ncdot draft stip division august 2019 · 2019-09-05 · draft state transportation improvement...
TRANSCRIPT
-
Draft State Transportation Improvement Program STIP
FY 2020 – 2029 2019 August 2019
-
COUNTY
FUTURE YEARS
F
(1) IDENTIFICATION NUMBER (3) FUNDING CATEGORY
I - Interstate HP - Federal-Aid High Priority DIV - Division Need A - AcquisitionR, A, X - Rural HSIP - Highway Safety Improvement Program EX - Exempt C - ConstructionM Special L - Local HF - State Dollars (Non-STI) CB - Construction (BUILD NC)U - Urban BG5200 - Surface Transportation Block Grant Program (5K - 200K) NHFP - National Highway Freight Program REG - Regional Impact CG - Construction (GARVEE)B - Bridge Replacement BGANY - Surface Transportation Block Grant Program (Any Area) NHP - National Highway Performance Program SW - Statewide Mobility F - Feasibility StudyAV - Aviation BGBA - Surface Transportation Block Grant Program (Bonus Allocation) NHPB - National Highway Performance Program (Bridge) TRN -Transition Project G - Grading and StructuresE - Enhancements, Call, BGDA - Surface Transportation Block Grant Program (Direct Attributable) NHPBA - National Highway Performance Program (Bonus Allocation) I - ImplementationEB BGIM - Surface Transportation Block Grant Program (Interstate Maintenance) NHPIM - National Highway Performance Program (Interstate Maintenance) L - LandscapingEL Local BGLT5 - Surface Transportation Block Grant Program (Less than 5K) O - Other M - MitigationER Roadside BGOFF -Surface Transportation Block Grant Program (Off System Bridge) S - State O - OperationsS BOND (R) - Revenue Bond S (M) - State Match P - PavingEE - Mitigation CMAQ - Congestion Mitigation T - State Highway Trust Funds PE - Preliminary EngineeringK - Rest Area DP - Discretionary TA - Transportation Alternatives Program (Uncategorized) R - Right of WayL - Landscape ER - Emergency Relief Funds TA5200 - Transportation Alternatives Program (5K - 200K) RB - Right of Way (BUILD NC)P, SB - Passenger Rail FLAP - Federal Lands Access Program TAANY - Transportation Alternatives Program (Any Area) RG - Right of Way (GARVEE)SR - Safe Routes to School FLTP - Federal Lands Transportation Program TADA - Transportation Alternatives Program (Direct Attributable) S - StructureW, SI, SF - Highway Safety HFB - Highway Fund Bridge TALT5 -Transportation Alternatives Program (Less than 5K) U - UtilitiesY, Z - Railroad-Highway CrossingsF - FerryFS - Feasibility StudyT - Public Transportation
LENGTH (MILES)
Bicycle & Pedestrian
FY 2025
DEVELOPMENTAL PROGRAMDELIVERABLE PROGRAM
1500
(4) WORK TYPE (ACTIVITY)
DIVISION 00
R-0000
IDROUTE/CITY
SW
ROUTE/CITY NHP
I-40 TO NC 96 EAST OF HOMETOWN.WIDEN TO A FOUR-LANE FACILITY
NHP
US or NC RoutesON NEW LOCATION.I - InterstateWITH A BYPASS OF HOMETOWN
9000
NUMBERS
WAKE
NHPNHP
SW
used for each project phase.
FUNDING SOURCE (2)
U
SW
NHP
ASWC
A
One or two letterdesignation for project
(Estimates are in thousand of dollars.)
funding types. Multi-year funding of a project segment
or activities see or activity beginning in the initial scheduled year.
Preliminary Engineering, Right of Way, Utility, Mitigation and Construction cost estimates by funding category in current dollars. Cost may include one or more
Utilities or Construction.
5000 B
For other work types
UNFUNDED
UNFUNDED
5000
HIGHWAY PROGRAM
FUN
DS
AR
RC 5000
C
FY 2021
M
FY 2020
4000 700
TOTAL PROJECT
COST (THOU)
7.3 25063,450
FY 2022
PRIOR YEARS COST
(THOU)
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FY 2023 FY 2024 FY 2029FY 2026
20000NHP
C10000
C B C B
FY 2027 FY 2028
C
NC 3 TO SR 1003SR 1003 TO NC 96
H090010A
5000R B
LOCATION / DESCRIPTION
SR - Secondary Road
IDENTIFICATION NUMBERSAssigned to each project at conception and remains with
Identifies the "STI" Funding
NC 00
LOCATION / DESCRIPTION Various - Multiple Routes
Phases of implementation:
any project breaks.
NHP
Project termini and a general
CB
BG - Surface Transportation Block Grant Program (Uncategorized)
Category for the project and
ESTIMATED COST PROJECT BREAKS
work description.
See Highway Funding Key
FUNDING CATEGORY (3)
WORK TYPE (ACTIVITY)
break.
indicates (Cash-Flow Funding) with proposed work type
(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES
Work Type (Activity) box below
APD - Appalachian DevelopmentBA - Bonus Allocation
for an explanation of funding categories
Preliminary engineering,Right of Way, Mitigation,
I-40 TO NC 3
on main project
H090010BH090010C
H090010
SPOT ID appears with project break information if not shown
NEW ROUTE or City
project until completion.
NHP
T-18
-
ROUTE / CITY /TRANSIT PARTNER IDCOUNTY
FUTURE YEARS
F
below.
