statewide transportation improvement program (stip) 2010-2013 amended to include fy 2011... ·...
TRANSCRIPT
JUNE 2011
Statewide Transportation Improvement Program (STIP)Fiscal Years 2010-2013
Department of Transportation and Public WorksHighway and Transportation Authority
US Department of Transportation
Federal Transit Administration (FTA)Federal Highway Administration (FHWA)
San Juan Urbanized Area (SJUA)
Urbanized Areas Under 200,000 Population (UZA)
Aguadilla Urbanized Area (AUA)
Nonurbanized Area
AMENDMENT TO INCLUDEFISCAL YEARS 2011-2013 SJUA PROGRAM
Department of Transportation and Public WorksHighway and Transportation Authority
Statewide Transportation Improvement Program (STIP)Fiscal Years 2010-2013
US Department of TransportationFederal Transit Administration (FTA) Federal Highway Administration (FHWA)
“The preparation of this document has been financed in part through a grant from U.S. Department of Transportation, Federal Transit Administration, under the Transportation Equity Act for the 21st Century and funds authorized under the Title 23 USC.”
Amendment to IncludeFiscal Year 2011
Statewide Transportation Improvement Program (STIP) Fiscal Years 2010-2013
I
INTRODUCTION The Puerto Rico Department of Transportation and Public Woks (PRDTPW), as the umbrella agency for transportation, and the Puerto Rico Highways and Transportation Authority (PRHTA) prepare this Statewide Transportation Improvement Program (STIP), which includes the proposed distribution, by projects, of the federal funds assigned to Puerto Rico for the fiscal years of 2010 to 2013, through programs of the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA), to which federal agencies it is presented for joint approval. This STIP includes transit and highway projects for both urbanized and non-urbanized (rural) areas, thus covering all of Puerto Rico. Programmed projects result from a planning process that is in accordance with 23 USC 420 and 511, 49 USC and all other relevant federal or Commonwealth legislation. The portion of the STIP corresponding to the metropolitan and urbanized areas was developed in cooperation with the Metropolitan Planning Organization (MPO). The MPO’s were provided with estimates of available Federal funds which can be utilized in developing the Metropolitan Transportation Improvement Programs (TIP). The TIP’s were included without modification in the STIP, once approved by the MPO. The non-urbanized areas and rural areas were also provided with and estimate of the expected allocation of funds based on estimates of the previous year. The PRDTPW provides for public involvement in development of this STIP. As part of the public participation process and complying with the federal regulations, the PRDTPW also considers petitions of projects from the municipalities, agencies and the general public. The STIP includes:
1- A list of priorities transportation projects proposed to be carried out in the first 3 years. 2- Cover a period of not less than 4 years. 3- Contain only projects consistent with the statewide plan. 4- Is financially constrained by year and include financial information to demonstrate which projects are to be implemented.
Statewide Transportation Improvement Program (STIP) Fiscal Years 2010-2013
II
This document includes the priority list of proposed projects that are to be undertaken by year, consistent with the transportation plan and are financially constrained. Projects included in the Annual Element can be implemented using the allocation of funds for Fiscal Year 2010 and carryover funds. General transportation priorities are defined as follows:
1- Regional projects, projects which involve several municipalities 2- Public transportation projects of high impact and investment 3- Carryover projects 4- Continuity projects 5- Construction of transportation facilities 6- Improvements of existing transportation facilities 7- Construction of shelters/stop for transportation services 8- Acquisition of transit and paratransit vehicles to start, maintain or expand local and regional services 9- Preventive maintenance cost for transit vehicles 10- Operational assistant to paratransit services 11- Construction of facilities for maintenance garage for transit vehicles 12- Transit enhancement 13- Transit security and transit safety projects 14- Transportation projects for elderly and handicapped
The STIP is presented in self-explanatory tables with projects organized by priority by mode of transportation or type of improvements. The projects are identified by a roman numeral which stands for the year of the improvement, a letter which stands for the mode of transportation or type of improvement and an Arabic consecutive number which stands for the logical order of projects.
Statewide Transportation Improvement Program (STIP) Fiscal Years 2010-2013
III
Identification of the letters is as follows:
A. Public transportation improvements B. Elderly and Handicapped Transportation C. Improvements to increase capacity and safety on the roads D. Other transportation related improvements
The Annual Element is presented as part of the Five Year Program. The PRDTPW and the PRHTA, regard the Transportation Enhancement Program as an important component of our overall effort to improve the transportation network in Puerto Rico and, indeed our quality of life, and intend to continue these projects under the New Legislation, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), which provides for enhancement projects under specific a set-aside Program for this purpose under highway funding for Puerto Rico. Since the beginning of the requirement that MPO’s be constituted and because of the wide powers and resources that the PRDTPW has in our relatively small Island, this Agency was designated as MPO for all the urbanized areas in Puerto Rico.
To assure a forum for cooperative decision-making in the planning process, this MPO makes policy and programming decisions through three Policy Committees. The first committee is for the San Juan Urbanized Area (SJUA), defined by the 2000 Census as falling in the funding category of areas with over one million inhabitants and comprising the following Municipalities:
Aguas Buenas Carolina Comerío Juncos Naguabo San Juan Vega Baja Aibonito Cataño Corozal Las Piedras Naranjito San Lorenzo Yabucoa Barranquitas Cayey Dorado Loíza Orocovis Toa Baja Bayamón Ciales Guaynabo Manatí Patillas Toa Alta Caguas Cidra Gurabo Maunabo Río Grande Trujillo Alto Canóvanas Coamo Humacao Morovis Salinas Vega Alta
Statewide Transportation Improvement Program (STIP) Fiscal Years 2010-2013
IV
The second committee is for Urbanized Area of Aguadilla (AUA), which falls in the funding category of areas with over 200,000 and less than one million inhabitants. It is defined as comprising the following municipalities:
Aguada Lares Utuado Aguadilla Las Marías Añasco Moca Camuy San Sebastián Isabela Rincón
The third committee is for Urbanized Areas Under 200,000 Population (UZA), defined as follows:
Urbanized Area Comprising Municipalities
• Arecibo Arecibo, Camuy, Hatillo, Quebradillas • Fajardo Ceiba, Fajardo, Luquillo, Naguabo • Florida-Barceloneta Arecibo, Barceloneta, Florida, Manatí • Guayama Arroyo, Guayama, Patillas, Salinas • Juana Díaz Juana Díaz, Villalba • Mayagüez Añasco, Hormigueros, Mayagüez • Ponce Ponce • San Germán-Cabo Rojo Cabo Rojo, Lajas, Sabana Grande, San Germán • Yauco Guánica, Guayanilla, Peñuelas, Yauco
The Policy Committee also includes representatives from the following agencies involved with the transportation issues:
• Department of Transportation and Public Works (PRDTPW) • Highway and Transportation Authority (HTA) • Metropolitan Bus Authority (MBA), included only as a member of the SJUA Policy Committee
Statewide Transportation Improvement Program (STIP) Fiscal Years 2010-2013
V
• Ports Authority • Planning Board • Public Services Commission • Rules and Permits Administration • Environmental Quality Board • Maritime Transportation Authority (MTA) • Puerto Rico Division of the Federal Highway Administration (Non Voting) • Region IV Administrator of Federal Transit Administration (Non Voting)
As a result of the 2000 Census, the urbanized area boundaries in Puerto Rico were significantly redefined, with some previously defined urban areas being subdivided while others were consolidated and expanded and new ones were designated. On of the results of these changes is that only 6 municipalities, out of the 78 that comprise the Commonwealth, do not have within their geographical boundaries any part of the eleven (11) urbanized or metropolitan areas currently designated for Puerto Rico, and therefore do not participate in the technical and policy committees of the MPO. These non-urbanized municipalities are:
1. Adjuntas 4. Maricao 2. Culebra 5. Santa Isabel 3. Jayuya 6. Vieques
Recognizing that these rural or non-urbanized municipalities have the right to participate in the ongoing process of developing a new Statewide Transportation Plan (STP), and in order to follow a logical planning process for Puerto Rico’s transportation system, the PRDTPW/PRHTA develop the STP and the Urbanized Areas’ Long Range Transportation Plans (LRTP’s) within a regionalization scheme that incorporates the six non-urbanized municipalities within regional transportation plans.
Statewide Transportation Improvement Program (STIP) Fiscal Years 2010-2013
VI
THE PRHTA FIVE YEARS PRIORITY CAPITAL IMPROVEMENT PROGRAM (CIP)
The PRHTA CIP is the basis for preparation of the STIP and TIP’s for FHWA federal-aid-projects. Highways and Transportation projects using FHWA funds are also included in the Five-Year CIP, updated no less than once a year. This Program is based on the Agency budget that is financed by revenues from gasoline and diesel taxes, vehicles registration fees, toll road collection, the federal funds apportionment’s (FHWA + FTA), and interim financing and bonds issues.
As a medium range plan the CIP is consistent with the twenty-year master plan prepared by the Puerto Rico Planning Board for the San Juan Metropolitan Region (SJMR). It also considers the metropolitan area transportation studies, the Statewide Transportation Study results and recommendations. Highway projects priorities are based on the following factors:
• Support of public policy regarding land use and development, as established in long and medium range plans • Improving condition and level of service of existing facilities • Presence in the master plan • Projects requested by citizens, legislators, agencies and elected local officials • Provision of new and improved access to Industrial Parks, Ports, Airports and other points of agricultural, tourism, or
commercial importance activities • Traffic analysis and projections • Cost benefits analysis of competing projects • Availability of funds • Coordination with federal agencies
During the year, the CIP is subjected to continued analysis and changes resulting from project delays in design, increases or decreases in project cost estimates, ant other related information. The CIP is updated at least once a year, to reflect changes in bidding dates, project cost, scope of works, and project termini, among other elements.
Statewide Transportation Improvement Program (STIP) Fiscal Years 2010-2013
VIII
Federal Transit Administration (FTA)
Summary of Total Federal Estimated Projects Costs
Subject 2010 2011 2012 2013 Section 5307 $44,369,572 $13,167,639 $11,770,183 $5,400,741 Section 5309 $13,125,865 $-0- $-0- $-0- Section 5310 $,830,400 $544,000 $-0- $-0- Section 5311 $3,706,769 $1,407,659 $242,703 $251,767 Section 5316 $10,811,385 $7,063,650 $-0- $-0- Section 5317 $2,898,893 $1,914,403 $-0- $-0- RTAP $82,288 $82,130 $-0- $-0- ARRA $68,970,496 $-0- $-0- $-0- Total $143,965,268 $17,500,696 $12,012,886 $5,652,508
Project Financial Plan for FTA Programs
A. San Juan Urbanized Area
I. The Federal cost for projects, for FTA programs, are as follows:
Fiscal Year 2010 is $101,391,590
Section 5307 $34,219,131 Section 5309 $12,635,923 Section 5310 $ 1,473,600 Section 5316 $ 4,069,771 Section 5317 $ 1,108,677 ARRA-RTG $47,209,174 ARRA-FG $ 675,314
Fiscal Year 2011 is $ 56,639,361
Section 5307 $50,483,432 Section 5309 $ 3,587,177
Section 5310 $ 1,452,968 Section 5316 $ 4,063,650 Section 5317 $ 1,114,403
Fiscal Year 2012 is $2,205,849 Section 5307 $2,205,849
Fiscal Year 2013 is $440,000 Section 5307 $440,000
II. Source of funds for the FY 2010 (carryover projects are included) is as follows:
Federal $ 101,391,590 State $ 6,590,976 Municipalities $ 3,006,619
and Private Institutions
III. FTA assistance for FY 2010 is distributed as follows:
Section 5307 and 5340 Urbanized Area
Apportionment FY 2010 $ 30,707,243 Carryover Funds $ 18,737,890 Transfer Funds $ 1,308,720 Apportionment ARRA – FY 2009 $ 47,209,174 Apportionment ARRA
Fixed Guideway – FY 2009 $ 675,314 Total Funds Available $98,638,341
Section 5316 Apportionment FY 2010 $ 4,069,771
Section 5317 Apportionment FY 2010 $ 1,108,677
Section 5309 Prior Year Unobligated Funds $ 12,635,923
Section 5310 Apportionment FY 2010 $ 2,056,403 1
1 This amount is used to fund projects Islandwide (San Juan Metropolitan Area, Aguadilla Urbanized Area, Urbanized Areas Under 200,000 Population and Nonurbanized Areas)
Statewide Transportation Improvement Program (STIP) Fiscal Years 2010-2013
IX
IV. Source of funds for the FY 2011 is as follows:
Federal $ 56,659,993 State $ 9,725,000 Municipalities $ 3,966,450
and Private Institutions
V. FTA assistance for FY 2011 is distributed as follows:
Section 5307 and 5340 Urbanized Area
• FY 2011 Apportionment $31,355,610 Carryover Funds $14,903,910 Transfer Funds $ 4,223,912 Total Funds Available $50,483,432
Section 5309 Fixed Guideway • FY 2011
Apportionment $ 3,587,177
Section 5310
• FY 2011 Apportionment $2,047,368 1
Section 5316 JARC
• FY 2011 Apportionment $4,063,650
Section 5317 NF • FY 2011
Apportionment $ 1,114,403
B. Aguadilla Urbanized Area
I. The Federal cost for projects, for FTA programs, is as follows:
Fiscal Year 2010 is $2,880,723
Section 5307 $ 82,526 Section 5309 $ 359,942 Section 5310 $ -0- ARRA-RTG $ 2,438,255
Fiscal Year 2011 is $ -0-
Fiscal Year 2012 is $ -0-
Fiscal Year 2013 is $ -0-
II. Source of funds for the FY 2010 (carryover projects are included) is as follows:
Federal $ 2,880,723 Municipalities $ 110,618
and Private Institutions
III. FTA assistance for FY 2010 is distributed as follows:
Section 5307 and 5340 Urbanized Area
Apportionment FY 2010 $3,736,999 ARRA
Apportionment – FY 2009 $2,438,255 Total Funds Available $6,175,254
Section 5309 Prior Years Unobligated
Funds $359,942
Section 5316 Apportionment FY 2010 $680,292
Section 5317 Apportionment FY 2010 $ 154,102
Statewide Transportation Improvement Program (STIP) Fiscal Years 2010-2013
X
C. Urbanized Areas Under 200,000 Population (UZA)
I. The Federal cost for projects, for FTA programs, is as follows:
Fiscal Year 2010 is $35,623,719
Section 5307 $ 10,067,915 Section 5309 $ 130,000 Section 5310 $ 356,800 Section 5316 $ 6,741,614 Section 5317 $ 1,790,216 ARRA-RTG $ 16,537,174
Fiscal Year 2011 is $ 13,947,639 Section 5307 $ 9,603,639 Section 5310 $ 544,000 Section 5316 $ 3,000,000
Section 5317 $ 800,000
Fiscal Year 2012 is $ 9,564,334 Section 5307 $ 9,564,334 Section 5310 $ -0-
Fiscal Year 2013 is $ 4,960,741 Section 5307 $ 4,960,741
II. Source of funds for the FY 2010 (carryover projects are included) is as follows:
Federal $ 35,623,719 State $ 1,832,947 Municipalities $ 4,902,491
and Private Institutions
III. FTA assistance for FY 2010 is distributed as follows:
1. Section 5307 and 5340 Urbanized Area
• FY 2010 Apportionment $ 12,567,735
• Apportionment ARRA –FY 2009 $ 16,191,202
• Transfer ARRA Funds from AUA $ 345,972
• Total Funds Available $29,104,909
2. Section 5316
• FY 2010 Apportionment $ 3,446,426
3. Section 5317
• FY 2010 Apportionment $ 903,492
4. Section 5310
• FY 2010 Apportionment $2,056,403 1
IV. Source of funds for the FY 2011 is as follows:
Federal $ 13,947,639 State $ 1,600,583 Municipalities $ 2,950,331
and Private Institutions
V. FTA assistance for FY 2011 is distributed as follows:
Section 5307 and 5340 Urbanized Area
• FY 2011 Apportionment $ 14,356,235
1 This amount is used to fund projects Islandwide (San Juan Metropolitan Area, Aguadilla Urbanized Area, Urbanized Areas Under 200,000 Population and Nonurbanized Areas)
Statewide Transportation Improvement Program (STIP) Fiscal Years 2010-2013
XI
Section 5316
• FY 2011 Apportionment $ 3,290,321
Section 5317 • FY 2011
Apportionment $ 891,304
Section 5310
• FY 2011 Apportionment $2,047,368 1
D. Nonurbanized Area
I. The Federal cost for projects, for FTA programs, is as follows:
Fiscal Year 2010 is $5,899,636
Section 5311 $ 3,706,769 RTAP $ 82,288 Section 5310 $ -0- ARRA-RTG $ 2,110,579
Fiscal Year 2011 is $ 1,489,789 Section 5311 $ 1,407,659 RTAP $ 82,130
Fiscal Year 2012 is $ 242,703 Section 5311 $ 242,703
Fiscal Year 2013 is $ 251,767 Section 5311 $251,767
II. Source of funds for the FY 2010 is as follows:
Federal $5,899,636 State $ 874,117 Municipalities $ -0-
and Private Institutions
III. FTA assistance for FY 2010 is distributed as follows:
1. Section 5311 and 5340 Nonurbanized Area
• Apportionment FY 2010 $1,402,016 • Apportionment RTAP $ 82,288 • Transfer Funds $2,304,753 • Apportionment ARRRA – FY 2009 $2,110,579 • Total Funds Available $5,899,636
2. Section 5316 • Apportionment $ 453,898
3. Section 5317 • Apportionment $ 101,636
IV. Source of funds for the FY 2011 is as follows:
Federal $1,489,789 State $ 299,128 Municipalities $ -0-
and Private Institutions
V. FTA assistance for FY 2011 is distributed as follows:
1. Section 5311 and 5340 Nonurbanized Area
• Apportionment FY 2011 $1,407,659 • Apportionment RTAP $ 82,130 • Total Funds Available $1,489,789
2. Section 5316 • Apportionment $ 453,213
3. Section 5317 • Apportionment $ 102,161
Statewide Transportation Improvement Program (STIP)
Section 5307
San Juan Urbanized Area (SJUA)(UA > 1,OOO,OOO in Population)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013Amendment to Include
Fiscal Year 2011
FTA - 2
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. Cost1
Aguas Buenas2011 F - 128,000 - - 128,000
S - 32,000 - - 32,000
T - 160,000 - - 160,000
2Aguas Buenas
2011 F - - 3,300 - 3,300
S - - 825 - 825
T - - 4,125 - 4,125
3Aguas Buenas
2011 F - - 120,000 - 120,000
S - - 30,000 - 30,000
T - - 150,000 - 150,000
4Aguas Buenas
2011 F - 90,000 - - 90,000
S - 22,500 - - 22,500
T - 112,500 - - 112,500
5Aguas Buenas
2011 F - 1,280 - - 1,280
S - 320 - - 320
T - 1,600 - - 1,600
Source of Local FundsProject Justification
Construction of Stops Sign for Shuttle System
Narrative Justification Submitted by the Municipality
Pending Submission of New Grantee Documentaion
Pending Submission of New Grantee Documentaion and the approval of NEPA Document
Acquisition of Two (2) Vehicles for Public Transportation (1 Shuttle Bus, 11 Passenger Capacity and One (1) Paratransit)
Narrative Justification Submitted by the Municipality
Pending Submission of New Grantee Documentaion
NEPA Process and the Improvement to the Maintenance Garage
Narrative Justification Submitted by the Municipality
Acquisition of One (1) Trolley (11 Passenger Capacity)
Narrative Justification Submitted by the Municipality
Pending Submission of New Grantee Documentaion
Purchase of Computer Equipment and Installation of Stop Signs
Narrative Justification Submitted by the Municipality
Pending Submission of New Grantee Documentaion
FTA - 3
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
6Aguas Buenas
2010 F - - 23,440 - 23,440
S - - 5,860 - 5,860
T - - 29,300 - 29,300
7Aguas Buenas
2010 F - - 14,667 - 14,667
S - - 3,667 - 3,667
T - - 18,334 - 18,334
8Aibonito
2009 F 570,554 - - - 570,554
S 142,639 - - - 142,639
T 713,193 - - - 713,193
9Bayamón
2010 F - - 24,000 - 24,000
S - - 6,000 - 6,000
T - - 30,000 - 30,000
10Bayamón
2010 F - 144,000 - - 144,000
S - 36,000 - - 36,000
T - 180,000 - - 180,000
Narrative Justification Submitted by the Municipality
Acquisition and Installation of Four (4) Security Camera
Narrative Justification Submitted by the Municipality
Pending Submission of New Grantee Documentaion
Pending Submission of New Grantee Documentaion and the approval of NEPA Document
NEPA and Environmental Permits, Design and Engineering for the Improvemet to Trolley Maintenance Garage, Phase I.
