Backward Regions Grant Fund Sheopur. Prepared by Zila Panchayat, Sheopur Swapnil Education Society, Bhopal. Sheopur District. Introduction & Profile. Location of Sheopur District in India. Block Wise District Map of Sheopur. Vijaypur. Sheopur. Kharal. Introduction of the district. - PowerPoint PPT PresentationTRANSCRIPT
Backward Regions Grant FundBackward Regions Grant FundSheopurSheopur
Prepared by
Zila Panchayat, Sheopur
Swapnil Education Society, Bhopal
Introduction & ProfileIntroduction & Profile
Sheopur DistrictSheopur District
Location of Sheopur District in India
Block Wise District Map of Sheopur Block Wise District Map of Sheopur
Vijaypur
Sheopur
Kharal
1. The important rivers like Chambal, Seep, Parvati, Kuwari and Kuno are the lifeline of the district.
2. The Chambal, which originates in the Indore district, forms the northwestern boundary of Madhaya Pradesh with Rajstahan.
3. Rail and road transport are common means of transportation.
4. Nearest air port is Gwalior, is 225 Km away.5. Rail or bus routes connect about 25 percent of
villages. Roads connect all the tehsil headquarters. 6. Sheopur lies on main trunk Narrow gauge railway
route of central railway joining Gwalior.
Introduction of the districtIntroduction of the district
AdministrativAdministrative Setup of e Setup of Sheopur Sheopur DistrictDistrict
General Administration Details
Development Block 3
Tehsil 3
Janpad Panchayat 3
Gram Panchayat 226
Tribal Block 1
Legislative Assembly seats 2
Sub Division Tehsil Block Nagar Palika
Sheopur
Sheopur Karahal
SheopurKarahal
SheopurKarahal
vijayjpur vijayjpur vijayjpur vijayjpurBaroda
Population Statistic of Sheopur DistrictPopulation Statistic of Sheopur District
S. No Variables No of
Persons
1 Total population 559495
2 Population in rural area 470924
3 Population in urban area 88571
4 Population in age group of 0 to 6 years 112229
5 Number of household 96898
6 Household size 5.8
7 Urban population 15.8
8 Sex ratio 895
9 Sex ratio- 0 to 6 years 929
10 Schedule caste population 90420
11 Schedule tribe population 120482
12 Literate population 207536
13 Literacy rate 46.4
14 Working population ( Main and Marginal) 229277
Source: Census 2001
Population Statistic of Sheopur DistrictPopulation Statistic of Sheopur District
Source: Census 2001
Rural84%
Urban16%
Other Poulation
62%
SC & ST Populatio
n38%
Population Statistic of Sheopur DistrictPopulation Statistic of Sheopur District
Source: Census 2001
0
20000
40000
60000
80000
100000
120000
140000
160000
SC Population ST Population Litrate
RuralUrban
0
100000
200000
300000
400000
500000
600000
District Population SC & ST Population
Rural Urban Total
SC/ST Sex Ratio in Sheopur
760780800820840860880900920940960
Scheduledcaste
ScheduledTribe
VijaypurSeopur Karahal
BPL HOUSEHOLD
BPL HOUSEHOLD POPULATION BLOCK WISE
S.NO BLOCK BPL HOUSEHOLD PERSENTAGE
1 SHEOPUR 9274 33
2 KARHAL 7870 28
3 VIJAYPUR 10961 39
TOTAL 28105
Distribution of Literacy Rate in DistrictDistribution of Literacy Rate in District
Facilities Number
Primary school 71Middle School 175High School 9Higher Secondary 17Degree College 2EGS Centres 169
Working Population in DistrictWorking Population in District
124538
79272
203810
21429
4038
25467
145967
83310
229277
0
50000
100000
150000
200000
250000
Male Female Total
Rural
Urban
District
Worker Participation in DistrictWorker Participation in District
Almost 60%
area of
district
comes under
the category
of 40 to 60
% Worker
Participation
Rate
Forest Covered in Sheopur DistrictForest Covered in Sheopur District
Agriculture Pattern of the Agriculture Pattern of the districtdistrict
1. About 22 % percent of the geographical area is available for cultivation. About 65% percent of the total cultivable area in the district is irrigated.
