  • 8/14/2019 Automatic, c Road Estimate.

    1/46

    AVERAGE LEAD OF 1 km

    S.No. Kind of Materials Name of Quarry Lead Cost conveyance Total

    1 Mortar Sand Arjuna River 23 115.00 111.85 226.85

    2 Filling Sand Arjuna River 23 85.00 111.85 196.85

    3 40 mm Metal Malaipatti 19 290.00 95.45 385.45

    4 20 mm Metal Malaipatti 19 365.00 95.45 460.45

    5 6 mm Metal Malaipatti 19 215.00 95.45 310.45

    6 Rough Stone Malaipatti 19 160.00 95.45 255.45

    7 Bond Stone Malaipatti 19 250.00 95.45 345.45

    8 Country Bricks Gollapatti 29 1250.00 114.65 1364.65

    9 Brick Jelly 20 mm Gollapatti 29 240.00 #REF! #REF!

    10 Shell lime Virudhunagar 10 650.00 #REF! #REF!

    11 Pressed Tiles Virudhunagar 10 3550.00 61.50 3611.50

    12 Lime Stone Virudhunagar 10 320.00 #REF! #REF!

    13 Steel Virudhunagar 10 16110.00 34.00 16144.00

    14 Cement Virudhunagar 10 2600.00 34.00 2634.00

  • 8/14/2019 Automatic, c Road Estimate.

    2/46

    0 0

    1 3.40

    2 7

    3 10.20

    4 14

    5 176 20

    7 24

    8 27

    9 31

    10 34

    11 37

    1240 CEMENT

    13 43

    14 45

    15 4816 52

    17 54

    18 57

    19 60

    20 63

    21 65

    22 67

    23 70

    24 72

    2575

    26 77

    27 80

    28 82

    29 85

    30 87

    31 89

    32 92

    33 94

    34 97

    35 99

    36 10237 104

    38 107

    39 109

    40 111.50

    41 113.45

    42 115.40

  • 8/14/2019 Automatic, c Road Estimate.

    3/46

    43 117.35

    44 119.30

    45 121.25

    46 123.20

    47 125.15

    48 127.1049 129.05

    50 131.00

  • 8/14/2019 Automatic, c Road Estimate.

    4/46

    1 7.90

    2 15.80

    3 23.70

    4 31.60

    5 39.50

    6 47.407 55.30

    8 63.20

    9 71.10

    10 79.00

    11 85.55

    12 92.10

    13 98.65

    14 105.20

    15 111.75

    16 118.30

    17 124.85

    18 131.40

    19 137.95

    20 144.50

    21 150-.15

    22 155.80

    23 161.45

    24 167.10

    25 172.75

    26 178.40

    27 184.0528 189.70

    29 195.35

    30 201.00

    31 206.65

    32 212.30

    33 217.95

    34 223.60

    35 229.25

    36 234.90

    37 240.5538 246.20

    39 251.85

    40 257.50

  • 8/14/2019 Automatic, c Road Estimate.

    5/46

    Deatail

  • 8/14/2019 Automatic, c Road Estimate.

    6/46

    1 6.80

    2 13.60

    3 20.40

    4 27.20

    5 34.00

    6 40.807 47.60

    8 54.40

    9 61.20

    10 68.00

    11 73.40

    12 78.80

    13 84.20

    14 89.60

    15 95.00

    16 100.40

    17 105.80

    18 111.20

    19 116.60

    20 122.00

    21 126.45

    22 130.90

    23 135.35

    24 139.80

    25 144.25

    26 148.70

    27 153.1528 157.60

    29 162.05

    30 166.50

    31 170.95

    32 175.40

    33 179.85

    34 184.30

    35 188.75

    36 193.20

    37 197.6538 202.10

    39 206.55

    40 211.00

  • 8/14/2019 Automatic, c Road Estimate.

    7/46

    1 6

    2 12

    3 18

    4 25

    5 31

    6 377 43

    8 49

    9 55

    10 62

    11 67

    12 72

    13 77

    14 82

    15 87

    1692

    17 97

    18 102

    19 107

    20 116

    21 117

    22 121

    23 126

    24 130

    25 135

    26 139

    27 143

    28 148

    29 152

    30 157

    31 161

    32 165

    33 170

    34 174

    35 179

    36 183

    37 18738 192

    39 196

    40 201

    41-80 add 2.75 per km

    Mangalore Tiles (2000 nos.) Machine Presse

  • 8/14/2019 Automatic, c Road Estimate.

