1 PROJECT ITEMSSECTION:
Alt Set ID: Alt Mbr ID:
Contractor:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
_________._____
0010 202.15
REMOVING MANHOLE OR CATCHBASIN
EA
3.000
_________._____
_________._____
0020 202.20
REMOVING BITUMINOUS CONCRETEPAVEMENT
SY
575.000
_________._____
_________._____
0030 202.202
REMOVING PAVEMENT SURFACE SY
67.000
_________._____
_________._____
0040 203.20
COMMON EXCAVATION CY
8,670.000
_________._____
_________._____
0050 203.26
GRAVEL BORROW CY
650.000
_________._____
_________._____
0060 304.15
AGGREGATE BASE COURSE - TYPE B CY
6,625.000
_________._____
_________._____
0070 403.207
HOT MIX ASPHALT 19.0 MM HMA T
1,000.000
_________._____
_________._____
0080 403.2081
12.5 MM POLYMER MODIFIED HOTMIX ASPHALT
T
725.000
_________._____
_________._____
0090 403.209
HOT MIX ASPHALT 9.5 MM(SIDEWALKS, DRIVES, INCIDENTALS)
T
115.000
_________._____
_________._____
0100 403.213
HOT MIX ASPHALT 12.5 MM BASE T
720.000
_________._____
_________._____
0110 409.15
BITUMINOUS TACK COAT - APPLIED G
320.000
_________._____
_________._____
0120 461.131
TEMPORARY PAVEMENT T
250.000
_________._____
Proposal Schedule of Items Page 1 of 8
Maine Department of Transportation
12/22/2014
Proposal ID: 020216.00 Project(s): 020216.00
1 PROJECT ITEMSSECTION:
Alt Set ID: Alt Mbr ID:
Contractor:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
_________._____
0130 502.341
STRUCTURAL CONCRETE ROADWAYMEDIAN
CY
40.000
_________._____
_________._____
0140 502.342
STRUCTURAL CONCRETE ROADWAYTRUCK APRON
CY
125.000
_________._____
_________._____
0150 603.16
15 INCH CULVERT PIPE OPTION I LF
20.000
_________._____
_________._____
0160 603.165
15 INCH REINFORCED CONCRETEPIPE CLASS III
LF
512.000
_________._____
_________._____
0170 603.55
CONCRETE PIPE TIES GP
4.000
_________._____
_________._____
0180 604.072
CATCH BASIN TYPE A1-C EA
1.000
_________._____
_________._____
0190 604.092
CATCH BASIN TYPE B1-C EA
6.000
_________._____
_________._____
0200 604.11
CATCH BASIN TYPE C1 EA
1.000
_________._____
_________._____
0210 604.18
ADJUSTING MANHOLE OR CATCHBASIN TO GRADE
EA
1.000
_________._____
_________._____
0220 604.249
CATCH BASIN TYPE F6-C EA
1.000
_________._____
_________._____
0230 605.09
6 INCH UNDERDRAIN TYPE B LF
1,120.000
_________._____
_________._____
0240 606.23
GUARDRAIL TYPE 3C - SINGLE RAIL LF
312.500
_________._____
Proposal Schedule of Items Page 2 of 8
Maine Department of Transportation
12/22/2014
Proposal ID: 020216.00 Project(s): 020216.00
1 PROJECT ITEMSSECTION:
Alt Set ID: Alt Mbr ID:
Contractor:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
_________._____
0250 606.265
TERMINAL END - SINGLE RAIL -GALVANIZED STEEL
EA
1.000
_________._____
_________._____
0260 606.353
REFLECTORIZED FLEXIBLEGUARDRAIL MARKER
EA
4.000
_________._____
_________._____
0270 606.356
UNDERDRAIN DELINEATOR POST EA
3.000
_________._____
_________._____
0280 606.81
TANGENT GUARDRAIL TERMINAL -ENERGY ABSORBING
EA
1.000
_________._____
_________._____
0290 609.11
VERTICAL CURB TYPE 1 LF
256.000
_________._____
_________._____
0300 609.12
VERTICAL CURB TYPE 1 - CIRCULAR LF
246.000
_________._____
_________._____
0310 609.234
TERMINAL CURB TYPE 1 - 4 FOOT EA
4.000
_________._____
_________._____
0320 609.26
CURB TRANSITION SECTION B TYPE1
EA
4.000
_________._____
_________._____
0330 609.34
CURB TYPE 5 LF
2,404.000
_________._____
_________._____
0340 609.341
CURB TYPE 5 - TRUCK APRON LF
569.000
_________._____
_________._____
0350 609.35
CURB TYPE 5 - CIRCULAR LF
131.000
_________._____
_________._____
0360 610.08
PLAIN RIPRAP CY
38.000
_________._____
Proposal Schedule of Items Page 3 of 8
Maine Department of Transportation
12/22/2014
Proposal ID: 020216.00 Project(s): 020216.00
1 PROJECT ITEMSSECTION:
Alt Set ID: Alt Mbr ID:
Contractor:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
_________._____
0370 613.319
EROSION CONTROL BLANKET SY
275.000
_________._____
_________._____
0380 615.07
LOAM CY
590.000
_________._____
_________._____
0390 618.13
SEEDING METHOD NUMBER 1 UN
47.000
_________._____
_________._____
0400 619.1201
MULCH UN
47.000
_________._____
_________._____
0410 620.58
EROSION CONTROL GEOTEXTILE SY
75.000
_________._____
_________._____
0420 621.031
EVERGREEN TREES (4 FOOT - 5FOOT) GROUP A
EA
3.000
_________._____
_________._____
0430 621.039
EVERGREEN TREES (5 FOOT - 6FOOT) GROUP C
EA
3.000
_________._____
_________._____
0440 621.043
