, City of Air Quality Exempt 0.63 CO CO Contr

CO Contr

CO Engr

2018

2018

2018

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

STBG

Local Match

Local Match

$518,536

$129,634

$25,927

$0

$0

$0

$674,097

$674,097

$674,097

$677,311

$677,311

$677,311

2018stipID0536FDCO

2018stipID0536FDCO

2018stipID0536FDCO

Ph subtotal: $674,097 $0 $674,097 $677,311

105661 MVRPC GRE GRE W Second St

Resurfacing

Description: Mill and resurfacing of W. Second

Street including repair of deteriorated curb and

inlets. Installation of two Rectangular Rapid

Flashing Beacons (RRFBs) at the Creekside

Trail crossing. Work Type: Mill and Fill

Termini: W. Second Street: from S. Allison

Avenue to US-42 (S. Church Street)

Xenia, City of Air Quality Exempt 0.44 DD Dtl Dsgn 2019 LAB State 2 Labor - State Match $622 $0 $622 $399,125 2018AM01ID0029FDDD

Ph subtotal: $622 $0 $622 $399,125

ENV Env PE 2019 LAB State 2 Labor - State Match $3,525 $0 $3,525 $399,125 2018AM01ID0029FDENV

Ph subtotal: $3,525 $0 $3,525 $399,125

Description: Mill and resurfacing of W. Second

Street including repair of deteriorated curb and

inlets. Installation of two Rectangular Rapid

Flashing Beacons (RRFBs) at the Creekside

Trail crossing. *This project is Part 1 and is

being bid with Part 2, PID #108002.* Work

Type: Mill and Fill Termini: W. Second Street:

from S. Allison Avenue to US-42 (S. Church

Street)

Xenia, City of Air Quality Exempt 0.44 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4TA7

LNT

4TA7

LNT

Federal

Local Match

Federal

Local Match

Z230

LNTP

Z230

LNTP

Bridge

Local Match

Bridge

Local Match

$528,569

$818,681

$7,862

$32,556

$0

$0

$0

$0

$1,387,668

$1,387,668

$1,387,668

$1,387,668

$1,395,991

$1,395,991

$1,395,991

$1,395,991

2018AM08ID0255FDCO

2018AM08ID0255FDCO

2018AM08ID0255FDCO

2018AM08ID0255FDCO

Ph subtotal: $1,387,668 $0 $1,387,668 $1,395,991

106216 MVRPC GRE GRE N Fairfield Rd

Resurfacing

Description: This project consists of milling and

resurfacing, upgrading curb ramps to ADA

compliance, repair to deteriorated curb and

sidewalk, and the installation of raised pavement

markers. Work Type: Minor Rehabilitation -

Pavement Gnrl Sys Termini: North Fairfield

Road from North Drive to Lakeview Drive

Beavercreek, City of Air Quality Exempt 1.19 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4TA7

LNT

4TA7

LNT

Federal

Local Match

Federal

Local Match

LNTP

LNTP

Un-Assigned Federal

Local Match

Un-Assigned Federal

Local Match

$638,400

$425,600

$19,152

$12,768

$0

$0

$0

$0

$1,095,920

$1,095,920

$1,095,920

$1,095,920

$1,107,539

$1,107,539

$1,107,539

$1,107,539

2018AM02ID0072FDCO

2018AM02ID0072FDCO

2018AM02ID0072FDCO

2018AM02ID0072FDCO

Ph subtotal: $1,095,920 $0 $1,095,920 $1,107,539

106217 MVRPC GRE GRE CR 36 0.00

Resurfacing

Description: This project consists of milling and

resurfacing, pavement repairs, placement of a

SAMI layer over the existing concrete base, curb

repairs, pavement markings, and the installation

of raised pavement markers. Work Type:

Minor Rehabilitation - Pavement Gnrl Sys

Termini: Indian Ripple Road from Stroop Road to

Sylvania Drive

Beavercreek, City of Air Quality Exempt 0.49 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4TA7

LNT

4TA7

LNT

Federal

Local Match

Federal

Local Match

LNTP

LNTP

Un-Assigned Federal

Local Match

Un-Assigned Federal

Local Match

$706,300

$302,700

$21,189

$9,081

$0

$0

$0

$0

$1,039,270

$1,039,270

$1,039,270

$1,039,270

$1,050,289

$1,050,289

$1,050,289

$1,050,289

2018AM02ID0073FDCO

2018AM02ID0073FDCO

2018AM02ID0073FDCO

2018AM02ID0073FDCO

Ph subtotal: $1,039,270 $0 $1,039,270 $1,050,289

106311 MVRPC GRE GRE CR 502 0.00 Maple

Ave

Description: Widening of the roadway to

accommodate 3 traffic lanes and bike lanes,

milling and resurfacing, full depth pavement

repair where necessary, new curb, gutter, and

storm sewer system, and striping. Work Type:

Widening Termini: Maple Avenue: from Dayton

Yellow Springs Road to Doris Drive

Fairborn, City of Air Quality Exempt 1.12 CO CO Contr

CO Contr

2021

2021

4TA7

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

$1,754,344

$1,169,563

$0

$0

$3,128,580

$3,128,580

$3,220,509

$3,220,509

2018AM02ID0074FDCO

2018AM02ID0074FDCO

Page 17: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 17 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 106311 MVRPC GRE GRE CR 502 0.00 Maple

Ave

Description: Widening of the roadway to

accommodate 3 traffic lanes and bike lanes,

Fairborn, City of Air Quality Exempt 1.12 CO CO Engr 2021 LNT Local Match LNTP Local Match $204,673 $0 $3,128,580 $3,220,509 2018AM02ID0074FDCO

Ph subtotal: $3,128,580 $0 $3,128,580 $3,220,509

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $4,789 $0 $4,789 $3,220,509 2018AM02ID0074FDDD

Ph subtotal: $4,789 $0 $4,789 $3,220,509

ENV Env PE 2018 LAB State 2 Labor - State Match $27,140 $0 $27,140 $3,220,509 2018AM02ID0074FDENV

Ph subtotal: $27,140 $0 $27,140 $3,220,509

RW RW Serv 2018 LAB State 2 Labor - State Match $60,000 $0 $60,000 $3,220,509 2018AM02ID0074FDRW

Ph subtotal: $60,000 $0 $60,000 $3,220,509

106312 MVRPC GRE GRE CR 1 1.75 Col Glenn

Enhncmnt

Description: Installation of a shared use path,

decorative walls, gateway columns, decorative

street lighting, and landscaping. Work Type:

Bike Facility Termini: Colonel Glenn Highway:

from the west city corporation limit (near

Presidential Drive) to North Fairfield Road

Fairborn, City of Air Quality Exempt 0.76 CO CO Contr

CO Contr

CO Engr

2021

2021

2021

4TC7

LNT

LNT

Federal

Local Match

Local Match

Z301

LNTP

LNTP

TAP/Enhancements

Local Match

Local Match

$350,000

$1,585,754

$135,503

$0

$0

$0

$2,071,257

$2,071,257

$2,071,257

$2,093,045

$2,093,045

$2,093,045

2018AM13ID0454FDCO

2018AM13ID0454FDCO

2018AM13ID0454FDCO

Ph subtotal: $2,071,257 $0 $2,071,257 $2,093,045

106319 MVRPC GRE GRE CR 1 1.83 Col Glenn

Sdwk Pt1

Description: Installation of new sidewalk,

pedestrian crossings with ADA compliant curb

ramps, signal improvements, construction of

retaining walls, and installation of lighting for

pedestrian facilities.*Being constructed as a Part

1/Part 2 project. Part 2 is PID 106 Work Type:

Pedestrian Facilities Termini: Colonel Glenn

Highway: from University Boulevard to Old

Yellow Springs Road

Fairborn, City of Air Quality Exempt 1.03 CO CO Contr

CO Contr

CO Contr

CO Engr

2021

2021

2021

2021

4TB7

4TC7

LNT

LNT

Federal

Federal

Local Match

Local Match

Z400

Z301

LNTP

LNTP

CMAQ

TAP/Enhancements

Local Match

Local Match

$920,349

$350,000

$1,106,180

$166,357

$0

$0

$0

$0

$2,542,886

$2,542,886

$2,542,886

$2,542,886

$2,542,886

$2,542,886

$2,542,886

$2,542,886

2018AM15ID0518FDCO

2018AM15ID0518FDCO

2018AM15ID0518FDCO

2018AM15ID0518FDCO

Ph subtotal: $2,542,886 $0 $2,542,886 $2,542,886

106324 MVRPC GRE GRE Yellow Springs ADA

Curb Ramp

Description: Upgrading curb ramps to meet

current ADA standards at a number of crossings

in the Village of Yellow Springs. Work Type:

Add Sidewalks Termini: Elm St: Phillips St to

Winter St; Dayton St: East Enon Rd to Winter St;

South College St: East Enon Rd to High St

Yellow Springs, Village of Air Quality Exempt 0.96 CO CO Contr

CO Contr

CO Engr

CO Engr

2018

2018

2018

2018

4BG

4TC7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

Z301

38

2

Local Match

Not Grouped

TAP/Enhancements

Labor - Local Match

$30,682

$92,045

$9,205

$3,068

$0

$0

$0

$0

$135,000

$135,000

$135,000

$135,000

$143,781

$143,781

$143,781

$143,781

2018AM03ID0118FDCO

2018AM03ID0118FDCO

2018AM03ID0118FDCO

2018AM03ID0118FDCO

Ph subtotal: $135,000 $0 $135,000 $143,781

107120 MVRPC GRE GRE SR 444 4.60 Description: FY2020 Urban Paving in the City of

Fairborn on a portion of SR 444 from Lindberg

St. to E. Dayton Drive. Work Type:

Resurfacing, Undivided System Termini: GRE

SR 444 SLM 4.60 to 5.15

Fairborn, City of Air Quality Exempt 0.55 CO CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

2020

2020

2020

2020

2020

2020

4BG

4BG

4PF7

4BG

LAB

LAB

Local Match

Local Match

Federal

Local Match

Federal

Local Match

2

2

Z001

2

Z001

2

Local Match

Local Match

National Hwy Performance P

Local Match

National Hwy Performance P

Labor - Local Match

$387,324

$946,276

$242,400

$89,110

$23,205

$7,095

$0

$0

$0

$0

$0

$0

$1,695,410

$1,695,410

$1,695,410

$1,695,410

$1,695,410

$1,695,410

$1,709,333

$1,709,333

$1,709,333

$1,709,333

$1,709,333

$1,709,333

2018MODID0526FDCO

2018MODID0526FDCO

2018MODID0526FDCO

2018MODID0526FDCO

2018MODID0526FDCO

2018MODID0526FDCO

Ph subtotal: $1,695,410 $0 $1,695,410 $1,709,333

107217 MVRPC GRE GRE US 35 5.84 Description: This project is to replace the

existing US 35/Valley Trebein intersection with

an interchange of Valley Trebein over US 35.

Work Type: Interchange, New Termini: 0.50

miles west of Valley Trebein to 0.64 miles east of

Valley Trebein

Greene County

Commissioners

Air Quality Non-Exe 1.16 DD Dtl Dsgn

Dtl Dsgn

2019

2019

4B47

4BD7

Federal

State

Z001

2

National Hwy Performance P

State Funds (002)

$250,977

$200,000

$0

$0

$1,250,977

$1,250,977

$30,070,977

$30,070,977

2018AM08ID0256FDDD

2018AM08ID0256FDDD

Page 18: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 18 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 107217 MVRPC GRE GRE US 35 5.84 Description: This project is to replace the

existing US 35/Valley Trebein intersection with

Greene County

Commissioners

Air Quality Non-Exe 1.16 DD Dtl Dsgn 2019 4BK7 Federal Z001 National Hwy Performance P $800,000 $0 $1,250,977 $30,070,977 2018AM08ID0256FDDD

Ph subtotal: $1,250,977 $0 $1,250,977 $30,070,977

RW Acquis

Acquis

2020

2020

4BD7

4BK7

State

Federal

2

Z001

State Funds (002)

National Hwy Performance P

$200,000

$800,000

$0

$0

$1,000,000

$1,000,000

$30,070,977

$30,070,977

2018AM10ID0303FDRW

2018AM10ID0303FDRW

Ph subtotal: $1,000,000 $0 $1,000,000 $30,070,977

108002 MVRPC GRE GRE CR 86 7.45 W.

Second St

Description: Mill and resurface of West Second

Street from South Progress Drive to Massie

Drive. Work Type: Mill and Fill Termini: W.

Second Street: from S. Progress Drive to Massie

Drive

Xenia, City of Air Quality Exempt 0.85 CO CO Contr

CO Contr

CO Engr

2019

2019

2019

4TA7

LNT

LNT

Federal

Local Match

Local Match

LNTP

LNTP

Un-Assigned Federal

Local Match

Local Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

2018AM06ID0204XXCO

2018AM06ID0204XXCO

2018AM06ID0204XXCO

Ph subtotal: $0 $0 $0 $0

108836 MVRPC GRE GRE TR 215 0.86

Columbus St

Description: Replacement of Bridge No. GRE

COLUM 0020 (SFN: 2960370) which carries

Columbus Street (TR 215) over the North

Branch of Shawnee Creek with a pre-cast

concrete four-sided box culvert. Work Type:

Bridge Preservation Termini: Bridge GRE

COLUM 0020 (SFN: 2960370)

Xenia, City of Air Quality Exempt CO CO Contr

CO Engr

2021

2021

5BP7

5BP7

Federal

Federal

Z240

Z240

STBG

STBG

$597,168

$59,717

$0

$0

$656,885

$656,885

$659,292

$659,292

2018AM15ID0519FDCO

2018AM15ID0519FDCO

Ph subtotal: $656,885 $0 $656,885 $659,292

108934 MVRPC GRE GRE SR 835 0.00 Description: FY2021 Urban Paving in the City of

Beavercreek on a portion of SR 835 from the

Montgomery County line to the US 35 ramp.

Work Type: Resurfacing, Undivided System

Termini: GRE SR 835: SLM 0 - 2.08

Beavercreek, City of Air Quality Exempt 2.08 CO CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

4PF7

LNT

4PF7

LNT

Federal

Local Match

Federal

Local Match

Z240

LNTP

Z240

LNTP

STBG

Local Match

STBG

Local Match

$987,590

$987,591

$29,628

$29,628

$0

$0

$0

$0

$2,034,437

$2,034,437

$2,034,437

$2,034,437

$2,135,171

$2,135,171

$2,135,171

$2,135,171

2018AM10ID0304FDCO

2018AM10ID0304FDCO

2018AM10ID0304FDCO

2018AM10ID0304FDCO

Ph subtotal: $2,034,437 $0 $2,034,437 $2,135,171

109170 MVRPC GRE GRE VAR Guardrail FY 20 Description: Replacement and upgrades to

existing guardrail and anchor/bridge assemblies

on various county roads in Greene County.

Work Type: Guardrail upgrade/replace

Termini: Various county roads in Greene County

GREENE COUNTY

ENGINEER

Air Quality Exempt 14.43 CO CO Contr

CO Engr

2020

2020

4HB7

LNT

Federal

Local Match

ZS30

LNTP

Highway Safety Imp Prog

Local Match

$300,000

$12,000

$0

$0

$312,000

$312,000

$314,226

$314,226

2018AM12ID0408FDCO

2018AM12ID0408FDCO

Ph subtotal: $312,000 $0 $312,000 $314,226

111002 MVRPC GRE GRE Yellow Springs SRTS

2019

Description: Install sidewalk Work Type:

Pedestrian Facilities Termini: West Limestone

Street from Mills Lawn Elementary to Dayton

Street

Yellow Springs, Village of Air Quality Exempt DD Dtl Dsgn 2021 4SC7 Federal Z303 TAP/Safe Routes to School $12,000 $0 $12,000 $460,000 2018AM13ID0455FDDD

Ph subtotal: $12,000 $0 $12,000 $460,000

ENV Env PE 2020 4SC7 Federal Z303 TAP/Safe Routes to School $68,000 $0 $68,000 $460,000 2018AM13ID0455FDENV

Ph subtotal: $68,000 $0 $68,000 $460,000

RW RW Serv 2020 LAB State 2 Labor - State Match $60,000 $0 $60,000 $460,000 2018AM13ID0455FDRW

Ph subtotal: $60,000 $0 $60,000 $460,000

111657 MVRPC GRE GRE-68-13.51 Description: Improve safety at the intersection of

US-68 and SR-235 by either constructing a

roundabout or relocating SR-235 to reduce

intersection skew. Work Type: Intersection

Improvement (Safety) Termini: Intersection of

US-68 and SR-235

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.20 ENV Env PE 2021 4HJ7 Federal ZS30 Highway Safety Imp Prog $400,000 $0 $400,000 $2,990,000 2018AM15ID0520FDENV

Ph subtotal: $400,000 $0 $400,000 $2,990,000

Page 19: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 19 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 25349 OKI HAM HAM SR 264 10.42 Description: Remove bridge No. HAM-264-1044

(SFN: 3111547), over abandoned RR.

Reconstruct roadway on new embankment.

Work Type: Major Reconstruction Termini:

FROM 4.22 MILES NORTH OF US 50 TO 4.15

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.07 CO CO Contr

CO Contr

CO Engr

CO Engr

2020

2020

2020

2020

4PF7

4PS7

LAB

LAB

Federal

State

Federal

State

L240

2

L240

2

STBG

State Funds (002)

STBG

Labor - State Match

$400,000

$100,000

$40,000

$10,000

$0

$0

$0

$0

$550,000

$550,000

$550,000

$550,000

$617,000

$617,000

$617,000

$617,000

2018stipID0560FDCO

2018stipID0560FDCO

2018stipID0560FDCO

2018stipID0560FDCO

Ph subtotal: $550,000 $0 $550,000 $617,000

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $3,750 $0 $3,750 $617,000 2018stipID0560FDDD

Ph subtotal: $3,750 $0 $3,750 $617,000

ENV Env PE 2018 LAB State 2 Labor - State Match $21,250 $1,000 $22,250 $617,000 2018stipID0560FDENV

Ph subtotal: $21,250 $1,000 $22,250 $617,000

RW Acquis

Labor

RW Serv

2018

2018

2018

4PS7

LAB

LAB

State

State

State

2

2

2

State Funds (002)

Labor - State Match

Labor - State Match

$20,000

$1,000

$20,000

$0

$0

$0

$41,000

$41,000

$41,000

$617,000

$617,000

$617,000

2018stipID0560FDRW

2018stipID0560FDRW

2018stipID0560FDRW

Ph subtotal: $41,000 $0 $41,000 $617,000

76256 OKI HAM HAM IR 75 10.10 (14.61) Description: Phase 8 project limist from 14.50 to

16.50, Glendale Milford to Kemper overpass.

Widen for a fourth lane on I75 in both directions

and auxiliary lanes from Sharon Road to

Glendale Milford Road and from Sharon Road to

IR275. Work includes improving the c Work

Type: Major Widening Termini: Glendale

Milford Road to IR275 (phase 8)

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 2.02 RW Acquis

Acquis

RW Serv

RW Serv

2016

2016

2016

2016

4BD7

4BK7

4BD7

4BK7

State

Federal

State

Federal

2

L050

2

L050

State Funds (002)

National Highway System

State Funds (002)

National Highway System

$540,000

$2,160,000

$65,400

$261,600

$203,000

$203,000

$203,000

$203,000

$3,230,000

$3,230,000

$3,230,000

$3,230,000

$57,901,053

$57,901,053

$57,901,053

$57,901,053

2018MODID0205FDRW

2018MODID0205FDRW

2018MODID0205FDRW

2018MODID0205FDRW

Ph subtotal: $3,027,000 $203,000 $3,230,000 $57,901,053

77628 OKI HAM HAM IR 71 3.81 Description: Two-Step Low-Bid Design Build:

Provide a full movement interchange at IR-71 &

MLK Drive while maintaining existing connections

to WHT and McMillan. Provide ramp metering on

the northbound entrance ramp from McMillan.

Provide a northbound auxiliary lane fr Work

Type: Interchange, Reconstruction Termini:

Cincinnati - 9 Uptown communities.

Cincinnati, City of Air Quality Non-Exe 3.56 OT Dbt Serv

Dbt Serv

Dbt Serv

Dbt Serv

2018

2019

2020

2021

4TA7

4TA7

4TA7

4TA7

Federal

Federal

Federal

Federal

M230

M230

M230

M230

STBG

STBG

STBG

STBG

$1,000,000

$1,000,000

$1,000,000

$1,000,000

$0

$0

$0

$0

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$105,492,627

$105,492,627

$105,492,627

$105,492,627

2018stipID0562FDOTH

2018stipID0562FDOTH

2018stipID0562FDOTH

2018stipID0562FDOTH

Ph subtotal: $4,000,000 $0 $4,000,000 $105,492,627

77889 OKI HAM HAM IR 75 7.85 Description: Phase 8 of the Mill Creek

Expressway Project. Project will widen for

additional through lanes, rehabilitate existing

pavement and bridges. Reconstruct SR 562

interchange, remove the Towne Ave.

interchange, complete minor improvements to

the Paddock Road Work Type: Major

Widening Termini: Begin south of SR562

interchange and at the SR126 interchange, 7.85

to 10.30

DISTRICT 8 PRODUCTION Air Quality Non-Exe 3.45 RW Acquis

Acquis

RW Serv

RW Serv

Utl Remb

Utl Remb

2016

2016

2016

2016

2016

2016

4BD7

4BK7

4BD7

4BK7

4BD7

4BK7

State

Federal

State

Federal

State

Federal

2

L050

2

L050

2

M001

State Funds (002)

National Highway System

State Funds (002)

National Highway System

State Funds (002)

National Hwy Performance P

$381,800

$1,527,200

$33,000

$132,000

$15,000

$60,000

$0

$0

$0

$0

$0

$0

$2,149,000

$2,149,000

$2,149,000

$2,149,000

$2,149,000

$2,149,000

$135,703,578

$135,703,578

$135,703,578

$135,703,578

$135,703,578

$135,703,578

2018MODID0207FDRW

2018MODID0207FDRW

2018MODID0207FDRW

2018MODID0207FDRW

2018MODID0207FDRW

2018MODID0207FDRW

Ph subtotal: $2,149,000 $0 $2,149,000 $135,703,578

Page 20: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 20 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 82288 OKI HAM HAM IR 75 12.60 Description: Phase 1&2 of the HAM-75 Corridor

Projects. Phase 1: Reconstruct the interstate

between Shepherd Lane and Glendale-Milford

Rd. Work includes the redesign of the Shepherd

Ln. interchange, removal of the collector

distributor system, and improvements to th

Work Type: Major Reconstruction Termini:

From 0.3 miles south of Shepherd Lane to 0.2

miles north of Glendale-Milford Rd.(phase 1)

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 1.84 CO CO Engr

CO Engr

CO Engr

CO Engr

CO Engr

CO Engr

2018

2018

2019

2019

2020

2020

4PF7

4PS7

4PF7

4PS7

4PF7

4PS7

Federal

State

Federal

State

Federal

State

Z001

2

Z001

2

Z001

2

National Hwy Performance P

State Funds (002)

National Hwy Performance P

State Funds (002)

National Hwy Performance P

State Funds (002)

$729,510

$182,378

$1,263,274

$315,818

$1,209,570

$302,392

$6,538,500

$6,538,500

$6,538,500

$6,538,500

$6,538,500

$6,538,500

$10,541,442

$10,541,442

$10,541,442

$10,541,442

$10,541,442

$10,541,442

$123,048,053

$123,048,053

$123,048,053

$123,048,053

$123,048,053

$123,048,053

2018stipID0563FDCO

2018stipID0563FDCO

2018stipID0563FDCO

2018stipID0563FDCO

2018stipID0563FDCO

2018stipID0563FDCO

Ph subtotal: $4,002,942 $6,538,500 $10,541,442 $123,048,053

83723 OKI HAM HAM IR 75 3.85 Description: This is Phase 5 of the Hamilton 75

corridor projects. This phase was split off of the

work originally to be completed under PID

76257. Project adds a lane to I-75 and

reconfigures the I-74/75 interchange. Work

Type: Major Widening Termini: From the

Monmouth overpass to just south of Clifton Rd.

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 3.47 RW Acquis

Acquis

Utl Remb

Utl Remb

Utl Remb

Utl Remb

2014

2014

2014

2014

2015

2015

4BD7

4BK7

4BD7

4BK7

4BD7

4BK7

State

Federal

State

Federal

State

Federal

2

L050

2

L050

2

L05E

State Funds (002)

National Highway System

State Funds (002)

National Highway System

State Funds (002)

National Highway System

$170,000

$680,000

$80,000

$320,000

$400,000

$1,600,000

$567,550

$567,550

$567,550

$567,550

$567,550

$567,550

$3,817,550

$3,817,550

$3,817,550

$3,817,550

$3,817,550

$3,817,550

$176,126,375

$176,126,375

$176,126,375

$176,126,375

$176,126,375

$176,126,375

2018MODID0212FDRW

2018MODID0212FDRW

2018MODID0212FDRW

2018MODID0212FDRW

2018MODID0212FDRW

2018MODID0212FDRW

Ph subtotal: $3,250,000 $567,550 $3,817,550 $176,126,375

84492 OKI HAM HAM IR 275 39.81 Description: Resurface and perform pavement

repair on I-275 from just before Four Mile Road

to the Ohio River in Hamilton County. Project

includes minor rehabilitation to a bridge size

culvert and 5 mainline twin bridges including the

Combs Hehl Bridge over the OhioR Work

Type: Minor Rehabilitation - Pavement Prmy Sys

Termini: HAM IR 275: SLM 39.81 to 41.36

ODOT SPONSORING

AGENCY

Air Quality Exempt 1.55 CO CO Contr

CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

2018

2018

2018

2018

2018

2018

4BG

4PS7

7BTB

7DG

LAB

LAB

Local Match

State

Bonds

Bonds

Local Match

State

2

2

42

45

2

2

Local Match

State Funds (002)

State Bonds

Garvee Bond-Fund 045-Lon

Labor - Local Match

Labor - State Match

$7,589,473

$5,994,692

$2,433,011

$13,654,804

$458,143

$993,749

$0

$0

$0

$0

$0

$0

$31,123,872

$31,123,872

$31,123,872

$31,123,872

$31,123,872

$31,123,872

$32,619,673

$32,619,673

$32,619,673

$32,619,673

$32,619,673

$32,619,673

2018AM03ID0120FDCO

2018AM03ID0120FDCO

2018AM03ID0120FDCO

2018AM03ID0120FDCO

2018AM03ID0120FDCO

2018AM03ID0120FDCO

Ph subtotal: $31,123,872 $0 $31,123,872 $32,619,673

86462 OKI HAM HAM/CLE SR 32F 2.50/0.00 Description: Perform Environmental analyses

and Preliminary Engineering for the following:

Consolidate and manage access points to

establish relocated SR 32 a controlled access

arterial roadway west of IR 275, including

coordination for accommodation of multi-modal

co Work Type: New Construction Termini:

From US 50 to Bells Lane

ODOT SPONSORING

AGENCY

Air Quality Exempt 5.63 ENV Env PE

Env PE

2016

2016

4BD7

4BK7

State

Federal

2

L240

State Funds (002)

STP

$1,970,673

$7,882,691

$4,175,523

$4,175,523

$14,028,887

$14,028,887

$398,478,887

$398,478,887

2018MODID0213FDENV

2018MODID0213FDENV

Ph subtotal: $9,853,364 $4,175,523 $14,028,887 $398,478,887

88124 OKI HAM HAM IR 75 10.10 Description: Add fourth lane in each direction,

add auxiliary lanes from bridge at 10.10 (over Mill

creek) to SR126, reconstruct left hand exit from

northbound IR75 to Galbraith Road as a right

hand exit and improve ramps from: eastbound

SR126 to southbound IR75, Galb Work Type:

Major Widening Termini: 1010 Bridge over Mill

creek to Galbraith Road (phase 3)

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 0.79 RW Acquis

Acquis

RW Serv

RW Serv

RW Serv

2016

2016

2016

2016

2016

4BD7

4BK7

4BD7

4BK7

LAB

State

Federal

State

Federal

State

2

M001

2

M001

2

State Funds (002)

National Hwy Performance P

State Funds (002)

National Hwy Performance P

Labor - State Match

$22,000

$88,000

$8,000

$32,000

$77,702

$0

$0

$0

$0

$0

$227,702

$227,702

$227,702

$227,702

$227,702

$50,120,606

$50,120,606

$50,120,606

$50,120,606

$50,120,606

2018MODID0214FDRW

2018MODID0214FDRW

2018MODID0214FDRW

2018MODID0214FDRW

2018MODID0214FDRW

Page 21: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 21 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

Ph subtotal: $227,702 $0 $227,702 $50,120,606

FHWA 8 88129 OKI HAM HAM IR 75 11.09 Description: Replace railroad bridge prior to

widening IR75. Includes construction of

substructure for future 3rd rail line and a poriton

of the final alignment of the exit ramp to Galbraith

Road.(phase 4 TTV) Work Type: New Bridge

Termini: Railroad bridge 11.09 on southbound

IR75 in the split (phase 4)

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.02 RW Acquis

Acquis

RW Serv

RW Serv

2019

2019

2018

2018

4BD7

4BK7

4BD7

4BK7

State

Federal

State

Federal

2

M001

2

M001

State Funds (002)

National Hwy Performance P

State Funds (002)

National Hwy Performance P

$140,000

$560,000

$14,000

$56,000

$0

$0

$0

$0

$770,000

$770,000

$770,000

$770,000

$35,117,366

$35,117,366

$35,117,366

$35,117,366

2018AM02ID0081FDRW

2018AM02ID0081FDRW

2018AM02ID0081FDRW

2018AM02ID0081FDRW

Ph subtotal: $770,000 $0 $770,000 $35,117,366

88132 OKI HAM HAM IR 75 10.87 Description: Add fourth lane, auxiliary lane from

Shepherd entrance to Galbraith exit and

construct C-D for Galbraith/Anthony

Wayne(phase 5 TTV) and southbound IR75 to

westbound SR126 ramp (part of phase 7).

