automation systems & it within intel s high volume

19
Automation Systems & IT Automation Systems & IT within Intel within Intel s High Volume s High Volume Manufacturing Manufacturing 2006 MIT Manufacturing Summit 2006 MIT Manufacturing Summit Bimal Dey / Anthony Maggi Bimal Dey / Anthony Maggi

Upload: others

Post on 18-Dec-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Automation Systems & IT Automation Systems & IT within Intelwithin Intel’’s High Volume s High Volume

ManufacturingManufacturing

2006 MIT Manufacturing Summit2006 MIT Manufacturing SummitBimal Dey / Anthony MaggiBimal Dey / Anthony Maggi

2

AGENDAAGENDA

IntelIntel’’s Manufacturing Environment s Manufacturing Environment Automation Drivers/DomainsAutomation Drivers/DomainsFocus Topic: Automated Focus Topic: Automated MatMat’’ll Handling Handling Focus Topic: Process Control SystemsFocus Topic: Process Control Systems

3

Environment: Highly GlobalEnvironment: Highly Global

IrelandIrelandFab 14/24Fab 14/24

IsraelIsraelFab 8/18/28Fab 8/18/28

OregonOregonDev D1C/D1DDev D1C/D1D

Fab 15/20Fab 15/20

CaliforniaCaliforniaDev D2Dev D2

ColoradoColoradoFab 23Fab 23

ArizonaArizonaFab12/22/32 Fab12/22/32

New MexicoNew MexicoFab 7/11/11XFab 7/11/11X

Mass.Mass.Fab 17Fab 17

Costa RicaCosta RicaSan Jose A/TSan Jose A/T

A/T DevA/T DevMalaysiaMalaysia

Penang A/TPenang A/TKulim A/TKulim A/T

ChinaChinaPudong/ChenduPudong/Chendu A/TA/T

PhilippinesPhilippinesManila A/TManila A/TCavite A/TCavite A/T

WashingtonWashingtonSystems MfgSystems Mfg

Board MfgBoard Mfg

Kulim Board/Module MfgKulim Board/Module MfgBrazilBrazil

SubSub--con Mfg.con Mfg.

ThailandThailandSubSub--con Mfgcon MfgVietnamVietnam--ATAT

SubSub--con Mfgcon Mfg

TaiwanTaiwanSubSub--con Mfgcon Mfg

SubSub--con Mfgcon MfgWafer FabWafer Fab

Systems/Sub-conSystems/Sub-conAssembly/TestAssembly/Test

Challenge: Deploy CE! IT capabilities across the globe

4

Manufacturing Environment Vectors Manufacturing Environment Vectors 18 month18 month

cyclescyclesGlobalGlobal

dispersion

Cost of Cost of excursionsexcursions

Automation Automation reliabilityreliability

Computing Computing securitysecurity

TechnologiesTechnologies

Supply Supply chainchainoptimizationoptimization

AffordabilityAffordabilitydispersion

Quality Quality expectationsexpectations

CompetitiveCompetitivechallengeschallenges

Each are drivers as well as opportunities for IT

5

IT Infrastructure Challenges in MfgIT Infrastructure Challenges in Mfg

Environmental vectors are confound by key Environmental vectors are confound by key challenges includingchallenges including……

ComplexityComplexityExploitation of security vulnerabilitiesExploitation of security vulnerabilitiesExplosive usage growth of products and Explosive usage growth of products and servicesservices

Equates to continued cost pressures

6

AGENDAAGENDA

IntelIntel’’s Manufacturing Environments Manufacturing EnvironmentAutomation Drivers/DomainsAutomation Drivers/DomainsFocus Topic: Automated Focus Topic: Automated MatMat’’ll Handling Handling Focus Topic: Process Control SystemsFocus Topic: Process Control Systems

7

Key Automation Drivers for MfgKey Automation Drivers for Mfg

WIP Matched to Current Needs

Error free processing

Rapid Factory Cycle Time

Optimized Space Management

High Equipment Availability & Utilization

Rapid New Product Switch over

Zero set up time

Higher People ProductivityLot size reduction

8

AGENDAAGENDA

IntelIntel’’s Manufacturing Environments Manufacturing EnvironmentAutomation Drivers/DomainsAutomation Drivers/DomainsFocus Topic: Automated Focus Topic: Automated MatMat’’ll Handling Handling Focus Topic: Process Control SystemsFocus Topic: Process Control Systems

