bathurst station preliminary design consultation

51
Bathurst Station Preliminary Design 11/03/22 Bathurst Station Preliminary Design Open House #1 November 28, 2011

Upload: tarynwismer

Post on 13-Jun-2015

126 views

Category:

Travel


2 download

DESCRIPTION

Station design is one of the most exciting -- and most critical -- components of The Crosstown construction. There are a number of major considerations for station design, including: accessibility for people with disabilities, development potential, integration with surrounding communities, and minimizing construction impacts. Visit www.thecrosstown.ca for more information about The Crosstown.

TRANSCRIPT

Page 1: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23

Bathurst Station Preliminary Design

Open House #1 November 28,

2011

Page 2: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 2Bathurst Station - Preliminary Design

Overview

Page 3: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

3

Part 1• Introduction • Crosstown Update • Station Design 101 - Design Principles

Part 2 •Bathurst Station Preliminary Design

*Our partners in City Planning are here if you have questions about existing development requirements in the Bathurst area or the future Land Use Study around Crosstown Stations

Open House Overview

04/13/23 3Bathurst Station - Preliminary Design

Overview

Page 4: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

The Purpose of Tonight’s Open House • Provide a brief Crosstown project update

• Present the Crosstown station design philosophy • Explain the anatomy of the station components and challenges• Display the preliminary design of Bathurst Station Most importantly:

*Get your input on the Preliminary Design early in this process.

• The architectural design will be prepared for Open House #2 in Spring 2012. Significant outreach will follow on construction.

• Walls at the future station box are scheduled to begin at Bathurst in 2013 as part of the tunnelling process.

• Bathurst Station construction is scheduled to begin in 2014.

04/13/23Bathurst Station - Preliminary Design

Overview4

Page 5: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23 5Bathurst Station - Preliminary Design

Overview

Page 6: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

Format for Feedback • Please speak with the project team at the displays, we’re here to

answer your questions

• There are tables to write comments and for group discussions

• Please submit a feedback form tonight if possible , or send us comments

via e-mail, mail, or online at www.thecrosstown.ca by December 12, 2011

• A consultation report to inform the designers will be posted online at:

www.thecrosstown.ca

04/13/23Bathurst Station - Preliminary Design

Overview6

Page 7: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview7

* Final number and location of stations subject to review

Page 8: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview8

The Eglinton-Scarborough Crosstown Plan• $8.4 billion transit investment from the Province of Ontario through

Metrolinx

• 25 km east-west transit corridor between Black Creek Drive and Scarborough Centre

• 60% faster than bus service today (e.g. only 15 minutes from Keele to Yonge)

• 19 km underground tunnel (Black Creek Drive to Kennedy Station)*

• 6km seamless service will replace the SRT from Kennedy Station to Scarborough Centre

• Up to 26 stations

*Exact alignment west of Keele Street and east of Laird Drive TBD

Page 9: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

First Construction Contract• Tunnel launch site preparation is underway at Keelesdale Park (between Black Creek Drive and Keele Street)

• Tunnelling will start in summer 2012 and head east

04/13/23Bathurst Station - Preliminary Design

Overview9

Page 10: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview10

Crosstown Construction Update

Crosstown tunnel preparation work at Black Creek and Eglinton in Keelesdale Park Piling rigs are building concrete support walls for the future tunnel launch shaft The shaft will enable tunnelling eastward in summer 2012 Soil testing for the tunnel and stations continues from Keele Street to Kennedy Station in

Scarborough

Page 11: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

Conceptual Design of a Crosstown Station

Urban Design and Architectural Guidelines have been developed:

•ensure positive change along the corridor •guide individual station designs and achieve consistency•guide configuration of surface elements•integrate surface elements with existing and future development

04/13/23 11Bathurst Station - Preliminary Design

Overview

Page 12: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

• Main Entrance• Secondary Entrance• Passenger Transportation (elevators, escalators)• Mechanical and Electrical Systems • Ventilation Shafts and Ventilation Fan Rooms• Traction Power Substations

Guiding Principle: Consolidate Surface Elements to enhance design & minimize

impacts

• Reduce construction impacts (traffic, staging area, noise, dust )• Preserve public space and development potential • Save $

Stations 101 What’s needed to make a Station Work?

04/13/23 12Bathurst Station - Preliminary Design

Overview

Page 13: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

13

• Integrate with surrounding neighbourhood

• Safe and enjoyable user experience

• Full accessibility

• Preserve space for future re-development

• Enhance the local “sense of place”

• Long-term sustainability

• Reduce Construction Footprint & Impacts

• Reduce Costs

Design Philosophy

Compatible scale

04/13/23 13Bathurst Station - Preliminary Design

Overview

Accessibility for all users

Page 14: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

14

Accessibility Principles & Features • Access for persons with all levels of mobility • Elevators

