automatic, c road estimate
TRANSCRIPT
-
8/14/2019 Automatic, c Road Estimate.
1/46
AVERAGE LEAD OF 1 km
S.No. Kind of Materials Name of Quarry Lead Cost conveyance Total
1 Mortar Sand Arjuna River 23 115.00 111.85 226.85
2 Filling Sand Arjuna River 23 85.00 111.85 196.85
3 40 mm Metal Malaipatti 19 290.00 95.45 385.45
4 20 mm Metal Malaipatti 19 365.00 95.45 460.45
5 6 mm Metal Malaipatti 19 215.00 95.45 310.45
6 Rough Stone Malaipatti 19 160.00 95.45 255.45
7 Bond Stone Malaipatti 19 250.00 95.45 345.45
8 Country Bricks Gollapatti 29 1250.00 114.65 1364.65
9 Brick Jelly 20 mm Gollapatti 29 240.00 #REF! #REF!
10 Shell lime Virudhunagar 10 650.00 #REF! #REF!
11 Pressed Tiles Virudhunagar 10 3550.00 61.50 3611.50
12 Lime Stone Virudhunagar 10 320.00 #REF! #REF!
13 Steel Virudhunagar 10 16110.00 34.00 16144.00
14 Cement Virudhunagar 10 2600.00 34.00 2634.00
-
8/14/2019 Automatic, c Road Estimate.
2/46
0 0
1 3.40
2 7
3 10.20
4 14
5 176 20
7 24
8 27
9 31
10 34
11 37
1240 CEMENT
13 43
14 45
15 4816 52
17 54
18 57
19 60
20 63
21 65
22 67
23 70
24 72
2575
26 77
27 80
28 82
29 85
30 87
31 89
32 92
33 94
34 97
35 99
36 10237 104
38 107
39 109
40 111.50
41 113.45
42 115.40
-
8/14/2019 Automatic, c Road Estimate.
3/46
43 117.35
44 119.30
45 121.25
46 123.20
47 125.15
48 127.1049 129.05
50 131.00
-
8/14/2019 Automatic, c Road Estimate.
4/46
1 7.90
2 15.80
3 23.70
4 31.60
5 39.50
6 47.407 55.30
8 63.20
9 71.10
10 79.00
11 85.55
12 92.10
13 98.65
14 105.20
15 111.75
16 118.30
17 124.85
18 131.40
19 137.95
20 144.50
21 150-.15
22 155.80
23 161.45
24 167.10
25 172.75
26 178.40
27 184.0528 189.70
29 195.35
30 201.00
31 206.65
32 212.30
33 217.95
34 223.60
35 229.25
36 234.90
37 240.5538 246.20
39 251.85
40 257.50
-
8/14/2019 Automatic, c Road Estimate.
5/46
Deatail
-
8/14/2019 Automatic, c Road Estimate.
6/46
1 6.80
2 13.60
3 20.40
4 27.20
5 34.00
6 40.807 47.60
8 54.40
9 61.20
10 68.00
11 73.40
12 78.80
13 84.20
14 89.60
15 95.00
16 100.40
17 105.80
18 111.20
19 116.60
20 122.00
21 126.45
22 130.90
23 135.35
24 139.80
25 144.25
26 148.70
27 153.1528 157.60
29 162.05
30 166.50
31 170.95
32 175.40
33 179.85
34 184.30
35 188.75
36 193.20
37 197.6538 202.10
39 206.55
40 211.00
-
8/14/2019 Automatic, c Road Estimate.
7/46
1 6
2 12
3 18
4 25
5 31
6 377 43
8 49
9 55
10 62
11 67
12 72
13 77
14 82
15 87
1692
17 97
18 102
19 107
20 116
21 117
22 121
23 126
24 130
25 135
26 139
27 143
28 148
29 152
30 157
31 161
32 165
33 170
34 174
35 179
36 183
37 18738 192
39 196
40 201
41-80 add 2.75 per km
Mangalore Tiles (2000 nos.) Machine Presse
-
8/14/2019 Automatic, c Road Estimate.