    8/46

    Tiles

  • 8/14/2019 Automatic, c Road Estimate.

    9/46

    1 5

    2 9

    3 14

    4 19

    5 23

    6 287 33 Country Bricks8 37

    9 42

    10 47

    11 50

    12 54

    13 58

    14 62

    15 66

    1669

    17 73

    18 77

    19 81

    20 85

    21 88

    22 91

    23 95

    24 98

    25 101

    26 105

    27 108

    28 111

    29 115

    30 118

    31 121

    32 125

    33 128

    34 131

    35 135

    36 138

    37 14138 145

    39 148

    40 152

    41-80 add 2.65 per km

  • 8/14/2019 Automatic, c Road Estimate.

    10/46

    1 3.75

    2 7.50

    3 11.25

    4 15.00

    5 18.75 Lime Stone,Broken Stone Brick jelly Wood Work

    6 22.507 26.25

    8 30.00

    9 33.75

    10 37.50

    11 40.65

    12 43.80

    13 46.95

    14 50.10

    15 53.25

    1656.40

    17 59.55

    18 62.70

    19 65.85

    20 69.00

    21 71.70

    22 74.40

    23 77.10

    24 79.80

    25 82.50

    26 85.20

    27 87.90

    28 90.60

    29 93.30

    30 96.00

    31 98.70

    32 101.40

    33 104.10

    34 106.80

    35 109.50

    36 112.20

    37 114.9038 117.60

    39 120.30

    40 123.00

    41-80 add 1.65 per km

  • 8/14/2019 Automatic, c Road Estimate.

    11/46

    1 5

    2 11

    3 16

    4 22

    5 27

    6 337 38 Rough Stone,Bond Stone,sand,Earth Broken8 44

    9 49

    10 55

    11 59

    12 64

    13 68

    14 73

    15 77

    1682

    17 86

    18 91

    19 95

    20 100

    21 104

    22 108

    23 112

    24 116

    25 120

    26 124

    27 128

    28 132

    29 136

    30 140

    31 143

    32 147

    33 151

    34 155

    35 159.25

    36 163.20

    37 167.1538 171.10

    39 175.05

    40 179.00

    41 182.15

    42 185.30

    43 188.45

  • 8/14/2019 Automatic, c Road Estimate.

    12/46

    44 191.60

    45 194.75

    46 197.90

    47 201.05

    48 204.20

    49 207.3550 210.50

  • 8/14/2019 Automatic, c Road Estimate.

    13/46

    Stone,Gravel,Surki

  • 8/14/2019 Automatic, c Road Estimate.

    14/46

  • 8/14/2019 Automatic, c Road Estimate.

    15/46

    0 0

    1 3.40

    2 7

    3 10.20

    4 14

    5 176 20

    7 24

    8 27

    9 31

    10 34

    11 37

    12 40

    1343 STEEL

    14 45

    15 4816 52

    17 54

    18 57

    19 60

    20 63

    21 65

    22 67

    23 70

    24 72

    2575

    26 77

    27 80

    28 82

    29 85

    30 87

    31 89

    32 92

    33 94

    34 97

    35 99

    36 10237 104

    38 107

    39 109

    40 112

    41 113.45

    42 115.40

  • 8/14/2019 Automatic, c Road Estimate.

    16/46

    43 117.35

    44 119.30

    45 121.25

    46 123.20

    47 125.15

    48 127.1049 129.05

    50 131.00

  • 8/14/2019 Automatic, c Road Estimate.

    17/46

    Mazon I 179

    Mazon II 162

    Mazdoor I 112

    Mazsdoor II 101

    Fitter I 157

    Fitter II 146

    Painter I 143Painter II 132

    Carpenter I 176

    Carpenter I I 160

    Stocking charge

    Metal 3.15

    Gravel 3.05

    Sand 3.05

    Filling gravel 10.10

    Filling Sand 9.00

    Mixing CM 29.70

    Mixing LM 72.60

    Cleaning surfa 2.15

  • 8/14/2019 Automatic, c Road Estimate.