ADTAP - Applalachian Development Transportation Assistance Pgm. FSPR - State Planning and ResearchFSSO - Federal State Safety Oversight (Rail) (5329)
CMAQ - Congestion MitigationDP - Discretionary or DemonstrationFBBF - Bus and Bus Facilities Formula (5339) JARC - Job Assistance and Reverse Commute (5316) I - ImpementationFBUS - Bus and Bus Facilities (5339) L - Local O - OperationsFED - Federal Rail Funds O - Other Oc - OPS Funded CapitalFEDT - Undesignated Federal Transit Funds RR - Rail-Highway Safety PE - Preliminary EngineeringFEPD - Enhanced Mobility Adults and People with Disabilities (5310) RTAP - Rural Transit Assistance Program PL - Planning / DesignFF - Federal Ferry S - State R - Right-of-WayFLAP - Federal Lands Access Program S (M) - State MatchFMOD - Fixed Guideway Modifications SMAP - Operating Assistance and State MaintenanceFMPL - Metropolitan and Statewide Planning (5303/5304) SRTS - Safe Routes to SchoolFNF - New Freedom Program (5317) STHSR - Stimulus High Speed RailFNS - New Starts - Fixed Guideway CIG - Capital (5309)FNU - Non Urbanized Area Formula Program (5311)FSGR - State of Good Repair Formula (Rail) (5337)
ROUTE / CITY /
DURHAM AREA
DURHAMTRANSIT AUTHORITY
SPOT ID appears with project break information if not shown
TRANSIT PARTNER
Assigned to each project at
I - InterstateUS or NC Routes
on main project
H090010AH090010BH090010C
Various - multiple routes
TRANSIT PARTNER
any project breaks.Category for the project and
NEW ROUTE or City
IDENTIFICATION NUMBERS
A - Acquisition
SW - Statewide Mobility
DIV - Division NeedSD - State Dollars (Non-STI)REG - Regional Impact
FUNDING SOURCE (2)
Identifies the "STI" Funding
See Highway Funding Key
project until completion.
(3) WORK TYPE (ACTIVITY)
C - ConstructionAD - Administrative
CP - Capital
DIVISION 00
FY 2024
NON-HIGHWAY PROGRAM
FY 2020
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FY 2029
One or two letterdesignation for project
Utilities or Construction.
and Construction cost estimates by funding category in current dollars. Cost may include one or more break.
Preliminary Engineering,Preliminary Engineering, Right of Way, Utility, Mitigation
C
UNFUNDED
ESTIMATED COST WORK TYPE (ACTIVITY) (3)
DIV C
FY 2022 FY 2023FY 2021
A
UNFUNDED
CP A4000CP A
700
B
FY 2027 FY 2028FY 2025
10000B CP 5000 BCP CP 5000
C5000 BCP
FY 2026
A
5000
FUNDING CATEGORY (1)
DIVBDIV
type or activity beginning in the initial scheduled year. For other work types
work description.
used for each project phase.
PROJECT BREAKS
Work Type(Activity) boxor activities see
(Estimates are in thousand of dollars.)
indicates (Cash-Flow Funding) with proposed work
20000CP
Phases of implementation:
CP
funding types. Multi-year funding of a project segment
SHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
LOCATION / DESCRIPTION Project termini and a general
PRIOR YEARS COST
(THOU)
H090010
NUMBERS
TA-4738
(1) FUNDING CATEGORY
SR - Secondary Road
DIVSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
for an explanation of funding categories
conception and remains with
Right of Way, Mitigation,
9000
LOCATION / DESCRIPTION
PASSENGER AMENITIES - BUS STOP
TOTAL PROJECT
COST (THOU) F
UN
DS
SHELTERS, BENCHES, SHOP EQUIPMENT
FUZ - Urbanized Area Formula Program (5307)BGDA - STBG Program - Direct Attributable
T - State Highway Trust FundsTADA - Transportation Alternatives Program - (Direct Attributable)
HP - Federal-Aid High Priority
(2) FUNDING SOURCES KEY
FUZ
BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE
FUZ
CP
DEVELOPMENTAL PROGRAMDELIVERABLE PROGRAM
BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET
TIGER DISC - TIGER Discretionary Grants
T-19
-
1
STATE TRANSPORTATION IMPROVEMENT PROGRAM
Division 1BertieCamdenChowanCurrituckDareGatesHertfordHyde MartinNorthamptonPasquotank
PerquimansTyrrellWashington
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
R-5809 23589 2219HERTFORD COUNTY LINE TO WASHINGTON COUNTY LINE. MODERNIZE ROADWAY.
24.8H141741
T 100R AT 10U AT 2217C A C 2217 A C 2216 AT 750R B250R BT 10U BT 3400C B C 3400 B C 3400 B C 3400 B
A WASHINGTON COUNTY LINE TO US 17 AT MIDWAY.DIV H141741B US 17 AT MIDWAY TO SOUTHERN CITY LIMITS OF COLERAIN.DIV H141741C SOUTHERN CITY LIMITS OF COLERAIN TO HERTFORD COUNTY LINE. - UNDER CONSTRUCTIONDIV H141741
BERTIENC 45
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400S C 100BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 1 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIVHSIP C 180 DIVHSIP R 30 REGHSIP C 180 REGHSIP R 40 SWHSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 2 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
INTERSTATE PROJECTSI-6026 6010 10PASQUOTANK COUNTY LINE TO
VIRGINIA STATE LINE. PAVEMENT REHABILITATION.
9.6
SW
NHPIM 3000C3000C
CAMDEN
US 17(FUTURE I-87)
RURAL PROJECTS
BUILD NC BOND AMOUNT $78.2M PAYBACK FROM 2025 - 2040.
R-2574 117663 3523EAST OF NC 34 (SHAWBORO ROAD) AT BELCROSS IN CAMDEN COUNTY TO US 158/NC 168 (CARATOKE HIGHWAY) IN CURRITUCK COUNTY. WIDEN TO MULTI-LANES.