2. Canal is the major source of irrigation, which accounts for 53350 Ha irrigation.(35% approx.) by tube-wells 38600 Ha (25%),by wells 12250 Ha(8%) and by rivers 10200 Ha(7%) and by ponds 1300Ha(1%).
Crops:
• Wheat is the most important food grain grown in the district.
• Mustard is the most important oil seed grown in the district.
• Major kharif crops are Bazara and Soyabean.
Canal & Water Bodies of District on MapCanal & Water Bodies of District on Map
Irrigation by Source in Sheopur District
Agriculture Pattern of Sheopur DistrictAgriculture Pattern of Sheopur District
Health Facilities in the district
In Sheopur district there is a District hospital which has all the basic medical facility,
2 Community Health Centres, 8 Primary Health Centres, 89 Sub Health Centre, 1 Private Nursing Home.
The detailed information is given below
Financial Resource Inflow Sheopur District (2006-07)
Scheme 2006-07
NREGA 483932000
SGSY 6737000
IWDP 4732245
State Finance 19159000
Finance Commission 47870000
Gokul Gram 1010000
MDG 25227000
IAY 20239000
Others 223600
Total 609129845
Primary Health Centres
S.No Name of the health centre
No. of beds/ doctors
Facility available
Address
1. Primary Health Centre, Bargavan
6/1 Medical facility
Primary Health Centre, Bargavan
2. Primary Health Centre, Dhodar
6/1 Medical facility
Primary Health Centre, Dhodar
3. Primary Health Centre, Radep
6/1 Medical facility
Primary Health Centre, Radep
4. Primary Health Centre, Durgapuri
6/1 Medical facility
Primary Health Centre, Durgapuri
5. Primary Health Centre, Vespur
6/1 Medical facility
Primary Health Centre, Vespur
6. Primary Health Centre, Sahasram
6/1 Medical facility
Primary Health Centre, Sahasram
7. Primary Health Centre, Agra
6/1 Medical facility
Primary Health Centre, Agra
8. Primary Health Centre, Barods
6/2 Medical facility
Primary Health Centre, Barods Ph. 07530-276413
List of Hospitals
S.No
Name of the health centre
No. of doctors
No. of beds
Facility available
Address
1. District Hospital Sheopur
09 30 Ultrasound facility, E.C.G, Lens transplantation
District Hospital Sheopur
2. Samudayic Swasthya Kendra, Vijaypur
03 30 Medical facility
Samudayic Swasthya Kendra, Viajypur
3. Samudayic Swasthya Kendra, Karahal
04 30 Medical facility
Samudayic Swasthya Kendra, Karahal
Distribution of Community Health Worker Distribution of Community Health Worker & Health Facilities in District& Health Facilities in District
• Health Services was very poor in entire the district.
• Not a single health centre have well equipped health equipments
• Most of the Place in the district did not have CHW facility
SWOT Analysis Sheopur SWOT Analysis Sheopur DistrictDistrict
Strengths
Avg Rainfall of 871.3 mm and three rivers
Cheap and abundant Labour
Proximity to Rajasthan
Wide scope for increased agricultural productivity
Forest area(more than 300 medicinal species)
Weaknesses Undulated
topography and Concurrent droughts
Depleting Ground Water table
Unskilled Labour force
Fragmented Land holdings
Rain fed agriculture Traditional /contract
migration No industries
Opportunities
Increase in irrigation capacity
Diversification to commercial farming
Skill development and capacity development of Tribal community,SHG's, farmers etc.