    18/46

    Kind of Materials Rate

    Mortar Sand 110

    Filling Sand 11040 mm Metal 560

    20 mm Metal 780

    12 mm Metal 720

    10 mm Metal 530

    6 mm Metal 360

    Rough Stone 262

    Bond Stone 360

    Country Bricks 2220

    Brick Jelly 20 mm 320

    Shell lime 850

    Pressed Tiles 5130

    Lime Stone 625

    Steel 32000

    Cement 4400

    Red Gravel 97

    Well Gravel 86

    Quarry Rubbish 58

    Snowcem 30

    Distember 60

    Enemal paint 160

  • 8/14/2019 Automatic, c Road Estimate.

    19/46

    Improvements to the existing Oorani at Thenkarai.

    LEAD STATEMENT

    Unit Cost Total

    1Mortar Sand Sivagiri 41 1 cum 110.00 ### 292.15

    2Filling Sand Sivagiri 41 1 cum 110.00 ### 292.15

    3Cement Pu godown 20 1 Mt ### 62.50 4462.50

    4Steel Pu godown 20 1 Mt ### 62.50 32062.50

    540 mm Metal Motamalai 15 1 cum 560.00 77.25 637.25

    620 mm Metal Motamalai 15 1 cum 780.00 77.25 857.25

    712mm Metal Motamalai 15 1 cum 720.00 77.25 797.25

    810 mm Metal Motamalai 15 1 cum 530.00 77.25 607.25

    96 mm Metal Motamalai 15 1 cum 360.00 77.25 437.25

    10Rough Stone Motamalai 15 1 cum 262.00 77.25 339.25

    11Bond Stone Motamalai 15 1 cum 360.00 77.25 437.25

    12 5 000 No ### 23.25 2243.25

    13Brick Jelly 20 mm 5 1 cum 320.00 18.75 338.75

    14Red Gravel 1 1 cum 97.00 5.45 102.45

    15Well Murambu 1 1 cum 86.00 5.45 91.45

    16Lime Stone 1 1 cum 625.00 3.75 628.75

    17 8 000 No ### 24.60 5154.60

    18Shell Lime 1 cum 850.00 850.00

    er e a e a ove ea s an ra es are s or es an correc o e es

    Name of Work:

    S.No.

    Kind ofMaterials

    Name ofQuarry

    Leadin

    km

    conveyanc

    e

    CountryBricks(8 3/4x 4 1/4

    Pressed Tiles(20

    cm 20*

  • 8/14/2019 Automatic, c Road Estimate.

    20/46

    o my now e ge.

  • 8/14/2019 Automatic, c Road Estimate.

    21/46

    SUB-DATA

    Mixing Ratio

    Cement 4462.50 4284.00 3213.00 2142.00 1606.50 1285.20

    Sand 292.15 292.15 292.15 292.15 292.15

    4576.15 3505.15 2434.15 1898.65 1577.35

    Mixing charges

    29.70 29.70 29.70 29.70 29.70 29.70

    4605.85 3534.85 2463.85 1928.35 1607.05

    Main Data

    7.Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring

    blasting etc., complete for foundation as per SS 20 B.

    8. Filling with carted sand including cost and conveyance and all labour

    charges such as watering and ramming etc., complete as per standard specification.

    1.00 Cum Cost of Sand 292.15 1 Cum 292.15

    1.00 Cum 9.00 1 Cum 9.00

    Total 301.15

    Rs 301.15 /1CUM

    Name ofMaterials

    Cost ofMaterials

    CM 1:1 1/2960 kgs

    CM 1:2720 kgs

    CM 1:3480 kgs

    CM 1:4360 kgs

    CM 1:5288 kgs

    ConcreteWorks

    For MortarWorks

    For Structure works Rs.28.75 x 2 = 57.50/ 1 cum.

    For Drainage works Rs.29 x 1.5 = 43.13/ 1 cum.

    For C.C pavement Rs.28.75x1 = 28.75/ 1 cum.

    FillingCharges

  • 8/14/2019 Automatic, c Road Estimate.

    22/46

    Name of work: Providing cement concrete road with drainage at

    Sl.No. Description of work No Measurements. Contents Rate Amount

    L B D

    1 Earthwork excavation in all clauses of soils with intial lead and

    Lift etc. complete as per SS 20 B for foundation of drinage.

    1 50.00 0.81 0.20 8.10

    1 25.00 0.81 0.20 4.05

    1 20.00 0.81 0.20 3.24

    15.39 43.13 664

    2 Cement concrete 1:4:8, mix using 40mm ISS HBG metal

    including all cost and conveyance and all labour charges

    etc. complete.