EVERGREEN TREES (6 FOOT - 8FOOT) GROUP A
EA
1.000
_________._____
_________._____
0450 621.101
PLUG/ STARTER PLANT EA
2,200.000
_________._____
_________._____
0460 621.287
LARGE DECIDUOUS TREE (3 INCH -3.50 INCH CALIPER) GROUP C
EA
4.000
_________._____
_________._____
0470 621.389
DWARF EVERGREENS (15 INCH - 18INCH) GROUP A
EA
108.000
_________._____
_________._____
0480 621.39
DWARF EVERGREENS (15 INCH - 18INCH) GROUP B
EA
12.000
_________._____
Proposal Schedule of Items Page 4 of 8
Maine Department of Transportation
12/22/2014
Proposal ID: 020216.00 Project(s): 020216.00
1 PROJECT ITEMSSECTION:
Alt Set ID: Alt Mbr ID:
Contractor:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
_________._____
0490 621.397
DWARF EVERGREENS (18 INCH - 24INCH) GROUP C
EA
84.000
_________._____
_________._____
0500 621.415
DWARF EVERGREENS (3 FOOT - 3.50FOOT) GROUP C
EA
12.000
_________._____
_________._____
0510 621.531
DECIDUOUS SHRUBS (12"-18"CAL.)GROUP A
EA
48.000
_________._____
_________._____
0520 621.54
DECIDUOUS SHRUBS (18 INCH - 24INCH) GROUP A
EA
48.000
_________._____
_________._____
0530 621.547
DECIDUOUS SHRUBS (2 FOOT - 3FOOT) GROUP B
EA
48.000
_________._____
_________._____
0540 626.21
METALLIC CONDUIT LF
20.000
_________._____
_________._____
0550 626.22
NON-METALLIC CONDUIT LF
1,150.000
_________._____
_________._____
0560 626.32
24 INCH FOUNDATION EA
15.000
_________._____
_________._____
0570 626.33
30 INCH DIAMETER, 8 FOOT OR LESSFOUNDATION
EA
10.000
_________._____
_________._____
0580 626.35
CONTROLLER CABINETFOUNDATION
EA
1.000
_________._____
_________._____
0590 626.36
REMOVE OR MODIFY CONCRETEFOUNDATION
EA
17.000
_________._____
Proposal Schedule of Items Page 5 of 8
Maine Department of Transportation
12/22/2014
Proposal ID: 020216.00 Project(s): 020216.00
1 PROJECT ITEMSSECTION:
Alt Set ID: Alt Mbr ID:
Contractor:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
_________._____
0600 627.78
TEMPORARY 4 INCH PAINTEDPAVEMENT MARKING LINE, WHITEOR YELLOW
LF
16,200.000
_________._____
_________._____
0610 629.05
HAND LABOR, STRAIGHT TIME HR
20.000
_________._____
_________._____
0620 631.12
ALL PURPOSE EXCAVATOR(INCLUDING OPERATOR)
HR
15.000
_________._____
_________._____
0630 631.172
TRUCK - LARGE (INCLUDINGOPERATOR)
HR
15.000
_________._____
_________._____
0640 631.18
CHAIN SAW RENTAL (INCLUDINGOPERATOR)
HR
10.000
_________._____
0650 634.160
HIGHWAY LIGHTING _________._____LUMP SUM LUMP SUM
_________._____
0660 634.2042
LED LUMINARIES EA
15.000
_________._____
_________._____
0670 634.210
CONVENTIONAL LIGHT STANDARD EA
11.000
_________._____
_________._____
0680 639.19
FIELD OFFICE TYPE B EA
1.000
_________._____
_________._____
0690 645.103
DEMOUNT GUIDE SIGN EA
6.000
_________._____
_________._____
0700 645.106
DEMOUNT REGULATORY, WARNING,CONFIRMATION AND ROUTEMARKER ASSEMBLY SIGN
EA
13.000
_________._____
Proposal Schedule of Items Page 6 of 8
Maine Department of Transportation
12/22/2014
Proposal ID: 020216.00 Project(s): 020216.00
1 PROJECT ITEMSSECTION:
Alt Set ID: Alt Mbr ID:
Contractor:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
_________._____
0710 645.108
DEMOUNT POLE EA
10.000
_________._____
_________._____
0720 645.113
REINSTALL GUIDE SIGN EA
2.000
_________._____
_________._____
0730 645.116
REINSTALL REGULATORY, WARNING,CONFIRMATION AND ROUTEMARKER ASSEMBLY SIGN
EA
13.000
_________._____
0740 645.14
SPECIAL WORK NO: 1 _________._____LUMP SUM LUMP SUM
_________._____
0750 645.162
BREAKAWAY DEVICES MULTI-POLE EA
3.000
_________._____
_________._____
0760 645.251
ROADSIDE GUIDE SIGNS, TYPE I SF
1,250.000
_________._____
_________._____
0770 645.289
STEEL H-BEAM POLES LB
7,700.000
_________._____
_________._____
0780 645.292
REGULATORY, WARNING,CONFIRMATION AND ROUTEMARKER ASSEMBLY SIGNS TYPE II
SF
420.000
_________._____
_________._____
0790 652.33
DRUM EA
50.000
_________._____
_________._____
0800 652.34
CONE EA
75.000
_________._____
_________._____
0810 652.35
CONSTRUCTION SIGNS SF
920.000
_________._____
_________._____
0820 652.36
MAINTENANCE OF TRAFFICCONTROL DEVICES
CD
125.000
_________._____
Proposal Schedule of Items Page 7 of 8
Maine Department of Transportation
12/22/2014
Proposal ID: 020216.00 Project(s): 020216.00
1 PROJECT ITEMSSECTION:
Alt Set ID: Alt Mbr ID:
Contractor:
Bid AmountUnit PriceApproximateQuantity and
UnitsDescription
Item IDProposal
LineNumber Dollars Cents Dollars Cents
_________._____
0830 652.38
FLAGGER HR