8/46
Tiles
-
8/14/2019 Automatic, c Road Estimate.
9/46
1 5
2 9
3 14
4 19
5 23
6 287 33 Country Bricks8 37
9 42
10 47
11 50
12 54
13 58
14 62
15 66
1669
17 73
18 77
19 81
20 85
21 88
22 91
23 95
24 98
25 101
26 105
27 108
28 111
29 115
30 118
31 121
32 125
33 128
34 131
35 135
36 138
37 14138 145
39 148
40 152
41-80 add 2.65 per km
-
8/14/2019 Automatic, c Road Estimate.
10/46
1 3.75
2 7.50
3 11.25
4 15.00
5 18.75 Lime Stone,Broken Stone Brick jelly Wood Work
6 22.507 26.25
8 30.00
9 33.75
10 37.50
11 40.65
12 43.80
13 46.95
14 50.10
15 53.25
1656.40
17 59.55
18 62.70
19 65.85
20 69.00
21 71.70
22 74.40
23 77.10
24 79.80
25 82.50
26 85.20
27 87.90
28 90.60
29 93.30
30 96.00
31 98.70
32 101.40
33 104.10
34 106.80
35 109.50
36 112.20
37 114.9038 117.60
39 120.30
40 123.00
41-80 add 1.65 per km
-
8/14/2019 Automatic, c Road Estimate.
11/46
1 5
2 11
3 16
4 22
5 27
6 337 38 Rough Stone,Bond Stone,sand,Earth Broken8 44
9 49
10 55
11 59
12 64
13 68
14 73
15 77
1682
17 86
18 91
19 95
20 100
21 104
22 108
23 112
24 116
25 120
26 124
27 128
28 132
29 136
30 140
31 143
32 147
33 151
34 155
35 159.25
36 163.20
37 167.1538 171.10
39 175.05
40 179.00
41 182.15
42 185.30
43 188.45
-
8/14/2019 Automatic, c Road Estimate.
12/46
44 191.60
45 194.75
46 197.90
47 201.05
48 204.20
49 207.3550 210.50
-
8/14/2019 Automatic, c Road Estimate.
13/46
Stone,Gravel,Surki
-
8/14/2019 Automatic, c Road Estimate.
14/46
-
8/14/2019 Automatic, c Road Estimate.
15/46
0 0
1 3.40
2 7
3 10.20
4 14
5 176 20
7 24
8 27
9 31
10 34
11 37
12 40
1343 STEEL
14 45
15 4816 52
17 54
18 57
19 60
20 63
21 65
22 67
23 70
24 72
2575
26 77
27 80
28 82
29 85
30 87
31 89
32 92
33 94
34 97
35 99
36 10237 104
38 107
39 109
40 112
41 113.45
42 115.40
-
8/14/2019 Automatic, c Road Estimate.
16/46
43 117.35
44 119.30
45 121.25
46 123.20
47 125.15
48 127.1049 129.05
50 131.00
-
8/14/2019 Automatic, c Road Estimate.
17/46
Mazon I 179
Mazon II 162
Mazdoor I 112
Mazsdoor II 101
Fitter I 157
Fitter II 146
Painter I 143Painter II 132
Carpenter I 176
Carpenter I I 160
Stocking charge
Metal 3.15
Gravel 3.05
Sand 3.05
Filling gravel 10.10
Filling Sand 9.00
Mixing CM 29.70
Mixing LM 72.60
Cleaning surfa 2.15
-
8/14/2019 Automatic, c Road Estimate.
18/46
Kind of Materials Rate
Mortar Sand 110
Filling Sand 11040 mm Metal 560
20 mm Metal 780
12 mm Metal 720
10 mm Metal 530
6 mm Metal 360
Rough Stone 262
Bond Stone 360
Country Bricks 2220
Brick Jelly 20 mm 320
Shell lime 850
Pressed Tiles 5130
Lime Stone 625
Steel 32000
Cement 4400
Red Gravel 97
Well Gravel 86
Quarry Rubbish 58
Snowcem 30
Distember 60
Enemal paint 160
-
8/14/2019 Automatic, c Road Estimate.
