Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4" Page 1 of 216 STIP Agency Dist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status Length (SLM) Ph Subph SFY SAC Fund Type Billing Code Obligation Group ALI - Qty XXX STIP Phase Estimate Total Phase Encumbered STIP Phase Total Project Total STIP Reference (New) FHWA 1 80441 LACRPC ALL ALL Lima RR Grade Separation Description: Improvements include a railroad grade separation of the Indiana & Ohio railway crossing at Elm St. Additional improvements include 0.70 miles of pavement reconstruction at the intersection of Elm St. and Bellefontaine Ave and the addition of a storm sewe Work Type: Railroad Grade Separation Termini: Bellefontaine Ave. to North St. along the Indiana & Ohio Railway Lima, City of Air Quality Exempt 0.23 CO CO Contr CO Contr CO Contr CO Contr CO Contr CO Contr CO Contr CO Contr CO Engr CO Engr Oth Remb RR Remb 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 4B37 4BD7 4BK7 4HJ7 4R47 4TA7 4TB7 LNT 4B37 LNT LNT LNT Federal State Federal Federal Federal Federal Federal Local Match Federal Local Match Local Match Local Match Z302 002 Z001 ZS30 LY10 Z231 Z400 LNTP Z302 LNTP LNTP LNTP Not Grouped State Funds (002) Not Grouped Not Grouped Earmarks / High Priority Not Grouped Not Grouped Local Match Not Grouped Local Match Local Match Local Match $599,180 $800,000 $3,200,000 $2,500,000 $370,832 $1,014,000 $1,414,800 $1,170,485 $41,943 $732,909 $9,391 $84,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $11,937,539 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 $17,354,104 2018AM02ID0035FDCO 2018AM02ID0035FDCO 2018AM02ID0035FDCO 2018AM02ID0035FDCO 2018AM02ID0035FDCO 2018AM02ID0035FDCO 2018AM02ID0035FDCO 2018AM02ID0035FDCO 2018AM02ID0035FDCO 2018AM02ID0035FDCO 2018AM02ID0035FDCO 2018AM02ID0035FDCO Ph subtotal: $11,937,539 $0 $11,937,539 $17,354,104 RW Utl Remb Utl Remb 2018 2018 4BD7 4BK7 State Federal 002 M001 State Funds (002) National Hwy Performance P $20,000 $80,000 $1,304,364 $1,304,364 $1,404,364 $1,404,364 $14,300,275 $14,300,275 2018stipID0002FDRW 2018stipID0002FDRW Ph subtotal: $100,000 $1,304,364 $1,404,364 $14,300,275 87188 LACRPC ALL ALL SR 65/81 8.02/11.34 Description: SR 65: Grind and resurface with asphalt concrete from Grand Avenue to SR115. Install curb & gutter, sidewalks and new storm sewer from Northern Avenue to Jacobs Avenue. PID 92396 used to conduct PE. SR81: Grind and resurface with asphalt concrete. Work Type: Resurfacing, Undivided System Termini: SR65:From Grand Ave. in Lima to SR115. SR81: From Wapak Rd. to Eastown Rd. ODOT SPONSORING AGENCY Air Quality Exempt 5.35 CO CO Contr CO Contr CO Contr CO Contr CO Contr CO Contr CO Contr CO Engr CO Engr CO Engr CO Engr CO Engr 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 4BG 4PF7 4PF7 4PF7 4PS7 4TA7 4TB7 LAB LAB LAB LAB LAB Local Match Federal Federal Federal State Federal Federal Federal Federal Federal Local Match State 002 M001 Z001 Z231 002 M001 Z400 M001 Z231 Z400 002 002 Local Match National Hwy Performance P National Hwy Performance P STBG State Funds (002) National Hwy Performance P CMAQ National Hwy Performance P STBG CMAQ Labor - Local Match Labor - State Match $78,491 $1,862,129 $7,670 $343,469 $474,826 $589,367 $247,967 $97,120 $10,304 $16,495 $2,355 $15,721 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $3,745,913 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 $4,852,145 2018stipID0003FDCO 2018stipID0003FDCO 2018stipID0003FDCO 2018stipID0003FDCO 2018stipID0003FDCO 2018stipID0003FDCO 2018stipID0003FDCO 2018stipID0003FDCO 2018stipID0003FDCO 2018stipID0003FDCO 2018stipID0003FDCO 2018stipID0003FDCO Ph subtotal: $3,745,913 $0 $3,745,913 $4,852,145 RW Utl Remb Utl Remb 2019 2019 4PF7 4PS7 Federal State M001 002 National Hwy Performance P State Funds (002) $40,000 $10,000 $564,618 $564,618 $614,618 $614,618 $4,852,145 $4,852,145 2018stipID0003FDRW 2018stipID0003FDRW Ph subtotal: $50,000 $564,618 $614,618 $4,852,145 90849 LACRPC ALL ALL SR 309 0.00 Description: Part 1 of 2. Resurface the roadway with asphalt concrete. Replace the existing curb and gutter in the Village of Elida. From Pioneer Road to 0.2 miles west of Eastown Road - widen the roadway to meet design standards (5 - 12' lanes), install new curb a Work Type: Mill and Fill Termini: On SR309 from US30 to 0.2 miles west of Eastown Road ODOT SPONSORING AGENCY Air Quality Exempt 8.96 RW Utl Remb 2018 4PS7 State 002 State Funds (002) $100,000 $1,179,076 $1,279,076 $12,022,680 2018stipID0004FDRW Ph subtotal: $100,000 $1,179,076 $1,279,076 $12,022,680 90949 LACRPC ALL ALL Lima Wayne/High Streets Description: Modify High Street to a one-way, two lane operation between Metcalf Street and Central Avenue. Convert Wayne Street to a two-way operation between Cole Street and Central Avenue. Includes resurfacing, curb & gutter, replacing sidewalk as needed, new sign Work Type: Section Improvement Termini: High Street from Metcalf Street to Central Avenue AND Wayne Street from Cole Street to Central Avenue. Lima, City of Air Quality Exempt 1.87 CO CO Contr CO Engr Oth Remb 2019 2019 2019 LNT LNT LNT Local Match Local Match Local Match LNTP LNTP LNTP Local Match Local Match Local Match $3,091,730 $216,421 $4,864 $0 $0 $0 $3,313,015 $3,313,015 $3,313,015 $3,512,117 $3,512,117 $3,512,117 2018stipID0005FDCO 2018stipID0005FDCO 2018stipID0005FDCO Ph subtotal: $3,313,015 $0 $3,313,015 $3,512,117

Upload: dinhnhu

Post on 20-Apr-2018

227 views

Category:

Documents


2 download

TRANSCRIPT

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 1 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    FHWA 1 80441 LACRPC ALL ALL Lima RR Grade

    Separation

    Description: Improvements include a railroad

    grade separation of the Indiana & Ohio railway

    crossing at Elm St. Additional improvements

    include 0.70 miles of pavement reconstruction at

    the intersection of Elm St. and Bellefontaine Ave.

    and the addition of a storm sewe Work Type:

    Railroad Grade Separation Termini:

    Bellefontaine Ave. to North St. along the Indiana

    & Ohio Railway

    Lima, City of Air Quality Exempt 0.23 CO CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Engr

    CO Engr

    Oth Remb

    RR Remb

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    4B37

    4BD7

    4BK7

    4HJ7

    4R47

    4TA7

    4TB7

    LNT

    4B37

    LNT

    LNT

    LNT

    Federal

    State

    Federal

    Federal

    Federal

    Federal

    Federal

    Local Match

    Federal

    Local Match

    Local Match

    Local Match

    Z302

    002

    Z001

    ZS30

    LY10

    Z231

    Z400

    LNTP

    Z302

    LNTP

    LNTP

    LNTP

    Not Grouped

    State Funds (002)

    Not Grouped

    Not Grouped

    Earmarks / High Priority

    Not Grouped

    Not Grouped

    Local Match

    Not Grouped

    Local Match

    Local Match

    Local Match

    $599,180

    $800,000

    $3,200,000

    $2,500,000

    $370,832

    $1,014,000

    $1,414,800

    $1,170,485

    $41,943

    $732,909

    $9,391

    $84,000

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $11,937,539

    $11,937,539

    $11,937,539

    $11,937,539

    $11,937,539

    $11,937,539

    $11,937,539

    $11,937,539

    $11,937,539

    $11,937,539

    $11,937,539

    $11,937,539

    $17,354,104

    $17,354,104

    $17,354,104

    $17,354,104

    $17,354,104

    $17,354,104

    $17,354,104

    $17,354,104

    $17,354,104

    $17,354,104

    $17,354,104

    $17,354,104

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    2018AM02ID0035FDCO

    Ph subtotal: $11,937,539 $0 $11,937,539 $17,354,104

    RW Utl Remb

    Utl Remb

    2018

    2018

    4BD7

    4BK7

    State

    Federal

    002

    M001

    State Funds (002)

    National Hwy Performance P

    $20,000

    $80,000

    $1,304,364

    $1,304,364

    $1,404,364

    $1,404,364

    $14,300,275

    $14,300,275

    2018stipID0002FDRW

    2018stipID0002FDRW

    Ph subtotal: $100,000 $1,304,364 $1,404,364 $14,300,275

    87188 LACRPC ALL ALL SR 65/81 8.02/11.34 Description: SR 65: Grind and resurface with

    asphalt concrete from Grand Avenue to SR115.

    Install curb & gutter, sidewalks and new storm

    sewer from Northern Avenue to Jacobs Avenue.

    PID 92396 used to conduct PE. SR81: Grind

    and resurface with asphalt concrete. Work

    Type: Resurfacing, Undivided System

    Termini: SR65:From Grand Ave. in Lima to

    SR115. SR81: From Wapak Rd. to Eastown

    Rd.

    ODOT SPONSORING

    AGENCY

    Air Quality Exempt 5.35 CO CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Engr

    CO Engr

    CO Engr

    CO Engr

    CO Engr

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    2018

    4BG

    4PF7

    4PF7

    4PF7

    4PS7

    4TA7

    4TB7

    LAB

    LAB

    LAB

    LAB

    LAB

    Local Match

    Federal

    Federal

    Federal

    State

    Federal

    Federal

    Federal

    Federal

    Federal

    Local Match

    State

    002

    M001

    Z001

    Z231

    002

    M001

    Z400

    M001

    Z231

    Z400

    002

    002

    Local Match

    National Hwy Performance P

    National Hwy Performance P

    STBG

    State Funds (002)

    National Hwy Performance P

    CMAQ

    National Hwy Performance P

    STBG

    CMAQ

    Labor - Local Match

    Labor - State Match

    $78,491

    $1,862,129

    $7,670

    $343,469

    $474,826

    $589,367

    $247,967

    $97,120

    $10,304

    $16,495

    $2,355

    $15,721

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $3,745,913

    $3,745,913

    $3,745,913

    $3,745,913

    $3,745,913

    $3,745,913

    $3,745,913

    $3,745,913

    $3,745,913

    $3,745,913

    $3,745,913

    $3,745,913

    $4,852,145

    $4,852,145

    $4,852,145

    $4,852,145

    $4,852,145

    $4,852,145

    $4,852,145

    $4,852,145

    $4,852,145

    $4,852,145

    $4,852,145

    $4,852,145

    2018stipID0003FDCO

    2018stipID0003FDCO

    2018stipID0003FDCO

    2018stipID0003FDCO

    2018stipID0003FDCO

    2018stipID0003FDCO

    2018stipID0003FDCO

    2018stipID0003FDCO

    2018stipID0003FDCO

    2018stipID0003FDCO

    2018stipID0003FDCO

    2018stipID0003FDCO

    Ph subtotal: $3,745,913 $0 $3,745,913 $4,852,145

    RW Utl Remb

    Utl Remb

    2019

    2019

    4PF7

    4PS7

    Federal

    State

    M001

    002

    National Hwy Performance P

    State Funds (002)