Increase in socio-economic status due to impact of various schemes and allied activities
Herbal Farming Tourism potential
Threats Monsoons in inverse
proportion
Erratic Rainfall
Pattern
Traditional
Migration
Traditional
agriculture
Lack of
electrification
Lack of basic
infrastructure
SWOT Analysis Sheopur SWOT Analysis Sheopur DistrictDistrict
Vision & MissionVision & Mission
Sheopur District Sheopur District
BRGF ProjectBRGF Project
Problem Vision Mission
The tribal of Sheopur district are residing in sparsely populated and scattered hamlets lacking connectivity The undulating topography preference for nuclear families and the poor communication etc are the contributing factors to this phenomenon Consequently the people find it difficult to keep in touch with external world and take advantage of modern technologies of production marketing and communication
Villagers should use proper communication facilities and contribute in process of development through adopting modern technologies and knowledge
In each and every Panchayat one Information has proposed for improvement of communication facilities.
Total 226 village Information centers
The quality of education in rural areas is low the drops our rates are also high with most of the schools lacking in basic facilities
Every children should get well education facilities
Specially focused on improving Higher education facilities
Taking tribal hostels for girls & boys
The district lacks in the basic infrastructure related to health & education. It is poorly connected with railways and repair the building of most of the schools hospital and veterinary centers are also in a bad condition.
Villager should availed proper health facilities at every place & any time
Improving health infrastructure & facilities and also improving basic amenities
Distribution of BRGF Programme for Distribution of BRGF Programme for Sheopur DistrictSheopur District
(Budget for Five Year is 75 Crore)(Budget for Five Year is 75 Crore)
Trainings (SIRD) 5 crore for 5 years
Urban Area Plan 11.2 crore for5 years
Rural Area Plan 58.8 crore for5 years
SC/ST Sub Plan (42% of Rural Plan)
24.69 crore for 5 Years
Apna Ghar for SC/ST
3.20 crore for 5 Years(12.95% of Rural Plan)
Other Activities for SC/ST
18.51 crore for 5 Years
5% Salary & Administration + 0.1% Protsahan Amount
2.94+0.0588=2.9988 Lakh for 1 year.
Infrastructure13.03%
Health Renovation/ Rep
air2.18%
Health21.21%
Electrification2.80%
Education0.31%
Basic Amenities18.23%
Agriculture Development
0.34%
SC/ ST Sub Plan41.89%
Shelf of Project wise Shelf of Project wise Rural PlanRural Plan of of BRGF in Sheopur DistrictBRGF in Sheopur District
(Budget for Five Year is (Budget for Five Year is 5946.115946.11 Lakhs)Lakhs)
Drinking Water20.30%
Basic Amenities24.81%
Agriculture Development
1.25%
Health0.72%
Education5.10%
Health Renovation/ Rep
air4.51%
Infrastructure43.30%
Shelf of Project wise Shelf of Project wise Urban PlanUrban Plan of of BRGF in Sheopur DistrictBRGF in Sheopur District
(Budget for Five Year is (Budget for Five Year is 1157.871157.87 Lakhs)Lakhs)
Major Works Taken Under BRGF Plan of Sheopur District
• To improve facilities of Health in the entire district new construction of health infrastructure works were taken under the Plan i.e. Construction of 21 Sub Health Centre, 14 Ayurvedic Hospitals, 9 Veterinary Hospitals. Beside this plan is also envisaged to improve existing infrastructure of health facility. Thus, 8 Postmortem rooms & 11 Attendant rooms were proposed under existing Primary sub Health Centre buildings. Moreover, as far as renovation & repair of existing health facilities is concerned, the BRGF plan should renovate & repair to 39 Sub Health Centres and 4 Primary Health Centre etc.
• School buildings, Library & Laboratory facilities in High & Higher Secondary Schools. Construction of Hostel buildings for Tribal Girls & Boys
• The Sheopur district is tribal dominated district so SC/ST sub plan worth Rs.2471.61Lakhs has been proposed. This plan in focused to improve livelihood of SC/ST and ensure roof on it. The plan covered above 1280 Apna Ghar of SC/ST families, Minor Irrigation facility to improve agriculture, ponds for fisheries development and community buildings specially in tribal dominant area. In fact Plan is also taken 5 tribal hostels & 5 tribal schools to provided better education to children.