6,100.000
_________._____
_________._____
0840 652.41
PORTABLE CHANGEABLE MESSAGESIGN
EA
6.000
_________._____
0850 656.75
TEMPORARY SOIL EROSION ANDWATER POLLUTION CONTROL
_________._____LUMP SUM LUMP SUM
_________._____
0860 658.20
ACRYLIC LATEX COLOR FINISH,GREEN
SY
825.000
_________._____
0870 659.10
MOBILIZATION _________._____LUMP SUM LUMP SUM
_________._____
0880 823.3331
REMOVE AND RESET GATE VALVEAND BOX
EA
1.000
_________._____
_________._____
0890 824.32
REMOVE/RESET HYDRANT EA
1.000
_________._____
Section: 1 _________._____Total:
Total Bid: _________._____
Proposal Schedule of Items Page 8 of 8
West Gardiner WIN 20216.00 December 15, 2014
SPECIAL PROVISION SECTION 645
HIGHWAY SIGNING (Special Work No. 1: Relocate Sign Pylon)
Description This work shall consist of relocating the existing Maine Turnpike Exit 102 service plaza sign pylon from its present location on the west side of the service plaza entrance southwesterly approximately 55’ to a new location on the west side of the reconstructed service plaza entrance as shown on the project plans, including new reinforced concrete footings and piers, new structural steel tube sleeves in the footings and piers, removal of existing and construction of new water struck brick column facades, dismantling and reassembly of Lexan sign faces, relocation of sign power transformers and wireless communication components, installation of new electrical conduit and wiring, disconnection and reconnection of power for internal lighting, relocation and attachment of service plaza information signs to the pylon columns, removal of existing reinforced concrete footings and piers, and all labor, equipment and incidental materials necessary to relocate the sign pylon in accordance with these specifications and in reasonably close conformity with the plans. General The relocated sign pylon shall be installed with sign faces approximately perpendicular to the centerline of the existing Route 9/126 approaches. The exact location and orientation of the relocated sign pylon shall be determined in the field, subject to approval of the Resident. All materials to be furnished shall be new unless otherwise noted. Existing materials to be removed and not reinstalled shall be disposed of by the Contractor. Materials In addition to other requirements of this Special Provision, materials shall meet the requirements of the following Sections of the Standard Specifications: Structural Concrete 502 Reinforcing Steel 503 Structural Steel 504
Structural Concrete Related Material 701 Aggregates for Concrete 703.01, 703.02 Joint Mortar 705.02
Reinforcing Steel 709.01 Non-Metallic Conduit 715.03 Metallic Junction and Fuse Box 715.05 Secondary Wiring 715.07 Assembly Hardware 719.07 Steel Supports 720.03
Special Provision 645.14 West Gardiner WIN 20216.00
12/15/14
2 of 4
New concrete footings and piers shall be Class LP. New structural steel tube sleeves to be installed in new concrete footings and piers shall be fourteen feet (14’) lengths of ten inch (10”) square, one-quarter inch (1/4”) wall thickness, A500 structural steel square tube. New brick for reconstructed sign pylon column facades shall be Morin Waterstruck Brick manufactured by Morin Brick Company, a division of R.J. Finlay & Co., Auburn, Maine. Color and texture shall match that of the existing sign pylon column brick facades. Construction All construction and materials required for relocation of the service plaza sign pylon shall match that shown on Maine Turnpike Authority “9393” Record Drawings dated December 2, 2008 for the existing sign pylon, except as noted in this Special Provision. The applicable Maine Turnpike Authority record drawings follow this Special Provision. The Contractor shall be responsible for structural analysis and submittal of documentation to the Department for confirmation that the sign pylon structural steel tube columns and reinforced concrete footings and piers meet requirements of the current edition of AASHTO “Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals”. Any increases in size or thickness or addition of other structural components found to be required to meet current AASHTO specifications, if any, will be considered incidental to lump sum payment for Pay Item 645.14. Existing service plaza sign pylon Lexan sign faces shall be carefully removed and stored by the Contractor to be reinstalled in the relocated sign pylon. Other existing sign