Task 21-01 Carryover Funds 2010, Phase I Subject to the approval of the NEPA Document
Purchase of Two (2) Support Vehicles; One (1) Pick-Up Truck and One (1) Passenger Van (10 Passenger Capacity)
Task 21-01
NEPA Process and Improvement to the Existing Public Transportation Terminal
Carryover 2009 . Pending Submission of New Grantee Documentaion and the approval of the NEPA Document
Prevenvite Maintenance Cost for Trolleys and Paratransit Vehicels
Narrative Justification Submitted by the Municipality
FTA - 4
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
11Bayamón
2010 F - - 1,564,000 - 1,564,000
S - - 391,000 - 391,000
T - - 1,955,000 - 1,955,000
12Bayamón
2010 F - 800,000 - - 800,000
S - 200,000 - - 200,000
T - 1,000,000 - - 1,000,000
13Carolina
2007 F 3,148,400 - - - 3,148,400 Approved
S 787,100 - - - 787,100 PR-90-X231-00
T 3,935,500 - - - 3,935,500
14Carolina
2010 F - 3,414,000 - - 3,414,000
S - 853,500 - - 853,500
T - 4,267,500 - - 4,267,500
15Carolina
2010 F 136,000 - - - 136,000 Approved
S 34,000 - - - 34,000 PR-90-X264-00
T 170,000 - - - 170,000
Narrative Justification Submitted by the Municipality
Design and Construction of the Carolina Multimodal Center, Phase I and II
Additional Funds for the Construction of the Carolina Multimodal Center, Phase II
Narrative Justification Submitted by the Municipality
Narrative Justification Submitted by the Municipality
Acquisition of Two (2) Paratransit Vehicles
Improvements to Trolleys Maintenance Garage, Phase II
Replacement of 173 Passenger Shelters and Twelve (12) Bus Stop Signs through out the Municipality
Narrative Justification Submitted by the Municipality
Municipality Budget 2010-2011
FTA - 5
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
16Carolina
2010 F 1,694,400 - - - 1,694,400
S 423,600 - - - 423,600
T 2,118,000 - - - 2,118,000
17Cataño
2009 F 38,240 38,240 - - 76,480
S 9,560 9,560 - - 19,120
T 47,800 47,800 - - 95,600
18Cataño
2009 F 16,000 16,160 16,322 - 48,482
S 4,000 4,040 4,081 - 12,121
T 20,000 20,200 20,403 - 60,603
19Cataño
2011 F - 103,200 - - 103,200
S - 25,800 - - 25,800
T - 129,000 - - 129,000
20Cayey
2009 F 48,000 48,480 - - 96,480
S 12,000 12,120 - - 24,120
T 60,000 60,600 - - 120,600
Preventive Maintenance Cost for Transit System
Narrative Justification Submitted by the Municipality
Narrative Justification Submitted by the Municipality
Acquisition of Six (6) Buses for Expansion Services
Narrative Justification Submitted by the Municipality
Provision of Paratransit Services in Accordance with ADA Regularions
Narrative Justification Submitted by the Municipality
Acquisition of One (1) Mini-Trolley for Expansion of Service
Provision of Paratransit Services in Accordance with ADA Regulations
Narrative Justification Submitted by the Municipality
FTA - 6
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
21Cayey
2009 F 20,075 25,877 - - 45,952
S 5,019 6,469 - - 11,488
T 25,094 32,346 - - 57,440
22Ciales 2010
F 60,000 - - - 60,000
S 15,000 - - - 15,000
T 75,000 - - - 75,000
23Ciales
2011 F - 128,000 - - 128,000
S - 32,000 - - 32,000
T - 160,000 - - 160,000
24Ciales
2011 F - 16,000 - - 16,000
S - 4,000 - - 4,000
T - 20,000 - - 20,000
25Cidra
2009 F 12,856 - - - 12,856
S 3,214 - - - 3,214
T 16,070 - - - 16,070
Pending Submission of New Grantee Documentaion
Construction of Two (2) Passenger Shelters along Road 173, Montellano Ward
Narrative Justification Submitted by the Municipality
Narrative Justification Submitted by the Municipality
Carryover Funds 2009
Prevenvite Maintenance Cost for Transit System
Narrative Justification Submitted by the Municipality
Pending Submission of New Grantee Documentaion
Preventive Maintenance Cost for Transit System
Narrative Justification Submitted by the Municipality
Pending Submission of New Grantee Documentaion
Narrative Justification Submitted by the Municipality
Acquisition of One (1) Trolley Bus for the Urban Area
Acquisition of One (1) Mini-Bus (19 passenger Capacity) for Public Transportation Services
FTA - 7
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
26Cidra
2010 F 14,667 14,814 - - 29,481
S 3,667 3,704 - - 7,370
T 18,334 18,518 - - 36,851
27Cidra
2011 F 232,725 - - - 232,725
S 58,181 - - - 58,181
T 290,906 - - - 290,906
28Cidra
2011 F 33,152 - - - 33,152
S 8,288 - - - 8,288
T 41,440 - - - 41,440
29Corozal
2009 F 960 - - - 960
S 240 - - - 240
T 1,200 - - - 1,200
30Corozal
2009 F 54,400 - - - 54,400
S 13,600 - - - 13,600
T 68,000 - - - 68,000
Pending Submission of New Grantee Documentaion
Narrative Justification Submitted by the Municipality
Carryover Funds 2009. Pending Submission of New Grantee Documentaion
Prevenvite Maintenance Cost for FTA Funded Vehicles Facilities
Replacement of Conventional Energy Security Lighting for Photovoltaic Solar Powered Luminaries Public Transportation Center
Narrative Justification Submitted by the Municipality
Purchase of Two (2) Radio Communication System for Transit Services
Narrative Justification Submitted by the Municipality
FTA Transportation Management Software Program
Narrative Justification Submitted by the Municipality
Acquisition of One (1) Paratransit Vehicles to Replace Old One
Narrative Justification Submitted by the Municipality
FTA - 8
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
31Corozal
2010 F 7,200 - - - 7,200
S 1,800 - - - 1,800
T 9,000 - - - 9,000
32Gurabo
2009 F 76,434 - - - 76,434
S 19,109 - - - 19,109
T 95,543 - - - 95,543
33Gurabo
2010 F 300,000 - - - 300,000
S 75,000 - - - 75,000
T 375,000 - - - 375,000
34 Juncos 2009 F 80,000 - - - 80,000
S 20,000 - - - 20,000
T 100,000 - - - 100,000
35 Manatí 2008 F 50,000 - - - 50,000
S 12,500 - - - 12,500
T 62,500 - - - 62,500
Narrative Justification Submitted by the Municipality
Street and Stops Sign for Trolleys Stops Carryover Funds 2009Narrative Justification Submitted by the Municipality
Approved PR-90-X268
Preventive Maintenance Costs for Transit Vehicles
Approved PR-90-X275
Construction of Maintenance Facilities, Phase II
Narrative Justification Submitted by the Municipality
Approved PR-90-X268
Narrative Justification Submitted by the Municipality
Engineering, Design and Environmental Compliance for the Construction of Maintenance Facilities , Phase I
Narrative Justification Submitted by the Municipality
Pending Submission of New Grantee Documentaion
Purchase and Installation of 17 Trolleys Stops Signal
FTA - 9
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
36 Manatí 2008 F 60,000 - - - 60,000
S 15,000 - - - 15,000
T 75,000 - - - 75,000
37 Manatí 2008 F 172,000 - - - 172,000
S 43,000 - - - 43,000
T 215,000 - - - 215,000
38 Manatí 2008 F 20,480 - - - 20,480
S 5,120 - - - 5,120
T 25,600 - - - 25,600
39Manatí
2010 F 640,000 - - - 640,000
S 160,000 - - - 160,000
T 800,000 - - - 800,000
40 Maunabo 2007 F 260,000 - - - 260,000
S 65,000 - - - 65,000
T 325,000 - - - 325,000
Acquisition of Two (2) Trolleys and One (1) Paratransit Vehicles for Public Transit System
Narrative Justification Submitted by the Municipality
Acquisition of Four (4) Trolley Replica Buses for 28 Passenger, for New Route Coto Sur and Norte Ward
Installation of Communication Equipment and Security System for Transit Vehicles
Narrative Justification Submitted by the Municipality
Narrative Justification Prepared by the Municipality
Provision of Paratransit Services in Accordance with ADA Regulations
Replacement of Three (3) Paratransit Mini-Buses (8-10 Passenger Capacity)
Narrative Justification Submitted by the Municipality
Approved PR-90-X266
Approved PR-90-X275
Approved PR-90-X275
Narrative Justification Submitted by the Municipality
Approved PR-90-X275
FTA - 10
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
41 Maunabo 2011 F - 38,688 - - 38,688
S - 9,672 - - 9,672
T - 48,360 - - 48,360
42 Maunabo 2011 F - 64,172 - - 64,172
S - 16,043 - - 16,043
T - 80,215 - - 80,215
43 MBA 2010 F 14,973,065 18,000,000 - - 32,973,065
S 3,743,266 4,500,000 - - 8,243,266
T 18,716,331 22,500,000 - - 41,216,331
44 MBA 2010 F 237,058 - - - 237,058
S 59,265 - - - 59,265
T 296,323 - - - 296,323
45 MBA 2010 F 1,204,742 - - - 1,204,742
S 301,186 - - - 301,186
T 1,505,928 - - - 1,505,928
Upgrade Equipment to Support Communication Center System
Narrative Justification Submitted
Purchase of Capital Maintenance Items/Spare Parts and Miscellaneous Equipment for Compliance with Local and Federal Environmental Regulations
Narrative Justification Submitted
Preventive Maintenance Cost for Motor Bus and Demand Respond Services
Narrative Justification Submitted
From this Amount, $923,912 will be Funded with the Transfer of Funds From the UZA's Area to SJUA
Provision of Paratransit Services in Accordance with ADA Regulations
Preventive Maintenance Cost for the Public Transportation System (Three Vehicles)
Narrative Justification Prepared by the Municipality
Narrative Justification Prepared by the Municipality
FTA - 11
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
46 MBA 2010 F 214,618 - - - 214,618
S 53,655 - - - 53,655
T 268,273 - - - 268,273
47 MBA 2010 F 258,336 300,000 - - 558,336
S 64,584 75,000 - - 139,584
T 322,920 375,000 - - 697,920
48 MBA 2010 F 978,483 300,000 - - 1,278,483
S 244,621 75,000 - - 319,621
T 1,223,104 375,000 - - 1,598,104
49 MBA 2010 F 3,057,600 - - - 3,057,600
S 764,400 - - - 764,400
T 3,822,000 - - - 3,822,000
50 MBA 2010 F 1,000,000 - - - 1,000,000
S 250,000 - - - 250,000
T 1,250,000 - - - 1,250,000
Improvement to the Administrative and Maintenance Facilities
Narrative Justification Submitted
Construction of New Bus Wash Facility Narrative Justification Submitted
Upgrade and Maintenance of Computer Hardware and Software to Support Bus Operations
Narrative Justification Submitted
Replacement of Equipment and Tools for the Bus Maintenance Workshop
Narrative Justification Submitted
Narrative Justification Submitted
Mildlife Overhaul 2007 Unit
FTA - 12
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
51 MBA 2010 F 1,000,000 - - - 1,000,000
S 250,000 - - - 250,000
T 1,250,000 - - - 1,250,000
52 MBA 2011 F 100,000 - - - 100,000
S 25,000 - - - 25,000
T 125,000 - - - 125,000
53 MBA 2011 F 200,000 - - - 200,000
S 50,000 - - - 50,000
T 250,000 - - - 250,000
54Morovis
2010 F 260,000 - - - 260,000
S 65,000 - - - 65,000
T 325,000 - - - 325,000
55Morovis
2010 F 80,000 - - - 80,000
S 20,000 - - - 20,000
T 100,000 - - - 100,000
Acquisition of One (1) Paratransit Van, for Complementary Transportation System
Narrative Justification Prepared by the Municipality
Pending Submission of New Grantee Documentaion
Narrative Justification Prepared by the Municipality
Pending Submission of New Grantee Documentaion
Acquisition of Two (2) Trolleys to Start Trolley System in the Urban Area
Entrance Renovation for the San Francisco Facility
Narrative Justification Submitted
Administration and Employee Education and Training
Narrative Justification Submitted
Mobile Fare Box Collection Equipment Narrative Justification Submitted
FTA - 13
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
56PRHTA
2011 F - 1,500,000 - - 1,500,000
S - 375,000 - - 375,000
T - 1,875,000 - - 1,875,000
57PRHTA
2011 F - 12,000,000 - - 12,000,000
S - 3,000,000 - - 3,000,000
T - 15,000,000 - - 15,000,000
58PRPA
2011 F 2,100,000 3,300,000 - - 5,400,000
S 525,000 825,000 - - 1,350,000
T 2,625,000 4,125,000 - - 6,750,000
59PRPA
2011 F 1,040,000 1,000,000 - - 2,040,000
S 260,000 250,000 - - 510,000
T 1,300,000 1,250,000 - - 2,550,000
60PRPA
2011 F - 2,500,000 - - 2,500,000
S - 625,000 - - 625,000
T - 3,125,000 - - 3,125,000
Narrative Justification Submitted
Preventive Maintenance Cost for Tren Urbano
Narrative Justification Submitted
Preventive Maintenance Cost for Ferry Boat Acuaexpreso Service
Narrative Justification Submitted
This Project will be Funded with the Transfer of Funds From the UZA's Area to SJUA
Fare Collection System
Improvement to Pier II Narrative Justification Submitted
Funding Conditioned on Approval of NEPA Document
Improvement to Maintenance Building Facility in Isla Grande
Narrative Justification Submitted
Funding Conditioned on Approval of NEPA Document
FTA - 14
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
61 San Juan 2011 F - 1,520,000 - - 1,520,000
S - 380,000 - - 380,000
T - 1,900,000 - - 1,900,000
62San Juan
2010 F 3,000,000 2,000,000 - - 5,000,000
S 750,000 500,000 - - 1,250,000
T 3,750,000 2,500,000 - - 6,250,000
63San Juan
2011 F - 1,200,000 - - 1,200,000
S - 300,000 - - 300,000
T - 1,500,000 - - 1,500,000
64 San Lorenzo 2007 F 117,170 - - - 117,170