10.6
REG
H090139
T 5865R R 5865 T 1760U T 67100CB CB 6710 CB 6710 CB 6710 CB 6710 CB 6710CAMDEN
CURRITUCK
US 158(SHORTCUT ROAD)
R-5807 21193 750US 158 IN CAMDEN TO SR 1119 (SOUTH TROTMAN ROAD) IN SHILOH. MODERNIZE ROADWAY AND REPLACE BRIDGES 140017 AND 140018 IN CAMDEN COUNTY.
6.8
DIV
H090869T 1600R T 636U U 1907 T C 5434 C 5433 C 5433
CAMDENNC 343
Page 3 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
RIGHT-OF-WAY IN PROGRESS.
R-5717 18381 2181NC 343 IN CAMDEN COUNTY TO NC 168 IN CURRITUCK COUNTY. WIDEN AND INTERSECTION IMPROVEMENTS.
10.9
DIV
H111228
T C 100 AT C 5366 C 5367 C 5367
A 0.15 SOUTH OF SR 1225 (LILLY ROAD) TO 0.25 MILES NORTH OF SR 1225 (LILLY ROAD). - UNDER CONSTRUCTION.DIVCAMDENCURRITUCK
SR 1227/SR 1208(SOUTH MILLS ROAD)SR 1224/SR 1223(OLD SWAMP ROAD)
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400S C 100BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
URBAN PROJECTS
UNDER CONSTRUCTION
U-4438 89924 89924US 17 BUSINESS (NORTH ROAD STREET) TO EAST OF PASQUOTANK RIVER IN ELIZABETH CITY. RECONSTRUCT ROADWAY AND REPLACE BRIDGE 690019.
0.6CAMDENPASQUOTANK
US 158
Page 4 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIVHSIP C 180 DIVHSIP R 30 REGHSIP C 180 REGHSIP R 40 SWHSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 5 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
INTERSTATE PROJECTSI-6027 5500BERTIE COUNTY LINE TO PERQUIMANS
COUNTY LINE. PAVEMENT REHABILITATION.
9.3
SW
NHPIM 2750C2750C
CHOWAN
US 17(FUTURE I-87)
RURAL PROJECTSR-5938 26010 10NC 37 (GLIDEN ROAD) TO VIRGINIA
STATE LINE. MODERNIZE ROADWAY.17.3
DIV
H090868T R 4000T U 2000T C 6667 C 6667 C 6666
CHOWANGATES
NC 32
Page 6 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400 S C 100 BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5507 6307 6307REPLACE BRIDGE 200024 OVER WARWICK CREEK, BRIDGE 200020 OVER DILLARD CREEK, AND BRIDGE 200021 OVER SAND RUN.
HF
CHOWANNC 32
MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 7 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 REG HSIP C 180 REG HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
RURAL PROJECTS
BUILD NC BOND AMOUNT $78.2M PAYBACK FROM 2025 - 2040.
R-2574 117663 3523EAST OF NC 34 (SHAWBORO ROAD) AT BELCROSS IN CAMDEN COUNTY TO US 158/NC 168 (CARATOKE HIGHWAY) IN CURRITUCK COUNTY. WIDEN TO MULTI-LANES.
10.6
REG
H090139
T 5865R R 5865 T 1760U T 67100CB CB 6710 CB 6710 CB 6710 CB 6710 CB 6710CAMDEN
CURRITUCK
US 158(SHORTCUT ROAD)
Page 8 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
RIGHT-OF-WAY IN PROGRESS.
R-5717 18381 2181NC 343 IN CAMDEN COUNTY TO NC 168 IN CURRITUCK COUNTY. WIDEN AND INTERSECTION IMPROVEMENTS.
10.9
DIV
H111228
T C 100 AT C 5366 C 5367 C 5367
A 0.15 SOUTH OF SR 1225 (LILLY ROAD) TO 0.25 MILES NORTH OF SR 1225 (LILLY ROAD). - UNDER CONSTRUCTION.DIVCAMDENCURRITUCK
SR 1227/SR 1208(SOUTH MILLS ROAD)SR 1224/SR 1223(OLD SWAMP ROAD)
DESIGN BUILD PROJECT - NORTH CAROLINA TURNPIKE AUTHORITY PROJECT - GARVEE BOND FUNDING $129 M; PAYBACK FY 2020-2034.
R-2576 491952 44244MID-CURRITUCK BRIDGE, COINJOCK TO COROLLA. NEW STRUCTURE OVER CURRITUCK SOUND AND UPGRADE APPROACHES.
7.3
DIV
H129515BGLT5 8235RGRG 1647 1647RG1647RG1647RG RG 1647 RG 1647 RG 1647 RG 1647 RG 1647 RG 1647S(M) R 3200 3200RBGLT5 U 1947BGLT5 46900CGCG 9380 9380CG9380CG9380CG CG 9380 CG 9380 CG 9380 CG 9380 CG 9380 CG 9380S(M) C 9110 9110C9110C9110CBOND R C 59379 59379C59379C59379C
CURRITUCKNEW ROUTE
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400S C 100BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5937 30100 30100REHABILITATE BRIDGE 260016 OVER CURRITUCK SOUND.
SWCURRITUCKUS 158
Page 9 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIVHSIP C 180 DIVHSIP R 30 REGHSIP C 180 REGHSIP R 40 SWHSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 10 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
RURAL PROJECTS
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
R-2544 98934 8333EAST OF SR 1153 (OLD FERRY LANDING ROAD) TO US 264. WIDEN TO MULTI-LANES.