    For drinage.

    1 50.00 0.81 0.10 4.05

    1 25.00 0.81 0.10 2.03

    1 20.00 0.81 0.10 1.62

    Cement road

    1 50.00 4.00 0.10 20.00

    1 25.00 3.50 0.10 8.751 20.00 3.50 0.10 7.00

    43.45 1797.73 78102

    3 Brickwork in cement mortar 1:5, mix using country bricks including

    all cost and conveyance and all laboaur charges etc. complete.

    Drinage side wall

    2 50.00 0.23 0.30 6.90

    2 25.00 0.23 0.30 3.45

    2 20.00 0.23 0.30 2.76

    13.11 1959.43 25688

  • 8/14/2019 Automatic, c Road Estimate.

    23/46

    4 Cement concrete 1:2:4, mix using 20mm ISS HBG metal including all

    cost and conveyance and all labour charges etc. complete.

    For cement road.

    1 50.00 4.00 0.075 15.00

    1 25.00 3.50 0.075 6.561 20.00 3.50 0.075 5.25

    26.81 2718.66 72894

    5 Plastering with cement mortar 1:5,12mm thick including all cost and

    conveyance and all labour charges etc. complete.

    1 50.00 1.36 68.00

    1 25.00 1.36 34.00

    1 20.00 1.36 27.20

    129.20 58.90 7610

    6 Contigencies and other unforseen charges for tar pad, L.S. 42

    and strret crossings.

    Total Err:508

  • 8/14/2019 Automatic, c Road Estimate.

    24/46

    Name of Work :-

    Qty Unit Description of Work KM

    Rate Per Amount

    4.000 KG Cost of Biumen 32600 MT 130.40

    10 SQM 71.00 71.00

    10 Sqm Labour Charges (HDSR 2002-2003) 12.00 12.00

    Rate for 10 sqm 213.40

    Rate for 1 sqm 21.34

    Name of Work :-

    Qty Unit Description of Work KM

    Rate Per Amount

    PROVIDING AND LAYING PREMIX CARPET WITH SEAL COAT TYPE - A

    0.180 Cum Cost of 13.2 mm IRC HBG machine metal 921 1 cum 165.81

    0.090 Cum Cost of 11.2mm IRC HBG machine metal 685 1 Cum 61.66

    0.090 Cum Cost of 6.70mm IRC HBG machine metal 556 1 Cum 50.05

    24.400 KG Cost of packed Bitumen 34600 1 Mt 844.24

    10 Sqm Hire charges for Tools and plant 290.92 290.92

    10 Sqm Labour Charges (HDSR 2002-2003)

    Rate for 10 Sqm 1412.68

    Rate for 1 Sqm 141.27

    Applying tack coat over WBM surface using Kg ofBitumen per 10 sqm. Including cost of Bitumenemulsion which will be supplied departmentallyat section stores cost of which will be recoveredat the rates as per special conditions appendedherewith including conveyance of Bitumenemulsion to actual workspot handling charges

    including labour charges for brushing, cleaningand preparing the surface for laying the tackcoat and labour for applying the requiredquantity of bitumen emulsion including, hire,fuel and running charges for all tools and plantsemployed for the work including all otherincidental charges such as barricading andproviding danger lights, flages etc., complete as

    Hire Charges for Bitumen squire with selfheating pumping arrangements SI HG SR 2002-2003

    10sqm

    Providing and laying P.C. with seal coat type Afor 20mm thickness using 0.18 cum of 13.20 MMIRC machine crushed metal with 14.60 Kg ofBitumen for Green mixing 10 Sqm of premixcarpet and 0.09 cum of 6.70mm IRC machinecrusher metal with 9.80 kgs of bitumen for sealcoat type A per 10 sqm including cost andconveyance of materials to the work sight andstacking them to the departmental metric guagefor pre measurement hating bitumen boilerheating the aggregates and mixing them withbitumen in mini hot mix plaint for premix rollerfor rolling to mix for pre mix carpeter and sealscoats separately including labour charges forspreading seals cost charges for mini hot mixplant bitumen boiler power roller and all other

    tools and plants employed to accommodate as

    10Sqm

  • 8/14/2019 Automatic, c Road Estimate.

