autodesk university 2012 learn. connect. explore

41
Autodesk University 2012 LEARN. CONNECT. EXPLORE. A Walk in the Cloud: Getting to Know Autodesk PLM 360

Upload: mikel

Post on 06-Feb-2016

36 views

Category:

Documents


0 download

DESCRIPTION

Autodesk University 2012 LEARN. CONNECT. EXPLORE. A Walk in the Cloud: Getting to Know Autodesk PLM 360. Rob Cohee Sr. Manager, PLM Product Management. Brian Schanen Manager, PLM Technical Marketing. PLM… What does it “Do”?. Program Management • Project Management • Project Costing - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Autodesk University 2012 LEARN. CONNECT. EXPLORE

Autodesk University 2012LEARN. CONNECT. EXPLORE.

A Walk in the Cloud: Getting to Know Autodesk PLM 360

Page 2: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Rob CoheeSr. Manager, PLM Product

Management

Brian Schanen Manager, PLM Technical

Marketing

Page 3: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

PLM… What does it “Do”?

Program Management• Project Management• Project Costing• New Product Introduction• Tasks• Requirements

Engineering• Items and BOMs• Change Request• Change Orders• Material Specifications• Design Review

Supply & Procurement• Suppliers• RFQ• RFQ Projects• Warranty Recovery

Quality• Inspections• Non Conformances• Corrective / Preventative Actions• Audits• Procedures, Guidelines, & Specs• Document Change Order

Operations• Accident Reports• Calibration• Equipment Maintenance

Sales & Marketing• Customers• Sales Quotes• Marketing Assets

Service & Support• Service Request• Return Merchandise Authorization

Page 4: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

You are “doing” PLM Today. So how is this different?

You are “doing” PLM Today.

Page 5: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Instant PLM

Cloud-based, zero deployment

Accessible on any device

Up and running in minutes, not months

Page 6: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

The First Tour

Page 7: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

The Deep Dive

Page 8: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

PLM360 Architecture

Datacenter Infrastructure

Hardware Infrastructure

Software Infrastructure

PLM360 Web Application

Customer Tenants

Page 9: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Tenant Architecture (customer.autodeskplm360.net)

Security (Users/Groups/Roles)

Services (API/Scripting/Reporting)

Workspaces

PLM360

Page 10: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Workspace Architecture (Customer Workspace)

Configuration

Items

CUSTOMERTENANT

Item 1 – CIM-0001Item 2 – CIM-0002 - - -

Behaviors

Page 11: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Workspace – Workflow

Page 12: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Apps Overview

CUSTOMERTENANT

Workspace A Workspace B Workspace C

Page 13: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Apps Overview

CUSTOMERTENANT

Page 14: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

New Product IntroductionPowered by Autodesk PLM 360

New

Pro

duct

Intr

oduc

tion

Project Management

Task Management

Project Costing

Page 15: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Quality ManagementPowered by Autodesk PLM 360

Qua

lity

Man

agem

ent

Inspections

Non-Conformances

Corrective / Preventive Action

Inspection TypeInspected Item

Supplier

Description of Problem

Total Impact of NC

Page 16: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Adopt Different Apps as Required

Page 17: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Apps are Products Powered by PLM 360

PLM 360 App Guides Wiki Help for End Users & Administrators

Page 18: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Out of the cloud solutions that customers are utilizing today.