    $40,000

    $10,000

    $564,618

    $564,618

    $614,618

    $614,618

    $4,852,145

    $4,852,145

    2018stipID0003FDRW

    2018stipID0003FDRW

    Ph subtotal: $50,000 $564,618 $614,618 $4,852,145

    90849 LACRPC ALL ALL SR 309 0.00 Description: Part 1 of 2. Resurface the roadway

    with asphalt concrete. Replace the existing curb

    and gutter in the Village of Elida. From Pioneer

    Road to 0.2 miles west of Eastown Road - widen

    the roadway to meet design standards (5 - 12'

    lanes), install new curb a Work Type: Mill and

    Fill Termini: On SR309 from US30 to 0.2 miles

    west of Eastown Road

    ODOT SPONSORING

    AGENCY

    Air Quality Exempt 8.96 RW Utl Remb 2018 4PS7 State 002 State Funds (002) $100,000 $1,179,076 $1,279,076 $12,022,680 2018stipID0004FDRW

    Ph subtotal: $100,000 $1,179,076 $1,279,076 $12,022,680

    90949 LACRPC ALL ALL Lima Wayne/High

    Streets

    Description: Modify High Street to a one-way,

    two lane operation between Metcalf Street and

    Central Avenue. Convert Wayne Street to a

    two-way operation between Cole Street and

    Central Avenue. Includes resurfacing, curb &

    gutter, replacing sidewalk as needed, new sign

    Work Type: Section Improvement Termini:

    High Street from Metcalf Street to Central

    Avenue AND Wayne Street from Cole Street to

    Central Avenue.

    Lima, City of Air Quality Exempt 1.87 CO CO Contr

    CO Engr

    Oth Remb

    2019

    2019

    2019

    LNT

    LNT

    LNT

    Local Match

    Local Match

    Local Match

    LNTP

    LNTP

    LNTP

    Local Match

    Local Match

    Local Match

    $3,091,730

    $216,421

    $4,864

    $0

    $0

    $0

    $3,313,015

    $3,313,015

    $3,313,015

    $3,512,117

    $3,512,117

    $3,512,117

    2018stipID0005FDCO

    2018stipID0005FDCO

    2018stipID0005FDCO

    Ph subtotal: $3,313,015 $0 $3,313,015 $3,512,117

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 2 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    FHWA 1 95503 LACRPC ALL ALL Elida Road Description: Plane and pave with 1.5" of asphalt

    concrete, including concrete joint repairs.

    Work Type: Resurfacing, Undivided System

    Termini: On Elida Road, from the East

    corporation limit of Delphos to Jct. Baugh Road.

    ALLEN COUNTY ENGINEER Air Quality Exempt 2.17 CO CO Contr

    CO Contr

    CO Contr

    CO Engr

    2018

    2018

    2018

    2018

    4BG

    4TA7

    4TA7

    LAB

    Local Match

    Federal

    Federal

    Local Match

    002

    M231

    M232

    002

    Local Match

    STBG

    STBG

    Labor - Local Match

    $175,754

    $184,380

    $517,866

    $35,120

    $0

    $0

    $0

    $0

    $913,120

    $913,120

    $913,120

    $913,120

    $923,557

    $923,557

    $923,557

    $923,557

    2018stipID0006FDCO

    2018stipID0006FDCO

    2018stipID0006FDCO

    2018stipID0006FDCO

    Ph subtotal: $913,120 $0 $913,120 $923,557

    99963 LACRPC ALL ALL LACRPC SFY18 RTP Description: LACRPC SFY 2018 Regional

    Transportation Planning Program Supplemental

    Funds. Work Type: Planning & Research

    Termini: 0

    LIMA (TCC) Air Quality Exempt SPR Planning 2018 4TD7 Federal M240 STBG $150,000 $0 $150,000 $150,000 2018stipID0007FDSPR

    Ph subtotal: $150,000 $0 $150,000 $150,000

    99964 LACRPC ALL ALL LACRPC SFY19 RTP Description: LACRPC SFY 2019 Regional

    Transportation Planning Program Supplemental

    Funds Work Type: Planning & Research

    Termini: 0

    LIMA (TCC) Air Quality Exempt SPR Planning 2019 4TD7 Federal M240 STBG $150,000 $0 $150,000 $150,000 2018stipID0008FDSPR

    Ph subtotal: $150,000 $0 $150,000 $150,000

    105329 LACRPC ALL ALL LACRPC FY 20 Reg

    Trans Plng

    Description: LACRPC SFY 2020 Regional

    Transportation Planning Program Supplemental

    funds Work Type: Planning & Research

    Termini: 0

    LIMA (TCC) Air Quality Exempt SPR Planning 2020 4TD7 Federal Un-Assigned Federal $200,000 $0 $200,000 $200,000 2018stipID0009FDSPR

    Ph subtotal: $200,000 $0 $200,000 $200,000

    105331 LACRPC ALL ALL LACRPC FY 21 Reg

    Trans Plng

    Description: LACRPC SFY 2021 Regional

    Transportation Planning Program Supplemental

    funds Work Type: Planning & Research

    Termini: 0

    LIMA (TCC) Air Quality Exempt SPR Planning 2021 4TD7 Federal Un-Assigned Federal $200,000 $0 $200,000 $200,000 2018stipID0010FDSPR

    Ph subtotal: $200,000 $0 $200,000 $200,000

    107925 LACRPC ALL ALL Pavement Condition

    Index

    Description: Acquire the PCI data for County and

    Township roads in Allen County through

    acquisition of capital system management

    software, PAVER Pavement Maintenance

    Management System V. 7.0. - Colorado State

    University PAVER Center. Work Type:

    Pavement Condition Investigation Termini:

    Various locations in Allen County

    ALLEN COUNTY ENGINEER Air Quality Exempt SPR Planning 2019 4TA7 Federal Un-Assigned Federal $50,000 $0 $50,000 $50,000 2018AM04ID0126FDSPR

    Ph subtotal: $50,000 $0 $50,000 $50,000

    96605 DEF DEF SR 15 14.77 Description: Perfrom PE to determine if scope

    will include a full replacement or a deck

    replacement. PID also includes the design and

    construction phases of the project. Structure

    carries Clinton Street over the Maumee River in

    downtown defiance. Work Type: Bridge

    Replacement Termini: SR15/18/66 bridge over

    the Maumee River in the City of Defiance

    ODOT SPONSORING

    AGENCY

    Air Quality Exempt RW RW Serv 2018 LAB State 002 Labor - State Match $50,000 $0 $50,000 $14,248,808 2018MODID0006FDRW

    Ph subtotal: $50,000 $0 $50,000 $14,248,808

    MVPO DEF DEF SR 15 14.77 Description: Preliminary engineering determined

    this to be a full structure replacement. PID also

    includes the design and construction phases of

    the project. Structure carries Clinton Street over

    the Maumee River in downtown Defiance.

    Work Type: Bridge Replacement Termini:

    SR15/18/66 bridge over the Maumee River in the

    City of Defiance

    ODOT SPONSORING

    AGENCY

    Air Quality Exempt CO CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Engr

    CO Engr

    CO Engr

    CO Engr

    Oth Remb

    Oth Remb

    2019

    2019

    2019

    2019

    2019

    2019

    2019

    2019

    2019

    2019

    4B37

    4BG

    4PF7

    4PS7

    LAB

    LAB

    LAB

    LAB

    4PF7

    4PS7

    Federal

    Local Match

    Federal

    State

    Federal

    Federal

    Local Match

    State

    Federal

    State

    Z302

    002

    M001

    002

    M001

    Z302

    002

    002

    M001

    002

    TAP/Enhancements

    Local Match

    National Hwy Performance P

    State Funds (002)

    National Hwy Performance P

    TAP/Enhancements

    Labor - Local Match

    Labor - State Match

    National Hwy Performance P

    State Funds (002)

    $447,450

    $403,840

    $7,191,370

    $1,797,843

    $503,396

    $44,745

    $28,975

    $125,849

    $12,000

    $3,000

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $10,558,468

    $10,558,468

    $10,558,468

    $10,558,468

    $10,558,468

    $10,558,468

    $10,558,468

    $10,558,468

    $10,558,468

    $10,558,468

    $12,956,620

    $12,956,620

    $12,956,620

    $12,956,620

    $12,956,620

    $12,956,620

    $12,956,620

    $12,956,620

    $12,956,620

    $12,956,620

    2018stipID0011FDCO

    2018stipID0011FDCO

    2018stipID0011FDCO

    2018stipID0011FDCO

    2018stipID0011FDCO

    2018stipID0011FDCO

    2018stipID0011FDCO

    2018stipID0011FDCO

    2018stipID0011FDCO

    2018stipID0011FDCO

    Ph subtotal: $10,558,468 $0 $10,558,468 $12,956,620

    PE Dtl Dsgn

    Dtl Dsgn

    Dtl Dsgn

    Dtl Dsgn

    2018

    2018

    2018

    2018

    4PF7

    4PS7

    LAB

    LAB

    Federal

    State

    Federal

    State

    M001

    002

    Z001

    002

    National Hwy Performance P

    State Funds (002)

    National Hwy Performance P

    Labor - State Match

    $123,491

    $30,873

    $45,866

    $11,467

    $2,129,475

    $2,129,475

    $2,129,475

    $2,129,475

    $2,341,172

    $2,341,172

    $2,341,172

    $2,341,172

    $12,956,620

    $12,956,620

    $12,956,620

    $12,956,620

    2018stipID0011FDPE

    2018stipID0011FDPE

    2018stipID0011FDPE

    2018stipID0011FDPE

    Ph subtotal: $211,697 $2,129,475 $2,341,172 $12,956,620

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 3 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    FHWA 1 87005 Findlay HAN HAN IR 75 14.39 Description: Major-New reconstruction and

    widening of IR75 through the City of Findlay.

    Reconstruct the IR75/US 68 system interchange

    and replace all mainline structures. See

    companion project PID 77801. Work Type:

    Major Widening Termini: From approximately

    0.8 miles south of US68/IR75 interchange to just

    south of the CR 99 interchange.

    ODOT SPONSORING

    AGENCY

    Air Quality Exempt 7.10 RW Utl Remb

    Utl Remb

    2016

    2016

    4RA7

    4RC

    State

    Federal

    002

    M001

    State Funds (002)

    National Hwy Performance P

    $115,732

    $462,929

    $11,037,446

    $11,037,446

    $11,616,107

    $11,616,107

    $160,141,765

    $160,141,765

    2018MODID0002FDRW

    2018MODID0002FDRW

    Ph subtotal: $578,661 $11,037,446 $11,616,107 $160,141,765

    100184 Findlay HAN HAN Findlay FY2020

    Resurfacing

    Description: Resurface with asphalt concrete.