19/46
Improvements to the existing Oorani at Thenkarai.
LEAD STATEMENT
Unit Cost Total
1Mortar Sand Sivagiri 41 1 cum 110.00 ### 292.15
2Filling Sand Sivagiri 41 1 cum 110.00 ### 292.15
3Cement Pu godown 20 1 Mt ### 62.50 4462.50
4Steel Pu godown 20 1 Mt ### 62.50 32062.50
540 mm Metal Motamalai 15 1 cum 560.00 77.25 637.25
620 mm Metal Motamalai 15 1 cum 780.00 77.25 857.25
712mm Metal Motamalai 15 1 cum 720.00 77.25 797.25
810 mm Metal Motamalai 15 1 cum 530.00 77.25 607.25
96 mm Metal Motamalai 15 1 cum 360.00 77.25 437.25
10Rough Stone Motamalai 15 1 cum 262.00 77.25 339.25
11Bond Stone Motamalai 15 1 cum 360.00 77.25 437.25
12 5 000 No ### 23.25 2243.25
13Brick Jelly 20 mm 5 1 cum 320.00 18.75 338.75
14Red Gravel 1 1 cum 97.00 5.45 102.45
15Well Murambu 1 1 cum 86.00 5.45 91.45
16Lime Stone 1 1 cum 625.00 3.75 628.75
17 8 000 No ### 24.60 5154.60
18Shell Lime 1 cum 850.00 850.00
er e a e a ove ea s an ra es are s or es an correc o e es
Name of Work:
S.No.
Kind ofMaterials
Name ofQuarry
Leadin
km
conveyanc
e
CountryBricks(8 3/4x 4 1/4
Pressed Tiles(20
cm 20*
-
8/14/2019 Automatic, c Road Estimate.
20/46
o my now e ge.
-
8/14/2019 Automatic, c Road Estimate.
21/46
SUB-DATA
Mixing Ratio
Cement 4462.50 4284.00 3213.00 2142.00 1606.50 1285.20
Sand 292.15 292.15 292.15 292.15 292.15
4576.15 3505.15 2434.15 1898.65 1577.35
Mixing charges
29.70 29.70 29.70 29.70 29.70 29.70
4605.85 3534.85 2463.85 1928.35 1607.05
Main Data
7.Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring
blasting etc., complete for foundation as per SS 20 B.
8. Filling with carted sand including cost and conveyance and all labour
charges such as watering and ramming etc., complete as per standard specification.
1.00 Cum Cost of Sand 292.15 1 Cum 292.15
1.00 Cum 9.00 1 Cum 9.00
Total 301.15
Rs 301.15 /1CUM
Name ofMaterials
Cost ofMaterials
CM 1:1 1/2960 kgs
CM 1:2720 kgs
CM 1:3480 kgs
CM 1:4360 kgs
CM 1:5288 kgs
ConcreteWorks
For MortarWorks
For Structure works Rs.28.75 x 2 = 57.50/ 1 cum.
For Drainage works Rs.29 x 1.5 = 43.13/ 1 cum.
For C.C pavement Rs.28.75x1 = 28.75/ 1 cum.
FillingCharges
-
8/14/2019 Automatic, c Road Estimate.
22/46
Name of work: Providing cement concrete road with drainage at
Sl.No. Description of work No Measurements. Contents Rate Amount
L B D
1 Earthwork excavation in all clauses of soils with intial lead and
Lift etc. complete as per SS 20 B for foundation of drinage.
1 50.00 0.81 0.20 8.10
1 25.00 0.81 0.20 4.05
1 20.00 0.81 0.20 3.24
15.39 43.13 664
2 Cement concrete 1:4:8, mix using 40mm ISS HBG metal
including all cost and conveyance and all labour charges
etc. complete.
For drinage.
1 50.00 0.81 0.10 4.05
1 25.00 0.81 0.10 2.03
1 20.00 0.81 0.10 1.62
Cement road
1 50.00 4.00 0.10 20.00
1 25.00 3.50 0.10 8.751 20.00 3.50 0.10 7.00
43.45 1797.73 78102
3 Brickwork in cement mortar 1:5, mix using country bricks including
all cost and conveyance and all laboaur charges etc. complete.