PLM 360 Workflows & Processes

NPI Engineering Asset Management Quality

Page 19: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Quality Management

InspectionsNon-Conformances

Corrective/Preventative Actions

Page 20: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Quality Management Concept Map

Page 21: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Inspections

Define an Inspection record to capture all relevant information

Captures the actions and results of the inspection

Links directly to the Item, and the supplier

Links spawn a Non-Conformance automatically is needed

MFG & ProductionQuality Management Asset Management NPI

Page 22: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Non-Conformance

Determine the disposition based on inspection results

Captures the information of the Item, the Inspection and allows teams to collaborate on the next steps

Automatically spawns a Corrective Action

MFG & ProductionQuality Management Asset Management NPI

Page 23: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Corrective and Preventative Actions

Defines the problem, possible causes and Action taken Can be spawned from a Non Conformance Can automatically spawn a Change Request for Engineering

MFG & ProductionQuality Management Asset Management NPI

Page 24: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Asset & Equipment Management

Integrate Process, Equipment & Facility design Manage Assets & Facilities

Track & manage initiatives, programs & projects

Page 25: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Manufacturing Asset Management Concept Map

Page 26: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Reconcile design information from process, equipment & facility and commission into a single view

R&D, Engineering & Manufacturing can collaborate more closely than ever before

Track issues & drive resolution, before they become problems on site

Integrated with leading CAD data management

Integrate Process, Equipment & Facilities

MFG & ProductionQuality Management Asset Management NPI

Page 27: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Manage Assets & Facilities

Define & specify operational requirements, procedures, calibration & maintenance

Track & manage corrective, scheduled & preventative maintenance

Track and maintain suppliers and parts lists… “As delivered”, “As maintained” and “As used”

MFG & ProductionQuality Management Asset Management NPI

Page 28: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Program / Project Management

Stage Gate NPI ProcessManage & Track Efforts & Resource

Provide Visibility

Page 29: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Program / Project Management Concept Map

Page 30: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Drive Consensus & Manage Decisions

Create & share business plans everyone can follow to drive success across all key program phases

Record assumptions, justifications, plans, requirements, issues & stakeholders

Clearly drive commitment &

execution

MFG & ProductionQuality Management Asset Management NPI

Page 31: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Define programs & projects as a team to track against milestones

Assign teams, tasks, owners, deadlines, and track status, costs, completion, and more

Project & program information instantly updated with task execution, when it happens, as it happens.

Manage & Track Resource & Effort

Programs

Projects

Tasks

MFG & ProductionQuality Management Asset Management NPI

Page 32: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Easily build and share reports, graphs, dashboards that present the information you need, when you need it.

Provide a real time view into progress

Easily manipulate information & reports to gain the insight you need

Highlight & track key focus areas

Provide Visibility

MFG & ProductionQuality Management Asset Management NPI

Page 33: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Engineering Process Management

Item and BOM ManagementChange RequestChange OrdersDesign Review

Page 34: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Engineering Management Concept Map

Page 35: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Item and BOM Management

Dramatically increase BOM accuracy through clear and concise data entry and relationship mapping

Easily assign item attributes using drag-and drop configuration and pick list classifications

Quickly build efficient item records and relationships using industry-standard templates

MFG & Production Quality Management Asset Management NPI

Page 36: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Change Request

Ensure accuracy by cross-linking key information (e.g. cost) to the actual item source data

Quickly reveal the magnitude of a change by using tables that compute fields automatically

Reduce delay with workflows that directly assign stages and due dates to those responsible

MFG & Production Quality Management Asset Management NPI

Page 37: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Change Orders

Quickly discover and assess the impact of changes by reviewing a tabulated list of affected items

Reduce delay with workflows that directly assign stages and due dates to those responsible

Learn the complete change history by reviewing the change owner, summary and log

MFG & Production Quality Management Asset Management NPI

Page 38: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Design Review

Stay flexible with ad hoc or regular reviews based on multiple review schedule configurations

Accurately record review outcomes according to benchmarks configured and agreed beforehand

Resolve issues faster by automatically notifying owners of key tasks and due dates via email

MFG & Production Quality Management Asset Management NPI

Page 39: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Customer Success

Cloud-based, zero deployment

Accessible on any device

Up and running in minutes, not months

Page 40: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

Q&A

Cloud-based, zero deployment

Accessible on any device

Up and running in minutes, not months

Page 41: Autodesk University 2012 LEARN. CONNECT. EXPLORE

© 2012 Autodesk

The next generation, cloud based alternative