Work also involves work on 3 bridges. Work

Type: Major Widening Termini: Galbraith Road

to Shepherd Lane, southbound only (phase 5)

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 1.94 RW Acquis

Acquis

RW Serv

RW Serv

2019

2019

2018

2018

4BD7

4BK7

4BD7

4BK7

State

Federal

State

Federal

2

M001

2

M001

State Funds (002)

National Hwy Performance P

State Funds (002)

National Hwy Performance P

$360,000

$1,440,000

$40,000

$160,000

$0

$0

$0

$0

$2,000,000

$2,000,000

$2,000,000

$2,000,000

$92,707,834

$92,707,834

$92,707,834

$92,707,834

2018AM02ID0082FDRW

2018AM02ID0082FDRW

2018AM02ID0082FDRW

2018AM02ID0082FDRW

Ph subtotal: $2,000,000 $0 $2,000,000 $92,707,834

88133 OKI HAM HAM IR 75 10.62 Description: Add fourth lane and auxiliary lane for

northbound IR75 between Galbraith and

Shepherd(phase 6 TTV) and westbound SR126

to northbound IR75 ramp (part of phase 7)

Work Type: Major Widening Termini: Galbraith

Road to Shepherd Lane, northbound only (phase

6)

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 1.91 RW Acquis

Acquis

RW Serv

RW Serv

2019

2019

2018

2018

4BD7

4BK7

4BD7

4BK7

State

Federal

State

Federal

2

M001

2

M001

State Funds (002)

National Hwy Performance P

State Funds (002)

National Hwy Performance P

$480,000

$1,920,000

$68,000

$272,000

$0

$0

$0

$0

$2,740,000

$2,740,000

$2,740,000

$2,740,000

$175,476,115

$175,476,115

$175,476,115

$175,476,115

2018AM02ID0083FDRW

2018AM02ID0083FDRW

2018AM02ID0083FDRW

2018AM02ID0083FDRW

Ph subtotal: $2,740,000 $0 $2,740,000 $175,476,115

89068 OKI HAM HAM IR 75 0.22 Description: Reconstruction of I-75 from Ohio

River through the Western Hills Viaduct. Brent

Spence Bridge Detailed Design, RW, and

Construction Phase Project (Ohio only).

September 2012 Programmatic Work is for R/W

plan development and Acquisition Services.

Work Type: Major Reconstruction Termini:

From the OH/KY State Line to the 3.00+/- Mile

Marker

ODOT SPONSORING

AGENCY

Air Quality Exempt 3.43 RW Acquis

Acquis

2016

2016

4BD7

4BK7

State

Federal

2

L05E

State Funds (002)

National Highway System

$24,165,280

$8,661,120

$64,334,055

$64,334,055

$120,370,455

$120,370,455

$1,154,245,085

$1,154,245,085

2018MODID0216FDRW

2018MODID0216FDRW

Ph subtotal: $32,826,400 $64,334,055 $120,370,455 $1,154,245,085

91419 OKI HAM HAM PPS FY2021 Description: Hamilton County Preventative

Maintenance on the Priority System for FY2021.

The routes is located on HAM-275 and HAM-74

Work Type: Preventive Maintenance Termini:

route to be determined

ODOT SPONSORING

AGENCY

Air Quality Exempt 13.16 CO CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

4PF7

4PS7

LAB

LAB

Federal

State

Federal

State

Z001

2

Z001

2

National Hwy Performance P

State Funds (002)

National Hwy Performance P

Labor - State Match

$5,405,760

$600,640

$162,171

$18,019

$0

$0

$0

$0

$6,186,590

$6,186,590

$6,186,590

$6,186,590

$6,352,990

$6,352,990

$6,352,990

$6,352,990

2018stipID0566FDCO

2018stipID0566FDCO

2018stipID0566FDCO

2018stipID0566FDCO

Ph subtotal: $6,186,590 $0 $6,186,590 $6,352,990

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $24,960 $0 $24,960 $6,352,990 2018stipID0566FDDD

Ph subtotal: $24,960 $0 $24,960 $6,352,990

ENV Env PE 2018 LAB State 2 Labor - State Match $141,440 $0 $141,440 $6,352,990 2018stipID0566FDENV

Ph subtotal: $141,440 $0 $141,440 $6,352,990

Page 22: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 22 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 91826 OKI HAM HAM IR 71 8.42 Description: Plane and Pave a portion of IR 71 in

Hamilton County from the RR bridge north of SR

562 to SR 126. Includes deck replacement of

bridges HAM-71-1068 L/R over Stewart Rd. and

minor rehabiltiations of several other bridges

within project limits. Highway sign Work Type:

Minor Rehabilitation - Pavement Prmy Sys

Termini: HAM IR 71: from north of SR 562 to SR

126

ODOT SPONSORING

AGENCY

Air Quality Exempt 5.43 CO CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

2018

2018

2018

2018

2018

4BC7

4HJ7

7DG

LAB

LAB

State

Federal

Bonds

Federal

State

2

ZS30

45

ZS30

2

State Funds (002)

Not Grouped

Garvee Bond-Fund 045-Lon

Highway Safety Imp Prog

Labor - State Match

$663,300

$5,969,700

$26,526,656

$417,879

$1,449,468

$0

$0

$0

$0

$0

$35,027,003

$35,027,003

$35,027,003

$35,027,003

$35,027,003

$37,036,293

$37,036,293

$37,036,293

$37,036,293

$37,036,293

2018AM02ID0084FDCO

2018AM02ID0084FDCO

2018AM02ID0084FDCO

2018AM02ID0084FDCO

2018AM02ID0084FDCO

Ph subtotal: $35,027,003 $0 $35,027,003 $37,036,293

92638 OKI HAM HAM IR 275 28.29 Description: Construct loop ramp for northbound

US42 to westbound IR275 to replace left turn for

northbound US42. In conjunction with the loop

ramp the westbound exit ramp will be relocated

to line up with Hauck Road. Work Type:

Intersection Improvement Termini: 0.1 miles

west of US42 to 0.15 miles east of US42 on

westbound IR275

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.55 CO CO Contr

CO Contr

CO Engr

CO Engr

2020

2020

2020

2020

4BC7

4HJ7

LAB

LAB

State

Federal

Federal

State

2

MS3E

MS3E

2

State Funds (002)

Highway Safety Imp Prog

Highway Safety Imp Prog

Labor - State Match

$60,625

$545,625

$54,563

$6,063

$0

$0

$0

$0

$666,875

$666,875

$666,875

$666,875

$4,392,005

$4,392,005

$4,392,005

$4,392,005

2018stipID0568FDCO

2018stipID0568FDCO

2018stipID0568FDCO

2018stipID0568FDCO

Ph subtotal: $666,875 $0 $666,875 $4,392,005

DD Dtl Dsgn

Dtl Dsgn

2018

2018

4BC7

4HJ7

State

Federal

2

MS3E

State Funds (002)

Highway Safety Imp Prog

$0

$0

$0

$0

$0

$0

$0

$0

2018stipID0568XXDD

2018stipID0568XXDD

Ph subtotal: $0 $0 $0 $0

RW Acquis

Acquis

RW Serv

RW Serv

2019

2019

2019

2019

4BC7

4HJ7

4BC7

4HJ7

State

Federal

State

Federal

2

MS3E

2

MS3E

State Funds (002)

Highway Safety Imp Prog

State Funds (002)

Highway Safety Imp Prog

$225,000

$2,025,000

$84,375

$759,375

$0

$0

$0

$0

$3,093,750

$3,093,750

$3,093,750

$3,093,750

$4,392,005

$4,392,005

$4,392,005

$4,392,005

2018stipID0568FDRW

2018stipID0568FDRW

2018stipID0568FDRW

2018stipID0568FDRW

Ph subtotal: $3,093,750 $0 $3,093,750 $4,392,005

94484 OKI HAM HAM VAR CTCS Cincinnati Description: Installation of underground duct

bank that contains fiber optic interconnect cable.

The traffic signals will be upgraded to LED

technology. New signal controllers and signal

timing will be implemented. Work Type: Signals

Termini: 130 signalized intersections in

Cincinnati - bound by Mehring Way (S), Central

Pkwy (N), Central Ave (W), & Eggleston Ave (E)

Cincinnati, City of Air Quality Exempt 5.73 CO CO Contr

CO Contr

CO Engr

2017

2017

2017

4TB7

LNT

LNT

Federal

Local Match

Local Match

M400

LNTP

LNTP

CMAQ

Local Match

Local Match

$4,000,000

$2,415,628

$449,094

$0

$0

$0

$6,864,722

$6,864,722

$6,864,722

$6,875,465

$6,875,465

$6,875,465

2018MODID0227FDCO

2018MODID0227FDCO

2018MODID0227FDCO

Ph subtotal: $6,864,722 $0 $6,864,722 $6,875,465

94491 OKI HAM HAM ORT Salem to Sutton Description: Construction of a combination of 10'

wide bike path and existing and new 5' wide side

path along the west side of Kellogg Avenue to

connect the existing trail system at Salem Road

and Sutton Road. Retaining walls will be

constructed to accommodate grading Work

Type: Bikeways Termini: Kellogg Avenue: from

the existing bike path at Salem Road to the

existing Anderson Twp bike path at Sutton Road

Cincinnati, City of Air Quality Exempt 2.17 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TB7

LNT

LNT

Federal

Local Match

Local Match

Z400

LNTP

LNTP

Not Grouped

Local Match

Local Match

$3,163,442

$790,860

$276,801

$0

$0

$0

$4,231,103

$4,231,103

$4,231,103

$4,765,691

$4,765,691

$4,765,691

2018MODID0383FDCO

2018MODID0383FDCO

2018MODID0383FDCO

Ph subtotal: $4,231,103 $0 $4,231,103 $4,765,691

RW Acquis

Acquis

RW Serv

2018

2018

2018

4TB7

LNT

LAB

Federal

Local Match

State

M400

LNTP

2

CMAQ

Labor - State Match

Labor - State Match

$400,000

$100,000

$7,481

$0

$0

$0

$507,481

$507,481

$507,481

$4,765,691

$4,765,691

$4,765,691

2018MODID0382FDRW

2018MODID0382FDRW

2018MODID0382FDRW

Ph subtotal: $507,481 $0 $507,481 $4,765,691

Page 23: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 23 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 94518 OKI HAM HAM Cincy Barge & Rail

Terminal

Description: Renovation and expansion of an

existing intermodal port to improve the existing

footprint with updated safety, solar energy,

conveyor, handlers, paving, security, crane, and

dock apparatus on-site. Work Type:

Inter-modal Facility Termini: The Cincinnati

Barge and Rail Terminal located at 1707

Riverside Drive, Cincinnati, OH 45202

OHIO RAIL

DEVELOPMENTAL

COMMISSION

Air Quality Exempt 0.40 CO CO Contr

CO Contr

CO Engr

2016

2016

2016

4TB7

LNT

LNT

Federal

Local Match

Local Match

M400

LNTP

LNTP

CMAQ

Local Match

Local Match

$1,320,000

$330,000

$115,500

$0

$0

$0

$1,765,500

$1,765,500

$1,765,500

$1,765,500

$1,765,500

$1,765,500

2018MODID0229FDCO

2018MODID0229FDCO

2018MODID0229FDCO

Ph subtotal: $1,765,500 $0 $1,765,500 $1,765,500

94519 OKI HAM HAM Cincinnati Bulk

Terminals

Description: The project entails construction of a

new 3,673? siding from Milepost 3.4 to 4.1

located between the existing King-Wade Siding

and the mainline. The siding will be used to

support local switching operations when serving

nearby customers. Work Type: Railroad

Improvements & Rehabilitation Termini:

Cincinnati Bulk Terminals Facility at 895 West

Mehring Way, Cincinnati, OH 45203

Ohio Rail Development

Commission

Air Quality Exempt 0.20 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TB7

LNT

LNT

Federal

Local Match

Local Match

Z003

LNTP

LNTP

CMAQ

Local Match

Local Match

$1,128,706

$282,176

$121,180

$0

$0

$0

$1,410,882

$1,410,882

$1,410,882

$1,410,882

$1,410,882

$1,410,882

2018MODID0484FDCO

2018MODID0484FDCO

2018MODID0484FDCO

Ph subtotal: $1,532,062 $0 $1,410,882 $1,410,882

94741 OKI HAM HAM IR 71 6.86 Description: Widening northbound IR-71 to

provide three continuous through lanes through

the SR-562 interchange. Removing the North

bound Ridge Road exit and adding a North

bound exit to Kennedy. Part 1 HAM-71-8.42 PID

91826 Part 2 HAM-71-6.86 PID 94741 Work

Type: Widening Termini: 0.1 mi south of

Williams Avenue Overpass to 0.04 mi north of

Red Bank (SLM 6.86-9.74)

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 3.09 RW Acquis

Acquis

2018

2018

4BC7

4HJ7

State

Federal

2

ZS30

State Funds (002)

Highway Safety Imp Prog

$26,700

$240,300

$0

$0

$267,000

$267,000

$1,867,197

$1,867,197

2018stipID0570FDRW

2018stipID0570FDRW

Ph subtotal: $267,000 $0 $267,000 $1,867,197

95282 OKI HAM HAM CR 73 0.00 Cheviot Rd Description: Pavement rehabilitation of the entire

roadway within the project limits, repair of curb,

storm water inlets, and sidewalk, widening of the

pavement for an additional northbound lane from

just north of Tallahasee Drive to Jessup Road,

and profile and align Work Type: Minor

Widening Termini: Cheviot Road: from North

Bend Road to Jessup Road

HAMILTON COUNTY

ENGINEER

Air Quality Exempt 0.64 CO CO Contr

CO Contr

CO Engr

2018

2018

2018

4TA7

LNT

LNT

Federal

Local Match

Local Match

M230

LNTP

LNTP

STBG

Local Match

Local Match

$2,212,624

$948,267

$221,262

$0

$0

$0

$3,382,153

$3,382,153

$3,382,153

$5,700,712

$5,700,712

$5,700,712

2018stipID0571FDCO

2018stipID0571FDCO

2018stipID0571FDCO

Ph subtotal: $3,382,153 $0 $3,382,153 $5,700,712

97782 OKI HAM HAM OKI 2018 Rideshare Description: OKI FY 2018 Rideshare Program

Work Type: Rideshare Termini: 0

OKI Air Quality Exempt SP Planning 2018 4TE7 Federal M400 CMAQ $171,749 $0 $171,749 $171,749 2018stipID0572FDSP

Ph subtotal: $171,749 $0 $171,749 $171,749

97783 OKI HAM HAM OKI 2019 Rideshare Description: OKI FY 2019 Rideshare Program

Work Type: Rideshare Termini: 0

OKI Air Quality Exempt SP Planning 2019 4TE7 Federal M40E CMAQ $172,366 $0 $172,366 $172,366 2018stipID0573FDSP

Ph subtotal: $172,366 $0 $172,366 $172,366

97784 OKI HAM HAM OKI 2020 Rideshare Description: OKI FY 2020 Rideshare Program

Work Type: Rideshare Termini: 0

OKI Air Quality Exempt SP Planning 2020 4TE7 Federal Z400 CMAQ $212,609 $0 $212,609 $212,609 2018stipID0574FDSP

Ph subtotal: $212,609 $0 $212,609 $212,609

97785 OKI HAM HAM OKI 2018 AQ Program Description: OKI FY 2018 Air Quality

ProgramOKI plans to use Contributed Services

for the local match Work Type: Air Quality

Planning Termini: 0

OKI Air Quality Exempt SP Planning 2018 4TE7 Federal M400 CMAQ $192,981 $0 $192,981 $192,981 2018stipID0575FDSP

Ph subtotal: $192,981 $0 $192,981 $192,981

Page 24: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 24 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 97786 OKI HAM HAM OKI 2019 AQ Program Description: OKI FY 2019 Air Quality

ProgramOKI plans to use Contributed Services

for the local match Work Type: Air Quality

Planning Termini: 0

OKI Air Quality Exempt SP Planning

Planning

2019

2019

4TE7

LNT

Federal

Local Match

M40E

LNTP

CMAQ

Local Match

$246,955

$61,739

$0

$0

$308,694

$308,694

$308,694

$308,694

2018stipID0576FDSP

2018stipID0576FDSP

Ph subtotal: $308,694 $0 $308,694 $308,694

97788 OKI HAM HAM OKI 2020 AQ Program Description: OKI FY 2020 Air Quality

ProgramOKI plans to use Contributed Services

for the Local Match Work Type: Air Quality

Planning Termini: 0

OKI Air Quality Exempt SP Planning

Planning

2020

2020

4TE7

LNT

Federal

Local Match

Z001

LNTP

National Hwy Performance P

Local Match

$297,624

$74,406

$0

$0

$372,030

$372,030

$372,030

$372,030

2018stipID0577FDSP

2018stipID0577FDSP

Ph subtotal: $372,030 $0 $372,030 $372,030

98109 OKI HAM HAM Elmore to Central

Pkwy Conn

Description: As part of changes to the I-74/75

interchange of the Mill Creek Expressway

project. Traffic patterns have changed.

Preliminary Engineering is being undertaken to

evaluate this connection. The project will

Construct a new roadway to connect Elmore

Stree Work Type: New Bridge Termini:

Elmore Street west of IR-74 (near Dirr Street) to

Central Parkway (near Cincinnati State

Technical College)

CINCINNATI Air Quality Exempt DD Dtl Dsgn

Dtl Dsgn

2016

2016

4BG

LU27

Local Match

Federal

2 Local Match

Un-Assigned Federal

$0

$0

$0

$0

$0

$0

$0

$0

2018MODID0238XXDD

2018MODID0238XXDD

Ph subtotal: $0 $0 $0 $0

ENV Env PE 2016 LU27 Federal LY10 Earmarks / High Priority $0 $0 $0 $0 2018MODID0238XXENV

Ph subtotal: $0 $0 $0 $0

98764 OKI HAM HAM CR 279 0.00

Sycamore Rd

Description: Improvements to three intersections

along Sycamore Road: (1) Kenwood Road, (2)

Blue Ash Road, and (3) Plainfield Road. Work

includes conversion of the Sycamore Road and

Plainfield Road intersection to a modern

roundabout, vertical profile improvements at

Work Type: Intersection Improvement Termini:

Sycamore Road: from Plainfield Road to

Kenwood Road

SYCAMORE TOWNSHIP OF

HAMILTON COUNTY

Air Quality Exempt 0.70 CO CO Contr

CO Contr

CO Contr

CO Engr

2019

2019

2019

2019

4TA7

4TC7

LNT

LNT

Federal

Federal

Local Match

Local Match

M230

M301

LNTP

LNTP

STBG

TAP/Enhancements

Local Match

Local Match

$4,950,120

$49,880

$1,410,256

$448,718

$0

$0

$0

$0

$6,858,974

$6,858,974

$6,858,974

$6,858,974

$7,928,932

$7,928,932

$7,928,932

$7,928,932

2018stipID0578FDCO

2018stipID0578FDCO

2018stipID0578FDCO

2018stipID0578FDCO

Ph subtotal: $6,858,974 $0 $6,858,974 $7,928,932

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $5,525 $0 $5,525 $7,928,932 2018stipID0578FDDD

Ph subtotal: $5,525 $0 $5,525 $7,928,932

ENV Env PE 2018 LAB State 2 Labor - State Match $31,311 $0 $31,311 $7,928,932 2018stipID0578FDENV

Ph subtotal: $31,311 $0 $31,311 $7,928,932

RW Acquis

Acquis

RW Serv

2018

2018

2018

4TA7

LNT

LAB

Federal

Local Match

State

M230

LNTP

2

STBG

Local Match

Labor - State Match

$800,000

$225,641

$7,481

$0

$0

$0

$1,033,122

$1,033,122

$1,033,122

$7,928,932

$7,928,932

$7,928,932

2018stipID0578FDRW

2018stipID0578FDRW

2018stipID0578FDRW

Ph subtotal: $1,033,122 $0 $1,033,122 $7,928,932

98767 OKI HAM HAM SR 4 4.31 City of

Wyoming

Description: Pavement rehabilitation, curb

replacement, upgrades to the storm sewer

system, traffic signal replacement/upgrades,

implementation of "road diet" measures, addition

of bike lanes. Work Type: Minor Rehabilitation

- Pavement Prmy Sys Termini: SR-4

(Springfield Pike): from the southern corp. limit to

the northern corp. limit in Wyoming

Wyoming, City of Air Quality Exempt 1.69 RW Acquis

Acquis

RW Serv

2017

2017

2017

4BG

4TA7

LAB

Local Match

Federal

State

2

M230

2

Local Match

STP

Labor - State Match

$6,000

$24,000

$200,000

$0

$0

$0

$230,000

$230,000

$230,000

$8,260,000

$8,260,000

$8,260,000

2018MODID0245FDRW

2018MODID0245FDRW

2018MODID0245FDRW

Ph subtotal: $230,000 $0 $230,000 $8,260,000

Page 25: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 25 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 98767 OKI HAM HAM SR 4 4.31 City of

Wyoming

Description: Pavement rehabilitation, curb

replacement, upgrades to the storm sewer

system, traffic signal replacement/upgrades,

implementation of "road diet" measures, addition

of shared use lanes (sharrows). Work Type:

Minor Rehabilitation - Pavement Prmy Sys

Termini: SR-4 (Springfield Pike): from the

southern corp. limit to the northern corp. limit in

Wyoming

Wyoming, City of Air Quality Exempt 1.69 CO CO Contr

CO Contr

CO Contr

CO Engr

2018

2018

2018

2018

4BG

4TA7

4TC7

4BG

Local Match

Federal

Federal

Local Match

2

M230

M301

2

Local Match

STBG

TAP/Enhancements

Local Match

$1,460,000

$4,640,000

$1,200,000

$511,000

$0

$0

$0

$0

$7,811,000

$7,811,000

$7,811,000

$7,811,000

$8,223,300

$8,223,300

$8,223,300

$8,223,300

2018stipID0579FDCO

2018stipID0579FDCO

2018stipID0579FDCO

2018stipID0579FDCO

Ph subtotal: $7,811,000 $0 $7,811,000 $8,223,300

98769 OKI HAM HAM CR 251 0.64 Blue Ash

Road

Description: Rehabilitation and repair of the

existing pavement, storm water improvements,

water quality features, on-street parking

reconfiguration, installation of lighting, sidewalks,

bus shelters, and traffic signal/RR pre-emption

improvements. Work Type: Minor

Rehabilitation - Pavement Gnrl Sys Termini:

CR-251 (Blue Ash Road): from Duneden Road

to Galbraith Road

DEER PARK Air Quality Exempt 0.25 CO CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

2019

4BG

4TA7

4TC7

4BG

LAB

Local Match

Federal

Federal

Local Match

Local Match

2

M230

M301

2

2

Local Match

STBG

TAP/Enhancements

Local Match

Labor - Local Match

$2,054,900

$3,770,800

$448,800

$369,215

$70,000

$0

$0

$0

$0

$0

$6,713,715

$6,713,715

$6,713,715

$6,713,715

$6,713,715

$7,159,477

$7,159,477

$7,159,477

$7,159,477

$7,159,477

2018stipID0580FDCO

2018stipID0580FDCO

2018stipID0580FDCO

2018stipID0580FDCO

2018stipID0580FDCO

Ph subtotal: $6,713,715 $0 $6,713,715 $7,159,477

ENV Env RW S

Env RW S

2017

2017

4BG

4TA7

Local Match

Federal

2

M230

Local Match

STP

$15,000

$60,000

$250,000

$250,000

$325,000

$325,000

$6,068,715

$6,068,715

2018MODID0246FDENV

2018MODID0246FDENV

Ph subtotal: $75,000 $250,000 $325,000 $6,068,715

RW Acquis

Acquis

2018

2018

4BG

4TA7

Local Match

Federal

2

M230

Local Match

STBG

$20,000

$80,000

$0

$0

$100,000

$100,000

$7,159,477

$7,159,477

2018stipID0580FDRW

2018stipID0580FDRW

Ph subtotal: $100,000 $0 $100,000 $7,159,477

98772 OKI HAM HAM CR 239 5.18 Winton

Road

Description: Rehabilitation of pavement; widening

of pavement to provide left-turn lanes at several

locations; rehab/repair and, as necessary,

replacement of curbs, storm sewer system, and

sidewalks; traffic signal improvements. Work

Type: Turn Lane Addition Termini: CR-239

(Winton Road): from Fleming Road to Sarbrook

Drive

HAMILTON COUNTY

ENGINEER

Air Quality Exempt 0.52 CO CO Contr

CO Contr

CO Engr

2018

2018

2018

4TA7

LNT

LNT

Federal

Local Match

Local Match

M230

LNTP

LNTP

STBG

Local Match

Local Match

$3,464,000

$866,000

$303,100

$0

$0

$0

$4,633,100

$4,633,100

$4,633,100

$5,170,289

$5,170,289

$5,170,289

2018stipID0581FDCO

2018stipID0581FDCO

2018stipID0581FDCO

Ph subtotal: $4,633,100 $0 $4,633,100 $5,170,289

99525 OKI HAM HAM OKI 2018 Reg Plng -

FIAM

Description: OKI FY 2018 Regional

Transportation Planning - FIAM Work Type:

Planning & Research Termini: 0

OKI Air Quality Exempt SP Planning 2018 4TD7 Federal M450 Metro Planning $119,725 $0 $119,725 $119,725 2018stipID0582FDSP

Ph subtotal: $119,725 $0 $119,725 $119,725

99526 OKI HAM HAM OKI 2019 Reg Plng -

FIAM

Description: OKI FY 2019 Regional

Transportation Planning - FIAM Work Type:

Planning & Research Termini: 0

OKI Air Quality Exempt SP Planning

Planning

2019

2019

4TD7

LNT

Federal

Local Match

M450

LNTP

Metro Planning

Local Match

$80,653

$20,163

$0

$0

$100,816

$100,816

$100,816

$100,816

2018stipID0583FDSP

2018stipID0583FDSP

Ph subtotal: $100,816 $0 $100,816 $100,816

99527 OKI HAM HAM OKI 18 Reg Trans

Plng - LU

Description: OKI FY 2018 Regional

Transportation Planning - Land Use Work

Type: Planning & Research Termini: 0

OKI Air Quality Exempt SP Planning 2018 4TD7 Federal M450 Metro Planning $309,049 $0 $309,049 $309,049 2018stipID0584FDSP

Ph subtotal: $309,049 $0 $309,049 $309,049

99528 OKI HAM HAM OKI 19 Reg Trans

Plng - LU

Description: FY 2019 OKI Regional

Transportation Planning - Land Use Work

Type: Planning & Research Termini: 0

OKI Air Quality Exempt SP Planning 2019 4TD7 Federal M450 Metro Planning $328,975 $0 $411,219 $411,219 2018stipID0585FDSP

Page 26: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 26 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 99528 OKI HAM HAM OKI 19 Reg Trans

Plng - LU

Description: FY 2019 OKI Regional

Transportation Planning - Land Use Work

OKI Air Quality Exempt SP Planning 2019 LNT Local Match LNTP Local Match $82,244 $0 $411,219 $411,219 2018stipID0585FDSP

Ph subtotal: $411,219 $0 $411,219 $411,219

99837 OKI HAM HAM US 22 7.16 Description: Reconstruction of Montgomery

Road (US-22/SR-3) from the Norwood corp. line

to the Silverton corp. line. The existing typical

section (two 16' wide shared parking/thru lanes

and two 9' thru lanes) will be re-striped to provide

a five lane section (two thru Work Type:

Signals Termini: Montgomery Road

(US-22/SR-3): Norwood corp. line (near

Cypress Way) to Silverton corp. line (near

Coleridge Avenue)

Cincinnati, City of Air Quality Exempt 2.03 CO CO Contr

CO Contr

CO Engr

2019

2019

2019

4TB7

LNT

LNT

Federal

Local Match

Local Match

M40E

LNTP

LNTP

CMAQ

Local Match

Local Match

$2,000,000

$500,000

$175,000

$0

$0

$0

$2,675,000

$2,675,000

$2,675,000

$2,695,851

$2,695,851

$2,695,851

2018stipID0586FDCO

2018stipID0586FDCO

2018stipID0586FDCO

Ph subtotal: $2,675,000 $0 $2,675,000 $2,695,851

100031 OKI HAM HAM Harrison Ave Bikepath Description: Construction of a 12 foot wide

multi-use path along an abandoned rail corridor,

that loosely parallels Harrison Avenue (on the

west side). Work Type: Bikeways Termini:

Old rail corridor (west of Harrison Avenue): from

approximately Lee Court to Hutchinson Road

GREEN TOWNSHIP OF

HAMILT0N COUNTY

Air Quality Exempt 0.31 CO CO Contr

CO Contr

CO Engr

2018

2018

2018

4BG

4TC7

LAB

Local Match

Federal

Local Match

2

Z301

2

Local Match

TAP/Enhancements

Labor - Local Match

$497,500

$497,500

$99,500

$0

$0

$0

$1,094,500

$1,094,500

$1,094,500

$1,144,251

$1,144,251

$1,144,251

2018stipID0587FDCO

2018stipID0587FDCO

2018stipID0587FDCO

Ph subtotal: $1,094,500 $0 $1,094,500 $1,144,251

100032 OKI HAM HAM SR 264 6.02 Sidewalk Description: Construction of new sidewalk, curb,

and storm sewer system on the south side of

SR-264. Work Type: Add Sidewalks Termini:

SR-264 (Bridgetown Road): from the Public

Library to Markay Court.