Drinage side wall
2 50.00 0.23 0.30 6.90
2 25.00 0.23 0.30 3.45
2 20.00 0.23 0.30 2.76
13.11 1959.43 25688
-
8/14/2019 Automatic, c Road Estimate.
23/46
4 Cement concrete 1:2:4, mix using 20mm ISS HBG metal including all
cost and conveyance and all labour charges etc. complete.
For cement road.
1 50.00 4.00 0.075 15.00
1 25.00 3.50 0.075 6.561 20.00 3.50 0.075 5.25
26.81 2718.66 72894
5 Plastering with cement mortar 1:5,12mm thick including all cost and
conveyance and all labour charges etc. complete.
1 50.00 1.36 68.00
1 25.00 1.36 34.00
1 20.00 1.36 27.20
129.20 58.90 7610
6 Contigencies and other unforseen charges for tar pad, L.S. 42
and strret crossings.
Total Err:508
-
8/14/2019 Automatic, c Road Estimate.
24/46
Name of Work :-
Qty Unit Description of Work KM
Rate Per Amount
4.000 KG Cost of Biumen 32600 MT 130.40
10 SQM 71.00 71.00
10 Sqm Labour Charges (HDSR 2002-2003) 12.00 12.00
Rate for 10 sqm 213.40
Rate for 1 sqm 21.34
Name of Work :-
Qty Unit Description of Work KM
Rate Per Amount
PROVIDING AND LAYING PREMIX CARPET WITH SEAL COAT TYPE - A
0.180 Cum Cost of 13.2 mm IRC HBG machine metal 921 1 cum 165.81
0.090 Cum Cost of 11.2mm IRC HBG machine metal 685 1 Cum 61.66
0.090 Cum Cost of 6.70mm IRC HBG machine metal 556 1 Cum 50.05
24.400 KG Cost of packed Bitumen 34600 1 Mt 844.24
10 Sqm Hire charges for Tools and plant 290.92 290.92
10 Sqm Labour Charges (HDSR 2002-2003)
Rate for 10 Sqm 1412.68
Rate for 1 Sqm 141.27
Applying tack coat over WBM surface using Kg ofBitumen per 10 sqm. Including cost of Bitumenemulsion which will be supplied departmentallyat section stores cost of which will be recoveredat the rates as per special conditions appendedherewith including conveyance of Bitumenemulsion to actual workspot handling charges
including labour charges for brushing, cleaningand preparing the surface for laying the tackcoat and labour for applying the requiredquantity of bitumen emulsion including, hire,fuel and running charges for all tools and plantsemployed for the work including all otherincidental charges such as barricading andproviding danger lights, flages etc., complete as
Hire Charges for Bitumen squire with selfheating pumping arrangements SI HG SR 2002-2003
10sqm
Providing and laying P.C. with seal coat type Afor 20mm thickness using 0.18 cum of 13.20 MMIRC machine crushed metal with 14.60 Kg ofBitumen for Green mixing 10 Sqm of premixcarpet and 0.09 cum of 6.70mm IRC machinecrusher metal with 9.80 kgs of bitumen for sealcoat type A per 10 sqm including cost andconveyance of materials to the work sight andstacking them to the departmental metric guagefor pre measurement hating bitumen boilerheating the aggregates and mixing them withbitumen in mini hot mix plaint for premix rollerfor rolling to mix for pre mix carpeter and sealscoats separately including labour charges forspreading seals cost charges for mini hot mixplant bitumen boiler power roller and all other
tools and plants employed to accommodate as
10Sqm
-
8/14/2019 Automatic, c Road Estimate.