9

Automation/IT role in 300mm MfgAutomation/IT role in 300mm Mfg

Com

mun

icat

ion

Bus

OHT

Process Equipment

Process Equipment

Litho Etch Films

Thermal Planar Metrology

Remote Command Centers

100% AMHS

AutomatedDispatching

Yield Analysis

CYBER SECURITY

Remote Diagnostics

Wafer/Unit Trace

New MES

Pervasive FDC / SPC

Run to Run Control with APC

Framework

Tool Reliability Tracking

Factory Wide User Interfaces

Real Time Tool View

Scheduler /Dispatcher

Information Bus

ReticleTracking

Manufacturing ExecutionSystem (MES)

ExecutionControl (EC)

AMHS ComponentsAMHS Components

Process Equipment I/F’s

E-5-SECS IIE-30-GEME-37 HSMSE-87 Carrier MgmtE-90 Substrate TrackingE-40 Process Job MgmtE-84 Parallel I/O for

OHVE-94 Control Job Mgmt

Process or MetrologyEquipment

ToolEmbeddedController

OHV

FOUP

Station Controllers

Interbaytransport

AMHS Equipment I/F’sE5 SECS IIE30 GEME37 HSMS

StockerEquipment

Interbaycontroller

Intrabaycontroller

Material ControlSystem (MCS)

E82 IBSEME84 Parallel I/OE88 Stocker SEM

Key Points:1. Production Equipment standards and capabilities

were Critical to achieving 100% Intrabay Automation

2. AMHS Standards enable mix and match of supplier tools to get Best In Class equipment

3. Major time focus was spent integrating software capabilities with Production and AMHS Equipment

4. All in-line process and metrology equipment must be [and has been] connected to the AMHS

11

300mm Automation 300mm Automation –– Fully IntegratedFully Integrated

Goal: Direct Tool to Tool WIP Goal: Direct Tool to Tool WIP Movement without human Movement without human

interventionintervention

F11x F11x 2.6miles of track2.6miles of track

12

Remote Operations Center in F11xRemote Operations Center in F11x

AMHS SummaryAMHS Summary

Intel has achieved 100% Integrated Intrabay Intel has achieved 100% Integrated Intrabay AMHS in its 300mm FabsAMHS in its 300mm Fabs100% integrated intrabay could not have been 100% integrated intrabay could not have been achieved in the same timeframe without open achieved in the same timeframe without open industry standards industry standards Rapid throughput AMHS transport systems are Rapid throughput AMHS transport systems are needed to meet demanding lot cycle times, fast needed to meet demanding lot cycle times, fast run rate production equipment, and complex run rate production equipment, and complex process technology scenariosprocess technology scenariosFuture capabilities are planned to extend the Future capabilities are planned to extend the current technology to fully (near 100%) current technology to fully (near 100%) automated decision making for intrabay automated decision making for intrabay scheduling and dispatchingscheduling and dispatching

14

Process Control SystemsProcess Control Systems

Automated Process Control (On Line)Automated Process Control (On Line)

Fault Detection Systems (On Line)Fault Detection Systems (On Line)

Statistical Process Control Systems (Off Statistical Process Control Systems (Off Line)Line)

15

Overview of Process Control SystemsOverview of Process Control SystemsTypical Usage of Process Control at a Process ToolTypical Usage of Process Control at a Process Tool

MetrologyEquipment

UI

ProcessEquipment

UI

MetrologyEquipment

Step N-1 Step N+1Step N

UI

FDC – Monitor equipment event and time series data. Stop tool when ranges or profiles are exceededPervasive Implementation

SPC – Monitor statistical data and stop the tool if trending to OOC100% of the Fab

Essential Data standards include SEMI E40, E94, E90 for wafer level control & tracking

Sensors – Use 3rd

party and embedded sensors to provide FDC & R2R APC dataVarious % - Decision is based on problem being solved