    Project also includes widening, drainage and

    bike path work. Work Type: Resurfacing,

    Undivided System Termini: On CR 236 from

    SR 568 to US 224

    Findlay, City of Air Quality Exempt 1.27 CO CO Contr

    CO Contr

    CO Engr

    CO Engr

    2020

    2020

    2020

    2020

    4TA7

    LNT

    4TA7

    LNT

    Federal

    Local Match

    Federal

    Local Match

    Z231

    LNTP

    Z231

    LNTP

    STBG

    Local Match

    STBG

    Local Match

    $940,000

    $235,000

    $28,200

    $7,050

    $0

    $0

    $0

    $0

    $1,210,250

    $1,210,250

    $1,210,250

    $1,210,250

    $1,232,035

    $1,232,035

    $1,232,035

    $1,232,035

    2018stipID0001FDCO

    2018stipID0001FDCO

    2018stipID0001FDCO

    2018stipID0001FDCO

    Ph subtotal: $1,210,250 $0 $1,210,250 $1,232,035

    103972 HAN HAN US 68 5.01 Arlington

    Phase 1

    Description: Phase 1 of 3 to reconstruct Main

    Street (US 68) in the Village of Arlington,

    including curb, gutter, drainage and storm

    sewer. Construction limits for Phase 1 is from

    the northern intersection with SR 103 to the

    bridge over Buck Run.This PID includes the

    Work Type: Major Rehabilitation Termini:

    From the south corp to Wardwell Street in the

    Village of Arlington.

    Arlington, Village of Air Quality Exempt 0.36 CO CO Contr

    CO Contr

    CO Contr

    CO Engr

    CO Engr

    CO Engr

    2019

    2019

    2019

    2019

    2019

    2019

    4BG

    4PF7

    4PS7

    LAB

    LAB

    LAB

    Local Match

    Federal

    State

    Federal

    Local Match

    State

    002

    Z232

    002

    Z232

    002

    002

    Local Match

    STBG

    State Funds (002)

    STBG

    Labor - Local Match

    Labor - State Match

    $801,000

    $368,000

    $92,000

    $14,720

    $56,070

    $3,680

    $0

    $0

    $0

    $0

    $0

    $0

    $1,335,470

    $1,335,470

    $1,335,470

    $1,335,470

    $1,335,470

    $1,335,470

    $1,411,130

    $1,411,130

    $1,411,130

    $1,411,130

    $1,411,130

    $1,411,130

    2018stipID0012FDCO

    2018stipID0012FDCO

    2018stipID0012FDCO

    2018stipID0012FDCO

    2018stipID0012FDCO

    2018stipID0012FDCO

    Ph subtotal: $1,335,470 $0 $1,335,470 $1,411,130

    104001 HAN HAN US 68 4.70 Arlington

    Phase 2

    Description: Phase 2 of 3 to reconstruct Main

    Street (US 68) in the Village of Arlington,

    including curb, gutter, drainage and storm

    sewer. Construction limits for Phase 2 is from

    the south corp limit of Arlington to the northern

    intersection with SR 103.Preliminary Work

    Type: Major Rehabilitation Termini: From the

    south corp to the northern intersection with SR

    103.

    Arlington, Village of Air Quality Exempt 0.31 CO CO Contr

    CO Contr

    CO Contr

    CO Engr

    CO Engr

    CO Engr

    2020

    2020

    2020

    2020

    2020

    2020

    4BG

    4PF7

    4PS7

    LAB

    LAB

    LAB

    Local Match

    Federal

    State

    Federal

    Local Match

    State

    002

    Z232

    002

    Z232

    002

    002

    Local Match

    STBG

    State Funds (002)

    STBG

    Labor - Local Match

    Labor - State Match

    $793,000

    $392,000

    $98,000

    $15,680

    $55,510

    $3,920

    $0

    $0

    $0

    $0

    $0

    $0

    $1,358,110

    $1,358,110

    $1,358,110

    $1,358,110

    $1,358,110

    $1,358,110

    $1,435,090

    $1,435,090

    $1,435,090

    $1,435,090

    $1,435,090

    $1,435,090

    2018stipID0013FDCO

    2018stipID0013FDCO

    2018stipID0013FDCO

    2018stipID0013FDCO

    2018stipID0013FDCO

    2018stipID0013FDCO

    Ph subtotal: $1,358,110 $0 $1,358,110 $1,435,090

    2 95627 D02 D02 Land Preserv Along

    New US-24

    Description: A project to protect land as open

    space along the new US-24 corridor by acquiring

    a conservation easment from various properties

    (13 properties in FUL/HEN/LUC); perform

    necessary related work. Work Type: Acquire

    Easements Termini: Various parcels in Fulton,

    Henry and Lucas Counties

    DISTRICT 2 PRODUCTION CO Air Quality Exem RW Acquis

    Acquis

    2014

    2014

    4BG

    4D57

    Local Match

    Federal

    002 Local Match

    National Corridor Boarder

    $4,441,383

    $3,434,618

    $0

    $0

    $7,876,001

    $7,876,001

    $8,000,001

    $8,000,001

    2018MODID0015FDRW

    2018MODID0015FDRW

    Ph subtotal: $7,876,001 $0 $7,876,001 $8,000,001

    96813 MVPO FUL FUL SR66 Relocation on

    CR24

    Description: Relocate SR-66 west of Archbold

    on CR-24; perform necessary related work

    Work Type: Relocation Termini: From US-20A

    in Fulton County to US-6 in Henry County

    Archbold, Village of Air Quality Exempt 5.97 PE Env PE

    Env PE

    Env PE

    2018

    2018

    2018

    4BD7

    4BK7

    LNT

    State

    Federal

    Local Match

    002

    Z232

    LNTP

    State Funds (002)

    STBG

    Local Match

    $90,000

    $398,470

    $9,617

    $971,730

    $971,730

    $971,730

    $1,469,817

    $1,469,817

    $1,469,817

    $1,469,817

    $1,469,817

    $1,469,817

    2018stipID0014FDPE

    2018stipID0014FDPE

    2018stipID0014FDPE

    Ph subtotal: $498,087 $971,730 $1,469,817 $1,469,817

    103410 MVPO FUL FUL CR 20 12.5 Bridge

    Re-deck X

    Description: Federal exchange project to

    re-deck and widen bridge on Fulton CR 20, .5

    north of CR N Work Type: Bridge Deck

    Replacement Termini: CR 20 @ SLM 12.5

    FULTON COUNTY

    ENGINEER

    Air Quality Exempt 0.20 CO CO Contr

    CO Contr

    CO Engr

    CO Engr

    2021

    2021

    2021

    2021

    4C87

    LNT

    4C87

    LNT

    State

    Local Match

    State

    Local Match

    002

    LNTP

    002

    LNTP

    State Funds (002)

    Local Match

    State Funds (002)

    Local Match

    $646,000

    $34,000

    $32,300

    $1,700

    $0

    $0

    $0

    $0

    $714,000

    $714,000

    $714,000

    $714,000

    $717,916

    $717,916

    $717,916

    $717,916

    2018stipID0015FDCO

    2018stipID0015FDCO

    2018stipID0015FDCO

    2018stipID0015FDCO

    Ph subtotal: $714,000 $0 $714,000 $717,916

    PE Dtl Dsgn 2020 LAB State 002 Labor - State Match $500 $0 $3,416 $717,916 2018stipID0015FDPE

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 4 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    FHWA 2 103410 MVPO FUL FUL CR 20 12.5 Bridge

    Re-deck X

    Description: Federal exchange project to

    re-deck and widen bridge on Fulton CR 20, .5

    FULTON COUNTY

    ENGINEER

    Air Quality Exempt 0.20 PE Env PE 2020 LAB State 002 Labor - State Match $2,916 $0 $3,416 $717,916 2018stipID0015FDPE

    Ph subtotal: $3,416 $0 $3,416 $717,916

    RW RW Serv 2020 LAB State 002 Labor - State Match $500 $0 $500 $717,916 2018stipID0015FDRW

    Ph subtotal: $500 $0 $500 $717,916

    105068 MVPO FUL FUL Wilson St Bridge

    Replacement

    Description: Full replacement of Wilson Street

    bridge over Bad Creek in Delta Ohio Work

    Type: Bridge Replacement Termini: Wilson St

    Bridge over Bad Creek

    Delta, Village of Air Quality Exempt CO CO Contr

    CO Contr

    2018

    2018

    4R87

    LNT

    Federal

    Local Match

    Z233

    LNTP

    STBG

    Local Match

    $482,220

    $25,380

    $0

    $0

    $507,600

    $507,600

    $567,600

    $567,600

    2018stipID0016FDCO

    2018stipID0016FDCO

    Ph subtotal: $507,600 $0 $507,600 $567,600

    77254 TMACOG LUC LUC-75-4.52 Ph 2 Description: Detail Design (Stage 2 on), R/W

    and Construction of the I-75 stretch between

    Detroit Ave and Lagrange. Widen and upgrade

    existing facility and modify existing (including

    system intechange by old Jeep plant) and/or add

    new interchanges to provide better an Work

    Type: Interchange, Reconstruction Termini:

    Toledo. From Detroit Ave (US-24) to Lagrange

    ODOT SPONSORING

    AGENCY

    Air Quality Non-Exe 3.11 CO CO Engr

    CO Engr

    2018

    2018

    4BD7

    4BK7

    State

    Federal

    002

    M001

    State Funds (002)

    National Hwy Performance P

    $398,000

    $1,392,000

    $148,268,140

    $148,268,140

    $150,058,140

    $150,058,140

    $161,207,907

    $161,207,907

    2018stipID0019FDCO

    2018stipID0019FDCO

    Ph subtotal: $1,790,000 $148,268,140 $150,058,140 $161,207,907

    80995 TMACOG LUC LUC TMACOG SIB loan

    repayment

    Description: Phase II rehabilitation of the MLK

    bridge Work Type: SIB Termini: SIB loan

    repayment for PID 78325

    Not Yet Assigned Air Quality Exempt OT Dbt Serv

    Dbt Serv

    2018

    2019

    4TA7

    4TA7

    Federal

    Federal

    M230

    M230

    STBG

    STBG

    $484,189

    $498,823

    $0

    $0

    $983,012

    $983,012

    $0

    $0

    2018stipID0020FDOTH

    2018stipID0020FDOTH

    Ph subtotal: $983,012 $0 $983,012 $0

    90701 TMACOG LUC LUC South Ave Reconstruct Description: A TMACOG funded project to

    reconstruct South Ave from Reynolds Rd to

    Byrne Rd; perform necessary related work;

    FIELD REVIEW Required. Work Type: Major

    Reconstruction Termini: City of Toledo,

    Reynolds Rd to Byrne Rd

    Toledo, City of Air Quality Exempt 2.23 CO CO Contr

    CO Contr

    CO Engr

    2019

    2019

    2018

    4TA7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    L23E

    LNTP

    LNTP

    STBG

    Local Match

    Local Match

    $3,717,700

    $1,045,937

    $476,363

    $0

    $0

    $0

    $5,240,000

    $5,240,000

    $5,240,000

    $5,554,000

    $5,554,000

    $5,554,000

    2018stipID0021FDCO

    2018stipID0021FDCO

    2018stipID0021FDCO

    Ph subtotal: $5,240,000 $0 $5,240,000 $5,554,000

    PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $47,000

    $220,000

    $0

    $0

    $267,000

    $267,000

    $5,554,000

    $5,554,000

    2018stipID0021FDPE

    2018stipID0021FDPE

    Ph subtotal: $267,000 $0 $267,000 $5,554,000

    RW RW Serv 2018 LAB State 002 Labor - State Match $47,000 $0 $47,000 $5,554,000 2018stipID0021FDRW

    Ph subtotal: $47,000 $0 $47,000 $5,554,000

    93594 TMACOG LUC LUC IR 75 1.10 Description: A multi-Lane & Major Bridge funded

    project (project # 2) to reconstruct the existing

    pavement and to rehabilitate/widen/replace

    existing bridges; perform necessary related

    work. See PID 93592 for project # 1 and PID

    93604 for project # 3. UPDATE (2-25-13 Work

    Type: Major Rehabilitation Termini: From

    South Ave to north of Dorr St

    DISTRICT 2 PRODUCTION Air Quality Exempt 1.60 CO CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Engr

