Backlog NSR Project Review and RESULTS Issues
Land Based Investment Strategy (LBIS):
Current Reforestation and Timber Supply Mitigation Meeting
September 28, 2011
Richmond, BC
Matt LeRoy
Dave Weaver
Paul RehslerResource Practices Branch
Backlog Management Policy
"backlog area" means an area a) from which the timber was harvested, damaged, or destroyed before October 1, 1987; and, b) that in the District Manager's opinion, is insufficiently stocked with healthy, well-spaced trees of a commercially acceptable species
Not satisfactorily restocked (NSR)" means productive forest land that has been denuded and has not been regenerated to the desired stocking standards for the opening
Previous NSR Reports
1984 1988 1990 1997 1999 2000 20010
100000
200000
300000
400000
500000
600000
700000
800000
82-87
pre82
By Region, backlog NSR would be eliminated by:
• 2007 in PR, PR• 2005/06 in Car, Kam,
Nel • 2003/04 in Van
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 (sept)0
20
40
60
80
100
120
140
160
180
200
110 109 109 111 112 112 116 116
98 96
60 59 59 58 58 5858 57
50 49
Annual NSR Backlog, Provincial Totals, (thousands of hectares)
Ministry 82-87
Ministry pre-82
Arrow
Arrowsm
ith
Bound
ary
Cassia
r
Cranb
rook
Fort N
elson
Fort S
t.Joh
n/Daw
son
Creek
Golden
Inve
rmer
e
Kalum
Kamloo
ops
Kispiox
Lake
s
Mac
kenz
ie
Mer
ritt/L
illoet
t
Mor
iceNas
s
Okana
gan
Pricne
Geo
rge
Revels
toke
Soo T
SA
Willi
ams
Lake
0
5000
10000
15000
20000
25000
30000
NSR hectares by TSA
TSA
He
cta
res
of
NS
R
2010 2011 2012 2013 2014 20150
5
10
15
20
25
30
35
40
25
3836 36 36
0
Annual Backlog NSR reduction target, (thousands of hectares)
2009 2010 20110
1
2
3
4
5
6
7
8
2.6
6.2
1.7
0.3
1.2
0.6
Backlog NSR reductions April 1st to September 21st
Ministry 82-87
Ministry pre-82
Condensed Year, April 1st to Sept 21st
Th
ou
sa
nd
s o
f h
ec
tare
s
• Known Challenges:– Not just an opening file exercise– Getting down to the most challenging openings
• Anticipating year over year increasingly challenging openings
– Resourcing– Do folks know about their options with survey standards?
• Where does Forsite fit in? Forsite is our provincial contractor, initially handling category 1, and 6
backlog NSR openings
NSR Project Categories
Declared with NO FC Update
Opening FG with NSR with No Planned Treatments
Survey with no FC update
Survey with FC update no spatial
NSR with no SU’s
NSR Increased No Planning
Quick Wins
-There are a number of openings in the backlog NSR listing that are in excess of 1,000 hectares
-Where no RAH’s in place let’s make use of Forsite’s horsepower to clean up these openings