back contact solar modules

14
Back contact solar modules:

Upload: others

Post on 08-Jan-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Back contact solar modules:

Our vision: Increase solar module quality throughhigh-tech manufacturing

Backsheet

Conductive material

Punched encapsulant

Backcontact cells

EncapsulantGlass

The product

High-tech equipment

123456789101112

Process steps

1 Upwards elevator

2

3

4

Back sheet lay-up

Interconnection

Application of encapsulant

5

6

7

8

9

Quality inspection

Cell positioning

Quality inspection

Encapsulant unwinding and application

Glass de-stacking and lay-up

10

11

12 Downwards elevator

Flipping

Pre-tagging

Production platform:

⎻ Suitable for all new cell technologies as MWT, IBC and HJ-BC

⎻ No IP constraints for modules

⎻ No IP constrains for most cell technologies

⎻ Quick payback on investment

Back-contact PV modules

2% lower CtM losses2% higher cell output

4 oC lower NOCT

4% less dead area

Module performance advantages

Fewer hotspots Less FF losses

Reliability: second to none

0.60

0.65

0.70

0.75

0.80

0.85

0.90

0 1 2 3 4 5 6F

F25 [

-]

year

i. 4ºC lower NOCTii. Less prone to hotspots – PCB = heat sinkiii. Almost no FF lossiv. TCT test supreme to any other modules

Module reliability advantages

i. Production platform for MWT today and IBC & HJ-BC cells tomorrow

ii. 1 time cell handling instead of 7 times, resulting in higher yield and fewer (micro)cracks

iii. 4 operators needed for front-end assembly instead of 12

iv. High throughput in one line: up to 90 modules/hour

v. Upgradeable equipment

vi. Inbuilt inspection steps for quality monitoring

vii. Long equipment autonomy

viii. Suitable for half cell mfg

Production advantages

Our Unique Selling Points:

i. About 3 GWp installed equipment base

ii. Reliable and high precision equipment

iii. Strong IP position

iv. Extensive process knowledge

v. 15 years process experience

vi. BoM independent

vii. Customer support at Eurolab

Why Eurotron?

Impression Eurolab

Process

Reliability

Any objections?

Equipment Supply chain

Maturity Costs