GREEN TOWNSHIP OF

HAMILT0N COUNTY

Air Quality Exempt 0.55 CO CO Contr

CO Contr

CO Engr

CO Engr

2018

2018

2018

2018

4BG

4TC7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

M301

17

2

Local Match

TAP/Enhancements

TAP/Enhancements

Labor - Local Match

$285,028

$285,028

$28,500

$28,500

$0

$0

$0

$0

$627,055

$627,055

$627,055

$627,055

$762,245

$762,245

$762,245

$762,245

2018stipID0588FDCO

2018stipID0588FDCO

2018stipID0588FDCO

2018stipID0588FDCO

Ph subtotal: $627,055 $0 $627,055 $762,245

100046 OKI HAM HAM ORT West Segment 1 Description: Construction of a 10' wide multi-use

trail from the Evans Recreation Area to State

Street. Work Type: Bikeways Termini: Evans

Recreation Area (near the Mill Creek) to State

Street

Cincinnati, City of Air Quality Exempt DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $4,081 $0 $4,081 $482,707 2018stipID0589FDDD

Ph subtotal: $4,081 $0 $4,081 $482,707

ENV Env PE 2018 LAB State 2 Labor - State Match $23,127 $0 $23,127 $482,707 2018stipID0589FDENV

Ph subtotal: $23,127 $0 $23,127 $482,707

RW RW Serv 2018 LAB State 2 Labor - State Match $374 $0 $374 $482,707 2018stipID0589FDRW

Ph subtotal: $374 $0 $374 $482,707

HAM ORT West Segment 1

- Part 1

Description: Construction of a 10' wide multi-use

trail from the Evans Recreation Area to State

Street.Part 2 - HAM ORT West Segment 2

Work Type: Bikeways Termini: Evans

Recreation Area (near the Mill Creek) to State

Street

Cincinnati, City of Air Quality Exempt CO CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

2020

2020

2020

2020

2020

4TB7

4TB7

LNT

4TB7

LNT

Federal

Federal

Local Match

Federal

Local Match

Z400

LNTP

LNTP

Un-Assigned Federal

Not Grouped

Local Match

Un-Assigned Federal

Local Match

$714,000

$316,630

$449,441

$14,370

$101,109

$0

$0

$0

$0

$0

$1,595,550

$1,595,550

$1,595,550

$1,595,550

$1,595,550

$1,623,132

$1,623,132

$1,623,132

$1,623,132

$1,623,132

2018MODID0442FDCO

2018MODID0442FDCO

2018MODID0442FDCO

2018MODID0442FDCO

2018MODID0442FDCO

Ph subtotal: $1,595,550 $0 $1,595,550 $1,623,132

100047 OKI HAM HAM ORT West Segment 2 Description: Construction of a 10' shared use

path from Fairbanks Avenue (near Boldface

Park) to the Gilday Riverside Playfield. Work

Type: Bikeways Termini: Fairbanks Avenue

(near Boldface Park) to the Gilday Reserve

Playfield

Cincinnati, City of Air Quality Exempt CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TB7

LNT

LNT

Federal

Local Match

Local Match

Z400

LNTP

LNTP

CMAQ

Local Match

Local Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$34,689

$34,689

$34,689

2018MODID0442FDCO

2018MODID0442FDCO

2018MODID0442FDCO

Page 27: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 27 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

Ph subtotal: $0 $0 $0 $34,689

FHWA 8 100047 OKI HAM HAM ORT West Segment 2 Description: Construction of a 10' shared use

path from Fairbanks Avenue (near Boldface

Cincinnati, City of Air Quality Exempt DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $4,081 $0 $4,081 $1,005,814 2018stipID0590FDDD

Ph subtotal: $4,081 $0 $4,081 $1,005,814

ENV Env PE 2018 LAB State 2 Labor - State Match $23,127 $0 $23,127 $1,005,814 2018stipID0590FDENV

Ph subtotal: $23,127 $0 $23,127 $1,005,814

RW RW Serv 2018 LAB State 2 Labor - State Match $7,481 $0 $7,481 $34,689 2018MODID0445FDRW

Ph subtotal: $7,481 $0 $7,481 $34,689

101019 OKI HAM HAM OSS FY 2019 Description: Overhead Sign Support Inspections

in Hamilton County. Work Type: Signs

Termini: Hamilton County

ODOT SPONSORING

AGENCY

Air Quality Exempt DD Dtl Dsgn 2019 4PS7 State 2 State Funds (002) $600,000 $0 $600,000 $600,000 2018stipID0591FDDD

Ph subtotal: $600,000 $0 $600,000 $600,000

101578 OKI HAM HAM US 42 12.96 Reading

Road

Description: Repair and resurfacing of Reading

Road (US-42) from Inwood Drive to the northern

Village corp. line (north of McSwain Drive). Also

included is driveway reconstruction, drainage

improvements, replacement of existing

deteriorated concrete sidewalk, replacem

Work Type: Major Rehabilitation Termini:

Reading Road (US-42): from Inwood Drive to the

northern Village corp. limit (north of McSwain

Drive)

EVENDALE, VILLAGE OF Air Quality Exempt 1.10 CO CO Contr

CO Contr

CO Engr

CO Engr

2017

2017

2017

2017

4BG

4TA7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

2

Local Match

Un-Assigned Federal

Un-Assigned Federal Labor

Labor - Local Match

$459,974

$441,935

$44,194

$45,997

$0

$0

$0

$0

$992,100

$992,100

$992,100

$992,100

$1,019,158

$1,019,158

$1,019,158

$1,019,158

2018MODID0256FDCO

2018MODID0256FDCO

2018MODID0256FDCO

2018MODID0256FDCO

Ph subtotal: $992,100 $0 $992,100 $1,019,158

101886 OKI HAM HAM Cincinnati CTCS Zone

9

Description: The project includes installation of

fiber optic interconnect cable. Traffic signals will

be upgraded to LED technology. New signal

controllers will be installed and new signal timing

implemented. Work Type: Signals Termini:

City of Cincinnati Traffic Signal Zone 9 (includes

Paddock and Reading Road corridors S of the

I-75 split)

Cincinnati, City of Air Quality Exempt 6.83 CO CO Contr

CO Contr

CO Engr

2018

2018

2018

4TB7

LNT

LNT

Federal

Local Match

Local Match

Z400

LNTP

LNTP

CMAQ

Local Match

Local Match

$3,200,000

$800,000

$280,000

$0

$0

$0

$4,280,000

$4,280,000

$4,280,000

$4,288,298

$4,288,298

$4,288,298

2018stipID0592FDCO

2018stipID0592FDCO

2018stipID0592FDCO

Ph subtotal: $4,280,000 $0 $4,280,000 $4,288,298

103358 OKI HAM HAM Banks Variable

Message Signs

Description: Installation of cantilever style

dynamic message signs in four interstate

locations. Signs will be connected into the central

control system by tying into existing fiber optic

cable and coordinated with OHGO system to

ensure regional coordination. Work Type:

Misc. Traffic Cont. Termini: IR-75 NB at MM

191; IR-75 SB at MM 1.5; IR-71 SB at MM 2.7;

IR-471 NB at MM 4.2

HAMILTON COUNTY

ENGINEER

Air Quality Exempt CO CO Contr

CO Contr

CO Engr

CO Engr

2018

2018

2018

2018

4BG

4TA7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

Z230

17

2

Local Match

STBG

Bridge

Labor - Local Match

$139,894

$559,578

$55,958

$13,989

$0

$0

$0

$0

$769,419

$769,419

$769,419

$769,419

$788,635

$788,635

$788,635

$788,635

2018stipID0593FDCO

2018stipID0593FDCO

2018stipID0593FDCO

2018stipID0593FDCO

Ph subtotal: $769,419 $0 $769,419 $788,635

103392 OKI HAM HAM US 22 12.38

Sidewalks

Description: Construction of new sidewalk on the

west side of Montgomery Road from Dearwester

Drive to tie into existing sidewalk approximately

375 feet south of Pinehurst Lane. Work Type:

Add Sidewalks Termini: Montgomery Road

(US-22/SR-3): from Dearwester Dr to ex.

sidewalk 375' S of Pinehurst Ln

SYCAMORE TOWNSHIP OF

HAMILTON COUNTY

Air Quality Exempt 0.38 CO CO Contr

CO Contr

CO Engr

CO Engr

2020

2020

2020

2020

4TB7

LNT

4TB7

LNT

Federal

Local Match

Federal

Local Match

Z400

LNTP

Z400

LNTP

CMAQ

Local Match

CMAQ

Local Match

$859,838

$214,960

$1,256

$106,224

$0

$0

$0

$0

$1,182,278

$1,182,278

$1,182,278

$1,182,278

$1,306,134

$1,306,134

$1,306,134

$1,306,134

2018AM10ID0307FDCO

2018AM10ID0307FDCO

2018AM10ID0307FDCO

2018AM10ID0307FDCO

Page 28: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 28 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

Ph subtotal: $1,182,278 $0 $1,182,278 $1,306,134

FHWA 8 103392 OKI HAM HAM US 22 12.38

Sidewalks

Description: Construction of new sidewalk on the

west side of Montgomery Road from Dearwester

SYCAMORE TOWNSHIP OF

HAMILTON COUNTY

Air Quality Exempt 0.38 RW Acquis

Acquis

2019

2019

4TB7

LNT

Federal

Local Match

Z400

LNTP

CMAQ

Local Match

$80,000

$20,000

$0

$0

$100,000

$100,000

$961,094

$961,094

2018stipID0594FDRW

2018stipID0594FDRW

Ph subtotal: $100,000 $0 $100,000 $961,094

103416 OKI HAM HAM Plainfield Rd

Roundabouts

Description: Conversion of three signalized

intersections to multi-lane modern roundabouts.

Work Type: Intersection Improvement

Termini: Intersections of Plainfield Road with (1)

EB SR-126 ramps (2) Hunt Road, and (3)

Peppermill Ln/Reed Hartman Hwy

BLUE ASH Air Quality Exempt 0.47 CO CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

2021

4HJ7

4TB7

LNT

4TB7

LNT

Federal

Federal

Local Match

Federal

Local Match

ZS30

Z400

LNTP

Z400

LNTP

Highway Safety Imp Prog

CMAQ

Local Match

CMAQ

Local Match

$5,000,000

$3,738,318

$1,490,135

$261,682

$454,309

$0

$0

$0

$0

$0

$10,944,444

$10,944,444

$10,944,444

$10,944,444

$10,944,444

$13,933,953

$13,933,953

$13,933,953

$13,933,953

$13,933,953

2018stipID0595FDCO

2018stipID0595FDCO

2018stipID0595FDCO

2018stipID0595FDCO

2018stipID0595FDCO

Ph subtotal: $10,944,444 $0 $10,944,444 $13,933,953

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $16,754 $0 $16,754 $13,933,953 2018stipID0595FDDD

Ph subtotal: $16,754 $0 $16,754 $13,933,953

ENV Env PE 2018 LAB State 2 Labor - State Match $94,940 $0 $94,940 $13,933,953 2018stipID0595FDENV

Ph subtotal: $94,940 $0 $94,940 $13,933,953

RW Acquis

Acquis

RW Serv

2020

2020

2018

4TA7

LNT

LAB

Federal

Local Match

State

Z230

LNTP

2

Bridge

Local Match

Labor - State Match

$2,014,470

$863,344

$3,799

$0

$0

$0

$2,881,613

$2,881,613

$2,881,613

$13,860,907

$13,860,907

$13,860,907

2018MODID0467FDRW

2018MODID0467FDRW

2018MODID0467FDRW

Ph subtotal: $2,881,613 $0 $2,881,613 $13,860,907

104116 OKI HAM D08 PO FY2019 (Hamilton

Co.)

Description: District 8 PO for Hamilton County

issues in FY 2019. Work Type: Maintenance

Contracts (Interstate, etc.) Termini: Hamilton

County

ODOT SPONSORING

AGENCY

Air Quality Exempt OT Oth Remb 2019 4CP7 State 2 State Funds (002) $1,226,000 $0 $1,226,000 $1,226,000 2018stipID0596FDOTH

Ph subtotal: $1,226,000 $0 $1,226,000 $1,226,000

104409 OKI HAM HAM Banks VMS Phase 2 Description: Installation of cantilever style

dynamic message signs (DMS). Signs will be

connected to the Cincinnati central control

system by tying into existing fiber optic and

coordinated with the current OHGO system to

ensure regional coordination. Work Type:

Misc. Traffic Cont. Termini: Second Street,

Third Street, and US-50 in downtown Cincinnati

HAMILTON COUNTY

ENGINEER

Air Quality Non-Exe 0.40 CO CO Contr

CO Contr

CO Engr

CO Engr

2018

2018

2018

2018

4TA7

LNT

4TA7

LNT

Federal

Local Match

Federal

Local Match

Z230

LNTP

Z230

LNTP

STBG

Local Match

STBG

Local Match

$3,600,000

$900,000

$400,000

$100,000

$0

$0

$0

$0

$5,000,000

$5,000,000

$5,000,000

$5,000,000

$5,000,000

$5,000,000

$5,000,000

$5,000,000

2018stipID0597FDCO

2018stipID0597FDCO

2018stipID0597FDCO

2018stipID0597FDCO

Ph subtotal: $5,000,000 $0 $5,000,000 $5,000,000

104667 OKI HAM HAM IR 75 3.84 Description: This is Phase 5A of the Hamilton 75

corridor projects (MCE). This phase was split

off of the work originally to be completed under

PID 83723. Project adds a lane to I-75 SB,

provides 4-lane continuity NB, and reconfigures

the I-74 EB ramps to I-75. Env Work Type:

Major Widening Termini: From the Monmouth

overpass to just south of Clifton Rd.

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 1.71 CO CO Contr

CO Contr

CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

CO Engr

CO Engr

CO Engr

CO Engr

2019

2019

2019

2019

2019

2019

2019

2019

2019

2020

2020

2021

4BD7

4BK7

4PF7

4PS7

7PM

4PF7

4PS7

LAB

LAB

4PF7

4PS7

4PF7

State

Federal

Federal

State

Bonds

Federal

State

Federal

State

Federal

State

Federal

2

Z001

Z001

2

45

Z001

2

Z001

2

Z001

2

Z001

State Funds (002)

National Hwy Performance P

National Hwy Performance P

State Funds (002)

Garvee Bond-Fund 045-Lon

National Hwy Performance P

State Funds (002)

National Hwy Performance P

Labor - State Match

National Hwy Performance P

State Funds (002)

National Hwy Performance P

$6,200,000

$24,800,000

$9,000,000

$1,000,000

$39,000,000

$209,516

$23,280

$2,366,000

$3,234,000

$1,204,292

$133,810

$1,178,010

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$88,479,798

$88,479,798

$88,479,798

$88,479,798

$88,479,798

$88,479,798

$88,479,798

$88,479,798

$88,479,798

$88,479,798

$88,479,798

$88,479,798

$98,185,471

$98,185,471

$98,185,471

$98,185,471

$98,185,471

$98,185,471

$98,185,471

$98,185,471

$98,185,471

$98,185,471

$98,185,471

$98,185,471

2018stipID0598FDCO

2018stipID0598FDCO

2018stipID0598FDCO

2018stipID0598FDCO

2018stipID0598FDCO

2018stipID0598FDCO

2018stipID0598FDCO

2018stipID0598FDCO

2018stipID0598FDCO

2018stipID0598FDCO

2018stipID0598FDCO

2018stipID0598FDCO

Page 29: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 29 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 104667 OKI HAM HAM IR 75 3.84 Description: This is Phase 5A of the Hamilton 75

corridor projects (MCE). This phase was split

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 1.71 CO CO Engr 2021 4PS7 State 2 State Funds (002) $130,890 $0 $88,479,798 $98,185,471 2018stipID0598FDCO

Ph subtotal: $88,479,798 $0 $88,479,798 $98,185,471

DD Dtl Dsgn

Dtl Dsgn

2019

2019

4BD7

4BK7

State

Federal

2

Z001

State Funds (002)

National Hwy Performance P

$1,600,000

$6,400,000

$197,890

$197,890

$8,197,890

$8,197,890

$98,185,471

$98,185,471

2018stipID0598FDDD

2018stipID0598FDDD

Ph subtotal: $8,000,000 $197,890 $8,197,890 $98,185,471

104668 OKI HAM HAM IR 74 18.01 Description: This is Phase 5B of the Hamilton

MCE 75 corridor projects. This phase was split

off of the work originally to be completed under

PID 83723. Project addresses work on I-74 as

part of the I-74/75 interchange reconstruction.

In addition, will improve the Work Type: Major

Widening Termini: From just west of Colerain

interchange with I-74 to I-75

ODOT SPONSORING

AGENCY

Air Quality Non-Exe 1.47 CO CO Contr

CO Contr

CO Engr

CO Engr

2020

2020

2020

2020

4BD7

4BK7

LAB

LAB

State

Federal

Federal

State

2

Z001

Z001

2

State Funds (002)

National Hwy Performance P

National Hwy Performance P

Labor - State Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$100,730,569

$100,730,569

$100,730,569

$100,730,569

2018stipID0599XXCO

2018stipID0599XXCO

2018stipID0599XXCO

2018stipID0599XXCO

Ph subtotal: $0 $0 $0 $100,730,569

DD Dtl Dsgn

Dtl Dsgn

2020

2020

4BD7

4BK7

State

Federal

2

Z001

State Funds (002)

National Hwy Performance P

$0

$0

$0

$0

$0

$0

$100,730,569

$100,730,569

2018stipID0599XXDD

2018stipID0599XXDD

Ph subtotal: $0 $0 $0 $100,730,569

104934 OKI HAM HAM US 22 14.74 Montg

Sidewalks

Description: Construction of a 7' wide sidewalk

on the east side of Montgomery Road from

School House Lane to Radabaugh Drive. Work

Type: Add Sidewalks Termini: US-22

(Montgomery Road): from School House Lane to

Radabaugh Drive

Montgomery, City of Air Quality Exempt 0.49 CO CO Contr

CO Contr

CO Engr

2021

2021

2021

4TC7

LNT

LNT

Federal

Local Match

Local Match

Z301

LNTP

LNTP

TAP/Enhancements

Local Match

Local Match

$359,480

$89,870

$44,935

$0

$0

$0

$494,285

$494,285

$494,285

$593,192

$593,192

$593,192

2018stipID0600FDCO

2018stipID0600FDCO

2018stipID0600FDCO

Ph subtotal: $494,285 $0 $494,285 $593,192

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $736 $0 $736 $593,192 2018stipID0600FDDD

Ph subtotal: $736 $0 $736 $593,192

ENV Env PE 2018 LAB State 2 Labor - State Match $4,171 $0 $4,171 $593,192 2018stipID0600FDENV

Ph subtotal: $4,171 $0 $4,171 $593,192

RW Acquis

Acquis

RW Serv

2020

2020

2018

4TC7

LNT

LAB

Federal

Local Match

State

Z301

LNTP

2

TAP/Enhancements

Local Match

Labor - State Match

$27,200

$6,800

$60,000

$0

$0

$0

$94,000

$94,000

$94,000

$593,192

$593,192

$593,192

2018stipID0600FDRW

2018stipID0600FDRW

2018stipID0600FDRW

Ph subtotal: $94,000 $0 $94,000 $593,192

104936 OKI HAM HAM SR 126/US 22

20.00/13.19

Description: Construction of a multi-lane modern

roundabout to replace/modify the existing partial

clover interchange at SR-126 and US-22.

Work Type: Intersection Improvement Termini:

SR-126 & US-22 Interchange

Montgomery, City of Air Quality Non-Exe 0.63 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

STBG

Local Match

Local Match

$6,000,000

$2,571,429

$600,000

$0

$0

$0

$9,171,429

$9,171,429

$9,171,429

$9,325,029

$9,325,029

$9,325,029

2018stipID0601FDCO

2018stipID0601FDCO

2018stipID0601FDCO

Ph subtotal: $9,171,429 $0 $9,171,429 $9,325,029

104942 OKI HAM HAM Reading Signal

Upgrades

Description: Retrofit existing traffic signal heads

at 26 signalized intersections within the City of

Reading, OH with LED signal heads. Existing

pedestrian heads will be retrofitted with LED

lenses. Existing school flashers will be replaced.

Battery backup systems wi Work Type:

Signals Termini: City of Reading, OH (26

signalized intersections)

Reading, City of Air Quality Exempt 3.87 CO CO Contr

CO Contr

CO Engr

2018

2018

2018

4BG

4TA7

LAB

Local Match

Federal

Local Match

2

Z230

2

Local Match

STBG

Labor - Local Match

$73,400

$293,600

$36,700

$0

$0

$0

$403,700

$403,700

$403,700

$495,451

$495,451

$495,451

2018stipID0602FDCO

2018stipID0602FDCO

2018stipID0602FDCO

Ph subtotal: $403,700 $0 $403,700 $495,451

Page 30: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 30 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 104944 OKI HAM HAM CR 269 2.80 Kenwood

Road

Description: Addition of a southbound right turn

lane from Kenwood Road to US-22 (Montgomery

Road). In addition, a physical divider will be

constructed to separate the southbound left-turn

lane from other southbound traffic on Kenwood

Roa Work Type: Intersection Improvement

Termini: Intersection of US-22 with Kenwood

Road in Sycamore Township, OH

SYCAMORE TOWNSHIP OF

HAMILTON COUNTY

Air Quality Exempt 0.16 CO CO Contr

CO Contr

CO Engr

2021

2021

2021

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

STBG

Local Match

Local Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

2018stipID0603XXCO

2018stipID0603XXCO

2018stipID0603XXCO

Ph subtotal: $0 $0 $0 $0

RW Acquis

Acquis

RW Serv

2021

2021

2021

4TA7

LNT

LAB

Federal

Local Match

Labor

Z230

LNTP

LABR

STBG

Local Match

Labor

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

2018stipID0603XXRW

2018stipID0603XXRW

2018stipID0603XXRW

Ph subtotal: $0 $0 $0 $0

Description: Addition of a southbound right turn

lane from Kenwood Road to US-22 (Montgomery

Road). In addition, a physical divider will be

constructed to separate the southbound left-turn

lane from other southbound traffic on Kenwood

Road. A shared use path will be c Work Type:

Intersection Improvement Termini: Intersection

of US-22 with Kenwood Road in Sycamore

Township, OH

SYCAMORE TOWNSHIP OF

HAMILTON COUNTY

Air Quality Exempt 0.16 DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $1,719 $0 $1,719 $2,244,463 2018stipID0603FDDD

Ph subtotal: $1,719 $0 $1,719 $2,244,463

ENV Env PE 2018 LAB State 2 Labor - State Match $9,742 $0 $9,742 $2,244,463 2018stipID0603FDENV

Ph subtotal: $9,742 $0 $9,742 $2,244,463

105058 OKI HAM HAM Bassett Road

Sidewalk

Description: Construction of sidewalk along

Bassett Road from Fairbanks Avenue to Elberon

Avenue. Work Type: Add Sidewalks Termini:

Bassett Road: from Fairbanks Avenue to

Elberon Avenue

Cincinnati, City of Air Quality Exempt CO CO Contr

CO Contr

CO Engr

CO Engr

2020

2020

2020

2020

4TC7

LNT

4TC7

LNT

Federal

Local Match

Federal

Local Match

Z301

LNTP

LNTP

Not Grouped

Local Match

Un-Assigned Federal

Local Match

$504,000

$126,000

$56,000

$14,000

$0

$0

$0

$0

$700,000

$700,000

$700,000

$700,000

$700,000

$700,000

$700,000

$700,000

2018MODID0443FDCO

2018MODID0443FDCO

2018MODID0443FDCO

2018MODID0443FDCO

Ph subtotal: $700,000 $0 $700,000 $700,000

105162 OKI HAM HAM CR 665 0.39 Auburn

Avenue

Description: Widening of Auburn Avenue to five

lanes between Dorchester and Gilman Avenues.