S 29,293 - - - 29,293
T 146,463 - - - 146,463
65 San Lorenzo 2008 F 16,000 - - - 16,000
S 4,000 - - - 4,000
T 20,000 - - - 20,000
Narrative Justification Submitted by the Municipality
Acquisition of Two (2) Paratransit Vans, (10 -12) Passenger Capacity
Acquisition of Radio Communication Equipment for Transportation System
Total Project Cost $5,000,000
Narrative Justification Submitted by the Municipality
Approved PR-90-X274
Approved PR-90-X274
Replacement of Six (6) 30' Trolley Buses over 12 Year Old
NEPA, A/E Cost, Design and Acquisition of Land for the Construction of New Transit Maintenance and Operation Garage Phase I
Alernative Analysis Study for Santurce -Old San Juan Mass Transit System
Narrative Justification Submitted by the Municipality
Funding Conditioned on Approval of NEPA Document
FTA - 15
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
66 San Lorenzo 2008 F 36,400 - - - 36,400
S 9,100 - - - 9,100
T 45,500 - - - 45,500
67 San Lorenzo 2010 F 215,000 - - - 215,000
S 53,750 - - - 53,750
T 268,750 - - - 268,750
68San Lorenzo
2010 F 10,000 - - - 10,000
S 2,500 - - - 2,500
T 12,500 - - - 12,500
69San Lorenzo
2010 F 25,000 - - - 25,000
S 6,250 - - - 6,250
T 31,250 - - - 31,250
70San Lorenzo
2011 F - 120,000 - - 120,000
S - 30,000 - - 30,000
T - 150,000 - - 150,000
Narrative Justification Submitted by the Municipality
Narrative Justification Prepared by the Municipality
Approved PR-90-X274
Provision of Paratransit Services in Accordance with ADA Regulations
Narrative Justification Prepared by the Municipality
Approved PR-90-X274
Narrative Justification Prepared by the Municipality
Acquisition of Two (2) Paratransit Vans (10-12 Passenger Capacity) for Expansion of the Public Transportation Services
Preventive Maintenance Costs for Transit Vehicles
Acquisition of Two (2) Mini-Buses for Public Transportation Services
Narrative Justification Submitted by the Municipality
Design and Construction of Seven (7) Shelters for Public Transportation Route
Approved PR-90-X274
FTA - 16
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
71San Lorenzo
2011 F - 336,000 - - 336,000
S - 84,000 - - 84,000
T - 420,000 - - 420,000
72 Toa Alta 2010 F 300,000 - - - 300,000
S 75,000 - - - 75,000
T 375,000 - - - 375,000
73 Toa Baja 2010 F 160,000 - - - 160,000
S 40,000 - - - 40,000
T 200,000 - - - 200,000
74 Toa Baja 2010 F 19,921 20,120 - 40,041
S - 4,980 5,030 - 10,010
T - 24,901 25,150 - 50,051
75 Toa Baja 2009 F 100,000 136,400 - - 236,400
S 25,000 34,100 - - 59,100
T 125,000 170,500 - - 295,500
Narrative Justification Submitted by the Municipality
Provision of Paratransit Services in Accordance with ADA Regulations
Narrative Justification Submitted by the Municipality. Task 21-04
Preventive Maintenance Cost for Transit Vehicles
Narrative Justification Submitted by the Municipality. Task 21-04
Task 25-08 Acquisition of Two (2) Trolleys Toward Improvement Traffic Conditions in the CBD
Acquisition of Two (2) Paratransit Vehicles for the Expansion of Paratransit Services
Acquisition of Two (2) Mini-Buses for Expansion of the Public Transportation Services
Narrative Justification Prepared by the Municipality
FTA - 17
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
76 Toa Baja 2011 F - 364,000 - - 364,000
S - 91,000 - - 91,000
T - 455,000 - - 455,000
77 Toa Baja 2011 F - - 360,000 - 360,000
S - - 90,000 - 90,000
T - - 450,000 - 450,000
78 Toa Baja 2010 F - - 60,000 - 60,000
S - - 15,000 - 15,000
T - - 75,000 - 75,000
79 Toa Baja 2010 F - - - 400,000 400,000
S - - - 100,000 100,000
T - - - 500,000 500,000
80 Toa Baja 2011 F - 560,000 - 560,000
S - 140,000 - 140,000
T - 700,000 - 700,000
Narrative Justification Submitted by the Municipality
Construction of Maintenance Garage, Phase II
Purchase of Five (5) Cutaway 30ft, 24 Passenger Buses for New Routes to Tren Urbano Station and Pajaros Ward
Narrative Justification Submitted by the Municipality. Task 21-04
NEPA and Design for the Construction of Maintenance Garage, Phase I
Narrative Justification Submitted by the Municipality
Construction of Mini-Terminal in Toa Baja, Phase II
Task 21-04NEPA, Desing and Acquisition of Land for the Construction of Mini-Terminal in Toa Baja, Phase I
Narrative Justification Submitted by the Municipality
FTA - 18
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
81 Toa Baja 2011 F - 80,000 - 80,000
S - 20,000 - 20,000
T - 100,000 - 100,000
82 Vega Alta 2009 F 250,000 - - - 250,000
S 62,500 - - - 62,500
T 312,500 - - - 312,500
83 Vega Alta 2009 F 9,200 - - - 9,200
S 2,300 - - - 2,300
T 11,500 - - - 11,500
84 Vega Alta 2009 F 136,000 - - - 136,000
S 34,000 - - - 34,000
T 170,000 - - - 170,000
85 Vega Alta 2009 F 4,000 - - - 4,000
S 1,000 - - - 1,000
T 5,000 - - - 5,000
Narrative Justification Submitted by the Municipality
ApprovedPR-90-X286
Purchase of Computer and Radio Communication System
Acquisition of Three (3) Vehicles (22 Passenger Capacity) for the Urban Center
ApprovedPR-90-X286
Computer Hardware for Paratransit Program
Narrative Justification Submitted by the Municipality
ApprovedPR-90-X286
ApprovedPR-90-X286
Narrative Justification Submitted by the Municipality
Purchase of Three (3) Paratransit Vehicles (Twelve (12) Passenger) in Accordance with ADA Regulations
Narrative Justification Submitted by the Municipality
Purchase of One (1) Paratransit Mini-Bus to meet Additional ADA Demand
Narrative Justification Submitted by the Municipality
FTA - 19
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
86 Vega Alta 2010 F 3,000 - - - 3,000
S 750 - - - 750
T 3,750 - - - 3,750
87 Vega Alta 2010 F 200,000 - - - 200,000
S 50,000 - - - 50,000
T 250,000 - - - 250,000
88 Vega Baja 2008 F 42,024 57,000 - - 99,024
S 10,506 14,250 - - 24,756
T 52,530 71,250 - - 123,780
89 Vega Baja 2008 F 173,600 119,200 - - 292,800
S 43,400 29,800 - - 73,200
T 217,000 149,000 - - 366,000
90 Vega Baja 2010 F 140,000 - - 140,000
S 35,000 - - 35,000
T 175,000 - - 175,000
Narrative Justification Submitted by the Municipality
Narrative Justification Submitted by the Municipality
Installation of 18 Transit Stops Signs for New Route
Provision of Paratransit Services in Accordance with ADA Regulations
Narrative Justification Submitted by the Municipality
Approved FY 2010 PR-90-X267
NEPA and Remodeling of Publico Terminal for Six (6) Shuttle Buses and Paratransit System
Approved FY 2010 PR-90-X267
Narrative Justification Submitted by the Municipality
Replacement of Two (2) Paratransit Vehicles
Preventive Maintenance Cost for Transit Fleet
Narrative Justification Submitted by the Municipality
FTA - 20
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
SECTION 5307: SAN JUAN URBANIZED AREA (SJUA)Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
91Yabucoa
2010 F 64,000 - - - 64,000
S 16,000 - - - 16,000
T 80,000 - - - 80,000
92Yabucoa
2011 F - - - 40,000 40,000
S - - - 10,000 10,000
T - - - 50,000 50,000
93 F - - - - -
S - - - - -
T - - - - -
94 F - - - - -
S - - - - -
T - - - - -
95 F - - - - -
S - - - - -
T - - - - -
.34,219,131 50,483,432 2,205,849 440,000 87,348,412
Narrative Justification Submitted by the Municipality
Purchase of One (1) Paratransit Van for Complementary Transportation System
Preventive Maintenances Cost for Transit Vehicle System
Total Federal Funds:
Statewide Transportation Improvement Program (STIP)
Section 5309
San Juan Urbanized Area (SJUA)(UA > 1,OOO,OOO in Population)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013
FTA - 22
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5309: CAPITAL PROGRAM, SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. Cost1 PRPA 2006 F 6,314,718 - - - 6,314,718
S 1,578,680 - - - 1,578,680
T 7,893,398 - - - 7,893,398
2 Bus Terminal Bayamón 2006 F 386,232 - - - 386,232
S 96,558 - - - 96,558
T 482,790 - - - 482,790
3 Purchase of Trolleys Cars Bayamón 2006 F 547,162 - - - 547,162
S 136,791 - - - 136,791
T 683,953 - - - 683,953
4 CNF 2006 F 1,931,160 - - - 1,931,160
S 482,790 - - - 482,790
T 2,413,950 - - - 2,413,950
5 Bus Security Equipment *MBA 2006 F 2,508,000 - - - 2,508,000
S 627,000 - - - 627,000
T 3,135,000 - - - 3,135,000
Source of Local FundsProject Justification
The Amount Programmed Includes $601,920 from FY 2007 $652,080 from FY 2008 and $677,160 from FY 2009
Improvements Cataño Ferry Terminal
Section 5309 Bus and Bus Facility Allocations
Section 5309 Bus and Bus Facility Allocations
Fixed Guideway FY 2008 and FY 2009
The Cataño Terminal was Approved by FTA grant number PR-03-0049-01.
The Amount Programmed Includes $120,384 from FY 2007 $130,416 from FY 2008 and $135,432 from FY 2009
The Amount Programmed Includes $170,544 from FY 2007 $184,756 from FY 2008 and $191,862 from FY 2009
The Amount Programmed Includes $576,840 from FY 2006, $601,920 from FY 2007, $652,080 from FY 2008 and $677,160 from FY 2009
Section 5309 Bus and Bus Facility Allocations
Section 5309 Bus and Bus Facility Allocations
Acquisition of Buses and Bus Facilities for the Caribbean National Forest Services
FTA - 23
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5309: CAPITAL PROGRAM, SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013 Est. CostSource of Local FundsProject Justification
6 Acquisition of Buses *MBA 2006 F 836,000 - - - 836,000
S 209,000 - - - 209,000
T 1,045,000 - - - 1,045,000
7 Yabucoa 2006 F 112,651 - - - 112,651
S 28,163 - - - 28,163
T 140,814 - - - 140,814
8 F - - - - -
S - - - - -
T - - - - -
9 F - - - - -
S - - - - -
T - - - - -
10 F - - - - -
S - - - - -
T - - - - -
12,635,923 - - - 12,635,923 Total Federal Funds:
* Project Name Clarified in the SAFETEA-LU Technical Corrections Act of 2008 (HR.1195)
The Amount Programmed Includes $192,280 from FY 2006, $200,640 from FY 2007, $217,360 from FY 2008 and $225,720 from FY 2009
Section 5309 Bus and Bus Facility Allocations
The Amount Programmed Includes $35,112 from FY 2007 $38,038 from FY 2008 and $39,501 from FY 2009
Fiscal Years 2006 Section 5309 Bus and Bus Facility Allocations
Acquisition of Trolleys Buses
Statewide Transportation Improvement Program (STIP)
Section 5309
San Juan Urbanized Area (SJUA)(UA > 1,OOO,OOO in Population)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Amendment to IncludeFiscal Years 2010-2013
Fiscal Year 2011
FTA - 25
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5309: CAPITAL PROGRAM, SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
1 2011 F - 3,587,177 - - 3,587,177
S - 896,794 - - 896,794
T - 4,483,971 - - 4,483,971
F - - - - -
S - - - - -
T - - - - -
F - - - - -
S - - - - -
T - - - - -
F - - - - -
S - - - - -
T - - - - -
- 3,587,177 - - 3,587,177 Total Federal Funds:
Fixed Guideway FY 2011
Project Justification
Source of Local Funds
Preventive Maintenance for Acuaexpreso Service
PRPA
Statewide Transportation Improvement Program Statewide Transportation Improvement Program ( )( )(STIP)(STIP)
Fiscal Years 2010Fiscal Years 2010 20132013
D RA TRA S T AD STRAT O ( TA)D RA TRA S T AD STRAT O ( TA)
Fiscal Years 2010Fiscal Years 2010--20132013
San Juan Urbanized Area (SJUA)San Juan Urbanized Area (SJUA)FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)
San Juan Urbanized Area (SJUA)San Juan Urbanized Area (SJUA)(UA > 1,OOO,OOO in Population)(UA > 1,OOO,OOO in Population)
Section 5310Section 5310
FTA - 27
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5310: ELDERLY AND PERSONS WITH DISABILITIES PROGRAM, SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
1 2010 F 50,400 - - - 50,400
S 12,600 - - - 12,600
T 63,000 - - - 63,000
2 2010 F 50,400 - - - 50,400
S 12,600 - - - 12,600
T 63,000 - - - 63,000
3 2010 F 128,000 - - - 128,000
S 32,000 - - - 32,000
T 160,000 - - - 160,000
4 2010 F 64,000 - - - 64,000
S 16,000 - - - 16,000
T 80,000 - - - 80,000
5 2010 F 100,800 - - - 100,800
S 25,200 - - - 25,200
T 126,000 - - - 126,000
Acquisition of One (1) Paratransit Van
Subject to Final Evaluation and Availability of Funds.
Acquisition of One (1) Paratransit Van
Subject to Final Evaluation and Availability of Funds.
Centro de Adiestramiento para
Personas con Impedimentos, Inc.
(Aibonito)
Centro de Adienstramiento para
Personas con Impedimentos, Inc.
(Coamo)
Subject to Final Evaluation and Availability of Funds.
Acquisition of One (1) Mini Bus Subject to Final Evaluation and Availability of Funds.
Acquisition of Two (2) Mini Buses
Municipality of Coamo(Senior Citizens
Center)
Egida del Policia, Inc.(Guaynabo)
Acquisition of Two (2) Paratransit Vans
Subject to Final Evaluation and Availability of Funds.