11.7 T 315U AT 1175R AT 14700C AT 1401U BT 1350R BT 23300C BT 1860U CT 300R CT 46200C C
A EAST OF SR 1153 (OLD FERRY LANDING ROAD) TO WEST OF SR 1102 (EAST LAKE ROAD).H090124-AB WEST OF SR 1102 (EAST LAKE ROAD) TO EAST OF DARE COUNTY LANDFILL.H090124-BC EAST OF DARE COUNTY LANDFILL TO US 264.
DAREUS 64
Page 11 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
R-2545 615829 4242EAST OF COLUMBIA TO EAST OF THE ALLIGATOR RIVER. WIDEN TO MULTI-LANES.
15.9 T 1395U AAT 1825R AAT 24800C AAT 1611U ABT 2025R ABT 72500C ABT 503100C BT 3175R BT 1156U B
AA EAST OF COLUMBIA TO WEST OF SR 1229 (OLD US 64) AT ALLIGATOR RIVER.AB WEST OF SR 1229 (OLD US 64) AT ALLIGATOR RIVER TO WEST OF ALLIGATOR RIVER.B WEST OF ALLIGATOR RIVER TO EAST OF SR 1153 (OLD FERRY LANDING ROAD).
DARETYRRELL
US 64
R-3419 81860 1000US 64-NC 12 TO EASTERN END OF CURRITUCK SOUND BRIDGE. ACCESS MANAGEMENT IMPROVEMENTS.
17.3
SW
H090230T R 3000T U 2960T 56175CC 18725
DAREUS 158
R-4457 32412 188NC 12. IMPROVE INTERSECTION.
REG
H090284NHP U 500NHP R 3850 R 3850NHP 24024C
DAREUS 158
RIGHT-OF-WAY IN PROGRESS
R-5014 14225 2525DEAD END TO US 158 (CROATON HIGHWAY) IN KILL DEVIL HILLS. OPERATIONAL-SAFETY IMPROVEMENTS.
4.3
DIV
H129043
BG5200 C 5850 5850C
DARE
SR 1217(COLLINGTON ROAD)
Page 12 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400 S C 100 BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
UNDER CONSTRUCTION
R-5738 2594 2594SR 1210 (BOB PERRY ROAD) TO IVY LANE. UPGRADE FACILITY AND REPLACE BRIDGE 270040.
1
DIV
H112082DARE
SR 1208(WEST KITTY HAWKROAD)
BRIDGE PROJECTSB-2500 513209 513209REPLACE BRIDGE 270011 (HERBERT C.
BONNER BRIDGE) OVER OREGON INLET AND NC 12 IMPROVEMENTS.
2.7
TRN
AB PHASE II, SHORT-TERM IMPROVEMENTS AT PEA ISLAND. - COMPLETEDTRNB PHASE II, LONG-TERM IMPROVEMENTS AT RODANTHE. - UNDER CONSTRUCTIONTRN
DARENC 12
B-5610 1574 100REPLACE BRIDGE 270008 OVER CANAL.
REG
T 70R T 1404C DARE
NC 12
Page 13 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 14 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIVHSIP C 180 DIVHSIP R 30 REGHSIP C 180 REGHSIP R 40 SWHSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
IN PROGRESS
S-5502 212 212OUTER BANKS SCENIC BYWAY WAYSIDES AND INTERPRETIVE SIGNS.
TRN
CARTERETDAREHYDE
NC 12/US 70
RURAL PROJECTSR-5808 26410 800SR 1002 (ACORN HILL ROAD) TO
PASQUOTANK COUNTY LINE. MODERNIZE ROADWAY.
4
DIV
H150682NHP 2212R738RNHP 100UNHP 5640C C 5640 C 5640 C 5640
GATESUS 158
R-5938 26010 10NC 37 (GLIDEN ROAD) TO VIRGINIA STATE LINE. MODERNIZE ROADWAY.
17.3
DIV
H090868T R 4000T U 2000T C 6667 C 6667 C 6666
CHOWANGATES
NC 32
Page 15 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400S C 100BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 16 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIVHSIP C 180 DIVHSIP R 30 REGHSIP C 180 REGHSIP R 40 SWHSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
RURAL PROJECTS
INCLUDES B-5605
R-5796 12650 750PEACHTREE STREET TO NC 42. WIDEN TO MULTI-LANES.
1
REG
H150898
T 1034R R 1033 R 1033T 500UT C 8300HERTFORD
US 13/NC 42/NC 561(MEMORIAL DRIVE)
Page 17 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
BUILD NC BOND AMOUNT $32.7M FROM 2025 - 2040.
R-5311 90900 20809NC 11/NC 561 INTERSECTION NEAR AHOSKIE TO US 13/US 158/NC 45 INTERSECTION NEAR WINTON. WIDEN TO MULTI-LANES.
7.8H129676
T 5450R B R 5450 BT 1600U BT 28060CB BCB 2806 B CB 2806 B CB 2806 B CB 2806 B CB 2806 BT C 5167 B C 5167 B C 5167 B
A WEST OF MODLIN ROAD TO EAST OF NC 11/SR 1213 (OLD NC 11 ROAD). CONSTRUCT GRADE SEPARATION AT SR 1130 (MODLIN ROAD) AND INTERCHANGE AT OLD NC 11/SR 1213 (OLD NCROAD). - UNDER CONSTRUCTION
SW H129676-A
B NC 11/NC 561 INTERSECTION NEAR AHOSKIE TO US 13/US 158/NC 45 INTERSECTION NEAR WINTON.REG H129676-B
HERTFORDUS 13/NC 11
RIGHT-OF-WAY IN PROGRESS.
R-5811 4190 310NC 45 TO END OF STATE MAINTENANCE. MODERNIZE ROADWAY.
4.1
DIVH150846
T C 1940 1940CHERTFORDNC 461
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400S C 100BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5603 1575 1575REPLACE BRIDGE 450137 OVER MEHERRIN RIVER OVERFLOW.