• Construction of Panchayat Building in building less panchayats, construction of Storage Godowan in Existing Faire Price Shop Buildings
• Rural village electrification works were taken in most need villages• Construction of 4 Resource Centre, Stadium and Play Ground etc.
Gap Identification In Available Resources
S.No.
Infrastructure Existing Required GapProposed
in BRGF
1 Anganwadi Building 341 744 403 403
2 Attendant Room 2 12 10 9
3 Ayurvedic Hospital 14 27 13 13
4 Bus Stop 56 87 31 22
5 Community Building 211 533 322 322
6 Community complex 3 6 3 3
7 EGS School 332 567 235 0
8 Fair Price Shop Godowan 108 158 50 50
9 Funeral Ghat 334 365 31 3
10 Agri. Net Equipment Room & Godowan 1 4 3 3
11 Games Complex 0 1 1 1
12 Godowan 381 487 106 106
13 Govt Boys Hostel 0 1 1 1
14 Govt Girls Hostel 0 1 1 1
15 Govt. Well for Drinking water 159 375 216 0
16 Hat Bazar Facility 118 173 55 0
17 High School Building 9 65 56 0
18 Higher Secondary School Building 16 21 5 2
Source: Primary Field Survey of Villages
S.No.
Infrastructure Existing Required GapProposed
in BRGF
19 Hostel 15 20 5 5
20 Information Centre 0 225 225 225
21 Kitchen Garden 397 721 324 0
22 Lab in HS School 10 18 8 2
23 Library in HS School 10 18 8 2
24 Middle School 9 52 43 0
25 Panchyat Building 140 217 77 77
26 Parking at Bus Stand 0 1 1 1
27 Postmortem Room 1 8 7 7
28 Primary Health Centre 8 12 4 4
29 Primary School 86 587 501 0
30 Private Well for Drinking Water 204 606 402 0
31 Rural Electrification Work 473 533 60 60
32 Sport Complex 0 1 1 1
33 Stadium 0 1 1 1
34 Sub Health Centre Building 89 149 60 60
35 Tap Water Facility 2 6 4 4
36 Veterinary Hospital 10 19 9 9
Gap Identification In Available Resources
Source: Primary Field Survey of Villages
Distribution of Proposed Works in Panchyati Raj Institutions
Block
Gram Panchyat (works upto 5.00 Lakhs)
Janpad Panchyat (Works
between 5 to 10
Lakhs
Zila Panchyat (Works
more than 10.00
Lakhs)
Total
No. of Works
Estimated cost (
in lacs)
No. of Works
Estimated cost ( in
lacs)
No. of Works
Estimated cost (
in lacs)
No. of Works
Estimated cost (
in lacs)
Karahal 897 1372.84 8 60.40 26 676.60 931 2109.84
Sheopur 1228 1768.20 12 106.00 31 1086.32 1271 2960.52
Vijaypur 1094 1712.43 12 95.20 22 726.00 1128 2533.63
Total 3219 4853.46 32 261.60 79 2488.92 3330 7603.98
Karahal 96% 65% 1% 3% 3% 32% 100% 100%
Sheopur 97% 60% 1% 4% 2% 37% 100% 100%
Vijaypur 97% 68% 1% 4% 2% 29% 100% 100%
Total 97% 64% 1% 3% 2% 33% 100% 100%
Human Resource Management
S.No.
