from: schronce, jason b to · 8/15/2019  · please see the updated p6.0 project status spreadsheet...

3
From: Schronce, Jason B To: [email protected] ; [email protected] ; [email protected] ; chris.lukasina@campo- nc.us ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; Love, Jane ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; Eric Howell ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; DWS - Bryant Buck LA52 ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; [email protected] ; rose ; [email protected] ; [email protected] ; Jennings, Jerry D ; Midgett, Craig A ; Byrum, Gretchen A ; Hobbs, Barry ; Hampton, Diane K ; White, Leonard E ; Hunter, Robert P ; Cabaniss, Jeffrey D ; Aman, Michael C ; Marks, Caitlin M ; Pytcher, Alan ; Collette, Karen E. ; Kimes, D. Chad ; Hite, Katie E ; Eatmon, Jimmy ; Keeter, Ronald L ; Cauley, Charles ; Keilson, David P ; Deaton, Robert W ; Hopkins, Joey ; Hancock, Richard W ; Sturdivant, Darius D ; Hammond, William R ; Burns, Gregory W ; Njegovan, Tamara M. ; Robinson, Stephen J ; Mills, James M ; Huffines, Donald R ; Kluchar, Bryan ; Vollert, Kathy M ; Jones, Brandon H ; Haith, Fredrick D ; Craver, Phillip W ; Ivey, Stephen P ; Basham, Stuart L ; Griffith, Donald C ; Cole, Scott ; Canipe, Brett D ; Sizemore, Sean B ; Weisz, Robbie N ; Pettyjohn, Michael A ; Atkins, Wayne O ; Panicker, Anil T ; Ledbetter, Dean ; Stafford, Mark E ; McSwain, Jacqueline ; Cook, Hannah K ; Sparks, Stephen M ; Gibbs, Mark T ; Cannon, Steven L ; Merithew, Brendan W ; Williams, Stephen J ; Wilson, Troy S ; Burch, Brian C Cc: Chamberlain, Steven A ; Lee, Sarah E ; Green, Justin D ; Schronce, Jason B ; Argabright, Van ; McIntyre, Ray ; Wasserman, David S ; Stanley, Mike ; Wing, Leigh M ; Lewis, Derrick W ; Arellano, Terry C ; Walston, Bobby L ; Coe, Michael L ; Bingham, Rachel S ; Cockburn, JoHanna I ; Caldwell, LaToya ; Baker, Sterling D ; Byrum, Gretchen A ; Peele, Catherine D ; Dixon, John E ; Perry, Neil L ; Johnston, Mark L ; Orthner, Jason T ; Gibson, Laura K ; Alavi, J S ; Wert, Brian M ; Werner, Christopher M ; White, Julie A (NCDOT) ; Magliola, Dana A ; [email protected] ; Farley, John C ; Ayers, Stephanie ; Baker, Sterling D ; Arnold, Jonathan L ; Boyle, Elizabeth ; Reed, James ; Sparks, Kimberly L ; Rouse, John W ; Mitchell, Louis L ; Little, Timothy M ; Lewis, Robert W ; Howard, David L ; Dunlop, James H ; Mayhew, Brian K ; Peter Trencansky ; Mark Freeman ; [email protected] Subject: RE: P5.0 Projects with P6.0 Status Date: Thursday, August 15, 2019 10:37:10 AM Attachments: image001.png P5 Projects with P6 Status 8-15-2019 - Updated Draft 20-29 STIP.xlsx SPOT Partners, Please see the updated P6.0 Project Status spreadsheet based on the updated re-release of the DRAFT 2020-2029 STIP in August 2019. Please note, the FINAL STATUS will be based on the Adopted 2020-2029 STIP by the Board of Transportation (anticipated) next month. Column AH – P6.0 Project Status Column AI – Change in Status from January 2019 Release of DRAFT 2020-2029 STIP Please let me know if you have any questions. Jason B. Schronce, PE SPOT Manager Strategic Prioritization Office of Transportation North Carolina Department of Transportation 919 707 4646 office [email protected]

Upload: others

Post on 01-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • From: Schronce, Jason BTo: [email protected]; [email protected]; [email protected]; chris.lukasina@campo-

    nc.us; [email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected]; Love, Jane;[email protected]; [email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected]; [email protected]; EricHowell; [email protected]; [email protected]; [email protected]; [email protected];[email protected]; [email protected]; [email protected]; [email protected];[email protected]; [email protected]; DWS - Bryant Buck LA52; [email protected];[email protected]; [email protected]; [email protected]; [email protected];[email protected]; [email protected]; rose; [email protected]; [email protected];Jennings, Jerry D; Midgett, Craig A; Byrum, Gretchen A; Hobbs, Barry; Hampton, Diane K; White, Leonard E;Hunter, Robert P; Cabaniss, Jeffrey D; Aman, Michael C; Marks, Caitlin M; Pytcher, Alan; Collette, Karen E.;Kimes, D. Chad; Hite, Katie E; Eatmon, Jimmy; Keeter, Ronald L; Cauley, Charles; Keilson, David P; Deaton,Robert W; Hopkins, Joey; Hancock, Richard W; Sturdivant, Darius D; Hammond, William R; Burns, Gregory W;Njegovan, Tamara M.; Robinson, Stephen J; Mills, James M; Huffines, Donald R; Kluchar, Bryan; Vollert, KathyM; Jones, Brandon H; Haith, Fredrick D; Craver, Phillip W; Ivey, Stephen P; Basham, Stuart L; Griffith, Donald C;Cole, Scott; Canipe, Brett D; Sizemore, Sean B; Weisz, Robbie N; Pettyjohn, Michael A; Atkins, Wayne O;Panicker, Anil T; Ledbetter, Dean; Stafford, Mark E; McSwain, Jacqueline; Cook, Hannah K; Sparks, Stephen M;Gibbs, Mark T; Cannon, Steven L; Merithew, Brendan W; Williams, Stephen J; Wilson, Troy S; Burch, Brian C

    Cc: Chamberlain, Steven A; Lee, Sarah E; Green, Justin D; Schronce, Jason B; Argabright, Van; McIntyre, Ray;Wasserman, David S; Stanley, Mike; Wing, Leigh M; Lewis, Derrick W; Arellano, Terry C; Walston, Bobby L; Coe,Michael L; Bingham, Rachel S; Cockburn, JoHanna I; Caldwell, LaToya; Baker, Sterling D; Byrum, Gretchen A;Peele, Catherine D; Dixon, John E; Perry, Neil L; Johnston, Mark L; Orthner, Jason T; Gibson, Laura K; Alavi, J S;Wert, Brian M; Werner, Christopher M; White, Julie A (NCDOT); Magliola, Dana A; [email protected];Farley, John C; Ayers, Stephanie; Baker, Sterling D; Arnold, Jonathan L; Boyle, Elizabeth; Reed, James; Sparks,Kimberly L; Rouse, John W; Mitchell, Louis L; Little, Timothy M; Lewis, Robert W; Howard, David L; Dunlop,James H; Mayhew, Brian K; Peter Trencansky; Mark Freeman; [email protected]

    Subject: RE: P5.0 Projects with P6.0 StatusDate: Thursday, August 15, 2019 10:37:10 AMAttachments: image001.png

    P5 Projects with P6 Status 8-15-2019 - Updated Draft 20-29 STIP.xlsx

    SPOT Partners, Please see the updated P6.0 Project Status spreadsheet based on the updated re-release of theDRAFT 2020-2029 STIP in August 2019. Please note, the FINAL STATUS will be based on the Adopted 2020-2029 STIP by the Board ofTransportation (anticipated) next month. Column AH – P6.0 Project StatusColumn AI – Change in Status from January 2019 Release of DRAFT 2020-2029 STIP Please let me know if you have any questions. Jason B. Schronce, PESPOT ManagerStrategic Prioritization Office of TransportationNorth Carolina Department of Transportation919 707 4646 [email protected]

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=d18fd0d60478492280e243a34595b43a-Guest_738d4mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=773e2acf9a1d4cab85aa083dc9e77092-Guest_84c34mailto:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=773e2acf9a1d4cab85aa083dc9e77092-Guest_84c34mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=e02769a4e4bd4a29b8be4d2545b14938-DWS - Bryanmailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=cf06aeefcee64f21bb8f9d19ce03586f-Guest_ef26dmailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=c42e6293048c46aea020883d6bca7b2b-kfussellmailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=a199a08afd1949bba5644d946572a33a-jscole1mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=962a4d844b8b433799e8dcb38a20088b-mlcoemailto:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=962a4d844b8b433799e8dcb38a20088b-mlcoemailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=baf6cf64daa7483fac3946fc2cdfa42b-bmwertmailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]

    All Projects

    Projects in blue text are funded in the Statewide Mobility category (see column R). Projects not fully funded in Statewide Mobility are eligible to receive local input points (see column W).Projects in green text are funded in the Regional Imapct category. Projects not fully funded in Regional Impact are eligible to receive local input points (see column X).Projects in orange text are funded in the Division Needs category.

    BASED ON AUGUST 2019 STIP RELEASEBASED ON JANUARY 2019 DRAFT STIP RELEASE

    SPOT IDModeTIPProject CategoryRoute / Facility NameFrom / Cross StreetTo / Cross StreetDescriptionSpecific Improvement TypeCost to NCDOTStatewide Mobility Quantitative Score(Out of 100)Regional Impact Total Score (Out of 100)Division Needs Total Score (Out of 100)Funding Region(s)Division(s)MPO(s) / RPO(s)County(s)Funded Status - DraftProgrammed Amount(2020-2029) -DraftRight-of-Way Date - DraftConstruction Date - Draft CommentsEligible for Regional Impact Local Input PointsEligible for Division Needs Local Input PointsType of P5.0 SubmittalREGIONAL IMPACT Quantitative Score(Out of 70)REGIONAL IMPACT Local Input Points - MPO/RPO(out of 100 - 15% of total score)REGIONAL IMPACT Local Input Points - Division Engineer(out of 100 - 15% of total score)DIVISION NEEDS Quantitative Score(Out of 50)DIVISION NEEDS Local Input Points - MPO/RPO(out of 100 - 25% of total score)DIVISION NEEDS Local Input Points - Division Engineer(out of 100 - 25% of total score)P6.0 STATUS(August 2019 Draft 2020-2029 STIP Release)Change from January 2019 DRAFT STIP Release?P5.0 SubmitterP6.0 Status(January Draft)P6.0 Type of CarryoverSPOT Comments on P6.0 StatusDivision Comments on P6.0 Status

    A130004AviationDivision Needs7W6 - Hyde County Airport7W6 - Corportate Hangars, Apron and Taxiway N/ADesign and Installation of 3 60'x60' Corporate Hangars and associated apron/taxiways (includes Project Request Numbers: 3078 )1900 - Hangars$ 1,784,250N/AN/A11.11A01Albemarle RPOHydeNo - Division Needs ProjectYesHolding TankN/AN/AN/A11.110.000.00Holding TankNoAlbemarle RPOHolding Tank

    A130005AviationAV-5812Division Needs7W6 - Hyde County Airport7W6 - Runway 11 Extension to 5000'N/AExtend runway 300 ft. at approach end of Runway 11 for a total runway length of 5,000 ft. (includes Project Request Numbers: 2585 )0500 - Runway Length/Width$ 364,750N/AN/A65.77A01Albemarle RPOHydeDivision Needs$365,000FY 2023No - Division Needs ProjectYesCarryoverN/AN/AN/A40.7750.0050.00CommittedNoDivision 1Committed