The intersection of Auburn Avenue with

Huntington Place and the entrance to the

Hamilton County Juvenile Detention Center will

be realigned. Improvements to the Auburn

Avenue i Work Type: Widening Termini:

Auburn Avenue: from Dorchester Avenue to

Gilman Avenue

Cincinnati, City of Air Quality Non-Exe 0.28 CO CO Contr

CO Contr

CO Engr

2021

2021

2021

4TA7

LNT

LNT

Federal

Local Match

Local Match

Z230

LNTP

LNTP

STBG

Local Match

Local Match

$2,500,800

$625,200

$218,820

$0

$0

$0

$3,344,820

$3,344,820

$3,344,820

$5,188,956

$5,188,956

$5,188,956

2018stipID0605FDCO

2018stipID0605FDCO

2018stipID0605FDCO

Ph subtotal: $3,344,820 $0 $3,344,820 $5,188,956

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $5,120 $0 $5,120 $5,188,956 2018stipID0605FDDD

Ph subtotal: $5,120 $0 $5,120 $5,188,956

ENV Env PE 2018 LAB State 2 Labor - State Match $29,016 $0 $29,016 $5,188,956 2018stipID0605FDENV

Ph subtotal: $29,016 $0 $29,016 $5,188,956

RW Acquis

Acquis

RW Serv

2020

2020

2018

4TA7

LNT

LAB

Federal

Local Match

State

Z230

LNTP

2

STBG

Local Match

Labor - State Match

$1,400,000

$350,000

$60,000

$0

$0

$0

$1,810,000

$1,810,000

$1,810,000

$5,188,956

$5,188,956

$5,188,956

2018stipID0605FDRW

2018stipID0605FDRW

2018stipID0605FDRW

Ph subtotal: $1,810,000 $0 $1,810,000 $5,188,956

Page 31: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 31 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 105168 OKI HAM HAM Wasson Way Trail

Phase 2a

Description: Construction of a 12'-14' foot

shared-use path and parallel 6'-8' wide

pedestrian path to extend the proposed Wasson

Way Trail network from Tamarack Avenue to the

west, across the existing RR bridge over IR-71,

terminating near the intersection of Floral Work

Type: Bikeways Termini: Floral Avenue and

Elsmere Avenue intersection to Tamarack

Avenue (tie into proposed Wasson Way Trail)

Cincinnati, City of Air Quality Exempt CO CO Contr

CO Contr

CO Engr

2019

2019

2019

4TC7

LNT

LNT

Federal

Local Match

Local Match

Z301

LNTP

LNTP

Not Grouped

Local Match

Local Match

$944,000

$1,337,515

$159,706

$0

$0

$0

$2,441,221

$2,441,221

$2,441,221

$2,461,817

$2,461,817

$2,461,817

2018AM04ID0161FDCO

2018AM04ID0161FDCO

2018AM04ID0161FDCO

Ph subtotal: $2,441,221 $0 $2,441,221 $2,461,817

105181 OKI HAM HAM Hauck Road Widening Description: Widening of Hauck Road to three

lanes to add a center two way left turn lane. In

addition curb and gutter will be constructed,

replacement of the storm sewer system, and

construction of a sidewalk on the north side of

Hauck Road. Work Type: Roadway

Improvement (Safety) Termini: Hauck Road:

from 80' west of the Norfolk Southern crossing

(near Reading Road) to 500' west of US-42

(Lebanon Road)

Sharonville, City of Air Quality Exempt ENV Env RW S

Env RW S

2020

2020

4TA7

LNT

Federal

Local Match

Z230

LNTP

Bridge

Local Match

$66,300

$44,200

$166,400

$166,400

$110,500

$110,500

$5,137,801

$5,137,801

2018MODID0497FDENV

2018MODID0497FDENV

Ph subtotal: $110,500 $166,400 $110,500 $5,137,801

Description: Widening of Hauck Road to three

lanes to add a center two way left turn lane. In

addition curb and gutter will be constructed,

replacement of the storm sewer system, and

construction of a sidewalk on the north side of

Hauck Road. Work Type: Widening Termini:

Hauck Road: from 80' west of the Norfolk

Southern crossing (near Reading Road) to 500'

west of US-42 (Lebanon Road)

Sharonville, City of Air Quality Exempt CO CO Contr

CO Contr

CO Contr

CO Engr

2021

2021

2021

2021

4BG

4TA7

4TC7

LAB

Local Match

Federal

Federal

Local Match

2

Z230

Z301

2

Local Match

STBG

TAP/Enhancements

Labor - Local Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,161,042

$1,161,042

$1,161,042

$1,161,042

2018MODID0509FDCO

2018MODID0509FDCO

2018MODID0509FDCO

2018MODID0509FDCO

Ph subtotal: $0 $0 $0 $1,161,042

RW Acquis

Acquis

2020

2020

4TA7

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

$348,300

$232,200

$60,000

$60,000

$640,500

$640,500

$5,137,801

$5,137,801

2018stipID0607FDRW

2018stipID0607FDRW

Ph subtotal: $580,500 $60,000 $640,500 $5,137,801

105184 OKI HAM HAM CR 266 12.42 Kemper

Bikepath

Description: Construction of a shared use path

along Kemper Road from US-42 to the Sharon

Woods Park, Lakeview Lodge driveway, where it

will connect with the Sharon Woods trail

network. Work Type: Bike Facility Termini:

Kemper Road: from US 42 to the Sharon Woods

Park - Lakeview Lodge driveway

Sharonville, City of Air Quality Exempt 0.74 ENV Env PE

Env RW S

Env RW S

2018

2020

2020

LAB

4TC7

LNT

State

Federal

Local Match

2

Z301

LNTP

Labor - State Match

TAP/Enhancements

Local Match

$12,260

$47,760

$31,840

$0

$0

$0

$91,860

$91,860

$91,860

$674,224

$674,224

$674,224

2018MODID0498FDENV

2018MODID0498FDENV

2018MODID0498FDENV

Ph subtotal: $91,860 $0 $91,860 $674,224

Description: Construction of a shared use path

along Kemper Road from US-42 to the Sharon

Woods Park, Lakeview Lodge driveway, where it

will connect with the Sharon Woods trail

network. Work Type: Bikeways Termini:

Kemper Road: from US 42 to the Sharon Woods

Park - Lakeview Lodge driveway

Sharonville, City of Air Quality Exempt 0.74 CO CO Contr

CO Contr

CO Engr

2021

2021

2021

4BG

4TC7

LAB

Local Match

Federal

Local Match

2

Z301

2

Local Match

TAP/Enhancements

Labor - Local Match

$199,320

$298,980

$49,830

$0

$0

$0

$548,130

$548,130

$548,130

$709,630

$709,630

$709,630

2018stipID0608FDCO

2018stipID0608FDCO

2018stipID0608FDCO

Ph subtotal: $548,130 $0 $548,130 $709,630

RW Acquis

Acquis

2020

2020

4TC7

LNT

Federal

Local Match

Z301

LNTP

TAP/Enhancements

Local Match

$49,140

$32,760

$0

$0

$81,900

$81,900

$709,630

$709,630

2018stipID0608FDRW

2018stipID0608FDRW

Page 32: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 32 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

Ph subtotal: $81,900 $0 $81,900 $709,630

FHWA 8 105214 OKI HAM HAM MICRO FY2024 Description: Microsurfacing in Hamilton County

in FY2024 Work Type: Preventive

Maintenance Termini: HAM SR 32 SLM 1.79 to

4.58

ODOT SPONSORING

AGENCY

Air Quality Exempt 2.79 DD Dtl Dsgn 2020 LAB State 2 Labor - State Match $0 $0 $0 $724,786 2018stipID0609XXDD

Ph subtotal: $0 $0 $0 $724,786

ENV Env PE 2020 LAB State 2 Labor - State Match $0 $0 $0 $724,786 2018stipID0609XXENV

Ph subtotal: $0 $0 $0 $724,786

105314 OKI HAM HAM WHV Western

Approach

Description: Western Hills Viaduct (WHV) Phase

1: Acquisition of parcels and structure demolition

of right of way required for the western approach

of the new WHV. Removal of the western plaza

to the extent possible while maintaining traffic. Fill

and grade the wester Work Type: Bridge

Demolition Only Termini: Western approach to

the Western Hills Viaduct (roughly from

Moellering Avenue to State Avenue)

Cincinnati, City of Air Quality Exempt 0.25 RW Acquis

Acquis

2018

2018

4BK7

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

$520,000

$130,000

$1,270,000

$1,270,000

$1,920,000

$1,920,000

$14,099,000

$14,099,000

2018stipID0610FDRW

2018stipID0610FDRW

Ph subtotal: $650,000 $1,270,000 $1,920,000 $14,099,000

105315 OKI HAM HAM WHV Eastern

Approach

Description: Western Hills Viaduct (WHV) Phase

2: Acquisition of parcels and structure demolition

on the eastern approach to the new WHV. Fill

and grade the eastern approach and construct

new retaining walls where practical and where

they can be constructed in a manne Work

Type: Bridge Demolition Only Termini: Eastern

approach to the Western Hills Viaduct (roughly

Spring Grove Avenue to Central Parkway)

Cincinnati, City of Air Quality Exempt 0.20 RW Acquis

Acquis

2019

2019

4BK7

LNT

Federal

Local Match

Z001

LNTP

Not Grouped

Local Match

$2,400,000

$600,000

$0

$0

$3,000,000

$3,000,000

$9,900,000

$9,900,000

2018AM06ID0207FDRW

2018AM06ID0207FDRW

Ph subtotal: $3,000,000 $0 $3,000,000 $9,900,000

105347 OKI HAM HAM WHV Mill Creek Bridge

& RR

Description: Western Hills Viaduct (WHV) Phase

6: Construction of a new bridge over the Mill

Creek, south of the WHV to provide contractor

access for future construction. In addition,

relocation of the bypass track on the east bank

of the Mill Creek further east, to c Work Type:

New Bridge Termini: Rail yard below WHV and

Mill Creek crossing south of WHV (from State

Avenue to the rail yard)

Cincinnati, City of Air Quality Exempt 0.20 RW Acquis

Acquis

2021

2021

4BK7

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

$800,000

$200,000

$0

$0

$1,000,000

$1,000,000

$7,600,000

$7,600,000

2018AM06ID0208FDRW

2018AM06ID0208FDRW

Ph subtotal: $1,000,000 $0 $1,000,000 $7,600,000

105349 OKI HAM HAM WHV New Viaduct

Construction

Description: Western Hills Viaduct (WHV) Phase

8: Construction of the new Western Hills Viaduct

including construction of tower piers, approach

bridge substructure, large span and approach

span superstructures and decks, and remaining

approach roadway. Work Type: New Bridge

Termini: Western Hills Viaduct and approaches

(near Moellering Ave on west side to east of

Central Pkwy along W McMillan St on east side)

Cincinnati, City of Air Quality Exempt 1.06 DD Dtl Dsgn

Dtl Dsgn

Dtl Dsgn

2018

2018

2020

4BK7

LNT

LNT

Federal

Local Match

Local Match

LNTP

LNTP

Un-Assigned Federal

Local Match

Local Match

$1,270,729

$317,682

$1,911,589

$0

$0

$0

$3,500,000

$3,500,000

$3,500,000

$259,900,000

$259,900,000

$259,900,000

2018MODID0262FDDD

2018MODID0262FDDD

2018MODID0262FDDD

Ph subtotal: $3,500,000 $0 $3,500,000 $259,900,000

ENV PE Engr

PE Engr

PE Engr

PE Engr

2017

2017

2017

2017

4BK7

4R27

4R47

LNT

Federal

Federal

Federal

Local Match LNTP

Un-Assigned Federal

Un-Assigned Federal

Un-Assigned Federal

Local Match

$3,729,271

$1,500,942

$1,337,469

$932,318

$932,318

$932,318

$932,318

$932,318

$8,432,318

$8,432,318

$8,432,318

$8,432,318

$259,900,000

$259,900,000

$259,900,000

$259,900,000

2018MODID0262FDENV

2018MODID0262FDENV

2018MODID0262FDENV

2018MODID0262FDENV

Ph subtotal: $7,500,000 $932,318 $8,432,318 $259,900,000

Page 33: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 33 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 105763 OKI HAM HAM CR 457 12.68

Harrison Ave

Description: Widening the roadway to increase

lane widths, mill and fill of pavement with spot

repairs where needed. Installation of a retaining

wall where a slide exists on the east side of the

roadway, installation of sidewalk where it

currently does not exist, and Work Type:

Widening Termini: Harrison Ave: from

Wesselmen Rd to the Harrison Greene

Shopping Center

GREEN TOWNSHIP OF

HAMILT0N COUNTY

Air Quality Exempt 1.02 CO CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

2020

2020

2020

2020

2020

2020

4TA7

4TC7

LNT

4TA7

4TC7

LNT

Federal

Federal

Local Match

Federal

Federal

Local Match

LNTP

LNTP

Un-Assigned Federal

Un-Assigned Federal

Local Match

Un-Assigned Federal

Un-Assigned Federal

Local Match

$2,933,685

$411,215

$2,736,736

$205,358

$28,785

$191,572

$0

$0

$0

$0

$0

$0

$6,507,351

$6,507,351

$6,507,351

$6,507,351

$6,507,351

$6,507,351

$9,007,351

$9,007,351

$9,007,351

$9,007,351

$9,007,351

$9,007,351

2018AM01ID0031FDCO

2018AM01ID0031FDCO

2018AM01ID0031FDCO

2018AM01ID0031FDCO

2018AM01ID0031FDCO

2018AM01ID0031FDCO

Ph subtotal: $6,507,351 $0 $6,507,351 $9,007,351

RW Acquis

Acquis

2019

2019

4TA7

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

$1,375,000

$1,125,000

$0

$0

$2,500,000

$2,500,000

$9,007,351

$9,007,351

2018AM01ID0031FDRW

2018AM01ID0031FDRW

Ph subtotal: $2,500,000 $0 $2,500,000 $9,007,351

105831 OKI HAM HAM Deer Park Bike/Ped

Connector

Description: Pavement replacement and

resurfacing on St. John's Terrace, Blue Ash

Road, and Orchard Lane. Replacement of curb

and gutter, drive aprons, installation of signage

and pavement markings. Existing RR crossing at

the south side of Chamberlain Park will be re

Work Type: Add Sidewalks Termini: St. Johns

Ter: Plainfield Rd to Chamberlain Park; Blue Ash

Rd: from the park to Orchard; Orchard: Blue

Ash Rd to Sycamore Twp

DEER PARK Air Quality Exempt 0.06 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4BG

4TC7

LAB

Local Match

Federal

Local Match

2

2

Local Match

Un-Assigned Federal

Labor - Local Match

$1,114,012

$750,000

$130,481

$0

$0

$0

$1,994,493

$1,994,493

$1,994,493

$2,040,233

$2,040,233

$2,040,233

2018AM08ID0259FDCO

2018AM08ID0259FDCO

2018AM08ID0259FDCO

Ph subtotal: $1,994,493 $0 $1,994,493 $2,040,233

105851 OKI HAM HAM IR 75 0.22 Demo Description: This will be to demolish structures

acquired for the Brent Spence Bridge project.

(PID 89068) Work Type: Building Demolition

Termini: From the OH/KY State Line to the 3.00

+/- Mile Marker

ODOT SPONSORING

AGENCY

Air Quality Exempt 2.79 CO CO Contr

CO Engr

2018

2018

4BD7

LAB

State

State

2

2

State Funds (002)

Labor - State Match

$700,000

$70,000

$0

$0

$770,000

$770,000

$791,232

$791,232

2018AM02ID0085FDCO

2018AM02ID0085FDCO

Ph subtotal: $770,000 $0 $770,000 $791,232

106185 OKI HAM HAM Hutchinson Rd Bike

Bridge

Description: Construction of a bike path bridge

over Hutchinson Road to connect the Harrison

Avenue bike path from west of Hutchinson to

east of Hutchinson. Work Type: New Bridge

Termini: Hutchinson Road: west of Filview Circle

(at old RR bridge location)

GREEN TOWNSHIP OF

HAMILT0N COUNTY

Air Quality Exempt 0.03 CO CO Contr

CO Contr

CO Engr

CO Engr

2020

2020

2020

2020

4BG

4TC7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

2

Local Match

Un-Assigned Federal

Un-Assigned Federal Labor

Labor - Local Match

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

2018AM01ID0032XXCO

2018AM01ID0032XXCO

2018AM01ID0032XXCO

2018AM01ID0032XXCO

Ph subtotal: $0 $0 $0 $0

106228 OKI HAM HAM Harrison Ave Ped

Improvement

Description: On the east side of Harrison

Avenue, improve pedestrian facilities including

installation of new sidewalks, curb & gutter,

removal of existing tree planters, and installation

of lighting. Work Type: Bicycle and Pedestrian

Termini: Harrison Avenue: from Montana

Avenue to Epworth Avenue

Cincinnati, City of Air Quality Exempt 0.13 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TC7

LNT

LNT

Federal

Local Match

Local Match

Z301

LNTP

LNTP

TAP/Enhancements

Local Match

Local Match

$294,074

$73,518

$36,759

$0

$0

$0

$404,351

$404,351

$404,351

$426,964

$426,964

$426,964

2018AM12ID0409FDCO

2018AM12ID0409FDCO

2018AM12ID0409FDCO

Ph subtotal: $404,351 $0 $404,351 $426,964

Page 34: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 34 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 106404 OKI HAM HAM US 27 10.39 Description: Install sidewalk on the west side of

US-27 from Banning to Brynside; painted

crosswalks at Brynside intersection and ADA

curb ramps; unsignalized crosswalk north of

Banning with concrete median island and RRFB

or PHB. Work Type: Add Sidewalks Termini:

US-27 from Banning to Brynside

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.63 DD Dtl Dsgn

Dtl Dsgn

Dtl Dsgn

2018

2019

2019

LAB

4BC7

4HJ7

State

State

Federal

2

2

Labor - State Match

State Funds (002)

Un-Assigned Federal

$8,206

$2,040

$18,360

$0

$0

$0

$28,606

$28,606

$28,606

$792,482

$792,482

$792,482

2018AM02ID0086FDDD

2018AM02ID0086FDDD

2018AM02ID0086FDDD

Ph subtotal: $28,606 $0 $28,606 $792,482

ENV Env PE

Env PE

Env PE

2018

2018

2018

4BC7

4HJ7

LAB

State

Federal

State

2

2

State Funds (002)

Un-Assigned Federal

Labor - State Match

$4,142

$37,277

$46,503

$0

$0

$0

$87,922

$87,922

$87,922

$792,482

$792,482

$792,482

2018AM02ID0086FDENV

2018AM02ID0086FDENV

2018AM02ID0086FDENV

Ph subtotal: $87,922 $0 $87,922 $792,482

RW Acquis

Acquis

RW Serv

RW Serv

RW Serv

2019

2019

2018

2019

2019

4BC7

4HJ7

LAB

4BC7

4HJ7

State

Federal

State

State

Federal

2

2

2

State Funds (002)

Un-Assigned Federal

Labor - State Match

State Funds (002)

Un-Assigned Federal

$4,058

$36,522

$60,000

$6,265

$56,385

$0

$0

$0

$0

$0

$163,230

$163,230

$163,230

$163,230

$163,230

$792,482

$792,482

$792,482

$792,482

$792,482

2018AM02ID0086FDRW

2018AM02ID0086FDRW

2018AM02ID0086FDRW

2018AM02ID0086FDRW

2018AM02ID0086FDRW

Ph subtotal: $163,230 $0 $163,230 $792,482

Description: Install sidewalk on the west side of

US-27 from Banning to Brynside; painted

crosswalks at Brynside intersection and ADA

curb ramps; unsignalized crosswalk north of

Banning with concrete median island and RRFB

or PHB. Work Type: Pedestrian Facilities

Termini: US-27 from Banning to Brynside

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.63 CO CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

2021

2021

2021

2021

2021

2021

4BC7

4BG

4HJ7

LAB

LAB

LAB

State

Local Match

Federal

Federal

Local Match

State

002

002

ZS30

ZS30

002

002

State Funds (002)

Local Match

Highway Safety Imp Prog

Highway Safety Imp Prog

Labor - Local Match

Labor - State Match

$50,870

$42,600

$457,830

$45,783

$4,260

$5,087

$0

$0

$0

$0

$0

$0

$606,430

$606,430

$606,430

$606,430

$606,430

$606,430

$1,026,261

$1,026,261

$1,026,261

$1,026,261

$1,026,261

$1,026,261

2018AM15ID0526FDCO

2018AM15ID0526FDCO

2018AM15ID0526FDCO

2018AM15ID0526FDCO

2018AM15ID0526FDCO

2018AM15ID0526FDCO

Ph subtotal: $606,430 $0 $606,430 $1,026,261

106411 OKI HAM HAM IR 275 28.29 Description: Ramp improvements at the I-275 &

US-42 interchange; Re-assigning lane usage on

US-42 through interchange and at Hauck Rd

Work Type: Intersection Improvement Termini:

HAM IR 275 & US 42 Interchange

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.33 DD Dtl Dsgn

Dtl Dsgn

Dtl Dsgn

2018

2019

2019

LAB

4BC7

4HJ7

State

State

Federal

2

2

Labor - State Match

State Funds (002)

Un-Assigned Federal

$24,960

$10,143

$91,283

$0

$0

$0

$126,385

$126,385

$126,385

$2,825,595

$2,825,595

$2,825,595

2018AM02ID0087FDDD

2018AM02ID0087FDDD

2018AM02ID0087FDDD

Ph subtotal: $126,385 $0 $126,385 $2,825,595

ENV Env PE

Env PE

Env PE

2018

2018

2018

4BC7

4HJ7

LAB

State

Federal

State

2

2

State Funds (002)

Un-Assigned Federal

Labor - State Match

$20,593

$185,333

$141,440

$0

$0

$0

$347,365

$347,365

$347,365

$2,825,595

$2,825,595

$2,825,595

2018AM02ID0087FDENV

2018AM02ID0087FDENV

2018AM02ID0087FDENV

Ph subtotal: $347,365 $0 $347,365 $2,825,595

RW Acquis

Acquis

RW Serv

RW Serv

RW Serv

2019

2019

2018

2019

2019

4BC7

4HJ7

LAB

4BC7

4HJ7

State

Federal

State

State

Federal

2

2

2

State Funds (002)

Un-Assigned Federal

Labor - State Match

State Funds (002)

Un-Assigned Federal

$6,790

$61,110

$20,000

$2,910

$26,190

$0

$0

$0

$0

$0

$117,000

$117,000

$117,000

$117,000

$117,000

$2,825,595

$2,825,595

$2,825,595

$2,825,595

$2,825,595

2018AM02ID0087FDRW

2018AM02ID0087FDRW

2018AM02ID0087FDRW

2018AM02ID0087FDRW

2018AM02ID0087FDRW

Ph subtotal: $117,000 $0 $117,000 $2,825,595

HAM IR 275 28.29 - Part 1 Description: Ramp improvements at the I-275 &

US-42 interchange; Re-assigning lane usage on

US-42 through interchange and at Hauck RdPID

105181 - HAM-Hauk Road Widening - Part 2.

Work Type: Intersection Improvement (Safety)

Termini: HAM IR 275 & US 42 Interchange

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.33 CO CO Contr

CO Contr

CO Contr

CO Contr

2021

2021

2021

2021

4BC7

4BG

4HJ7

4IS7

State

Local Match

Federal

State

2

2

ZS30

2

State Funds (002)

Local Match

Highway Safety Imp Prog

State Funds (002)

$257,200

$1,542,600

$2,957,400

$80,000

$0

$0

$0

$0

$7,562,340

$7,562,340

$7,562,340

$7,562,340

$8,396,058

$8,396,058

$8,396,058

$8,396,058

2018MODID0509FDCO

2018MODID0509FDCO

2018MODID0509FDCO

2018MODID0509FDCO

Page 35: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 35 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 106411 OKI HAM HAM IR 275 28.29 - Part 1 Description: Ramp improvements at the I-275 &

US-42 interchange; Re-assigning lane usage on

ODOT SPONSORING

AGENCY

Air Quality Exempt 0.33 CO CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

CO Engr

CO Engr

2021

2021

2021

2021

2021

2021

2021

4TA7

4TC7

LAB

LAB

LAB

LAB

LAB

Federal

Federal

Federal

Federal

Federal

Local Match

State

Z230

Z301

17

17

ZS30

2

2

Bridge

TAP/Enhancements

STBG

TAP/Enhancements

Highway Safety Imp Prog

Labor - Local Match

Labor - State Match

$2,130,000

$76,800

$149,100

$7,680

$226,296

$111,660

$23,604

$0

$0

$0

$0

$0

$0

$0

$7,562,340

$7,562,340

$7,562,340

$7,562,340

$7,562,340

$7,562,340

$7,562,340

$8,396,058

$8,396,058

$8,396,058

$8,396,058

$8,396,058

$8,396,058

$8,396,058

2018MODID0509FDCO

2018MODID0509FDCO

2018MODID0509FDCO

2018MODID0509FDCO

2018MODID0509FDCO

2018MODID0509FDCO

2018MODID0509FDCO

Ph subtotal: $7,562,340 $0 $7,562,340 $8,396,058

106412 OKI HAM HAM SR 32 5.10 Description: Study to install of a two-way left turn

lane between Little Dry Run and the Newtown

east corporation limits and a right turn lane at

Little Dry Run. Work Type: Safety Studies

Termini: HAM SR 32 between Little Dry Run &

the Newtown E CL.