DIV
HERTFORD
SR 1311(BOONE'S BRIDGE ROAD)
Page 18 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 19 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 REG HSIP C 180 REG HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
RURAL PROJECTS
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400 S C 100 BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5942 1210 1210REHABILITATE BRIDGE 470020 OVER INTRACOASTAL WATERWAY.
REGHYDEUS 264
Page 20 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 21 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIVHSIP C 180 DIVHSIP R 30 REGHSIP C 180 REGHSIP R 40 SWHSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
IN PROGRESS
S-5502 212 212OUTER BANKS SCENIC BYWAY WAYSIDES AND INTERPRETIVE SIGNS.
TRN
CARTERETDAREHYDE
NC 12/US 70
INTERSTATE PROJECTS
"A" BREAK DELETED - WORK WAS COMPLETED WITH CONTRACT RESURFACING.
I-6028 11125 10EDGECOMBE COUNTY LINE TO US 13/17 AND US 64 INTERCHANGE. PAVEMENT REHABILITATION.
18.56
SW
NHPIM C 5873 BNHPIM C 5242 C
B US 64 ALTERNATE TO NC 125.SWC NC 125 TO US 13/17 AND US 64 INTERCHANGE.SW
MARTIN
US 13/US 64(FUTURE I-87)
RURAL PROJECTSR-5879 2010 10MAIN STREET IN WILLIAMSTON.
IMPROVE INTERSECTION.
REG
H170812NHP R 300NHP U 100NHP C 1600
MARTINUS 13/US 17
Page 22 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
R-5810 9700 500SR 1119 (RALPH TAYLOR ROAD) TO SR 1205 (HOLLY CREEK ROAD). ACCESS MANAGEMENT.
2.4
DIV
H150836T 700R700RT 250U250UT C 2433 C 2433 C 2434
MARTINUS 17
RIGHT-OF-WAY IN PROGRESS
R-2511 85097 12597 WASHINGTON BYPASS NORTH OF NC 171 TO MULTI-LANES SOUTH OF
WILLIAMSTON. WIDEN TO MULTI-LANES.
10
DIV
H090102T R 8000T U 2200T 15575C15575C15575C C 15575
BEAUFORTMARTIN
US 17
UNDER CONSTRUCTION
R-3826 17607 17607SR 1182 (EAST COLLEGE ROAD) TO NC 125 NORTHWEST OF WILLIAMSTON. TWO LANES, PART ON NEW LOCATION.
2.5
REG
H129108MARTINNC 125
RIGHT-OF-WAY IN PROGRESS.
R-4705 32800 6000NC 903 TO SR 1182 (EAST COLLEGE ROAD). UPGRADE FACILITY.
9.6
DIV
H090289
BGLT5 C 8933 C 8933 C 8934
MARTIN
SR 1142(PRISON CAMPROAD)
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400S C 100BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 23 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5503 2195 2195REPLACE BRIDGE 570053 OVER COLLIE SWAMP.
DIVMARTIN
SR 1142(PRISON CAMP ROAD)
MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIVHSIP C 180 DIVHSIP R 30 REGHSIP C 180 REGHSIP R 40 SWHSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 24 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
INTERSTATE PROJECTSI-5931 9301 1HALIFAX COUNTY LINE (MILE MARKER
173.9) TO THE VIRGINIA STATE LINE (MILE MARKER 181.4). PAVEMENT REHABILITATION.
7.5
SW
NHPIM C 4650 C 4650NORTHAMPTONI-95
UNDER CONSTRUCTION
I-5839 19321 19321CHOCKOYOTTE CREEK (MILE MARKER 172) TO VIRGINIA STATE LINE (MILE MARKER 181.4). PAVEMENT REHABILITATION.
9.4
SW
NORTHAMPTONI-95
RURAL PROJECTSR-2582 234836 89281I-95/NC 46 IN ROANOKE RAPIDS TO SR
1333 (MT. CARMEL CHURCH ROAD) EASTOF JACKSON. WIDEN TO MULTI-LANES WITH BYPASS OF JACKSON, SOME NEW LOCATION.
15.2 T 1640PE APE 328 A 328PE A328PE A328PE A PE 328 A PE 328 A PE 328 A PE 328 A PE 328 A PE 328 AT 1285RB ARB 257 A 257RB A257RB A257RB A RB 257 A RB 257 A RB 257 A RB 257 A RB 257 A RB 257 AT 6860CB ACB 1372 A 1372CB A1372CB A1372CB A CB 1372 A CB 1372 A CB 1372 A CB 1372 A CB 1372 A CB 1372 AT C 2320 A 15693C A15694C A15693C AT 5400R BT 61400C B
A I-95/NC 46 IN ROANOKE RAPIDS TO SR 1312 (ST. JOHN CHURCH ROAD) IN NORTHAMPTON COUNTY. - RIGHT-OF-WAY IN PROGRESS - BUILD NC BOND FUNDING: $16M FOR CONSTRUCTIONPAYBACK 2019 - 2033, $3M FOR RIGHT-OF-WAY PAYBACK 2020-2034, $3,831,436 FOR PE PAYBACK 2020 - 2034.
DIV H129113-A
B SR 1312 (ST. JOHN CHURCH ROAD) TO SR 1333 (MT. CARMEL CHURCH ROAD) EAST OF JACKSON.
NORTHAMPTONUS 158/NC 46
R-5739 9873 1185NC 48 IN GASTON TO THE VIRGINIA STATE LINE. UPGRADE AND WIDEN EXISTING FACILITY.