pylon components, including but not limited to vertical seam steel roof panels and internal lighting, may be carefully removed at the Contractor’s discretion to avoid damage and stored by the Contractor to be reinstalled in the relocated sign pylon. Existing wiring for internal lighting of the sign pylon shall be disconnected. Existing sign pylon brick column facades shall be removed, and waste material shall be disposed of off the project. New reinforced concrete footings, minimum thirty-six inches (36”) diameter by minimum five feet (5’) length shall be placed at the new sign pylon location approved by the Resident. Precast footings will not be allowed. Reinforcing shall be as shown on record drawings of the existing sign pylon, at minimum. One 14’ length of minimum 10” square structural steel tube shall be cast into each footing and anchored to the footing with J-bolts. The top of the footings shall be approximately six inches (6”) below finish grade of adjacent ground. A 24” by 24” by 36” high reinforced concrete pier shall be placed separately on each footing, centered on the footing and with the east and west sides of the piers oriented to be parallel to the sign faces of the sign pylon. The top edges of each pier shall be chamfered as directed.
Special Provision 645.14 West Gardiner WIN 20216.00
12/15/14
3 of 4
The 8” square structural steel tube columns shall be cut cleanly at the top of the 10” square structural steel tube foundation sleeves of the existing sign pylon. The structure shall be removed from the existing foundations, transported to the new foundations, and the structural steel tube columns inserted into the new foundation sleeves. Steel tube columns and sleeves shall be capped and welded all around as detailed on the record drawings of the existing sign pylon structure. The sign structure shall be carefully supported throughout the detachment, transport and reattachment process to avoid damage. Any additional dismantling and reconstruction of the structure that the Contractor considers to be necessary to avoid damage during transport and reattachment will be considered incidental to lump sum payment for Pay Item 645.14. Upon completion of attachment of the structural steel tube columns to the foundation sleeves, the brick column facades shall be reconstructed with new brick and tied to the steel tube columns as detailed in the record drawings of the existing sign pylon. Lexan sign faces and other components removed for transport of the structure shall be reattached to the relocated structure. New conduit and wiring shall be installed from a new junction box to be installed approximately at Station 5001+05 Right on the service plaza exit to the new sign pylon location. A new external, lockable, metallic junction box shall be installed above ground on a pier of the new sign pylon location. Wiring shall be reconnected to the internal sign lighting of the pylon. All work and materials necessary for reconnection of the sign pylon internal lighting shall comply with requirements of the latest edition of the National Electrical Code. Upon completion of removal of the pylon structure from the existing foundations, the old foundations, conduit and disconnected wiring within the limits of new roadway construction shall be removed. A large guide sign located at Station 13+82 Right is noted on the plans for removal. Removal of that guide sign will be paid under other items of the contract. Attached to the steel posts of the guide sign are eight (8) small service plaza information signs. The Contractor shall demount the eight service plaza information signs from the guide sign posts and shall reinstall them on the brick column facades of the relocated service plaza sign pylon. The reinstalled information signs shall be arrayed similarly to their existing arrangement, with two information signs on each of the east and west faces of the brick column facades of the service plaza sign pylon. The top of the information signs shall be no higher than the bottom of the service plaza Lexan sign faces. A temporary service plaza sign shall be installed by the Contractor. Sign size is anticipated to be approximately 64 square feet. Maine Turnpike Authority will furnish the sign. The Contractor will be responsible for erecting the temporary sign, supporting it as required with temporary wood posts, removing the temporary sign and supports after completion and acceptance of relocation of the permanent sign pylon, furnishing and installation of temporary ground-mounted external lighting for the temporary sign, and