25/46
Name of Work :-
I Layer Using Grade II Metal (90mm to 22.4mm) size metal
Qty Unit Description Rate Per Amount
0.050Cum Cost of 90mm IRC HBG Metal 425.15 21.26
0.450Cum Cost of 63mm IRC HBG Metal 532.151cum 239.47
0.425Cum Cost of 53mm IRC HBG metal 607.15 258.04
0.050Cum Cost of 45mm IRC HBG metal 753.15 37.66
0.025Cum Cost of 22.4 mm IRC HBG metal 982.15 24.55
0.24Cum Cost of Red Gravel 127.30 30.55
10.00Sqm 180.64 180.64
10.00Sqm
- Rate for 10 Sqm 792.17
- Rate for 1 Cum 1056.22
Name of Work :-
II Layer Using Grade III Metal (63mm to 22.4mm) size metal
Qty Unit Description Rate Per Amount
0.025Cum Cost of 63mm IRC HBG Metal 532.15 13.30
0.200Cum Cost of 53mm IRC HBG metal 607.15 121.43
0.725Cum Cost of 45mm IRC HBG metal 753.15 546.03
0.025Cum Cost of 22.4 mm IRC HBG metal 982.15 24.55
0.025Cum 685.15 17.13
0.24Cum Cost of Red Gravel 127.30 30.55
10 Sqm 180.64 180.64
10Sqm
- Rate for 10 Sqm 933 64
1cum
1cum
1cum
1cum
1cum
Higher Charges for Tolls & Plant(S119&20 HGSR)
10Sqm
Labour Charges (S119 & 20HDSR)
1cum
1cum
1cum
1
Cost of 11.20 mm IRC HBG 1
1
Higher Charges for Tolls & Plant(S119&20 HGSR)
10Sqm
Labour Charges (S119 & 20
-
8/14/2019 Automatic, c Road Estimate.
26/46
- Rate for 1 Cum 1244.85
-
8/14/2019 Automatic, c Road Estimate.
27/46
-
8/14/2019 Automatic, c Road Estimate.
28/46
Abstract
Name of work: Improvements to the existing Oorani at
S.No. Description of work Quantity Rate per Amount
1 Earthwork excavation inall clauses of soils with
intial lead of 0 to 100meters
using with machineries
including all labour
charges. 3600 55.00 1cum 198000
2 Earthwork excavation in
all clauses of soils
with intial lead and lift
in Medium rock& dense
medium rock 450 104.50 1cum 47025
3 Earthwork excavation in
all clauses of soils with
intial lead and lift as per
SS20 B for foundation 66.44 53 1cum 3488
4 Cement concrete 1:4:8 mix
using 40,mm metal include
ding all c ost and conveye
ance etc. complete. 27.74 1797.73 1cum 49865
5 R.R.Masonry in cement
mortar 1:5, mix using
required bond stone withsimultanous pointing 105.20 1528.52 1 cum 160793
6 Filling with carted sand in
cluding all cost and con-
veyance and all labour
charges etc. complete. 2.40 301.15 1cum 723
7 Centering soffists of c.c.
works including all cost
and all labour charges 25.83 90.00 1sqm 2325
8 Cement concrete 1:2:4
mix using 20mm ISS HBG
metal inclulding all
cost. 2.58 2718.66 1cum 7022
9 Plastering with cement
-
8/14/2019 Automatic, c Road Estimate.
29/46
mortar 1:5, 20mm thick
including all cost 59.00 112.66 6646
10 Towards tree planting L.S. 1000
11 Towards sitting slab
arrangements L.S. 1000
12 Contigencies & Other un
forseen charges L.S. 113
Total 478000
-
8/14/2019 Automatic, c Road Estimate.
30/46
Name of work: Improvements to the existing Oorani at
Detailed estimate.
S.No. Descrition of work No Measurements Contents.
L B D
1 Earthwork excavation in all clauses of
soils with intial led and lift complying with
machineries and tippers including all
labour charges.
Masin pond 1 40.00 40.00 2.00 3200.00
Baby pond 1 20.00 20.00 1.00 400.00
3600.00
2 Earthwork excavation in all clauses of soilsintial lead and lift etc. complete in M.R.
Dense medium rock requiring blasting
etc. complete.