    A130014AviationDivision NeedsEDE - Northeastern Regional AirportEDE - Box Hangars N/AThe airport has a waiting list for hangars. This project provides additional box hangars. (includes Project Request Numbers: 2482 )1900 - Hangars$ 1,112,400N/AN/A13.48A01Albemarle RPOChowanNo - Division Needs ProjectYesHolding TankN/AN/AN/A13.480.000.00Holding TankNoAlbemarle RPOHolding Tank

    A130021AviationAV-5877Division NeedsMQI - Dare County Regional AirportMQI - Southeast Corporate Hangar TaxiwayN/AConstruct corporate hangar taxiway (Southeast side). (includes Project Request Numbers: 2359 )1240 - Corporate and T-hangar Taxiway: Construction$ 329,875N/AN/A30.46A01Albemarle RPODareNo - Division Needs ProjectYesCarryoverN/AN/AN/A30.460.000.00Holding TankNoDivision 1Holding Tank

    A130025AviationDivision NeedsMQI - Dare County Regional AirportMQI - Southeast Box HangarsN/AConstruct a 3-unit box hangar adjacent to the taxilanes and 14-unit T-Hangar that was most recently constructed (Southeast side), in accordance with Airport Master Plan and ALP. (includes Project Request Numbers: 2358 )1900 - Hangars$ 766,480N/AN/A15.03A01Albemarle RPODareNo - Division Needs ProjectYesHolding TankN/AN/AN/A15.030.000.00Holding TankNoAlbemarle RPOHolding Tank

    A130037AviationDivision NeedsONX - Currituck County Regional AirportONX - Corportate Hangar with OfficeN/AConstruction of 10,000 SF Corporate Hangar and 3,000 SF office space. (includes Project Request Numbers: 2624 )1900 - Hangars$ 1,525,020N/AN/A13.32A01Albemarle RPOCurrituckNo - Division Needs ProjectYesHolding TankN/AN/AN/A13.320.000.00Holding TankNoAlbemarle RPOHolding Tank

    A130038AviationDivision NeedsONX - Currituck County Regional AirportONX - T-Hangar, Apron and Taxiway N/AConstruction of one new 10-unit T-Hangar and Hangar Taxiway and Apron Site work and Paving. (includes Project Request Numbers: 2633 )1900 - Hangars$ 1,421,900N/AN/A13.74A01Albemarle RPOCurrituckNo - Division Needs ProjectYesHolding TankN/AN/AN/A13.740.000.00Holding TankNoAlbemarle RPOHolding Tank

    A130041AviationAV-5834Division NeedsONX - Currituck County Regional AirportONX - Runway Pavement StrengtheningN/AStrengthen Runway to 100,000 lb. dual wheel strength to support larger jet and transport aircraft traffic (includes Project Request Numbers: 2630 )0605 - Pavement Strength - Runway$ 4,698,400N/AN/A29.90A01Albemarle RPOCurrituckNo - Division Needs ProjectYesCarryoverN/AN/AN/A29.900.000.00Holding TankNoDivision 1Holding Tank

    A130044AviationAV-5835Division NeedsPMZ - Plymouth Municipal AirportPMZ - T-HangarN/AConstruct a new 8-unit T-Hangar (includes Project Request Numbers: 2730 )1900 - Hangars$ 1,421,900N/AN/A12.91A01Albemarle RPOWashingtonNo - Division Needs ProjectYesCarryoverN/AN/AN/A12.910.000.00Holding TankNoDivision 1Holding Tank

    A130045AviationDivision NeedsPMZ - Plymouth Municipal AirportPMZ - Corportate Hangars, Apron and Taxiway N/AConstruct 80'X100' corporate hangar including site preparation, apron, and taxilane access. (includes Project Request Numbers: 2734 )1900 - Hangars$ 1,421,900N/AN/A12.91A01Albemarle RPOWashingtonNo - Division Needs ProjectYesHolding TankN/AN/AN/A12.910.000.00Holding TankNoAlbemarle RPOHolding Tank

    A130091AviationDivision NeedsSUT - Cape Fear Regional Jetport / Howie Franklin FieldSUT - West Apron Expansion & HangarsN/APurchase 26 acres for west apron expansion and hangars (PC# 2176)1200 - Aircraft Apron / Helipad Requirements$ 1,620,000N/AN/A59.59B03Cape Fear RPOBrunswickNo - Division Needs ProjectYesHolding TankN/AN/AN/A34.59100.000.00Holding TankNoCape Fear RPOHolding Tank

    A130104AviationDivision NeedsCPC - Columbus County Municipal AirportCPC - Construct New Terminal BuildingN/AConstruct a new terminal building to also serve as a disaster recovery center for southeastern NC during natural disasters such as Hurricanes. The existing terminal building does not meet the recommended square footage (3,200 SF) for terminal buildings. CPC is far enough away from the coast that this airport with a 5,500' runway length could allow emergency aircraft to land and use the facility as a command station during a hurricane. (PC# 2387)1305 - General Aviation Terminal Building: New Construction$ 1,325,000N/AN/A20.57C06Cape Fear RPOColumbusNo - Division Needs ProjectYesHolding TankN/AN/AN/A20.570.000.00Holding TankNoCape Fear RPOHolding Tank

    A130113AviationDivision NeedsLHZ - Triangle North Executive AirportLHZ - Industrial Hangar SiteN/ADevelopment of new industrial site, in phases, including site preparation for industrial hangar sites and construction of pavement for aprons, connector taxiway, access road, and parking. (includes Project Request Numbers: 2799 )1900 - Hangars$ 6,100,000N/AN/A11.31C05Capital Area MPOFranklinNo - Division Needs ProjectYesHolding TankN/AN/AN/A11.310.000.00Holding TankNoCapital Area MPOHolding Tank

    A130119AviationAV-5824Division NeedsEQY - Charlotte-Monroe Executive AirportEQY - East Partial Parallel TaxiwayN/AConstruct a partial parallel taxiway on the east side of Runway 5-23 to allow for future development. (includes Project Request Numbers: 3183 )1100 - Taxiway Requirements$ 3,232,000N/AN/A32.60E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesCarryoverN/AN/AN/A32.600.000.00Holding TankNoDivision 10Holding Tank

    A130121AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - North Hangar Area, Phase IAN/AConstruct an apron, a taxiway and access road for future corporate hangar development off the north corner of the parallel taxiway. This project is required to be completed prior to phase 1b and subsequent phases of the north hangar area to provide access to the runway and taxiway system. (includes Project Request Numbers: 2830 )1200 - Aircraft Apron / Helipad Requirements$ 1,332,540N/AN/A35.36E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesHolding TankN/AN/AN/A35.360.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A130122AviationAV-5825Division NeedsEQY - Charlotte-Monroe Executive AirportEQY - North Hangar Area, Phase IIN/AConstruct a Taxilane and Apron for additional corporate hangar development. This project requires the completion of the North Hangar Area Improvements - Phase IA project to provide access to the runway and taxiway system for this Phase II project. (includes Project Request Numbers: 3178 )1200 - Aircraft Apron / Helipad Requirements$ 2,485,000N/AN/A29.48E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesCarryoverN/AN/AN/A29.480.000.00Holding TankNoDivision 10Holding Tank

    A130123AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - North Hangar Area, Phase IIIN/AConstruct a taxilane and apron for additional corporate hangar development. Part of overall phased development. (includes Project Request Numbers: 3181 )1200 - Aircraft Apron / Helipad Requirements$ 2,441,700N/AN/A33.14E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesHolding TankN/AN/AN/A33.140.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A130124AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - North Hangar Area, Phase IVN/AConstruct a taxilane and apron for additional corporate hangar development. Part of overall phased development. (includes Project Request Numbers: 3182 )1200 - Aircraft Apron / Helipad Requirements$ 1,907,190N/AN/A33.76E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesHolding TankN/AN/AN/A33.760.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A130126AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - Terminal Building ExpansionN/AA proposed 6,200 square foot expansion to the existing terminal building includes a new conference center, reconfiguration of existing offices and new office space. (includes Project Request Numbers: 2831)1315 - General Aviation Terminal Building: Construct Addition to Existing$ 1,710,000N/AN/A20.83E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesHolding TankN/AN/AN/A20.830.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A130127AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - Auto Parking Expansion Land Acquisition & Design N/ALand acquisition and a design process is necessary to allow for an expansion to existing parking (includes Project Request Numbers: 2825 )1325 - General Aviation Terminal Building: Construct non-revenue terminal public parking$ 980,410N/AN/A17.60E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesHolding TankN/AN/AN/A17.600.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A130131AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - East Area Land AcquisitionN/ALand acquisition necessary for future airport expansion. This land totals 16.0 acres at $60,000/acre. (includes Project Request Numbers: 2834 )1900 - Hangars$ 882,000N/AN/A20.23E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesHolding TankN/AN/AN/A20.230.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A130133AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - Air Traffice Control Tower & Access RoadN/AConstruct new air traffic control tower and construct a new access road to the proposed air traffic control tower. (includes Project Request Numbers: 2832)3005 - Other: Not otherwise defined in system plan objectives$ 4,311,900N/AN/A6.65E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesHolding TankN/AN/AN/A6.650.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A130142AviationDivision NeedsSVH - Statesville Regional AirportSVH - Westside South Parallel TaxiwayN/AConstruction of a parallel taxiway is needed to meet current FAA separation standards - this project is funded. Bethlehem Road must be relocated to the south of the proposed taxiway before taxiway extension can begin. This road is needed to provide access to area residents and businesses. (Includes Project Request Numbers 3382 )1100 - Taxiway Requirements$ 3,293,000N/AN/A36.03F12Charlotte Regional Transportation Planning OrganizationIredellNo - Division Needs ProjectYesHolding TankN/AN/AN/A36.030.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A130144AviationDivision NeedsMRH - Michael J. Smith FieldMRH - Apron ExpansionN/AExpand Apron to accommodate future Aircraft growth and types (8350 SY Expansion) (includes Project Request Numbers: 3022 )1200 - Aircraft Apron / Helipad Requirements$ 1,152,000N/AN/A28.61B02Down East RPOCarteretNo - Division Needs ProjectYesHolding TankN/AN/AN/A28.610.000.00Holding TankNoDown East RPOHolding Tank

    A130150AviationAV-5838Division NeedsMRH - Michael J. Smith FieldMRh - Runway 8-26 Pavement StrengtheningN/AStrengthen Runway 8-26 pavement to accommodate 100,000 # DW aircraft (includes Project Request Numbers: 3024 )0605 - Pavement Strength - Runway$ 3,449,000N/AN/A55.93B02Down East RPOCarteretNo - Division Needs ProjectYesCarryoverN/AN/AN/A30.93100.000.00Holding TankNoDivision 2Holding Tank

    A130162AviationAV-5839Division NeedsDPL - Duplin County AirportDPL - Industrial Air Park Apron, Taxilane and Landside accessN/AThe County purchased land adjacent to the airport entrance roadway with the intent of developing the property into an industrial air park development. This project includes the site infrastructure needed to provide airfield access (apron and taxilane) as well as landside access to 2 of the proposed lots. (includes Project Request Numbers: 3260 )1200 - Aircraft Apron / Helipad Requirements$ 1,638,000N/AN/A54.48B03East Carolina RPODuplinNo - Division Needs ProjectYesCarryoverN/AN/AN/A29.48100.000.00Holding TankNoDivision 3Holding Tank