    CO Engr

    CO Engr

    CO Engr

    CO Engr

    CO Engr

    CO Engr

    CO Engr

    CO Engr

    RR Remb

    RR Remb

    2019

    2019

    2019

    2019

    2019

    2019

    2019

    2019

    2019

    2019

    2019

    2019

    2020

    2020

    2021

    2021

    2019

    2019

    4BT7

    4RA7

    4RC

    7BTB

    7MB

    7PM

    7RA

    4PF7

    4PS7

    4RA7

    LAB

    LAB

    4PF7

    4PS7

    4PF7

    4PS7

    4RA7

    4RC

    State

    State

    Federal

    Bonds

    Bonds

    Bonds

    Bonds

    Federal

    State

    State

    Federal

    State

    Federal

    State

    Federal

    State

    State

    Federal

    002

    002

    Z001

    042

    045

    045

    042

    Z001

    002

    002

    Z001

    002

    Z001

    002

    Z001

    002

    002

    Z001

    State Funds (002)

    State Funds (002)

    National Hwy Performance P

    State Bonds

    Garvee Bond-Fund 045-Lon

    Garvee Bond-Fund 045-Lon

    State Bonds

    National Hwy Performance P

    State Funds (002)

    State Funds (002)

    National Hwy Performance P

    Labor - State Match

    National Hwy Performance P

    State Funds (002)

    National Hwy Performance P

    State Funds (002)

    State Funds (002)

    National Hwy Performance P

    $2,500,000

    $6,800,000

    $27,200,000

    $37,000,000

    $16,000,000

    $60,000,000

    $6,000,000

    $2,400,000

    $600,000

    $13,206

    $3,336,000

    $6,334,000

    $1,200,000

    $300,000

    $400,000

    $100,000

    $140,000

    $560,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $20,000

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $170,903,206

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    $187,595,728

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    2018stipID0022FDCO

    Ph subtotal: $170,883,206 $20,000 $170,903,206 $187,595,728

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 5 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    FHWA 2 93594 TMACOG LUC LUC IR 75 1.10 Description: A multi-Lane & Major Bridge funded

    project (project # 2) to reconstruct the existing

    pavement and to rehabilitate/widen/replace

    existing bridges; perform necessary related

    work. See PID 93592 for project # 1 and PID

    93604 for project # 3. UPDATE (2-25-13 Work

    Type: Major Rehabilitation Termini: Fron South

    Ave to north of Dorr St

    DISTRICT 2 PRODUCTION Air Quality Non-Exe 1.65 PE Env PE

    Env RW S

    2016

    2016

    4BT7

    4RA7

    State

    State

    002

    002

    State Funds (002)

    State Funds (002)

    $35,000

    $170,000

    $10,592,107

    $10,592,107

    $10,797,107

    $10,797,107

    $119,880,000

    $119,880,000

    2018MODID0012FDPE

    2018MODID0012FDPE

    Ph subtotal: $205,000 $10,592,107 $10,797,107 $119,880,000

    CO Air Quality None 1.65 RW Acquis 2014 4RA7 State 002 State Funds (002) $1,000,000 $0 $1,000,000 $119,880,000 2018MODID0013FDRW

    Ph subtotal: $1,000,000 $0 $1,000,000 $119,880,000

    94407 TMACOG LUC LUC US 20A 3.55/4.55

    Rndbt/Conct

    Description: A project to construct 2

    roundabouts at US-20A/SR-295 and at

    US-20A/Whitehouse-Spence Rd and a

    connector road from the new roundabout @

    SR-295 to the South Airfield Rd Industrial Park;

    perform necessary related work. Work Type:

    Intersection Improvement Termini: at

    US-20A/SR-295 and

    US-20A/Whitehouse-Spencer Rd intersections

    DISTRICT 2 PRODUCTION Air Quality Exempt 1.43 CO CO Contr

    CO Contr

    CO Contr

    CO Contr

    CO Engr

    CO Engr

    CO Engr

    2020

    2020

    2020

    2020

    2020

    2020

    2020

    4BG

    4JM7

    4PF7

    4PS7

    4BG

    LAB

    LAB

    Local Match

    State

    Federal

    State

    Local Match

    Federal

    State

    002

    002

    Z001

    002

    002

    Z001

    002

    Local Match

    State Funds (002)

    Not Grouped

    State Funds (002)

    Local Match

    National Hwy Performance P

    Labor - State Match

    $2,450,000

    $250,000

    $800,000

    $200,000

    $75,000

    $122,400

    $30,600

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $3,928,000

    $3,928,000

    $3,928,000

    $3,928,000

    $3,928,000

    $3,928,000

    $3,928,000

    $4,771,473

    $4,771,473

    $4,771,473

    $4,771,473

    $4,771,473

    $4,771,473

    $4,771,473

    2018AM03ID0094FDCO

    2018AM03ID0094FDCO

    2018AM03ID0094FDCO

    2018AM03ID0094FDCO

    2018AM03ID0094FDCO

    2018AM03ID0094FDCO

    2018AM03ID0094FDCO

    Ph subtotal: $3,928,000 $0 $3,928,000 $4,771,473

    95339 TMACOG LUC LUC Toledo Lighthouse Ph

    1

    Description: A TMACOG funded phase 1 project

    to address exterior cleaning and stabilization of

    the masonry walls and structure of the the

    Toledo Harbor lighthouse; Also, new

    replacement windows and shutters will be

    included in Phase 1; perform necessary related

    work. Work Type: Facility Renovation

    Termini: Offshore at the western end of Lake

    Erie at the entrance to the Toledo Harbor

    channel in Maumee Bay

    LUCAS COUNTY ENGINEER Air Quality Exempt 0.01 CO CO Contr

    CO Contr

    CO Engr

    CO Engr

    2019

    2019

    2019

    2019

    4TC7

    LNT

    4TC7

    LNT

    Federal

    Local Match

    Federal

    Local Match

    M301

    LNTP

    M301

    LNTP

    TAP/Enhancements

    Local Match

    TAP/Enhancements

    Local Match

    $464,400

    $116,100

    $46,400

    $11,600

    $0

    $0

    $0

    $0

    $638,500

    $638,500

    $638,500

    $638,500

    $642,784

    $642,784

    $642,784

    $642,784

    2018stipID0023FDCO

    2018stipID0023FDCO

    2018stipID0023FDCO

    2018stipID0023FDCO

    Ph subtotal: $638,500 $0 $638,500 $642,784

    PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $643

    $3,641

    $0

    $0

    $4,284

    $4,284

    $642,784

    $642,784

    2018stipID0023FDPE

    2018stipID0023FDPE

    Ph subtotal: $4,284 $0 $4,284 $642,784

    95515 TMACOG LUC WOO/LUC-Chessie Circle

    Trail

    Description: Remove the former CSX RR bridge

    over the Maumee River and construct a

    bike/hike trail on abandoned RR track, owned by

    Toledo Metroparks; perform necessary related

    work. See PID 80544 for RW Acquis. Work

    Type: Bikeways Termini: Former CSX RR

    Bridge over Maumee River near the Turnpike

    Bridge and Bike/hike trail from River Rd to

    Glanzman Rd

    Wood County Airport Authority Air Quality Exempt PE Dtl Dsgn

    Env PE

    2016

    2016

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $50,400

    $284,400

    $217,365

    $217,365

    $552,165

    $552,165

    $3,343,121

    $3,343,121

    2018MODID0014FDPE

    2018MODID0014FDPE

    Ph subtotal: $334,800 $217,365 $552,165 $3,343,121

    95686 TMACOG LUC LUC Bancroft St Reconst Description: A TMACOG funded project to

    rehabilitate the pavementon Bancroft St from

    Secor Rd to Parkside Blvd; Perform necessary

    related work. FIELD REVIEW conducted on

    6/2/15. Work Type: Mill and Fill Termini: City

    of Toledo, from Secor to Parkside

    Toledo, City of Air Quality Exempt 1.40 CO CO Contr

    CO Contr

    CO Engr

    2018

    2018

    2018

    4TA7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    M230

    LNTP

    LNTP

    STBG

    Local Match

    Local Match

    $8,280,800

    $2,070,200

    $587,500

    $0

    $0

    $0

    $10,938,500

    $10,938,500

    $10,938,500

    $11,172,500

    $11,172,500

    $11,172,500

    2018stipID0024FDCO

    2018stipID0024FDCO

    2018stipID0024FDCO

    Ph subtotal: $10,938,500 $0 $10,938,500 $11,172,500

    95875 TMACOG LUC LUC IR 475 0.56 Widening Description: A project to replace/rehab existing

    pavement and widen I-475 by adding one

    additional lane for a total of 3 lanes in each

    direction from US-24 to US-20; perform

    necessary related work. See PIDs 80694,

    88084, 80695 and 96482 for mainline bridges.

    See PID 9 Work Type: Major Widening

    Termini: From US-24 (AWT) to SR-20 (Central

    Ave)

    DISTRICT 2 PRODUCTION Air Quality Non-Exe 8.39 PE Dtl Dsgn

    Dtl Dsgn

    2015

    2015

    4BD7

    4BK7

    State

    Federal

    State Funds (002)

    National Hwy Performance P

    $100,000

    $400,000

    $107,388

    $107,388

    $4,700,000

    $4,700,000

    $61,200,000

    $61,200,000

    2018MODID0021FDPE

    2018MODID0021FDPE

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 6 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    FHWA 2 95875 TMACOG LUC LUC IR 475 0.56 Widening Description: A project to replace/rehab existing

    pavement and widen I-475 by adding one

    DISTRICT 2 PRODUCTION Air Quality Non-Exe 8.39 PE Env PE

    Env PE

    2014

    2014

    4BD7

    4BK7

    State

    Federal

    002

    M001

    State Funds (002)

    National Hwy Performance P

    $818,522

    $3,274,090

    $107,388

    $107,388

    $4,700,000

    $4,700,000

    $61,200,000

    $61,200,000

    2018MODID0021FDPE

    2018MODID0021FDPE

    Ph subtotal: $4,592,612 $107,388 $4,700,000 $61,200,000

    96482 TMACOG LUC LUC IR 475 0.93 over

    Monclova Rd

    Description: Redeck and widen the I-475 bridge

    over Monclova Road and NS RR; Perform other

    necessary work. "Limited Review". Work

    Type: Minor Widening Termini: I-475 bridge

    over Monclova Road and NS RR.