    25/46

    Name of Work :-

    I Layer Using Grade II Metal (90mm to 22.4mm) size metal

    Qty Unit Description Rate Per Amount

    0.050Cum Cost of 90mm IRC HBG Metal 425.15 21.26

    0.450Cum Cost of 63mm IRC HBG Metal 532.151cum 239.47

    0.425Cum Cost of 53mm IRC HBG metal 607.15 258.04

    0.050Cum Cost of 45mm IRC HBG metal 753.15 37.66

    0.025Cum Cost of 22.4 mm IRC HBG metal 982.15 24.55

    0.24Cum Cost of Red Gravel 127.30 30.55

    10.00Sqm 180.64 180.64

    10.00Sqm

    - Rate for 10 Sqm 792.17

    - Rate for 1 Cum 1056.22

    Name of Work :-

    II Layer Using Grade III Metal (63mm to 22.4mm) size metal

    Qty Unit Description Rate Per Amount

    0.025Cum Cost of 63mm IRC HBG Metal 532.15 13.30

    0.200Cum Cost of 53mm IRC HBG metal 607.15 121.43

    0.725Cum Cost of 45mm IRC HBG metal 753.15 546.03

    0.025Cum Cost of 22.4 mm IRC HBG metal 982.15 24.55

    0.025Cum 685.15 17.13

    0.24Cum Cost of Red Gravel 127.30 30.55

    10 Sqm 180.64 180.64

    10Sqm

    - Rate for 10 Sqm 933 64

    1cum

    1cum

    1cum

    1cum

    1cum

    Higher Charges for Tolls & Plant(S119&20 HGSR)

    10Sqm

    Labour Charges (S119 & 20HDSR)

    1cum

    1cum

    1cum

    1

    Cost of 11.20 mm IRC HBG 1

    1

    Higher Charges for Tolls & Plant(S119&20 HGSR)

    10Sqm

    Labour Charges (S119 & 20

  • 8/14/2019 Automatic, c Road Estimate.

    26/46

    - Rate for 1 Cum 1244.85

  • 8/14/2019 Automatic, c Road Estimate.

    27/46

  • 8/14/2019 Automatic, c Road Estimate.

    28/46

    Abstract

    Name of work: Improvements to the existing Oorani at

    S.No. Description of work Quantity Rate per Amount

    1 Earthwork excavation inall clauses of soils with

    intial lead of 0 to 100meters

    using with machineries

    including all labour

    charges. 3600 55.00 1cum 198000

    2 Earthwork excavation in

    all clauses of soils

    with intial lead and lift

    in Medium rock& dense

    medium rock 450 104.50 1cum 47025

    3 Earthwork excavation in

    all clauses of soils with

    intial lead and lift as per

    SS20 B for foundation 66.44 53 1cum 3488

    4 Cement concrete 1:4:8 mix

    using 40,mm metal include

    ding all c ost and conveye

    ance etc. complete. 27.74 1797.73 1cum 49865

    5 R.R.Masonry in cement

    mortar 1:5, mix using

    required bond stone withsimultanous pointing 105.20 1528.52 1 cum 160793

    6 Filling with carted sand in

    cluding all cost and con-

    veyance and all labour

    charges etc. complete. 2.40 301.15 1cum 723

    7 Centering soffists of c.c.

    works including all cost

    and all labour charges 25.83 90.00 1sqm 2325

    8 Cement concrete 1:2:4

    mix using 20mm ISS HBG

    metal inclulding all

    cost. 2.58 2718.66 1cum 7022

    9 Plastering with cement

  • 8/14/2019 Automatic, c Road Estimate.

    29/46

    mortar 1:5, 20mm thick

    including all cost 59.00 112.66 6646

    10 Towards tree planting L.S. 1000

    11 Towards sitting slab

    arrangements L.S. 1000

    12 Contigencies & Other un

    forseen charges L.S. 113

    Total 478000

  • 8/14/2019 Automatic, c Road Estimate.

    30/46

    Name of work: Improvements to the existing Oorani at

    Detailed estimate.

    S.No. Descrition of work No Measurements Contents.

    L B D

    1 Earthwork excavation in all clauses of

    soils with intial led and lift complying with

    machineries and tippers including all

    labour charges.