10.5
DIV
H141680T R 100T 4294C4294CNORTHAMPTON
NC 46
Page 25 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
BUILD NC BOND FUNDING $32.7M FOR CONSTRUCTION PAYBACK FY 2021-2035
R-5757 43528 1338SEABOARD TOWN LIMITS TO HERTFORD COUNTY LINE. UPGRADE ROADWAY.
24.6
DIV
H141684T R 100T 16836CB2806CB2806CB2806CB CB 2806 CB 2806 CB 2806 CB 2806 CB 2806 CB 2806NORTHAMPTON
NC 305
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400S C 100BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
BRIDGE PROJECTS
OTHER FUNDS REPRESENT FEDERAL BUILD GRANT FUNDING. RIGHT-OF-WAY IN PROGRESS.
BR-0118 600 40REPLACE BRIDGE NO. 650093 OVER JACKS SWAMP ON SR 1203 (JACKS SWAMP ROAD).
DIV
O R 60O C 250 250C
NORTHAMPTON
SR 1203(JACKS SWAMP ROAD)
OTHER FUNDS REPRESENT FEDERAL BUILD GRANT FUNDING. RIGHT-OF-WAY IN PROGRESS.
BR-0117 900 80REPLACE BRIDGE NO. 650052 OVER GUMBERRY SWAMP ON SR 1313 (HARGRAVES ROAD).
DIV
O R 20O C 400 400C
NORTHAMPTON
SR 1313(HARGRAVES ROAD)
Page 26 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 27 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 REG HSIP C 180 REG HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
INTERSTATE PROJECTS
GARVEE BOND FUNDING $9M; PAYBACK FY 2020 - 2034 FOR CONSTRUCTION
I-6029 17590 10PERQUIMANS COUNTY LINE TO NORTH END OF US 17 (ELIZABETH CITY) BYPASS. PAVEMENT REHABILITATION.
10.1
SW
NHPIM 3860CGCG 772 772CG772CG772CG CG 772 CG 772 CG 772 CG 772 CG 772 CG 772S(M) C 3000 3000C
PASQUOTANK
US 17(FUTURE I-87)
RURAL PROJECTS
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400 S C 100 BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 28 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029URBAN PROJECTS
U-5940 21643 2000SR 1308 (CHURCH STREET) TO US 17 BUSINESS (NORTH ROAD STREET). ACCESS MANAGEMENT.
1.5
REG
H150685
T 4546R1515R T 1108U370U T 3026C C 3026 C 3026 C 3026
PASQUOTANK
US 17(HUGHESBOULEVARD)
U-5939 2028 500SR 1145 (OAK STUMP ROAD). IMPROVE INTERSECTION.
1
REG
H150618T R 240 T U 40 T 624C624C
PASQUOTANKUS 17 BUSINESS
UNDER CONSTRUCTION
U-4438 89924 89924US 17 BUSINESS (NORTH ROAD STREET) TO EAST OF PASQUOTANK RIVER IN ELIZABETH CITY. RECONSTRUCT ROADWAY AND REPLACE BRIDGE 690019.
0.6CAMDENPASQUOTANK
US 158
UTILITY RELOCATION IN PROGRESS
U-5942 3140 540ELIZABETH CITY SIGNAL SYSTEM. 14.1
REGH150687
BG5200 C 2600 PASQUOTANKELIZABETH CITY
BRIDGE PROJECTS
MUNICIPAL BRIDGE
B-6053 600REPLACE BRIDGE 690034 OVER KNOBBS CREEK TRIBUTARY IN ELIZABETH CITY.
DIV
BGOFF R 40 L R 10 BGOFF U 40 L U 10 BGOFF C 400 L C 100
PASQUOTANKPROVIDENCE ROAD
Page 29 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIVHSIP C 180 DIVHSIP R 30 REGHSIP C 180 REGHSIP R 40 SWHSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 30 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
INTERSTATE PROJECTSI-6030 5000SR 1101 (EAST BEAR SWAMP ROAD) TO
US 17 BUSINESS. PAVEMENT REHABILITATION.
5.76
SW
NHPIM 2500C2500C
PERQUIMANS
US 17(FUTURE I-87)
RURAL PROJECTSR-5869 200110 10SOUTH OF US 17 BUSINESS (EDENTON
ROAD) TO NORTH OF SR 1220 (WIGGINS ROAD). UPGRADE ROADWAY AND CONVERT INTERSECTIONS TO INTERCHANGES.
6 NHP R 3000 A R 3000 ANHP U 450 A U 450 ANHP 15000C AC 7500 A C 7500 ANHP R 1700 B R 1700 BNHP U 500 BNHP 9900C BC 4950 B C 4950 BNHP 3500R CNHP 1000U CNHP 135000C C
A SR 1336 (HARVEY POINT ROAD) AND SR 1338 (WAYNE FORK ROAD). CONVERT AT-GRADE INTERSECTION TO AN INTERCHANGE. - FORMERLY IDENTIFIED AS R-4459DIV H090286B SR 1300 (NEW HOPE ROAD). CONVERT AT-GRADE INTERSECTION TO INTERCHANGE. - FORMERLY IDENTIFIED AS R-4458DIV H090285C SOUTH OF US 17 BUSINESS (EDENTON ROAD) TO NORTH OF SR 1220 (WIGGINS ROAD). UPGRADE ROADWAY. - PROGRAMMED FOR PLANNING & ENVIRIONMENTAL STUDY ONLY.
PERQUIMANSUS 17
UNDER CONSTRUCTION
R-5716 2445 2445SR 1302 (UNION HALL ROAD) TO SR 1303 (WOODLAND CHURCH ROAD). WIDEN AND RESURFACE.
1.5
DIV
H141222PERQUIMANS
SR 1300(NEW HOPE ROAD)
Page 31 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
RIGHT-OF-WAY IN PROGRESS. BUILD NC BONDS: $4 MILLION FOR CONSTRUCTION - PAYBACK 2020-2034; $680,881 FOR PE - PAYBACK 2020-2034.