Main pond 1 40.00 20.00 0.50 400.00
Baby pond 1 10.00 10.00 0.50 50.00
450.00
3 Earthwork excavation in all clauses of
soils with intial lead and lift etc. complete
for foundation.
Baby pond wall 1 79.10 0.60 0.30 14.24
Step side wall 2 6.00 0.75 (0.0+2.00) /2 9.00
Retaingwall 1 40.00 0.90 1.20 43.20
66.44
4 Cement concrete 1:4:8 mix using 40mm ISS
HBG metal including all cost and con
veyance and all labour charges etc.
Baby pond wall foundation 1 79.10 0.60 0.30 14.24
Step side wall foundation 2 6.00 0.75 0.30 2.70
Retaining wall foundation 1 40.00 0.90 0.30 10.80
Step Base 1 4.00 4.00 0.15 0.00
27.74
-
8/14/2019 Automatic, c Road Estimate.
31/46
-
8/14/2019 Automatic, c Road Estimate.
32/46
10 Towards tree planting and watering L.S.
11 Towards sitting slab arrangements L.S.
12 Contigencies and other unforseen charges L.S.
-
8/14/2019 Automatic, c Road Estimate.
33/46
9.Cement concrete 1: :4:8
conveyance and all labour charges etc., Complete for 10 Cum
9.00 Cum Cost of 40mm metal 637.25 1 Cum 5735.25
4.50 Cum cement mortar1:4 1898.65 1 Cum 8543.93
1.80 Nos Mason II Class 162.00 Each 291.60
17.70 Nos Mazdoor I Class 112.00 Each 1982.40
14.10 Nos Mazdoor II Class 101.00 Each 1424.10
L.S. Sundries L.S 0.02
For 10 cum 17977.30
Rs. 1797.73 /1 cum
Brick work in CM 1:5 mix using country bricks of size 8 x 4 x 2 3/4 includi
cost and conveyance of all materials and all labour charges etc., Complete for 10 Cum.
1300.00 Nos Cost of country bricks 2243.25 1000 Nos 2916.23
0.708 Cum Cement mortar 1:5 1607.05 1Cum 1137.79
1.00 Nos Mason I Class 179.00 Each 179.00
3.00 Nos Mason II Class 162.00 Each 486.00
2.00 Nos Mazdoor I Class 112.00 Each 224.00
6.00 Nos Mazdoor II Class 101.00 Each 606.00
L.S Sundries L.S 0.08
Rate for 10 Cum 5549.10
/2.832
Rs. 1959.43 / 1 cum
Plastering with Cm 1:5 mix using to 12 mm thick including all cost andconveyance of all Materials and all labour charges etc., Complete for 10 Sqm.
0.14 Cum Cost of CM 1:5 1607.05 1Cum 224.99
1.10 Nos Mason I Class 179.00 Each 196.90
0.50 Nos Mazdoor I Class 112.00 Each 56.00
1.10 Nos Mazdoor II Class 101.00 Each 111.10
L.S Sundries L.S 0.01
For 10 sqm 589.00
Rs 58.90 /1 sqm
-
8/14/2019 Automatic, c Road Estimate.
34/46
Random Rubble Masonry in CM 1:5 mix using required Bond stone simultaneous
pointing including all cost conveyance and all labour charges etc, Complete.
10.00 Cum Cost of Rough stone 339.25 1Cum 3392.50
1.00 Cum Cost of Bond stone 437.25 1Cum 437.25
3.40 Nos Cost of CM 1:5 1607.05 1Cum 5463.97
7.10 Nos Mason I Class 179.00 Each 1270.90
10.60 Nos Mason II Class 162.00 Each 1717.20
14.10 Nos Mazdoor I Class 112.00 Each 1579.20
14.10 Nos Mazdoor II Class 101.00 Each 1424.10
L.S Sundries L.S 0.08
For 10 cum 15285.20
Rs. 1528.52 / 1 cum
Plastering with CM 1:5 mix using to 20 MM thick including all costconveyance etc., Complete.
