aww2013: iwrm in karnataka, india: crafting a new future by d. satya murty

20
7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 1/20 IWRM in Karnataka, India: Crafting a new future D. Satya Murty – Principal Secretary, State Government of Karnataka Yasmin Siddiqi, Senior Water Resources Specialist, ADB Clive Lyle, Consultant

Upload: adbwaterforall

Post on 03-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 1/20

IWRM in Karnataka, India:Crafting a new future

D. Satya Murty – Principal Secretary, State Government of Karnataka

Yasmin Siddiqi, Senior Water Resources Specialist, ADBClive Lyle, Consultant

Page 2: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 2/20

Focus

• Karnataka Water Sector• Rationale

• Vision

• Program Design

•• Expected Benefits

2

Page 3: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 3/20

Karnataka – Leading IWRM

Page 4: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 4/20

Rationale

Projected Sector Water Demands in 2025 (Karnataka)

SectorWater Demand 2000 Water Demand 2025 Growth Rate per

Annum (%)Million m3 TMC Million m3 TMC

Agriculture31,431 1,110 38,397 1,356

0.80

1,647 58 2,594 92.

Industrial1,347 47 3,542 125

3.94

Power , , 0.84

Others1,497 53 5,987 211

5.70

4

Total37,419 1,321 52,366 1,849

1.36

Page 5: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 5/20

SWOT for Karnataka Water SectorStrengths

*

Weaknesses*

statements

* Accepts need for change

* Skilled technical workforce

 

* Limited coordination across agencies* Inadequate operational level linkages

* Rigid service systems* Actions to establish AC-IWRM

* Commitment of funds and donor support

* Leadership and support

* Less priority to better governance

Opportunities Threats

 * Central government support for key actions* Alignment of agri & irrigation plans & actions

* Adoption of new technology & systems

*

o ca ns a es* Change of key leaders & key drivers for change

* Resistance to change by lobby groups,

systems * Water crisis causing poor decisions

5

Page 6: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 6/20

State Vision for IWRM• Water resources

management• IWRM

• Water services delivery• Irrigation services

• Domestic water supply and

sanitation

•• Waste water management

• Other uses, fisheries, navigation,

tourism and multi-use systems

6

Page 7: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 7/20

• River and ecosystem health•

• Watershed mgmt & sedimentmanagement

• -

management objectives

• On-going initiatives• FAO support: capacity building + MASSCOTE

• WB support for hydrology project, watershed +rejuvenation of tank irrigation systems

• support to ooc et ana n m a.• WEF-WRG support to identify and analyse

options

• ra eg c mgm coor na on

7

Page 8: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 8/20

Sustainable 

Environmental 

Flow

• Meet requirements in 

low & high flows periods

• Cauvery tribunal 

awarded 10% of  flow for 

env ronmen

8

Page 9: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 9/20

IWRM Initiatives• Advance Centre for IWRM

 –  Budget speech 2011–12

• Advanced Centre for IWRM with financial assistance from the ADB.

• Merging WALMI, Dharwad+ KERC, Mysore+ CMO,Bangalore.

• 10 m $ to develop a model institute.

 –  u ge speec –

“ A centre of excellence for IWRM will be established with an objective to co-ordinate efforts for effective irrigation maintenance 

on efficient water management from storage to 

maintenance”.

9

Page 10: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 10/20

Budget 

Speech 

2013‐

2014• Budget allocation for irrigation of  $2.0 billion

• Priorit   for IWRM: first time in India

• Policies & procedures : formulation in progress and required MOUs 

with national/international agencies 

• ADB financed IWRM program:  firm loan for 2013 covering K‐8 sub‐

basin of  Krishna basin

• Strengthening basin

 and

 sub

 basin

 institutions

  – specifically

 AC

‐IWRM

 

t roug   partners ps  nc u ng ‐ ,  , e ater

• Irrigation service delivery improvement (selected medium and major 

irrigation projects)

.   ,  .  