Special Provision 645.14 West Gardiner WIN 20216.00
12/15/14
4 of 4
removing the temporary lighting after completion and acceptance of relocation of the permanent sign pylon. Power service for the temporary lighting shall be by connection to the existing service plaza power service. The temporary sign shall be returned to the Maine Turnpike Authority service yard adjacent to the project upon removal. Temporary lighting hardware shall remain the property of the Contractor upon removal. Method of Measurement Special Work No. 1: Relocate Sign Pylon will be measured for payment by the lump sum complete in place. Basis of Payment The accepted Special Work No. 1: Relocate Sign Pylon will be paid for at the contract lump sum price, which payment shall be full compensation for all labor, materials and equipment necessary to construct new reinforced concrete footings and piers with new structural steel tube sleeves; remove existing sign pylon brick column facades; remove and safely store service plaza pylon signage and other necessary components to protect from damage; disconnect and remove existing sign lighting wiring and conduit; relocate and attach the existing service plaza sign pylon structure to the new piers; construct new brick column facades; remove and reinstall sign power transformers and wireless communication components; install new electrical conduit, junction boxes and wiring; reinstall service plaza pylon signage and other necessary components that were removed for temporary storage; remove existing reinforced concrete footings and piers; demount service plaza information signage from a highway guide sign and reinstall the information signage on the service plaza sign pylon; install, support and remove a temporary service plaza sign; furnish, install and remove temporary service plaza sign floodlighting; and all other labor, equipment and incidental materials necessary to relocate the Maine Turnpike Exit 102 sign pylon with fully functioning internal illumination in accordance with these specifications and in reasonably close conformity with the plans. Any materials removed from the existing service plaza sign pylon that are intended to be reinstalled in the relocated sign pylon and that may be lost or damaged during removal, storage or reinstallation shall be replaced with approved equivalent new materials at the expense of the Contractor. Payment will be made under: Pay Item Pay Unit 645.14 Special Work No. 1: Lump Sum
Relocate Sign Pylon
HIGHWAY Division: Filename:...\HIGHWAY\MSTA\006_Estimate.dgnUsername:Date:12/22/2014 Jonathan.FrenchE
ST
IM
AT
ED
QU
AN
TIT
IE
S
IT
EM
NO
.Q
UA
NT
ITY
DE
SC
RIP
TIO
NU
NIT
DESIGN-DETAILED
BYDATE PROJ. MANAGER SH
EE
T N
UM
BE
R
FIELD CHANGES
REVISIONS 1
REVISIONS 2
REVISIONS 3
REVISIONS 4
CHECKED-REVIEWED OFDESIGN2-DETAILED2
DESIGN3-DETAILED3
WIN
HIGHWAY PLANS
DEPARTMENT OF TRANSPORTATION
STATE OF MAINE
DATE
SIGNATURE
P.E. NUMBER
ESTIMATED QUANTITIES
EA
RT
HW
OR
K S
UM
MA
RY
ES
TIM
AT
ED
QU
AN
TIT
IE
S
IT
EM
NO
.Q
UA
NT
ITY
DE
SC
RIP
TIO
NU
NIT
_____
6
STP-2021(600) 57
20216.00
WEST GARDINER
EXIT 102\ROUTE 9__________
______
______
______
______
______
______
______ ______
J. FRENCHBT TRAN
________________________
________________________
______
______
R. MOULTON
824.3
2
82
3.3
33
1
65
9.1
0
658.2
0
111
82
5
EA
EA
LS
SY
LS
EA
HR
CD
SF
EA
EA
SF
LB
SF
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
LS
HR
HR
HR
HR
LF
EA
EA
EA
EA
LF
LF
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
SY
UN
UN
CY
SY
CY
LF
LF
LF
EA
EA
LF
LF
EA
EA
EA
EA
LF
LF
EA
EA
EA
EA
EA
GP
LF
LF
CY
CYTGTTTTCY
CY
CY
SY
SY
EA
16
6100
12
5
920
75
50
420
7700
12
50
3113210
136111
15110
15
15
20
16200
17110
15
1150
20
48
48
48
12
84
12
108
4
22
00
13375
47
47
590
27
5
38
131
569
24
04
44
24
6
25
6
1341
31
2.5
1120
111614
512
20
12
5
40
25
0
320
72
0
115
72
5
10
00
66
25
650
8670
67
57
5
3
TE
MP
OR
AR
Y S
OIL
ER
OS
ION
AN
D W
AT
ER
PO
LL
UT
ION
CO
NT
RO
L
PO
RT
AB
LE
CH
AN
GE
AB
LE
ME
SS
AG
E S
IGN
FL
AG
GE
R
MA
INT
EN
AN
CE
OF
TR
AF
FIC
CO
NT
RO
L D
EV
ICE
S
CO
NS
TR
UC
TIO
N S
IGN
S
CO
NE
DR
UM
RE
G., W
AR
N., C
ON
FIR
MA
TIO
N A
ND
RT
E M
AR
KE
R A
SS
EM
BL
Y S
IGN
S T
YP
E I
I
ST
EE
L H
-BE
AM
PO
LE
S
RO
AD
SID
E G
UID
E S
IGN
S,
TY
PE
I
BR
EA
KA
WA
Y D
EV
ICE
S M
UL
TI-
PO
LE
SP
EC
IAL
WO
RK
NO
1:
RE
LO
CA
TE
M.T
.A.