    A130179AviationAV-5811Division NeedsW40 - Mount Olive Municipal AirportW40 - Runway Extension to 5,500'N/AProject includes design and construction of a 245' extension and displaced threshold to provide the airport with a runway length of 5,500' (includes Project Request Numbers: 3011 )0500 - Runway Length/Width$ 603,000N/AN/A89.69A04East Carolina RPOWayneDivision Needs$603,000FY 2023No - Division Needs ProjectYesCarryoverN/AN/AN/A39.69100.00100.00CommittedNoDivision 4Committed

    A130186AviationAV-5775Statewide MobilityAVL - Asheville Regional AirportAVL - Wright Brothers Way ExtensionN/ADesign and construction of a 1,500 ft extension to Wright Brothers Way Road (2781 )1320 - General Aviation Terminal Building: Construct Terminal Access Road$ 500,00060.3641.9126.32G13French Broad River MPOBuncombeYesYesCarryover41.910.000.0026.320.000.00Holding TankNoDivision 13Holding Tank

    A130192AviationDivision NeedsEHO - Shelby-Clevland County Regional AirportEHO - South Phase I, Hangars and Equipment Buildings, Apron and TaxilanesN/ARehabilitate existing Apron, construct (including site preparation) an airfield maintenance equipment storage building, one 10 unit T-hangar, two box hangars, associated taxi lanes and access. Includes site preparation for future hangar development area, access and procurement of airfield maintenance equipment (tractor/mower). (includes Project Request Numbers: 2334 )1900 - Hangars$ 8,000,000N/AN/A9.87F12Gaston-Cleveland-Lincoln MPOClevelandNo - Division Needs ProjectYesHolding TankN/AN/AN/A9.870.000.00Holding TankNoGaston-Cleveland-Lincoln MPOHolding Tank

    A130198AviationDivision NeedsEHO - Shelby-Clevland County Regional AirportEHO - Airport Entrance RoadN/ADemolition and reconstruction of the airport entrance and portions of highway 150. The improvements will eliminate the existing unsafe skewed intersection replacing it with a 90 degree intersection while maintaining the appropriate sight distances. (includes Project Request Numbers: 2349) Includes relocation of existing CAP Hangar and construction of parking improvements in this area.1320 - General Aviation Terminal Building: Construct Terminal Access Road$ 1,351,000N/AN/A13.89F12Gaston-Cleveland-Lincoln MPOClevelandNo - Division Needs ProjectYesHolding TankN/AN/AN/A13.890.000.00Holding TankNoGaston-Cleveland-Lincoln MPOHolding Tank

    A130201AviationAV-5849Division NeedsEHO - Shelby-Clevland County Regional AirportEHO - Runway 5 Extension to 5,500'N/AThe existing runway length is 5,000 feet.This project includes extending the runway 5 end a distance of 500 feet, along with a corresponding extension of the parallel taxiway to the new runway end. Also included is a 150 foot wide by 300 foot long extended runway safety area beyond the new runway end. (includes Project Request Numbers: 2344 )0500 - Runway Length/Width$ 7,600,000N/AN/A58.87F12Gaston-Cleveland-Lincoln MPOClevelandNo - Division Needs ProjectYesCarryoverN/AN/AN/A33.87100.000.00Holding TankNoDivision 12Holding Tank

    A130210AviationDivision NeedsGWW - Wayne Executive JetportGWW - Terminal BuildingN/AConstruct a new terminal building (8,000 – 10,000 sq ft), parking, and access road, and expand existing terminal area parking to accommodate additional users and redesign existing layout. (includes Project Request Numbers: 2146 and 3547)1305 - General Aviation Terminal Building: New Construction$ 3,190,000N/AN/A18.66A04Goldsboro Urban Area MPOWayneNo - Division Needs ProjectYesHolding TankN/AN/AN/A18.660.000.00Holding TankNoGoldsboro Urban Area MPOHolding Tank

    A130212AviationDivision NeedsGWW - Wayne Executive JetportGWW - Corportate Hangar Access RoadN/AConstruct an access road for the corporate hangar area (includes Project Request Numbers: 2148 ). Approximately 750 linear feet.1320 - General Aviation Terminal Building: Construct Terminal Access Road$ 350,000N/AN/A21.52A04Goldsboro Urban Area MPOWayneNo - Division Needs ProjectYesHolding TankN/AN/AN/A21.520.000.00Holding TankNoGoldsboro Urban Area MPOHolding Tank

    A130258AviationAV-5807Regional ImpactPGV - Pitt-Greenville AirportPGV - Apron ExpansionN/AApron Expansion - Design and Construction (Concrete and Bituminous) for air carrier ramp (includes Project Request Numbers: 2538 )1200 - Aircraft Apron / Helipad Requirements$ 300,000N/A66.6755.43B02Greenville Urban Area MPOPittYesYesCarryover51.67100.000.0034.4384.000.00Holding TankNoDivision 2Holding Tank

    A130280AviationDivision NeedsUKF - Wilkes County AirportUKF - Taxilane and Hangar Construction (Phase 1&2)N/APhase I - paving two taxilanes for a 10 bay T-hangar building on a previously prepared area and the construction of a 10 bay T-hangar building. Phase II - paving one taxilane for a proposed 10 bay T-hangar building on the north hangar development area and the construction of a 10 bay T-hangar building. Phase includes paving a connector taxiway, one taxilane and construction of a 20 bay T-hangar building on the north hangar development area. (includes Project Request Numbers: 2301)1240 - Corporate and T-hangar Taxiway: Construction$ 5,220,000N/AN/A23.97F11High Country RPOWilkesNo - Division Needs ProjectYesHolding TankN/AN/AN/A23.970.000.00Holding TankNoHigh Country RPOHolding Tank

    A130288AviationDivision NeedsFQD - Rutherford County - Marchman FieldFQD - New Terminal BuildingN/AThis project will consist of a new terminal building near the eastside development area. (includes Project Request Numbers: 2920 )1305 - General Aviation Terminal Building: New Construction$ 1,620,000N/AN/A19.54G13Isothermal RPORutherfordNo - Division Needs ProjectYesHolding TankN/AN/AN/A19.540.000.00Holding TankNoIsothermal RPOHolding Tank

    A130289AviationDivision NeedsFQD - Rutherford County - Marchman FieldFQD - East Airfield DevelopmentN/ADesign and site work to provide a partial parallel taxiway, new apron for larger corporate aircraft parking, fueling, and hangar development. The existing terminal area apron is built out and is not large enough to accommodate these aircraft. (2269)1200 - Aircraft Apron / Helipad Requirements$ 6,165,000N/AN/A22.68G13Isothermal RPORutherfordNo - Division Needs ProjectYesHolding TankN/AN/AN/A22.680.000.00Holding TankNoIsothermal RPOHolding Tank

    A130291AviationAV-5774Division NeedsFQD - Rutherford County - Marchman FieldFQD - Runway 5 Extension to 6,000' N/AThe existing runway length is 5000'. The NC GA Development Plan recommended a runway length of 5500'. This project will extend the runway to 6000' as shown on the current ALP. (includes Project Request Numbers: 3209 )0500 - Runway Length/Width$ 6,100,000N/AN/A59.07G13Isothermal RPORutherfordNo - Division Needs ProjectYesCarryoverN/AN/AN/A34.07100.000.00Holding TankNoDivision 13Holding Tank

    A130298AviationAV-5809Regional ImpactOAJ - Albert J. Ellis AirportOAJ - Airport Access Road Realignment and ExtensionN/AThis project will realign and extend the access roadway into the airport. This project will be funded by NCDOT Grants and local funds. (includes Project Request Numbers: 3110 )1320 - General Aviation Terminal Building: Construct Terminal Access Road$ 300,000N/A58.0451.08B03Jacksonville Urban Area MPOOnslowYesYesCarryover43.04100.000.0026.08100.000.00Holding TankNoDivision 3Holding Tank

    A130310AviationDivision NeedsHNZ - Henderson-Oxford AirportHNZ - Corporate HangarN/AConstruct a new 100' X 120' corporate hangar and associated apron. (includes Project Request Numbers: 2896 )1900 - Hangars$ 1,670,000N/AN/A13.02C05Kerr-Tar RPOGranvilleNo - Division Needs ProjectYesHolding TankN/AN/AN/A13.020.000.00Holding TankNoKerr-Tar RPOHolding Tank

    A130311AviationDivision NeedsHNZ - Henderson-Oxford AirportHNZ - Corporate Hangar - 50' x 60'N/AConstruct a new 50' x 60' corporate hangar, as well as apron, taxilane, and access road. (includes Project Request Numbers: 3067 )1900 - Hangars$ 955,000N/AN/A14.92C05Kerr-Tar RPOGranvilleNo - Division Needs ProjectYesHolding TankN/AN/AN/A14.920.000.00Holding TankNoKerr-Tar RPOHolding Tank

    A130316AviationDivision NeedsTDF - Person County AirportTDF - Terminal Expansion , Area Apron Expansion, Term Area and Parking ExpansionN/AExpand existing 2,000 terminal building to +/-5,000 sq ft. Building was constructed in mid-1980s. Passenger levels are projected to increase ~40% over next 20 years and terminal needs to be expanded to accommodate increased activity at TDF. Expand terminal auto parking in conjunction with Project 2439 to expand terminal building. Expand 6in waterline from SR 1131 to terminal area. Associated with project 2439. Current terminal is served by well.(includes PRN: 2440/2439/2444 )1315 - General Aviation Terminal Building: Construct Addition to Existing$ 2,738,000N/AN/A15.26C05Kerr-Tar RPOPersonNo - Division Needs ProjectYesHolding TankN/AN/AN/A15.260.000.00Holding TankNoKerr-Tar RPOHolding Tank

    A130318AviationDivision NeedsTDF - Person County AirportTDF - T-Hangar, Executive Hangar, & Taxiway Multiple PhasesN/AConstruct T-Hangar and Executive Hangar. All existing hangars at TDF are occupied. The Airport needs new hangars to support economic development.(includes Project Request Number: 3139)1900 - Hangars$ 1,865,000N/AN/A12.81C05Kerr-Tar RPOPersonNo - Division Needs ProjectYesHolding TankN/AN/AN/A12.810.000.00Holding TankNoKerr-Tar RPOHolding Tank

    A130326AviationAV-5840Division NeedsLBT - Lumberton Regional AirportLBT - Hangar TaxilaneN/AThis project will provide a hangar taxiway for corporate hangar development northeast of terminal building. (includes Project Request Numbers: 2409 )1240 - Corporate and T-hangar Taxiway: Construction$ 370,000N/AN/A55.93C06Lumber River RPORobesonNo - Division Needs ProjectYesCarryoverN/AN/AN/A30.93100.000.00Holding TankNoDivision 6Holding Tank

    A130332AviationDivision NeedsMEB - Laurinburg-Maxton AirportMEB - New Terminal BuildingN/AThis project will remove the existing aged terminal building and replace it with a new 7,500 sf terminal building in the same location. (includes Project Request Numbers: 2932 )1305 - General Aviation Terminal Building: New Construction$ 1,641,000N/AN/A21.65E08Lumber River RPOScotlandNo - Division Needs ProjectYesHolding TankN/AN/AN/A21.650.000.00Holding TankNoLumber River RPOHolding Tank