InfrastructureProposed in BRGF
Staff required per unit
Total Staff
required
1 Anganwadi Building 403 2 806
2 Attendant Room 9 1 9
3 Ayurvedic Hospital 13 2 26
4 Govt Boys Hostel 1 10 10
5 Govt Girls Hostel 1 10 10
6 Higher Secondary School Building 2 14 28
7 Hostel 5 8 40
8 Information Centre 225 1 225
9 Postmortem Room 7 1 7
10 Primary Health Centre 4 2 8
11 Sport Complex 1 12 12
12 Stadium 1 26 26
13 Sub Health Centre Building 60 2 120
14 Tap Water Facility 4 1 4
15 Veterinary Hospital 9 2 18
Total 745 - 1349
Chart-Strategy for Livelihood Activities
Formation of SHGS
Strengthening of SHGs members
Identification of Backward &
Forward LinkagesStartup of Livelihood Activities
Handholding Support
Promotion & Marketing of
Products
Income Generation & Livelihood
Sustainability
Year wise & Shelf of Project Wise Coverage under Sheopur BRGF
Block wise & Shelf of Project Wise Coverage under Sheopur BRGF
Note-Rs.5.00crore of training is not included
Area Shelf of Project Karahal Sheopur Vijaypur Total
Rural Basic Amenities 260.61 515.15 304.88 1080.64
Education 0.00 18.50 0.00 18.50
Electrification 160.00 15.00 125.00 300.00
Health 307.85 398.30 494.50 1200.65
Health Renovation/Repair 43.90 32.50 52.45 128.85
Infrastructure 251.60 273.90 226.60 752.10
SC/ST Sub Plan 700.13 957.75 807.50 2465.37
Rural Total 1724.09 2211.10 2010.93 5946.11
Urban Agriculture Development 8.00 8.00 8.00 24.00
Basic Amenities 55.00 236.50 105.00 396.50
Drinking Water 75.00 225.00 75.00 375.00
Education 0.00 56.50 0.00 56.50
Health 38.75 0.00 28.80 67.55
Health Renovation/Repair 0.00 0.00 28.90 28.90
Infrastructure 26.00 56.42 110.00 192.42
SC/ST Sub Plan 17.00 0.00 0.00 17.00
Urban Total 219.75 582.42 355.70 1157.87
Training Training Programme 166.00 167.00 167.00 500.00
Training Total 166.00 167.00 167.00 500.00
Grand Total 2109.84 2960.52 2533.63 7603.98
Block/Year/Shelf of Project Wise Coverage under Sheopur BRGF
Block Block Wise Wise
ProposeProposed d
ActivitieActivities under s under BRGFBRGF
Rural PlanRural Plan
Activity Activity wise wise
CoveragCoverage of e of
Rural Rural BRGF BRGF Plan Plan
Rural PlanRural Plan
Urban Urban PlanPlan
Block Block Wise Wise
ProposeProposed d
ActivitieActivities under s under BRGFBRGF
Activity Activity wise wise
CoveragCoverage of e of
Rural Rural BRGF BRGF Plan Plan
Urban PlanUrban Plan11.57 Crore11.57 Crore
5 Works5 Works
Panchayat Wise Five Panchayat Wise Five YearYear
BRGF PlanBRGF Plan
Panchyat Wise List of Proposed Works Panchyat Wise List of Proposed Works under under
BRGF PlanBRGF PlanArea Block Gram Panchyat Village Head Activity proposed Place Estimated cost ( in lacs)Year
Rural Karahal Aameth Aameth(I) Health Anganwadi Building Aameth 2.45 1
Rural Karahal Aameth Aameth(II) Health Anganwadi Building Aameth 2.45 2
Rural Karahal Awada Awada Basic Aminities Road Construction in village 20.00 2
Rural Karahal Awada Awada Basic Aminities Road Construction village to police station 12.00 4