Source of Local FundsProject Justification
Municipality of Toa Alta
( Elderly Center)
FTA - 28
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5310: ELDERLY AND PERSONS WITH DISABILITIES PROGRAM, SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
Source of Local FundsProject Justification
6 2010 F 50,400 - - - 50,400
S 12,600 - - - 12,600
T 63,000 - - - 63,000
7 2010 F 50,400 - - - 50,400
S 12,600 - - - 12,600
T 63,000 - - - 63,000
8 2010 F 64,000 - - - 64,000
S 16,000 - - - 16,000
T 80,000 - - - 80,000
9 2010 F 128,000 - - - 128,000
S 32,000 - - - 32,000
T 160,000 - - - 160,000
10 2010 F 100,800 - - - 100,800
S 25,200 - - - 25,200
T 126,000 - - - 126,000
Subject to Final Evaluation and Availability of Funds.
Acquisition of One (1) Mini Bus
Acquisition of Two (2) Mini Buses
Subject to Final Evaluation and Availability of Funds.
Acquisition of Two (2) Paratransit Vans
Acquisition of One (1) Paratransit Van
Subject to Final Evaluation and Availability of Funds.
Municipality of Cataño(Elderly Center)
Municipality of Humacao
(CDT)
Municipality of Humacao
(Elderly Center)
Subject to Final Evaluation and Availability of Funds.
Municipality of Yabucoa
Acquisition of One (1) Paratransit Van
Subject to Final Evaluation and Availability of Funds.
Municipality of Humacao
(Office for Person with Disabilities Affairs)
FTA - 29
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5310: ELDERLY AND PERSONS WITH DISABILITIES PROGRAM, SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
Source of Local FundsProject Justification
11 2010 F 100,800 - - - 100,800
S 25,200 - - - 25,200
T 126,000 - - - 126,000
12 2010 F 384,000 - - - 384,000
S 96,000 - - - 96,000
T 480,000 - - - 480,000
13 2010 F 100,800 - - - 100,800
S 25,200 - - - 25,200
T 126,000 - - - 126,000
14 2010 F 100,800 - - - 100,800
S 15,200 - - - 15,200
T 126,000 - - - 126,000
F - - - - -
S - - - - -
T - - - - -
Total Federal Funds: 1,473,600 1,473,600
Acquisition of Two (2) Paratransit Vans
Subject to Final Evaluation and Availability of Funds.
Subject to Final Evaluation and Availability of Funds.
Oficina Pro Ayuda a Personas con
Impedimentos, Inc.(Northeast)
Municipality of Las Piedras
Subject to Final Evaluation and Availability of Funds.
Acquisition of Six (6) Mini Buses
Acquisition of Two (2) Paratransit Vans
Vocational Rehabilitation Administration
(Metro-East Region)
Acquisition of Two (2) Paratransit Vans
Subject to Final Evaluation and Availability of Funds.
Municipality of Cayey
Statewide Transportation Improvement Program (STIP)
Section 5310
San Juan Urbanized Area (SJUA)(UA > 1,OOO,OOO in Population)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013Amendment to Include
Fiscal Year 2011
FTA - 31
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5310: ELDERLY AND PERSONS WITH DISABILITIES PROGRAM, SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
1 2011 F - 50,400 - - 50,400
S - 12,600 - - 12,600
T - 63,000 - - 63,000
2 2011 F - 201,600 - - 201,600
S - 50,400 - - 50,400
T - 252,000 - - 252,000
3 2011 F - 136,000 - - 136,000
S - 34,000 - - 34,000
T - 170,000 - - 170,000
4 2011 F - 100,800 - - 100,800
S - 25,200 - - 25,200
T - 126,000 - - 126,000
5 2011 F - 136,000 - - 136,000
S - 34,000 - - 34,000
T - 170,000 - - 170,000
Acquisition of Two (2) Mini Buses (16 Passenger Capacity)
Municipality of Morovis
Subject to Final Evaluation and Availability of Funds.
Acquisition of Two (2) Mini Buses (16 Passenger Capacity)
Municipality of Maunabo
Subject to Final Evaluation and Availability of Funds.
Acquisition of Two (2) Paratransit Van (10 Passengers Capacity)
Municipality of Gurabo Subject to Final Evaluation and Availability of Funds.
Subject to Final Evaluation and Availability of Funds.
Acquisition of Four (4) Paratransit Van (10 Passenger Capacity)
Municipality of Caguas Subject to Final Evaluation and Availability of Funds.
Project Justification
Source of Local Funds
Acquisition of One (1) Paratransit Van (10 Passenger Capacity)
Centro Coameño para la Véjez, Inc.
FTA - 32
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5310: ELDERLY AND PERSONS WITH DISABILITIES PROGRAM, SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
Project Justification
Source of Local Funds
6 2011 F - 100,800 - - 100,800
S - 25,200 - - 25,200
T - 126,000 - - 126,000
7 2011 F - 68,000 - - 68,000
S - 17,000 - - 17,000
T - 85,000 - - 85,000
8 2011 F - 136,000 - - 136,000
S - 34,000 - - 34,000
T - 170,000 - - 170,000
9 2011 F - 136,000 - - 136,000
S - 34,000 - - 34,000
T - 170,000 - - 170,000
10 2011 F - 68,000 - - 68,000
S - 17,000 - - 17,000
T - 85,000 - - 85,000
Acquisition of Two (2) MinBuses (16 Passenger Capacity)
Municipality of Guaynabo (Family
Service Department)
Subject to Final Evaluation and Availability of Funds.
Acquisition of One (1) MinBus (16 Passenger Capacity)
Municipality of Manatí (Elderly
Center)
Subject to Final Evaluation and Availability of Funds.
Acquisition of One (1) MinBus (16 Passenger Capacity)
Centro Providencia para Personas de
Mayor Edad
Subject to Final Evaluation and Availability of Funds.
Acquisition of Two (2) MinBuses (16 Passenger Capacity)
Municipality of Toa Baja
Subject to Final Evaluation and Availability of Funds.
Acquisition of Two (2) Paratransit Van (10 Passenger Capacity)
Municipality of Naranjito
Subject to Final Evaluation and Availability of Funds.
FTA - 33
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5310: ELDERLY AND PERSONS WITH DISABILITIES PROGRAM, SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
Project Justification
Source of Local Funds
11 2011 F - 50,400 - - 50,400
S - 12,600 - - 12,600 T - 63,000 - - 63,000
12 2011 F - 204,736 - - 204,736
S - - - - -
T - 204,736 - - 204,736
13 2011 F - 64,232 - - 64,232
S - 16,058 - - 16,058
T - 80,290 - - 80,290
14 F - - - - -
S - - - - -
T - - - - -
15 F - - - - -
S - - - - -
T - - - - -
- 1,452,968 - - 1,452,968Total Federal Funds:
Contingency PRHTA Subject to Availability of Funds.
Acquisition of One (1) Paratransit Van (10 Passenger Capacity)
Municipality of Aguas Buenas
Subject to Final Evaluation and Availability of Funds.
State Administration PRHTA Subject to Availability of Funds.
Statewide Transportation Improvement Program (STIP)
Section 5316
San Juan Urbanized Area (SJUA)(UA > 1,OOO,OOO in Population)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013
FTA - 34
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5316: JOB ACCESS AND REVERSE COMMUTE (JARC), SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
1 2010 F 577,200 - - - 577,200
S 144,300 - - - 144,300
T 721,500 - - - 721,500
2 2010 F 41,600 - - - 41,600
S 10,400 - - - 10,400
T 52,000 - - - 52,000
3 2010 F 96,000 - - - 96,000
S 24,000 - - - 24,000
T 120,000 - - - 120,000
4 2010 F 64,000 - - - 64,000
S 16,000 - - - 16,000
T 80,000 - - - 80,000
5 2010 F 211,200 - - - 211,200
S 211,200 - - - 211,200
T 422,400 - - - 422,400
Project Justification
Source of Local Funds
Acquisition of Eight (8) Mini-Buses
Municipality of Caguas
Desing and Construction of Eight (8) Bus Shelters
Municipality of Caguas
GPS Locator and Sensors for Mini-Buses and Bus Stations
Municipality of Caguas
Construction of Four (4) Bicycle Storage at Transit Stations
Municipality of Caguas
Vouchers Program Municipality of Caguas
FTA - 35
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5316: JOB ACCESS AND REVERSE COMMUTE (JARC), SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
Project Justification
Source of Local Funds
6 2010 F 3,079,771 - - - 3,079,771
S 17,000 - - - 17,000
T 3,096,771 - - - 3,096,771
F - - - - -
S - - - - -
T - - - - -
F - - - - -
S - - - - -
T - - - - -
F - - - - -
S - - - - -
T - - - - -
F - - - - -
S - - - - -
T - - - - -
Total Federal Funds: 4,069,771 4,069,771
Projects for Planning, Capital and Operating for Municipalities Belong on the UZA's > 200,000
Statewide in the UZA's > 200,000
Statewide Transportation Improvement Program (STIP)
Section 5316
San Juan Urbanized Area (SJUA)(UA > 1,OOO,OOO in Population)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013Amendment to Include
Fiscal Year 2011
FTA - 37
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5316: JOB ACCESS AND REVERSE COMMUTE (JARC), SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
1 2011 F - 112,000 - - 112,000
S - 28,000 - - 28,000
T - 140,000 - - 140,000
2 2011 F - 10,336 - - 10,336
S - 2,584 - - 2,584
T - 12,920 - - 12,920
3 2011 F - 85,200 - - 85,200
S - 85,200 - - 85,200
T - 170,400 - - 170,400
4 2011 F - 3,856,114 - - 3,856,114
S - 964,029 - - 964,029
T - 4,820,143 - - 4,820,143
F - - - - -
S - - - - -
T - - - - -
Total Federal Funds: - 4,063,650 - - 4,063,650
Project Justification Source of Local Funds
Acquisition of Two (2) Mini-Buses with (12 Passenger Capacity)
Municipality of Toa Baja
Preventive Maintenance Cost for JARC Transit Fleet
Municipality of Toa Baja
Operating Assistance Municipality of Toa Baja
Projects for Planning, Capital and Operating for Municipalities Belong on the UZA's > 200,000
Statewide in the UZA's > 200,000
Statewide Transportation Improvement Program (STIP)
Section 5317
San Juan Urbanized Area (SJUA)(UA > 1,OOO,OOO in Population)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013
FTA - 39
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5317: NEW FREEDOM PROGRAM (NF), SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
1 2010 F 240,000 - - - 240,000
S 60,000 - - - 60,000
T 300,000 - - - 300,000
2 2010 F 60,000 - - - 60,000
S 15,000 - - - 15,000
T 75,000 - - - 75,000
3 2010 F 16,000 - - - 16,000
S 4,000 - - - 4,000
T 20,000 - - - 20,000
4 2010 F 118,677 - - - 118,677
S 29,669 - - - 29,669
T 148,346 - - - 148,346
F - - - - -
S - - - - -
T - - - - -
Total Federal Funds: 1,108,677 1,108,677
Acquisition of GPS Locator System for NF Vehicles
Municipality of Caguas
Projects for Capital and Operating for Municipalities Belong on UZA's >200,000
Statewide in the UZA>200,000
Acquisition of Scheduling and Dispacth System
Municipality of Caguas
Project Justification
Source of Local Funds
Acquisition of Four (4) Paratransit Buses for NF Proyects
Municipality of Caguas
Statewide Transportation Improvement Program (STIP)
Section 5317
San Juan Urbanized Area (SJUA)(UA > 1,OOO,OOO in Population)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013Amendment to Include
Fiscal Year 2011
FTA - 41
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5317: NEW FREEDOM PROGRAM (NF), SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
1 2011 F - 168,000 - - 168,000
S - 42,000 - - 42,000
T - 210,000 - - 210,000
2 2011 F - 168,000 - - 168,000
S - 42,000 - - 42,000
T - 210,000 - - 210,000
3 2011 F - 156,000 - - 156,000
S - 39,000 - - 39,000
T - 195,000 - - 195,000
4 2011 F - 56,000 - - 56,000
S - 14,000 - - 14,000
T - 70,000 - - 70,000
5 2011 F - 4,800 - - 4,800
S - 1,200 - - 1,200
T - 6,000 - - 6,000
Project Justification
Source of Local Funds
Acquisition of Three (3) Mini-Buses with (12 Passenger Capacity)
Municipality of Toa Baja
Acquisition of Three (3) Mini-Buses with (10 Passenger Capacity)
Municipality of Aguas Buenas
Acquisition of Three (3) Mini-Buses with (10 Passenger Capacity)
Municipality of Cidra
Acquisition of One (1) Mini-Bus with (12 Passenger Capacity)
American Cancer Society
Acquisition of ADP Hardware Municipality of Cidra
FTA - 42
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5317: NEW FREEDOM PROGRAM (NF), SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
Project Justification
Source of Local Funds
6 2011 F - 3,200 - - 3,200
S - 800 - - 800
T - 4,000 - - 4,000
7 2011 F - 54,358 - - 54,358
S - 13,590 - - 13,590
T - 67,948 - - 67,948
8 2011 F - 27,200 - - 27,200
S - 6,800 - - 6,800
T - 34,000 - - 34,000
9 2011 F - 12,000 - - 12,000
S - 3,000 - - 3,000
T - 15,000 - - 15,000
10 2011 F - 5,453 - - 5,453
S - 1,363 - - 1,363
T - 6,816 - - 6,816
Acquisition of Security Cameras Municipality of Aguas Buenas
Acquisition of Scheduling and Dispacth System
Municipality of Aguas Buenas
Acquisition of Scheduling and Dispacth System
Municipality of Cidra
GPS Locator for New Freedom System Mini-Buses
Municipality of Aguas Buenas
Preventive Maintenance Cost for NF Transit Fleet
Municipality of Aguas Buenas
FTA - 43
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5317: NEW FREEDOM PROGRAM (NF), SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
Project Justification
Source of Local Funds
11 2011 F - 14,429 - - 14,429
S - 3,607 - - 3,607
T - 18,036 - - 18,036
12 2011 F - 1,920 - - 1,920
S - 480 - - 480
T - 2,400 - - 2,400
13 2011 F - 29,331 - - 29,331
S - 29,331 - - 29,331
T - 58,662 - - 58,662
14 2011 F - 45,850 - - 45,850
S - 45,850 - - 45,850
T - 91,700 - - 91,700
15 2011 F - 111,600 - - 111,600
S - 111,600 - - 111,600
T - 223,200 - - 223,200
Preventive Maintenance Cost for NF Transit Fleet
Municipality of Toa Baja
Preventive Maintenance Cost for NF Transit Fleet
American Cancer Society
Operating Assistance Municipality of Cidra
Operating Assistance American Cancer Society
Operating Assistance Municipality of Toa Baja
FTA - 44
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 -2013
SECTION 5317: NEW FREEDOM PROGRAM (NF), SAN JUAN URBANIZED AREA Num. Description Grantee Year Annual Element Three Years Program Total
Remarks
Entered 2010 2011 2012 2013Est. Cost
Project Justification
Source of Local Funds
16 2011 F - 50,107 - - 50,107
S - 50,107 - - 50,107
T - 100,214 - - 100,214
17 2011 F - 206,155 - - 206,155
S - 51,539 - - 51,539
T - 257,694 - - 257,694
18 F - - - - -
S - - - - -
T - - - - -
19 F - - - - -
S - - - - -
T - - - - -
15 F - - - - -
S - - - - -
T - - - - -
Total Federal Funds: - 1,114,403 - - 1,114,403
Preventive Maintenance Cost for NF Transit Fleet
Municipality of Aguas Buenas
Projects for Capital and Operating for Municipalities Belong on UZA's >200,000
Statewide in the UZA>200,000
Statewide Transportation Improvement Program Statewide Transportation Improvement Program ( )( )(STIP)(STIP)
Fiscal Years 2010Fiscal Years 2010 20132013
D RA TRA S T AD STRAT O ( TA)D RA TRA S T AD STRAT O ( TA)
Fiscal Years 2010Fiscal Years 2010--20132013
Aguadilla Urbanized Area (AUA)Aguadilla Urbanized Area (AUA)FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)
Aguadilla Urbanized Area (AUA)Aguadilla Urbanized Area (AUA)(UA > 2OO,OOO in Population)(UA > 2OO,OOO in Population)
Section Section 53075307
FTA - 46
COMMONWEALTH OF PUERTO RICO
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION 5307: AGUADILLA URBANIZED AREA (AUA)Num. Description Grantee Year
Entered
2010 2011 2012 2013
1 Aguada 2010 F 24,000 - - - 24,000
S 6,000 - - - 6,000
T 30,000 - - - 30,000
2 Aguada 2010 F 45,480 - - - 45,480
S 11,370 - - - 11,370
T 56,850 - - - 56,850
3 Aguada 2010 F 13,046 - - - 13,046
S 3,262 - - - 3,262
T 16,308 - - - 16,308
4 F - - - - -
S - - - - -
T - - - - -
5 F - - - - -
S - - - - -
T - - - - -
82,526 - - - 82,526
Source of Local Funds Remarks
2009-2010 Municipality Budget
2009-2010 Municipality Budget
Total Est. Cost
Annual Element Three Year Program
Narrative Submitted by Municipality
Project Justification
Narrative Submitted by Municipality
Total Federal Funds:
Preventive Maintenance Cost for Two (2) Trolleys and One (1) Paratransit Vans