    A130347AviationDivision NeedsCTZ - Clinton-Sampson County AirportCTZ - HangarsN/AThere are currently no airport owned hangars available for lease on the airport and no leasable area for new private/corporate hangar construction. This project will develop a hangar complex adjacent to the new southwest parallel taxiway. This project will include site preparation for and construction of two 8 unit 40x40 Hangars. (includes Project Request Numbers: 2464 )1900 - Hangars$ 972,000N/AN/A42.65B03Mid-Carolina RPOSampsonNo - Division Needs ProjectYesHolding TankN/AN/AN/A17.65100.000.00Holding TankNoMid-Carolina RPOHolding Tank

    A130348AviationDivision NeedsCTZ - Clinton-Sampson County AirportCTZ - Hangars 2N/AThere are currently no airport owned hangars available for lease on the airport and no leasable area for new private/corporate hangar construction. Project will develop a hangar complex adjacent to the new southwest parallel taxiway over the course of four phases. This project will include site preparation for and construction of two 8 unit 40x40 Hangars.(includes Project Request Numbers: 3265 )1900 - Hangars$ 1,053,900N/AN/A17.29B03Mid-Carolina RPOSampsonNo - Division Needs ProjectYesHolding TankN/AN/AN/A17.290.000.00Holding TankNoMid-Carolina RPOHolding Tank

    A130352AviationDivision NeedsEYF - Curtis L Brown Jr. FieldEYF - Land Acquisition for Future DevelopmentN/AThe Airport desires to foster economic development through the use of the Airport, therefore this project will acquire land (approx. 19 acres) adjacent to the Airport for development of large corporate hangars/apron or aviation industrial development. (includes Project Request Numbers: 2139 )1900 - Hangars$ 415,000N/AN/A41.21C06Mid-Carolina RPOBladenNo - Division Needs ProjectYesHolding TankN/AN/AN/A16.21100.000.00Holding TankNoMid-Carolina RPOHolding Tank

    A130354AviationDivision NeedsEYF - Curtis L Brown Jr. FieldEYF - Hangars N/ASite preparation for two new corporate hangars. Project to include site preparation, taxilane and ramp paving, and utility installation. Construction of two hangars totaling approximately 16,400 sq.ft. to be completed by others. (includes Project Request Numbers: 2142 )1900 - Hangars$ 450,000N/AN/A16.11C06Mid-Carolina RPOBladenNo - Division Needs ProjectYesHolding TankN/AN/AN/A16.110.000.00Holding TankNoMid-Carolina RPOHolding Tank

    A130361AviationAV-5827Division NeedsHRJ - Harnett Regional JetportHRJ - Hangar TaxiwaysN/AThis project will construct much needed hangar taxiways for new T-hangar development. There are currently no available hangar spaces. (includes Project Request Numbers: 2196 )1240 - Corporate and T-hangar Taxiway: Construction$ 842,400N/AN/A26.55C06Mid-Carolina RPOHarnettNo - Division Needs ProjectYesCarryoverN/AN/AN/A26.550.000.00Holding TankNoDivision 6Holding Tank

    A130363AviationDivision NeedsHRJ - Harnett Regional JetportHRJ - Apron ExpansionN/ACorporate Apron expansion is needed to provide dedicated parking space for larger corporate turboprop and jet aircraft next to the terminal building and to avoid maneuvering conflicts with the fueling apron and hangar access taxiway. Existing apron has 19 tie down locations which is insufficient to meet ADP requirements. Apron area will provide space for two helicopters. (Includes project request number 2190)1200 - Aircraft Apron / Helipad Requirements$ 2,499,390N/AN/A30.57C06Mid-Carolina RPOHarnettNo - Division Needs ProjectYesHolding TankN/AN/AN/A30.570.000.00Holding TankNoMid-Carolina RPOHolding Tank

    A130368AviationDivision NeedsHRJ - Harnett Regional JetportHRJ - Hangars N/AThe Airport has a waiting list for hangar rental. This 5 unit hangar will provide needed space. (includes Project Request Numbers: 2195 )1900 - Hangars$ 1,427,400N/AN/A17.60C06Mid-Carolina RPOHarnettNo - Division Needs ProjectYesHolding TankN/AN/AN/A17.600.000.00Holding TankNoMid-Carolina RPOHolding Tank

    A130369AviationDivision NeedsHRJ - Harnett Regional JetportHRJ - Hangars 2 N/AThis project will construct much needed hangars; 13 units. (includes Project Request Numbers: 2198 )1900 - Hangars$ 867,600N/AN/A19.61C06Mid-Carolina RPOHarnettNo - Division Needs ProjectYesHolding TankN/AN/AN/A19.610.000.00Holding TankNoMid-Carolina RPOHolding Tank

    A130373AviationAV-5788Division NeedsMCZ - Martin County AirportMCZ - T-Hangar Taxilanes and ApronN/AConstruction of new T-Hangar Taxilanes. Construction of apron for two corporate hangars, including site preparation for hangars (approximately 1540 sqyd..). (includes Project Request Numbers: 2155/2836 )1240 - Corporate and T-hangar Taxiway: Construction$ 260,000N/AN/A55.93A01Mid-East RPOMartinDivision Needs$260,000FY 2025No - Division Needs ProjectYesCarryoverN/AN/AN/A30.93100.000.00CommittedNoDivision 1Committed

    A130374AviationAV-5836Division NeedsMCZ - Martin County AirportMCZ - Corporate HangarN/AConstruct 60'x60' corporate hangar. (includes Project Request Numbers: 2837 )1900 - Hangars$ 265,000N/AN/A16.73A01Mid-East RPOMartinNo - Division Needs ProjectYesCarryoverN/AN/AN/A16.730.000.00Holding TankNoDivision 1Holding Tank

    A130375AviationAV-5837Division NeedsMCZ - Martin County AirportMCZ - T-HangarsN/AConstruct a 10 unit T-Hangar Construct an access road to existing T-hangars (includes Project Request Numbers: 2156/2154 )1900 - Hangars$ 900,000N/AN/A14.46A01Mid-East RPOMartinNo - Division Needs ProjectYesCarryoverN/AN/AN/A14.460.000.00Holding TankNoDivision 1Holding Tank

    A130378AviationDivision NeedsOCW - Washington-Warren FieldOCW - T-Hangar and TaxiwayN/AIncludes construction of a new 6 unit T-Hangar, Site Preparation, and necessary taxiway located south of the existing T- Hangar development. The airport requests the ability to reserve FY 17, 18, and 19 Vision 100 Funds to complete this project. (includes Project Request Numbers: 2672 )1900 - Hangars$ 821,990N/AN/A14.82B02Mid-East RPOBeaufortNo - Division Needs ProjectYesHolding TankN/AN/AN/A14.820.000.00Holding TankNoMid-East RPOHolding Tank

    A130379AviationDivision NeedsOCW - Washington-Warren FieldOCW - Mantenance HangarN/AProject incudes design and construction of new 100' x 100' maintenance hangar. The existing hangar was damaged during the tornado that hit the airport in 2012. The airport request the ability to reserve FY 17, 18 and 19 vision 100 Funds to complete this project. (includes Project Request Numbers: 3003 )1900 - Hangars$ 680,000N/AN/A15.44B02Mid-East RPOBeaufortNo - Division Needs ProjectYesHolding TankN/AN/AN/A15.440.000.00Holding TankNoMid-East RPOHolding Tank

    A130380AviationDivision NeedsOCW - Washington-Warren FieldOCW - Gravity Sewer Line to serve hangarsN/AProject involves installation of approximately 2400 LF of new gravity sewer line from the intersection of Airport Road and Market Street to the terminal area to serve existing and future corporate hangar tenants and the maintenance hangar. (includes Project Request Numbers: 3002 )1900 - Hangars$ 306,000N/AN/A16.47B02Mid-East RPOBeaufortNo - Division Needs ProjectYesHolding TankN/AN/AN/A16.470.000.00Holding TankNoMid-East RPOHolding Tank

    A130384AviationAV-5862Regional ImpactEWN - Coastal Carolina Regional AirportEWN - Corporate Area Apron, Taxiway and Access RoadN/AThis project includes the design for a corporate area apron, taxiway, and access road to accommodate development needs for the Airport. The area was cleared of trees to remove wildlife habitat within the airport fence line. Includes the coordination with regulatory agencies in order to mitigate and acquire the permits for the land associated with the Runway 32 corporate area expansion. (includes Project Request Numbers: 3159, 3167, 3166 )1200 - Aircraft Apron / Helipad Requirements$ 300,000N/A52.5061.80B02New Bern Area MPOCravenYesYesCarryover52.500.000.0036.80100.000.00Holding TankNoDivision 2Holding Tank

    A130386AviationAV-5860Regional ImpactEWN - Coastal Carolina Regional AirportEWN - GA Apron ExpansionN/AThe project includes the design of apron and taxiway/taxi lanes and the removal of old outdated T-hangars. This will allow the construction of new corporate/GA hangars to accommodate growth. This project will allow expansion of the current apron and allow construction of modern corporate and General Aviation hangars. (includes Project Request Numbers: 3164/3165 )1200 - Aircraft Apron / Helipad Requirements$ 300,000N/A54.0437.19B02New Bern Area MPOCravenYesYesCarryover54.040.000.0037.190.000.00Holding TankNoDivision 2Holding Tank

    A130387AviationRegional ImpactEWN - Coastal Carolina Regional AirportEWN - Future Development Land AcquisitionN/ALand acquisition of approximately seven acres on Clermont road to accommodate future expansion of the airport. Joined with the property on which the old passenger terminal was located, provides easy access to Runway 4/22 and Runway 14/32. (includes Project Request Numbers: 31723005 - Other: Not otherwise defined in system plan objectives$ 300,000N/A21.1835.08B02New Bern Area MPOCravenYesYesHolding Tank21.180.000.0010.08100.000.00Holding TankNoNew Bern Area MPOHolding Tank

    A130388AviationRegional ImpactEWN - Coastal Carolina Regional AirportEWN - Air Traffic Control TowerN/AThis project consists of the coordination, justification, and construction of a new Air Traffic Control Tower to replace the existing, aging structure. The airport's control tower was dedicated in 1974. It was vacated when President Reagan fired the striking air traffic controllers. It sat empty until it was put into service once again in 1999. It is a functioning, but aged structure in need of replacement. (includes Project Request Numbers: 3197 )3005 - Other: Not otherwise defined in system plan objectives$ 300,000N/A38.6810.03B02New Bern Area MPOCravenYesYesHolding Tank23.68100.000.0010.030.000.00Holding TankNoNew Bern Area MPOHolding Tank

    A130413AviationAV-5878Division NeedsASJ - Tri-County AirportASJ - T-Hangar ConstructionN/AThis project will provide access to the T-Hangars that are to be constructed. (includes Project Request Numbers: 2648 )1240 - Corporate and T-hangar Taxiway: Construction$ 311,000N/AN/A55.52A01Peanut Belt RPOHertfordDivision Needs$311,000FY 2027No - Division Needs ProjectYesCarryoverN/AN/AN/A30.52100.000.00CarryoverNoDivision 1CarryoverProgrammed, not Committed