• Implementation 2013‐2022

Page 11: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 11/20

IWRM Initiatives

 • Strengthening institutional arrangements• Economic instruments and water user fee

• PPP

• Climate Change• reen grow n a ves

 • River Basin issues and concerns

• Basin selection

• RBO

• Basin planning process & execution 11

Page 12: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 12/20

IWRM Initiatives

• Irrigation Service Delivery Improvement• ncrease rr ga on e c enc es crop pro uc v y

• Conjunctive management• Main system water allocations & irrigation service fees• rr ga on area sus a na y• Irrigation modernization process

• Water Supply & Sanitation• Improved water quality, qty & sanitation in at least 3

towns• Capacity Building in IWRM

• , a e epar men s, s gams• Stakeholder participation

• Various stakeholders & specific roles identified• Rigorous and continued public awareness &

consultations12

Page 13: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 13/20

IWRM 

Roadmap

 

 Water Resources

 Management

 (enhanced access and security  of   water resources in rivers in 

Karnataka)

KEY THEMES

Institutions and Policies for IWRM

Inter‐sector integration

IWRM Based 

Irrigation 

Management

Integrated 

River Basin 

Management

IWRM and Learning Processes

Foundation Actions

Data, Information, and 

Knowledge Management Stakeholder

 

Involvement

Page 14: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 14/20

IWRM Program

• Piloting in K-8 sub-basin of Krishna basin –leading to state wide

• r an un er separa e nance program – coor na on

through IWRM steering committee and planning approach

• Strengthening state & basin level institutions - policy framework,, - ,

organizations, partnerships for institutional capacity building

• Modernization of irrigation infrastructure & management systems – ,

telemetry, innovations:

 – improve water balance with new technologies & institutional modalities

 – Includes – buried pipe networks, micro irrigation, water saving crops,

GW use – Rigorous WUCS strengthening

• Stakeholder artici ation - includin ender action lan for women’s more focused participation, identification and communication strategy

14

Page 15: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 15/20

Ex Im   By 2028, in selected sub-basins:

River basin management arrangements established in at least 3su - as ns

Water quality in 90 % of river reaches in selected sub-basinsmaintained above class for intended use

Gross value (2012 INR) of annual irrigated production increases

Expected Outcomes

 

By 2020State IWRM strategy implemented

B 2023

Annual water resources monitoring and assessments in programsub-basins and corresponding water allocations to usersimplemented

By 2023

Increase in land irrigated in 2023 as a result of the program

Page 16: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 16/20

Krishna Basin‐ K8 ‐Tungabhadra sub basin

Page 17: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 17/20

Tungabhadra left bank command area

rLocations

Vijayanagara canals

Gondhi canals

Page 18: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 18/20

Organizations  InvolvedWater

 

Resources 

Developmenta er 

se 

epar men s

Rural 

Urban 

MOWR

CWC

Water Resources 

Livestock 

Fisheries 

Energy ‐ Hydro  + Thermal

Industries

Development Organization

‐Major,

 Medium,

 Minor

 

‐Command Area  Devlpt

Industries Development 

Corporation

‐CNNL

‐KBJNL

‐GW

 

Panchayat Raj & Rural 

Development IWRM in Karnataka

 

WRDO (Surface water)

Groundwater Dept.

Environment, Forests, Science 

KERI

ESC

& Technology Dept. 

‐Pollution Control Board

Meteorology

CMO

UNESCO‐IHE,

 FAO,

 eWater,

 CGIAR

Page 19: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 19/20

Ex ected Benefits• Systematic, science based planning of water

planning and allocation• AC-IWRM re ionall reco nized centre of

excellence for IWRM

• State policy for IWRM implemented• Improved livelihoods of 1.5 million people by

modernize 345,000 ha of irrigated area

 • Improved water productivity for irrigation – increased ields less water

19

Page 20: AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

7/29/2019 AWW2013: IWRM in Karnataka, India: Crafting a new future by D. Satya Murty

http://slidepdf.com/reader/full/aww2013-iwrm-in-karnataka-india-crafting-a-new-future-by-d-satya-murty 20/20

eop e 

Karnataka

T an   you 

20