bam east gold deposit - landore · this presentation is not directed to, or intended for...

30
February 2017 www.landore.com BAM East Gold Deposit

Upload: others

Post on 16-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

F e b r u a r y 2 0 1 7 w w w . l a n d o r e . c o m

BAM East Gold Deposi t

Page 2: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

The information contained in this presentation (this "presentation") has been prepared Landore Resources Limited ("the Company") as at the date of this presentation and is subject to updating, completion, revision, further verification and amendment without notice. This presentation is for general information only and is the property of the Company. Making this presentation available in no circumstances whatsoever implies the existence of a commitment or contract by or with the Company, or any of its affiliated entities, or any of its or their respective subsidiaries, directors, officers, representatives, employees, advisers or agents for any purpose. This presentation has not been approved by the United Kingdom Listing Authority under the Prospectus Rules (made under Part VI of the Financial Services and Markets Act 2000 ("FSMA")) or otherwise, or by the London Stock Exchange plc. This presentation does not constitute or form part of any offer for sale or solicitation of any offer to buy or subscribe for any securities nor shall it or any part of it form the basis of or be relied on in connection with, or act as any inducement to enter into, any contract or commitment whatsoever. No reliance may be placed for any purpose whatsoever on the information or opinions contained in this presentation or on the completeness, accuracy or fairness thereof. No undertaking, representation, warranty or other assurance, express or implied, is made or given by or on behalf of the Company or its directors, officers, partners, employees, agents or advisers or any other person as to the accuracy or completeness of the information or opinions contained in this presentation and no responsibility or liability is accepted by any of them for any such information or opinions or for any errors, omissions, misstatements, negligence or otherwise for any other communication written or otherwise. In addition, in issuing this presentation, the Company undertakes no obligation to update or to correct any inaccuracies which may become apparent in this presentation. Notwithstanding the aforesaid, nothing in this paragraph shall exclude liability for any undertaking, representation, warranty or other assurance made fraudulently. The statements contained in this presentation may include "forward looking statements" that express expectations of future events or results. All statements based on future expectations rather than on historical facts are forward looking statements that involve a number of risks and uncertainties and the Company cannot give assurance that such statements will prove to be correct. Any forward looking statements made by or on behalf of the Company speak only as of the date they are made. The Company gives no undertaking to update forward looking statements to reflect any changes in expectations, events, conditions or circumstances upon which such statements are made. The presentation should not be considered a recommendation by the Company or any of its affiliated entities, or any of its or their respective subsidiaries, directors, officers, representatives, employees, advisers or agents in connection with any purchase of or subscription for securities of the Company. This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution or use would be contrary to law or regulation or which would require any registration or licensing within such jurisdiction. In particular, this presentation should not be copied or distributed by recipients and should not be distributed by any means including electronic transmission, to persons with addresses in the United States of America, Canada, Australia, South Africa or Japan their possessions or territories or to any citizens thereof, or to any corporation, partnership or such entity created or organised under the laws thereof. Any such distribution contrary to the above could result in a violation of the laws of such countries. This presentation is confidential and are being supplied to you solely for your information and may not be reproduced, re-distributed or passed to any other person or published in whole or in part for any purpose. By accepting receipt of this document, you agree to be bound by the limitations and restrictions set out above. February 2017 webpage

Landore Resources Ltd.

2

Important Notice

Page 3: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Landore Properties - Canada Politically Secure and Mining Friendly

Junior Lake

Seeley Lake

West Graham

Miminiska Lake Lessard

QUEBEC

ONTARIO

NEWFOUNDLAND AND LABRADOR

USA

USA

Lake Superior

Thunder Bay

Sudbury

Toronto

Chibougamau

Montreal

Lake Huron

Hudson Bay

CANADA

USA

3

Page 4: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Landore Gold Properties - Ontario One of the Top Ten Mining Jurisdictions in the World

Junior Lake

Miminiska Lake

ONTARIO

Lake Superior

Thunder Bay

Sudbury

Toronto

4

Timmins

Red Lake

2

Kirkland Lake

Gold Mine Company 2015 Production (ounces of gold)

1 Red Lake Gold Mine

Goldcorp Inc. 375,700

2 Musselwhite Mine

Goldcorp Inc. 270,300

3 Hemlo Mine Barrick Gold Corp. 219,000

4 Detour Lake Gold Mine

Detour Gold Corp. 505,558

5 Hoyle Pond Mine

Goldcorp Inc. 140,553 (estimated)

6 Dome Mine Goldcorp Inc. – Porcupine Gold Mines

109,640 (estimated)

7 Macassa Mine

Kirkland Lake Gold Inc. 102,957

8 Young-Davidson Mine

Alamos Gold Inc. 160,358

1

4 5

6 7 3

8

Page 5: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Junior Lake Property

5

Junior Lake

ONTARIO B4-7 Ni/Cu Deposit

VW Ni Deposit

Junior Lake Property

Mining Leases 21-year renewable

mining, surface rights

22,497 Hectares

BAM East Gold Deposit BAM Gold Prospect

Swole Lithium Despard Lithium

Tape Lake Lithium

Page 6: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

BAM East Gold Deposi t

6

Maiden Mineral Resource Estimate of

301,000 ounces gold

Category Tonnes Grade (g/t Au) Contained Gold (oz) Indicated 4,455,000 1.35 193,000 Inferred 2,730,000 1.23 108,000