SIG
N P
YL
ON
RE
INS
TA
LL
RE
G.,
WA
RN
., C
ON
FIR
MA
TIO
N A
ND
RT
E M
AR
KE
R A
SS
EM
BL
Y S
IGN
RE
INS
TA
LL
GU
IDE
SIG
N
DE
MO
UN
T P
OL
E
DE
MO
UN
T R
EG
., W
AR
N.,
CO
NF
IRM
AT
ION
AN
D R
TE
MA
RK
ER
AS
SE
MB
LY
SIG
N
DE
MO
UN
T G
UID
E S
IGN
FIE
LD
OF
FIC
E T
YP
E B
CO
NV
EN
TIO
NA
L L
IGH
T S
TA
ND
AR
D
LE
D L
UM
INA
RIE
S
HIG
HW
AY
LIG
HT
ING
CH
AIN
SA
W R
EN
TA
L (
INC
LU
DIN
G O
PE
RA
TO
R)
TR
UC
K -
LA
RG
E (
INC
LU
DIN
G O
PE
RA
TO
R)
AL
L P
UR
PO
SE
EX
CA
VA
TO
R (
INC
LU
DIN
G O
PE
RA
TO
R)
HA
ND
LA
BO
R, S
TR
AIG
HT
TIM
E
TE
MP
OR
AR
Y 4
IN
CH
PV
MT
. M
AR
K L
INE
, W
OR
YE
LL
OW
RE
MO
VE
OR
MO
DIF
Y C
ON
CR
ET
E F
OU
ND
AT
ION
CO
NT
RO
LL
ER
CA
BIN
ET
FO
UN
DA
TIO
N
30 I
NC
H D
IAM
ET
ER
, 8 F
T O
R L
ES
S F
OU
ND
AT
ION
24
IN
CH
FO
UN
DA
TIO
N
NO
N-M
ET
AL
LIC
CO
ND
UIT
ME
TA
LL
IC C
ON
DU
IT
DE
CID
UO
US
SH
RU
BS
(2
FO
OT
- 3
FO
OT
) G
RO
UP
B
DE
CID
UO
US
SH
RU
BS
(1
8 I
NC
H -
24
IN
CH
) G
RO
UP
A
DE
CID
UO
US
SH
RU
BS
(12"-1
8"C
AL
.) G
RO
UP
A
DW
AR
F E
VE
RG
RE
EN
S (
3 F
OO
T -
3.5
0 F
OO
T)
GR
OU
P C
DW
AR
F E
VE
RG
RE
EN
S (
18 I
NC
H -
24 I
NC
H)
GR
OU
P C
DW
AR
F E
VE
RG
RE
EN
S (
15 I
NC
H -
18 I
NC
H)
GR
OU
P B
DW
AR
F E
VE
RG
RE
EN
S (
15
IN
CH
- 1
8 I
NC
H)
GR
OU
P A
LA
RG
E D
EC
IDU
OU
S T
RE
E (
3 I
NC
H -
3.5
0 I
NC
H C
AL
IPE
R)
GR
OU
P C
PL
UG
/ S
TA
RT
ER
PL
AN
T
EV
ER
GR
EE
N T
RE
ES
(6 F
OO
T -
8 F
OO
T)
GR
OU
P A
EV
ER
GR
EE
N T
RE
ES
(5 F
OO
T -
6 F
OO
T)
GR
OU
P C
EV
ER
GR
EE
N T
RE
ES
(4 F
OO
T -
5 F
OO
T)
GR
OU
P A
ER
OS
ION
CO
NT
RO
L G
EO
TE
XT
ILE
MU
LC
H
SE
ED
ING
ME
TH
OD
NU
MB
ER
1
LO
AM
ER
OS
ION
CO
NT
RO
L B
LA
NK
ET
PL
AIN
RIP
RA
P
CU
RB
TY
PE
5 -
CIR
CU
LA
R
CU
RB
TY
PE
5 -
TR
UC
K A
PR
ON
CU
RB
TY
PE
5
CU
RB
TR
AN
SIT
ION
SE
CT
ION
B T
YP
E 1
TE
RM
INA
L C
UR
B T
YP
E 1
- 4
FO
OT
VE
RT
ICA
L C
UR
B T
YP
E 1
- C
IRC
UL
AR
VE
RT
ICA
L C
UR
B T
YP
E 1
TA
NG
EN
T G
UA
RD
RA
IL T
ER
MIN
AL
UN
DE
RD
RA
IN D
EL
INE
AT
OR
PO
ST
RE
FL
EC
TO
RIZ
ED
FL
EX
IBL
E G
UA
RD
RA
IL M
AR
KE
R
TE
RM
INA
L E
ND
- S
ING
LE
RA
IL -
GA
LV
AN
IZE
D S
TE
EL
GU
AR
DR
AIL
TY
PE
3C
- S
ING
LE
RA
IL
6 I
NC
H U
ND
ER
DR
AIN
TY
PE
B
CA
TC
H B
AS
IN T
YP
E F
6-C
AD
JU
ST
ING
MA
NH
OL
E O
R C
AT
CH
BA
SIN
TO
GR
AD
E
CA
TC
H B
AS
IN T
YP
E C
1
CA
TC
H B
AS
IN T
YP
E B
1-C
CA
TC
H B
AS
IN T
YP
E A
1-C
CO
NC
RE
TE
PIP
E T
IES
15
IN
CH
RE
INF
OR
CE
D C
ON
CR
ET
E P
IPE
CL
AS
S I
II
15 I
NC
H C
UL
VE
RT
PIP
E O
PT
ION
I
ST
RU
CT
UR
AL
CO
NC
RE
TE
RO
AD
WA
Y T
RU
CK
AP
RO
N
ST
RU
CT
UR
AL
CO
NC
RE
TE
RO
AD
WA
Y M
ED
IAN
TE
MP
OR
AR
Y P
AV
EM
EN
T
BIT
UM
INO
US
TA
CK
CO
AT
- A
PP
LIE
D
HO
T M
IX A