    Masin pond 1 40.00 40.00 2.00 3200.00

    Baby pond 1 20.00 20.00 1.00 400.00

    3600.00

    2 Earthwork excavation in all clauses of soilsintial lead and lift etc. complete in M.R.

    Dense medium rock requiring blasting

    etc. complete.

    Main pond 1 40.00 20.00 0.50 400.00

    Baby pond 1 10.00 10.00 0.50 50.00

    450.00

    3 Earthwork excavation in all clauses of

    soils with intial lead and lift etc. complete

    for foundation.

    Baby pond wall 1 79.10 0.60 0.30 14.24

    Step side wall 2 6.00 0.75 (0.0+2.00) /2 9.00

    Retaingwall 1 40.00 0.90 1.20 43.20

    66.44

    4 Cement concrete 1:4:8 mix using 40mm ISS

    HBG metal including all cost and con

    veyance and all labour charges etc.

    Baby pond wall foundation 1 79.10 0.60 0.30 14.24

    Step side wall foundation 2 6.00 0.75 0.30 2.70

    Retaining wall foundation 1 40.00 0.90 0.30 10.80

    Step Base 1 4.00 4.00 0.15 0.00

    27.74

  • 8/14/2019 Automatic, c Road Estimate.

    31/46

  • 8/14/2019 Automatic, c Road Estimate.

    32/46

    10 Towards tree planting and watering L.S.

    11 Towards sitting slab arrangements L.S.

    12 Contigencies and other unforseen charges L.S.

  • 8/14/2019 Automatic, c Road Estimate.

    33/46

    9.Cement concrete 1: :4:8

    conveyance and all labour charges etc., Complete for 10 Cum

    9.00 Cum Cost of 40mm metal 637.25 1 Cum 5735.25

    4.50 Cum cement mortar1:4 1898.65 1 Cum 8543.93

    1.80 Nos Mason II Class 162.00 Each 291.60

    17.70 Nos Mazdoor I Class 112.00 Each 1982.40

    14.10 Nos Mazdoor II Class 101.00 Each 1424.10

    L.S. Sundries L.S 0.02

    For 10 cum 17977.30

    Rs. 1797.73 /1 cum

    Brick work in CM 1:5 mix using country bricks of size 8 x 4 x 2 3/4 includi

    cost and conveyance of all materials and all labour charges etc., Complete for 10 Cum.

    1300.00 Nos Cost of country bricks 2243.25 1000 Nos 2916.23

    0.708 Cum Cement mortar 1:5 1607.05 1Cum 1137.79

    1.00 Nos Mason I Class 179.00 Each 179.00

    3.00 Nos Mason II Class 162.00 Each 486.00

    2.00 Nos Mazdoor I Class 112.00 Each 224.00

    6.00 Nos Mazdoor II Class 101.00 Each 606.00

    L.S Sundries L.S 0.08

    Rate for 10 Cum 5549.10

    /2.832

    Rs. 1959.43 / 1 cum

    Plastering with Cm 1:5 mix using to 12 mm thick including all cost andconveyance of all Materials and all labour charges etc., Complete for 10 Sqm.

    0.14 Cum Cost of CM 1:5 1607.05 1Cum 224.99

    1.10 Nos Mason I Class 179.00 Each 196.90

    0.50 Nos Mazdoor I Class 112.00 Each 56.00

    1.10 Nos Mazdoor II Class 101.00 Each 111.10

    L.S Sundries L.S 0.01

    For 10 sqm 589.00

    Rs 58.90 /1 sqm

  • 8/14/2019 Automatic, c Road Estimate.

    34/46

    Random Rubble Masonry in CM 1:5 mix using required Bond stone simultaneous

    pointing including all cost conveyance and all labour charges etc, Complete.

    10.00 Cum Cost of Rough stone 339.25 1Cum 3392.50

    1.00 Cum Cost of Bond stone 437.25 1Cum 437.25

    3.40 Nos Cost of CM 1:5 1607.05 1Cum 5463.97

    7.10 Nos Mason I Class 179.00 Each 1270.90

    10.60 Nos Mason II Class 162.00 Each 1717.20

    14.10 Nos Mazdoor I Class 112.00 Each 1579.20

    14.10 Nos Mazdoor II Class 101.00 Each 1424.10

    L.S Sundries L.S 0.08

    For 10 cum 15285.20

    Rs. 1528.52 / 1 cum

    Plastering with CM 1:5 mix using to 20 MM thick including all costconveyance etc., Complete.