Page 7: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

BAM East Gold Deposit

7

One year from discovery to Maiden Resource Estimate. Discovery drill-hole 0415-517 drilled in December 2015. Resource cut-off 3rd January 2017 US$5 per ounce of gold discovery cost. Total expenditure for Landore Canada in 2016, US$1.5 million 36 ounces of gold per metre discovery rate. 8,436 metres drilled on the BAM East Gold project, including exploration

Discovery to Resource (Canadian NI43-101)

Page 8: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

BAM East Gold Deposit

8

Exploration Works To-Date 2015 December Drilling Discovery drill-holes 0415-517 and 0415-518

Geophysics Borehole TDEM Survey on drill-hole 0415-517

2016 February Drilling 5 drill-holes for 564 metres drilled to confirm discovery

Geophysics Interpretation report on borehole TDEM survey

July Drilling 22 drill-holes for 4,077 metres

August Gold Screen Metallics 216 samples from drill-holes 0415-518, 0416-519 to 0416-536

September Petrography 7 BAM East drill-core samples

October Drilling 15 drill holes for 3,678 metres

December Metallurgy 2 composite samples from drill-holes 0416-525 and 0416-547

Gold Screen Metallics 29 samples from drill-holes 0416-536 to 0416-549

Geotechnical Acoustic Televiewer surveys on 6 drill-holes on BAM East

2017 January Gold Screen Metallics 19 samples from drill-holes 0416-551 to 0416-557

February Resource Estimate NI 43-101 Mineral Resource Estimate on BAM East Gold Deposit

Page 9: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

BAM East Gold Deposit

9

Page 10: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

BAM East Gold Deposit

10

Page 11: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

BAM East Gold Deposit

11

Page 12: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

BAM East Gold Deposit

12

Page 13: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

BAM East Gold Deposit

13

Potential Open Pit - Underground Operation

• Close to surface +30 metres wide gold mineralisation

• Consistent gold grades for 700 metres strike length, improving with depth

• Open to the east and west along strike and at depth

• Potential for the initial development to be progressed as a low cost, bulk tonnage, open pit operation

Page 14: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

BAM East Gold Deposit

14

Preliminary Metallurgical Assessment

• Simple processing path

• Maximum recovery

• Low CAPEX and OPEX

Preliminary Metallurgical Tests reported 98 percent recovery by gravity concentration followed by cyanidation leach extraction of the gravity tail 58 percent gravity concentration feed gold recovery to the pan concentrate 6 hours to near-peak gold extraction with rapid gold leach kinetics at a nominal primary grind sizing of 75µm K80

Page 15: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Prepar ing fo r Deve lopment

15

Page 16: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

16

Junior Lake Project Preparing for Development

Mining Leases • 3 mining leases covering 3,676 hectares • 21 years renewable for further terms of 21

years

Landore has the right, subject to provisions of certain Acts and reservations, to: • Sink shafts, excavations etc., for mining

purposes • Construct dams, reservoirs, railways, etc., as

needed • Erect buildings, machinery, furnaces, etc., as

required and to treat ores

Baseline Studies • Baseline surface water quality monitoring

of area lakes and streams on-going since 2007

• Environmental Baseline study of Vegetation, Wildlife, Fish and Fish Habitat

• Bathymetry Study of Ketchikan Lake (adjacent to VW Deposit)

Performed since 2007 by Golder Associates Ltd.

Page 17: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

17

Junior Lake Project

Proposed Hydro Station Little Jackfish River Junior

Lake

Good road access

Abundant water

Proposed hydropower generating station (approx.20kms)

Canadian National Rail (approx. 13kms)

Thunder Bay port facilities

Infrastructure

Page 18: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

18

Landore signs updated Memorandum of Understanding (MOU) with Whitesand First Nation, 2012

And with

Animbiigoo Zaagi igan Anishinaabek (AZA) First Nation, 2013

Junior Lake Project Socially Responsible

Page 19: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Jun io r Lake N icke l Pro jec t

19 K a t r i n a Z o n e , V W N i c k e l D e p o s i t

Page 20: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

20

Massive sulphide drill core, B4-7 Deposit

Works Completed Since Last Resource Update Late 2012 to 2015. Drilling • 23,300 metres diamond drilling (16,910 metres of

which on B4-7, VW Deposits) Geophysics • Ground and borehole geophysics Studies • Geotechnical works, B4-7 open pit optimization • Mineral potential investigation • Junior Lake geophysics review

Planned Works (Pending Favourable Market Conditions) • Update resource to include the above works • Pre-Feasibility Studies

NI 43-101 Compliant Resources B4-7 33,248 tonnes at 1.24% NiEq VW 21,760 tonnes at 0.49% NiEq + B4-7 Exploration Target ~20,000 tonnes at ~1.24% NiEq

Junior Lake Nickel Project

Page 21: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Junior Lake Nickel Project B4-7 Deposit – Down Plunge Potential

21

Page 22: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Other Proper t ies and Asse ts

22

Page 23: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Junior Lake Lithium Prospects

23

Occurrences

Despard Lithium Occurrence

Swole Lake Lithium Occurrence Spodumene bearing

pegmatite: Discovered by Landore

Drill hole 0411-304 returning intersections of 1.12% Li2O over 3.1m and 1.14% Li2O over 8.8m.