    DISTRICT 2 PRODUCTION Air Quality Exempt 0.39 PE Dtl Dsgn

    Dtl Dsgn

    Env PE

    Env PE

    2015

    2015

    2014

    2014

    4BD7

    4BK7

    4BD7

    4BK7

    State

    Federal

    State

    Federal

    002

    002

    M001

    State Funds (002)

    Un-Assigned Federal

    State Funds (002)

    National Hwy Performance P

    $7,000

    $28,000

    $53,000

    $212,000

    $0

    $0

    $0

    $0

    $300,000

    $300,000

    $300,000

    $300,000

    $6,215,000

    $6,215,000

    $6,215,000

    $6,215,000

    2018MODID0023FDPE

    2018MODID0023FDPE

    2018MODID0023FDPE

    2018MODID0023FDPE

    Ph subtotal: $300,000 $0 $300,000 $6,215,000

    98909 TMACOG LUC LUC Bennett Rd Pav

    Reconst

    Description: Reconstruction of Bennett Rd in

    Toledo; perform necessary related work; FIELD

    REVIEW REQUIRED. Work Type: Major

    Rehabilitation Termini: Laskey to Alexis

    Toledo, City of Air Quality Exempt 1.02 CO CO Contr

    CO Contr

    CO Engr

    2020

    2020

    2020

    4TA7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    M23E

    LNTP

    LNTP

    STBG

    Local Match

    Local Match

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    $0

    2018stipID0025XXCO

    2018stipID0025XXCO

    2018stipID0025XXCO

    Ph subtotal: $0 $0 $0 $0

    PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $1,725

    $9,750

    $0

    $0

    $11,475

    $11,475

    $2,487,775

    $2,487,775

    2018stipID0025FDPE

    2018stipID0025FDPE

    Ph subtotal: $11,475 $0 $11,475 $2,487,775

    98910 TMACOG LUC LUC Douglas Rd Reconst Description: Reconstruct Douglas Rd from

    Laskey to Alexis in the City of Toledo; perform

    necessary related work; FIELD REVIEW

    REQUIRED. Work Type: Major Rehabilitation

    Termini: Laskey to Alexis

    Toledo, City of Air Quality Exempt 1.12 CO CO Contr

    CO Contr

    CO Engr

    2020

    2020

    2020

    4TA7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    M23E

    LNTP

    LNTP

    STBG

    Local Match

    Local Match

    $1,997,896

    $499,474

    $200,000

    $0

    $0

    $0

    $2,697,370

    $2,697,370

    $2,697,370

    $2,709,970

    $2,709,970

    $2,709,970

    2018stipID0026FDCO

    2018stipID0026FDCO

    2018stipID0026FDCO

    Ph subtotal: $2,697,370 $0 $2,697,370 $2,709,970

    PE Dtl Dsgn

    Env PE

    2019

    2019

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $1,900

    $10,700

    $0

    $0

    $12,600

    $12,600

    $2,709,970

    $2,709,970

    2018stipID0026FDPE

    2018stipID0026FDPE

    Ph subtotal: $12,600 $0 $12,600 $2,709,970

    98930 TMACOG LUC LUC Sylvania Ave Rehab in

    County

    Description: Rehabilitate the pavement of

    Sylvania Ave; perform necessary related work.

    FIELD REVIEW REQUIRED. Work Type:

    Major Rehabilitation Termini: Centennial Rd to

    McCord Rd

    LUCAS COUNTY ENGINEER Air Quality Exempt 1.87 CO CO Contr

    CO Contr

    CO Engr

    2019

    2019

    2019

    4TA7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    M23E

    LNTP

    LNTP

    STBG

    Local Match

    Local Match

    $2,041,600

    $510,400

    $75,000

    $0

    $0

    $0

    $2,627,000

    $2,627,000

    $2,627,000

    $2,640,000

    $2,640,000

    $2,640,000

    2018stipID0027FDCO

    2018stipID0027FDCO

    2018stipID0027FDCO

    Ph subtotal: $2,627,000 $0 $2,627,000 $2,640,000

    PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $2,000

    $11,000

    $0

    $0

    $13,000

    $13,000

    $2,640,000

    $2,640,000

    2018stipID0027FDPE

    2018stipID0027FDPE

    Ph subtotal: $13,000 $0 $13,000 $2,640,000

    98932 TMACOG LUC LUC Glendale Resurf Description: Mill and resurface existing asphalt

    pavement including full depth pavement repairs;

    perform necessary related work. FIELD

    REVIEW REQUIRED. Work Type: Mill and Fill

    Termini: AWT to Broadway St

    Toledo, City of Air Quality Exempt 0.36 PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $500

    $2,500

    $0

    $0

    $3,000

    $3,000

    $400,716

    $400,716

    2018stipID0028FDPE

    2018stipID0028FDPE

    Ph subtotal: $3,000 $0 $3,000 $400,716

    RW RW Serv 2018 LAB State 002 Labor - State Match $300 $0 $300 $400,716 2018stipID0028FDRW

    Ph subtotal: $300 $0 $300 $400,716

    98939 TMACOG LUC LUC TMACOG FY 18

    Rideshare

    Description: TMACOG FY 18 Rideshare

    Program Work Type: Rideshare Termini: 0

    TMACOG Air Quality Exempt SPR Planning 2018 4TE7 Federal M400 CMAQ $95,800 $0 $95,800 $95,800 2018stipID0029FDSPR

    Ph subtotal: $95,800 $0 $95,800 $95,800

    98940 TMACOG LUC LUC TMACOG FY 18 AQ

    Program

    Description: TMACOG FY 18 AQ Program

    Work Type: Air Quality Planning Termini: 0

    TMACOG Air Quality Exempt SPR Planning 2018 4TE7 Federal M400 CMAQ $85,000 $0 $85,000 $85,000 2018stipID0030FDSPR

    Ph subtotal: $85,000 $0 $85,000 $85,000

    98941 TMACOG LUC LUC TMACOG FY 19

    Rideshare

    Description: TMACOG FY 19 Rideshare

    Program Work Type: Rideshare Termini: 0

    TMACOG Air Quality Exempt SPR Planning 2019 4TE7 Federal M400 CMAQ $95,800 $0 $95,800 $95,800 2018stipID0031FDSPR

    Ph subtotal: $95,800 $0 $95,800 $95,800

    98942 TMACOG LUC LUC TMACOG FY 19 AQ

    Program

    Description: TMACOG FY 19 AQ Program

    Work Type: Air Quality Planning Termini: 0

    TMACOG Air Quality Exempt SPR Planning 2019 4TE7 Federal M400 CMAQ $85,000 $0 $85,000 $85,000 2018stipID0032FDSPR

    Ph subtotal: $85,000 $0 $85,000 $85,000

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 7 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    FHWA 2 98943 TMACOG LUC LUC TMACOG FY 20

    Rideshare

    Description: TMACOG FY 20 Rideshare

    Program Work Type: Rideshare Termini: 0

    TMACOG Air Quality Exempt SPR Planning 2020 4TE7 Federal M400 CMAQ $112,800 $0 $112,800 $112,800 2018stipID0033FDSPR

    Ph subtotal: $112,800 $0 $112,800 $112,800

    98944 TMACOG LUC LUC TMACOG FY 20 AQ

    Program

    Description: TMACOG FY 20 AQ Program

    Work Type: Air Quality Planning Termini: 0

    TMACOG Air Quality Exempt SPR Planning

    Planning

    2020

    2020

    4TE7

    LNT

    Federal

    Local Match

    M400

    LNTP

    CMAQ

    Local Match

    $68,000

    $17,000

    $0

    $0

    $85,000

    $85,000

    $85,000

    $85,000

    2018stipID0034FDSPR

    2018stipID0034FDSPR

    Ph subtotal: $85,000 $0 $85,000 $85,000

    98953 TMACOG LUC LUC Woodruff Ave Resurf Description: Mill and resurface existing asphalt

    pavement including full depth pavement repairss,

    minor walk upgrades, minor drainage

    improvements, and curb repairs as needed;

    perform necessary related work. FIELD

    REVIEW REQUIRED. Work Type:

    Resurfacing, Undivided System Termini:

    Collingwood Blvd to Cherry St

    Toledo, City of Air Quality Exempt 1.23 CO CO Contr

    CO Contr

    CO Engr

    2019

    2019

    2019

    4TA7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    M230

    LNTP

    LNTP

    STBG

    Local Match

    Local Match

    $400,000

    $800,000

    $40,000

    $0

    $0

    $0

    $1,240,000

    $1,240,000

    $1,240,000

    $1,240,000

    $1,240,000

    $1,240,000

    2018stipID0035FDCO

    2018stipID0035FDCO

    2018stipID0035FDCO

    Ph subtotal: $1,240,000 $0 $1,240,000 $1,240,000

    98955 TMACOG LUC LUC McCord Resurf Description: Mill existing pavement, perform spot

    full depth repairs; reconstruct failed catch

    basins; place 2 course asphalt overlay; sidewalk

    repair/addition; perform necessary related work.

    FIELD REVIEW REQUIRED Work Type: Mill

    and Fill Termini: Angola Rd to Hancock Ave

    LUCAS COUNTY ENGINEER Air Quality Exempt 0.99 CO CO Contr

    CO Contr

    CO Engr

    2018

    2018

    2018

    4TA7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    M230

    LNTP

    LNTP

    STBG

    Local Match

    Local Match

    $400,000

    $407,000

    $80,000

    $0

    $0

    $0

    $887,000

    $887,000

    $887,000

    $913,200

    $913,200

    $913,200

    2018stipID0036FDCO

    2018stipID0036FDCO

    2018stipID0036FDCO

    Ph subtotal: $887,000 $0 $887,000 $913,200

    PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $3,900

    $18,400

    $0

    $0

    $22,300

    $22,300

    $913,200

    $913,200

    2018stipID0036FDPE

    2018stipID0036FDPE

    Ph subtotal: $22,300 $0 $22,300 $913,200

    RW RW Serv 2018 LAB State 002 Labor - State Match $3,900 $0 $3,900 $913,200 2018stipID0036FDRW

    Ph subtotal: $3,900 $0 $3,900 $913,200

    98997 TMACOG LUC LUC Ottawa River Rd

    Resurf

    Description: Resurface Ottawa River Rd in the

    City of Toledo; perform necessary related work;

    swmall project designated by TMACOG. FIELD

    REVIEW REQUIRED. Work Type: Mill and Fill

    Termini: Suder to 290th

    Toledo, City of Air Quality Exempt 1.13 CO CO Contr

    CO Contr

    CO Engr

    CO Engr

    2018

    2018

    2018

    2018

    4TA7

    LNT

    4TA7

    LNT

    Federal

    Local Match

    Federal

    Local Match

    M230

    LNTP

    M230

    LNTP

    STBG

    Local Match

    STBG

    Local Match

    $325,000

    $325,000

    $13,000

    $13,000

    $0

    $0

    $0

    $0

    $676,000

    $676,000

    $676,000

    $676,000

    $696,100

    $696,100

    $696,100

    $696,100

    2018stipID0037FDCO

    2018stipID0037FDCO

    2018stipID0037FDCO

    2018stipID0037FDCO

    Ph subtotal: $676,000 $0 $676,000 $696,100

    PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $3,000

    $14,100

    $0

    $0

    $17,100

    $17,100

    $696,100

    $696,100

    2018stipID0037FDPE

    2018stipID0037FDPE

    Ph subtotal: $17,100 $0 $17,100 $696,100

    RW RW Serv 2018 LAB State 002 Labor - State Match $3,000 $0 $3,000 $696,100 2018stipID0037FDRW

    Ph subtotal: $3,000 $0 $3,000 $696,100

    98999 TMACOG LUC LUC Kilburn Rd Bike Lanes Description: A TMACOG funded project to add

    bike lanesalong Kilburn Rd; Perform necessary

    related work; FIELD REVIEW REQUIRED;