0.22 Cum Cost of CM 1:5 1607.05 1 Cum 353.55
2.20 Nos Mason I Class 179.00 Each 393.80
0.50 Nos Mazdoor I Class 112.00 Each 56.00
3.20 Mazdoor II Class 101.00 Each 323.20
L.S Sundries L.S 0.05
For 10 sqm 1126.60
Rs. 112.66 /1 sqm
Cement concrete 1:2:4 mix using 40mm ISS HBG metal including all costand conveyance and all labour charges etc., Complete.
9.00 Cum 857.25 1Cum 7715.25
4.50 Cum Cement Mortar 1:2 3505.15 1Cum 15773.18
1.80 1Nos Mason II Class 162.00 1Cum 291.60
17.70 Nos Mazdoor I Class 112.00 Each 1982.4014.10 Nos Mazdoor II Class 101.00 Each 1424.10
L.S Sundries L.S 0.08
Rate for 10 cum 27186.60
Rs. 2718.66 / 1 cum
Cost of 20mm IssHBG metal
-
8/14/2019 Automatic, c Road Estimate.
35/46
RCC 1:11/2:3 mix using using 20mm size of HBG metal including all costand conveyance etc., complete
9.00 Cum Cost of 20mm Metal 857.25 1 Cum 7715.25
4.50 Cum 4576.15 1Cum 20592.68
3.50 Nos Mason II Class 162.00 Each 567.00
21.20 Nos Mazdoor I Class 112.00 Each 2374.4035.30 Nos Mazdoor II class 101.00 Each 3565.30
L.S Sundries L.S 0.08
For 10 cum 34814.70
Rs. 3481.47 /1 cum
and conveyance etc., complete
1.00 Qtl Cost of steel 32062.50 1Mt 3206.25
0.01 Qtl Cost of binding wire 40.00 1 kg 40.00
3.50 Nos Fitter I Class 157.00 Each 549.50
For 1 qtl 3795.75
Rs. 3795.75 /qtl
RCC 1:2:4 mix using using 20mm size of HBG metal including all costand conveyance etc., complete
9.00 Cum Cost of 20mm Metal 857.25 1 Cum 7715.25
4.50 Cum Cost of Sand 292.15 1Cum 1314.68
3231.00 Kgs Cost of Cement 4462.50 1 Mt 14418.34
3.50 Nos Mason II Class 162.00 Each 567.00
21.20 Nos Mazdoor I Class 112.00 Each 2374.40
35.30 Nos Mazdoor II class 101.00 Each 3565.30
L.S Sundries L.S 0.04
For 10 cum 29955.00
Rs. 2995.50 /1 cum
Cement Mortar 1:11/2:
Supplying and fabrication of steel for RCC works including all cost
-
8/14/2019 Automatic, c Road Estimate.
36/46
Granolithic Cement Concrete 1:2:4 mix to 0.25m thick using 10mm to12mm ISS size of HBG metal including all cost and conveyance of all materials
to work site and all labour charges etc., complete for 10 cum
9.00 Cum 702.25 1 Cum 6320.25
4.50 Cum Cement Mortar 1:2 3505.15 1 Cum 15773.18
1.80 Nos Mason II Class 162.00 Each 291.60
17.70 Nos Mazdoor I Class 112.00 Each 1982.40
14.10 Nos Mazdoor II 101.00 Each 1424.10
L.S Sundries L.S 0.07
For 10 cum 25791.60
Rs. 2579.16 /1 cum
Pointing with CM 1:3 mix over pressed titles on terrace roofing including all cost
and conveyance of all materials and labour charges etc., Complete for 10 sqm
0.04 Cum Cost of CM 1: 3 2463.85 1 Cum 98.55
2.20 Nos Mason II Class 162.00 Each 356.40
0.50 Nos Mazdoor I Class 112.00 Each 56.00
1.10 Nos Mazdoor II Class 101.00 Each 111.10
L.S Sundries L.S 0.05
For 10 sqm 622.10
Rs. 62.21 /1 sqm
Brick jelly with lime concrete using 20mm size of brick jelly with no sand
to be add including all cost and conveyance and all labour charges etc., complete
12.80 Cum 338.75 1 Cum 4336.00
5.00 Cum Cost of lime Stone 628.75 1 Cum 3143.75
1.80 Nos Mason I Class 179.00 Each 322.20
17.70 Nos Mazdoor I Class 112.00 Each 1982.40
14.10 Nos Mazdoor II Class 101.00 Each 1424.10
L.S Sundries L.S 0.05
For 10 cum 11208.50
Rs. 1120.85 / 1 cum
Cost of 10mm to12mm ISS HBG metal
Cost of 20mm brickjelly
-
8/14/2019 Automatic, c Road Estimate.