Newtown, Village of Air Quality Exempt 0.90 OT Pln Stdy

Pln Stdy

2018

2018

4BG

4HJ7

Local Match

Federal

2 Local Match

Un-Assigned Federal

$4,770

$42,929

$0

$0

$47,699

$47,699

$47,699

$47,699

2018AM02ID0088FDOTH

2018AM02ID0088FDOTH

Ph subtotal: $47,699 $0 $47,699 $47,699

107130 OKI HAM HAM CR 284 1.33 Description: Construct roundabout at Pfeiffer Rd

& Deerfield Rd Work Type: Intersection

Improvement Termini: Pfeiffer Road & Deerfield

Road

Montgomery, City of Air Quality Exempt 0.33 DD Dtl Dsgn

Dtl Dsgn

Dtl Dsgn

2018

2019

2019

LAB

4BG

4HJ7

State

Local Match

Federal

2

2

Labor - State Match

Local Match

Un-Assigned Federal

$1,328

$5,049

$45,441

$0

$0

$0

$51,818

$51,818

$51,818

$1,534,287

$1,534,287

$1,534,287

2018AM06ID0209FDDD

2018AM06ID0209FDDD

2018AM06ID0209FDDD

Ph subtotal: $51,818 $0 $51,818 $1,534,287

ENV Env PE

Env PE

Env PE

2018

2020

2020

LAB

4BG

4HJ7

State

Local Match

Federal

2

2

ZS30

Labor - State Match

Local Match

Highway Safety Imp Prog

$7,523

$10,251

$92,259

$0

$0

$0

$110,033

$110,033

$110,033

$1,534,287

$1,534,287

$1,534,287

2018MODID0465FDENV

2018MODID0465FDENV

2018MODID0465FDENV

Ph subtotal: $110,033 $0 $110,033 $1,534,287

RW Acquis

Acquis

RW Serv

RW Serv

RW Serv

2020

2020

2018

2020

2020

4BG

4HJ7

LAB

4BG

4HJ7

Local Match

Federal

State

Local Match

Federal

2

2

2

Local Match

Un-Assigned Federal

Labor - State Match

Local Match

Un-Assigned Federal

$3,913

$35,217

$40,000

$1,677

$15,093

$0

$0

$0

$0

$0

$95,900

$95,900

$95,900

$95,900

$95,900

$1,534,287

$1,534,287

$1,534,287

$1,534,287

$1,534,287

2018AM06ID0209FDRW

2018AM06ID0209FDRW

2018AM06ID0209FDRW

2018AM06ID0209FDRW

2018AM06ID0209FDRW

Ph subtotal: $95,900 $0 $95,900 $1,534,287

107295 OKI HAM HAM LMST Beechmont

Bridge - Pt 1

Description: Part 1 - Construction of a new

segment of the Little Miami Scenic Trail from the

existing trail along SR-32 north of Beechmont

Avenue, under the existing interchange of SR-32

with Beechmont, across the Little Miami River

(LMR) using the existing Beechmont Work

Type: Bike Facility Termini: From the ex. Little

Miami Scenic Trail on SR 32 east of the LMR to

the Lunken Trail west of the LMR - HAM SR 32

1.44 R Bridge

Hamilton County Park District Air Quality Exempt 0.50 CO CO Contr

CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

2021

2021

2021

2021

2021

2021

2021

4BG

4PF7

4PS7

4TB7

LAB

LAB

LAB

Local Match

Federal

State

Federal

Federal

Local Match

State

2

Z001

2

Z400

Z001

2

2

Local Match

National Hwy Performance P

State Funds (002)

CMAQ

National Hwy Performance P

Labor - Local Match

Labor - State Match

$1,131,400

$507,200

$126,800

$4,320,000

$50,720

$381,598

$12,680

$0

$0

$0

$0

$0

$0

$0

$6,530,398

$6,530,398

$6,530,398

$6,530,398

$6,530,398

$6,530,398

$6,530,398

$6,590,976

$6,590,976

$6,590,976

$6,590,976

$6,590,976

$6,590,976

$6,590,976

2018AM13ID0457FDCO

2018AM13ID0457FDCO

2018AM13ID0457FDCO

2018AM13ID0457FDCO

2018AM13ID0457FDCO

2018AM13ID0457FDCO

2018AM13ID0457FDCO

Ph subtotal: $6,530,398 $0 $6,530,398 $6,590,976

107296 OKI HAM HAM Mt. Healthy Signals Ph

2

Description: Upgrades to the existing City of Mt.

Healthy Signal System, covering 14 signalized

intersections on Compton Road and Hamilton

Avenue (US-127). Work Type: Traffic Control

(Safety) Termini: City of Mt. Healthy signals

along Compton Road and Hamilton Avenue

(US-127)

Mt. Healthy, City of Air Quality Exempt 2.24 CO CO Contr

CO Contr

CO Engr

CO Engr

2020

2020

2020

2020

4BG

4TB7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

Z400

Z400

2

Local Match

CMAQ

CMAQ

Labor - Local Match

$215,721

$862,885

$60,402

$15,100

$0

$0

$0

$0

$1,154,109

$1,154,109

$1,154,109

$1,154,109

$1,320,509

$1,320,509

$1,320,509

$1,320,509

2018MODID0500FDCO

2018MODID0500FDCO

2018MODID0500FDCO

2018MODID0500FDCO

Ph subtotal: $1,154,109 $0 $1,154,109 $1,320,509

Page 36: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 36 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 107301 OKI HAM HAM US 22/SR 3 9.66

Silverton

Description: Upgrades to the existing signalized

intersections of Montgomery Road with Highland

Ave, Plainfield Rd, Sampson Ln, and Elwynne

Drive. Access management improvements and

uprgrades to existing sidewalk for ADA

compliance also included. Work Type: Signals

Termini: US-22/SR-3 (Montgomery Road):

intersections with Highland Ave, Plainfield Rd,

Sampson Ln, and Elwynne Dr

Silverton, City of Air Quality Exempt 0.37 ENV Env PE

Env RW S

Env RW S

2018

2021

2021

LAB

4TB7

LNT

State

Federal

Local Match

2

LNTP

Labor - State Match

Un-Assigned Federal

Local Match

$141,440

$12,000

$3,000

$0

$0

$0

$156,440

$156,440

$156,440

$2,311,312

$2,311,312

$2,311,312

2018AM10ID0308FDENV

2018AM10ID0308FDENV

2018AM10ID0308FDENV

Ph subtotal: $156,440 $0 $156,440 $2,311,312

RW Acquis

Acquis

2021

2021

4TB7

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

$80,000

$20,000

$0

$0

$100,000

$100,000

$2,311,312

$2,311,312

2018AM10ID0308FDRW

2018AM10ID0308FDRW

Ph subtotal: $100,000 $0 $100,000 $2,311,312

107715 OKI HAM HAM Sycamore Twp

Intercnnect Ph2

Description: Completion of extension of fiber

optic interconnect through existing conduit to

Clete McDaniels Sports Complex and Schuler

Sports Complex, as well as finalizing fiber work

on signals along Montgomery Road, Galbraith

Road, and Kenwood Road. Work Type:

Signals Termini: Sycamore Township's signal

system, primarily along Montgomery Road,

Kenwood Road, and Galbraith Road

SYCAMORE TOWNSHIP OF

HAMILTON COUNTY

Air Quality Exempt 4.36 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4TA7

LNT

4TA7

LNT

Federal

Local Match

Federal

Local Match

LNTP

LNTP

Un-Assigned Federal

Local Match

Un-Assigned Federal

Local Match

$574,186

$574,186

$40,193

$40,193

$0

$0

$0

$0

$1,228,758

$1,228,758

$1,228,758

$1,228,758

$1,231,680

$1,231,680

$1,231,680

$1,231,680

2018AM04ID0165FDCO

2018AM04ID0165FDCO

2018AM04ID0165FDCO

2018AM04ID0165FDCO

Ph subtotal: $1,228,758 $0 $1,228,758 $1,231,680

109416 OKI HAM HAM OKI 2020 Reg Plng -

FIAM

Description: OKI State Fiscal Year 2020Fiscal

Impact Analysis Model Project Work Type:

Planning & Research Termini: 0

OKI Air Quality Exempt SP Planning 2020 4TD7 Federal Un-Assigned Federal $97,069 $0 $97,069 $97,069 2018AM11ID0364FDSP

Ph subtotal: $97,069 $0 $97,069 $97,069

109417 OKI HAM HAM OKI 20 Reg Trans

Plng - LU

Description: SFY 2020 OKI Regional

Transportation Planning - Land Use Work

Type: Planning & Research Termini: 0

OKI Air Quality Exempt SP Planning 2020 4TD7 Federal Un-Assigned Federal $411,219 $0 $411,219 $411,219 2018AM11ID0365FDSP

Ph subtotal: $411,219 $0 $411,219 $411,219

109437 OKI HAM HAM CR 376 0.61 Paddison

Sidewlk

Description: Installation of sidewalk along

Paddison Road from Beechmont Avenue to the

existing walk at Bluecrest Drive. Work Type:

Add Sidewalks Termini: Paddison Road: from

Beechmont Avenue to ex. sidewalk at Bluecrest

Drive

Anderson, Township of Air Quality Exempt 0.75 CO CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

4BG

4TC7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

Z301

17

2

Local Match

TAP/Enhancements

TAP/Enhancements

Labor - Local Match

$211,303

$601,401

$60,140

$21,130

$0

$0

$0

$0

$893,975

$893,975

$893,975

$893,975

$984,836

$984,836

$984,836

$984,836

2018AM12ID0410FDCO

2018AM12ID0410FDCO

2018AM12ID0410FDCO

2018AM12ID0410FDCO

Ph subtotal: $893,975 $0 $893,975 $984,836

110259 OKI HAM HAM IR 71 1.34 Description: Repair stone masonry veneer

façade in the spandrels over, and the pilasters

on either side of, the portals for Lytle Tunnel.

Additionally, replace in its entirety, the

deteriorating concrete wall cap on the south

portal mainline tunnel with new reinforce Work

Type: Miscellaneous Termini: Along IR71 SLM

1.34 to 1.47

ODOT SPONSORING

AGENCY

Air Quality Exempt CO CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

4BT7

4BU7

LAB

LAB

State

Federal

Federal

State

2

Z001

Z001

2

State Funds (002)

National Hwy Performance P

National Hwy Performance P

Labor - State Match

$96,800

$387,200

$38,720

$9,680

$0

$0

$0

$0

$532,400

$532,400

$532,400

$532,400

$631,723

$631,723

$631,723

$631,723

2018AM14ID0484FDCO

2018AM14ID0484FDCO

2018AM14ID0484FDCO

2018AM14ID0484FDCO

Ph subtotal: $532,400 $0 $532,400 $631,723

Page 37: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 37 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 110519 OKI HAM HAM Cincinnati Red Bike FY

20

Description: Purchase of bike share stations and

bicycles, including electric-assist bicycles to

further expand the bike share system in

Cincinnati. Work Type: Bicycle and Pedestrian

Termini: City of Cincinnati, Hamilton County,

OH

Port of Greater Cincinnati

Development Authority

Air Quality Exempt CO CO Contr

CO Contr

2020

2020

4TC7

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

$500,000

$125,000

$0

$0

$625,000

$625,000

$629,637

$629,637

2018AM12ID0411FDCO

2018AM12ID0411FDCO

Ph subtotal: $625,000 $0 $625,000 $629,637

111491 OKI HAM HAM Wasson Way Phase 3 Description: Construction of a shared use path

along the Wasson Way rail corridor from

Madison Road to Marburg Avenue. Construction

of a new trailhead at Marburg Avenue. Work

Type: Shared Use Path Termini: Former

Norfok-Southern RR corridor from Madison

Road to Marburg Avenue

Cincinnati, City of Air Quality Exempt 0.02 CO CO Contr

CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

2021

2021

4BC7

4HJ7

4TA7

LNT

4TA7

LNT

State

Federal

Federal

Local Match

Federal

Local Match

002

Z230

LNTP

Z230

LNTP

State Funds (002)

Un-Assigned Federal

Bridge

Local Match

Bridge

Local Match

$37,000

$333,000

$1,446,728

$482,243

$101,271

$59,657

$0

$0

$0

$0

$0

$0

$2,459,898

$2,459,898

$2,459,898

$2,459,898

$2,459,898

$2,459,898

$2,475,716

$2,475,716

$2,475,716

$2,475,716

$2,475,716

$2,475,716

2018AM15ID0527FDCO

2018AM15ID0527FDCO

2018AM15ID0527FDCO

2018AM15ID0527FDCO

2018AM15ID0527FDCO

2018AM15ID0527FDCO

Ph subtotal: $2,459,898 $0 $2,459,898 $2,475,716

111503 OKI HAM HAM CR 266 9.19 Kemper

Intrcnnct

Description: Transfer of existing fiber optic

interconnect from the current location to new

steel poles along Kemper Road between

Tri-County Parkway and Century Blvd. Transfer

of existing power services. Work Type: Traffic

Control Maintenance Termini: Kemper Road:

from Tri-County Parkway to Century Boulevard

Springdale, City of Air Quality Exempt 0.45 CO CO Contr

CO Contr

CO Engr

2021

2021

2021

4BG

4TA7

LAB

Local Match

Federal

Local Match

002

Z230

002

Local Match

Bridge

Labor - Local Match

$25,625

$102,500

$12,813

$0

$0

$0

$140,938

$140,938

$140,938

$152,853

$152,853

$152,853

2018AM15ID0528FDCO

2018AM15ID0528FDCO

2018AM15ID0528FDCO

Ph subtotal: $140,938 $0 $140,938 $152,853

96654 PRE PRE IR 70 0.00 Description: Resurface and pavement repair on

IR 70 in Preble County from the Indiana State

line to the Montgomery County line. The

pavement work will include mainline and all

ramps within the project limits. The project will

also include mionr bridge work on appro Work

Type: Minor Rehabilitation - Pavement Prmy Sys

Termini: PRE IR 70: SLM 0.00 to 17.67

ODOT SPONSORING

AGENCY

Air Quality Exempt 17.67 DD Dtl Dsgn

Dtl Dsgn

2018

2018

4PF7

4PS7

Federal

State

Z001

2

National Hwy Performance P

State Funds (002)

$675,000

$75,000

$9,149

$9,149

$759,149

$759,149

$36,698,111

$36,698,111

2018stipID0622FDDD

2018stipID0622FDDD

Ph subtotal: $750,000 $9,149 $759,149 $36,698,111

PRE IR 70 0.00, Pt. 1 Description: Part 1 -Resurface and pavement

repair on IR 70 in Preble County from the Indiana

State line to the Montgomery County line. The

pavement work will include mainline and all

ramps within the project limits. Bridge work will

include painting and replacing Work Type:

Minor Rehabilitation - Pavement Prmy Sys

Termini: PRE IR 70: SLM 0.00 to 17.67

ODOT SPONSORING

AGENCY

Air Quality Exempt 18.63 CO CO Contr

CO Contr

CO Contr

CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

2020

2020

2020

2020

2020

2020

2020

2020

2020

4BR7

4MT

4PF7

4PF7

4PS7

5MT

LAB

LAB

LAB

State

State

Federal

Federal

State

Federal

Federal

Federal

State

2

2

M001

Z232

2

Z232

M001

Z232

2

State Funds (002)

State Funds (002)

National Hwy Performance P

STBG

State Funds (002)

STBG

National Hwy Performance P

STBG

Labor - State Match

$500,000

$220,000

$21,145,520

$1,320,000

$2,679,502

$880,000

$760,366

$66,000

$115,985

$0

$0

$0

$0

$0

$0

$0

$0

$0

$27,687,373

$27,687,373

$27,687,373

$27,687,373

$27,687,373

$27,687,373

$27,687,373

$27,687,373

$27,687,373

$28,377,094

$28,377,094

$28,377,094

$28,377,094

$28,377,094

$28,377,094

$28,377,094

$28,377,094

$28,377,094

2018AM12ID0413FDCO

2018AM12ID0413FDCO

2018AM12ID0413FDCO

2018AM12ID0413FDCO

2018AM12ID0413FDCO

2018AM12ID0413FDCO

2018AM12ID0413FDCO

2018AM12ID0413FDCO

2018AM12ID0413FDCO

Ph subtotal: $27,687,373 $0 $27,687,373 $28,377,094

Page 38: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 38 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 98147 MVRPC WAR WAR CR 603 0.00 Franklin

ITS

Description: Reconstruct three traffic signals in

downtown Franklin (Second Street with River,

Main, and Riley) including new mast-arm signal

poles, illuminated signs, and traffic management

cameras. The intersections will be incorporated

into a traffic-responsive clo Work Type: Traffic

Management System Termini: Second Street:

from Miami Avenue to approximately 500 feet

east of Riley Boulevard

Franklin, City of Air Quality Exempt 0.15 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4BG

4TB7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

M400

M400

2

Local Match

CMAQ

CMAQ

Labor - Local Match

$288,904

$674,108

$67,411

$28,890

$0

$0

$0

$0

$1,059,313

$1,059,313

$1,059,313

$1,059,313

$1,077,471

$1,077,471

$1,077,471

$1,077,471

2018stipID0537FDCO

2018stipID0537FDCO

2018stipID0537FDCO

2018stipID0537FDCO

Ph subtotal: $1,059,313 $0 $1,059,313 $1,077,471

100187 MVRPC WAR WAR Franklin Signals

Phase 2

Description: Reconstruction of three traffic

signals with equipment conforming to current

standards including vehicular detection and

installation of battery backup systems. The

traffic signal operation will be managed by the

City using proposed fiber optic interconne

Work Type: Signals Termini: Intersections of

Riley Boulevard with (1) East 4th Street, (2) East

6th Street; Intersection of East 6th Street with

Anderson

Franklin, City of Air Quality Exempt 0.24 CO CO Contr

CO Contr

CO Engr

CO Engr

2021

2021

2021

2021

4BG

4TB7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

M40E

M40E

2

Local Match

Not Grouped

CMAQ

Labor - Local Match

$282,000

$658,000

$65,800

$28,200

$0

$0

$0

$0

$1,034,000

$1,034,000

$1,034,000

$1,034,000

$1,051,513

$1,051,513

$1,051,513

$1,051,513

2018AM06ID0205FDCO

2018AM06ID0205FDCO

2018AM06ID0205FDCO

2018AM06ID0205FDCO

Ph subtotal: $1,034,000 $0 $1,034,000 $1,051,513

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $2,627 $0 $2,627 $1,319,436 2018stipID0538FDDD

Ph subtotal: $2,627 $0 $2,627 $1,319,436

ENV Env PE 2018 LAB State 2 Labor - State Match $14,886 $0 $14,886 $1,319,436 2018stipID0538FDENV

Ph subtotal: $14,886 $0 $14,886 $1,319,436

100188 MVRPC WAR BUT/WAR GMR Trail

Extension

Description: Construction of a 10' wide multi-use

trail to extend the existing Great Miami River

scenic trail. Project includes construction of a

retaining wall for approximately 400 feet,

installation of concrete barriers to separate bike

and vehicular traffic, and t Work Type: Bike

Facility Termini: Adjacent to SR-73: from the

current GMR Trail terminus near Breiel Blvd. to

the Baxter Drive trailhead north of SR-73.

Franklin, City of Air Quality Exempt CO CO Contr

CO Contr

CO Contr

CO Engr

CO Engr

CO Engr

2020

2020

2020

2020

2020

2020

4BG

4TB7

4TB7

LAB

LAB

LAB

Local Match

Federal

Federal

Federal

Local Match

Local Match

2

M40E

Z400

M40E

002

2

Local Match

CMAQ

CMAQ

CMAQ

Labor - Local Match

Labor - Local Match

$853,790

$923,238

$546,800

$8,242

$81,885

$72,541

$0

$0

$0

$0

$0

$0

$2,486,496

$2,486,496

$2,486,496

$2,486,496

$2,486,496

$2,486,496

$2,523,634

$2,523,634

$2,523,634

$2,523,634

$2,523,634

$2,523,634

2018MODID0527FDCO

2018MODID0527FDCO

2018MODID0527FDCO

2018MODID0527FDCO

2018MODID0527FDCO

2018MODID0527FDCO

Ph subtotal: $2,486,496 $0 $2,486,496 $2,523,634

100816 OKI WAR WAR SR 48 11.54 Description: Part 1: Rehabilitate Bridge

WAR-48-1154 (E Turtle Creek Union Rd over

SR 48) by replacing the concrete deck,

increasing vertical clearance under the bridge,

and other minor maintenance. A multi-use path

to be constructed east of Deerfield Rd. across

the n Work Type: Bridge Deck Replacement

Termini: Bridge No.: WAR-48-1154. TurtleCreek

Union Rd. from Deerfield Rd. to Cornett Rd.

ODOT SPONSORING

AGENCY

Air Quality Exempt DD Dtl Dsgn

Dtl Dsgn

Dtl Dsgn

2019

2020

2020

LAB

4PF7

4PS7

State

Federal

State

2

Z001

2

Labor - State Match

National Hwy Performance P

State Funds (002)

$24,960

$41,057

$10,264

$0

$0

$0

$76,281

$76,281

$76,281

$5,000,378

$5,000,378

$5,000,378

2018AM11ID0366FDDD

2018AM11ID0366FDDD

2018AM11ID0366FDDD

Ph subtotal: $76,281 $0 $76,281 $5,000,378

Page 39: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 39 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 100827 MVRPC WAR WAR SR 73 14.58/14.62 Description: Rehabilitate bridge WAR-73-1458

over the Little Miami River by replacing the

concrete deck. Replace bridge WAR-73-1462

over Corwin Nixon Rd. and the Little Miami

Bikepath. Work Type: Bridge Replacement

Termini: WAR-73-1458 - WAR-73-1462

ODOT SPONSORING

AGENCY

Air Quality Exempt DD Dtl Dsgn

Dtl Dsgn

Dtl Dsgn

2018

2020

2020

LAB

4PF7

4PS7

State

Federal

State

2

Z001

2

Labor - State Match

National Hwy Performance P

State Funds (002)

$24,960

$42,000

$10,500

$0

$0

$0

$77,460

$77,460

$77,460

$4,689,100

$4,689,100

$4,689,100

2018stipID0541FDDD

2018stipID0541FDDD

2018stipID0541FDDD

Ph subtotal: $77,460 $0 $77,460 $4,689,100

ENV Env PE

Env PE

Env PE

2018

2018

2018

4PF7

4PS7

LAB

Federal

State

State

Z001

2

2

National Hwy Performance P

State Funds (002)

Labor - State Match

$238,000

$59,500

$141,440

$0

$0

$0

$438,940

$438,940

$438,940

$4,689,100

$4,689,100

$4,689,100

2018stipID0541FDENV

2018stipID0541FDENV

2018stipID0541FDENV

Ph subtotal: $438,940 $0 $438,940 $4,689,100

RW RW Serv 2018 LAB State 2 Labor - State Match $40,000 $0 $40,000 $4,689,100 2018stipID0541FDRW

Ph subtotal: $40,000 $0 $40,000 $4,689,100

100882 OKI WAR WAR SR 741/Parkside

Drive Impr

Description: Reconfiguration of the existing

intersection of SR-741 with Kings Mill Road and

Parkside Drive. SR-741 will become the through

movement. The Kings Mill Road approach from

the south will intersect SR-741 at a signal

controlled T-intersection. Parkside Driv Work

Type: Intersection Improvement Termini:

Intersection of SR-741 with Kings Mill Road and

Parkside Drive

Mason, City of Air Quality Exempt 0.51 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TB7

LNT

LNT

Federal

Local Match

Local Match

Z400

LNTP

LNTP

CMAQ

Local Match

Local Match

$3,531,446

$1,643,943

$362,276

$0

$0

$0

$5,537,665

$5,537,665

$5,537,665

$6,335,369

$6,335,369

$6,335,369

2018stipID0613FDCO

2018stipID0613FDCO

2018stipID0613FDCO

Ph subtotal: $5,537,665 $0 $5,537,665 $6,335,369

RW Acquis

Acquis

2019

2019

4TB7

LNT

Federal

Local Match

Z400

LNTP

CMAQ

Local Match

$600,000

$150,000

$6,907

$6,907

$756,907

$756,907

$6,335,369

$6,335,369

2018stipID0613FDRW

2018stipID0613FDRW

Ph subtotal: $750,000 $6,907 $756,907 $6,335,369

100885 OKI WAR WAR Snider Road

Roundabouts

Description: Reconstruction of the existing

intersections of Snider Road with Thornberry

Court and Mason Road into single lane modern

roundabouts. Work Type: Intersection

Improvement (Safety) Termini: Intersectionw of

Snider Road with Thornberry Court and Mason

Road

Mason, City of Air Quality Exempt 2.51 CO CO Contr

CO Contr

CO Engr

2020

2020

2020

4TB7

LNT

LNT

Federal

Local Match

Local Match

Z400

LNTP

LNTP

CMAQ

Local Match

Local Match

$1,558,544

$925,193

$173,862

$0

$0

$0

$2,657,599

$2,657,599

$2,657,599

$2,690,189

$2,690,189

$2,690,189

2018MODID0502FDCO

2018MODID0502FDCO

2018MODID0502FDCO

Ph subtotal: $2,657,599 $0 $2,657,599 $2,690,189

101201 MVRPC WAR WAR Franklin SRTS 2015 Description: Implement various

countermeasures to improve safety of kids

walking and biking to school including installing

an Rectangular Rapid Flashing Beacon (RRFB)

at Fourth & Sherman. Work Type: Signals

Termini: Various Locations in Franklin

Franklin, City of Air Quality Exempt 0.15 CO CO Contr

CO Contr

CO Engr

CO Engr

2019

2019

2019

2019

4BG

4SC7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

M3E2

M3E2

2

Local Match

Not Grouped

TAP/Enhancements

Labor - Local Match

$6,144

$75,856

$7,586

$614

$0

$0

$0

$0

$90,200

$90,200

$90,200

$90,200

$165,978

$165,978

$165,978

$165,978

2018AM03ID0119FDCO

2018AM03ID0119FDCO

2018AM03ID0119FDCO

2018AM03ID0119FDCO

Ph subtotal: $90,200 $0 $90,200 $165,978

103753 OKI WAR WAR SR 741 2.19 Description: Widening of SR-747 to 5 lanes (2

thru lanes each direction and a center turn lane)

from Spy Glass Hill to Weldon Drive in Mason.

Traffic signals at US-42 and Bethany Road will

be replaced. Other improvements include street

lighting, landscaping, a shared Work Type:

Minor Widening Termini: SR 747: from Spy

Glass Hill (SLM 2.19) to Weldon Drive (SLM

3.06)

Mason, City of Air Quality Non-Exe 0.87 CO CO Contr

CO Contr

CO Contr

CO Contr

2021

2021

2021

2021

4HJ7

4TA7

4TC7

LNT

Federal

Federal

Federal

Local Match

ZS30

Z230

Z301

LNTP

Highway Safety Imp Prog

STBG

TAP/Enhancements

Local Match

$1,000,000

$4,757,027

$320,501

$1,380,493

$0

$0

$0

$0

$7,980,083

$7,980,083

$7,980,083

$7,980,083

$8,530,436

$8,530,436

$8,530,436

$8,530,436

2018stipID0615FDCO

2018stipID0615FDCO

2018stipID0615FDCO

2018stipID0615FDCO

Page 40: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 40 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 103753 OKI WAR WAR SR 741 2.19 Description: Widening of SR-747 to 5 lanes (2

thru lanes each direction and a center turn lane)

Mason, City of Air Quality Non-Exe 0.87 CO CO Engr 2021 LNT Local Match LNTP Local Match $522,062 $0 $7,980,083 $8,530,436 2018stipID0615FDCO

Ph subtotal: $7,980,083 $0 $7,980,083 $8,530,436

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $7,553 $0 $7,553 $8,530,436 2018stipID0615FDDD

Ph subtotal: $7,553 $0 $7,553 $8,530,436

ENV Env PE 2018 LAB State 2 Labor - State Match $42,800 $0 $42,800 $8,530,436 2018stipID0615FDENV

Ph subtotal: $42,800 $0 $42,800 $8,530,436

RW Acquis

Acquis

2020

2020

4TA7

LNT

Federal

Local Match

Z230

LNTP

STBG

Local Match

$400,000

$100,000

$0

$0

$500,000

$500,000

$8,530,436

$8,530,436

2018stipID0615FDRW

2018stipID0615FDRW

Ph subtotal: $500,000 $0 $500,000 $8,530,436

103848 MVRPC WAR WAR-48-0863 Description: Major Bridge Repair1.Repair the

deteriorated portions of the concrete parapet

(approximately 10%) using 519 patching and

replacement.2.Clean the scuppers and

joints.3.Patch unsound portions of the wearing

surface (less than 1%).4.Patch the unsound

portion Work Type: Bridge Repair Termini:

WAP-48-0863, SFN 8301085

ODOT SPONSORING

AGENCY

Air Quality Exempt DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $24,960 $0 $24,960 $2,517,100 2018stipID0543FDDD

Ph subtotal: $24,960 $0 $24,960 $2,517,100

ENV Env PE 2018 LAB State 2 Labor - State Match $141,440 $0 $141,440 $2,517,100 2018stipID0543FDENV

Ph subtotal: $141,440 $0 $141,440 $2,517,100

103849 MVRPC WAR WAR-22-0303 Description: Major Bridge repair1.Remove 1 1/4”

of the existing wearing surface and overlay

MSC.2.Remove and replace the existing strip

seals with a glued in compression seal or foam

expansion joints. The existing steel can remain

but should be blasted clean and metal Work

Type: Bridge Repair Termini: WAR-22-0303,

SFN 8300038

ODOT SPONSORING

AGENCY

Air Quality Exempt DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $24,960 $0 $24,960 $2,811,900 2018stipID0544FDDD

Ph subtotal: $24,960 $0 $24,960 $2,811,900

ENV Env PE 2018 LAB State 2 Labor - State Match $141,440 $0 $141,440 $2,811,900 2018stipID0544FDENV

Ph subtotal: $141,440 $0 $141,440 $2,811,900

OKI WAR WAR 22/48 3.03/8.63 Description: Repair Bridge WAR-22-0303 that

carries US 22 over the Little Miami River by

replacing the expansion joints, overlaying the

bridge, patching the substructure, and upgrading

the guardrail. Rehabilitate bridge WAR-48-0863

that carries SR 48 over the Little M Work

Type: Bridge Preservation Termini:

WAR-22-0303, SFN 8300038 - WAR-48-0863,

SFN 8301085

ODOT SPONSORING

AGENCY

Air Quality Exempt CO CO Contr

CO Engr

2020

2020

4BT7

LAB

State

State

2

2

State Funds (002)

Labor - State Match

$6,650,000

$465,500

$0

$0

$7,115,500

$7,115,500

$7,281,900

$7,281,900

2018MODID0481STCO

2018MODID0481STCO

Ph subtotal: $7,115,500 $0 $7,115,500 $7,281,900

104844 OKI WAR HAM/WAR IR 71 19.40/0.00 Description: Construction of an on-ramp from

southbound Mason-Montgomery Road to

southbound IR-71. Work Type: New

Construction Termini: IR-71 interchange with

Fields Ertel Road and Mason-Montgomery

Road.