    Spnosor Twp/County? Work Type: Bikeways

    Termini: Sylvania-Metamora to Central

    LUCAS COUNTY ENGINEER Air Quality Exempt 2.96 PE Dtl Dsgn

    Dtl Dsgn

    Env PE

    Env PE

    Env RW S

    Env RW S

    2018

    2018

    2018

    2018

    2018

    2018

    LAB

    LAB

    LAB

    LAB

    4TC7

    LNT

    Federal

    State

    Federal

    State

    Federal

    Local Match

    044

    002

    044

    002

    Z301

    LNTP

    TAP/Enhancements

    Labor - State Match

    TAP/Enhancements

    Labor - State Match

    Not Grouped

    Local Match

    $7,200

    $1,800

    $39,200

    $9,800

    $35,200

    $8,800

    $0

    $0

    $0

    $0

    $0

    $0

    $102,000

    $102,000

    $102,000

    $102,000

    $102,000

    $102,000

    $2,431,000

    $2,431,000

    $2,431,000

    $2,431,000

    $2,431,000

    $2,431,000

    2018AM04ID0127FDPE

    2018AM04ID0127FDPE

    2018AM04ID0127FDPE

    2018AM04ID0127FDPE

    2018AM04ID0127FDPE

    2018AM04ID0127FDPE

    Ph subtotal: $102,000 $0 $102,000 $2,431,000

    RW Acquis

    Acquis

    2018

    2018

    4TC7

    LNT

    Federal

    Local Match

    M301

    LNTP

    TAP/Enhancements

    Local Match

    $208,000

    $52,000

    $0

    $0

    $260,000

    $260,000

    $2,490,000

    $2,490,000

    2018stipID0038FDRW

    2018stipID0038FDRW

    Ph subtotal: $260,000 $0 $260,000 $2,490,000

    99000 TMACOG LUC LUC Summit St Enh Description: Summit St enhancement; perform

    necessary related work; FIELD REVIEW

    REQUIRED. Work Type: Design Aesthetics

    Termini: Lagrange to Chestnut

    Toledo, City of Air Quality Exempt 1.59 CO CO Contr

    CO Contr

    CO Engr

    2020

    2020

    2020

    4TC7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    M301

    LNTP

    LNTP

    TAP/Enhancements

    Local Match

    Local Match

    $776,944

    $194,236

    $30,000

    $0

    $0

    $0

    $1,001,180

    $1,001,180

    $1,001,180

    $1,001,180

    $1,001,180

    $1,001,180

    2018AM03ID0095FDCO

    2018AM03ID0095FDCO

    2018AM03ID0095FDCO

    Ph subtotal: $1,001,180 $0 $1,001,180 $1,001,180

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 8 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    FHWA 2 99731 TMACOG LUC LUC IR 475 1.85 @20A

    Interchnge

    Description: Build a new interchange in Lucas

    County at I-475 and US-20A; perform necessary

    related work. See PID 96484 for AER. Work

    Type: Interchange, New Termini: I-475 & 20A

    new interchange

    DISTRICT 2 PRODUCTION Air Quality Non-Exe 0.05 PE Env PE

    Env PE

    Env PE

    2016

    2016

    2016

    4BD7

    4BG

    4BK7

    State

    Local Match

    Federal

    002

    002

    M001

    State Funds (002)

    Local Match

    National Hwy Performance P

    $180,000

    $900,000

    $720,000

    $0

    $0

    $0

    $1,900,000

    $1,900,000

    $1,900,000

    $26,300,000

    $26,300,000

    $26,300,000

    2018MODID0027FDPE

    2018MODID0027FDPE

    2018MODID0027FDPE

    Ph subtotal: $1,800,000 $0 $1,900,000 $26,300,000

    2.79 RW Acquis

    Acquis

    Acquis

    2018

    2018

    2018

    4BD7

    4BG

    4BK7

    State

    Local Match

    Federal

    002

    002

    Z001

    State Funds (002)

    Local Match

    National Hwy Performance P

    $200,000

    $2,800,000

    $800,000

    $100,000

    $100,000

    $100,000

    $3,900,000

    $3,900,000

    $3,900,000

    $27,291,791

    $27,291,791

    $27,291,791

    2018stipID0040FDRW

    2018stipID0040FDRW

    2018stipID0040FDRW

    Ph subtotal: $3,800,000 $100,000 $3,900,000 $27,291,791

    99737 TMACOG LUC LUC IR 475/Dorr St

    Interchange

    Description: Buid a new inetrchnage in Lucas

    County on i-475 at Dorr St; perform necessary

    related work. See PID 96484 for AER. PE phase

    will be undertaken by local. Work Type:

    Interchange, New Termini: I-475/Dorr St

    Interchange

    DISTRICT 2 PRODUCTION Air Quality Non-Exe 0.02 PE Env PE

    Env PE

    Env PE

    2016

    2016

    2016

    4BD7

    4BK7

    LNT

    State

    Federal

    Local Match

    002

    M001

    LNTP

    State Funds (002)

    National Hwy Performance P

    Local Match

    $80,000

    $320,000

    $400,000

    $0

    $0

    $0

    $950,000

    $950,000

    $950,000

    $12,450,000

    $12,450,000

    $12,450,000

    2018MODID0028FDPE

    2018MODID0028FDPE

    2018MODID0028FDPE

    Ph subtotal: $800,000 $0 $950,000 $12,450,000

    LUC IR475-7.53/Dorr St

    Intrchng

    Description: Build a new interchange in Lucas

    County on IR-475 at Dorr St. See PID 96484 for

    AER. PE phase will be undertaken by local.

    11-21-17-Includes federal funded early

    acquisition of RW, independent of construction

    phase. Work Type: Interchange, New

    Termini: I-475/Dorr St Interchange

    DISTRICT 2 PRODUCTION Air Quality Non-Exe 1.04 RW Acquis

    Acquis

    Acquis

    Acquis

    RW Serv

    RW Serv

    2018

    2018

    2018

    2018

    2018

    2018

    4BD7

    4BK7

    4BK7

    LNT

    4BD7

    4BK7

    State

    Federal

    Federal

    Local Match

    State

    Federal

    002

    Z001

    LNTP

    002

    State Funds (002)

    Un-Assigned Federal

    Not Grouped

    Local Match

    State Funds (002)

    Un-Assigned Federal

    $279,142

    $800,000

    $316,566

    $2,836,470

    $173,724

    $694,896

    $600,000

    $600,000

    $600,000

    $600,000

    $600,000

    $600,000

    $5,700,798

    $5,700,798

    $5,700,798

    $5,700,798

    $5,700,798

    $5,700,798

    $24,176,641

    $24,176,641

    $24,176,641

    $24,176,641

    $24,176,641

    $24,176,641

    2018AM03ID0096FDRW

    2018AM03ID0096FDRW

    2018AM03ID0096FDRW

    2018AM03ID0096FDRW

    2018AM03ID0096FDRW

    2018AM03ID0096FDRW

    Ph subtotal: $5,100,798 $600,000 $5,700,798 $24,176,641

    99773 TMACOG LUC TMACOG SFY18 TIP

    Management

    Description: SFY18 TMACOG TIP Management

    Work Type: Planning & Research Termini: 0

    TMACOG Air Quality Exempt SPR Planning

    Planning

    2018

    2018

    4TD7

    LNT

    Federal

    Local Match

    M240

    LNTP

    STBG

    Local Match

    $80,000

    $20,000

    $0

    $0

    $100,000

    $100,000

    $100,000

    $100,000

    2018stipID0042FDSPR

    2018stipID0042FDSPR

    Ph subtotal: $100,000 $0 $100,000 $100,000

    99774 TMACOG LUC TMACOG SFY19 TIP

    Management

    Description: TMACOG SFY19 TIP Management

    Work Type: Planning & Research Termini: 0

    TMACOG Air Quality Exempt SPR Planning

    Planning

    2019

    2019

    4TD7

    LNT

    Federal

    Local Match

    M240

    LNTP

    STBG

    Local Match

    $80,000

    $20,000

    $0

    $0

    $100,000

    $100,000

    $100,000

    $100,000

    2018stipID0043FDSPR

    2018stipID0043FDSPR

    Ph subtotal: $100,000 $0 $100,000 $100,000

    99869 TMACOG LUC LUC SR 120 11.96

    Central/Talmdg

    Description: A CMAQ funded project to

    imnprove the intersection by adding turn lanes;

    perform necessary related work. Work Type:

    Turn Lane Addition Termini: Intersection of

    Central Ave and Talmadge St in Toledo

    Toledo, City of Air Quality Non-Exe 0.15 CO CO Contr

    CO Contr

    CO Engr

    2018

    2018

    2018

    4TB7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    M400

    LNTP

    LNTP

    CMAQ

    Local Match

    Local Match

    $1,048,000

    $262,000

    $130,000

    $0

    $0

    $0

    $1,440,000

    $1,440,000

    $1,440,000

    $2,131,000

    $2,131,000

    $2,131,000

    2018stipID0044FDCO

    2018stipID0044FDCO

    2018stipID0044FDCO

    Ph subtotal: $1,440,000 $0 $1,440,000 $2,131,000

    PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $103,600

    $483,800

    $0

    $0

    $587,400

    $587,400

    $2,131,000

    $2,131,000

    2018stipID0044FDPE

    2018stipID0044FDPE

    Ph subtotal: $587,400 $0 $587,400 $2,131,000

    RW RW Serv 2018 LAB State 002 Labor - State Match $103,600 $0 $103,600 $2,131,000 2018stipID0044FDRW

    Ph subtotal: $103,600 $0 $103,600 $2,131,000

    99871 TMACOG LUC LUC US 24 18.56 Narrow Description: Narrow Detroit Ave from an existing

    4/5 lanes to 3 lanes with street parking;

    Signalized intersections changed to single lane

    roundabouts; perform neceesary related work;

    FIELD REVIEW REQUIRED. Work Type:

    Intersection Improvement Termini: AWT to

    Copland in Toledo

    Toledo, City of Air Quality Exempt 0.67 CO CO Contr

    CO Contr

    CO Engr

    2019

    2019

    2019

    4TB7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    M400

    LNTP

    LNTP

    CMAQ

    Local Match

    Local Match

    $2,507,200

    $626,800

    $313,400

    $0

    $0

    $0

    $3,447,400

    $3,447,400

    $3,447,400

    $3,561,400

    $3,561,400

    $3,561,400

    2018stipID0045FDCO

    2018stipID0045FDCO

    2018stipID0045FDCO

    Ph subtotal: $3,447,400 $0 $3,447,400 $3,561,400

    PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $8,000

    $98,000

    $0

    $0

    $106,000

    $106,000

    $3,561,400

    $3,561,400

    2018stipID0045FDPE

    2018stipID0045FDPE

    Ph subtotal: $106,000 $0 $106,000 $3,561,400

    RW RW Serv 2018 LAB State 002 Labor - State Match $8,000 $0 $8,000 $3,561,400 2018stipID0045FDRW

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 9 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    Ph subtotal: $8,000 $0 $8,000 $3,561,400

    FHWA 2 99872 TMACOG LUC LUC SR 51 8.36 Signals Description: Purchase and install a Central