R-5740 9307 1492SR 1331 (RED BANK ROAD) TO SR 1300 (NEW HOPE ROAD). UPGRADE ROADWAY.
4.4
DIV
H141218
T 290PEPE 58 58PE58PE58PE PE 58 PE 58 PE 58 PE 58 PE 58 PE 58T 1715CBCB 343 343CB343CB343CB CB 343 CB 343 CB 343 CB 343 CB 343 CB 343T C 1800PERQUIMANS
SR 1329(WOODVILLE ROAD)
R-5806 6195 185US 17 TO SR 1350 (CHURCHES LANE). MODERNIZE ROADWAY.
6.1
DIV
H150680
T C 3005 3005C
PERQUIMANS
SR 1336(HARVEY POINTROAD)
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400S C 100BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
R-5939 8010 10WOODLAND CHURCH ROAD TO WOODVILLE ROAD (SR 1329). MODERNIZE ROADWAY.
4.4
DIV
H150642
T U 700T R 1300T C 2000 C 2000 C 2000PERQUIMANS
SR 1300(NEW HOPE ROAD)
BRIDGE PROJECTS
UNDER CONSTRUCTION - DESIGN BUILD PROJECT
R-4467 53727 37627EAST OF PERQUIMANS RIVER BRIDGE TO NC 37 IN HERTFORD. REPLACE BRIDGE 710008.
0.4
REG
T C 16100
PERQUIMANS
US 17 BUSINESS/NC 37
Page 32 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5606 2150 2150REPLACE BRIDGE 710011 OVER RACOON CREEK.
DIVPERQUIMANS
SR 1338(WYNNE FORK ROAD)
MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HIGHWAY SAFETY PROJECTS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIVHSIP C 180 DIVHSIP R 30 REGHSIP C 180 REGHSIP R 40 SWHSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 33 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
RURAL PROJECTSR-5940 18910 10COLUMBIA TO ALLIGATOR RIVER
BRIDGE. MODERNIZE ROADWAY.14.3
DIV
H171802NHP R 2400NHP U 300NHP C 5400 C 5400 C 5400
TYRRELLUS 64
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
R-2545 615829 4242EAST OF COLUMBIA TO EAST OF THE ALLIGATOR RIVER. WIDEN TO MULTI-LANES.
15.9 T 1395U AAT 1825R AAT 24800C AAT 1611U ABT 2025R ABT 72500C ABT 503100C BT 3175R BT 1156U B
AA EAST OF COLUMBIA TO WEST OF SR 1229 (OLD US 64) AT ALLIGATOR RIVER.AB WEST OF SR 1229 (OLD US 64) AT ALLIGATOR RIVER TO WEST OF ALLIGATOR RIVER.B WEST OF ALLIGATOR RIVER TO EAST OF SR 1153 (OLD FERRY LANDING ROAD).
DARETYRRELL
US 64
Page 34 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400S C 100BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 35 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 REG HSIP C 180 REG HSIP R 40 SW HSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
RURAL PROJECTSR-5937 11210 10SR 1100 (LONG RIDGE ROAD) TO NC 32
SOUTH. MODERNIZE ROADWAY.2.1
DIV
H170944
T R 2300 T U 300 T C 2867 C 2867 C 2866WASHINGTON
SR 1106(MORATTOCK ROAD)
Page 36 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029RURAL PROJECTS
R-5936 10610 10SR 1128 (A CANAL ROAD) TO SR 1183 (SHORE DRIVE). MODERNIZE ROADWAY.
4.2
DIV
H150702
T R 200 T U 100 T C 3434 C 3433 C 3433
WASHINGTON
SR 1126(ROPER NEWLAND ROAD)
UNDER CONSTRUCTION; "S" FUNDS REFLECT STATE HIGHWAY FUNDS
R-5781 4355 3855DIVISION 1 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.
DIV
TA C 400 S C 100 BERTIE
CAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 22095 22095ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 37 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029HIGHWAY SAFETY PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 695 695DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
IN PROGRESS
W-5701 1670 970SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 1.
HSIP R 30 DIVHSIP C 180 DIVHSIP R 30 REGHSIP C 180 REGHSIP R 40 SWHSIP C 240 SW
DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
Page 38 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
NON-HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029FERRY PROJECTS
F-5703 11600 6250REPLACEMENT VESSEL (SUPPORT FLEET) FOR TUGS AND BARGES
DIV
F130001T C 3250 AT C 2100 B
A Z-DRIVE TOWING AND PUSHING TUG - UNDER CONSTRUCTIONDIV F130001B TWO SUPPORT/ANCHOR TUGS, ONE SUPPORT TUG, THREE BARGES - UNDER CONSTRUCTIONDIV F130001
BEAUFORTBERTIEBRUNSWICKCAMDENCARTERETCHOWANCRAVENCURRITUCKDAREDUPLINGATESGREENEHERTFORDHYDEJONESLENOIRMARTINNEW HANOVERNORTHAMPTONONSLOWPAMLICOPASQUOTANKPENDERPERQUIMANSPITTSAMPSONTYRRELLWASHINGTON
VARIOUS
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6180 1513 1513CAPITAL
SD
FNULS
BERTIEHALIFAXHERTFORDNORTHAMPTON
CHOANOKE PUBLIC TRANSPORTATION AUTHORITY
Page 39 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
NON-HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6119 6504 4532ADMINISTRATION
SD
FNU AD 394 394AD394AD394ADL AD 74 74AD74AD74ADS AD 25 25AD25AD25AD
BERTIEHALIFAXHERTFORDNORTHAMPTON
CHOANOKE PUBLIC TRANSPORTATION AUTHORITY
FUNDS AUTHORIZED IN PROGRESS
TI-6104 28273 19025INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
SD
FNU O 1156 1156O1156O1156OL O 1156 1156O1156O1156OBEAUFORT
BERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
PASSENGER RAIL PROJECTS
DP FUNDS ARE FROM TIGER GRANT, OTHER FUNDS ARE FROM NCVA PRIVATE FUNDS
P-5600 9200 9200NORTH CAROLINA VIRGINIA RAILROAD. UPGRADE EXISTING RAILROAD TRACK.