    A130416AviationAV-5778Division NeedsASJ - Tri-County AirportASJ - Runway Extension to 5,000'N/AThis project will construct a 500' runway extension for a 5000' runway. (includes Project Request Numbers: 2639 )0500 - Runway Length/Width$ 679,000N/AN/A77.04A01Peanut Belt RPOHertfordDivision Needs$679,000FY 2023No - Division Needs ProjectYesCarryoverN/AN/AN/A39.54100.0050.00CommittedNoDivision 1Committed

    A130417AviationAV-5833Division NeedsIXA - Halifax Northampton Regional AirportIXA - Apron and Taxilane for Corportate HangarsN/AConstruction of taxilane and apron for corporate hangar development and site preparation for 6 corporate hangars and associated parking lots. (includes Project Request Numbers: 2170 )1200 - Aircraft Apron / Helipad Requirements$ 715,000N/AN/A69.25A04Peanut Belt RPOHalifaxDivision Needs$715,000FY 2026No - Division Needs ProjectYesCarryoverN/AN/AN/A31.75100.0050.00CarryoverNoDivision 4CarryoverProgrammed, not Committed

    A130419AviationAV-5822Division NeedsIXA - Halifax Northampton Regional AirportIXA - Apron and Taxilane for T-HangarsN/AConstruction of taxilane and site preparation for additional T-Hangars. (includes Project Request Numbers: 2788 )1240 - Corporate and T-hangar Taxiway: Construction$ 350,000N/AN/A68.48A04Peanut Belt RPOHalifaxDivision Needs$350,000FY 2024No - Division Needs ProjectYesCarryoverN/AN/AN/A30.98100.0050.00CommittedNoDivision 4Committed

    A130420AviationAV-5846Division NeedsIXA - Halifax Northampton Regional AirportIXA - T-HangarsN/AConstruction of one 6 unit T-hanger building that is a little bigger than the standard T-hangers (includes Project Request Numbers: 2789 ) 1900 - Hangars$ 575,000N/AN/A16.57A04Peanut Belt RPOHalifaxNo - Division Needs ProjectYesCarryoverN/AN/AN/A16.570.000.00Holding TankNoDivision 4Holding Tank

    A130421AviationDivision NeedsIXA - Halifax Northampton Regional AirportIXA - Maintenance HangarN/AConstruction of a 100' X 120' aircraft maintenance hanger. (includes Project Request Numbers: 2791 )1900 - Hangars$ 800,000N/AN/A15.75A04Peanut Belt RPOHalifaxNo - Division Needs ProjectYesHolding TankN/AN/AN/A15.750.000.00Holding TankNoDivision 4Holding Tank

    A130423AviationDivision NeedsSIF - Rockingham County / NC Shiloh AirportSIF - Terminal Apron Expansion N/AExpand terminal apron (includes Project Request Numbers: 2542 ).1200 - Aircraft Apron / Helipad Requirements$ 18,180,000N/AN/A47.73D07Piedmont Triad RPORockinghamNo - Division Needs ProjectYesHolding TankN/AN/AN/A22.73100.000.00Holding TankNoPiedmont Triad RPOHolding Tank

    A130424AviationAV-5898Division NeedsSIF - Rockingham County / NC Shiloh AirportSIF - T-Hanger Taxilanes N/AConstruct t-hangar taxilanes for addition of t-hangars. (includes Project Request Numbers: 2541 )1240 - Corporate and T-hangar Taxiway: Construction$ 574,290N/AN/A80.26D07Piedmont Triad RPORockinghamDivision Needs$574,000FY 2025No - Division Needs ProjectYesHolding TankN/AN/AN/A30.26100.00100.00CommittedNoPiedmont Triad RPOCommitted

    A130425AviationDivision NeedsSIF - Rockingham County / NC Shiloh AirportSIF - Corporate Hangars and ApronN/AConstruct corporate hangars (six - 60 'x 60') and access aprons. (includes Project Request Numbers: 2544 )1900 - Hangars$ 1,455,570N/AN/A13.38D07Piedmont Triad RPORockinghamNo - Division Needs ProjectYesHolding TankN/AN/AN/A13.380.000.00Holding TankNoPiedmont Triad RPOHolding Tank

    A130431AviationDivision NeedsHBI - Asheboro Regional AirportHBI - Terminal BuildingN/AConstruct new terminal building (includes Project Request Numbers: 3047). New PC #37991305 - General Aviation Terminal Building: New Construction$ 6,570,000N/AN/A16.24E08Piedmont Triad RPORandolphNo - Division Needs ProjectYesHolding TankN/AN/AN/A16.240.000.00Holding TankNoPiedmont Triad RPOHolding Tank

    A130432AviationAV-5858Division NeedsHBI - Asheboro Regional AirportHBI - Corporate and T-Hangar Taxiway ConstructionN/AProject includes: paving two new taxilanes and extending two existing taxilanes to serve additional hangar site; a new access road to the existing taxilanes and a new 10 Unit T-Hangar Building (includes Project Request Numbers: 2205/2207/2208/2212 ) New PC #22051240 - Corporate and T-hangar Taxiway: Construction$ 3,455,000N/AN/A69.59E08Piedmont Triad RPORandolphDivision Needs$3,455,000FY 2025No - Division Needs ProjectYesCarryoverN/AN/AN/A24.59100.0080.00CommittedNoDivision 8Committed

    A130439AviationDivision NeedsAFP - Anson County - Jeff Cloud FieldAFP - Apron ExpansionN/AExpand apron by approximately 6,000 square yards. This expansion would relocate itinerant parking areas away from existing hangars. (includes Project Request Numbers: 2871 )1200 - Aircraft Apron / Helipad Requirements$ 662,000N/AN/A53.20E10Rocky River RPOAnsonNo - Division Needs ProjectYesHolding TankN/AN/AN/A28.20100.000.00Holding TankNoRocky River RPOHolding Tank

    A130449AviationDivision NeedsVUJ - Stanly County AirportVUJ - Access RoadN/AAccess road from terminal parking area to ramp. (includes Project Request Numbers: 2801 )1320 - General Aviation Terminal Building: Construct Terminal Access Road$ 147,381N/AN/A51.88E10Rocky River RPOStanlyNo - Division Needs ProjectYesHolding TankN/AN/AN/A26.88100.000.00Holding TankNoRocky River RPOHolding Tank

    A130452AviationAV-5895Division NeedsVUJ - Stanly County AirportVUJ - Runway 4R-22L ExtensionN/APhase 1 - Design work for proposed 1,000' extension for Runway 4R-22L to accommodate existing aircraft users. Phase 2 - Grading and drainage portion of 1,000' runway extension for Runway 4R-22L to accommodate existing aircraft users. Phase 3 - Paving and lighting portion of 1,000' runway extension for Runway4R-22L to accommodate existing aircraft users. (includes Project Request Numbers: 2787/2792/2794 )0500 - Runway Length/Width$ 5,341,500N/AN/A88.99E10Rocky River RPOStanlyDivision Needs$10,684,000FY 2025No - Division Needs ProjectYesHolding TankN/AN/AN/A38.99100.00100.00CommittedNoRocky River RPOCommitted

    A130488AviationAV-5856Division NeedsTTA - Raleigh Executive Jetport at Sanford-Lee CountyTTA - Corporate Hangar Apron Expansion Phase IIN/ASite development for expansion of the Corporate Hangar Apron - Phase II (includes Project Request Numbers: 2401 )1200 - Aircraft Apron / Helipad Requirements$ 3,500,000N/AN/A25.77E08Triangle Area RPOLeeNo - Division Needs ProjectYesCarryoverN/AN/AN/A25.770.000.00Holding TankNoDivision 8Holding Tank

    A130494AviationAV-5844Division NeedsETC - Tarboro-Edgecombe AirportECT - Corporate Apron and HangarN/AExpand the Corporate Apron by 8,350 SF and construct a 70' X 80' Hangar. (includes Project Request Numbers: 2898 )1200 - Aircraft Apron / Helipad Requirements$ 570,000N/AN/A28.20A04Upper Coastal Plain RPOEdgecombeNo - Division Needs ProjectYesCarryoverN/AN/AN/A28.200.000.00Holding TankNoDivision 4Holding Tank

    A130498AviationDivision NeedsJNX - Johnston Regional AirportJNX - Taxiway WideningN/AThe existing taxiway pavements will be approaching the end of their useful life and require pavement rehabilitation. Assumed design would include a 3" asphalt maintenance overlay. The taxiways will be widened to 50' at this time to conform to C- III standards. (includes Project Request Numbers: 2129 )1100 - Taxiway Requirements$ 4,100,000N/AN/A27.24A04Upper Coastal Plain RPOJohnstonNo - Division Needs ProjectYesHolding TankN/AN/AN/A27.240.000.00Holding TankNoUpper Coastal Plain RPOHolding Tank

    A130499AviationAV-5847Division NeedsJNX - Johnston Regional AirportJNX - T-Hangars, Apron and Corporate Area Site PrepN/AThis project provides for construction of Phase I of the new corporate area development. Phase I will include the construction of a new t-hangar area and construction of a new apron. Elements of construction will include clearing and grubbing, grading and drainage, paving, and erosion control measures. (includes Project Request Numbers: 2127 )1240 - Corporate and T-hangar Taxiway: Construction$ 8,945,000N/AN/A42.32A04Upper Coastal Plain RPOJohnstonNo - Division Needs ProjectYesCarryoverN/AN/AN/A17.32100.000.00Holding TankNoDivision 4Holding Tank

    A150099AviationAV-5896ADivision NeedsSVH - Statesville Regional AirportSVH - Runway 28 Extension to 8,000' (Phase 1 of 5)N/AThe current runway length of 7,000' is anticipated to be a limiting factor to desired avaition growth in the region over the next 20 year planning period. Project consists of land acquisition, Navaid relocation, East Aviation Drive relocation, and construction of the runway extension. (Includes Project Request Number 3458)0500 - Runway Length/Width$ 9,630,000N/AN/A87.84F12Charlotte Regional Transportation Planning OrganizationIredellDivision Needs$9,630,000FY 2025 No - Division Needs ProjectYesHolding TankN/AN/AN/A37.84100.00100.00CommittedNoCharlotte Regional Transportation Planning OrganizationCommitted

    A150101AviationAV-5795Statewide MobilityILM - Wilmington International AirportILM - GA Apron ExpansionN/AExpand the GA Apron grassed area to paved surface to accommodate additional tie down space for aircraft. Includes Project Request Number: 00003432.1200 - Aircraft Apron / Helipad Requirements$ 500,00074.79N/AN/AB03Wilmington Urban Area MPONew HanoverStatewide Mobility$500,000FY 2022No - Funded in Statewide MobilityNo - Funded in Statewide MobilityCarryover52.94N/AN/A35.62N/AN/ACommittedNoDivision 3Committed

    A150114AviationAV-5799Statewide MobilityILM - Wilmington International AirportILM - Widen North-South Taxiway SystemN/AThe airport has had plans to widen the North-South TWY system to make the width consistent throughout. Currently the TWY system width ranges from 51 to 75 feet. The project will also add shoulders and keep the TWY lights on pavement to reduce mowing and maintenance. Includes Project Request Number: 000029881100 - Taxiway Requirements$ 500,00081.55N/AN/AB03Wilmington Urban Area MPONew HanoverStatewide Mobility$500,000FY 2027No - Funded in Statewide MobilityNo - Funded in Statewide MobilityCarryover57.94N/AN/A37.86N/AN/ACarryoverNoDivision 3CarryoverProgrammed, not CommittedFY 2027