    Traffic System for 507 signalized intersections in

    the City of Toledo and an Adaptive Traffic

    System for 13 signals to improve travel time and

    reduce congestion; perform necessary related

    work. Work Type: Signals Termini: Monroe

    St corridor-Cheltenham to Nantucket

    Toledo, City of Air Quality Exempt 2.64 CO CO Contr

    CO Contr

    CO Engr

    2018

    2018

    2018

    4TB7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    Z400

    LNTP

    LNTP

    Not Grouped

    Local Match

    Local Match

    $640,000

    $160,000

    $80,000

    $0

    $0

    $0

    $880,000

    $880,000

    $880,000

    $880,000

    $880,000

    $880,000

    2018MODID0350FDCO

    2018MODID0350FDCO

    2018MODID0350FDCO

    Ph subtotal: $880,000 $0 $880,000 $880,000

    100194 TMACOG LUC LUC US 24 20.07 Urban

    Pav

    Description: An urban paving project on US24 in

    Toledo to perform reconstruction of the

    pavement. UPDATE (4-28-15): deleted piece

    from City limit (18.59) to Copland (19.23) which

    is funded by TMACOG, PID 99871. Work

    Type: Major Rehabilitation Termini: Sherwood

    to Glendale

    Toledo, City of Air Quality Exempt 0.54 CO CO Contr

    CO Contr

    CO Engr

    2019

    2019

    2019

    4PF7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    Z240

    LNTP

    LNTP

    STBG

    Local Match

    Local Match

    $320,000

    $180,000

    $50,000

    $0

    $0

    $0

    $550,000

    $550,000

    $550,000

    $550,000

    $550,000

    $550,000

    2018stipID0047FDCO

    2018stipID0047FDCO

    2018stipID0047FDCO

    Ph subtotal: $550,000 $0 $550,000 $550,000

    100394 TMACOG LUC LUC Old Millard Ave Bridge Description: Replace the deteriorated concrete

    beam bridge on Old Millard Ave over Otter Creek

    in the City of Oregon; perform necessary related

    work. Work Type: Bridge Replacement

    Termini: Old Millard Ave bridge over Otter Creek

    Oregon, City of Air Quality Exempt CO CO Contr

    CO Contr

    CO Engr

    CO Engr

    2019

    2019

    2019

    2019

    4R87

    LNT

    4R87

    LNT

    Federal

    Local Match

    Federal

    Local Match

    Z233

    LNTP

    Z232

    LNTP

    STBG

    Local Match

    STBG

    Local Match

    $504,000

    $126,000

    $56,000

    $14,000

    $0

    $0

    $0

    $0

    $700,000

    $700,000

    $700,000

    $700,000

    $930,900

    $930,900

    $930,900

    $930,900

    2018stipID0048FDCO

    2018stipID0048FDCO

    2018stipID0048FDCO

    2018stipID0048FDCO

    Ph subtotal: $700,000 $0 $700,000 $930,900

    PE Dtl Dsgn

    Env PE

    2019

    2019

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $34,600

    $161,700

    $0

    $0

    $196,300

    $196,300

    $930,900

    $930,900

    2018stipID0048FDPE

    2018stipID0048FDPE

    Ph subtotal: $196,300 $0 $196,300 $930,900

    RW RW Serv 2019 LAB State 002 Labor - State Match $34,600 $0 $34,600 $930,900 2018stipID0048FDRW

    Ph subtotal: $34,600 $0 $34,600 $930,900

    101556 TMACOG LUC LUC SR2 18.62 Dehumidify Description: Install a dehumidification system, a

    dynamic lighting system, and repair cable

    hold-downs of the AWT bridge over the Maumee

    River in Toledo; Perform necessary related

    work.Wrap the existing cable with new round

    wire wrap at sections previously opened, new

    Work Type: Bridge Repair Termini: High Level

    Bridge (AWT) over Maumee River

    DISTRICT 2 PRODUCTION Air Quality Exempt CO CO Contr

    CO Contr

    CO Contr

    CO Engr

    CO Engr

    2018

    2018

    2018

    2018

    2018

    4BG

    4BT7

    4BU7

    LAB

    LAB

    Local Match

    State

    Federal

    Federal

    State

    002

    002

    L1CE

    L1CE

    002

    Local Match

    State Funds (002)

    Bridge

    Bridge

    Labor - State Match

    $300,000

    $2,280,000

    $9,120,000

    $442,400

    $110,600

    $0

    $0

    $0

    $0

    $0

    $12,253,000

    $12,253,000

    $12,253,000

    $12,253,000

    $12,253,000

    $14,147,312

    $14,147,312

    $14,147,312

    $14,147,312

    $14,147,312

    2018AM02ID0037FDCO

    2018AM02ID0037FDCO

    2018AM02ID0037FDCO

    2018AM02ID0037FDCO

    2018AM02ID0037FDCO

    Ph subtotal: $12,253,000 $0 $12,253,000 $14,147,312

    101914 TMACOG LUC LUC TMACOG FY 21 AQ

    Program

    Description: TMACOG FY 21 Air Quality

    Program Work Type: Air Quality Planning

    Termini: 0

    TMACOG Air Quality Non-Exe SPR Planning

    Planning

    2021

    2021

    4TE7

    LNT

    Federal

    Local Match

    M400

    LNTP

    CMAQ

    Local Match

    $68,000

    $17,000

    $0

    $0

    $85,000

    $85,000

    $85,000

    $85,000

    2018stipID0050FDSPR

    2018stipID0050FDSPR

    Ph subtotal: $85,000 $0 $85,000 $85,000

    101916 TMACOG LUC LUC TMACOG FY 21

    Rideshare

    Description: TMACOG FY 21 Rideshare

    Program Work Type: Air Quality Planning

    Termini: 0

    TMACOG Air Quality Exempt SPR Planning 2021 4TE7 Federal M400 CMAQ $112,800 $0 $112,800 $112,800 2018stipID0051FDSPR

    Ph subtotal: $112,800 $0 $112,800 $112,800

    102122 TMACOG LUC LUC SR 25 8.04

    Reconstruct

    Description: Reconstruction of SR-25 (AWT) in

    Toledo; perform necessary related work.

    Work Type: Major Rehabilitation Termini:

    From near City Park to I-75

    DISTRICT 2 PRODUCTION Air Quality Exempt 0.36 CO CO Contr

    CO Engr

    2018

    2018

    4BG

    4BG

    Local Match

    Local Match

    002

    002

    Local Match

    Local Match

    $1,200,000

    $120,000

    $0

    $0

    $1,320,000

    $1,320,000

    $1,919,210

    $1,919,210

    2018stipID0052FDCO

    2018stipID0052FDCO

    Ph subtotal: $1,320,000 $0 $1,320,000 $1,919,210

    102155 TMACOG LUC LUC Chessie Circle

    Connector

    Description: Construct a bike path along the

    northeast side of University Hills Blvd; perform

    necessary related work. This project will

    connect the Chessie Circle TYrail from Douglas

    Rd to Bancroft-Promenade Trail. Work Type:

    Bike path Relocation Termini: From Douglas to

    Bancroft

    Toledo, City of Air Quality Exempt 0.02 CO CO Contr

    CO Contr

    CO Engr

    CO Engr

    2018

    2018

    2018

    2018

    4TC7

    LNT

    4TC7

    LNT

    Federal

    Local Match

    Federal

    Local Match

    Z301

    LNTP

    Z301

    LNTP

    TAP/Enhancements

    Local Match

    TAP/Enhancements

    Local Match

    $388,400

    $97,100

    $38,800

    $9,700

    $0

    $0

    $0

    $0

    $534,000

    $534,000

    $534,000

    $534,000

    $614,000

    $614,000

    $614,000

    $614,000

    2018stipID0053FDCO

    2018stipID0053FDCO

    2018stipID0053FDCO

    2018stipID0053FDCO

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 10 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    Ph subtotal: $534,000 $0 $534,000 $614,000

    FHWA 2 102227 TMACOG LUC WOO/LUC Miami St

    Connector

    Description: Construct Miami St new connector

    ahead of the larger project PID 93592; perform

    necessary related work. Work Type: New

    Construction Termini: New Miami St connector

    DISTRICT 2 PRODUCTION Air Quality Exempt 0.49 CO CO Contr

    CO Engr

    2017

    2017

    4RA7

    LAB

    State

    State

    002

    002

    State Funds (002)

    Labor - State Match

    $700,000

    $70,000

    $0

    $0

    $770,000

    $770,000

    $984,401

    $984,401

    2018MODID0030FDCO

    2018MODID0030FDCO

    Ph subtotal: $770,000 $0 $770,000 $984,401

    102791 TMACOG LUC LUC 280 3.47 VGCS lighting Description: Evaluate options for replacement or

    rehab of the existing VGCS lighting system;

    Construct selected option and perform all

    necessary related work. Work Type: Lighting

    Maintenance Termini: VGCS Bridge

    DISTRICT 2 PRODUCTION Air Quality Exempt 0.01 CO CO Contr

    CO Contr

    CO Engr

    CO Engr

    CO Engr

    CO Engr

    2018

    2018

    2018

    2018

    2018

    2018

    4BT7

    4BU7

    4BT7

    4BU7

    LAB

    LAB

    State

    Federal

    State

    Federal

    Federal

    State

    002

    Z001

    002

    Z001

    Z001

    002

    State Funds (002)

    National Hwy Performance P

    State Funds (002)

    National Hwy Performance P

    National Hwy Performance P

    Labor - State Match

    $100,000

    $400,000

    $30,000

    $120,000

    $56,000

    $14,000

    $0

    $0

    $0

    $0

    $0

    $0

    $720,000

    $720,000

    $720,000

    $720,000

    $720,000

    $720,000

    $1,105,893

    $1,105,893

    $1,105,893

    $1,105,893

    $1,105,893

    $1,105,893

    2018stipID0054FDCO

    2018stipID0054FDCO

    2018stipID0054FDCO

    2018stipID0054FDCO

    2018stipID0054FDCO

    2018stipID0054FDCO

    Ph subtotal: $720,000 $0 $720,000 $1,105,893

    103417 TMACOG LUC LUC Chessie Circle Trail

    Paving

    Description: This 3.0 mile CMAQ project will

    provide a 16' paved surface on the existing

    Chessie Circle Trail from Bowman park to

    University Hills. Work Type: Bikeways

    Termini: Bowman Park to University Hills

    Toledo, City of Air Quality Exempt CO CO Contr

    CO Contr

    2021

    2021

    4TB7

    LNT

    Federal

    Local Match

    Z400

    LNTP

    CMAQ

    Local Match

    $1,418,400

    $354,600

    $0

    $0

    $1,773,000

    $1,773,000

    $1,782,350

    $1,782,350

    2018stipID0055FDCO

    2018stipID0055FDCO

    Ph subtotal: $1,773,000 $0 $1,773,000 $1,782,350

    PE Dtl Dsgn

    Env PE

    2020

    2020

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $1,350

    $7,500

    $0

    $0

    $8,850

    $8,850

    $1,782,350

    $1,782,350

    2018stipID0055FDPE

    2018stipID0055FDPE

    Ph subtotal: $8,850 $0 $8,850 $1,782,350

    RW RW Serv 2020 LAB State 002 Labor - State Match $500 $0 $500 $1,782,350 2018stipID0055FDRW

    Ph subtotal: $500 $0 $500 $1,782,350

    103437 TMACOG LUC LUC Secor Rd Wdn

    (Ban-Cen)

    Description: This project will widen Secor Rd

    between Bancroft St and Central Ave and install

    2 roundabouts.; NHS Waiver Required Work

    Type: Major Widening Termini: Bancroft St or

    Central Ave

    Toledo, City of Air Quality Exempt 1.01 PE Dtl Dsgn

    Env PE

    2019

    2019

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $25,000

    $100,000

    $0

    $0

    $125,000

    $125,000

    $10,722,000

    $10,722,000

    2018stipID0056FDPE

    2018stipID0056FDPE

    Ph subtotal: $125,000 $0 $125,000 $10,722,000

    RW Acquis

    Acquis

    RW Serv

    2020

    2020

    2019

    4TB7

    LNT

    LAB

    Federal

    Local Match

    State

    Z400

    LNTP

    002

    CMAQ

    Local Match

    Labor - State Match

    $2,600,000

    $650,000

    $50,000

    $0

    $0

    $0

    $3,300,000

    $3,300,000

    $3,300,000

    $10,722,000

    $10,722,000

    $10,722,000

    2018stipID0056FDRW

    2018stipID0056FDRW

    2018stipID0056FDRW

    Ph subtotal: $3,300,000 $0 $3,300,000 $10,722,000

    103789 TMACOG LUC LUC SR 25 9.15 Sfty Improv Description: Upgrade pedestrian markings,

    install back plates and upgrade signing at the

    intersection of Erie ST and Monroe St in

    Downtown Toledo; PERFORM NECESSARY

    RELTD WORK UPDATE; Work moved to PID

    95817 Work Type: Intersection Improvement

    Termini: TOLEDO. SR 25 ( Erie St ) at SR 51 (

    Monroe St)

    Toledo, City of Air Quality Exempt PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $2,000

    $5,000

    $0

    $0

    $7,000

    $7,000

    $7,500

    $7,500

    2018stipID0057FDPE

    2018stipID0057FDPE

    Ph subtotal: $7,000 $0 $7,000 $7,500

    RW RW Serv 2018 LAB State 002 Labor - State Match $500 $0 $500 $7,500 2018stipID0057FDRW

    Ph subtotal: $500 $0 $500 $7,500

    104273 TMACOG LUC LUC Overland Trail Description: This .9 mile project would

    replacement the pavement on the old Ottawa

    Park trail. The project begins at Bancroft St and

    runs to Monroe St along Ottawa Pky &

    Southcove Blvd. Work Type: Bikeways

    Termini: from Bancroft St to Monroe St along

    Ottawa Pky & Southcove Blvd.