SP
HA
LT
12
.5 M
M B
AS
E
HO
T M
IX A
SP
HA
LT
9.5
MM
HM
A (
SID
EW
AL
KS
, D
RIV
ES
, IN
CID
EN
TA
LS
)
12
.5 M
M P
OL
YM
ER
MO
DIF
IED
HO
T M
IX A
SP
HA
LT
HO
T M
IX A
SP
HA
LT
19
.0 M
M H
MA
AG
GR
EG
AT
E B
AS
E C
OU
RS
E -
TY
PE
B
GR
AV
EL
BO
RR
OW
CO
MM
ON
EX
CA
VA
TIO
N
RE
MO
VIN
G P
AV
EM
EN
T S
UR
FA
CE
RE
MO
VIN
G B
ITU
MIN
OU
S C
ON
CR
ET
E P
AV
EM
EN
T
RE
MO
VIN
G M
AN
HO
LE
OR
CA
TC
H B
AS
IN
656.7
5
65
2.4
1
652.3
8
652.3
6
652.3
5
652.3
4
652.3
3
645.2
92
64
5.2
89
64
5.2
51
645.1
62
64
5.1
4
645.1
16
645.1
13
645.1
08
645.1
06
645.1
03
63
9.1
9
634.2
10
63
4.2
04
2
63
4.1
6
631.1
8
631.1
72
631.1
2
62
9.0
5
62
7.7
8
626.3
6
626.3
5
626.3
3
626.3
2
626.2
2
626.2
1
62
1.5
47
62
1.5
4
62
1.5
31
62
1.4
15
621.3
97
62
1.3
9
62
1.3
89
621.2
87
62
1.1
01
62
1.0
43
62
1.0
39
62
1.0
31
620.5
8
61
9.1
20
1
61
8.1
3
61
5.0
7
613.3
19
61
0.0
8
60
9.3
5
609.3
41
60
9.3
4
60
9.2
6
609.2
34
60
9.1
2
60
9.1
1
606.8
1
606.3
56
606.3
53
60
6.2
65
60
6.2
3
605.0
9
60
4.2
49
60
4.1
8
60
4.1
1
604.0
92
604.0
72
60
3.5
5
60
3.1
65
603.1
6
50
2.3
42
50
2.3
41
461.1
31
40
9.1
5
40
3.2
13
40
3.2
09
40
3.2
08
1
40
3.2
07
30
4.1
5
203.2
6
203.2
0
20
2.2
02
202.2
0
202.1
5
ESTIMATE ITEM CHANGES12/22/14
* U
ND
ET
ER
MIN
ED
LO
CA
TIO
NS
RE
MO
VE
/RE
SE
T H
YD
RA
NT
RE
MO
VE
AN
D R
ES
ET
GA
TE
VA
LV
E A
ND
BO
X
MO
BIL
IZA
TIO
N
AC
RY
LIC
LA
TE
X C
OL
OR
FIN
ISH
, G
RE
EN
-5
0.4
’
HIGHWAY Division: Filename:...\MSTA\043_XSECT_23+60_008.dgnUsername:Date:12/18/2014 Jonathan.French
DESIGN-DETAILED
BYDATE PROJ. MANAGER SH
EE
T N
UM
BE
R
FIELD CHANGES
REVISIONS 1
REVISIONS 2
REVISIONS 3
REVISIONS 4
CHECKED-REVIEWED OFDESIGN2-DETAILED2
DESIGN3-DETAILED3
HIGHWAY PLANS
DEPARTMENT OF TRANSPORTATION
STATE OF MAINE
DATE
SIGNATURE
P.E. NUMBER
CROSS SECTIONS
20
5
210
215
220
225
05
10
15
20
25
30
35
40
45
50
55
60
65
70
-5
-10
-15
-2
0-2
5-30
-35
-40
-45
-50
-55
-60
-65
-70
23
+7
5.0
0
20
5
210
215
220
225
05
10
15
20
25
30
35
40
45
50
55
60
65
70
-5
-10
-15
-2
0-2
5-30
-35
-40
-45
-50
-55
-60
-65
-70
20
5
210
215
220
225
05
10
15
20
25
30
35
40
45
50
55
60
65
70
-5
-10
-15
-2
0-2
5-30
-35
-40
-45
-50
-55
-60
-65
-70
24+
00.0
0
20
5
210
215
220
225
05
10
15
20
25
30
35
40
45
50
55
60
65
70
-5
-10
-15
-2
0-25
-30
-35
-40
-45
-5
0-5
5-60
-65
-70
Sta
. 23+
60.0
0 t
o S
ta. 24+
00.0
0
C LC L
C L
C L
C LC L
C LC L
C L
C L
EX
IST
. S
TR
EE
T L
IGH
T
ST
A. 23+
63.8
2
2:1
-4:1
-1.9
%-1.9
%-2.0
%
2:1
-4:1
-1.8
%-2.0
%
-1.9
%-3.3
%
-1.8
%-1.9
%
-59.7
’
-6
6.3
’
50.8
’
43
.4’
21
0.8
7
51
.9’
210.7
6
56
.1’
6"
212.2
8
6"
211.7
0
6"
21
1.9
5
61.8
5’ L
T.