• Escalators

• Low-Floor Access

04/13/23Bathurst Station - Preliminary Design

Overview14

Page 15: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

15

Safety and Security Features • Monitored CCTV Security Cameras

• Urban Braille

• High Quality Lighting

04/13/23 15Bathurst Station - Preliminary Design

Overview

Page 16: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview16

Page 17: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

Architectural Design Approach

• Excellence in architectural/urban design treatments

• Cost effective and maintainable structures

• Standard station box configurations

• Creative use of materials, color, textures, artwork, light

• Brand identification with graphics• Use standard elements whenever

possible

04/13/23 17Bathurst Station - Preliminary Design

Overview

Page 18: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

Surface Elements – Guiding Principles

• Surface elements are most visible to public

• Integrate into local community

• Minimize property implications

• High quality design• Major focus on

consolidating:– Entrances– Vent Shafts– Substations

04/13/23 18Bathurst Station - Preliminary Design

Overview

Page 19: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

The Approach to Guide Detailed Design

04/13/23 19Bathurst Station - Preliminary Design

Overview

Page 20: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

• Any architectural finish can contain integrated artwork, including:

• walls• floors• ceilings• glazing

Integrated Artwork

04/13/23 20Bathurst Station - Preliminary Design

Overview

Page 21: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23 21Bathurst Station - Preliminary Design

Overview

Cross-Section

Page 22: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

Station Entrances

• Public spaces which fit into the community

• Main & Secondary Entrance • Main Entrance is fully accessible

• Use of height/massing to create unique structure

• Highly visible, transparent, sophisticated

• Promote Transit-Oriented Development

• Maximize daylight opportunities

• Well lit at night

• Connect with Buses on street

04/13/23 22Bathurst Station - Preliminary Design

Overview

Page 23: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

Traction Power Substations What and Why?

• Required to provide power to the station system • Every two kilometres, at stations• Many different configurations• Above ground, surface, below-ground• Guidelines to integrate substations

04/13/23 23Bathurst Station - Preliminary Design

Overview

Page 24: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

24

Presentation Part 2: Bathurst Station

04/13/23 24Bathurst Station - Preliminary Design

Overview

Page 25: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

Bathurst Station Preliminary Design

Preliminary Design by:

Crosstown ConsortiumIBI GroupLEA Consulting SNC Lavalin

04/13/23Bathurst Station - Preliminary Design

Overview25

Page 26: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

Local ContextPopulation Density within a 10 minute walk to Bathurst Station

04/13/23 Bathurst Station - Preliminary Design Overview

26

Page 27: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

Bathurst Station – Existing Uses & Proposed Development

04/13/23Bathurst Station - Preliminary Design

Overview27

Page 28: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 Bathurst Station - Preliminary Design Overview

28

Page 29: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

Bathurst Station – Local ContextUpper Village Business Improvement Area (BIA)

04/13/23Bathurst Station - Preliminary Design

Overview29

•www.uppervillagetoronto.ca •Represents merchants, venues and services from Allen Road to Bathurst Street

•Wide selection of shops, restaurants & services

Page 30: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview30

Bathurst Station – EA (2010) (add property numbers)

Page 31: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview31

Potential Future Secondary Entrance

Generic Rendering Only Architecture Concept TBD

Page 32: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview32

Key Advantages of New Consolidated Design Reduces construction footprint, cost & impacts (roadway construction reduced by 21.5 metres)

Improves look and feel from street for community

Reduces number of properties affected

Preserves potential for investment and development with more public space

Page 33: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23 33Bathurst Station - Preliminary Design

Overview

NORTH/EAST CORNER OF BATHURST AND EGLINTON

Page 34: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 34Bathurst Station - Preliminary Design Overview

NORTH/EAST CORNER OF BATHURST AND EGLINTON

Page 35: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23 35Bathurst Station - Preliminary Design

Overview

Rear Laneway

Page 36: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 36Bathurst Station - Preliminary Design Overview

PROPERTY LINE

NEW SETBACK

GREEN BARRIER

• Setbacks TBD

Page 37: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 37Bathurst Station - Preliminary Design Overview

Page 38: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview38

Page 39: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 Bathurst Station - Preliminary Design Overview

39

Page 40: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview40

Page 41: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview41

Page 42: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 42Bathurst Station - Preliminary Design Overview

Page 43: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 43Bathurst Station - Preliminary Design Overview

Page 44: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 44Bathurst Station - Preliminary Design Overview

Page 45: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 45Bathurst Station - Preliminary Design Overview

Page 46: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 46Bathurst Station - Preliminary Design Overview

Passenger Circulation

ISOMETRIC

Page 47: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 47Bathurst Station - Preliminary Design Overview

Architectural Concept: Preliminary Representation•subject to change

Page 48: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 48Bathurst Station - Preliminary Design Overview

Preliminary Representation•subject to change

Page 49: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23 49Bathurst Station - Preliminary Design Overview

Preliminary Representation•subject to change

Page 50: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview50

Page 51: Bathurst Station Preliminary Design Consultation

Bathurst Station Preliminary DesignBathurst Station Preliminary Design

04/13/23Bathurst Station - Preliminary Design

Overview51