    A150118AviationAV-5801Statewide MobilityILM - Wilmington International AirportILM - Air Carrier Apron ExpansionN/AConstruction for expansion of the Air Carrier Apron in support of the proposed terminal expansion project. Includes Project Request Number: 000034281200 - Aircraft Apron / Helipad Requirements$ 500,00076.96N/AN/AB03Wilmington Urban Area MPONew HanoverStatewide Mobility$500,000FY 2021No - Funded in Statewide MobilityNo - Funded in Statewide MobilityCarryover54.38N/AN/A35.98N/AN/ACommittedNoDivision 3Committed

    A150349AviationDivision NeedsAKH - Gastonia Municipal AirportAKH - Hangar Development Area - Site Preparation N/ASite preparation for expansion of Hangar Area (5 hangars, 2 corporate)1900 - Hangars$ 415,000N/AN/A16.21F12Gaston-Cleveland-Lincoln MPOGastonNo - Division Needs ProjectYesHolding TankN/AN/AN/A16.210.000.00Holding TankNoGaston-Cleveland-Lincoln MPOHolding Tank

    A150420AviationStatewide MobilityILM - Wilmington International AirportILM - Perimeter Road ImprovementsN/AProject will improve safety by relocating the Airport's vehicle perimeter road outside NAVAID critical areas and Object Free Areas. The road will be all-weather road allowing traffic to be separated from Aircraft movement areas. Includes Project Request Number: 000034153005 - Other: Not otherwise defined in system plan objectives$ 500,00034.9524.079.46B03Wilmington Urban Area MPONew HanoverYesYesHolding Tank24.070.000.009.460.000.00Holding TankNoWilmington Urban Area MPOHolding Tank

    A150423AviationAV-5796Statewide MobilityILM - Wilmington International AirportILM - Widen TaxiwaysN/AIncrease width of all taxiways to 75' that will accomendate all aircraft that utilize ILM.Includes Project Request Number: 000034501100 - Taxiway Requirements$ 500,00080.16N/AN/AB03Wilmington Urban Area MPONew HanoverStatewide Mobility$500,000FY 2026No - Funded in Statewide MobilityNo - Funded in Statewide MobilityCarryover57.01N/AN/A37.63N/AN/ACarryoverNoDivision 3CarryoverProgrammed, not CommittedFY 2026

    A150497AviationAV-5815Division NeedsACZ - Henderson FieldACZ - Henderson Field: Apron Expansion Phase 2 and Partial Parallel TaxiwayN/AThis project consist of Apron Expansion Phase 2 and a partial parallel taxiway. Since the completion of the Apron Expansion Phase -1 in 2013, the apron has remained 90-100% full. Additional Apron space is needed to service transient traffic and future tenants. As noted in the recently completed NC Airport System Plan, the current apron parking meets the system objective for Henderson Field (ACZ). This project will exceed the system objective value for apron parking. (Project Request 2485)1100 - Taxiway Requirements$ 2,103,000N/AN/A82.86B03Cape Fear RPOPenderDivision Needs$2,103,000FY 2024No - Division Needs ProjectYesCarryoverN/AN/AN/A32.86100.00100.00CommittedNoDivision 3Committed

    A150518AviationAV-5823Division NeedsCTZ - Clinton-Sampson County AirportCTZ - Runway Pavenent StrengtheningN/AProject provides a 2" asphalt overlay to achieve a runway strength of 30,000# DW. (includes Project Request Numbers: 2469)0605 - Pavement Strength - Runway$ 1,773,900N/AN/A36.29B03Mid-Carolina RPOSampsonNo - Division Needs ProjectYesCarryoverN/AN/AN/A36.290.000.00Holding TankNoDivision 3Holding Tank

    A150523AviationDivision NeedsEYF - Curtis L Brown Jr. FieldEYF - Airport industrial park phase IIN/APhase 2 - Airport industrial park. Hangar site prep for two 120' x 150' hangars, construct approximately 5560 sq yd aircraft apron, and parking lot construction. Includes Project Request Number 3404.1900 - Hangars$ 1,010,000N/AN/A13.89C06Mid-Carolina RPOBladenNo - Division Needs ProjectYesHolding TankN/AN/AN/A13.890.000.00Holding TankNoMid-Carolina RPOHolding Tank

    A150604AviationAV-5805Regional ImpactOAJ - Albert J. Ellis AirportOAJ - Land Acquisition for Runway Extension and Road RelocationN/AAcquire land for runway extension and roadway relocation (Project Request Number 3442)0500 - Runway Length/Width$ 300,000N/A77.22N/AB03Jacksonville Urban Area MPOOnslowRegional Impact$300,000FY 2023YesNo - Funded in Regional ImpactCarryover62.22100.000.0045.62N/AN/ACommittedNoDivision 3Committed

    A150605AviationAV-5804Regional ImpactOAJ - Albert J. Ellis AirportOAJ - Land Acquisition for Runway Projection Zone, Runway Extension and Road RelocationN/AAcquire land for roadway relocation, RPZ and runway extension0500 - Runway Length/Width$ 300,000N/A77.63N/AB03Jacksonville Urban Area MPOOnslowRegional Impact$300,000FY 2023YesNo - Funded in Regional ImpactCarryover62.63100.000.0045.72N/AN/ACommittedNoDivision 3Committed

    A150610AviationAV-5806Regional ImpactOAJ - Albert J. Ellis AirportOAJ - Runway 23 Extend 900' N/AExtend runway 23 and taxiway A 900' (construction) (Project Request Number 3761)0500 - Runway Length/Width$ 300,000N/A81.44N/AB03Jacksonville Urban Area MPOOnslowRegional Impact$300,000FY 2025YesNo - Funded in Regional ImpactCarryover66.44100.000.0046.68N/AN/ACommittedNoDivision 3Committed

    A150697AviationDivision NeedsSUT - Cape Fear Regional Jetport / Howie Franklin FieldSUT - West Apron Expansion (Phase 2)N/ASUT (Cape Fear Regional Jetport) - Expand the west apron for transient aircraft (Phase 2) (PC# 2175)1200 - Aircraft Apron / Helipad Requirements$ 3,042,000N/AN/A29.79B03Cape Fear RPOBrunswickNo - Division Needs ProjectYesHolding TankN/AN/AN/A29.790.000.00Holding TankNoCape Fear RPOHolding Tank

    A150700AviationAV-5843Division NeedsGWW - Wayne Executive JetportGWW - Runway 23 Extension to 6,500'N/AExtend Runway 23 1,000 feet. This project includes land acquisition, design, site prep, paving and lighting, and NAVAID relocation (Project request numbers 3302, 3551, 3552, 3554)0500 - Runway Length/Width$ 7,475,000N/AN/A84.74A04Goldsboro Urban Area MPOWayneDivision Needs$3,737,000FY 2029No - Division Needs ProjectYesCarryoverN/AN/AN/A34.74100.00100.00CarryoverNoDivision 4CarryoverProgrammed, not Committed

    A150741AviationDivision NeedsETC - Tarboro-Edgecombe AirportETC - T-Hangars & TaxilaneN/ATarboro Airport T-Hangars & Taxilane - Partner Connect Project #34311900 - Hangars$ 550,000N/AN/A14.82A04Upper Coastal Plain RPOEdgecombeNo - Division Needs ProjectYesHolding TankN/AN/AN/A14.820.000.00Holding TankNoUpper Coastal Plain RPOHolding Tank

    A150871AviationDivision NeedsTDF - Person County AirportTDF - Airfield Pavement StrengtheningN/AStrengthen Runway, Taxiway, and Apron Pavements to 90,000# for Critical Air Freight Aircraft. The runway, apron & majority of the taxiways were last overlaid in 2003; Taxiways A West and H were constructed in 2007. The design strength for these pavements was 30,000# SWG, 68.000# DWG. The pavement PCI's range from 67 (Fair) on the runway, 74 (Satisfactory) on the taxiways, & 67 (Fair) on the apron. Airport currently has operations by aircraft in excess of the pavement design strength. PC#34060605 - Pavement Strength - Runway$ 8,351,000N/AN/A53.87C05Kerr-Tar RPOPersonNo - Division Needs ProjectYesHolding TankN/AN/AN/A28.87100.000.00Holding TankNoKerr-Tar RPOHolding Tank

    A150872AviationDivision NeedsHNZ - Henderson-Oxford AirportHNZ - North Terminal Area DevelopmentN/AConstruct a New Parallel Taxiway (Project Request Number 3462); Construct a new terminal area apron(Project Request Number 3463); Construct a new terminal building (Project Request Number 3464);Access Road and Parking for new terminal (Project Request Number 3465). Project includes Project Request Numbers: 3462,3463,3464,34651305 - General Aviation Terminal Building: New Construction$ 10,329,000N/AN/A17.22C05Kerr-Tar RPOGranvilleNo - Division Needs ProjectYesHolding TankN/AN/AN/A17.220.000.00Holding TankNoKerr-Tar RPOHolding Tank

    A151018AviationDivision Needs60J - Odell Williamson Municipal Airport60J - Hangar Land Acquision and Hangar ConstructionN/AAcquire parcel with hangers located at the northeast corner of SR 1184 (Ocean Isle Beach Road) and NC 179 and construct new hangar building: Includes Project Request Number: 00022981900 - Hangars$ 760,000N/AN/A40.90B03Grand Strand Area Transportation StudyBrunswickNo - Division Needs ProjectYesHolding TankN/AN/AN/A15.90100.000.00Holding TankNoGrand Strand Area Transportation StudyHolding Tank

    A151025AviationStatewide MobilityGSO - Piedmont - Triad International AirportGSO - World Wide DriveN/AWorld Wide Drive. #3472 FY 2024.3005 - Other: Not otherwise defined in system plan objectives3005 - Other: Not otherwise defined in system plan objectives$ 500,00034.7423.929.51D07Greensboro Urban Area MPOGuilfordYesYesHolding Tank23.920.000.009.510.000.00Holding TankNoGreensboro Urban Area MPOHolding Tank

    A151026AviationAV-5803Statewide MobilityGSO - Piedmont - Triad International AirportGSO - Taxiway F and Bridge over Ted Johnson ParkwayN/ATaxiway F This taxiway will increase our capacity and improve aircraft movement around the airfield. This includes a Taxiway bridge over Ted Johnson Parkway.#3473 FY 20271100 - Taxiway Requirements$ 500,00089.64N/AN/AD07Greensboro Urban Area MPOGuilfordStatewide Mobility$500,000FY 2024No - Funded in Statewide MobilityNo - Funded in Statewide MobilityCarryover62.40N/AN/A43.89N/AN/ACommittedNoDivision 7Committed

    A151027AviationAV-5800Statewide MobilityGSO - Piedmont - Triad International AirportGSO - Taxiway J N/ATaxiway J This taxiway will increase our capacity and improve aircraft movement between Taxiway D and J2. This is adjacent to our Fixed Based Operator and this area can be a bottleneck for commercial service and general aviation. #3474 FY 20250535 - Runway Length: Taxiway Extension$ 500,00088.04N/AN/AD07Greensboro Urban Area MPOGuilfordStatewide Mobility$500,000FY 2023No - Funded in Statewide MobilityNo - Funded in Statewide MobilityCarryover62.14N/AN/A43.04N/AN/ACommittedNoDivision 7Committed