Operational Assistance for ADA Paratransit Service
Improvement to Public Transportation Terminal
Narrative Submitted by Municipality
2009-2010 Municipality Budget
Statewide Transportation Improvement Program Statewide Transportation Improvement Program ( )( )(STIP)(STIP)
Fiscal Years 2010Fiscal Years 2010 20132013
D RA TRA S T AD STRAT O ( TA)D RA TRA S T AD STRAT O ( TA)
Fiscal Years 2010Fiscal Years 2010--20132013
Aguadilla Urbanized Area (AUA)Aguadilla Urbanized Area (AUA)FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)
Aguadilla Urbanized Area (AUA)Aguadilla Urbanized Area (AUA)(UA > 2OO,OOO in Population)(UA > 2OO,OOO in Population)
Section 5309Section 5309
FTA - 48
COMMONWEALTH OF PUERTO RICO
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION 5309: CAPITAL PROGRAM, AGUADILLA URBANIZED AREA (AUA)Num. Description Grantee Year
Entered
2010 2011 2012 2013
1 Lares 2006 F 169,942 - - - 169,942
S 42,486 - - - 42,486
T 212,428 - - - 212,428
2 Las Marías 2009 F 190,000 - - - 190,000
S 47,500 - - - 47,500
T 237,500 - - - 237,500
3 F - - - - -
S - - - - -
T - - - - -
4 F - - - - -
S - - - - -
T - - - - -
5 F - - - - -
S - - - - -
T - - - - -
359,942 - - - 359,942
Source of Local Funds Remarks
The Amount Programmed Includes $52,969 from FY 2007, $57,383 from FY 2008 and $59,590 from FY 2009Carryover Funds FY 2009
Annual Element Three Year Program Project JustificationTotal Est. Cost
Purchase of Two (2) Trolleys to Offer Transportation through the Urban Zone in the Municipality of Lares
Purchase Trolley
Total Federal Funds:
Statewide Transportation Improvement Program (STIP)
Urbanized Area Under 200,000 in Population (UZA)FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013Amendment to Include
Fiscal Years 2011-2013 Program
Section 5307
FTA - 50
Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds RemarksEntered 2010 2011 2012 2013 Est. Cost
1 F 288,000 288,000 - - 576,000
Barceloneta 2010S 72,000 72,000 - - 144,000
T 360,000 360,000 - - 720,000
2 F 10,000 15,000 - - 25,000
Barceloneta 2010S 2,500 3,750 - - 6,250
T 12,500 18,750 - - 31,250
3 F 30,538 53,760 - - 84,298
Barceloneta 2010S 7,635 13,440 - - 21,075
T 38,173 67,200 - - 105,373
4 F 102,659 172,142 173,863 175,601 624,265
Barceloneta 2010S 25,665 43,036 43,466 43,900 156,066
T 128,324 215,178 217,329 219,501 780,331
5 F 408,954 359,331 362,924 366,553 1,497,762
Barceloneta 2010S 408,954 359,331 362,924 366,553 1,497,762
T 817,908 718,662 725,848 733,106 2,995,524
FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
FY 2010 ApprovedPR-90-X263 = $10,000
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION: 5307 URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)
Acquisition of Equipment for the Maintenance in the New Operation Center and Maintenance Garage
FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
FY 2010 ApprovedPR-90-X263 = $30,538
Project Descriptionand Localization
Acquisition of One (1) Trolley and One (1) Paratransit Vehicle to Expand Services - Public Transit System
FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
PR-90-X814 = $288,000 in TEAM Under FTA Consideration
Acquisition of Radio Communications System for Trolleys and Paratransit Vehicles
Preventive Maintenance of Transit Vehicles
FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
PR-90-X814 = $102,659 in TEAM Under FTA Consideration
Operational Assistance of Transit System
FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
PR-90-X814 = $408,954 in TEAM Under FTA Consideration
FTA - 51
Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds RemarksEntered 2010 2011 2012 2013 Est. Cost
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION: 5307 URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Project Description
and Localization
6 F 45,734 - - - 45,734
Barceloneta 2010S 11,434 - - - 11,434
T 57,168 - - - 57,168
7 F - 12,800 - - 12,800
Camuy 2011S - 3,200 - - 3,200
T - 16,000 - - 16,000
8 F - 8,000 - - 8,000
Camuy 2011S - 2,000 - - 2,000
T - 10,000 - - 10,000
9 F - 20,000 - - 20,000
Camuy 2011S - 5,000 - - 5,000
T - 25,000 - - 25,000
10 F - 12,000 - - 12,000
Camuy 2011S - 3,000 - - 3,000
T - 15,000 - - 15,000
FY 2011 - Narrative Justification Prepared by the Municipality
FY 2011 - Narrative Justification Prepared by the Municipality
Acquisition of Bycicle Racks to be Place Along the Trolley Routes
FY 2011 - Narrative Justification Prepared by the Municipality
Acquisition of Equipment and Tools for the Maintenance of Trolleys and Paratransit Vehicles
FY 2011 - Narrative Justification Prepared by the Municipality
Acquisition and Installation of Six (6) Security Camara
FY 2010 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
PR-90-X814 = $45,734 in TEAM Under FTA Consideration
Acquisition and Installation of Forty One (41) Route Signals Along the Trolley Routes
Acquisition of Radio Communications System for Trolleys and Paratransit Vehicles
FTA - 52
Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds RemarksEntered 2010 2011 2012 2013 Est. Cost
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION: 5307 URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Project Description
and Localization
11 F - 32,000 32,320 32,643 96,963
Camuy 2011S - 8,000 8,080 8,161 24,241
T - 40,000 40,400 40,804 121,204
12 F 70,992 71,701 72,418 73,142 288,253
Fajardo 2009S 17,748 17,925 18,105 18,286 72,063
T 88,740 89,626 90,523 91,428 360,316
13 F 495,148 240,674 243,080 247,941 1,226,843
Fajardo 2009S 495,148 240,674 243,080 247,941 1,226,843
T 990,296 481,348 486,160 495,882 2,453,686
14 F - 2,600 - - 2,600
Fajardo 2011S - 650 - - 650
T - 3,250 - - 3,250
15 F 55,120 40,992 41,402 42,230 179,744
Hatillo 2010S 13,780 10,248 10,351 10,558 44,936
T 68,900 51,240 51,753 52,788 224,680
FY 2010 ApprovedPR-90-X280 = $55,120
Preventive Maintenance of Trolleys and Paratransit Vehicles
FY 2011 - Narrative Justification Prepared by the Municipality
Carryover 2009 and 2010.FY 2009 = $254,474FY 2010 = $240,674
Preventive Maintenance for Two (2) Trolleys, One (1) Paratransit and wo (2) Mini-Bus Vehicle
FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
Acquisition of a Computer and Printer to Support Transit System
FY 2011 - Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
Certification Prepared by the Municipality
Preventive Maintenance of Transit Vehicles
FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
Operational Assistance for Public Transit System
FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
FTA - 53
Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds RemarksEntered 2010 2011 2012 2013 Est. Cost
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION: 5307 URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Project Description
and Localization
16 F 285,000 289,808 292,706 298,560 1,166,074
Hatillo 2010S 285,000 72,452 73,177 74,640 505,269
T 570,000 362,260 365,883 373,200 1,671,343
17 F 72,000 - - - 72,000
Hatillo 2010S 18,000 - - - 18,000
T 90,000 - - - 90,000
18 F 40,000 21,500 23,500 26,500 111,500
Hormigueros 2010S 10,000 5,375 5,875 6,625 27,875
T 50,000 26,875 29,375 33,125 139,375
19 F 128,791 70,000 75,500 80,000 354,291
Hormigueros 2010S 128,791 17,500 18,875 20,000 185,166
T 257,582 87,500 94,375 100,000 539,457
20 F 2,000,000 - - - 2,000,000
Mayagüez 2010S 500,000 - - - 500,000
T 2,500,000 - - - 2,500,000
FY 2010 ApprovedPR-90-X265 = $40,000
FY 2010 Approved PR-90-X265 = $128,791
This Study is included in the Unified Planning Work Program (UPWP) Fiscal Year 2010-2011.
Operational Assistance for Public Transportation System
FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
FY 2010 ApprovedPR-90-X280 = $285,000
Acquisition of Two (2) Paratransit Vehicle to Replacement Services - Public Transit System
FY 2010 - Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
FY 2010 ApprovedPR-90-X280 = $72,000
Preventive Maintenance FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
Operational Assistance for the Collective Transportaction
FY 2010 & 2011 -Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
Transit Study/AA for 2-4 Corridors for transit alternatives; LPA; NEPA
FY 2010 - Narrative Justification Prepared by the Municipality
FTA - 54
Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds RemarksEntered 2010 2011 2012 2013 Est. Cost
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION: 5307 URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Project Description
and Localization
21 F - 3,000,000 - - 3,000,000
Mayagüez 2008S - 750,000 - - 750,000
T - 3,750,000 - - 3,750,000
22 F - - 5,000,000 - 5,000,000
Mayagüez 2009S - - 1,250,000 - 1,250,000
T - - 6,250,000 - 6,250,000
23 F 80,000 - - - 80,000
Mayagüez 2009S 20,000 - - - 20,000
T 100,000 - - - 100,000
24 F - - 344,464 351,353 695,817
Naguabo 2011S - - 86,116 87,838 173,954
T - - 430,580 439,191 869,771
25 F - - 62,265 63,510 125,775
Naguabo 2011S - - 62,265 63,510 125,775
T - - 124,530 127,020 251,550
Subject to Study Results.
Design for the Construction of the Mayagüez Transit System
FY 2011 - Narrative Justification Prepared by the Municipality
Property Adquisition for the Construction of the Mayagüez Transit System
Subject to Study Results.
Acquisition of Two (2) Paratransit Vehicle to Rehabilitation Trolley Services - Public Transit System
FY 2010 - Narrative Justification Prepared by the Municipality
FY 2010 Approved PR-90-X273 = $80,000
Preventive Maintenance for One (1) Trolley and Two (2) Paratransit Vans of Transit System
FY 2012 - Narrative Justification Prepared by the Municipality
This municipality acquired vehicle under ARRA Funds. It is in process to be considere a grantee. The preventive maintenance cost are programming under 2012 waiting this process.
Operational Assistance for One (1) Trolley and Two (2) Paratransit Vans of Transit System
FY 2012 - Narrative Justification Prepared by the Municipality
This municipality acquired vehicle under ARRA Funds. It is in process to be considere a grantee. The operational assistance cost are programming under 2012 waiting this process.
FTA - 55
Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds RemarksEntered 2010 2011 2012 2013 Est. Cost
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION: 5307 URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Project Description
and Localization
26 F 1,310,242 1,000,000 1,000,000 1,000,000 4,310,242
PRPA 2008S 1,310,242 1,000,000 1,000,000 1,000,000 4,310,242
T 2,620,484 2,000,000 2,000,000 2,000,000 8,620,484
27 F 2,000,000 1,500,000 1,000,000 1,500,000 6,000,000
PRPA 2009S 500,000 375,000 250,000 375,000 1,500,000
T 2,500,000 1,875,000 1,250,000 1,875,000 7,500,000
28 F 90,820 - - - 90,820
PRPA 2010S 22,705 - - - 22,705
T 113,525 - - - 113,525
29 F - 902,331 - - 902,331
PRPA 2010S - 225,583 - - 225,583
T - 1,127,914 - - 1,127,914
30 F - - 139,224 - 139,224
PRPA 2010S - - 34,806 - 34,806
T - - 174,030 - 174,030
FY 2010 - Narrative Justification Prepared by the PRPA
Preventive Maintenance of Ferry Boat Fajardo
FY 2010 - Narrative Justification Prepared by the PRPA
Operational Assistances of Ferry Boat Fajardo
NEPA and Environmental Permits for the Construction of Maintenance and Operational Facility in Fajardo Ferry Terminal
FY 2010 - Narrative Justification Prepared by the PRPA
Design and Engineering for the Construction of Maintenance and Operational Facility in Fajardo Ferry Terminal
FY 2011 - Narrative Justification Prepared by the PRPA
Subject to Environmental Results.
Construction for Maintenance and Operational Facility in Fajardo Ferry Terminal
FY 2012 - Narrative Justification Prepared by the PRPA
Subject to Environmental Results.
FTA - 56
Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds RemarksEntered 2010 2011 2012 2013 Est. Cost
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION: 5307 URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Project Description
and Localization
31 F - 200,800 - - 200,800
Ponce 2010S - 50,200 - - 50,200
T - 251,000 - - 251,000
32 F - 1,000,000 - - 1,000,000
Ponce 2010S - 250,000 - - 250,000
T - 1,250,000 - - 1,250,000
33 F 50,000 50,000 - - 100,000
Villalba 2010S 12,500 12,500 - - 25,000
T 62,500 62,500 - - 125,000
33 F - - 598,658 598,658 1,197,316
Villalba 2011S - - 149,665 149,665 299,329
T - - 748,323 748,323 1,496,645
34 F - 9,600 - - 9,600
Villalba 2011S - 2,400 - - 2,400
T - 12,000 - - 12,000
35 F - 129,600 - - 129,600
Villalba 2011S - 32,400 - - 32,400
T - 162,000 - - 162,000
Construction of Thirty-Six (36) Shelter and Stop Station for New Transportation System
FY 2011 - Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
The shelter and stop station costs were programming under FY 2011 in expect of the delivery of the vehicle under ARRA funds.
Improvements to Publico Transportation Terminal Carlos Garay
FY 2010 - Narrative Justification Prepared by the Municipality
Subject to be considerate grantee
Acquisition of Five (5) Eco-Friendly Buses to Expand Routes Services for Mass Transportation System
FY 2010 - Narrative Justification Prepared by the Municipality
Subject to be considerate grantee
NEPA, Engineering & Design for Public Transit Vehicle Terminal Phase I
FY 2010 - Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
Construction of Villalba New's Terminal, Fase II
FY 2012 - Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
Acquisition of Radio Communications System for the Ten (10) FTA Vehicles
FY 2011 - Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
The Radio Communications System costs were programming under FY 2011 in expect of the delivery of the vehicle under ARRA funds.
FTA - 57
Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds RemarksEntered 2010 2011 2012 2013 Est. Cost
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION: 5307 URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Project Description
and Localization
36 F 1,000,000 - - - 1,000,000
Yauco 2008S 250,000 - - - 250,000
T 1,250,000 - - - 1,250,000
37 F 48,000 - 48,000
Yauco 2008S 12,000 - - - 12,000
T 60,000 - - - 60,000
38 F 60,000 - 60,000
Yauco 2008S 15,000 - - - 15,000
T 75,000 - - - 75,000
39 F 5,120 - 5,120
Yauco 2010S 1,280 - - - 1,280
T 6,400 - - - 6,400
40 F 20,797 - 20,797
Yauco 2010S 5,199 - - - 5,199
T 25,996 - - - 25,996
Carryover 2008.Acquisition of One (1) Paratransit for New Transit Service in Rio Prieto in Accordance ADA
FY 2010 - Narrative Justification Prepared by the Municipality
Acquisition of Two (2) Computers and Accessories to Support Transit Administration Program
FY 2010 - Narrative Justification Prepared by the Municipality
Acquisition of Four (4) Trolleys and (14) Vans (10-12 Passangers) for New Transportation Routes in Rural Areas
Acquisition of a 15 to 20 Passengers Bus for New Fixed Transit Services for the General Public in Rio Prieto
FY 2010 - Narrative Justification Prepared by the Municipality
FY 2010 - Narrative Justification Prepared by the Municipality
Acquisition of Equipment and Tools for Bus and Paratransit Vehicles Maintenance Workshop
FY 2010 Approved PR-90-X251 = $20,797
FY 2010 - Narrative Justification Prepared by the Municipality
FY 2010 Approved PR-90-X251 = $5,120
Carryover 2008.
Carryover 2008.