Run to Run APC - Use feedback and feed forward metrology and sensor data to adjust processing at the lot and wafer level. Drive for multi-step control.Various % - Decision is based on problem being solved

16

200mmGen 1

200mm Wafers1st Generation

(1993)

Cap

abili

ty a

nd E

ffici

ency

200mmGen 3

• Factory wide systems & usage of SPC & FDC

• Point Solutions for Run to Run APC

• Basic FDC & APC Control & Yield Analysis

300mmGen 4

200mm Wafers3rd Generation

(1999)

300mm Wafers4th Generation

(2007)

300mm Wafers2nd Generation

(2006)

• Point solutions for SPC spread across the factory

• Ad hoc and limited FDC and Run to Run APC Control Systems

• Rudimentary Control Analytics

300mmGen 2

• Factory wide systems & usage of SPC & FDC

• Maturing FDC & APC Control Analytics

• Reusable Run to Run APC Framework with litho coverage

• Advanced Yield Analysis and Analytics

• Factory wide systems and usage of PCS (SPC + FDC + APC)

• Advanced FDC & APC Control Analytics

• Advanced Yield Analysis and Analytics moving toward predictive models

Evolution of Intel Process ControlEvolution of Intel Process Control

Time axis

17

SUMMARYSUMMARYHigh Volume manufacturing in Semi High Volume manufacturing in Semi industry presents many unique industry presents many unique challengeschallengesAdvances in AMHS and PCS has been Advances in AMHS and PCS has been key to addressing some of these key to addressing some of these challengeschallengesContinued advances needed in these Continued advances needed in these two areas to keep pace with the two areas to keep pace with the ““MooreMoore’’s laws law”” and rapid pace of the and rapid pace of the Semi technologySemi technology

18

QuestionsQuestions

ReferencesReferencesJ. Wu, O. Rozmarin and B. Li, J. Wu, O. Rozmarin and B. Li, ““A Flexible Execution Control Framework for A Flexible Execution Control Framework for 300mm Factory Automation300mm Factory Automation”” in Semiconductor Manufacturing, 2003in Semiconductor Manufacturing, 2003Nimish Shah , Nimish Shah , ““ASMC Keynote Presentation 2005 ASMC Keynote Presentation 2005 ““E. Bass, D. Pillai, J. Dempsey, E. Bass, D. Pillai, J. Dempsey, ““300mm Full300mm Full--Factory Simulations for 90nm Factory Simulations for 90nm and 65nm IC Manufacturingand 65nm IC Manufacturing”” in Proceedings of the International Symposium in Proceedings of the International Symposium of Semiconductor Manufacturing (ISSM), 2003of Semiconductor Manufacturing (ISSM), 2003B. Li and J. Wu, B. Li and J. Wu, ““Factory Throughput Improvement Through Intelligent Factory Throughput Improvement Through Intelligent Integrated Delivery in 300mm Wafer ManufacturingIntegrated Delivery in 300mm Wafer Manufacturing”” in Proceedings of the in Proceedings of the International Symposium of Semiconductor Manufacturing (ISSM), 2International Symposium of Semiconductor Manufacturing (ISSM), 2003003J. Wu and R. Madson, J. Wu and R. Madson, ““APF in IntelAPF in Intel’’s 300mm Execution Control Strategys 300mm Execution Control Strategy”” in in Brooks Worldwide Automation and Performance Symposium, 2002Brooks Worldwide Automation and Performance Symposium, 2002J. Pettinato and M. Honma, J. Pettinato and M. Honma, ““Factory Integration RoadmapFactory Integration Roadmap”” at the at the International Technology Roadmap for Semiconductors (ITRS) ConfeInternational Technology Roadmap for Semiconductors (ITRS) Conference, rence, 20022002B. Sohn, D. Pillai, N. Acker, B. Sohn, D. Pillai, N. Acker, ““300mm Factory Design for Operational 300mm Factory Design for Operational EffectivenessEffectiveness””, IEEE/ASMC Conference, SEMICON , IEEE/ASMC Conference, SEMICON EuropaEuropa, Munich, , Munich, Germany, April 2000eGermany, April 2000e