The Tape Lake Lithium Occurrence Rock chip samples from one pegmatite

dyke returning 1.036%, 1.219% and 2.374% Li2O.

Page 24: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

MIMINISKA LAKE, ONTARIO (100%)– GOLD

LESSARD, QUEBEC (100%)– COPPER , ZINC, SILVER

• Exploration Target-503,000 tonnes at 5.34g/t for 86,357oz Au

Other Properties and Assets

• Inferred Resource (NI43-101 compliant)-740,000 tonnes at 1.88% Cu + 3.50% Zn + 38.62g/t Ag and 0.84g/t Au for a NSR value of US$206.52/t

• Indicated Resource (NI43-101 compliant) 84mlbs of Ni and 58 mlbs of Cu.

WEST GRAHAM, ONTARIO (30%) – NICKEL, COPPER

24

Page 25: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Corpora te In fo rmat ion

25

Page 26: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Board of Directors and Management Charles Wilkinson, Non-Executive Chairman Charles Wilkinson is a solicitor who retired from Lawrence Graham LLP in March 2005. At Lawrence Graham he specialised in corporate finance and commercial law and advised mining companies. He is Chairman of Doric Nimrod Air One Limited and Doric Nimrod Air Three Limited, Non-Executive Director of Doric Nimrod Air Two Limited and Premier Energy and Water Trust Plc. William Humphries, Chief Executive Officer and Director Bill Humphries has over 45 years’ experience in the mining and civil engineering industries. From 1996 to 1998 he was General Manager of Sardinia Gold Mining SpA. From January 1999 to July 2002 he was Managing Director of Brancote Holdings Plc until its merger with Meridian Gold Inc. and was Managing Director of Patagonia Gold Plc since its inception in November 2000 until February 2015. Richard Prickett, Finance Director Richard Prickett is a Chartered Accountant and has many years’ experience in corporate finance. He was Chairman of Brancote Holdings Plc from 1995 until its merger with Meridian Gold Inc. in July 2002. He is a Non-Executive Director of City Natural Resources High Yield Trust Plc and Non-Executive Chairman of Asian Growth Properties Limited. Helen Green, Non-Executive Director Helen Green is a Chartered Accountant and has been employed by Saffery Champness, a UK top 20 firm of Chartered Accountants, since 1984. She qualified as a Chartered Accountant in 1988, and became a partner in the London office in 1997. Since 2000 she has been based in the Guernsey office where she is the client liaison director responsible for trust and company administration. She is a Non-Executive Director of Acorn Income Fund Limited (of which she is Chairman), Henderson Diversified Income Limited, John Laing Infrastructure Fund Limited and City Natural Resources High Yield Trust Plc. Michele Tuomi, V. P. Exploration and Director, Landore Resources Canada Inc. Michele Tuomi is a Professional Geologist with over 15 years mineral exploration experience in both private and public sectors and is a Qualified Person under Canadian National Instrument 43-101. She joined Landore’s exploration team in 2005 working mainly on the development of Landore’s Flagship Junior lake property. In 2014 Ms. Tuomi was appointed to her current position of V.P. Exploration.

Landore Resources Ltd.

26

Board and Management

Page 27: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

Corporate Strategy

27

Focus on the highly prospective Junior Lake Property

Expansion of the existing B4-7 and VW compliant resources to +100,000 tonnes of Nickel Equivalent with objective to either develop in JV partnership or sell outright

Advance the newly-discovered BAM East Gold Deposit towards production through resource delineation and pre-feasibility studies

Sale or JV of non-core assets

Page 28: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

28

Issued number of shares : 707,488,001

Outstanding options: 50,850,000

Outstanding warrants: 1,830,000

Market capitalisation: £23.5 million as at 13 February 2017

Landore Resources Ltd. Share Information

Page 29: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

• 5,000 metre HQ drilling program to expand the newly defined Central zone

• 7,500 metre NQ drilling program to test highly prospective targets along the Junior Lake shear zone

• Upgrade Mineral Resource estimate

P h a s e 1 - Q 2 / 3 2 0 1 7

• 3,500 metre HQ Infill drilling for Measured Resource category

• Metallurgical, base line and other studies

• Pre-Feasibility studies commence

P h a s e 2 - Q 3 / 4 2 0 1 7

29

Landore Resources Ltd. Proposed Works

Page 30: BAM East Gold Deposit - Landore · This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in

F e b r u a r y 2 0 1 7 w w w . l a n d o r e . c o m

BAM East Gold Deposi t