FTA - 58
Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds RemarksEntered 2010 2011 2012 2013 Est. Cost
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION: 5307 URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Project Description
and Localization
41 F 100,000 - 100,000
Yauco 2010S 25,000 - - - 25,000
T 125,000 - - - 125,000
42 F 50,000 - 50,000
Yauco 2010S 12,500 - - - 12,500
T 62,500 - - - 62,500
43 F 320,000 - 320,000
Yauco 2010S 80,000 - - - 80,000
T 400,000 - - - 400,000
44 F 800,000 800,000
Yauco 2010S 200,000 - - - 200,000
T 1,000,000 - - - 1,000,000
45 F 100,000 101,000 102,010 104,050 407,060
Yauco 2010S 25,000 25,250 25,503 26,013 101,765
T 125,000 126,250 127,513 130,063 508,825
10,067,915$ 9,603,639$ 9,564,334$ 4,960,741$ 34,196,629$
$5,000 for the Environmental Analysis
Certification Prepared by the Municipality
Acquisition of Radio Communications System for the Four (4) Existing FTA Vehicles
FY 2010 Approved PR-90-X251 = $100,000
Acquisition of Hardware, Software and Radio Communications System for Van and Paratransit
FY 2010 - Narrative Justification Prepared by the Municipality
FY 2010 - Narrative Justification Prepared by the Municipality
Total Fiscal Year 2010 (Federal Funds):
Acquisition and Instalation of Bus Stops and Road Signs Along the Trolley Routes
FY 2010 - Narrative Justification Prepared by the Municipality
Environmental Analysis and the Construction and Rehabilitation of Sidewalks and ADA Ramps Along Trolley Route: Center of the City and Housing Complex
FY 2010 - Narrative Justification Prepared by the Municipality
Preventive Maintenance of Transit Vehicles
FY 2010 - Narrative Justification Prepared by the Municipality
FY 2010 Approved PR-90-X251 = $50,000
Certification Prepared by the Municipality
Certification Prepared by the Municipality
Statewide Transportation Improvement Program
(STIP)
Urbanized Area Under 200,000 in Population (UZA)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013
Amendment to Include
Section 5309
FTA - 60
Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds RemarksEntered 2010 2011 2012 2013 Est. Cost
1 F 130,000 - - - 130,000
2010S 32,500 - - - 32,500
T 162,500 - - - 162,500
2 F - - - - -
S - - - - -
T - - - - -
3 F - - - - -
S - - - - -
T - - - - -
4 F - - - - -
S - - - - -
T - - - - -
5 F - - - - -
S - - - - -
T - - - - -
130,000$ -$ -$ -$ 130,000$ Total Federal Funds:
Project Descriptionand Localization
Accessible Bus and Handicapped - Accessible Van for the Veterans Home Handicapped in the Municipality of Juana Díaz
PRHTA
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
SECTION: 5309 - BUS AND BUS RELATED EQUIPMENT AND FACILITIES - URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)
Statewide Transportation Improvement Program Statewide Transportation Improvement Program ( )( )(STIP)(STIP)
Fiscal Years 2010Fiscal Years 2010--20132013
D RA TRA S T AD STRAT O ( TA)D RA TRA S T AD STRAT O ( TA)
Fiscal Years 2010Fiscal Years 2010--20132013
Urbanized Area Under 200 000 in Population (UZA)Urbanized Area Under 200 000 in Population (UZA)FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)
Urbanized Area Under 200,000 in Population (UZA)Urbanized Area Under 200,000 in Population (UZA)
Section 5310Section 5310
FTA - 62
SECTION 5310: ELEDERLY AND PERSONS WITH DISABILITIES PROGRAM, URBANIZED AREAS UNDER 200,000 FORMULA PROGRAM (UZA)Num. Description Grantee Year
Entered 2010 2011 2012 20131 F 50,400 - - - 50,400
2010 S 12,600 - - - 12,600
T 63,000 - - - 63,000
2 F 50,400 - - - 50,400
2010 S 12,600 - - - 12,600
T 63,000 - - - 63,000
3 F 128,000 - - - 128,000
2010 S 32,000 - - - 32,000
T 160,000 - - - 160,000
4 F 128,000 - - - 128,000
2010 S 25,200 - - - 25,200
T 126,000 - - - 126,000
5 F - - - -
S - - - -
T - - - -
356,800 - - - 356,800
Subject to final evaluation and availability of funds.
Subject to final evaluation and availability of funds.
Source of Local Funds Remarks
Subject to final evaluation and availability of funds.
Subject to final evaluation and availability of funds.
Project Justification
Municipality of Arecibo
(Villa Campestre Center)
Municipality of Ponce
(Perla del Sur Center)
Municipality of Barceloneta
Total Est. Cost
Annual Element Three Year Program
Acquisition of two (2) Mini Bus
Acquisition of one (1) paratransit van
Acquisition of two (2) Paratrnasit Vans
COMMONWEALTH OF PUERTO RICO
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
Total Federal Funds:
Acquisition of one (1) paratransit van
Asociación Benefica de Ponce, Inc.
Statewide Transportation Improvement Program
(STIP)
Section 5310
Urbanized Area Under 200,000 in Population (UZA)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013
Amendment to Include
Fiscal Year 2011
FTA - 64
SECTION 5310: ELEDERLY AND PERSONS WITH DISABILITIES PROGRAM, URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Num. Description Grantee Year
Entered 2010 2011 2012 20131 2011 F - 68,000 68,000
S - 17,000 17,000
T - 85,000 85,000
2 2011 F - 68,000 68,000
S - 17,000 17,000
T - 85,000 85,000
3 2011 F - 136,000 136,000
S - 34,000 34,000
T - 170,000 170,000
4 2011 F - 136,000 136,000
S - 34,000 34,000
T - 170,000 170,000
5 2011 F - 68,000 68,000
S - 17,000 17,000
T - 85,000 85,000
Acquisition of two (2) Mini Buses (16 passengers capacity)
Municipality of Camuy
(Elderly Center)
Subject to final evaluation and availability of funds.
Acquisition of one (1) Mini Buses (16 passenger capacity)
Municipality of Guayama
Subject to final evaluation and availability of funds.
Subject to final evaluation and availability of funds.
Acquisition of two (2) Mini Buses (16 passenger capacity)
Municipality of Hormigueros
(Elderly Center)
Subject to final evaluation and availability of funds.
Three Year Program Total Est. Cost
Project Justification
Acquisition of one (1) Mini Bus (16 passenger capacity)
Asociación Comunitaria
Palmarejo II, Inc. (Lajas)
Source of Local Funds Remarks
Acquisition of one (1) Mini Bus (16 passenger capacity)
Centro ELIM, Inc. (Lajas)
Subject to final evaluation and availability of funds.
Annual Element
COMMONWEALTH OF PUERTO RICO
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
FTA - 65
SECTION 5310: ELEDERLY AND PERSONS WITH DISABILITIES PROGRAM, URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Num. Description Grantee Year
Entered 2010 2011 2012 2013Three Year Program Total
Est. CostProject Justification Source of Local Funds Remarks
Annual Element
COMMONWEALTH OF PUERTO RICO
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
6 2011 F - 68,000 68,000
S - 17,000 17,000
T - 85,000 85,000
7 F - - -
S - - -
T - - -
8 F - - -
S - - -
T - - -
9 F - - -
S - - -
T - - -
10 F - - -
S - - -
T - - -
Total Federal Funds: - 544,000 544,000
Acquisition of one (1) Mini Bus (16 passenger capacity)
Comité de Gericultura de Guayama, Inc.
Subject to final evaluation and availability of funds.
Statewide Transportation Improvement Program (STIP)
Section 5316
Urbanized Area Under 200,000 in Population (UZA)FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013
FTA - 67
SECTION: 5316 JOB ACCESS AND REVERSE COMMUTE PROGRAM - URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds Remarks
Entered 2010 2011 2012 2013 Est. Cost1 F 72,000 - - - 72,000
2010S 18,000 - - - 18,000
T 90,000 - - - 90,000
2 F - - - - -
S - - - - -
T - - - - -
3 F - - - - -
S - - - - -
T - - - - -
4 F - - - - -
S - - - - -
T - - - - -
5 F - - - - -
S - - - - -
T - - - - -
72,000$ -$ -$ -$ 72,000$
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
Project Descriptionand Localization
Acquisition of One (1) Paratransit Vehicle
Hatillo
Narrative Justification Prepared by the Municipality
Certification Prepared by the Municipality
Total Federal Funds:
Statewide Transportation Improvement Program
(STIP)
Urbanized Area Under 200,000 in Population (UZA)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013
Amendment to Include
Section 5316
FTA - 69
SECTION: 5316 JOB ACCESS AND REVERSE COMMUTE PROGRAM - URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds Remarks
Entered 2010 2011 2012 2013 Est. Cost1 F 5,773,282 3,000,000 - - 8,773,282
2010S 1,443,321 750,000 - - 2,193,321
T 7,216,603 3,750,000 - - 10,966,603
2 F 640,000 - - - 640,000
Mayagüez 2010S 160,000 - - - 160,000
T 800,000 - - - 800,000
3 F 328,332 - - - 328,332
Mayagüez 2010S 328,332 - - - 328,332
T 656,664 - - - 656,664
4 F - - - - -
S - - - - -
T - - - - -
5 F - - - - -
S - - - - -
T - - - - -
6,741,614$ 3,000,000$ -$ -$ 9,741,614$
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
Project Descriptionand Localization
Project for Planning, Capital and Operating for Municipality Belong on UZA < 200,000
Statewide in the UZAs <
200,000
FY 2009 = $3,446,426FY 2010 = $3,295,188
Acquisition of Eight (8) Vehicles (Buses) for the Transportation
Total Federal Funds:
Operating Assistance
Statewide Transportation Improvement Program
(STIP)
Urbanized Area Under 200,000 in Population (UZA)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013
Amendment to Include
Section 5317
FTA - 71
SECTION: 5317 NEW FREEDOM - URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)Num. Grantee Year Annual Element Three Year Program Total
Project Justification Source of Local Funds Remarks
Entered 2010 2011 2012 2013 Est. Cost1 F 1,790,216 800,000 - - 2,590,216
2010S 447,554 200,000 - - 647,554
T 2,237,770 1,000,000 - - 3,237,770
2 F - - - - -
S - - - - -
T - - - - -
3 F - - - - -
S - - - - -
T - - - - -
4 F - - - - -
S - - - - -
T - - - - -
5 F - - - - -
S - - - - -
T - - - - -
1,790,216$ 800,000$ -$ -$ 2,590,216$ Total Federal Funds:
FY 2009 = $903,492FY 2010 = $886,724
Project Descriptionand Localization
Project for Misc. Capital and Operating for Municipality Belong on UZA < 200,000
Statewide in the UZAs <
200,000
FISCAL YEARS 2010-2013
COMMONWEALTH OF PUERTO RICO
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMHIGHWAY AND TRANSPORTATION AUTHORITY
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
Statewide Transportation Improvement Program
(STIP)
Section 5311
Nonurbanized Area
(Under 5O,OOO in Population)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010-2013
Amendment to Include
Fiscal Year 2011
FTA - 73
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013Section 5311: Non-Urbanized Area Formula ProgramNum. Description Grantee Year Annual Element Three Years Program Total Project Justification Remarks
Entered 2010 2011 2012 2013 Est. Cost1 PRHTA 2009 F 210,302 - - - 210,302
S - - - - -
T 210,302 - - - 210,302
2 PRHTA 2009 F 210,302 - - - 210,302
S 52,576 - - - 52,576
T 262,878 - - - 262,878
3 PRHTA 2009 F 185,715 - - - 185,715
S 46,429 - - - 46,429
T 232,144 - - - 232,144
4 PRHTA 2009 F 140,000 - - - 140,000
S 35,000 - - - 35,000
T 175,000 - - - 175,000
5 PRHTA 2009 F 228,000 - - - 228,000
S 57,000 - - - 57,000
T 285,000 - - - 285,000
PR-18-X025Pending FTA approval
PR-18-X025Pending FTA approval
PR-18-X025Pending FTA approval
PR-18-X025Pending FTA approval
PR-18-X025Pending FTA approval
Acquisition of Three (3) Mini Buses: Two (2) for Existing Routes and One (1) for Naranjo Ward, by the Municipality of Comerío
State Administration
Intercity Bus Transportation
Acquisition of Two (2) Paratransit Van for Expansion, by the Municipallity of Guayama
Acquisition of Two (2) Trolleys for Expansion, by the Municipality of Jayuya
FTA - 74
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013Section 5311: Non-Urbanized Area Formula ProgramNum. Description Grantee Year Annual Element Three Years Program Total Project Justification Remarks
Entered 2010 2011 2012 2013 Est. Cost
6 PRHTA 2009 F 88,000 - - - 88,000
S 22,000 - - - 22,000
T 110,000 - - - 110,000
7 PRHTA 2009 F 339,698 - 173,246 178,443 691,387
S 84,925 - 43,312 44,611 172,847
T 424,623 - 216,558 223,054 864,234
8 PRHTA 2010 F 2,224,753 - - - 2,224,753
S 556,188 - - - 556,188
T 2,780,941 - - - 2,780,941
9 PRHTA 2010 F 80,000 - - - 80,000
S 20,000 - - - 20,000
T 100,000 - - - 100,000
10 PRHTA 2010 F - 211,149 - - 211,149 PR-18-X026
S - - - - -
T - 211,149 - - 211,149
PR-18-X025Fund from FY 2010Pending FTA approva
PR-18-X025Pending FTA approval
PR-18-X025Funds transferred from Section 5307 - Aguadilla Urbanized Area
PR-18-X025Funds transferred from Section 5307 - Aguadilla Urbanized Area
Design for an Emergency Ramp for Cargo Vessels at the Construction of Ferry Terminal in Culebra, by Ports Authority
State Administration
NEPA and Environmental Permits and Design for the Construction of Ferry Terminal in Culebra, by Ports Authority
Acquisition of One (1) Paratransit Van for Expansion, by the Municipality of Jayuya
Preventive Maintenance for Fajaro/Vieques/Culebra Ferry System, by Ports Authority
FTA - 75
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013Section 5311: Non-Urbanized Area Formula ProgramNum. Description Grantee Year Annual Element Three Years Program Total Project Justification Remarks
Entered 2010 2011 2012 2013 Est. Cost
11 PRHTA 2010 F - 211,149 - - 211,149 PR-18-X026
S - 52,787 - - 52,787
T - 263,936 - - 263,936
12 PRHTA 2010 F - 39,000 39,780 40,973 119,753 PR-18-X026
S - 9,750 9,945 10,243 29,938
T - 48,750 49,725 51,216 149,691
13 PRHTA 2010 F - 120,000 - - 120,000 PR-18-X026
S - 30,000 - - 30,000
T - 150,000 - - 150,000
14 PRHTA 2010 F - 24,000 - - 24,000 PR-18-X026
S - 6,000 - - 6,000
T - 30,000 - - 30,000
15 PRHTA 2010 F - 5,000 - - 5,000 PR-18-X026
S - 1,250 - - 1,250
T - 6,250 - - 6,250
Acquisition of Monitor Main System, by the Municipality of Comerío
Intercity Bus Transportation
Preventive Maintenance for Public Transit Service, by the Municipality of Comerío
Construction of Twelve (12) Shelters, by the Municipality of Comerío
Acquisition of Twenty (20) Stop Signs, by the Municipality of Comerío
FTA - 76
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013Section 5311: Non-Urbanized Area Formula ProgramNum. Description Grantee Year Annual Element Three Years Program Total Project Justification Remarks
Entered 2010 2011 2012 2013 Est. Cost
16 PRHTA 2010 F - 12,000 - - 12,000 PR-18-X026
S - 3,000 - - 3,000
T - 15,000 - - 15,000
17 PRHTA 2010 F - 12,000 - - 12,000 PR-18-X026
S - 3,000 - - 3,000
T - 15,000 - - 15,000
18 PRHTA 2010 F - 188,000 - - 188,000 PR-18-X026
S - 47,000 - - 47,000
T - 235,000 - - 235,000
19 PRHTA 2010 F - 177,361 - - 177,361 PR-18-X026
S - 44,340 - - 44,340
T - 221,701 - - 221,701
20 PRHTA 2010 F - 24,000 24,480 25,214 73,694 PR-18-X026
S - 6,000 6,120 6,304 18,424
T - 30,000 30,600 31,518 92,118
Acquisition of Six (6) Vehicle Monitor for Existing Fleet, by the Municipality of Comerío
Design for Trolleys Terminal, by the Municipality of Guayama
Construction of Trolleys Terminal, by the Municipality of Guayama
Acquisition of Three (3) Public Transportation Vans, by the Municipality of Jayuya
Preventive Maintenance for Trolleys and Paratransit, by the Municipality of Jayuya
FTA - 77
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013Section 5311: Non-Urbanized Area Formula ProgramNum. Description Grantee Year Annual Element Three Years Program Total Project Justification Remarks
Entered 2010 2011 2012 2013 Est. Cost
21 PRHTA 2010 F - 8,000 - - 8,000 PR-18-X026
S - 2,000 - - 2,000
T - 10,000 - - 10,000
22 PRHTA 2010 F - 240,000 - - 240,000 PR-18-X026
S - 60,000 - - 60,000
T - 300,000 - - 300,000
23 PRHTA 2010 F - 136,000 - - 136,000 PR-18-X026
S - 34,000 - - 34,000
T - 170,000 - - 170,000
24 F - - - - -
S - - - - -
T - - - - -
25 F - - - - -
S - - - - -
T - - - - -
Total Federal Funds 3,706,770 1,407,659 237,506 244,630 5,596,565
Acquisition of Twenty (20) Signs for Routes, by the Municipality of Jayuya
Acquisition of Two (2) Trolleys for Expansion, by the Municipality of Vieques
Acquisition of Two (2) Paratransit for Expansion, by the Municipality of Vieques
Section 5311
Nonurbanized Area(Under 5O,OOO in Population)
FEDERAL TRANSIT ADMINISTRATION (FTA)
Rural Transit Assistance Program (RTAP)
Statewide Transportation Improvement Program (STIP)Fiscal Years 2010 - 2013
Amendment to IncludeFiscal Year 2011
FTA - 79
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010-2013
Section 5311: Non Urbanized Area, RTAPNum. Description Grantee Year Annual Element Three Years Program Total
i d Project Justification Remarks
Entered 2010 2011 2012 2013 Est. Cost1 RTAP PRHTA 2009 F 82,288 - - - 82,288 PR-18-X025 - Pending FTA
approval.