21
6.7
7
8.5
’
21
6.7
6
6.2
’
216.4
6
6.7
’
216.4
4
7.2
’
20
5
210
215
220
225
0-5
-10
-15
-2
0-2
5-30
-35
-40
-45
-50
-55
-60
-65
-70
23
+6
0.0
0
20
5
210
215
220
225
0-5
-10
-15
-2
0-2
5-30
-35
-40
-45
-5
0-5
5-60
-65
-70
-2.0
%
6
"
21
1.9
0
6"
21
1.4
4
IN
ST
AL
L 6
" x
32
’ U
D T
YP
E B
OU
TL
ET
TO
ST
A. 2
3+
85
.17
, 3
0.8
’ L
T. (E
LE
V =
21
2.2
0)
ST
A. 23+
60.0
0, 49.4
’ L
T
IN
ST
AL
L 6
" x
10
7.0
’ U
D T
YP
E B
(E
LE
V =
212.7
4) (
RT
E. 9/1
26 E
AS
T)
TO
ST
A.
34
+5
2.4
0,
43
.3’ R
T.
ST
A. 23+
85.1
7, 30.8
’ L
T. (E
LE
V =
212.2
0)
F =
83
.8 C
Y
C =
93.3
CY
F =
75
.5
C =
83
.2 C
Y
_____
STP-2021(600) 57
20216.00
WEST GARDINER
EXIT 102\ROUTE 9__________
______
______
______
______
______
______
______
______
______ ______
J. FRENCHBT TRAN
________________________
________________________
______
______
R. MOULTON
WIN
43
20
5
210
215
220
225
05
10
15
20
25
30
35
40
45
50
55
60
65
70
-5
-10
-15
-2
0-2
5-30
-35
-40
-45
-50
-55
-60
-65
-70
24+
25.0
0
20
5
210
215
220
225
05
10
15
20
25
30
35
40
45
50
55
60
65
70
-5
-10
-15
-2
0-2
5-30
-35
-40
-45
-5
0-5
5-60
-65
-70
C L
C LC L
C LC L
2:1
-3:1
-1.7
%-1.7
%-1.5
%-1.5
%-1.6
%-1
.0%
-1.6
%-1
.0%
-6
9.2
’
45.0
’
210.6
4
60.7
’6
"
21
2.4
1
6"
212.2
1
EX
IST
. 1
8" R
CP
ST
A.
24
+1
3.3
8,
28
.77
’ R
T.
ST
A. 24+
14.5
4, 42.2
1’
LT
. T
O
217.0
9
12
.5’
217.1
1
8.5
’
HIGHWAY Division: Filename:...\MSTA\044_XSECT_24+25_009.dgnUsername:Date:12/18/2014 Jonathan.French
DESIGN-DETAILED
BYDATE PROJ. MANAGER SH
EE
T N
UM
BE
R
FIELD CHANGES
REVISIONS 1
REVISIONS 2
REVISIONS 3
REVISIONS 4
CHECKED-REVIEWED OFDESIGN2-DETAILED2
DESIGN3-DETAILED3
HIGHWAY PLANS
DEPARTMENT OF TRANSPORTATION
STATE OF MAINE
DATE
SIGNATURE
P.E. NUMBER
CROSS SECTIONS
Sta
. 24+
25.0
0 t
o S
ta. 24+
25.0
0
_____
STP-2021(600) 57
20216.00
WEST GARDINER
EXIT 102\ROUTE 9__________
______
______
______
______
______
______
______
______
______ ______
J. FRENCHBT TRAN
________________________
________________________
______
______
R. MOULTON
RE
MO
VE
WIN
44