Rural Karahal Awada Awada Health Veterinary Hospital Aawada 2.5 1
Rural Karahal Awada Awada Health Renovation/RepairSub Healh Centre Building water facility latring , electri facility , boundry wall2.5 2
Rural Karahal Awada Awada Infrastructure Information Centre At the Panchyat Level 1.0 1
Rural Karahal Awada Awada Infrastructure Patvari Quarter Office At the Panchyat Level 1.8 1
Rural Karahal Awada Awada SC/ST Sub Plan Apna Ghar SC/ST family 0.25 3
Rural Karahal Awada Awada SC/ST Sub Plan Apna Ghar SC/ST family 0.25 3
Rural Karahal Awada Awada SC/ST Sub Plan Dairy Development In the village 2.6 3
Rural Karahal Awada Awada SC/ST Sub Plan Apna Ghar SC/ST family 0.25 3
Rural Karahal Awada Awada SC/ST Sub Plan Apna Ghar SC/ST family 0.25 3
Rural Karahal Awada Awada SC/ST Sub Plan Apna Ghar SC/ST family 0.25 3
Rural Karahal Awada Awada SC/ST Sub Plan Apna Ghar SC/ST family 0.25 3
Panchyat & Year Wise Distribution of Panchyat & Year Wise Distribution of Estimated CostEstimated Cost
Block Gram Panchyat 1st Year 2nd Year 3rd Year 4th Year 5th Year TotalKarahal Awada 7.75 22.50 2.63 14.45 2.45 49.78
Badh 0.00 3.00 0.00 8.85 4.85 16.70Bagbaj 14.00 1.80 0.00 0.00 4.45 20.25Bandhali 5.50 3.45 2.00 0.00 0.00 10.95Bardha Khurd 1.00 2.45 0.00 0.00 4.45 7.90Bargawa 25.70 13.80 2.45 0.00 2.45 44.40Based 2.45 6.70 2.00 8.75 3.30 23.20Bavadhi chapa 1.00 5.75 3.50 5.55 2.94 18.74Budhera 0.00 6.85 6.36 5.95 2.45 21.61Bukharee 23.40 2.25 11.09 2.94 5.41 45.09Chack Rampura 1.00 3.30 3.30 0.00 5.75 13.35Chitara 24.45 10.40 5.00 5.88 57.26 102.99Dobh 3.50 6.00 2.45 2.95 5.21 20.11Dokarka 8.00 3.79 0.00 0.00 0.00 11.79Fatehpur 6.00 4.90 8.20 4.90 6.85 30.85Gadhla 2.81 18.35 8.30 3.30 0.00 32.76Goras 1.00 4.95 2.45 2.13 5.10 15.63Gothra 3.94 5.75 8.68 7.35 7.30 33.02Heerapur 24.45 14.10 64.63 2.40 6.24 111.82Jakhada 0.00 10.90 14.05 2.45 7.35 34.75
Annexure-1: Panchyat & Year Wise Fund Distribution under BRGF
Panchyat Wise BRGF Plan FormatPanchyat Wise BRGF Plan Format
Block Gram Panchyat Village Activity proposed 1st Year 2nd Year 3rd Year 4th Year 5th Year
Karahal Awada Awada Community Building 1.80 0.00 0.00 0.00 0.00Information Centre 1.00 0.00 0.00 0.00 0.00Road Construction 0.00 20.00 0.00 12.00 0.00Veterinary Hospital 2.50 0.00 0.00 0.00 0.00Dairy Development 0.00 0.00 2.63 0.00 0.00Sub Health Centre Building 0.00 2.50 0.00 0.00 0.00
Awada (I) Anganwadi Building 0.00 0.00 0.00 2.45 0.00Awada (II) Anganwadi Building 2.45 0.00 0.00 0.00 0.00Dhawa Anganwadi Building 0.00 0.00 0.00 0.00 2.45
Awada Total 7.75 22.50 2.63 14.45 2.45Badh Badh Anganwadi Building 0.00 0.00 0.00 2.45 0.00
Fair Price Shop Godowan 0.00 0.00 0.00 2.40 2.40Information Centre 0.00 1.00 0.00 0.00 0.00SC/ST Community Building 0.00 0.00 0.00 2.00 0.00
Kalu Khedli SC/ST Community Building 0.00 2.00 0.00 0.00 0.00Kanarkheda Anganwadi Building 0.00 0.00 0.00 0.00 2.45Rahron (Badh) SC/ST Community Building 0.00 0.00 0.00 2.00 0.00
Badh Total 0.00 3.00 0.00 8.85 4.85Bagbaj Bagbaj Anganwadi Building 0.00 0.00 0.00 0.00 2.45