S - - - - - $34,946 for 43.50.01; $47,342 for 43.50.02
T 82,288 - - - 82,288
2 RTAP PRHTA 2010 F - 82,130 - - 82,130 PR-18-X026
S - - - - - $34,946 for 43.50.01; $47,184 for 43.50.02
T - 82,130 - - 82,130
F - - - - -
S - - - - -
T - - - - -
F - - - - -
S - - - - -
T - - - - -
F - - - - -
S - - - - -
T - - - - -
82,288 82,130 - - 164,418 Total Federal Funds:
Department of Transportation and Public WorksDepartment of Transportation and Public WorksHi h d T t ti A th itHi h d T t ti A th itHighway and Transportation AuthorityHighway and Transportation Authority
AMERICAN RECOVERY AND REINVESTMENT ACT 2009AMERICAN RECOVERY AND REINVESTMENT ACT 2009(ARRA) (ARRA)
Statewide Transportation Improvement Program (STIP)Statewide Transportation Improvement Program (STIP)Fiscal Years 2010Fiscal Years 2010 20132013Fiscal Years 2010Fiscal Years 2010--20132013
US Department of TransportationUS Department of TransportationFederal Transit Administration (FTA)Federal Transit Administration (FTA) Federal Highway Administration (FHWA)Federal Highway Administration (FHWA)( )( ) g y ( )g y ( )
“The preparation of this document has been financed in part through a grant from U.S. Department of Transportation, Federal Transit Administration, under the Transportation Equity Act for the 21st Century and funds authorized under the Title 23 USC.”
Statewide Transportation Improvement Program Statewide Transportation Improvement Program ( )( )(STIP)(STIP)
Fiscal Years 2010Fiscal Years 2010 20132013
D RA TRA S T AD STRAT O ( TA)D RA TRA S T AD STRAT O ( TA)
Fiscal Years 2010Fiscal Years 2010--20132013
San Juan Urbanized Area (SJUA)San Juan Urbanized Area (SJUA)FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)
San Juan Urbanized Area (SJUA)San Juan Urbanized Area (SJUA)(UA > 1,OOO,OOO in Population)(UA > 1,OOO,OOO in Population)
READY TO GOREADY TO GOAMERICAN RECOVERY AND REINVESTMENT ACT 2009AMERICAN RECOVERY AND REINVESTMENT ACT 2009
(ARRA) (ARRA) (ARRA) (ARRA)
FTA - 82
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntered 2010 2011 2012 2013
Est. Cost1 Bayamón 2007 F 80,000 - - - 80,000
S - - - - -
T 80,000 - - - 80,000
2 Bayamón 2008 F 1,090,000 - - - 1,090,000
S - - - - -
T 1,090,000 - - - 1,090,000
3 Carolina 2007 F 140,498 - - - 140,498
S - - - - -
T 140,498 - - - 140,498
4 Carolina 2007 F 341,000 - - - 341,000
S - - - - -
T 341,000 - - - 341,000
5 Dorado 2006 F 325,000 - - - 325,000
S - - - - -
T 325,000 - - - 325,000
READY TO GO PROJECTS
FISCAL YEARS 2010 -2013
ARRA FUNDS: SAN JUAN URBANIZED AREA Apportionment $44,467,699Project Justification
Acquisition of One (1) 14 Passenger Paratransit Minibus
Included in STIP 2009.
Installation of 273 Passenger Shelters and Twelve (12) Bus-Stop Signs
Included in STIP 2009.
Rehabilitation of Transit Vehicles Manteinance Facilities
Included in STIP 2009.
Bus Shelters and Signage Included in STIP 2009.
Improvements to Municipal Transit Vehicles Maintenance Garage
Included in STIP 2009.
FTA - 83
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntered 2010 2011 2012 2013
Est. Cost
READY TO GO PROJECTS
FISCAL YEARS 2010 -2013
ARRA FUNDS: SAN JUAN URBANIZED AREA Apportionment $44,467,699Project Justification
6 Dorado 2006 F 35,000 - - - 35,000
S - - - - -
T 35,000 - - - 35,000
7 Juncos 2008 F 143,750 - - - 143,750
S - - - - -
T 143,750 - - - 143,750
8 PRPA 2008 F 625,000 - - - 625,000
S - - - - -
T 625,000 - - - 625,000
9 Toa Baja 2007 F 85,000 - - - 85,000
S - - - - -
T 85,000 - - - 85,000
10 Toa Baja 2006 F 312,500 - - - 312,500
S - - - - -
T 312,500 - - - 312,500
Design and Construction of Six (6) Passenger Shelters
Included in STIP 2009.
Improvements to Transit Vehicles Maintenance Garage
Included in STIP 2009.
Improvements to Acuaexpreso Maintenance Building Facility
Included in STIP 2009.
Purchase of One (1) 12 Passenger Minibuses for Paratransit Service
Included in STIP 2009.
Purchase of Two (2) Medium-Capacity Vehicles for New Public Transit Route
Included in STIP 2009.
FTA - 84
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntered 2010 2011 2012 2013
Est. Cost
READY TO GO PROJECTS
FISCAL YEARS 2010 -2013
ARRA FUNDS: SAN JUAN URBANIZED AREA Apportionment $44,467,699Project Justification
11 Cayey 2008 F 112,500 - - - 112,500
S - - - - -
T 112,500 - - - 112,500
12 Cidra 2008 F 98,638 - - - 98,638
S - - - - -
T 98,638 - - - 98,638
13 Cidra 2008 F 165,688 - - - 165,688
S - - - - -
T 165,688 - - - 165,688
14 Guaynabo 2008 F 2,000,000 - - - 2,000,000
S - - - - -
T 2,000,000 - - - 2,000,000
15 Humacao 2008 F 150,000 - - - 150,000
S - - - - -
T 150,000 - - - 150,000
Acquisition of One (1) Small Bus Transit System
Included in STIP 2009.
Replace Security Fence Surrounding Paratransit Storage and Maintenance Facilities
Included in STIP 2009.
Sidewalks and Trolley Stops Improvements and Repairs
Included in STIP 2009.
Acquisition of Transit Vehicles for Service Area Expansion
Included in STIP 2009.
Roof Replacement of the North Terminal
Included in STIP 2009.
FTA - 85
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntered 2010 2011 2012 2013
Est. Cost
READY TO GO PROJECTS
FISCAL YEARS 2010 -2013
ARRA FUNDS: SAN JUAN URBANIZED AREA Apportionment $44,467,699Project Justification
16 Manatí 2008 F 187,500 - - - 187,500
S - - - - -
T 187,500 - - - 187,500
17 MBA 2008 F 22,500,000 - - - 22,500,000
S - - - - -
T 22,500,000 - - - 22,500,000
18 PRHTA 2008 F 2,620,000 - - - 2,620,000
S - - - - -
T 2,620,000 - - - 2,620,000
19 PRHTA 2008 F 1,200,000 - - - 1,200,000
S - - - - -
T 1,200,000 - - - 1,200,000
20 PRHTA 2008 F 2,000,000 - - - 2,000,000
S - - - - -
T 2,000,000 - - - 2,000,000
Publico Terminal Roof Repairs Included in STIP 2009.
Acquisition of Forty-Five (45) Hybrid Fuel Buses to Replace 25 40ft. 1997 Buses and 15 40ft. 1998 Buses
Included in STIP 2009.
Purchase of 25 Mini-Buses for Tren Urbano Feeder System and Purchase of Security Cameras
Included in STIP 2009.
Operating Assistance for 25 Mini-Buses and 20 Forty Foot Buses
Included in STIP 2009.
Tren Urbano Power Saving, Ticket Vending Improvements and Security Cameras
Included in STIP 2009.
FTA - 86
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntered 2010 2011 2012 2013
Est. Cost
READY TO GO PROJECTS
FISCAL YEARS 2010 -2013
ARRA FUNDS: SAN JUAN URBANIZED AREA Apportionment $44,467,699Project Justification
21 PRHTA 2008 F 2,180,000 - - - 2,180,000
S - - - - -
T 2,180,000 - - - 2,180,000
22 PRHTA 2008 F 6,000,000 - - - 6,000,000
S - - - - -
T 6,000,000 - - - 6,000,000
23 San Lorenzo 2008 F 375,000 - - - 375,000
S - - - - -
T 375,000 - - - 375,000
24 Toa Alta 2008 F 185,500 - - - 185,500
S - - - - -
T 185,500 - - - 185,500
25 Toa Alta 2008 F 38,600 - - - 38,600
S - - - - -
T 38,600 - - - 38,600
Preventive Maintenance Cost for Capital Investments
Included in STIP 2009.
Purchase of 20 (40 foot) Buses for Metrobus I, Metrobus III and Metrobus Express
Included in STIP 2009.
Reconstruction of Sidewalks and ADA Ramps in Trolley Route
Included in STIP 2009.
Acquisition of One (1) Trolley for Public Transportation System
Included in STIP 2009.
Installtion of Forty (40) Stop Signs for Transit System
Included in STIP 2009.
FTA - 87
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntered 2010 2011 2012 2013
Est. Cost
READY TO GO PROJECTS
FISCAL YEARS 2010 -2013
ARRA FUNDS: SAN JUAN URBANIZED AREA Apportionment $44,467,699Project Justification
26 Vega Alta 2008 F 325,000 - - - 325,000
S - - - - -
T 325,000 - - - 325,000
27 Vega Baja 2008 F 300,000 - - - 300,000
S - - - - -
T 300,000 - - - 300,000
28 Cayey 2008 F 180,000 - - - 180,000
S - - - - -
T 180,000 - - - 180,000
29 Carolina 2008 F 350,000 - - - 350,000
S - - - - -
T 350,000 - - - 350,000
30 Cidra 2008 F 1,000,000 - - - 1,000,000
S - - - - -
T 1,000,000 - - - 1,000,000
Acquisition of Four (4) 18 Passenger Vehicles for Candelaria, Espinosa and Maricao Routes
Included in STIP 2009.
Purchase of Equipment and Tools for Transit Vehicle Maintenance
Included in STIP 2009.
Acquisition of Two (2) Paratransit Vehicles to Expand Services
Included in STIP 2009.
Purchase of Equipment and Tools for Preventive Maintenance of Transit Vehicles
Included in STIP 2009.
Replacement of Security and Energy System, with Solar Powered Ones in Public Transportation Center, Vehicle Storage and Maintenance
Included in STIP 2009.
FTA - 88
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntered 2010 2011 2012 2013
Est. Cost
READY TO GO PROJECTS
FISCAL YEARS 2010 -2013
ARRA FUNDS: SAN JUAN URBANIZED AREA Apportionment $44,467,699Project Justification
31 Dorado 2006 F 350,000 - - - 350,000 Included in STIP 2009.
S - - - - -
T 350,000 - - - 350,000
32 Juncos 2006 F 800,000 - - - 800,000 Included in STIP 2009.
S - - - - -
T 800,000 - - - 800,000
33 Corozal 2006 F 263,000 - - - 263,000
S - - - - -
T 263,000 - - - 263,000
34 Gurabo 2009 F 100,000 - - - 100,000
S - - - - -
T 100,000 - - - 100,000
35 Gurabo 2009 F 125,000 - - - 125,000
S - - - - -
T 125,000 - - - 125,000
Purchase of Two (2) Minibuses and One (1) Paratransit Van for Transit Services
Purchase of Three (3) Small Low-Emission Buses and One (1) Paratransit Van to Expand Transit Service
Acquisition of Two (2) Torlley for Public Transportation
Included in STIP 2009.
Purchase of Hardware, Software and Radio Communication System for the Trolleys and Paratransit System Management
Included in STIP 2009.
Preventive Maintenance Cost for Trolleys and Paratransit Vans
Included in STIP 2009.
FTA - 89
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntered 2010 2011 2012 2013
Est. Cost
READY TO GO PROJECTS
FISCAL YEARS 2010 -2013
ARRA FUNDS: SAN JUAN URBANIZED AREA Apportionment $44,467,699Project Justification
36 Gurabo 2009 F 285,000 - - - 285,000
S - - - - -
T 285,000 - - - 285,000
37 Gurabo 2009 F 65,000 - - - 65,000
S - - - - -
T 65,000 - - - 65,000
38 F - - - - -
S - - - - -
T - - - - -
39 F - - - - -
S - - - - -
T - - - - -
40 F - - - - -
S - - - - -
T - - - - -
47,209,174 - - - 47,209,174
Streets Sign and Stops Identifying the Trolleys Stops
Operational Assistances for Paratransit Services
Included in STIP 2009.
Included in STIP 2009.
Total Funds:
Statewide Transportation Improvement Program Statewide Transportation Improvement Program (STIP)(STIP)
Fiscal Years 2010Fiscal Years 2010--20132013
S J U b i d A (SJUA)S J U b i d A (SJUA)FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)
San Juan Urbanized Area (SJUA)San Juan Urbanized Area (SJUA)(UA > 1,000,000 in Population)(UA > 1,000,000 in Population)( , , p )( , , p )
FIXED GUIDEWAYFIXED GUIDEWAYAMERICAN RECOVERY AND REINVESTMENT ACT 2009AMERICAN RECOVERY AND REINVESTMENT ACT 2009
FIXED GUIDEWAYFIXED GUIDEWAY
(ARRA) (ARRA) (ARRA) (ARRA)
FTA - 91
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntered 2010 2011 2012 2013
Est. Cost1 PRPA 2008 F 675,314 - - - 675,314
S - - - - -
T 675,314 - - - 675,314
2 F - - - - -
S - - - - -
T - - - - -
3 F - - - - -
S - - - - -
T - - - - -
4 F - - - - -
S - - - - -
T - - - - -
5 F - - - - -
S - - - - -
T - - - - -
675,314 - - - 675,314 Total Funds:
Project Justification
Included in STIP 2009.
ARRA FUNDS: SAN JUAN URBANIZED AREA
FIXED GUIDEWAY
FISCAL YEARS 2010 -2013
Apportionment $675,314
Acuaexpreso System
Statewide Transportation Improvement Program Statewide Transportation Improvement Program (STIP)(STIP)(STIP)(STIP)
Fiscal Years 2010Fiscal Years 2010--20132013
FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)Aguadilla Urbanized Area (AUA)Aguadilla Urbanized Area (AUA)
FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)g ( )g ( )
(UA > 2OO,OOO in Population)(UA > 2OO,OOO in Population)
READY TO GOREADY TO GOAMERICAN RECOVERY AND REINVESTMENT ACT 2009AMERICAN RECOVERY AND REINVESTMENT ACT 2009
(ARRA) (ARRA) (ARRA) (ARRA)
FTA - 93
Num. Description Grantee YearEntere
d2010 2011 2012 2013
1 Lares 2006 F 169,942 - - - 169,942
S - - - - -
T 169,942 - - - 169,942
2 Aguada 2008 F 140,000 - - - 140,000
S - - - - -
T 140,000 - - - 140,000
3 Aguada 2008 F 56,850 - - - 56,850
S - - - - -
T 56,850 - - - 56,850
4 Lares 2008 F 152,000 - - - 152,000
S - - - - -
T 152,000 - - - 152,000
5 Lares 2008 F 256,000 - - - 256,000
S - - - - -
T 256,000 - - - 256,000
ARRA FUNDS: AGUADILLA URBANIZED AREA (AUA)Remarks
Included in STIP 2009.