    0.22 Cum Cost of CM 1:5 1607.05 1 Cum 353.55

    2.20 Nos Mason I Class 179.00 Each 393.80

    0.50 Nos Mazdoor I Class 112.00 Each 56.00

    3.20 Mazdoor II Class 101.00 Each 323.20

    L.S Sundries L.S 0.05

    For 10 sqm 1126.60

    Rs. 112.66 /1 sqm

    Cement concrete 1:2:4 mix using 40mm ISS HBG metal including all costand conveyance and all labour charges etc., Complete.

    9.00 Cum 857.25 1Cum 7715.25

    4.50 Cum Cement Mortar 1:2 3505.15 1Cum 15773.18

    1.80 1Nos Mason II Class 162.00 1Cum 291.60

    17.70 Nos Mazdoor I Class 112.00 Each 1982.4014.10 Nos Mazdoor II Class 101.00 Each 1424.10

    L.S Sundries L.S 0.08

    Rate for 10 cum 27186.60

    Rs. 2718.66 / 1 cum

    Cost of 20mm IssHBG metal

  • 8/14/2019 Automatic, c Road Estimate.

    35/46

    RCC 1:11/2:3 mix using using 20mm size of HBG metal including all costand conveyance etc., complete

    9.00 Cum Cost of 20mm Metal 857.25 1 Cum 7715.25

    4.50 Cum 4576.15 1Cum 20592.68

    3.50 Nos Mason II Class 162.00 Each 567.00

    21.20 Nos Mazdoor I Class 112.00 Each 2374.4035.30 Nos Mazdoor II class 101.00 Each 3565.30

    L.S Sundries L.S 0.08

    For 10 cum 34814.70

    Rs. 3481.47 /1 cum

    and conveyance etc., complete

    1.00 Qtl Cost of steel 32062.50 1Mt 3206.25

    0.01 Qtl Cost of binding wire 40.00 1 kg 40.00

    3.50 Nos Fitter I Class 157.00 Each 549.50

    For 1 qtl 3795.75

    Rs. 3795.75 /qtl

    RCC 1:2:4 mix using using 20mm size of HBG metal including all costand conveyance etc., complete

    9.00 Cum Cost of 20mm Metal 857.25 1 Cum 7715.25

    4.50 Cum Cost of Sand 292.15 1Cum 1314.68

    3231.00 Kgs Cost of Cement 4462.50 1 Mt 14418.34

    3.50 Nos Mason II Class 162.00 Each 567.00

    21.20 Nos Mazdoor I Class 112.00 Each 2374.40

    35.30 Nos Mazdoor II class 101.00 Each 3565.30

    L.S Sundries L.S 0.04

    For 10 cum 29955.00

    Rs. 2995.50 /1 cum

    Cement Mortar 1:11/2:

    Supplying and fabrication of steel for RCC works including all cost

  • 8/14/2019 Automatic, c Road Estimate.

    36/46

    Granolithic Cement Concrete 1:2:4 mix to 0.25m thick using 10mm to12mm ISS size of HBG metal including all cost and conveyance of all materials

    to work site and all labour charges etc., complete for 10 cum

    9.00 Cum 702.25 1 Cum 6320.25

    4.50 Cum Cement Mortar 1:2 3505.15 1 Cum 15773.18

    1.80 Nos Mason II Class 162.00 Each 291.60

    17.70 Nos Mazdoor I Class 112.00 Each 1982.40

    14.10 Nos Mazdoor II 101.00 Each 1424.10

    L.S Sundries L.S 0.07

    For 10 cum 25791.60

    Rs. 2579.16 /1 cum

    Pointing with CM 1:3 mix over pressed titles on terrace roofing including all cost

    and conveyance of all materials and labour charges etc., Complete for 10 sqm

    0.04 Cum Cost of CM 1: 3 2463.85 1 Cum 98.55

    2.20 Nos Mason II Class 162.00 Each 356.40

    0.50 Nos Mazdoor I Class 112.00 Each 56.00

    1.10 Nos Mazdoor II Class 101.00 Each 111.10

    L.S Sundries L.S 0.05

    For 10 sqm 622.10

    Rs. 62.21 /1 sqm

    Brick jelly with lime concrete using 20mm size of brick jelly with no sand

    to be add including all cost and conveyance and all labour charges etc., complete

    12.80 Cum 338.75 1 Cum 4336.00

    5.00 Cum Cost of lime Stone 628.75 1 Cum 3143.75

    1.80 Nos Mason I Class 179.00 Each 322.20

    17.70 Nos Mazdoor I Class 112.00 Each 1982.40

    14.10 Nos Mazdoor II Class 101.00 Each 1424.10

    L.S Sundries L.S 0.05

    For 10 cum 11208.50

    Rs. 1120.85 / 1 cum

    Cost of 10mm to12mm ISS HBG metal

    Cost of 20mm brickjelly

  • 8/14/2019 Automatic, c Road Estimate.