TRN
A TRACK IMPROVEMENTS. - UNDER CONSTRUCTIONTRNB STRUCTURES REHABILITATION. - UNDER CONSTRUCTIONTRN
BERTIEHERTFORDNORTHAMPTON
NCVA RR
Page 40 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
NON-HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029FERRY PROJECTS
F-5703 11600 6250REPLACEMENT VESSEL (SUPPORT FLEET) FOR TUGS AND BARGES
DIV
F130001T C 3250 AT C 2100 B
A Z-DRIVE TOWING AND PUSHING TUG - UNDER CONSTRUCTIONDIV F130001B TWO SUPPORT/ANCHOR TUGS, ONE SUPPORT TUG, THREE BARGES - UNDER CONSTRUCTIONDIV F130001
BEAUFORTBERTIEBRUNSWICKCAMDENCARTERETCHOWANCRAVENCURRITUCKDAREDUPLINGATESGREENEHERTFORDHYDEJONESLENOIRMARTINNEW HANOVERNORTHAMPTONONSLOWPAMLICOPASQUOTANKPENDERPERQUIMANSPITTSAMPSONTYRRELLWASHINGTON
VARIOUS
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6142 1586 1586CAPITAL
SD
FNULS
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
Page 41 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
NON-HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TK-6104 5866 4210ADMINISTRATION
SD
FNU AD 331 331AD331AD331ADL AD 62 62AD62AD62ADS AD 21 21AD21AD21AD
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
TM-6127 196 196OPERATING ASSISTANCE
SD
JARCL
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
FUNDS AUTHORIZED IN PROGRESS
TQ-6809 460 460Operating
SD
FEPDL
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
TQ-6116 1876 1876OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS
SD
FEPD
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
Page 42 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
NON-HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029PUBLIC TRANSPORTATION PROJECTS
TQ-6796 180 180OPERATING
SD
FEPD
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
FERRY PROJECTSF-5703 11600 6250REPLACEMENT VESSEL (SUPPORT
FLEET) FOR TUGS AND BARGES
DIV
F130001T C 3250 AT C 2100 B
A Z-DRIVE TOWING AND PUSHING TUG - UNDER CONSTRUCTIONDIV F130001B TWO SUPPORT/ANCHOR TUGS, ONE SUPPORT TUG, THREE BARGES - UNDER CONSTRUCTIONDIV F130001
BEAUFORTBERTIEBRUNSWICKCAMDENCARTERETCHOWANCRAVENCURRITUCKDAREDUPLINGATESGREENEHERTFORDHYDEJONESLENOIRMARTINNEW HANOVERNORTHAMPTONONSLOWPAMLICOPASQUOTANKPENDERPERQUIMANSPITTSAMPSONTYRRELLWASHINGTON
VARIOUS
Page 43 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
NON-HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6142 1586 1586CAPITAL
SD
FNU L S
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
FUNDS AUTHORIZED IN PROGRESS
TK-6104 5866 4210ADMINISTRATION
SD
FNU AD 331 331AD331AD331AD L AD 62 62AD62AD62AD S AD 21 21AD21AD21AD
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
TM-6127 196 196OPERATING ASSISTANCE
SD
JARC L
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
TQ-6116 1876 1876OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS
SD
FEPD
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
Page 44 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
NON-HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TQ-6809 460 460Operating
SD
FEPD L
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
TQ-6796 180 180OPERATING
SD
FEPD
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH SERVICE
FUNDS AUTHORIZED IN PROGRESS
TI-6104 28273 19025INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
SD
FNU O 1156 1156O1156O1156O L O 1156 1156O1156O1156O BEAUFORT
BERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
Page 45 of 69 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLEDIV - Division Category EX - Exempt Category SD - State Dollars (Non-STI)HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
-
NON-HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTY
IDLOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOSTLENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS
UNFUNDED
FUTURE YEARSFY 2020 FY 2022FY 2021 FY 2023
DELIVERABLE PROGRAM DEVELOPMENTAL PROGRAM
FY 2024 FY 2025 FY 2026 FY 2027 FY 2028(Miles) FY 2029FERRY PROJECTS
F-5703 11600 6250REPLACEMENT VESSEL (SUPPORT FLEET) FOR TUGS AND BARGES
DIV
F130001T C 3250 A T C 2100 B
A Z-DRIVE TOWING AND PUSHING TUG - UNDER CONSTRUCTIONDIV F130001B TWO SUPPORT/ANCHOR TUGS, ONE SUPPORT TUG, THREE BARGES - UNDER CONSTRUCTIONDIV F130001
BEAUFORTBERTIEBRUNSWICKCAMDENCARTERETCHOWANCRAVENCURRITUCKDAREDUPLINGATESGREENEHERTFORDHYDEJONESLENOIRMARTINNEW HANOVERNORTHAMPTONONSLOWPAMLICOPASQUOTANKPENDERPERQUIMANSPITTSAMPSONTYRRELLWASHINGTON
VARIOUS
PUBLIC TRANSPORTATION PROJECTS
FUNDS AUTHORIZED IN PROGRESS
TA-6142 1586 1586CAPITAL
SD
FNU L S
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONAL HEALTH S