Included in STIP 2009.
Project JustificationTotal Est. Cost
Annual Element Three Year Program
Acquisition of Two (2) Trolleys for Expansion of Service to the West Route
Acquisition of Two (2) Trolleys for Service Expansion in Urban Core (Additional Funds)
Improvements to Public Transportation Terminal
Acquisition of Two (2) Minibuses
Acquisition of One (1) Minibus for Transit Service
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
COMMONWEALTH OF PUERTO RICO
READY TO GO PROJECTS
Apportionment: $2,438,255
FISCAL YEARS 2010-2013
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
HIGHWAY AND TRANSPORTATION AUTHORITY
FTA - 94
Num. Description Grantee YearEntere
d2010 2011 2012 2013
ARRA FUNDS: AGUADILLA URBANIZED AREA (AUA)Remarks
Project JustificationTotal Est. Cost
Annual Element Three Year Program
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
COMMONWEALTH OF PUERTO RICO
READY TO GO PROJECTS
Apportionment: $2,438,255
FISCAL YEARS 2010-2013
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
HIGHWAY AND TRANSPORTATION AUTHORITY
6 Lares 2008 F 87,000 - - - 87,000
S - - - - -
T 87,000 - - - 87,000
7 Lares 2008 F 272,000 - - - 272,000
S - - - - -
T 272,000 - - - 272,000
8 Lares 2008 F 40,000 - - - 40,000
S - - - - -
T 40,000 - - - 40,000
9 Las Marías 2008 F 139,000 - - - 139,000
S - - - - -
T 139,000 - - - 139,000
10 Las Marías 2008 F 136,463 - - - 136,463
S - - - - -
T 136,463 - - - 136,463
Acquisition of Two (2) Paratransit Vans
Acquisition of One (1) 30 Passenger Trolley
Preventive Maintenance Cost and Signage for Trolley System
Additional Funds for Purchase of Two (2) Trolleys for Urban Area
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
Acquisition of Two (2) Trolleys for Expansion of Service to the North Route
Included in STIP 2009.
Included in STIP 2009.
FTA - 95
Num. Description Grantee YearEntere
d2010 2011 2012 2013
ARRA FUNDS: AGUADILLA URBANIZED AREA (AUA)Remarks
Project JustificationTotal Est. Cost
Annual Element Three Year Program
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
COMMONWEALTH OF PUERTO RICO
READY TO GO PROJECTS
Apportionment: $2,438,255
FISCAL YEARS 2010-2013
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
HIGHWAY AND TRANSPORTATION AUTHORITY
11 Las Marías 2008 F 52,000 - - - 52,000
S - - - - -
T 52,000 - - - 52,000
12 San Sebastián 2008 F 65,000 - - - 65,000
S - - - - -
T 65,000 - - - 65,000
13 San Sebastián 2008 F 140,000 - - - 140,000
S - - - - -
T 140,000 - - - 140,000
14 Rincón 2008 F 300,000 - - - 300,000
S - - - - -
T 300,000 - - - 300,000
15 Rincón 2008 F 200,000 - - - 200,000
S - - - - -
T 200,000 - - - 200,000
Acquisition of One (1) Minibus for Transit Service
Acquisition of One (1) Trolley for Transit Service
Acquisition of Two (2) Paratransit Vans
Acquisition of Two (2) Trolleys for Expand Service
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
Acquisition of Two (2) 15 Passenger Paratransit Vans
FTA - 96
Num. Description Grantee YearEntere
d2010 2011 2012 2013
ARRA FUNDS: AGUADILLA URBANIZED AREA (AUA)Remarks
Project JustificationTotal Est. Cost
Annual Element Three Year Program
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
COMMONWEALTH OF PUERTO RICO
READY TO GO PROJECTS
Apportionment: $2,438,255
FISCAL YEARS 2010-2013
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
HIGHWAY AND TRANSPORTATION AUTHORITY
16 Lares 2008 F 232,000 - - - 232,000
S - - - - -
T 232,000 - - - 232,000
17 F - - - - -
S - - - - -
T - - - - -
18 F - - - - -
S - - - - -
T - - - - -
19 F - - - - -
S - - - - -
T - - - - -
20 F - - - - -
S - - - - -
T - - - - -
2,438,255 - - - 2,438,255 Total Funds:
Included in STIP 2009.Design and Construction of Trolley System Maintenance Garage Facilities
Statewide Transportation Improvement Program Statewide Transportation Improvement Program ( )( )(STIP)(STIP)
Fiscal Years 2010Fiscal Years 2010 20132013
D RA TRA S T AD STRAT O ( TA)D RA TRA S T AD STRAT O ( TA)
Fiscal Years 2010Fiscal Years 2010--20132013
Urbanized Area Under 200 000 in Population (UZA)Urbanized Area Under 200 000 in Population (UZA)FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)
Urbanized Area Under 200,000 in Population (UZA)Urbanized Area Under 200,000 in Population (UZA)
READY TO GOREADY TO GOAMERICAN RECOVERY AND REINVESTMENT ACT 2009AMERICAN RECOVERY AND REINVESTMENT ACT 2009
(ARRA) (ARRA) (ARRA) (ARRA)
FTA - 98
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntere
d2010 2011 2012 2013
Est. Cost1 Arecibo 2008 F 225,000 - - - 225,000
S - - - - -
T 225,000 - - - 225,000
2 Arecibo 2008 F 150,000 - - - 150,000
S - - - - -
T 150,000 - - - 150,000
3 Arecibo 2008 F 300,000 - - - 300,000
S - - - - -
T 300,000 - - - 300,000
4 Barceloneta 2008 F 175,000 - - - 175,000
S - - - - -
T 175,000 - - - 175,000
5 Barceloneta 2008 F 150,000 - - - 150,000
S - - - - -
T 150,000 - - - 150,000
Acquisition of Two (2) Trolleys for Transit Service
Included in STIP 2009.
Acquisition of Two (2) Paratransit for Transit Service
Included in STIP 2009.
FISCAL YEARS 2010 - 2013
Project Justification
READY TO GO PROJECTS
Apportionemt $16,537,174ARRA FUNDS: URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
Acquisition of One (1) Trolley for Transit Service in Garrochales Ward
Included in STIP 2009.
Thirty-Two (32) Shelters for Trolley Routes
Acquisition of Two (2) Minibuses for Reverse Commuting Service
Included in STIP 2009.
Included in STIP 2009.
FTA - 99
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntere
d2010 2011 2012 2013
Est. Cost
FISCAL YEARS 2010 - 2013
Project Justification
READY TO GO PROJECTS
Apportionemt $16,537,174ARRA FUNDS: URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
6 Barceloneta 2008 F 400,000 - - - 400,000
S - - - - -
T 400,000 - - - 400,000
7 Camuy 2010 F 135,000 - - - 135,000
S - - - - -
T 135,000 - - - 135,000
8 Ceiba 2008 F 353,100 - - - 353,100
S - - - - -
T 353,100 - - - 353,100
9 Fajardo 2008 F 150,000 - - - 150,000
S - - - - -
T 150,000 - - - 150,000
10 Fajardo 2008 F 250,000 - - - 250,000
S - - - - -
T 250,000 - - - 250,000
Acquisition of One (1) Troleys
Included in STIP 2009.
Construction of Bus Stops and Signs for Existing Urban Route
Included in STIP 2009.
Acquisition of One (1) Trolley Vehicle for System Service Expansion
Included in STIP 2009.
Acquisition of Three (3) Trolleys and Two (2) Paratransit Vans
Included in STIP 2009.
Thirty (30) Bus Shelters for Palmas Altas, Garrochales, Florida Afuera & Pueblo Wards
FTA - 100
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntere
d2010 2011 2012 2013
Est. Cost
FISCAL YEARS 2010 - 2013
Project Justification
READY TO GO PROJECTS
Apportionemt $16,537,174ARRA FUNDS: URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
11 Fajardo 2008 F 605,500 - - - 605,500
S - - - - -
T 605,500 - - - 605,500
12 Fajardo 2007 F 138,903 - - - 138,903
S - - - - -
T 138,903 - - - 138,903
13 Mayagüez 2008 F 400,000 - - - 400,000
S - - - - -
T 400,000 - - - 400,000
14 Mayagüez 2008 F 600,000 - - - 600,000
S - - - - -
T 600,000 - - - 600,000
15 Mayagüez 2008 F 100,000 - - - 100,000
S - - - - -
T 100,000 - - - 100,000
Expansion of Publico Transit Vehicle Terminal
Included in STIP 2009.
Improvements to Public Transportation Terminal
Included in STIP 2009.
Acquisition of Four (4) Trolleys Vehicles for Public Transit
Included in STIP 2009.
Ammend Acquisition of Four (4) trolley Vehicles for Service Rehabilitation
Included in STIP 2009.
Acquisition of Two (2) Paratransit Vehicles to Rehabilitate Public Transit System
Included in STIP 2009.
FTA - 101
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntere
d2010 2011 2012 2013
Est. Cost
FISCAL YEARS 2010 - 2013
Project Justification
READY TO GO PROJECTS
Apportionemt $16,537,174ARRA FUNDS: URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
16 Naguabo 2008 F 400,000 - - - 400,000
S - - - - -
T 400,000 - - - 400,000
17 Naguabo 2008 F 200,000 - - - 200,000
S - - - - -
T 200,000 - - - 200,000
18 PRPA 2008 F 8,595,972 - - - 8,595,972
S - - - - -
T 8,595,972 - - - 8,595,972
19 Villalba 2008 F 200,000 - - - 200,000
S - - - - -
T 200,000 - - - 200,000
20 Villalba 2008 F 480,000 - - - 480,000
S - - - - -
T 480,000 - - - 480,000
Acquisition of One (1) Trolley and One (1) Paratransit for Transit System Expansion
Included in STIP 2009.
Acquisition of One (1) Paratransit Van for Transit Service
Included in STIP 2009.
Rehabilitation and Preventive Maintenance for Fajardo Ferry Boats 2008 and 2009
Included in STIP 2009.
Acquisition of Two (2) Trolleys (14 Passenger) for Urban Transit Service
Included in STIP 2009.
Acquisition of Eight (8) Paratransit Vans (10 to 12 Passenger) for Public Transit System
Included in STIP 2009.
FTA - 102
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntere
d2010 2011 2012 2013
Est. Cost
FISCAL YEARS 2010 - 2013
Project Justification
READY TO GO PROJECTS
Apportionemt $16,537,174ARRA FUNDS: URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
21 Yauco 2008 F 188,687 - - - 188,687
S - - - - -
T 188,687 - - - 188,687
22 Yauco 2008 F 135,000 - - - 135,000
S - - - - -
T 135,000 - - - 135,000
23 Yauco 2008 F 250,000 - - - 250,000
S - - - - -
T 250,000 - - - 250,000
24 Yauco 2008 F 112,500 - - - 112,500
S - - - - -
T 112,500 - - - 112,500
25 Camuy 2008 F 124,949 - - - 124,949
S - - - - -
T 124,949 - - - 124,949
Ten (10) Bus Shelters for New Transportation System in Almacigo Alto Ward
Acquisition of Two (2) Paratransit Vans
Acquisition of One (1) Trolley for Transit Service
Five (5) Bus Shelters for New Transit Service in Río Prieto Ward
Acquisition of Vehicles for Transportation System in Almacigo and Río Prieto Wards
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
FTA - 103
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntere
d2010 2011 2012 2013
Est. Cost
FISCAL YEARS 2010 - 2013
Project Justification
READY TO GO PROJECTS
Apportionemt $16,537,174ARRA FUNDS: URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
26 Camuy 2008 F 50,000 - - - 50,000
S - - - - -
T 50,000 - - - 50,000
27 Yauco 2008 F 161,808 - - - 161,808
S - - - - -
T 161,808 - - - 161,808
28 Yauco 2008 F 45,000 - - - 45,000
S - - - - -
T 45,000 - - - 45,000
29Yauco 2008
F 256,880 - - - 256,880
S - - - - -
T 256,880 - - - 256,880
30 Ceiba 2008 F 400,000 - - - 400,000
S - - - - -
T 400,000 - - - 400,000
Purchase of Bicycle Racks for Public Transportation Terminal to Enhance Public Transportation System
Preventive Maintenance for Trolley Service
Design and Construction of Minipublic Terminal in Barinas Ward
Design and Construction of Passenger Shelters in Urban Area
Acquisition of Five (5) Vans Vehicles for Rural Public Transportation
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
Included in STIP 2009.
FTA - 104
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntere
d2010 2011 2012 2013
Est. Cost
FISCAL YEARS 2010 - 2013
Project Justification
READY TO GO PROJECTS
Apportionemt $16,537,174ARRA FUNDS: URBANIZED AREA UNDER 200,000 FORMULA PROGRAM (UZA)
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITYSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
31 Hatillo 2008 F 400,000 - - - 400,000
S - - - - -
T 400,000 - - - 400,000
32 Camuy 2010 F 135,000 - - - 135,000
S - - - - -
T 135,000 - - - 135,000
33 Camuy 2010 F 30,000 - - - 30,000
S - - - - -
T 30,000 - - - 30,000
34 Yauco 2010 F 100,000 - - - 100,000
S - - - - -
T 100,000 - - - 100,000
35 Yauco 2010 F 138,875 - - - 138,875
S - - - - -
T 138,875 - - - 138,875
Total Funds: 16,537,174 - - - 16,537,174
Additional Funds for Construction of a Mini Transit Terminal
Project Administration for the Municipality of Yauco
Acquisition of Two (2) Paratransit Vehicles
Operational Assistance for the Municipality of Yauco
Project Administration for the Municipality of Camuy
Included in STIP 2009.
Statewide Transportation Improvement Program Statewide Transportation Improvement Program (STIP)(STIP)(STIP)(STIP)
Fiscal Years 2010Fiscal Years 2010--20132013
FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)
Fiscal Years 2010Fiscal Years 2010--20132013
FEDERAL TRANSIT ADMINISTRATION (FTA)FEDERAL TRANSIT ADMINISTRATION (FTA)
Nonurbanized AreaNonurbanized Area(Under 5O OOO in Population)(Under 5O OOO in Population)(Under 5O,OOO in Population)(Under 5O,OOO in Population)
READY TO GOREADY TO GOAMERICAN RECOVERY AND REINVESTMENT ACT 2009AMERICAN RECOVERY AND REINVESTMENT ACT 2009
READY TO GOREADY TO GO
(ARRA)(ARRA)
FTA - 106
Num. Description Grantee Year Annual Element Three Years Program Total
RemarksEntere
d2010 2011 2012 2013
Est. Cost1 Jayuya 2008 F 110,000 - - - 110,000
S - - - - -
T 110,000 - - - 110,000
2 Salinas 2008 F 222,000 - - - 222,000
S - - - - -
T 222,000 - - - 222,000
3 Utuado 2008 F 300,000 - - - 300,000
S - - - - -
T 300,000 - - - 300,000
4 PRPA 2008 F 1,478,579 - - - 1,478,579
S - - - - -
T 1,478,579 - - - 1,478,579
5 F - - - - -
S - - - - -
T - - - - -
2,110,579 - - - 2,110,579
ARRA FUNDS: NON URBANIZED AREAProject Justification
Included in STIP 2009.
Rehabilitation of Mosquito Terminal in Vieques
Construction of Thirty (30) Bus Shelters
Included in STIP 2009.
Apportionment $2,110,579
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FISCAL YEARS 2010 - 2013
COMMONWEALTH OF PUERTO RICODEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY
READY TO GO PROJECTS
Acquisition of Two (2) Paratransit Vehicles for Urban Transit
Included in STIP 2009.
Included in STIP 2009.
Acquisition of Two (2) Trolleys for Transit Service
Total Funds:
COMMONWEALTH OF PUERTO RICO DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION AUTHORITY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
FEDERAL HIGHWAY ADMINISTRATION (FHWA)
FISCAL YEARS 2010-2013
SEPTEMBER 2009