Egypt Experience with Absorption Chillers (Dr. Awn)
KAWASAKI Absorption Chiller (Eng. Murai)
October 20072
PRESENTATION OF KTEPRESENTATION OF KTEABSORPTION CHILLERABSORPTION CHILLER
October, 2007Kawasaki Thermal Eng.Co.,Ltd.
Rolling Stock & Construction Machinery
Consumer Products & MachineryAerospace Gas Turbine &
Machinery
Kawasaki Shipbuilding Corporation
Kawasaki Thermal Engineering Co., Ltd.
Continuous Efforts for Higher COPCOP(Coefficient of Performance) = Cooling Capacity /LHV Heat Input
World First
year
0.6
0.8
1
1.2
1.4
1.6
1.8
2
1965 1970 1975 1980 1985 1990 1995 2000 2005
CO
P
1968
1976
1983
1992
2000
2005
Double-Effect D.F.C.
Double-Effect D.F.C.
COP: 0.83COP: 0.83
Double-Effect D.F.C.
“J Series”
Double-Effect D.F.C.
“J Series”
COP: 1.04COP: 1.04
Double-Effect D.F.C.
“L Series”
Double-Effect D.F.C.
“L Series”
COP: 1.19COP: 1.19
Double-Effect D.F.C.
“SigmaChil Series”
Double-Effect D.F.C.
“SigmaChil Series”
COP: 1.22COP: 1.22
World top class energy efficiency Double-Effect
D.F.C. “Sigma Ace Series”
World top class energy efficiencyDouble-Effect
D.F.C. “Sigma Ace Series”
COP: 1.42COP: 1.42
Triple-EffectD.F.C.
Triple-EffectD.F.C.
COP: 1.78COP: 1.78
Double-EffectS.F.C. 1964
World First
1959
World First
Single-EffectS.F.C.
S.F.C.=Stem Fired ChillerD.F.C.=Direct Fired Chiller
Japan First
★
PRINCIPLE OF ERECTRIC CHILLERS AND ABSORPTION CHILLERS
ERECTRIC ABSORPTION
Condenser
Evaporator
Compressor
Chilled Water
Cooling Water Electric
Motor
Generator
Gas or Oil or Steam etc…
Absorber(LiBr)
Cooling Water
Solution Pump
Condenser
Evaporator
High PressureVacuum290 kPa 0.87 kPa
Qi2
12℃
7℃
Q01
32℃
37℃
HFC-134a
1000kPa
Q01 37℃
Qi2
12℃
7℃
32℃
Qi1
Q01
Qi1
COP = Qi1
Qi2 = Heat InputCooling Capacity
Chilled Water
8kPa
Refrigerant/Absorber ○ Water/LiBr × Freon/-----
Cooling ○ ○
Heating ○ ×
Fuel
Running Cost
Operating Pressure
Performance at Partial Load ◎ ×
Vacuum condition(0.87kPa)
High pressure(3,00kPa)
Absorption Electric
Depending on The Energy Cost of The Country
Natural Gas, Oil, Waste Heat,Steam, Any kind of Heat Electricity
Partial Load COP Curve
Load(%)100%50%0%
Partial Load COP Curve
Load(%)100%50%0%
Absorption Chillers are Suitable for Air-conditioning !
Water
HCFC-22
HCFC-123
HFC-134a HFC-407c HFC-410a
0
0.02
0.04
0.06
0.08
0 500 1000 1500 2000
地球温暖化係数(GWP)
オゾン層破壊係数
(ODP
)
指定フロン
代替フロン
Ozo
ne-D
eple
ting
Pote
ntial
(O
DP
)
Global Warming Potential (GWP)
Specified FreonReplacing Material of Freon
Characteristics of Various Types of Refrigerant
(ODP&GWP)
HCFC : Hydro Chloro Fluoro Carbon HFC: Hydro Fluoro Carbon
Refrigerant whose ozone Refrigerant whose ozone depleting potential is not depleting potential is not ““ZeroZero”” is regulated not to is regulated not to be produced by 2020.be produced by 2020.
Production of refrigerant Production of refrigerant whose global warming whose global warming potential is 500 will be potential is 500 will be regulated.regulated.
