    Anacostia Waterfront Initiative Transportation Master Plan UpdateInformational Meeting Thursday, December 12, 2013

    Welcome

    Welcome to the District Department of Transporta ons Anacos a Waterfront Ini a ve (AWI) Transporta on Master Plan UpdateInforma onal Mee ng.

    The Master Plan serves as our roadmap for coordina ng all of the projects and ini a ves already being planned, designed andconstructed within the AWI Program area. The plan helps us to minimize construc on impacts on you -- our residents, businessesand other important stakeholders and also advance these important projects as quickly and efficiently as possible.

    Tonights mee ng is intended to share with you the progress we have made and the projects and ini a ves being included in thenext Master Plan update currently being completed.

    The mee ng is being conducted in two parts: 1) a short overview presenta on about the Master Plan and 2) an Open House to allowyou to learn more about the DDOT transporta on projects and other major partnering agency ini a ves being coordinated andincluded in the next Master Plan update.

    Master Plan Corridors

    In keeping with the Master Plan update, the Open House dividesthe program area into six corridors and also accounts for variousprogram area-wide and partnering agency projects and ini a ves.The six corridors are:

    South Capitol Street Corridor Suitland Parkway Corridor Middle Anacos a Crossings Corridor Kenilworth Corridor M Street SE/SW Corridor Anacos a Riverwalk Trails Staff represen ng projects in each of the corridors will answeryour ques ons and add you to their contact lists for futureupdates and informa on.

    More Informa on

    The Anacos a Waterfront Ini a ve (AWI) is a 30-year, $10 billionseries of transporta on, environmental, economic, communityand recrea on projects that are transforming the shores of theAnacos a River into a world-class waterfront. The AWI Programarea stretches from the Tidal Basin to the citys northeast borderwith Maryland. For more informa on about DDOTs AWI Program,go to www.anacos awaterfront.org.

    To ask ques ons, comment or be added to the AWI communitycontact list, please email [email protected] or call 202-741-8528.

    AWI Transporta on Master Plan Corridors

  • 8/13/2019 AWI MasterPlan Public Meeting Handout 12/12/13

    2/5

    Completed

    Completed

    Design

    Design

    Completed

    Design

    1

    2

    3

    4

    5

    6

    Projects Status

    Frederick Douglass MemorialBridge RehabilitationBallpark Roadways (2008

    Near Term Improvements)South Capitol Street Phase 1(Segments 1 and 2)South Capitol Street Phase 2(Segments 4 and 5)I-295/Malcolm X BridgeRehabilitationI-295/Malcolm X Interchange

    Planning

    Design

    Completed

    Design

    1

    2

    3

    4

    Projects Status

    Suitland Parkway Pedestrian/-Bike TrailSouth Capitol Street Phase 2 -Segment 3Martin Luther King, Jr. AvenueTwo-Way ReconstructionMartin Luther King, Jr. AvenueTwo-Way Widening

    South Capitol Street Corridor

    Suitland Parkway Corridor

    anacostiawaterfront.org

  • 8/13/2019 AWI MasterPlan Public Meeting Handout 12/12/13

    3/5

    EnvironmenDocumentatCompleted

    Design

    Completed

    Completed

    UnderConstructionEnvironmenDocumentatEnvironmenDocumentat

    1

    2

    3

    4

    5

    7

    8

    6

    Projects StatusPennsylvania & Potomac Ave SEIntersectionPennsylvania Ave & DC 295Entrance Ramp ImprovementsPennsylvania Ave & Minnesota Ave IntersectionPedestrian Bridge: Anacostia HSto Anacostia Park11th Street Bridge Project -Phase 111th Street Bridge Project -Phase 2Barney Circle and SoutheastBoulevardVirginia Avenue/CSX NationalGateway - 12th Steet SE

    Middle Anacosta Crossings Corridor

    Kenilworth Corridor

    Completed

    Completed

    Planning

    Planning

    Completed

    Planning

    Design

    Design

    1

    2

    3

    4

    5

    7

    8

    6

    Projects StatusKenilworth Corridor Near -Term ImprovementsNannie Helen BurroughsInterchange

    East Capitol Street Interchange

    Benning Road Interchange

    Eastern Avenue Interchange

    Kenilworth Avenue MainlineImprovements

    Parkside Pedestrian Bridge

    DC 295/Kenilworth Pedestrian

    Bridges

    anacostiawaterfront.org

  • 8/13/2019 AWI MasterPlan Public Meeting Handout 12/12/13

    4/5

  • 8/13/2019 AWI MasterPlan Public Meeting Handout 12/12/13

    5/5

    1Projects Status

    AWI-Wide Projects

    Planning, Design and ConstructionDC Streetcar 2 PlanningWater Taxi3 PlanningSoccer Stadium4 DesignSt. Elizabeths East Infrastructure5 Environmental Documentation14th Street Bridge Improvements6 Design and ConstructionDC Water Clean Rivers/CSO Project7 Environmental Documentation Anacostia Park Master Plan8 Environmental DocumentationLong Bridge Study

    Design and Construction AWI Master Drainage PlanDesign and ConstructionPrivate Development