    A151029AviationAV-5802Statewide MobilityGSO - Piedmont - Triad International AirportGSO - Northwest ApronN/ANorthwest Apron This apron will increase capacity for future expansion.#3475FY20261200 - Aircraft Apron / Helipad Requirements$ 500,00081.91N/AN/AD07Greensboro Urban Area MPOGuilfordStatewide Mobility$500,000FY 2023No - Funded in Statewide MobilityNo - Funded in Statewide MobilityCarryover57.27N/AN/A38.87N/AN/ACommittedNoDivision 7Committed

    A151063AviationDivision NeedsBUY - Burlington - Alamance Regional AirportBUY - Aviation Terminal Building and Terminal Area DevelopmentN/AThis project will perform design, environmental assessment, and construction of new Terminal (8,000 sf) and Flight Operations (55,000 sf). Included with this project is the public access road, public vehicle parking and aircraft parking apron, and approximately 9 acres of land acquisition. (PRN 3468, 3469, 2610, 2613, 2649, 2655, 3138, 3143, 3187, 3189, 3190, 3191, 3468, 3469, 3470)1305 - General Aviation Terminal Building: New Construction$ 22,268,000N/AN/A42.73D07Burlington-Graham MPOAlamanceNo - Division Needs ProjectYesHolding TankN/AN/AN/A17.73100.000.00Holding TankNoBurlington-Graham MPOHolding Tank

    A170373AviationAV-5759Division NeedsZEF - Elkin Municipal AirportZEF - Runway 25 Extension to 4,200' and Full Parallel TaxiwayN/AThe 200’ Runway Extension and Full Parallel Taxiway project includes acquisition of 2 land parcels which fall within proposed work area grading limits as well as an environmental assessment. The 200 foot runway extension will result in a total runway length of 4,200 feet. The new parallel taxiway will provide new connectivity with the existing airport apron that will comply with FAA’s direct access requirements (the current/existing configuration does not comply). PC#29810500 - Runway Length/Width$ 10,756,000N/AN/A58.14F11Northwest Piedmont RPOSurryNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A33.14100.000.00Holding TankNoNorthwest Piedmont RPOHolding Tank

    A170437AviationDivision NeedsCPC - Columbus County Municipal AirportCPC - Widen Runway, Widen and Extend Runway Safety Area N/ACPC (Columbus Co Municipal) - Widen runway to 100', widen runway safety area to 300' and lengthen to 600', install runway lighting system MALSR (PC#s 3720/3721/3722)0540 - Runway Widening$ 7,454,000N/AN/A53.48C06Cape Fear RPOColumbusNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A28.48100.000.00Holding TankNoCape Fear RPOHolding Tank

    A170438AviationDivision NeedsCPC - Columbus County Municipal AirportCPC - T-hangars, corporate hangars, and hangar taxiways - Phase 2N/ACPC (Columbus County Airport) - Construct one 8-unit T-hangar, three 50'x50' corporate hangars, and accompanying taxiways on the west side of the Phase 1 hangars (PC# 2388)1900 - Hangars$ 1,936,000N/AN/A11.78C06Cape Fear RPOColumbusNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A11.780.000.00Holding TankNoCape Fear RPOHolding Tank

    A170595AviationAV-5890Regional ImpactJQF - Concord Regional AirportJQF - Apron Strengthening/Hangar Taxiway RehabN/AApron Strengthening: The existing pavement was constructed using a design load of 139,000 lbs with dual wheel configuration. Current airline traffic utilizes B737 and A319 aircraft, which exceed the design load of the existing pavement. Hangar Taxilane Rehabilitation: Most of the hangar taxilanes were constructed when the airport was constructed in 1994 and are over 20 years old. These pavements are very oxidized and show signs of typical aging (including larger thermal and joint cracks) (3575)0615 - Pavement Strength - Apron$ 300,000N/A86.80N/AE10Cabarrus-Rowan MPOCabarrusRegional Impact$300,000FY 2020YesNo - Funded in Regional ImpactNew Submittal56.80100.00100.0036.37N/AN/ACommittedNoCabarrus-Rowan MPOCommitted

    A170598AviationAV-5889Regional ImpactJQF - Concord Regional AirportJQF - Runway Safety Area Improvements - EMASN/AIn 1994 when the airport was constructed the extended runway safety area for Runway 2 was modified to a functional length of 600' to ensure that the wetlands and floodplain associated with Rocky River would not be negatively impacted . Based on the existing critical aircraft the ERSA should be 1,000' from the end of the runway . Declared distances have been published to identify the ERSA is 400' short of the FAA's required 1,000'. (2233)0535 - Runway Length: Taxiway Extension$ 300,000N/A90.90N/AE10Cabarrus-Rowan MPOCabarrusRegional Impact$300,000FY 2020YesNo - Funded in Regional ImpactNew Submittal60.90100.00100.0041.83N/AN/ACommittedNoCabarrus-Rowan MPOCommitted

    A170599AviationAV-5892Regional ImpactJQF - Concord Regional AirportJQF - North Apron ExpansionN/AThe proposed project consist of preparing an environmental assessment for the construction of an apron expansion to the north. The dimensions of the apron expansion will be approximately 300' X 300' . (2247)1200 - Aircraft Apron / Helipad Requirements$ 300,000N/A82.09N/AE10Cabarrus-Rowan MPOCabarrusRegional Impact$300,000FY 2026YesNo - Funded in Regional ImpactNew Submittal52.09100.00100.0034.54N/AN/ACarryoverNoCabarrus-Rowan MPOCarryoverProgrammed, not Committed

    A170731AviationDivision NeedsUKF - Wilkes County AirportUKF - New Airport TerminalN/AConstruct new airport terminal. Anticipated size of the new terminal building is 8,500 square feet to replace the existing building. The age of the existing facility is approximately 35 years old.1305 - General Aviation Terminal Building: New Construction$ 1,000,000N/AN/A21.39F11High Country RPOWilkesNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A21.390.000.00Holding TankNoHigh Country RPOHolding Tank

    A170733AviationDivision NeedsUKF - Wilkes County AirportUKF - Eastside Parallel TaxiwayN/AConstruct eastside partial parallel taxiway PC#38031100 - Taxiway Requirements$ 7,870,000N/AN/A29.61F11High Country RPOWilkesNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A29.610.000.00Holding TankNoHigh Country RPOHolding Tank

    A170736AviationDivision NeedsUKF - Wilkes County AirportUKF - Eastside development and Access RoadN/AAn expansion of the Wilkes County Airport to the east is planned with the establishment of the Wilkes Business Airpark. To facilitate the development for the 100+ acre site, a suitable access road is desired. PC# 23071100 - Taxiway Requirements$ 5,015,000N/AN/A30.39F11High Country RPOWilkesNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A30.390.000.00Holding TankNoHigh Country RPOHolding Tank

    A170738AviationAV-5894Division NeedsUKF - Wilkes County AirportUKF - Runway Extension to 7,000'N/AExtend runway from 6,250 feet to 7,000 feet to facilitate larger aircraft take off and landing PC#38020500 - Runway Length/Width$ 14,145,000N/AN/A57.94F11High Country RPOWilkesDivision Needs$14,145,000FY 2022FY 2024No - Division Needs ProjectYesNew SubmittalN/AN/AN/A32.940.00100.00CommittedNoHigh Country RPOCommitted

    A170876AviationDivision NeedsLBT - Lumberton Regional AirportLBT - 10 Unit T-Hangar and TaxiwayN/AProject will build 10 additional T- hangars and associated taxiways and aprons for the Lumberton Regional Airport increasing current capacity. Corresponds to Partner Connect #2424 (HANGAR TAXIWAYS AND T-HANGARS)1900 - Hangars$ 1,664,500N/AN/A13.07C06Lumber River RPORobesonNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A13.070.000.00Holding TankNoLumber River RPOHolding Tank

    A170908AviationStatewide MobilityILM - Wilmington International AirportILM - General Aviation Hangar TaxilaneN/AConstruct a new hangar taxilane to provide access into development hangar leasehold areas per ILM ALP. Includes Project Request Number: 000037591240 - Corporate and T-hangar Taxiway: Construction$ 500,00072.5850.0535.95B03Wilmington Urban Area MPONew HanoverYesYesNew Submittal50.050.000.0035.950.000.00Holding TankNoWilmington Urban Area MPOHolding Tank

    A170916AviationAV-5885Statewide MobilityILM - Wilmington International AirportILM - Runway 6-24 Pavement RehabilitationN/ARehabilitate runway 6-24 due to it exceeding its useful life of 20 years. Signs of alligator cracking in the pavement and exposed aggregate on the runway. This project will include all runway markings and possible taxiway markings. Includes Project Request Number: 000037870605 - Pavement Strength - Runway$ 500,00087.48N/AN/AB03Wilmington Urban Area MPONew HanoverStatewide Mobility$500,000FY 2027No - Funded in Statewide MobilityNo - Funded in Statewide MobilityNew Submittal61.78N/AN/A41.99N/AN/ACarryoverNoWilmington Urban Area MPOCarryoverProgrammed, not CommittedCON FY 2027

    A170922AviationStatewide MobilityILM - Wilmington International AirportILM - 2nd GA Hangar Aircraft Taxi LaneN/AConstruct a new hangar taxi lane to provide access into development hangar leasehold areas per ILM's ALP. Includes Project Request Number: 000037891240 - Corporate and T-hangar Taxiway: Construction$ 500,00072.5850.0535.95B03Wilmington Urban Area MPONew HanoverYesYesNew Submittal50.050.000.0035.950.000.00Holding TankNoWilmington Urban Area MPOHolding Tank

    A170926AviationStatewide MobilityILM - Wilmington International AirportILM - Runway 35 Wind Cone/PAPI ReplacementN/AThis project will be designed and constructed to replace the runway 35 wind cone due to its useful life. The PAPI's and powersupply unit (PSU) needs to be relocated outside the Runway Safety Area (RSA) per FAA Standards. Includes Project Request Number: 000038053005 - Other: Not otherwise defined in system plan objectives$ 500,00016.1910.5911.19B03Wilmington Urban Area MPONew HanoverYesYesNew Submittal10.590.000.0011.190.000.00Holding TankNoWilmington Urban Area MPOHolding Tank

    A170927AviationStatewide MobilityILM - Wilmington International AirportILM - Emergency Boat Ramp Access Launch Rwy 6N/AThis project will provide ARFF Rescue boat a concrete water access ramp along with a dock to provide life safety during an aircraft crash emergencies in Smith Creek. Includes Project Request Number: 000038063005 - Other: Not otherwise defined in system plan objectives$ 500,00010.367.685.36B03Wilmington Urban Area MPONew HanoverYesYesNew Submittal7.680.000.005.360.000.00Holding TankNoWilmington Urban Area MPOHolding Tank

    A170930AviationStatewide MobilityILM - Wilmington International AirportILM - 1st Paved Aircraft Taxi Lane N/AConstruct a new hangar taxi lane to provide access into development hangar leasehold area per ILM's Airport Layout Plan. Includes Project Request Number: 000038211240 - Corporate and T-hangar Taxiway: Construction$ 500,00072.5850.0535.95B03Wilmington Urban Area MPONew HanoverYesYesNew Submittal50.050.000.0035.950.000.00Holding TankNoWilmington Urban Area MPOHolding Tank