    Toledo, City of Air Quality Exempt 0.54 CO CO Contr

    CO Contr

    CO Engr

    2018

    2018

    2018

    4TC7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    Z301

    LNTP

    LNTP

    TAP/Enhancements

    Local Match

    Local Match

    $450,800

    $112,700

    $56,350

    $0

    $0

    $0

    $619,850

    $619,850

    $619,850

    $649,850

    $649,850

    $649,850

    2018stipID0058FDCO

    2018stipID0058FDCO

    2018stipID0058FDCO

    Ph subtotal: $619,850 $0 $619,850 $649,850

    PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $2,500

    $25,000

    $0

    $0

    $27,500

    $27,500

    $649,850

    $649,850

    2018stipID0058FDPE

    2018stipID0058FDPE

    Ph subtotal: $27,500 $0 $27,500 $649,850

    RW RW Serv 2018 LAB State 002 Labor - State Match $2,500 $0 $2,500 $649,850 2018stipID0058FDRW

    Ph subtotal: $2,500 $0 $2,500 $649,850

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 11 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    FHWA 2 104274 TMACOG LUC LUC Oak Openings Trail Description: Construct 1.8 miles of new trail

    from Secor Road to Wiregrass Lake Metro park.

    Work Type: Bikeways Termini: Secor Road

    to Wiregrass Lake Metropark

    Toledo Area Metropark District Air Quality Exempt CO CO Contr

    CO Contr

    CO Engr

    2020

    2020

    2020

    4TC7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    Z301

    LNTP

    LNTP

    Not Grouped

    Local Match

    Local Match

    $158,252

    $633,012

    $79,125

    $0

    $0

    $0

    $870,389

    $870,389

    $870,389

    $900,389

    $900,389

    $900,389

    2018MODID0374FDCO

    2018MODID0374FDCO

    2018MODID0374FDCO

    Ph subtotal: $870,389 $0 $870,389 $900,389

    PE Dtl Dsgn

    Env PE

    2018

    2018

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $2,500

    $25,000

    $0

    $0

    $27,500

    $27,500

    $900,389

    $900,389

    2018stipID0059FDPE

    2018stipID0059FDPE

    Ph subtotal: $27,500 $0 $27,500 $900,389

    RW RW Serv 2018 LAB State 002 Labor - State Match $2,500 $0 $2,500 $900,389 2018stipID0059FDRW

    Ph subtotal: $2,500 $0 $2,500 $900,389

    104276 TMACOG LUC LUC CR 506 0.7 Lagrance

    St Resf

    Description: Milling and resurfacing of the

    existing asphalt pavement, including full depth

    pavement repairs, walk improvements, minor

    drainage improvements and curb repairs as

    needed. Work Type: Minor Rehabilitation -

    Pavement Gnrl Sys Termini: From Utica St. to

    Oakland St.

    Toledo, City of Air Quality Exempt 1.27 CO CO Contr

    CO Contr

    CO Engr

    CO Engr

    2020

    2020

    2020

    2020

    4TA7

    LNT

    4TA7

    LNT

    Federal

    Local Match

    Federal

    Local Match

    Z230

    LNTP

    Z230

    LNTP

    STBG

    Local Match

    STBG

    Local Match

    $1,744,000

    $436,000

    $52,320

    $13,080

    $0

    $0

    $0

    $0

    $2,245,400

    $2,245,400

    $2,245,400

    $2,245,400

    $2,296,400

    $2,296,400

    $2,296,400

    $2,296,400

    2018stipID0060FDCO

    2018stipID0060FDCO

    2018stipID0060FDCO

    2018stipID0060FDCO

    Ph subtotal: $2,245,400 $0 $2,245,400 $2,296,400

    PE Dtl Dsgn

    Env PE

    2019

    2019

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $4,500

    $45,000

    $0

    $0

    $49,500

    $49,500

    $2,296,400

    $2,296,400

    2018stipID0060FDPE

    2018stipID0060FDPE

    Ph subtotal: $49,500 $0 $49,500 $2,296,400

    RW RW Serv 2019 LAB State 002 Labor - State Match $1,500 $0 $1,500 $2,296,400 2018stipID0060FDRW

    Ph subtotal: $1,500 $0 $1,500 $2,296,400

    104290 TMACOG LUC LUC CR 2231 0.00 York St

    Recon

    Description: Full Depth Reconstruction of the

    0.86 mile of the existing roadway including curb

    replacement, walk improvements, and drainage

    improvements as needed. Work Type: Major

    Reconstruction Termini: From Front St. to City

    Limit

    Toledo, City of Air Quality Exempt 0.90 CO CO Contr

    CO Contr

    CO Engr

    CO Engr

    2020

    2020

    2020

    2020

    4TA7

    LNT

    4TA7

    LNT

    Federal

    Local Match

    Federal

    Local Match

    Z230

    LNTP

    Z230

    LNTP

    STBG

    Local Match

    STBG

    Local Match

    $1,368,000

    $342,000

    $41,040

    $10,260

    $0

    $0

    $0

    $0

    $1,761,300

    $1,761,300

    $1,761,300

    $1,761,300

    $1,761,300

    $1,761,300

    $1,761,300

    $1,761,300

    2018stipID0061FDCO

    2018stipID0061FDCO

    2018stipID0061FDCO

    2018stipID0061FDCO

    Ph subtotal: $1,761,300 $0 $1,761,300 $1,761,300

    104297 TMACOG LUC LUC CR 573 1.45 Central

    Recon

    Description: Full Depth Reconstruction of the

    existing roadway and ramps to Buckeye

    including curb replacement, walk improvements,

    and drainage improvements as needed. (SMALL

    PROJECT) Work Type: Major Reconstruction

    Termini: Brigham St. to Buckeye St.

    Toledo, City of Air Quality Exempt 0.28 CO CO Contr

    CO Contr

    2020

    2020

    4TA7

    LNT

    Federal

    Local Match

    Z230

    LNTP

    STBG

    Local Match

    $400,000

    $854,300

    $33,000

    $33,000

    $1,287,300

    $1,287,300

    $1,480,300

    $1,480,300

    2018stipID0062FDCO

    2018stipID0062FDCO

    Ph subtotal: $1,254,300 $33,000 $1,287,300 $1,480,300

    PE Dtl Dsgn

    Env PE

    2019

    2019

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $5,000

    $15,000

    $0

    $0

    $20,000

    $20,000

    $1,480,300

    $1,480,300

    2018stipID0062FDPE

    2018stipID0062FDPE

    Ph subtotal: $20,000 $0 $20,000 $1,480,300

    RW RW Serv 2019 LAB State 002 Labor - State Match $3,000 $0 $3,000 $1,480,300 2018stipID0062FDRW

    Ph subtotal: $3,000 $0 $3,000 $1,480,300

    104300 TMACOG LUC LUC CR 73 2.0 McCord Mill

    & Fill

    Description: Mill and Fill the existing pavement,

    performing spot full depth repairs, placing a two

    course asphalt concrete overlay (SMALL

    PROJECT) Work Type: Mill and Fill Termini:

    Hancock Avenue to Dorr Street

    LUCAS COUNTY ENGINEER Air Quality Exempt 0.91 CO CO Contr

    CO Contr

    CO Engr

    2020

    2020

    2020

    4TA7

    LNT

    LNT

    Federal

    Local Match

    Local Match

    Z230

    LNTP

    LNTP

    STBG

    Local Match

    Local Match

    $400,000

    $210,000

    $24,000

    $0

    $0

    $0

    $634,000

    $634,000

    $634,000

    $657,000

    $657,000

    $657,000

    2018stipID0063FDCO

    2018stipID0063FDCO

    2018stipID0063FDCO

    Ph subtotal: $634,000 $0 $634,000 $657,000

    PE Dtl Dsgn

    Env PE

    2019

    2019

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $5,000

    $15,000

    $0

    $0

    $20,000

    $20,000

    $657,000

    $657,000

    2018stipID0063FDPE

    2018stipID0063FDPE

    Ph subtotal: $20,000 $0 $20,000 $657,000

    RW RW Serv 2019 LAB State 002 Labor - State Match $3,000 $0 $3,000 $657,000 2018stipID0063FDRW

    Ph subtotal: $3,000 $0 $3,000 $657,000

  • Ohio Department of Transportation 2018-2021 STIP Project List (Appendix 6) as of 6/1/2018 Query: "Current STIP Detail 4"

    Page 12 of 216

    STIP

    AgencyDist PID MPO Cnty Project Name (ie CRS) Descript / Category / Termini Sponsoring Agency Air Quality Status

    Length

    (SLM)Ph Subph SFY SAC Fund Type

    Billing

    CodeObligation Group ALI - Qty XXX

    STIP

    Phase

    Estimate

    Total

    Phase

    Encumbered

    STIP

    Phase

    Total

    Project

    TotalSTIP Reference (New)

    FHWA 2 104417 TMACOG LUC LUC CR 2232 0.00 Wenz

    Rd FDR

    Description: Full Depth Reclamation of the

    existing roadway including widening for asphalt

    shoulders, new walk, new bike facilities, and

    water quality drainage improvements. Work

    Type: Minor Rehabilitation - Pavement Gnrl Sys

    Termini: from Angola Rd to Hill Ave

    Toledo, City of Air Quality Exempt 1.04 CO CO Contr

    CO Contr

    CO Engr

    CO Engr

    2021

    2021

    2021

    2021

    4TA7

    LNT

    4TA7

    LNT

    Federal

    Local Match

    Federal

    Local Match

    Z230

    LNTP

    Z230

    LNTP

    STBG

    Local Match

    STBG

    Local Match

    $1,776,000

    $444,000

    $53,280

    $13,320

    $0

    $0

    $0

    $0

    $2,286,600

    $2,286,600

    $2,286,600

    $2,286,600

    $2,319,600

    $2,319,600

    $2,319,600

    $2,319,600

    2018stipID0064FDCO

    2018stipID0064FDCO

    2018stipID0064FDCO

    2018stipID0064FDCO

    Ph subtotal: $2,286,600 $0 $2,286,600 $2,319,600

    PE Dtl Dsgn

    Env PE

    2020

    2020

    LAB

    LAB

    State

    State

    002

    002

    Labor - State Match

    Labor - State Match

    $5,000

    $25,000

    $0

    $0

    $30,000

    $30,000

    $2,319,600

    $2,319,600

    2018stipID0064FDPE

    2018stipID0064FDPE

    Ph subtotal: $30,000 $0 $30,000 $2,319,600

    RW RW Serv 2020 LAB S