Ayurvedic Hospital 8.00 0.00 0.00 0.00 0.00Community Building 0.00 1.80 0.00 0.00 0.00Information Centre 1.00 0.00 0.00 0.00 0.00SC/ST Community Building 0.00 0.00 0.00 0.00 2.00Sub Health Centre Building 5.00 0.00 0.00 0.00 0.00
Bagbaj Total 14.00 1.80 0.00 0.00 4.45
Annexure-2: Panchyat Wise Work Plan under BRGF
l arks"kt udfparkt u
ddhengada dhengada f'k{kk l aca/kh izkFkfed 'kkyk Hkou YES 2 2 yes
f'k{kk l aca/kh Ekk/; fed 'kkyk Hkou YES 1 1 yes
f'k{kk l aca/kh 'kykvksa esa fdfpu 'ksM+ YES 1 1 yes
LokLF; l aca/kh vkaxuckM+h Hkou YES 2 1 yes
i s; t y l al k/ku gs.M iai YES 9 9 yes
i s; t y l al k/ku dqvka ut h YES 1 1 yes
i s; t y l al k/ku V~; wc oSy YES 2 2 yes
i s; t y l al k/ku Rkykc ¼eosf’k; ksa gsrq½ YES 1 1 yes No
GP_NAME
V_NAME
Type of Facility
Name of Facility
miyC/k l al k/kuksa ds Hkouksa dh LFkfr
¼l a[; k esa½
Xkzke esa miyC/k l al k/ku
dh fLFkfr ¼gkW@ ugha½
; fn gk rks
miyC/k l al k/kuksa dh l a[; k
miyC/k l al k/kuksa esa l s fdruksa ds Hkou
fuekZ.k gq, gS ¼l a[; k
esa½
Village Wise Status of Existing Village Wise Status of Existing InfrastructureInfrastructure
BRGF Plan
PROCESSPROCESS
ProcesProcesss
Tools Used for Preparation of PlanTools Used for Preparation of Plan
Village Level ScheduleVillage Level Schedule Format-I: Resource AnalysisFormat-I: Resource Analysis Format-II: Proposed WorksFormat-II: Proposed Works
PRAPRA Social MappingSocial Mapping Resource MappingResource Mapping
Check ListCheck List Data SoftwareData Software
Methodology for BRGF PlanMethodology for BRGF Plan
Information Collected by Village ScheduleInformation Collected by Village Schedule
Cast Composition Occupation Pattern Social Structure Worker Participation Source of Drinking Water Source of Irrigation etc.
ProcesProcesss
Information Collected by Village ScheduleInformation Collected by Village Schedule
Availability of Infrastructure School / Aaganwadi Panchayat Building Natural Resources & General
Amenities Missing/ Need Base Infrastructure Other Secondary Information
ProcesProcesss
2.2. Selection & Orientation of TeamSelection & Orientation of Team
• Selection of Team members for field survey
• Training of Field Investigators on Filling Schedules & PRA
• Preparation of Check List
ProcesProcesss
3.3. Field SurveyField Survey
Step-I: Step-I:
• Rapport Building• Transect Walk of Village • Collection of Information in prescribed
format• Listing Existing Infrastructure• Information regarding ongoing schemes of
Line departments
ProcesProcesss
3.3.Field SurveyField Survey
Step-IIStep-II
• Listing Missing Infrastructure at village level
• Listing needs & requirements of villagers
• Ranking & Prioritization of works • Conducting PRA exercise
• Social Mapping• Resource Mapping
ProcesProcesss
3.3.Field SurveyField Survey
Step-IIIStep-III
• Location of Selected Works on Village Map
• Estimates of Selected Works• Linking of Selected Works through
Existing Scheme• Sharing with Community & Govt.
Officials
ProcesProcesss