    A170931AviationAV-5888Statewide MobilityILM - Wilmington International AirportILM - T-Hangar Aircraft Taxi LanesN/AThis project will provide a bituminous paved surface taxi lane to expand the East side hangar development area. Includes Project Request Number: 000038081240 - Corporate and T-hangar Taxiway: Construction$ 500,00072.8965.2636.01B03Wilmington Urban Area MPONew HanoverYesYesNew Submittal50.260.00100.0036.010.000.00Holding TankNoWilmington Urban Area MPOHolding Tank

    A170936AviationAV-5886Statewide MobilityILM - Wilmington International AirportILM - Taxiway J ImprovementsN/AThis project will be designed and constructed to meet the new FAA requirements which does not allow direct access to or from an aircraft ramp to a runway. Includes Project Request Number: 000038101100 - Taxiway Requirements$ 500,00083.20N/AN/AB03Wilmington Urban Area MPONew HanoverStatewide Mobility$500,000FY 2027No - Funded in Statewide MobilityNo - Funded in Statewide MobilityNew Submittal58.66N/AN/A40.03N/AN/ACarryoverNoWilmington Urban Area MPOCarryoverProgrammed, not CommittedCON FY 2027

    A170960AviationDivision NeedsSOP - Moore County AirportSOP - Hangar development and expansion/improvement of utilitiesN/AHangar development and expansion and improvement of airport utilities (Partner Connect IDs 2925 and 2505)1900 - Hangars$ 2,643,000N/AN/A12.04E08Triangle Area RPOMooreNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A12.040.000.00Holding TankNoTriangle Area RPOHolding Tank

    A170962AviationDivision NeedsSOP - Moore County AirportSOP - Runway Pavement StrengtheningN/AStrengthen runway pavement (Partner Connect Project # 3229)0605 - Pavement Strength - Runway$ 8,275,000N/AN/A28.92E08Triangle Area RPOMooreNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A28.920.000.00Holding TankNoTriangle Area RPOHolding Tank

    A170963AviationDivision NeedsSOP - Moore County AirportSOP - Taxiway and apron pavement strengtheningN/AStrengthen taxiway and apron pavement (Partner Connect ID # 2490 and 3396)0610 - Pavement Strength - Taxiway$ 10,902,000N/AN/A25.39E08Triangle Area RPOMooreNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A25.390.000.00Holding TankNoTriangle Area RPOHolding Tank

    A171052AviationAV-5893Statewide MobilityCLT - Charlotte Douglas International AirportCLT - Concourse A Expansion Phase 2N/AExtend the concourse north toward Old Dowd Road. This project will include a three level pier including 16 passenger boarding gates, hold rooms, public restrooms, and circulation areas with moving sidewalks, concession areas, a baggage conveyor system, and other support areas. (3661)1315 - General Aviation Terminal Building: Construct Addition to Existing$ 500,00065.3175.67N/AE10Charlotte Regional Transportation Planning OrganizationMecklenburgRegional Impact$500,000FY 2020YesNo - Funded in Regional ImpactNew Submittal45.67100.00100.0026.47N/AN/ACommittedNoCharlotte Regional Transportation Planning OrganizationCommitted

    A171053AviationStatewide MobilityCLT - Charlotte Douglas International AirportCLT - Concourse C ExpansionN/AConstruct an additional 10-12 gates needed to support the future aircraft gate requirements. This expansion would widen the concourse and expand to the east off of the south end of the concourse. This includes passenger boarding gates, hold rooms, public restrooms, circulation areas with moving sidewalks, concession areas, and other support areas.(3662)1315 - General Aviation Terminal Building: Construct Addition to Existing$ 500,00065.7845.9826.55E10Charlotte Regional Transportation Planning OrganizationMecklenburgYesYesNew Submittal45.980.000.0026.550.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171054AviationStatewide MobilityCLT - Charlotte Douglas International AirportCLT - Concourse B ExpansionN/AConstruct an additional 8-10 gates needed to support the future aircraft gate requirements. This expansion would widen the concourse and expand to the westt off of the south end of the concourse. This includes passenger boarding gates, hold rooms, public restrooms, circulation areas with moving sidewalks, concession areas, and other support areas. (3663)1315 - General Aviation Terminal Building: Construct Addition to Existing$ 500,00065.7845.9826.55E10Charlotte Regional Transportation Planning OrganizationMecklenburgYesYesNew Submittal45.980.000.0026.550.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171055AviationAV-5880Statewide MobilityCLT - Charlotte Douglas International AirportCLT - West Ramp Expansion Phase IN/ADesign and construct aircraft ramp that will accommodate Concourse A Expansion. Phase I to provide additional aircraft parking and taxilane. This ramp will be 180,200 square yards of 18in concrete on top of 6in of cement treated base. This phase includes reconfiguring taxilanes/taxiways on the end of existing Concourse A to meet FAA design standards and to allow for the bidirectional flow which will be made possible by the construction of dual taxi lanes from Taxiway E 11 to the north (3543)1100 - Taxiway Requirements$ 500,00090.05N/AN/AE10Charlotte Regional Transportation Planning OrganizationMecklenburgStatewide Mobility$500,000FY 2019No - Funded in Statewide MobilityNo - Funded in Statewide MobilityNew Submittal62.63N/AN/A44.18N/AN/ACommittedNoCharlotte Regional Transportation Planning OrganizationCommitted

    A171058AviationAV-5879Statewide MobilityCLT - Charlotte Douglas International AirportCLT - Fourth Parallel Runway ConstructionN/AConstruct the fourth parallel runway of 12,000 feet in length and 150 feet in width, associated end-around-taxiways, and hold pads. (3667)0500 - Runway Length/Width$ 500,00099.64N/AN/AE10Charlotte Regional Transportation Planning OrganizationMecklenburgStatewide Mobility$500,000FY 2022No - Funded in Statewide MobilityNo - Funded in Statewide MobilityNew Submittal69.77N/AN/A49.90N/AN/ACommittedNoCharlotte Regional Transportation Planning OrganizationCommitted

    A171059AviationStatewide MobilityCLT - Charlotte Douglas International AirportCLT - Fuel Farm Pumping Station ExpansionN/ADesign and construct two new jet fuel pumping and filtering stations. (3672)2200 - Fuel Facilities$ 500,00017.1712.819.18E10Charlotte Regional Transportation Planning OrganizationMecklenburgYesYesNew Submittal12.810.000.009.180.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171060AviationStatewide MobilityCLT - Charlotte Douglas International AirportCLT - Center Airfield Lighting Vault RelocationN/ARelocation of the Center Airfield Lighting Vault to facilitate the construction of the South Ramp Expansion to accommodate the Concourse B and Concourse C Expansions.(3666)3005 - Other: Not otherwise defined in system plan objectives$ 500,00039.5426.5213.27E10Charlotte Regional Transportation Planning OrganizationMecklenburgYesYesNew Submittal26.520.000.0013.270.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171064AviationStatewide MobilityCLT - Charlotte Douglas International AirportCLT - Terminal Lobby Expansion ConstructionN/AConstruct an expansion of the current terminal lobby including all four levels of the ticketing area for additional public circulation space, main lobby area, baggage claim lobby area, security check point areas and airline ticket counter queuing spaces, as well as associated mechanical and support areas. (3673)1315 - General Aviation Terminal Building: Construct Addition to Existing$ 500,00065.1645.5726.45E10Charlotte Regional Transportation Planning OrganizationMecklenburgYesYesNew Submittal45.570.000.0026.450.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171065AviationStatewide MobilityCLT - Charlotte Douglas International AirportCLT - Third Aircraft Rescue and Firefighting StationN/AConstruct a third aircraft rescue and firefighting station as a requirement of the construction of a fourth parallel runway. (3671)3005 - Other: Not otherwise defined in system plan objectives$ 500,00047.3730.7519.56E10Charlotte Regional Transportation Planning OrganizationMecklenburgYesYesNew Submittal30.750.000.0019.560.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171066AviationAV-5881Statewide MobilityCLT - Charlotte Douglas International AirportCLT - West Ramp Expansion Phase IIN/ADesign and construct the remaining portion of the ramp for Concourse A Expansion Phase II. (3668)1200 - Aircraft Apron / Helipad Requirements$ 500,00081.39N/AN/AE10Charlotte Regional Transportation Planning OrganizationMecklenburgStatewide Mobility$500,000FY 2020No - Funded in Statewide MobilityNo - Funded in Statewide MobilityNew Submittal57.19N/AN/A37.45N/AN/ACommittedNoCharlotte Regional Transportation Planning OrganizationCommitted

    A171067AviationStatewide MobilityCLT - Charlotte Douglas International AirportCLT - West Ramp Lavatory and Fuel StationN/ADesign and construction of a new lavatory and fueling facilities on an expanded ramp area north of the future A Ramp. (3670)2200 - Fuel Facilities$ 500,00040.2128.1713.02E10Charlotte Regional Transportation Planning OrganizationMecklenburgYesYesNew Submittal28.170.000.0013.020.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171092AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - Corporate hangar site developmentN/ADesign and construct site development for four proposed corporate hangars south of existing transient aircraft parking apron. (3332)1900 - Hangars$ 791,901N/AN/A19.87E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A19.870.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171094AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - Land Acquisition - West Hangar AreaN/ALand acquisition to allow for additional hangar area on west side of airport property (3180)1900 - Hangars$ 475,200N/AN/A20.80E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A20.800.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171096AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - North Hangar Area Improvements (Phase 1b)N/AConstruct an Apron, Taxilane and Access Road for future corporate hangar development off the north corner of the parallel taxiway. (3747)1240 - Corporate and T-hangar Taxiway: Construction$ 1,428,400N/AN/A32.58E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A32.580.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171098AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - Strengthen Taxiways to 95,000 Dual Wheel, Fillet Widening (Phase 1)N/ARehabilitation and strengthening of taxiways to 95,000 dual wheel, and widen fillets at selected taxiways where group 3 aircraft operations are anticipated. This project is the next phase of improvements that include unfunded project elements and a continuation of project AV-5814.(2814)0610 - Pavement Strength - Taxiway$ 1,783,000N/AN/A35.83E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A35.830.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171099AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - Strengthen Taxiways to 95,000 Dual Wheel, Fillet Widening (Phase 2)N/ARehabilitation and strengthening of taxiways to 95,000 dual wheel, and widen fillets at selected taxiways where group 3 aircraft operations are anticipated. This project is the next phase of improvements that include unfunded project elements and a continuation of project AV-5814 and Phase 1 of this project listed for FY 2021. (2814)0610 - Pavement Strength - Taxiway$ 1,783,000N/AN/A35.83E10Charlotte Regional Transportation Planning OrganizationUnionNo - Division Needs ProjectYesNew SubmittalN/AN/AN/A35.830.000.00Holding TankNoCharlotte Regional Transportation Planning OrganizationHolding Tank

    A171100AviationDivision NeedsEQY - Charlotte-Monroe Executive AirportEQY - Strengthen Taxiways to 95,000 Dual Wheel, Fillet Widening (Phase 3)N/ARehabilitation and strengthening of taxiways to 95,000 dual wheel, and widen fillets at selected taxiways where group 3 aircraft operations are anticipated. This project is the next phase of improvements that include unfunded project elements and a continuation of project AV-5814 and Phase 2 of this project listed for FY 2022.(2814)0610 - Pavement Strength - Taxiway$ 1,783,0