    37/46

  • 8/14/2019 Automatic, c Road Estimate.

    38/46

    Rs. 9.74 / 1 sqm

    Painting with ready mixed good quality of enamel paint two coats including

    all cost and conveyance etc., complete for 10 Sqm Over new Iron works.

    2.22 Lits Cost of enamel paint 160.00 1 Litter 355.20

    1.10 Nos Painter Ist Class 143.00 Each 157.30

    L.S Sundries L.S 0.50For 10 sqm 513.00

    Rs. 51.30 / 1 sqm

    Plastering withs CM 1:3 10mm thick including all cost and conveyance and all

    labour charges etc., complete.

    0.10 Cum Cost of CM 1:3 2463.85 1Cum 246.39

    1.10 Nos Mason I Class 179.00 Each 196.90

    1.10 Nos Mazdoor I Class 112.00 Each 123.20

    1.10 Nos Mazdoor II Class 101.00 Each 111.10L.S Sundries L.S 0.02

    For 10 sqm 677.60

    Rs. 67.76 / 1 sqm

    for 10 sqm.

    1.34 Kgs Distember 60.00 1Kg 80.40

    0.50 Nos Painter I grade 132.00 Each 66.000.50 No. Mazdoor I grade 112.00 Each 56.00

    0.80 No. Mazdoor II grade 101.00 Each 80.80

    Sundries L.S. 0.80

    for 10 sqm 284.00

    Rs. 28.40/ 1 sqm

    10.00 sqm 2.15 1sqm 21.503.23 kgs snowcem paint 30.00 1Kg 96.90

    0.50 No. Painter I class 143.00 Each 71.50

    0.50 No. Mazdoor Igrade 112.00 Each 56.00

    0.80 No. Mazdoor II Grade 101.00 Each 80.80

    Sundries L.S. 0.80

    for 10 sqm 327.50

    Distermpering two coats includidng all cost anad conv eyance and all labourcharges

    Snowcem painting two coats with approved paint over cement plastered wallsurface ceiling and other new surface including cleaning preparing the surfaceand curing etc. complete for 10 sqm

    Cleaning plastered surface

  • 8/14/2019 Automatic, c Road Estimate.

    39/46

    Rs. 32.75/ 1 sqm

    Paving the floor with plain colour ceramic tiles 200 x 200 x 6 mm in CM 1 : 3, 20 mm thick.

    112.00 Nos Cost of ceramic tiles 40.00 1 Nos 4480.00

    0.21 Cum Cost of CM 1:3 2463.85 1 Cum 517.41

    3.00 Kgs White cement 18.00 1 kg 54.00

    50.00 Gram Colouring pigment 20.00 1 Kg 1.00

    1.20 Nos Mason I Class 179.00 Each 214.801.00 Nos Mason II Class 162.00 Each 162.00

    0.50 Nos Stone cutter I class 138.00 Each 69.00

    1.00 Nos Mazdoor I Class 112.00 Each 112.00

    1.00 Nos Mazdoor II Class 101.00 Each 101.00

    0.50 Kgs Cotton waste 5.00 Kg 2.50

    For 10 sqm 5713.71

    Rs. 571.37 / 1 sqm

  • 8/14/2019 Automatic, c Road Estimate.

    40/46

    g all

  • 8/14/2019 Automatic, c Road Estimate.

    41/46

  • 8/14/2019 Automatic, c Road Estimate.

    42/46

  • 8/14/2019 Automatic, c Road Estimate.

    43/46

  • 8/14/2019 Automatic, c Road Estimate.

    44/46

  • 8/14/2019 Automatic, c Road Estimate.

    45/46

  • 8/14/2019 Automatic, c Road Estimate.

    46/46