37/46
-
8/14/2019 Automatic, c Road Estimate.
38/46
Rs. 9.74 / 1 sqm
Painting with ready mixed good quality of enamel paint two coats including
all cost and conveyance etc., complete for 10 Sqm Over new Iron works.
2.22 Lits Cost of enamel paint 160.00 1 Litter 355.20
1.10 Nos Painter Ist Class 143.00 Each 157.30
L.S Sundries L.S 0.50For 10 sqm 513.00
Rs. 51.30 / 1 sqm
Plastering withs CM 1:3 10mm thick including all cost and conveyance and all
labour charges etc., complete.
0.10 Cum Cost of CM 1:3 2463.85 1Cum 246.39
1.10 Nos Mason I Class 179.00 Each 196.90
1.10 Nos Mazdoor I Class 112.00 Each 123.20
1.10 Nos Mazdoor II Class 101.00 Each 111.10L.S Sundries L.S 0.02
For 10 sqm 677.60
Rs. 67.76 / 1 sqm
for 10 sqm.
1.34 Kgs Distember 60.00 1Kg 80.40
0.50 Nos Painter I grade 132.00 Each 66.000.50 No. Mazdoor I grade 112.00 Each 56.00
0.80 No. Mazdoor II grade 101.00 Each 80.80
Sundries L.S. 0.80
for 10 sqm 284.00
Rs. 28.40/ 1 sqm
10.00 sqm 2.15 1sqm 21.503.23 kgs snowcem paint 30.00 1Kg 96.90
0.50 No. Painter I class 143.00 Each 71.50
0.50 No. Mazdoor Igrade 112.00 Each 56.00
0.80 No. Mazdoor II Grade 101.00 Each 80.80
Sundries L.S. 0.80
for 10 sqm 327.50
Distermpering two coats includidng all cost anad conv eyance and all labourcharges
Snowcem painting two coats with approved paint over cement plastered wallsurface ceiling and other new surface including cleaning preparing the surfaceand curing etc. complete for 10 sqm
Cleaning plastered surface
-
8/14/2019 Automatic, c Road Estimate.
39/46
Rs. 32.75/ 1 sqm
Paving the floor with plain colour ceramic tiles 200 x 200 x 6 mm in CM 1 : 3, 20 mm thick.
112.00 Nos Cost of ceramic tiles 40.00 1 Nos 4480.00
0.21 Cum Cost of CM 1:3 2463.85 1 Cum 517.41
3.00 Kgs White cement 18.00 1 kg 54.00
50.00 Gram Colouring pigment 20.00 1 Kg 1.00
1.20 Nos Mason I Class 179.00 Each 214.801.00 Nos Mason II Class 162.00 Each 162.00
0.50 Nos Stone cutter I class 138.00 Each 69.00
1.00 Nos Mazdoor I Class 112.00 Each 112.00
1.00 Nos Mazdoor II Class 101.00 Each 101.00
0.50 Kgs Cotton waste 5.00 Kg 2.50
For 10 sqm 5713.71
Rs. 571.37 / 1 sqm
-
8/14/2019 Automatic, c Road Estimate.
40/46
g all
-
8/14/2019 Automatic, c Road Estimate.
41/46
-
8/14/2019 Automatic, c Road Estimate.
42/46
-
8/14/2019 Automatic, c Road Estimate.
43/46
-
8/14/2019 Automatic, c Road Estimate.
44/46
-
8/14/2019 Automatic, c Road Estimate.
45/46
-
8/14/2019 Automatic, c Road Estimate.
46/46