Warren County TID Air Quality Non-Exe 1.20 CO CO Contr

CO Contr

CO Contr

CO Engr

2021

2021

2021

2021

4BG

4TA7

4TC7

LAB

Local Match

Federal

Federal

Local Match

2

Z230

Z301

2

Local Match

STBG

TAP/Enhancements

Labor - Local Match

$1,590,000

$3,696,000

$14,000

$500,500

$0

$0

$0

$0

$5,800,500

$5,800,500

$5,800,500

$5,800,500

$7,876,900

$7,876,900

$7,876,900

$7,876,900

2018stipID0616FDCO

2018stipID0616FDCO

2018stipID0616FDCO

2018stipID0616FDCO

Ph subtotal: $5,800,500 $0 $5,800,500 $7,876,900

DD Dtl Dsgn 2018 LAB State 2 Labor - State Match $24,960 $0 $24,960 $7,876,900 2018stipID0616FDDD

Ph subtotal: $24,960 $0 $24,960 $7,876,900

ENV Env PE 2018 LAB State 2 Labor - State Match $141,440 $0 $191,440 $7,876,900 2018MODID0496FDENV

Ph subtotal: $141,440 $0 $191,440 $7,876,900

RW Acquis 2020 4TA7 Federal Z230 STBG $1,260,000 $0 $1,860,000 $7,876,900 2018stipID0616FDRW

Page 41: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 41 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 104844 OKI WAR HAM/WAR IR 71 19.40/0.00 Description: Construction of an on-ramp from

southbound Mason-Montgomery Road to

Warren County TID Air Quality Non-Exe 1.20 RW Acquis

RW Serv

2020

2018

LNT

LAB

Local Match

State

LNTP

2

Local Match

Labor - State Match

$540,000

$60,000

$0

$0

$1,860,000

$1,860,000

$7,876,900

$7,876,900

2018stipID0616FDRW

2018stipID0616FDRW

Ph subtotal: $1,860,000 $0 $1,860,000 $7,876,900

HAM/WAR IR 71 19.83/0.00 Description: Construction of an on-ramp from

southbound Mason-Montgomery Road to

southbound IR-71. Work Type: Preliminary

Development Tasks Termini: IR-71

interchange with Fields Ertel Road and

Mason-Montgomery Road.

Warren County TID Air Quality Non-Exe 1.20 ENV Env RW S

Env RW S

2020

2020

4TA7

LNT

Federal

Local Match

Z230

LNTP

Bridge

Local Match

$35,000

$15,000

$0

$0

$191,440

$191,440

$7,876,900

$7,876,900

2018MODID0496FDENV

2018MODID0496FDENV

Ph subtotal: $50,000 $0 $191,440 $7,876,900

105175 OKI WAR WAR Mason-Lebanon Bike

Connector

Description: Construction of a shared use path

connecting the City of Mason trail system near

the Mason Sports Park to the City of Lebanon's

Countryside YMCA Trail (which has connectivity

to the Little Miami Scenic Trail). Work Type:

Bikeways Termini: Existing path near

Ambelside Meadows subdivisionon US-42 to the

existing path on the W side of Columbia Rd (N of

Kingsview Drive)

Mason, City of Air Quality Exempt CO CO Contr

CO Contr

CO Engr

2021

2021

2021

4TC7

LNT

LNT

Federal

Local Match

Local Match

Z301

LNTP

LNTP

TAP/Enhancements

Local Match

Local Match

$496,380

$124,095

$62,048

$0

$0

$0

$682,523

$682,523

$682,523

$682,523

$682,523

$682,523

2018stipID0617FDCO

2018stipID0617FDCO

2018stipID0617FDCO

Ph subtotal: $682,523 $0 $682,523 $682,523

106724 OKI WAR WAR CR 282 0.97 King Ave

Bridge

Description: Construct a new bridge over the

Little Miami River, upstream of the deteriorating

existing bridge. The project will improve safety

for motorists and pedestrians by improving the

alignment of the approach roadway, and will

grade separate the roadway from t Work

Type: Bridge Preservation Termini: From

approx 1,050' S of the LMR bridge on Grandin

(CR-150) to approx 800' N of the bridge on King

Ave (CR 282)

Warren County Engineer Air Quality Exempt 0.27 RW Acquis

Acquis

RW Serv

Utl Remb

Utl Remb

2021

2021

2019

2021

2021

4TA7

LNT

LAB

4TA7

LNT

Federal

Local Match

State

Federal

Local Match

Z230

LNTP

2

Z230

LNTP

Bridge

Local Match

Labor - State Match

Bridge

Local Match

$166,250

$71,250

$6,082

$166,250

$71,250

$0

$0

$0

$0

$0

$481,082

$481,082

$481,082

$481,082

$481,082

$15,909,091

$15,909,091

$15,909,091

$15,909,091

$15,909,091

2018AM13ID0458FDRW

2018AM13ID0458FDRW

2018AM13ID0458FDRW

2018AM13ID0458FDRW

2018AM13ID0458FDRW

Ph subtotal: $481,082 $0 $481,082 $15,909,091

107125 MVRPC WAR WAR SR 741 13.82 Description: FY2020 Urban Paving in the City of

Springboro on a portion of SR 741 from Southern

Corp to SR 73. Work Type: Resurfacing,

Undivided System Termini: WAR SR 741 SLM

13.82 to 15.67

Springboro, City of Air Quality Exempt 1.85 CO CO Contr

CO Contr

CO Engr

CO Engr

2020

2020

2020

2020

4BG

4PF7

LAB

LAB

Local Match

Federal

Federal

Local Match

2

Z240

Z240

2

Local Match

Not Grouped

STBG

Labor - Local Match

$781,600

$781,600

$23,448

$23,448

$0

$0

$0

$0

$1,610,096

$1,610,096

$1,610,096

$1,610,096

$1,677,314

$1,677,314

$1,677,314

$1,677,314

2018AM04ID0159FDCO

2018AM04ID0159FDCO

2018AM04ID0159FDCO

2018AM04ID0159FDCO

Ph subtotal: $1,610,096 $0 $1,610,096 $1,677,314

107302 OKI WAR WAR US 42 Roundabouts Description: Conversion of the existing

T-intersections of US-42 with (1) Bethany Road

and (2) Mason Morrow Millgrove Road to

modern roundabouts. Construction of a shared

use path from Bethany Road along US-42 and

connecting to the Mason Sports Park on Mason

Morrow Mi Work Type: Intersection

Improvement Termini: Intersections of US-42

with Bethany Road and Mason Morrow Millgrove

Road

Mason, City of Air Quality Exempt 0.46 RW Acquis

Acquis

2021

2021

4TB7

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

$200,000

$50,000

$0

$0

$250,000

$250,000

$3,461,533

$3,461,533

2018AM04ID0166FDRW

2018AM04ID0166FDRW

Ph subtotal: $250,000 $0 $250,000 $3,461,533

Page 42: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 42 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FHWA 8 108265 MVRPC WAR WAR TR 17 1.80

Dayton-Oxford Rd

Description: Mill and fill with pavement repair

where necessary, and application of new

pavement markings. Work Type: Mill and Fill

Termini: Dayton-Oxford/Chautauqua Road: from

Fairview Drive to Cedar Lane

Carlisle, Village of Air Quality Exempt 0.34 CO CO Contr

CO Contr

CO Engr

2019

2019

2019

4TA7

LNT

LNT

Federal

Local Match

Local Match

LNTP

LNTP

Un-Assigned Federal

Local Match

Local Match

$173,996

$43,499

$8,700

$0

$0

$0

$226,195

$226,195

$226,195

$227,809

$227,809

$227,809

2018AM06ID0206FDCO

2018AM06ID0206FDCO

2018AM06ID0206FDCO

Ph subtotal: $226,195 $0 $226,195 $227,809

FTA 8 94699 OKI BUT Middletown Transit

Operating

Description: Operating Assistance Work Type:

Transit Termini: Middletown

Middletown, City of Air Quality Exempt OT Trnst/Av

Trnst/Av

Trnst/Av

Trnst/Av

Trnst/Av

Trnst/Av

2018

2018

2018

2019

2019

2019

4EG

FTA

TOT

4EG

FTA

TOT

State

Federal

Local Match

State

Federal

Local Match

GRF

5307

LNTP

GRF

5307

LNTP

GRF

5307 - Urban Formula Progr

Local Match - 0003 - Local O

GRF

5307 - Urban Formula Progr

Local Match - 0003 - Local O

30.09.03 2018 GR

30.09.03 2018

30.09.03 2018

30.09.03 2019 GR

30.09.03 2019

30.09.03 2019

$100,000

$1,150,000

$1,150,000

$100,000

$1,150,000

$1,150,000

$4,715,865

$4,715,865

$4,715,865

$4,715,865

$4,715,865

$4,715,865

$9,515,865

$9,515,865

$9,515,865

$9,515,865

$9,515,865

$9,515,865

$9,670,691

$9,670,691

$9,670,691

$9,670,691

$9,670,691

$9,670,691

2018stipID1251FDOPER

2018stipID1251FDOPER

2018stipID1251FDOPER

2018stipID1251FDOPER

2018stipID1251FDOPER

2018stipID1251FDOPER

Ph subtotal: $4,800,000 $4,715,865 $9,515,865 $9,670,691

94702 OKI BUT Middletown Transit Prev

Maint

Description: Preventive Maintenance Work

Type: Transit Termini: Middletown

Middletown, City of Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

FTA

TOT

FTA

Federal

Local Match

Federal

5307

LNTP

5307

5307 - Urban Formula Progr

Local Match - 0003 - Local O

5307 - Urban Formula Progr

11.7A.00 2018

11.7A.00 2018

11.7A.00 2019

$200,000

$50,000

$250,000

$500,000

$500,000

$500,000

$1,000,000

$1,000,000

$1,000,000

$1,000,000

$1,000,000

$1,000,000

2018MODID0459FDCAPT

2018MODID0459FDCAPT

2018MODID0459FDCAPT

Ph subtotal: $500,000 $500,000 $1,000,000 $1,000,000

94703 OKI BUT Middletown Transit ADA

Asst

Description: ADA Operating Assistance Work

Type: Transit Termini: Middletown

Middletown, City of Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

2019

FTA

TOT

FTA

TOT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.7C.00 2018

11.7C.00 2018

11.7C.00 2019

11.7C.00 2019

$140,000

$35,000

$140,000

$35,000

$350,000

$350,000

$350,000

$350,000

$700,000

$700,000

$700,000

$700,000

$700,000

$700,000

$700,000

$700,000

2018stipID1253FDCAPT

2018stipID1253FDCAPT

2018stipID1253FDCAPT

2018stipID1253FDCAPT

Ph subtotal: $350,000 $350,000 $700,000 $700,000

94889 OKI BUT BCRTA Operating

Assistance

Description: Operating Assistance Work Type:

Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt OT Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

2019

FTA

TOT

FTA

TOT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

5307 - Urban Formula Progr

Local Match - 0003 - Local O

30.09.03 2018

30.09.03 2018

30.09.03 2019

30.09.03 2019

$1,000,000

$1,000,000

$1,000,000

$1,000,000

$3,878,644

$3,878,644

$3,878,644

$3,878,644

$7,878,644

$7,878,644

$7,878,644

$7,878,644

$8,000,000

$8,000,000

$8,000,000

$8,000,000

2018stipID1210FDOPER

2018stipID1210FDOPER

2018stipID1210FDOPER

2018stipID1210FDOPER

Ph subtotal: $4,000,000 $3,878,644 $7,878,644 $8,000,000

94891 OKI BUT BCRTA Preventive

Maintenance

Description: Preventive Maintenance - STP

funds only are a flex fund transfer for UTP

Work Type: FTA Transfer Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

2019

2019

2019

2019

FTA

TOT

4EG

4TP7

FTA

LNT

LNT

Federal

Local Match

State

Federal

Federal

Local Match

Local Match

5307

LNTP

GRF

M240

5307

LNTP

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

GRF

STBG

5307 - Urban Formula Progr

Local Match

Local Match

11.7A.00 2018

11.7A.00 2018

11.7A.00 2019 OT

11.7A.00 2019 OT

11.7A.00 5307

11.7A.00 5307

11.7A.00 2019 OT

$300,000

$75,000

$95,854

$450,000

$75,000

$18,750

$16,646

$750,000

$750,000

$750,000

$750,000

$750,000

$750,000

$750,000

$1,915,081

$1,915,081

$1,915,081

$1,915,081

$1,915,081

$1,915,081

$1,915,081

$1,915,081

$1,915,081

$1,915,081

$1,915,081

$1,915,081

$1,915,081

$1,915,081

2018AM06ID0169FDCAP

2018AM06ID0169FDCAP

2018AM06ID0169FDCAP

2018AM06ID0169FDCAP

2018AM06ID0169FDCAP

2018AM06ID0169FDCAP

2018AM06ID0169FDCAP

Ph subtotal: $1,031,250 $750,000 $1,915,081 $1,915,081

94892 OKI BUT BCRTA Small Replacement

Buses

Description: Small Replacement Buses - CMAQ

portion only are flex fund transfers Work Type:

FTA Transfer Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2018

2018

2019

2019

2019

2019

FTA

FTA

TOT

TOT

FTA

FTA

LNT

TOT

Federal

Federal

Local Match

Local Match

Federal

Federal

Local Match

Local Match

5307

5339

LNTP

LNTP

5307

5339

LNTP

LNTP

5307 - Urban Formula Progr

5339 / 0002 - Bus & Bus Fac

Local Match - 0003 - Local O

Local Match - 0003 - Local O

5307 - Urban Formula Progr

5339 / 0002 - Bus & Bus Fac

Local Match

Local Match - 0003 - Local O

11.12.04 2018 - Q

11.12.04 FY2018 -

11.12.04 FY2018 -

11.12.04 2018 - Q

11.12.04 FY2019 -

11.12.04 2019 - Q

11.12.04 2019 - Q

11.12.04 FY2019 -

$225,000

$150,000

$37,500

$56,250

$225,000

$150,000

$37,500

$56,250

$1,057,830

$1,057,830

$1,057,830

$1,057,830

$1,057,830

$1,057,830

$1,057,830

$1,057,830

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

$1,995,330

2018stipID1212FDCAPT

2018stipID1212FDCAPT

2018stipID1212FDCAPT

2018stipID1212FDCAPT

2018stipID1212FDCAPT

2018stipID1212FDCAPT

2018stipID1212FDCAPT

2018stipID1212FDCAPT

Ph subtotal: $937,500 $1,057,830 $1,995,330 $1,995,330

94894 OKI BUT BCRTA Security Equipment Description: Security Equipment Work Type:

Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

2019

FTA

TOT

FTA

TOT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.42.09 2018

11.42.09 2018

11.42.09 2019

11.42.09 2019

$15,000

$3,750

$15,000

$3,750

$37,500

$37,500

$37,500

$37,500

$75,000

$75,000

$75,000

$75,000

$75,000

$75,000

$75,000

$75,000

2018stipID1213FDCAPT

2018stipID1213FDCAPT

2018stipID1213FDCAPT

2018stipID1213FDCAPT

Ph subtotal: $37,500 $37,500 $75,000 $75,000

Page 43: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 43 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FTA 8 94895 OKI BUT BCRTA Shop/Office

Equipment

Description: Shop/Office Equipment Work

Type: Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

2019

FTA

TOT

FTA

TOT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.42.20 2018

11.42.20 2018

11.42.20 2019

11.42.20 2019

$35,000

$8,750

$35,000

$8,750

$87,500

$87,500

$87,500

$87,500

$175,000

$175,000

$175,000

$175,000

$175,000

$175,000

$175,000

$175,000

2018stipID1214FDCAPT

2018stipID1214FDCAPT

2018stipID1214FDCAPT

2018stipID1214FDCAPT

Ph subtotal: $87,500 $87,500 $175,000 $175,000

94896 OKI BUT BCRTA Transit

Enhancements

Description: Transit Enhancements Work

Type: Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

2019

FTA

TOT

FTA

TOT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.32.00 2018

11.32.00 2018

11.32.20 2019

11.32.20 2019

$15,000

$3,750

$15,000

$3,750

$37,500

$37,500

$37,500

$37,500

$75,000

$75,000

$75,000

$75,000

$75,000

$75,000

$75,000

$75,000

2018stipID1215FDCAPT

2018stipID1215FDCAPT

2018stipID1215FDCAPT

2018stipID1215FDCAPT

Ph subtotal: $37,500 $37,500 $75,000 $75,000

94897 OKI BUT BCRTA Large Replacement

Buses

Description: 35' Replacement Buses Work

Type: FTA Transfer Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

2019

2019

FTA

TOT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.12.02 - Qty 4

11.12.02 - Qty 4

$0

$0

$0

$0

$0

$0

$0

$0

2018stipID1216XXCAPT

2018stipID1216XXCAPT

Ph subtotal: $0 $0 $0 $0

97835 OKI BUT BCRTA ADA Operating

Service

Description: ADA Operating Assistance Work

Type: Transit Termini: Butler County

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

2019

FTA

TOT

FTA

TOT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.7C.00 2018

11.7C.00 2018

11.7C.00 2019

11.7C.00 2019

$150,000

$37,500

$150,000

$37,500

$750,000

$750,000

$750,000

$750,000

$1,125,000

$1,125,000

$1,125,000

$1,125,000

$1,125,000

$1,125,000

$1,125,000

$1,125,000

2018stipID1217FDCAPT

2018stipID1217FDCAPT

2018stipID1217FDCAPT

2018stipID1217FDCAPT

Ph subtotal: $375,000 $750,000 $1,125,000 $1,125,000

99799 OKI BUT BCRTA Bus Replacements Description: Bus Replacements Work Type:

FTA Transfer Termini: Butler County

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2019

2019

2019

2019

4TB7

4TB7

TOT

TOT

Federal

Federal

Local Match

Local Match

M400

M400

LNTP

LNTP

CMAQ

CMAQ

Local Match - 0003 - Local O

Local Match - 0003 - Local O

11.12.04 - Qty 5

11.12.02 - Qty 2

11.12.02 - Qty 2

11.12.04 - Qty 5

$392,958

$902,000

$225,500

$98,240

$444,850

$444,850

$444,850

$444,850

$2,063,548

$2,063,548

$2,063,548

$2,063,548

$2,063,548

$2,063,548

$2,063,548

$2,063,548

2018stipID1218FDCAPT

2018stipID1218FDCAPT

2018stipID1218FDCAPT

2018stipID1218FDCAPT

Ph subtotal: $1,618,698 $444,850 $2,063,548 $2,063,548

99800 OKI BUT BCRTA Bus Replacements Description: Bus Replacements Work Type:

FTA Transfer Termini: Butler County

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2018

2018

4TB7

4TB7

TOT

TOT

Federal

Federal

Local Match

Local Match

M400

M400

LNTP

LNTP

CMAQ

CMAQ

Local Match - 0003 - Local O

Local Match - 0003 - Local O

11.12.02 - Qty 2

11.12.04 - Qty 1

11.12.02 - Qty 2

11.12.04 - Qty 1

$922,000

$78,000

$230,500

$19,500

$0

$0

$0

$0

$1,250,000

$1,250,000

$1,250,000

$1,250,000

$1,250,000

$1,250,000

$1,250,000

$1,250,000

2018stipID1219FDCAPT

2018stipID1219FDCAPT

2018stipID1219FDCAPT

2018stipID1219FDCAPT

Ph subtotal: $1,250,000 $0 $1,250,000 $1,250,000

103348 OKI BUT BCRTA Bus Replacements Description: Bus replacements using MPO

CMAQ funds as a flex fund transfer Work

Type: FTA Transfer Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

2019

2019

4TB7

LNT

Federal

Local Match

M400

LNTP

CMAQ

Local Match

11.12.03 - Qty 9

11.12.03 - Qty 9

$893,565

$223,391

$0

$0

$1,116,956

$1,116,956

$1,116,956

$1,116,956

2018MODID0446FDCAPT

2018MODID0446FDCAPT

Ph subtotal: $1,116,956 $0 $1,116,956 $1,116,956

104272 OKI BUT BCRTA Operating

Assistance

Description: Operating Assistance Work Type:

Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2020

2021

2021

2021

4EG

FTA

LNT

4EG

FTA

LNT

State

Federal

Local Match

State

Federal

Local Match

GRF

5307

LNTP

GRF

5307

LNTP

GRF

5307 - Urban Formula Progr

Local Match

GRF

5307 - Urban Formula Progr

Local Match

30.09.03 FY2020

30.09.03 FY2020

30.09.03 FY2020

30.09.03 FY2021

30.09.03 FY2021

30.09.03 FY2021

$100,000

$1,000,000

$900,000

$100,000

$1,000,000

$900,000

$0

$0

$0

$0

$0

$0

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$4,000,000

2018stipID1221FDTR

2018stipID1221FDTR

2018stipID1221FDTR

2018stipID1221FDTR

2018stipID1221FDTR

2018stipID1221FDTR

Ph subtotal: $4,000,000 $0 $4,000,000 $4,000,000

104280 OKI BUT BCRTA Prev Maintenance Description: Preventive Maintenance Work

Type: Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2021

2021

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.7A.00 FY2020

11.7A.00 FY2020

11.7A.00 FY2021

11.7A.00 FY2021

$600,000

$150,000

$600,000

$150,000

$0

$0

$0

$0

$1,500,000

$1,500,000

$1,500,000

$1,500,000

$1,500,000

$1,500,000

$1,500,000

$1,500,000

2018AM05ID0151FDTR

2018AM05ID0151FDTR

2018AM05ID0151FDTR

2018AM05ID0151FDTR

Ph subtotal: $1,500,000 $0 $1,500,000 $1,500,000

104379 OKI BUT Middletown Transit

Operating

Description: Operating Assistance Work Type:

Transit Termini: Middletown

Middletown, City of Air Quality Exempt TR Transit Su

Transit Su

Transit Su

2020

2020

2020

4EG

FTA

LNT

State

Federal

Local Match

GRF

5307

LNTP

GRF

5307 - Urban Formula Progr

Local Match

30.09.03 2020 GR

30.09.03 2020 530

30.09.03 2020 Loc

$100,000

$1,200,000

$1,100,000

$0

$0

$0

$4,800,000

$4,800,000

$4,800,000

$4,800,000

$4,800,000

$4,800,000

2018stipID1254FDTR

2018stipID1254FDTR

2018stipID1254FDTR

Page 44: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 44 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FTA 8 104379 OKI BUT Middletown Transit

Operating

Description: Operating Assistance Work Type:

Transit Termini: Middletown

Middletown, City of Air Quality Exempt TR Transit Su

Transit Su

Transit Su

2021

2021

2021

4EG

FTA

LNT

State

Federal

Local Match

GRF

5307

LNTP

GRF

5307 - Urban Formula Progr

Local Match

30.09.03 2021 GR

30.09.03 2021 530

30.09.03 2021 Loc

$100,000

$1,200,000

$1,100,000

$0

$0

$0

$4,800,000

$4,800,000

$4,800,000

$4,800,000

$4,800,000

$4,800,000

2018stipID1254FDTR

2018stipID1254FDTR

2018stipID1254FDTR

Ph subtotal: $4,800,000 $0 $4,800,000 $4,800,000

104381 OKI BUT Middletown Transit Prev

Maint

Description: Preventive Maintenance Work

Type: Transit Termini: Middletown

Middletown, City of Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2021

2021

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.7A.00 2020

11.7A.00 2020

11.7A.00 2021

11.7A.00 2021

$200,000

$50,000

$200,000

$50,000

$0

$0

$0

$0

$500,000

$500,000

$500,000

$500,000

$500,000

$500,000

$500,000

$500,000

2018stipID1255FDTR

2018stipID1255FDTR

2018stipID1255FDTR

2018stipID1255FDTR

Ph subtotal: $500,000 $0 $500,000 $500,000

104382 OKI BUT Middletown Transit ADA

Asst

Description: ADA Operating Assistance Work

Type: Transit Termini: Middletown

Middletown, City of Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2021

2021

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.7C.00 2020

11.7C.00 2020

11.7C.00 2021

11.7C.00 2021

$140,000

$35,000

$140,000

$35,000

$0

$0

$0

$0

$350,000

$350,000

$350,000

$350,000

$350,000

$350,000

$350,000

$350,000

2018stipID1256FDTR

2018stipID1256FDTR

2018stipID1256FDTR

2018stipID1256FDTR

Ph subtotal: $350,000 $0 $350,000 $350,000

104384 OKI BUT BCRTA ADA Operating Description: ADA Operating Assistance Work

Type: Transit Termini: Butler County

Butler County Regional Transit

Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2021

2021

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.7C.00 FY2020

11.7C.00 FY2020

11.7C.00

11.7C.00

$150,000

$37,500

$150,000

$37,500

$0

$0

$0

$0

$375,000

$375,000

$375,000

$375,000

$375,000

$375,000

$375,000

$375,000

2018stipID1223FDTR

2018stipID1223FDTR

2018stipID1223FDTR

2018stipID1223FDTR

Ph subtotal: $375,000 $0 $375,000 $375,000

104389 OKI BUT BCRTA Security Equipment Description: Security Equipment Work Type:

Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2021

2021

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.49.09 FY2020

11.49.09 FY2020

11.49.09 FY2021

11.49.09 FY2021

$15,000

$3,750

$15,000

$3,750

$0

$0

$0

$0

$37,500

$37,500

$37,500

$37,500

$37,500

$37,500

$37,500

$37,500

2018stipID1224FDTR

2018stipID1224FDTR

2018stipID1224FDTR

2018stipID1224FDTR

Ph subtotal: $37,500 $0 $37,500 $37,500

104394 OKI BUT BCRTA Shop/Office

Equipment

Description: Shop/Office Equipment Work

Type: Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2021

2021

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.42.20 FY2020

11.42.20 FY2020

11.42.20 FY2021

11.42.20 FY2021

$35,000

$8,750

$35,000

$8,750

$0

$0

$0

$0

$87,500

$87,500

$87,500

$87,500

$87,500

$87,500

$87,500

$87,500

2018stipID1225FDTR

2018stipID1225FDTR

2018stipID1225FDTR

2018stipID1225FDTR

Ph subtotal: $87,500 $0 $87,500 $87,500

104398 OKI BUT BCRTA Software/Hardware Description: Technology Updates Work Type:

Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

2018

2018

2019

2019

2020

2020

2021

2021

FTA

LNT

FTA

LNT

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.42.08 FY2018

11.42.08 FY2018

11.42.08 FY2019

11.42.08 FY2019

11.42.08 FY2020

11.42.08 FY2020

11.42.08 FY2021

11.42.08 FY2021

$150,000

$30,000

$120,000

$30,000

$120,000

$30,000

$120,000

$30,000

$0

$0

$0

$0

$0

$0

$0

$0

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

$630,000

2018AM05ID0152FDTR

2018AM05ID0152FDTR

2018AM05ID0152FDTR

2018AM05ID0152FDTR

2018AM05ID0152FDTR

2018AM05ID0152FDTR

2018AM05ID0152FDTR

2018AM05ID0152FDTR

Ph subtotal: $630,000 $0 $630,000 $630,000

104400 OKI BUT BCRTA Transit

Enhancements

Description: Transit Enhancements Work

Type: Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2021

2021

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.32.00 FY2020

11.32.00 FY2020

11.32.00 FY2021

11.32.00 FY2021

$15,000

$3,750

$15,000

$3,750

$0

$0

$0

$0

$37,500

$37,500

$37,500

$37,500

$37,500

$37,500

$37,500

$37,500

2018AM05ID0153FDTR

2018AM05ID0153FDTR

2018AM05ID0153FDTR

2018AM05ID0153FDTR

Ph subtotal: $37,500 $0 $37,500 $37,500

104401 OKI BUT BCRTA Small Bus

Replacement

Description: Small Replacement Buses - CMAQ

portion only are flex fund transfers Work Type:

FTA Transfer Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2020

2020

2021

2021

FTA

FTA

LNT

LNT

FTA

FTA

Federal

Federal

Local Match

Local Match

Federal

Federal

5307

5339

LNTP

LNTP

5307

5339

5307 - Urban Formula Progr

5339 / 0002 - Bus & Bus Fac

Local Match

Local Match

5307 - Urban Formula Progr

5339 / 0002 - Bus & Bus Fac

11.12.04 FY2020 -

11.12.04 2020 - Q

11.12.04 FY2020 -

11.12.04 2020 - Q

11.12.04 FY2021 -

11.12.01 2021 - Q

$225,000

$150,000

$56,250

$37,500

$225,000

$150,000

$0

$0

$0

$0

$0

$0

$937,500

$937,500

$937,500

$937,500

$937,500

$937,500

$937,500

$937,500

$937,500

$937,500

$937,500

$937,500

2018stipID1228FDTR

2018stipID1228FDTR

2018stipID1228FDTR

2018stipID1228FDTR

2018stipID1228FDTR

2018stipID1228FDTR

Page 45: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 45 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FTA 8 104401 OKI BUT BCRTA Small Bus

Replacement

Description: Small Replacement Buses - CMAQ

portion only are flex fund transfers Work Type:

Butler County Regional Transit

Authority

Air Quality Exempt TR Transit Su

Transit Su

2021

2021

LNT

LNT

Local Match

Local Match

LNTP

LNTP

Local Match

Local Match

11.12.01 2021 - Q

11.12.04 FY2021 -

$37,500

$56,250

$0

$0

$937,500

$937,500

$937,500

$937,500

2018stipID1228FDTR

2018stipID1228FDTR

Ph subtotal: $937,500 $0 $937,500 $937,500

104453 OKI BUT BCRTA Facility

Improvements

Description: Facility Improvements Work

Type: Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

2018

2018

2019

2019

2020

2020

2021

2021

FTA

LNT

FTA

LNT

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

Federal

Local Match

Federal

Local Match

5339

LNTP

5339

LNTP

5339

LNTP

5339

LNTP

5339 / 0002 - Bus & Bus Fac

Local Match

5339 / 0002 - Bus & Bus Fac

Local Match

5339 / 0002 - Bus & Bus Fac

Local Match

5339 / 0002 - Bus & Bus Fac

Local Match

11.44.03 FY2018

11.44.03 FY2018

11.44.03 FY2019

11.44.03 FY2019

11.44.03 FY2020

11.44.03 FY2020

11.44.03 FY2021

11.44.03 FY2021

$50,000

$12,500

$150,000

$37,500

$150,000

$37,500

$150,000

$37,500

$0

$0

$0

$0

$0

$0

$0

$0

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

$625,000

2018AM05ID0154FDTR

2018AM05ID0154FDTR

2018AM05ID0154FDTR

2018AM05ID0154FDTR

2018AM05ID0154FDTR

2018AM05ID0154FDTR

2018AM05ID0154FDTR

2018AM05ID0154FDTR

Ph subtotal: $625,000 $0 $625,000 $625,000

104647 OKI BUT BCRTA Bus Replacement Description: Bus Replacement Work Type:

Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2020

2020

2020

2020

4TA7

4TA7

LNT

LNT

Federal

Federal

Local Match

Local Match

M230

M230

LNTP

LNTP

STBG

STBG

Local Match

Local Match

11.12.15 - Qty 5

11.12.04 - Qty 6

11.12.04 - Qty 6

11.12.15 - Qty 5

$155,968

$508,762

$127,190

$38,992

$0

$0

$0

$0

$830,912

$830,912

$830,912

$830,912

$830,912

$830,912

$830,912

$830,912

2018stipID1230FDCAPT

2018stipID1230FDCAPT

2018stipID1230FDCAPT

2018stipID1230FDCAPT

Ph subtotal: $830,912 $0 $830,912 $830,912

108504 OKI BUT BCRTA 5310 Program

Activities

Description: Mobility Management and Operating

Assistance using 5310 funds Work Type:

Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

2019

2019

FTA

LNT

Federal

Local Match

5310

LNTP

5310 - Enhanced Mobility

Local Match

11.7L.00

11.7L.00

$256,567

$64,142

$0

$0

$320,709

$320,709

$871,509

$871,509

2018AM07ID0217FDCAP

2018AM07ID0217FDCAP

Ph subtotal: $320,709 $0 $320,709 $871,509

OT Trnst/Av

Trnst/Av

2019

2019

FTA

LNT

Federal

Local Match

5310

LNTP

5310 - Enhanced Mobility

Local Match

30.09.00

30.09.00

$275,400

$275,400

$0

$0

$550,800

$550,800

$871,509

$871,509

2018AM07ID0217FDOPE

2018AM07ID0217FDOPE

Ph subtotal: $550,800 $0 $550,800 $871,509

108916 OKI BUT BCRTA Facility

Construction

Description: Construct facility Work Type:

Transit Termini: Hamilton

Butler County Regional Transit

Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

2020

2020

2020

2020

2020

FTA

FTA

FTA

LNT

LNT

Federal

Federal

Federal

Local Match

Local Match

5307

5307

5339

LNTP

LNTP

5307 - Urban Formula Progr

5307 - Urban Formula Progr

5339 / 0002 - Bus & Bus Fac

Local Match

Local Match

11.43.03 5307

11.43.03 5307 TD

11.43.03 5339

11.43.03 5339

11.43.03 5307

$400,000

$2,500,000

$2,668,750

$667,188

$100,000

$0

$0

$0

$0

$0

$6,335,938

$6,335,938

$6,335,938

$6,335,938

$6,335,938

$6,335,938

$6,335,938

$6,335,938

$6,335,938

$6,335,938

2018AM07ID0218FDCAP

2018AM07ID0218FDCAP

2018AM07ID0218FDCAP

2018AM07ID0218FDCAP

2018AM07ID0218FDCAP

Ph subtotal: $6,335,938 $0 $6,335,938 $6,335,938

99239 OKI CLE CTC Capitalized

Maintenance 2018

Description: Capitalized Maintenance Work

Type: Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt CO Oth Remb

Oth Remb

2018

2018

4EG

FTA

State

Federal

GRF

5307

GRF

5307 - Urban Formula Progr

11.7A.00

11.7A.00

$44,000

$176,000

$0

$0

$220,000

$220,000

$220,000

$220,000

2018MODID0364FDCAPT

2018MODID0364FDCAPT

Ph subtotal: $220,000 $0 $220,000 $220,000

99240 OKI CLE CTC Capitalized

Maintenance 2019

Description: Capitalized Maintenance Work

Type: Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt CO Oth Remb

Oth Remb

2019

2019

FTA

TOT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.7A.00

11.7A.00

$176,000

$44,000

$0

$0

$220,000

$220,000

$220,000

$220,000

2018stipID1232FDCAPT

2018stipID1232FDCAPT

Ph subtotal: $220,000 $0 $220,000 $220,000

99241 OKI CLE CTC Operating Assistance

2018

Description: Operating Assistance Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt OT Trnst/Av

Trnst/Av

Trnst/Av

2018

2018

2018

4EQ

FTA

TOT

State

Federal

Local Match

GRF

5307

LNTP

GRF

5307 - Urban Formula Progr

Local Match - 0003 - Local O

30.09.01 E&D

30.09.01 5307

30.09.01 Local

$33,000

$370,420

$237,420

$0

$0

$0

$640,840

$640,840

$640,840

$640,840

$640,840

$640,840

2018stipID1233FDOPER

2018stipID1233FDOPER

2018stipID1233FDOPER

Ph subtotal: $640,840 $0 $640,840 $640,840

99242 OKI CLE CTC Operating Assistance

2019

Description: Operating Assistance Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt OT Trnst/Av

Trnst/Av

Trnst/Av

2019

2019

2019

4EQ

FTA

TOT

State

Federal

Local Match

GRF

5307

LNTP

GRF

5307 - Urban Formula Progr

Local Match - 0003 - Local O

30.09.01 E&D

30.09.01 5307

30.09.01 Local

$33,000

$370,420

$237,420

$0

$0

$0

$640,840

$640,840

$640,840

$640,840

$640,840

$640,840

2018stipID1234FDOPER

2018stipID1234FDOPER

2018stipID1234FDOPER

Ph subtotal: $640,840 $0 $640,840 $640,840

99243 OKI CLE CTC Security Equipment

2018

Description: Security Equipment Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt CO Oth Remb

Oth Remb

2018

2018

FTA

TOT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.42.09

11.42.09

$12,000

$3,000

$0

$0

$15,000

$15,000

$15,000

$15,000

2018stipID1235FDCAPT

2018stipID1235FDCAPT

Ph subtotal: $15,000 $0 $15,000 $15,000

Page 46: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 46 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FTA 8 99244 OKI CLE CTC Security Equipment

2019

Description: Security Equipment Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt CO Oth Remb

Oth Remb

2019

2019

FTA

TOT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.42.09

11.42.09

$12,000

$3,000

$0

$0

$15,000

$15,000

$15,000

$15,000

2018stipID1236FDCAPT

2018stipID1236FDCAPT

Ph subtotal: $15,000 $0 $15,000 $15,000

99245 OKI CLE CTC Transit Enhancements

2018

Description: Transit Enhancements Work

Type: Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt CO Oth Remb

Oth Remb

2018

2018

FTA

TOT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.92.02

11.92.02

$12,000

$3,000

$0

$0

$15,000

$15,000

$15,000

$15,000

2018stipID1237FDCAPT

2018stipID1237FDCAPT

Ph subtotal: $15,000 $0 $15,000 $15,000

99246 OKI CLE CTC Transit Enhancements

2019

Description: Transit Enhancements Work

Type: Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt CO Oth Remb

Oth Remb

2019

2019

FTA

TOT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

11.92.02

11.92.02

$12,000

$3,000

$0

$0

$15,000

$15,000

$15,000

$15,000

2018stipID1238FDCAPT

2018stipID1238FDCAPT

Ph subtotal: $15,000 $0 $15,000 $15,000

99251 OKI CLE CTC Short Range Planning

2018

Description: Short Range Planning Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt SP Planning

Planning

2018

2018

FTA

TOT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

44.24.00

44.24.00

$8,000

$2,000

$0

$0

$10,000

$10,000

$10,000

$10,000

2018stipID1239FDPLAN

2018stipID1239FDPLAN

Ph subtotal: $10,000 $0 $10,000 $10,000

99252 OKI CLE CTC Short Range Planning

2019

Description: Short Range Planning Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt SP Planning

Planning

2019

2019

FTA

TOT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match - 0003 - Local O

44.24.00

44.24.00

$8,000

$2,000

$0

$0

$10,000

$10,000

$10,000

$10,000

2018stipID1240FDPLAN

2018stipID1240FDPLAN

Ph subtotal: $10,000 $0 $10,000 $10,000

104281 OKI CLE CTC Cap Maintenance Description: Capitalized Maintenance Work

Type: Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt CO Oth Remb

Oth Remb

2020

2020

FTA

LNT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match

11.7A.00

11.7A.00

$200,000

$50,000

$0

$0

$250,000

$250,000

$250,000

$250,000

2018stipID1241FDCAPT

2018stipID1241FDCAPT

Ph subtotal: $250,000 $0 $250,000 $250,000

104356 OKI CLE CTC Cap Maintenance 2021 Description: Capitalized Maintenance Work

Type: Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt TR Transit Su

Transit Su

2021

2021

FTA

LNT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match

11.7A.00 FY21

11.7A.00 FY21

$200,000

$50,000

$0

$0

$250,000

$250,000

$250,000

$250,000

2018stipID1242FDTR

2018stipID1242FDTR

Ph subtotal: $250,000 $0 $250,000 $250,000

104369 OKI CLE CTS Op Assistance FY2020 Description: Operating Assistance Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt OT Trnst/Av

Trnst/Av

Trnst/Av

Trnst/Av

2020

2020

2020

2020

4EG

4EQ

FTA

LNT

State

State

Federal

Local Match

GRF

GRF

5307

LNTP

GRF

GRF

5307 - Urban Formula Progr

Local Match

30.09.01 FY2020

30.09.01 FY2020

30.09.01 FY2020

30.09.01 FY2020

$100,000

$33,000

$370,420

$237,420

$0

$0

$0

$0

$740,840

$740,840

$740,840

$740,840

$740,840

$740,840

$740,840

$740,840

2018stipID1243FDOPER

2018stipID1243FDOPER

2018stipID1243FDOPER

2018stipID1243FDOPER

Ph subtotal: $740,840 $0 $740,840 $740,840

104371 OKI CLE CTC Operating Assistance

2021

Description: Operating Assistance Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

2021

2021

2021

2021

4EG

4EQ

FTA

LNT

State

State

Federal

Local Match

GRF

GRF

5307

LNTP

GRF

GRF

5307 - Urban Formula Progr

Local Match

30.09.01 FY2021

30.09.01 FY2021

30.09.01 FY2021

30.09.01 FY2021

$100,000

$33,000

$370,420

$237,420

$0

$0

$0

$0

$740,840

$740,840

$740,840

$740,840

$740,840

$740,840

$740,840

$740,840

2018stipID1244FDTR

2018stipID1244FDTR

2018stipID1244FDTR

2018stipID1244FDTR

Ph subtotal: $740,840 $0 $740,840 $740,840

104377 OKI CLE CTC Security Equipment

2020

Description: Security Equipment Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt CO Oth Remb

Oth Remb

2020

2020

FTA

LNT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match

11.42.09 FY2020

11.42.09 FY2020

$12,000

$3,000

$0

$0

$15,000

$15,000

$15,000

$15,000

2018stipID1245FDCAPT

2018stipID1245FDCAPT

Ph subtotal: $15,000 $0 $15,000 $15,000

104378 OKI CLE CTC Security Equipment

2021

Description: Security Equipment Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt TR Transit Su

Transit Su

2021

2021

FTA

LNT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match

11.42.09 FY21

11.42.09 FY21

$12,000

$3,000

$0

$0

$15,000

$15,000

$15,000

$15,000

2018stipID1246FDTR

2018stipID1246FDTR

Ph subtotal: $15,000 $0 $15,000 $15,000

104418 OKI CLE CTC Transit Enhancements

2020

Description: Transit Enhancements Work

Type: Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt CO Oth Remb

Oth Remb

2020

2020

FTA

LNT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match

11.92.02 FY2020

11.92.02 FY2020

$12,000

$3,000

$0

$0

$15,000

$15,000

$15,000

$15,000

2018stipID1247FDCAPT

2018stipID1247FDCAPT

Ph subtotal: $15,000 $0 $15,000 $15,000

104421 OKI CLE CTC Transit Enhancements

2021

Description: Transit Enhancements Work

Type: Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt TR Transit Su 2021 FTA Federal 5307 5307 - Urban Formula Progr 11.92.02 FY2021 $12,000 $0 $15,000 $15,000 2018stipID1248FDTR

Page 47: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 47 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FTA 8 104421 OKI CLE CTC Transit Enhancements

2021

Description: Transit Enhancements Work

Type: Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt TR Transit Su 2021 LNT Local Match LNTP Local Match 11.92.02 FY2021 $3,000 $0 $15,000 $15,000 2018stipID1248FDTR

Ph subtotal: $15,000 $0 $15,000 $15,000

104425 OKI CLE CTC Short Range Planning

2020

Description: Short Range Planning Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt SP Planning

Planning

2020

2020

FTA

LNT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match

44.24.00 FY2020

44.24.00 FY2020

$8,000

$2,000

$0

$0

$10,000

$10,000

$10,000

$10,000

2018stipID1249FDPLAN

2018stipID1249FDPLAN

Ph subtotal: $10,000 $0 $10,000 $10,000

104429 OKI CLE CTC Short Range Planning

2021

Description: Short Range Planning Work Type:

Transit Termini: Clermont County

Clermont County

Commissioners

Air Quality Exempt TR Transit Su

Transit Su

2021

2021

FTA

LNT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match

44.24.00

44.24.00

$8,000

$2,000

$0

$0

$10,000

$10,000

$10,000

$10,000

2018stipID1250FDTR

2018stipID1250FDTR

Ph subtotal: $10,000 $0 $10,000 $10,000

106744 OKI CLE CTC Fare Collection

Equipment

Description: Acquire Mobile Fare Collection

Equipment Work Type: Transit Termini:

Clermont County

Clermont County

Commissioners

Air Quality Exempt CO Oth Remb

Oth Remb

2018

2018

FTA

LNT

Federal

Local Match

5339

LNTP

5339 / 0002 - Bus & Bus Fac

Local Match

11.42.10

11.42.10

$200,000

$50,000

$0

$0

$250,000

$250,000

$250,000

$250,000

2018AM01ID0038FDCAP

2018AM01ID0038FDCAP

Ph subtotal: $250,000 $0 $250,000 $250,000

103584 MVRPC GRE GCTB Operating

Assistance

Description: Operating Assistance Work Type:

Transit Termini: Xenia

Greene CATS Air Quality Exempt OT Trnst/Av

Trnst/Av

Trnst/Av

Trnst/Av

Trnst/Av

Trnst/Av

2018

2018

2018

2019

2019

2019

4EG

FTA

LNT

4EG

FTA

LNT

State

Federal

Local Match

State

Federal

Local Match

GRF

5307

LNTP

GRF

5307

LNTP

GRF

5307 - Urban Formula Progr

Local Match

GRF

5307 - Urban Formula Progr

Local Match

30.09.03 State FY

30.09.03 FY2018

30.09.03 FY2018

30.09.03 State FY

30.09.03 FY2019

30.09.03 FY2019

$90,000

$950,000

$950,000

$90,000

$950,000

$950,000

$3,800,000

$3,800,000

$3,800,000

$3,800,000

$3,800,000

$3,800,000

$7,780,000

$7,780,000

$7,780,000

$7,780,000

$7,780,000

$7,780,000

$7,901,313

$7,901,313

$7,901,313

$7,901,313

$7,901,313

$7,901,313

2018stipID1064FDOPER

2018stipID1064FDOPER

2018stipID1064FDOPER

2018stipID1064FDOPER

2018stipID1064FDOPER

2018stipID1064FDOPER

Ph subtotal: $3,980,000 $3,800,000 $7,780,000 $7,901,313

104325 MVRPC GRE GCTB Bus Replacement Description: Bus Replacement Work Type:

Transit Termini: Xenia

Greene County Transit Board Air Quality Exempt CO Oth Remb

Oth Remb

2018

2018

FTA

LNT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match

11.12.04 - Qty 7

11.12.04 - Qty 7

$450,000

$112,500

$0

$0

$562,500

$562,500

$562,500

$562,500

2018stipID1066FDCAPT

2018stipID1066FDCAPT

Ph subtotal: $562,500 $0 $562,500 $562,500

104326 MVRPC GRE GCTB Bus Replacement Description: Bus Replacement Work Type:

Transit Termini: Xenia

Greene County Transit Board Air Quality Exempt CO Oth Remb

Oth Remb

2019

2019

FTA

LNT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match

11.12.04 - Qty 7

11.12.04 - Qty 7

$450,000

$112,500

$0

$0

$562,500

$562,500

$562,500

$562,500

2018stipID1067FDCAPT

2018stipID1067FDCAPT

Ph subtotal: $562,500 $0 $562,500 $562,500

104328 MVRPC GRE GCTB Operating

Assistance

Description: Operating Assistance Work Type:

Transit Termini: Xenia

Greene CATS Air Quality Exempt OT Trnst/Av

Trnst/Av

2020

2021

4EG

4EG

State

State

GRF

GRF

GRF

GRF

30.09.03 FY2020

30.09.03 FY2021

$90,000

$90,000

$4,000,000

$4,000,000

2018stipID1065FDOPER

2018stipID1065FDOPER

Ph subtotal: $180,000 $0 $0 $4,000,000

TR Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2020

2021

2021

2021

4TT7

FTA

LNT

4TT7

FTA

LNT

State

Federal

Local Match

State

Federal

Local Match

GRF

5307

LNTP

GRF

5307

LNTP

GRF

5307 - Urban Formula Progr

Local Match

GRF

5307 - Urban Formula Progr

Local Match

30.09.03

30.09.03

30.09.03

30.09.03

30.09.03 FY2021

30.09.03 FY2021

$230,062

$1,000,000

$769,938

$90,000

$1,000,000

$910,000

$0

$0

$0

$0

$0

$0

$3,769,938

$3,769,938

$3,769,938

$3,769,938

$3,769,938

$3,769,938

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$4,000,000

$4,000,000

2018AM10ID0285FDTR

2018AM10ID0285FDTR

2018AM10ID0285FDTR

2018AM10ID0285FDTR

2018AM10ID0285FDTR

2018AM10ID0285FDTR

Ph subtotal: $4,000,000 $0 $3,769,938 $4,000,000

104488 MVRPC GRE GCTB 2020 Bus

Replace-Prev Maint

Description: Bus Replacement and Preventive

Maintenance Work Type: Transit Termini:

Xenia

Greene County Transit Board Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2020

2020

2020

2020

FTA

FTA

LNT

LNT

Federal

Federal

Local Match

Local Match

5307

5307

LNTP

LNTP

5307 - Urban Formula Progr

5307 - Urban Formula Progr

Local Match

Local Match

11.7A.00

11.12.04

11.7A.00

11.12.04

$192,000

$340,000

$48,000

$85,000

$0

$0

$0

$0

$665,000

$665,000

$665,000

$665,000

$665,000

$665,000

$665,000

$665,000

2018AM10ID0286FDCAP

2018AM10ID0286FDCAP

2018AM10ID0286FDCAP

2018AM10ID0286FDCAP

Ph subtotal: $665,000 $0 $665,000 $665,000

104489 MVRPC GRE GCTB 2021 Bus

Replacement

Description: Bus Replacement Work Type:

Transit Termini: Xenia

Greene County Transit Board Air Quality Exempt TR Transit Su

Transit Su

2021

2021

FTA

LNT

Federal

Local Match

5307

LNTP

5307 - Urban Formula Progr

Local Match

11.12.04 FY2021

11.12.04 FY2021

$450,000

$112,500

$0

$0

$562,500

$562,500

$562,500

$562,500

2018stipID1069FDTR

2018stipID1069FDTR

Ph subtotal: $562,500 $0 $562,500 $562,500

90060 OKI HAM SORTA Capital P&R/Transit

Center

Description: Capital Park and Ride/Transit

Centers Work Type: FTA Transfer Termini:

Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb 2018 4TA7 Federal M230 STBG 11.36.04 OKI $3,480,000 $800,000 $5,150,000 $5,150,000 2018stipID1258FDCAPT

Page 48: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 48 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FTA 8 90060 OKI HAM SORTA Capital P&R/Transit

Center

Description: Capital Park and Ride/Transit

Centers Work Type: FTA Transfer Termini:

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb 2018 LNT Local Match LNTP Local Match 11.36.04 OKI $870,000 $800,000 $5,150,000 $5,150,000 2018stipID1258FDCAPT

Ph subtotal: $4,350,000 $800,000 $5,150,000 $5,150,000

94696 OKI HAM SORTA Preventive

Maintenance

Description: Preventive Maintenance. STP for

the Urban Transit Program is flex fund transfer

only. Work Type: FTA Transfer Termini:

Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

2019

2019

2019

2019

2019

2019

4AT7

FTA

FTA

LNT

LNT

LNT

Federal

Federal

Federal

Local Match

Local Match

Local Match

M240

5307

5337

LNTP

LNTP

LNTP

STBG

5307 - Urban Formula Progr

5337 / 0001 - Fixed Guidwy

Local Match

Local Match

Local Match

11.7A.00 2019 UT

11.7A.00 2019 53

11.7A.00 2019 53

11.7A.00 2019 UT

11.7A.00 2019 53

11.7A.00 2019 53

$996,257

$12,438,414

$68,182

$249,064

$17,046

$3,109,604

$35,485,834

$35,485,834

$35,485,834

$35,485,834

$35,485,834

$35,485,834

$53,579,084

$53,579,084

$53,579,084

$53,579,084

$53,579,084

$53,579,084

$53,579,084

$53,579,084

$53,579,084

$53,579,084

$53,579,084

$53,579,084

2018AM07ID0221FDCAP

2018AM07ID0221FDCAP

2018AM07ID0221FDCAP

2018AM07ID0221FDCAP

2018AM07ID0221FDCAP

2018AM07ID0221FDCAP

Ph subtotal: $16,878,567 $35,485,834 $53,579,084 $53,579,084

94698 OKI HAM SORTA ADA Service Description: ADA Service Work Type: Transit

Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

2019

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.7C.00 2018

11.7C.00 2018

11.7C.00 2019

11.7C.00 2019

$1,025,367

$256,342

$1,025,367

$256,342

$2,570,370

$2,570,370

$2,570,370

$2,570,370

$5,133,788

$5,133,788

$5,133,788

$5,133,788

$5,133,788

$5,133,788

$5,133,788

$5,133,788

2018stipID1260FDCAPT

2018stipID1260FDCAPT

2018stipID1260FDCAPT

2018stipID1260FDCAPT

Ph subtotal: $2,563,418 $2,570,370 $5,133,788 $5,133,788

94700 OKI HAM SORTA Tire Lease Description: Tire Lease Work Type: Transit

Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

2019

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.16.40 2018

11.16.40 2018

11.16.40 2019

11.16.40 2019

$589,270

$147,318

$589,270

$147,318

$1,473,176

$1,473,176

$1,473,176

$1,473,176

$2,946,352

$2,946,352

$2,946,352

$2,946,352

$2,946,352

$2,946,352

$2,946,352

$2,946,352

2018stipID1261FDCAPT

2018stipID1261FDCAPT

2018stipID1261FDCAPT

2018stipID1261FDCAPT

Ph subtotal: $1,473,176 $1,473,176 $2,946,352 $2,946,352

94705 OKI HAM SORTA Security Equipment Description: Security Equipment Work Type:

Transit Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2019

2019

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.42.09 2018

11.42.09 2018

11.42.09 2019

11.42.09 2019

$132,000

$33,000

$132,000

$33,000

$329,119

$329,119

$329,119

$329,119

$659,119

$659,119

$659,119

$659,119

$659,119

$659,119

$659,119

$659,119

2018stipID1262FDCAPT

2018stipID1262FDCAPT

2018stipID1262FDCAPT

2018stipID1262FDCAPT

Ph subtotal: $330,000 $329,119 $659,119 $659,119

95141 OKI HAM SORTA Operating

Assistance

Description: Operating Assistance Work Type:

Transit Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt OT Trnst/Av 2018 LNT Local Match LNTP Local Match 30.09.00 $77,704,288 $0 $77,704,288 $77,704,288 2018stipID1263FDOPER

Ph subtotal: $77,704,288 $0 $77,704,288 $77,704,288

95697 OKI HAM SORTA Bus Replacement

5339

Description: Bus & Bus Facilities for the

Cincinnati urbanized area Work Type: Transit

Termini: Cincinnati

ODOT SPONSORING

AGENCY

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2018

2018

2019

2019

2019

2019

2019

2019

FTA

FTA

LNT

LNT

FTA

FTA

FTA

LNT

LNT

LNT

Federal

Federal

Local Match

Local Match

Federal

Federal

Federal

Local Match

Local Match

Local Match

5339

5339

LNTP

LNTP

5339

5339

5339

LNTP

LNTP

LNTP

5339 / 0002 - Bus & Bus Fac

5339 / 0002 - Bus & Bus Fac

Local Match

Local Match

5339 / 0002 - Bus & Bus Fac

5339 / 0002 - Bus & Bus Fac

5339 / 0002 - Bus & Bus Fac

Local Match

Local Match

Local Match

11.12.04 2018 - Q

11.12.01 2018 - Q

11.12.04 2018 - Q

11.12.01 2018 - Q

11.12.04 5339 For

11.12.01 5339 Co

11.12.01 5339 For

11.12.01 5339 Co

11.12.04 5339 For

11.12.01 5339 For

$772,432

$393,600

$193,108

$98,400

$246,907

$2,668,750

$1,116,321

$889,583

$61,727

$279,080

$7,063,350

$7,063,350

$7,063,350

$7,063,350

$7,063,350

$7,063,350

$7,063,350

$7,063,350

$7,063,350

$7,063,350

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

$13,783,258

2018AM07ID0219FDCAP

2018AM07ID0219FDCAP

2018AM07ID0219FDCAP

2018AM07ID0219FDCAP

2018AM07ID0219FDCAP

2018AM07ID0219FDCAP

2018AM07ID0219FDCAP

2018AM07ID0219FDCAP

2018AM07ID0219FDCAP

2018AM07ID0219FDCAP

Ph subtotal: $6,719,908 $7,063,350 $13,783,258 $13,783,258

99155 OKI HAM SORTA Bus Replacement Description: Bus replacements - CMAQ

transfers for the OTPPP Work Type: FTA

Transfer Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

2019

2019

4TP7

LNT

Federal

Local Match

M400

LNTP

CMAQ

Local Match

11.12.01 2019 - Q

11.12.01 2019 - Q

$825,003

$206,251

$5,203,000

$5,203,000

$11,462,763

$11,462,763

$11,462,763

$11,462,763

2018AM07ID0222FDCAP

2018AM07ID0222FDCAP

Ph subtotal: $1,031,254 $5,203,000 $11,462,763 $11,462,763

99225 OKI HAM SORTA Operating

Assistance

Description: Operating Assistance Work Type:

Transit Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt OT Trnst/Av 2019 LNT Local Match LNTP Local Match 30.09.00 Local $77,704,288 $0 $77,704,288 $77,704,288 2018stipID1265FDOPER

Ph subtotal: $77,704,288 $0 $77,704,288 $77,704,288

99801 OKI HAM SORTA Bus Replacements Description: Bus Replacements - STP funds

only are a flex fund transfer Work Type: FTA

Transfer Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

2019

2019

4TB7

LNT

Federal

Local Match

M400

LNTP

CMAQ

Local Match

11.12.01 - Qty 12

11.12.01 - Qty 12

$4,704,000

$1,176,000

$950,000

$950,000

$6,830,000

$6,830,000

$6,830,000

$6,830,000

2018stipID1266FDCAPT

2018stipID1266FDCAPT

Ph subtotal: $5,880,000 $950,000 $6,830,000 $6,830,000

Page 49: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 49 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FTA 8 103349 OKI HAM SORTA Bus Replacements Description: Bus replacements using MPO

CMAQ funds as a flex fund transfer Work

Type: FTA Transfer Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

2021

2021

4TB7

LNT

Federal

Local Match

M400

LNTP

CMAQ

Local Match

11.12.01 - Qty 10

11.12.01 - Qty 10

$4,720,000

$1,180,000

$0

$0

$5,900,000

$5,900,000

$5,900,000

$5,900,000

2018stipID1267FDCAPT

2018stipID1267FDCAPT

Ph subtotal: $5,900,000 $0 $5,900,000 $5,900,000

104410 OKI HAM SORTA Operating

Assistance

Description: Operating Assistance Work Type:

Transit Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt TR Transit Su

Transit Su

2020

2021

LNT

LNT

Local Match

Local Match

LNTP

LNTP

Local Match

Local Match

30.09.00 2020

30.09.00 2021

$77,704,288

$77,704,288

$0

$0

$155,408,576

$155,408,576

$155,408,576

$155,408,576

2018stipID1268FDTR

2018stipID1268FDTR

Ph subtotal: $155,408,576 $0 $155,408,576 $155,408,576

104411 OKI HAM SORTA Preventive

Maintenance

Description: Preventive Maintenance. STP for

the Urban Transit Program is flex fund transfer

only. Work Type: FTA Transfer Termini:

Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb 2020 4AT7 Federal M240 STBG 11.7A.00 2020 UT $1,026,108 $33,687,270 2018stipID1269FDCAPT

Ph subtotal: $1,026,108 $0 $0 $33,687,270

TR Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2020

2021

2021

2021

2021

FTA

LNT

LNT

4AT7

FTA

LNT

LNT

Federal

Local Match

Local Match

Federal

Federal

Local Match

Local Match

5307

LNTP

LNTP

M240

5307

LNTP

LNTP

5307 - Urban Formula Progr

Local Match

Local Match

STBG

5307 - Urban Formula Progr

Local Match

Local Match

11.7A.00 2020 53

11.7A.00 2020 53

11.7A.00 2020 UT

11.7A.00 2021 UT

11.7A.00 2021 53

11.7A.00 2021 UT

11.7A.00 2021 53

$12,448,800

$3,112,200

$256,527

$1,026,108

$12,448,800

$256,527

$3,112,200

$0

$0

$0

$0

$0

$0

$0

$33,687,270

$33,687,270

$33,687,270

$33,687,270

$33,687,270

$33,687,270

$33,687,270

$33,687,270

$33,687,270

$33,687,270

$33,687,270

$33,687,270

$33,687,270

$33,687,270

2018stipID1269FDTR

2018stipID1269FDTR

2018stipID1269FDTR

2018stipID1269FDTR

2018stipID1269FDTR

2018stipID1269FDTR

2018stipID1269FDTR

Ph subtotal: $32,661,162 $0 $33,687,270 $33,687,270

104412 OKI HAM SORTA ADA Service Description: ADA Service Work Type: Transit

Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2021

2021

FTA

LNT

FTA

LNT

Federal

Local Match

Federal

Local Match

5307

LNTP

5307

LNTP

5307 - Urban Formula Progr

Local Match

5307 - Urban Formula Progr

Local Match

11.7C.00 2020

11.7C.00 2020

11.7C.00 2021

11.7C.00 2021

$1,025,367

$256,342

$1,025,367

$256,342

$0

$0

$0

$0

$2,563,418

$2,563,418

$2,563,418

$2,563,418

$2,563,418

$2,563,418

$2,563,418

$2,563,418

2018stipID1270FDTR

2018stipID1270FDTR

2018stipID1270FDTR

2018stipID1270FDTR

Ph subtotal: $2,563,418 $0 $2,563,418 $2,563,418

104413 OKI HAM SORTA Tire Lease/Security

Equip

Description: Tire Lease Work Type: Transit

Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

2020

2020

2020

2020

2021

2021

2021

2021

FTA

FTA

LNT

LNT

FTA

FTA

LNT

LNT

Federal

Federal

Local Match

Local Match

Federal

Federal

Local Match

Local Match

5307

5307

LNTP

LNTP

5307

5307

LNTP

LNTP

5307 - Urban Formula Progr

5307 - Urban Formula Progr

Local Match

Local Match

5307 - Urban Formula Progr

5307 - Urban Formula Progr

Local Match

Local Match

11.16.40 2020

11.42.09 2020

11.42.09 2020

11.16.40 2020

11.42.09 2021

11.16.40 2021

11.42.09 2021

11.16.40 2021

$589,123

$132,000

$33,000

$147,281

$132,000

$589,123

$33,000

$147,281

$0

$0

$0

$0

$0

$0

$0

$0

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

$1,802,808

2018stipID1271FDTR

2018stipID1271FDTR

2018stipID1271FDTR

2018stipID1271FDTR

2018stipID1271FDTR

2018stipID1271FDTR

2018stipID1271FDTR

2018stipID1271FDTR

Ph subtotal: $1,802,808 $0 $1,802,808 $1,802,808

104414 OKI HAM SORTA Bus Replacements Description: Bus Replacements - CMAQ funds

only are a flex fund transfer through the OTPPP

Work Type: FTA Transfer Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

2020

2020

2020

2020

2020

2020

4TP7

FTA

FTA

LNT

LNT

LNT

Federal

Federal

Federal

Local Match

Local Match

Local Match

M400

5339

5339

LNTP

LNTP

LNTP

CMAQ

5339 / 0002 - Bus & Bus Fac

5339 / 0002 - Bus & Bus Fac

Local Match

Local Match

Local Match

11.12.01 OTPPP -

11.12.04 5339 - Q

11.12.01 5339 - Q

11.12.01 OTPPP -

11.12.04 5339 - Q

11.12.01 5339 - Q

$2,088,000

$1,183,104

$742,400

$522,000

$295,776

$185,600

$0

$0

$0

$0

$0

$0

$5,016,880

$5,016,880

$5,016,880

$5,016,880

$5,016,880

$5,016,880

$5,016,880

$5,016,880

$5,016,880

$5,016,880

$5,016,880

$5,016,880

2018stipID1272FDCAPT

2018stipID1272FDCAPT

2018stipID1272FDCAPT

2018stipID1272FDCAPT

2018stipID1272FDCAPT

2018stipID1272FDCAPT

Ph subtotal: $5,016,880 $0 $5,016,880 $5,016,880

104415 OKI HAM SORTA Bus Replacements Description: Bus Replacements - CMAQ funds

only are a flex fund transfer through the OTPPP

Work Type: FTA Transfer Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

2021

2021

2021

2021

4TP7

FTA

LNT

LNT

Federal

Federal

Local Match

Local Match

M400

5339

LNTP

LNTP

CMAQ

5339 / 0002 - Bus & Bus Fac

Local Match

Local Match

11.12.01 OTPPP -

11.12.04 5339 - Q

11.12.04 5339 - Q

11.12.01 OTPPP -

$2,152,000

$1,184,960

$296,240

$538,000

$0

$0

$0

$0

$4,171,200

$4,171,200

$4,171,200

$4,171,200

$4,171,200

$4,171,200

$4,171,200

$4,171,200

2018stipID1273FDTR

2018stipID1273FDTR

2018stipID1273FDTR

2018stipID1273FDTR

Ph subtotal: $4,171,200 $0 $4,171,200 $4,171,200

104648 OKI HAM SORTA Bus Replacements Description: Bus Replacements Work Type:

FTA Transfer Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

2020

2020

4TA7

LNT

Federal

Local Match

M230

LNTP

STBG

Local Match

11.12.01 - Qty 10

11.12.01 - Qty 10

$4,000,000

$1,000,000

$0

$0

$5,000,000

$5,000,000

$5,000,000

$5,000,000

2018stipID1274FDCAPT

2018stipID1274FDCAPT

Ph subtotal: $5,000,000 $0 $5,000,000 $5,000,000

Page 50: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 50 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FTA 8 106917 OKI HAM SORTA Fare Collection

Equipment

Description: Acquire mobile fare collection

equipment Work Type: FTA Transfer

Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

2018

2018

4TP7

LNT

Federal

Local Match

M240

LNTP

STP

Local Match

11.42.10

11.42.10

$30,400

$7,600

$0

$0

$38,000

$38,000

$38,000

$38,000

2018AM02ID0073FDCAP

2018AM02ID0073FDCAP

Ph subtotal: $38,000 $0 $38,000 $38,000

107283 OKI HAM SORTA FY21 Bus

Replacements

Description: Bus replacements using OKI CMAQ

funds as a flex fund transfer. Work Type: FTA

Transfer Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt TR Transit Su

Transit Su

2021

2021

4TB7

LNT

Federal

Local Match

M400

LNTP

CMAQ

Local Match

11.12.01 - Qty 10

11.12.01 - Qty 10

$3,103,400

$2,156,600

$0

$0

$5,260,000

$5,260,000

$5,260,000

$5,260,000

2018AM03ID0112FDTR

2018AM03ID0112FDTR

Ph subtotal: $5,260,000 $0 $5,260,000 $5,260,000

107939 OKI HAM OKI Section 5310 Program Description: 5310 Program through the OKI

MPO using FFY2017 funds Work Type:

Transit Termini: Cincinnati

OKI Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

2019

FTA

FTA

FTA

FTA

FTA

FTA

FTA

FTA

FTA

FTA

LNT

LNT

LNT

LNT

LNT

LNT

LNT

LNT

LNT

Federal

Federal

Federal

Federal

Federal

Federal

Federal

Federal

Federal

Federal

Local Match

Local Match

Local Match

Local Match

Local Match

Local Match

Local Match

Local Match

Local Match

5310

5310

5310

5310

5310

5310

5310

5310

5310

5310

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

LNTP

5310 - Enhanced Mobility

5310 - Enhanced Mobility

5310 - Enhanced Mobility

5310 - Enhanced Mobility

5310 - Enhanced Mobility

5310 - Enhanced Mobility

5310 - Enhanced Mobility

5310 - Enhanced Mobility

5310 - Enhanced Mobility

5310 - Enhanced Mobility

Local Match

Local Match

Local Match

Local Match

Local Match

Local Match

Local Match

Local Match

Local Match

11.42.07

11.80.00

11.7A.00

11.12.15 - Qty 7

11.13.04 - Qty 1

11.42.09

11.7L.00

11.42.08

11.7D.02

11.12.04 - Qty 2

11.7D.02

11.42.08

11.12.15 - Qty 7

11.42.07

11.12.04 - Qty 2

11.7L.00

11.13.04 - Qty 1

11.7A.00

11.42.09

$40,000

$138,532

$8,180

$210,480

$42,170

$82,020

$767,094

$86,780

$480

$91,736

$120

$21,695

$52,620

$10,000

$22,934

$191,774

$10,543

$2,045

$20,505

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

$1,799,708

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

2018AM07ID0220FDCAP

Ph subtotal: $1,799,708 $0 $1,799,708 $1,799,708

107940 OKI HAM SORTA 5310 Program Description: 5310 Program activities through

SORTA Work Type: Transit Termini:

Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2018

2018

2018

2018

2018

2018

FTA

FTA

FTA

FTA

LNT

LNT

LNT

LNT

Federal

Federal

Federal

Federal

Local Match

Local Match

Local Match

Local Match

5310

5310

5310

5310

LNTP

LNTP

LNTP

LNTP

5310 - Enhanced Mobility

5310 - Enhanced Mobility

5310 - Enhanced Mobility

5310 - Enhanced Mobility

Local Match

Local Match

Local Match

Local Match

11.13.04 - Qty 3

11.13.15 - Qty 2

11.12.15 - Qty 2

11.12.04 - Qty 7

11.12.15 - Qty 2

11.13.04 - Qty 3

11.13.15 - Qty 2

11.12.04 - Qty 7

$151,926

$63,676

$60,454

$321,094

$15,114

$37,982

$15,919

$80,273

$0

$0

$0

$0

$0

$0

$0

$0

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

$746,438

2018AM03ID0113FDCAP

2018AM03ID0113FDCAP

2018AM03ID0113FDCAP

2018AM03ID0113FDCAP

2018AM03ID0113FDCAP

2018AM03ID0113FDCAP

2018AM03ID0113FDCAP

2018AM03ID0113FDCAP

Ph subtotal: $746,438 $0 $746,438 $746,438

107941 OKI HAM BCRTA 5310 Program Description: 5310 Program activities through

BCRTA Work Type: Transit Termini:

Cincinnati

Butler County Regional Transit

Authority

Air Quality Exempt OT Trnst/Av

Trnst/Av

2018

2018

FTA

LNT

Federal

Local Match

5310

LNTP

5310 - Enhanced Mobility

Local Match

30.09.00

30.09.00

$275,400

$275,400

$0

$0

$550,800

$550,800

$550,800

$550,800

2018AM03ID0110FDOPE

2018AM03ID0110FDOPE

Ph subtotal: $550,800 $0 $550,800 $550,800

109541 OKI HAM HAM SORTA 2020 DERG

Buses

Description: SORTA to replace five model year

2008 diesel powered transit buses with five new

diesel powered transit buses. 2019 DERG

rogram project selection. Work Type: FTA

Transfer Termini: Southwest Ohio Regional

Transit Authority

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

2020

2020

4NG

LNT

Federal

Local Match LNTP

Un-Assigned Federal

Local Match

11.12.01 - Qty 5

11.12.01 - Qty 5

$1,601,304

$1,067,536

$0

$0

$2,668,840

$2,668,840

$2,668,840

$2,668,840

2018AM07ID0223FDCAP

2018AM07ID0223FDCAP

Ph subtotal: $2,668,840 $0 $2,668,840 $2,668,840

109593 OKI HAM SORTA Silverton Access

Facility

Description: Renovation of Silverton Access

Facility Work Type: Transit Termini:

Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt CO Oth Remb

Oth Remb

2019

2019

FTA

LNT

Federal

Local Match

5339

LNTP

5339 / 0002 - Bus & Bus Fac

Local Match

11.34.02

11.34.02

$180,000

$20,000

$0

$0

$200,000

$200,000

$200,000

$200,000

2018AM07ID0224FDCAP

2018AM07ID0224FDCAP

Ph subtotal: $200,000 $0 $200,000 $200,000

Page 51: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 51 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FTA 8 112057 OKI HAM SORTA 2020 Bus

Replacements

Description: Bus Replacements - STBG funds

are a flex fund transfer Work Type: Flex Fund

Transfers Termini: Cincinnati

Southwest Ohio Regional

Transit Authority

Air Quality Exempt TR Transit Su

Transit Su

2020

2020

4TA7

LNT

Federal

Local Match

M230

LNTP

STBG

Local Match

11.12.01

11.12.01

$5,347,765

$2,291,899

$0

$0

$7,639,664

$7,639,664

$7,639,664

$7,639,664

2018AM11ID0320FDTR

2018AM11ID0320FDTR

Ph subtotal: $7,639,664 $0 $7,639,664 $7,639,664

112320 OKI HAM HAM SORTA 2020 DERG

Buses

Description: Southwest Ohio Regional Transit

Authority (SORTA), Hamilton County, to replace

four model year 2006 diesel powered transit

buses with new diesel powered transit buses,

#D20F-003. 2020 DERG Program project

selection. Work Type: Flex Fund Transfers

Termini: Southwest Ohio Regional Transit

Authority

Southwest Ohio Regional

Transit Authority

Air Quality Exempt TR Transit Su

Transit Su

2020

2020

4NG

LNT

Federal

Local Match

M400

LNTP

CMAQ

Local Match

11.12.01

11.12.01

$1,269,893

$892,995

$0

$0

$2,162,888

$2,162,888

$2,162,888

$2,162,888

2018AM11ID0321FDTR

2018AM11ID0321FDTR

Ph subtotal: $2,162,888 $0 $2,162,888 $2,162,888

104537 KYOVA LAW LCPA 2021 Operating

Assistance

Description: Operating Assistance Work Type:

Transit Termini: Lawrence County

Lawrence County Port

Authority

Air Quality Exempt TR Transit Su

Transit Su

Transit Su

2021

2021

2021

4EG

FTA

LNT

State

Federal

Local Match

GRF

5307

LNTP

GRF

5307 - Urban Formula Progr

Local Match

30.09.03 FY2021

30.09.03 FY2021

30.09.03 FY2021

$90,000

$1,000,000

$910,000

$0

$0

$0

$2,000,000

$2,000,000

$2,000,000

$2,000,000

$2,000,000

$2,000,000

2018stipID0933FDTR

2018stipID0933FDTR

2018stipID0933FDTR

Ph subtotal: $2,000,000 $0 $2,000,000 $2,000,000

99334 OKI WAR WCTS 2018 Operating

Assistance

Description: Operating Assistance Work Type:

Transit Termini: Lebanon

Warren County Transit Service Air Quality Exempt OT Trnst/Av

Trnst/Av

Trnst/Av

Trnst/Av

2018

2018

2018

2018

4EG

4EQ

FTA

LNT

State

State

Federal

Local Match

GRF

GRF

5307

LNTP

GRF

GRF

5307 - Urban Formula Progr

Local Match

30.09.01 OPTGP

30.09.01 E&D

30.09.01 5307

30.09.01 Local

$115,200

$22,444

$571,108

$433,464

$0

$0

$0

$0

$1,142,216

$1,142,216

$1,142,216

$1,142,216

$1,142,216

$1,142,216

$1,142,216

$1,142,216

2018stipID1275FDOPER

2018stipID1275FDOPER

2018stipID1275FDOPER

2018stipID1275FDOPER

Ph subtotal: $1,142,216 $0 $1,142,216 $1,142,216

99343 OKI WAR WCTS 2018 Bus

Replacement and PM

Description: Vehicle Replacement and

Capitalized Maintenance Work Type: Transit

Termini: Lebanon

Warren County Transit Service Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2018

2018

2018

2018

FTA

FTA

LNT

LNT

Federal

Federal

Local Match

Local Match

5307

5307

LNTP

LNTP

5307 - Urban Formula Progr

5307 - Urban Formula Progr

Local Match

Local Match

11.7A.00

11.12.15 - Qty 3

11.12.15 - Qty 3

11.7A.00

$99,460

$118,332

$29,583

$24,865

$0

$0

$0

$0

$272,240

$272,240

$272,240

$272,240

$272,240

$272,240

$272,240

$272,240

2018stipID1276FDCAPT

2018stipID1276FDCAPT

2018stipID1276FDCAPT

2018stipID1276FDCAPT

Ph subtotal: $272,240 $0 $272,240 $272,240

99346 OKI WAR WCTS 2019 Operating

Assistance

Description: Operating Assistance Work Type:

Transit Termini: Lebanon

Warren County Transit Service Air Quality Exempt OT Trnst/Av

Trnst/Av

Trnst/Av

Trnst/Av

2019

2019

2019

2019

4EG

4EQ

FTA

LNT

State

State

Federal

Local Match

GRF

GRF

5307

LNTP

GRF

GRF

5307 - Urban Formula Progr

Local Match

30.09.01 OPTGP

30.09.01 E&D

30.09.01 5307

30.09.01 Local

$115,200

$22,444

$571,108

$434,464

$0

$0

$0

$0

$1,143,216

$1,143,216

$1,143,216

$1,143,216

$1,143,216

$1,143,216

$1,143,216

$1,143,216

2018stipID1277FDOPER

2018stipID1277FDOPER

2018stipID1277FDOPER

2018stipID1277FDOPER

Ph subtotal: $1,143,216 $0 $1,143,216 $1,143,216

99347 OKI WAR WCTS 2019 Bus

Replacement and PM

Description: Vehicle Replacement and

Capitalized Maintenance Work Type: Transit

Termini: Lebanon

Warren County Transit Service Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

2019

2019

2019

FTA

FTA

LNT

Federal

Federal

Local Match

5307

5307

LNTP

5307 - Urban Formula Progr

5307 - Urban Formula Progr

Local Match

11.7A.00

11.12.15 - Qty 3

11.7A.00

$136,750

$186,450

$34,188

$0

$0

$0

$357,388

$357,388

$357,388

$357,388

$357,388

$357,388

2018MODID0456FDCAPT

2018MODID0456FDCAPT

2018MODID0456FDCAPT

Ph subtotal: $357,388 $0 $357,388 $357,388

104483 OKI WAR WCTS 2020 5307 Program Description: Operating assistance, vehicle

replacement, and preventive maintenance

Work Type: Transit Termini: Lebanon

Warren County Transit Service Air Quality Exempt CO Oth Remb

Oth Remb

Oth Remb

Oth Remb

2020

2020

2020

2020

FTA

FTA

LNT

LNT

Federal

Federal

Local Match

Local Match

5307

5307

LNTP

LNTP

5307 - Urban Formula Progr

5307 - Urban Formula Progr

Local Match

Local Match

11.12.15 - Qty 3

11.7A.00

11.7A.00

11.12.15 - Qty 3

$118,332

$99,460

$24,865

$29,583

$0

$0

$0

$0

$272,240

$272,240

$272,240

$272,240

$1,414,456

$1,414,456

$1,414,456

$1,414,456

2018stipID1279FDCAPT

2018stipID1279FDCAPT

2018stipID1279FDCAPT

2018stipID1279FDCAPT

Ph subtotal: $272,240 $0 $272,240 $1,414,456

OT Trnst/Av

Trnst/Av

Trnst/Av

Trnst/Av

2020

2020

2020

2020

4EG

4EQ

FTA

LNT

State

State

Federal

Local Match

GRF

GRF

5307

LNTP

GRF

GRF

5307 - Urban Formula Progr

Local Match

30.09.01 OPTGP

30.09.01 E&D

30.09.01 5307

30.09.01 Local

$115,200

$22,444

$571,108

$433,464

$0

$0

$0

$0

$1,142,216

$1,142,216

$1,142,216

$1,142,216

$1,414,456

$1,414,456

$1,414,456

$1,414,456

2018stipID1279FDOPER

2018stipID1279FDOPER

2018stipID1279FDOPER

2018stipID1279FDOPER

Ph subtotal: $1,142,216 $0 $1,142,216 $1,414,456

Page 52: Ohio Department of Transportation 2018-2021 STIP Project … STIP... · 2020. 5. 27. · Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20

Ohio Department of Transportation 2018-2021 STIP Project Listing (Appendix 6) as of 05/27/20 for District: 8 Query: "Current STIP Detail 5"

Page 52 of 52

STIP

AgencyDist PID

MPO/RTP

O/Large

City

Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality StatusLength

(SLM)Ph Subph SFY SAC Fund Type

Billing

CodeObligation Group ALI - Qty

STIP

Phase

Estimate

Total

Phase

Encumbered

STIP

Phase

Total

Project

TotalSTIP Reference ID

FTA 8 104485 OKI WAR WCTS 5307 Program Description: Operating assistance, vehicle

replacement, and preventive maintenance

Work Type: Transit Termini: Lebanon

Warren County Transit Service Air Quality Exempt TR Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

Transit Su

2021

2021

2021

2021

2021

2021

2021

2021

4EG

4EQ

FTA

FTA

FTA

LNT

LNT

LNT

State

State

Federal

Federal

Federal

Local Match

Local Match

Local Match

GRF

GRF

5307

5307

5307

LNTP

LNTP

LNTP

GRF

GRF

5307 - Urban Formula Progr

5307 - Urban Formula Progr

5307 - Urban Formula Progr

Local Match

Local Match

Local Match

30.09.01 OTPGP

30.09.01 E&D

11.12.15 - Qty 3

30.09.01 5307

11.7A.00

11.12.15 - Qty 3

11.7A.00

30.09.01 Local

$115,200

$22,444

$118,332

$571,108

$99,460

$29,583

$24,865

$433,464

$0

$0

$0

$0

$0

$0

$0

$0

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

$1,414,456

2018stipID1280FDTR

2018stipID1280FDTR

2018stipID1280FDTR

2018stipID1280FDTR

2018stipID1280FDTR

2018stipID1280FDTR

2018stipID1280FDTR

2018stipID1280FDTR

Ph subtotal: $1,414,456 $0 $1,414,456 $1,414,456