0
50
100
150
200
1972 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02
Project Operator152 Projects
90 Operators
(熱供給プラント)
電力・ガス・石油
冷暖房・給湯
煙突冷却塔
排熱・未利用エネルギー供給熱媒体 冷水・蒸気・温水
受入
地域導管
ヒートポンプまたは
ボイラ 冷凍機
熱供給プラント
設備User
Cooling/Heating
Pipe Line
Cooling/Heating Water, Steam
Plant
Boiler Chiller
Heat Pump
Power, Natural Gas
Oil, Waste Heat
District Cooling Project in Japan
Not use
Absorption
43%Absorption
57%
152 Project Executed
DHC Project in Japan
• Since the 1950s the electric chillers were widely used in Egypt (Carrier, Trane,…etc)
• Due to the great development and rise of economy in Egypt, hence the increasing demand of electricity, which forced the government to look for another energy substitute, Natural Gas.
• Therefore; absorption chillers were introduced in small scale in 1998, which followed by a great demand in the following years.
Why absorption chiller is used in Egypt
October 200714
Absorption Chillers Market Share in EgyptABSORPTION CHILLERS MARKET SHARE
3 5 8 10 12 15 20 3048
0102030405060
1999
2000
2001
2002
2003
2004
2005
2006
2007
YEARS
NU
MB
ER O
F U
NIT
S
October 200715
DESCRIPTION UnitA/C Water cooled
Absorption System Natural Gas
A/C Water cooled Conventional
System by electricity
Cooling capacity(Ton Refrigerant) TR 700 700
Chiller Elec. Consumption KW/hr 13 700
Operating system Natural Gas Electricity
Operating hours / year Hour 3000
Natural gas consumption m3/hr 179 0
Total energy cost LE/hr 95.3 193.5
Annual operating Cost LE 327,855 609,900
Total annual running cost LE 362,855 713,900
Saving In Energy Power % 51%
ENERGY COST ANALYSIS
1 US$ = 5.6 LEOctober 2007
17
DESCRIPTION UnitWater cooled
Absorption System Natural Gas
Conventional System by electricity
Cooling capacity TR 700 700Operating system Natural Gas Electricity Utilities tariffs:
a- Natural Gas LE/m3 0.25 0b- Electricity LE/KW 0.3 0.3c- Water LE/m3 1 1
Operating hours / year HourNatural gas consumption m3/hr 179 0Electricity consumption
a-Machine KW/hr 14 700b-Cooling Towers KW/hr 30 25c-Cooling Towers pumps KW/hr 160 125
Total electricity consumption KW/hr 204 850.0Energy cost
a-Natural gas LE/hr 44.8 0b- Diesel LE/hr 0 0c- Electricity LE/hr 61.2 255.0
Total energy cost LE/hr 106.0 255.0Cooling tower water consump m3/hr 1.5 1.2
Water cost LE/hr 1.5 1.2Hourly operating cost LE 107 256Annual operating Cost LE 322,425 768,600Annual maintenance cost including spare parts.
LE 40,000 80,000
Total annual running cost LE 362,425 848,600Major over-haul & replacements ** in 20 years
LE 700,000 920,000
Life cycle cost for 20 years LE 7,948,500 17,892,000Life cycle cost difference when using gas fired Absorption system in 20 years
LE 0 9,943,500
Annual operation cost difference when using gas fired Absorption system
LE 0 497,175
Saving In Electrical Power % 58%
Saving In Annual Operating Cost % 57%
** Major over-haul & replacements For absorption chiller needed every 20 yearsFor electric chiller needed every 10 years
3000
Taking into consideration that calculate only 50% from the Major over-haul and replacements needed for the electrical carrier A/C
Life Cycle Cost Analysis Comparison Between 1 unit 700 TR absorption system Natural Gas & 1 Unit 700TR conventiomal
system by electricity .
LIFE CYCLE COST ANALYSIS
1 US$ = 5.6 LEOctober 2007
18
Gas Chill Gas Chill District District Cooling Cooling
PlantPlant
PHASE I : 40,000 TR
PHASE II : 40,000 TR
TOTAL AREA ESTIMATED : 4,500,000 m2
CAIRO DISTRICT COOLING PROJECT
October 200719