author(s): matthew evatt - noao
TRANSCRIPT
Doc #: 2100-AD-015-0056 Revision: A
PROCEDURE FOR LIFTING 60 FT PERSONNEL LIFT FROM GARAGE TO C-FLOOR IN MAYALL TELESCOPE
Author(s): Matthew Evatt
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 2 of 13
1. Contents Revision History .............................................................................................................................. 3
1. Purpose .................................................................................................................................... 4
2. Applicable To ........................................................................................................................... 4
3. Scope ....................................................................................................................................... 4
4. Definitions ................................................................................................................................ 4
5. Training .................................................................................................................................... 4
6. Safety ....................................................................................................................................... 4
7. Personnel, Equipment and Materials Required ...................................................................... 4
8. Procedure ................................................................................................................................ 6
9. Procedure Review .................................................................................................................... 8
10. Records ................................................................................................................................ 8
11. References ........................................................................................................................... 8
12. Calculations ......................................................................................................................... 9
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 3 of 13
Revision History
Rev
Date Approved
Sections Affected
Reason for Change
Remarks and/or Change Details
Name
-- 5-Dec-2016 Initiated M. Evatt
Approved by:
SigEng
Name, ME Title
SigEM
Name, EL Maint
SigSci
Name, SciOps
Tammie Lavoie 17 February 2017 Tammie Lavoie, Safety Manager Date
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 4 of 13
1. Purpose
The purpose of this procedure is to detail how to rig and lift a 60 foot personnel lift from the ground floor to the C-floor of the Mayall telescope. A personnel lift of this size will be required during DESI installation.
2. Applicable To
Mayall 4m telescope, DESI
3. Scope
The scope of this document includes: - Opening the 4m dome main floor hatch - Rigging and lifting the personnel lift from the ground floor up to the C-floor
4. Definitions
5. Training
Personnel working on this task must be trained in the following: 1. Crane operator (1 person)
2. Qualified rigger (1 person)
3. General craftsperson (2 people)
6. Safety
1. JHA Form
2. Daily Briefing Form
7. Personnel, Equipment and Materials Required
Personnel: 1. Crane operator (1 person)
2. Qualified rigger (1 person)
3. General craftsperson (2 people)
Equipment:
1. 60 foot articulating boom lift - for example, the JLG 600AJ articulating boom lift as shown
in Figure 1.
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 5 of 13
Note: The JLG 600AJ articulating boom lift shown in Figure 1 is very similar to what we
will rent for the DESI Installation. The JLG 600AJ weighs 22740 lbf. (Source: https://www.jlg.com/en/equipment/engine-powered-boom-lifts/articulating/600-series/600aj?Cookie=language).
Note: The Genie S60 telescopic boom lift shown in Figure 2 was rented for use in
changing the damaged dome crane cables in 2007 in the Mayall telescope.
The Genie S60 weighs approx. 20521 lbf (Source: http://www.ritchiespecs.com/specification?type=Lifting&category=Boom+Lift&make=Genie&model=S60&modelid=108183).
2. Wire rope lifting sling assembly used to lift the hatch covers out of the main floor (Refer to
NOAO document 2100-AD-015-052 for removing the hatch cover)
3. 4 EA EA 12 ft Long x 3 inch wide lifting straps, capacity greater than 12400 lbs. For
example, McMaster Carr 9077T3 12 ft x 3 inch wide with 16400 lbs vertical capacity.
See Calculations Section at the end of this document for lift calculations.
4. 4 EA Shackles with capacity greater than 12500 lbs. For example, McMaster 8494T54 Black
Oxide Steel 1" Shackle with Screw Pin - 17000 lbf capacity, 1-1/8" Pin Diameter, 2-3/4"
Inside Width
See Calculations Section at the end of this document for lift calculations.
5. Flat washers for 1” shackle pin to center the boom lift’s lifting lugs on the shackles.
Figure 1. JLG 600AJ Articulating Boom Lift
Figure 2. Genie S60 Rigged for Lifting Through Hatch
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 6 of 13
8. Procedure
1. Open main floor hatch referencing NOAO document 2100-AD-015-052 and 2100-AD-015-
052-JHA for instructions (JHA-01).
2. Rig personnel lift using one 12 foot x 3 inch x 12500 lbf (minium vertical lift capacity) strap
and one 12500 lbf (minimum lift capacity) lifting shackle per lifting lug on the personnel
lift. See Section 12. Center the lifting lugs on the shackle pins using washers as shown in
Figure 4 (JHA-02).
3. Lower the 50 ton crane hook down to the
ground floor (JHA-02).
4. Raise the boom and basket of the lift up
until the length of the boom lift is short
enough to fit through the open hatch. If
this is not done, the articulating boom lift
will not fit through the hatch (see Figure
5). Refer to Figure 2 and Figure 3 for
how the 60 ft Genie lift was configured when it was lifted through the hatch in 2007 for
work on the overhead crane cables (JHA-03).
Figure 4. Lifting Shackle with Centering Washers
Figure 3. 60 Ft Genie Being Lifted Through Hatch in 2007
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 7 of 13
5. Tie two appropriately long tag lines to the boom lift to control swinging and rotation
during the lift (JHA-02). One of these will be held by a person on the ground to start, and
then the other will be held by a person on each floor as the load is lifted through the
hatches of each floor. As the load goes through hatches at each floor, the person holding
the tag line from the floor below will let go of it, then go up to the floor above it and be
ready to get the tag line there (JHA-04).
Figure 5. Envelope of 60 Ft Boom Lift vs Hatch Opening
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 8 of 13
6. Set the lift on the Console floor approximately in the location shown in Figure 6.
7. Close the main floor hatch (per 2100-AD-015-0052 and 2100-AD-015-0052-JHA) (JHA-05).
8. Stow the crane.
9. Procedure Review
None
10. Records
1. JHA signature sheet; kept by safety office, scanned and stored \ets_share\Safety 2. Fall protection training: kept by Safety Office 3. Rigging, suspended load: kept by Safety office 4. Maintenance record
11. References
Call out procedures by number & title
DOCUMENT NUMBER DOCUMENT TITLE
NA KPNO Emergency Manual
2100-AD-015-0052 Procedure for opening main floor hatch
2100-AD-015-0052-JHA JHA for opening main floor hatch
JLG 3121615 JLG 600AJ Operator’s Manual (If this lift is the one rented)
Figure 6. Console Floor Location for Boom Lift
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 9 of 13
12. Calculations
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 10 of 13
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 11 of 13
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 12 of 13
Procedure For Lifting 60 Ft Personnel Lift From Garage To C-Floor In Mayall Telescope
2100-AD-015-0056.Docx Page 13 of 13