Station design is one of the most exciting -- and most critical -- components of The Crosstown construction. There are a number of major considerations for station design, including: accessibility for people with disabilities, development potential, integration with surrounding communities, and minimizing construction impacts. Visit www.thecrosstown.ca for more information about The Crosstown.TRANSCRIPT
Bathurst Station Preliminary Design
04/13/23
Bathurst Station Preliminary Design
Open House #1 November 28,
2011
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 2Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
3
Part 1• Introduction • Crosstown Update • Station Design 101 - Design Principles
Part 2 •Bathurst Station Preliminary Design
*Our partners in City Planning are here if you have questions about existing development requirements in the Bathurst area or the future Land Use Study around Crosstown Stations
Open House Overview
04/13/23 3Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
The Purpose of Tonight’s Open House • Provide a brief Crosstown project update
• Present the Crosstown station design philosophy • Explain the anatomy of the station components and challenges• Display the preliminary design of Bathurst Station Most importantly:
*Get your input on the Preliminary Design early in this process.
• The architectural design will be prepared for Open House #2 in Spring 2012. Significant outreach will follow on construction.
• Walls at the future station box are scheduled to begin at Bathurst in 2013 as part of the tunnelling process.
• Bathurst Station construction is scheduled to begin in 2014.
04/13/23Bathurst Station - Preliminary Design
Overview4
Bathurst Station Preliminary Design
04/13/23 5Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
Format for Feedback • Please speak with the project team at the displays, we’re here to
answer your questions
• There are tables to write comments and for group discussions
• Please submit a feedback form tonight if possible , or send us comments
via e-mail, mail, or online at www.thecrosstown.ca by December 12, 2011
• A consultation report to inform the designers will be posted online at:
www.thecrosstown.ca
04/13/23Bathurst Station - Preliminary Design
Overview6
Bathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview7
* Final number and location of stations subject to review
Bathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview8
The Eglinton-Scarborough Crosstown Plan• $8.4 billion transit investment from the Province of Ontario through
Metrolinx
• 25 km east-west transit corridor between Black Creek Drive and Scarborough Centre
• 60% faster than bus service today (e.g. only 15 minutes from Keele to Yonge)
• 19 km underground tunnel (Black Creek Drive to Kennedy Station)*
• 6km seamless service will replace the SRT from Kennedy Station to Scarborough Centre
• Up to 26 stations
*Exact alignment west of Keele Street and east of Laird Drive TBD
Bathurst Station Preliminary Design
First Construction Contract• Tunnel launch site preparation is underway at Keelesdale Park (between Black Creek Drive and Keele Street)
• Tunnelling will start in summer 2012 and head east
04/13/23Bathurst Station - Preliminary Design
Overview9
Bathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview10
Crosstown Construction Update
Crosstown tunnel preparation work at Black Creek and Eglinton in Keelesdale Park Piling rigs are building concrete support walls for the future tunnel launch shaft The shaft will enable tunnelling eastward in summer 2012 Soil testing for the tunnel and stations continues from Keele Street to Kennedy Station in
Scarborough
Bathurst Station Preliminary Design
Conceptual Design of a Crosstown Station
Urban Design and Architectural Guidelines have been developed:
•ensure positive change along the corridor •guide individual station designs and achieve consistency•guide configuration of surface elements•integrate surface elements with existing and future development
04/13/23 11Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
• Main Entrance• Secondary Entrance• Passenger Transportation (elevators, escalators)• Mechanical and Electrical Systems • Ventilation Shafts and Ventilation Fan Rooms• Traction Power Substations
Guiding Principle: Consolidate Surface Elements to enhance design & minimize
impacts
• Reduce construction impacts (traffic, staging area, noise, dust )• Preserve public space and development potential • Save $
Stations 101 What’s needed to make a Station Work?
04/13/23 12Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
13
• Integrate with surrounding neighbourhood
• Safe and enjoyable user experience
• Full accessibility
• Preserve space for future re-development
• Enhance the local “sense of place”
• Long-term sustainability
• Reduce Construction Footprint & Impacts
• Reduce Costs
Design Philosophy
Compatible scale
04/13/23 13Bathurst Station - Preliminary Design
Overview
Accessibility for all users
Bathurst Station Preliminary Design
14
Accessibility Principles & Features • Access for persons with all levels of mobility • Elevators
• Escalators
• Low-Floor Access
04/13/23Bathurst Station - Preliminary Design
Overview14
Bathurst Station Preliminary Design
15
Safety and Security Features • Monitored CCTV Security Cameras
• Urban Braille
• High Quality Lighting
04/13/23 15Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview16
Bathurst Station Preliminary Design
Architectural Design Approach
• Excellence in architectural/urban design treatments
• Cost effective and maintainable structures
• Standard station box configurations
• Creative use of materials, color, textures, artwork, light
• Brand identification with graphics• Use standard elements whenever
possible
04/13/23 17Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
Surface Elements – Guiding Principles
• Surface elements are most visible to public
• Integrate into local community
• Minimize property implications
• High quality design• Major focus on
consolidating:– Entrances– Vent Shafts– Substations
04/13/23 18Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
The Approach to Guide Detailed Design
04/13/23 19Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
• Any architectural finish can contain integrated artwork, including:
• walls• floors• ceilings• glazing
Integrated Artwork
04/13/23 20Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
04/13/23 21Bathurst Station - Preliminary Design
Overview
Cross-Section
Bathurst Station Preliminary Design
Station Entrances
• Public spaces which fit into the community
• Main & Secondary Entrance • Main Entrance is fully accessible
• Use of height/massing to create unique structure
• Highly visible, transparent, sophisticated
• Promote Transit-Oriented Development
• Maximize daylight opportunities
• Well lit at night
• Connect with Buses on street
04/13/23 22Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
Traction Power Substations What and Why?
• Required to provide power to the station system • Every two kilometres, at stations• Many different configurations• Above ground, surface, below-ground• Guidelines to integrate substations
04/13/23 23Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
24
Presentation Part 2: Bathurst Station
04/13/23 24Bathurst Station - Preliminary Design
Overview
Bathurst Station Preliminary Design
Bathurst Station Preliminary Design
Preliminary Design by:
Crosstown ConsortiumIBI GroupLEA Consulting SNC Lavalin
04/13/23Bathurst Station - Preliminary Design
Overview25
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
Local ContextPopulation Density within a 10 minute walk to Bathurst Station
04/13/23 Bathurst Station - Preliminary Design Overview
26
Bathurst Station Preliminary Design
Bathurst Station – Existing Uses & Proposed Development
04/13/23Bathurst Station - Preliminary Design
Overview27
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 Bathurst Station - Preliminary Design Overview
28
Bathurst Station Preliminary Design
Bathurst Station – Local ContextUpper Village Business Improvement Area (BIA)
04/13/23Bathurst Station - Preliminary Design
Overview29
•www.uppervillagetoronto.ca •Represents merchants, venues and services from Allen Road to Bathurst Street
•Wide selection of shops, restaurants & services
Bathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview30
Bathurst Station – EA (2010) (add property numbers)
Bathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview31
Potential Future Secondary Entrance
Generic Rendering Only Architecture Concept TBD
Bathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview32
Key Advantages of New Consolidated Design Reduces construction footprint, cost & impacts (roadway construction reduced by 21.5 metres)
Improves look and feel from street for community
Reduces number of properties affected
Preserves potential for investment and development with more public space
Bathurst Station Preliminary Design
04/13/23 33Bathurst Station - Preliminary Design
Overview
NORTH/EAST CORNER OF BATHURST AND EGLINTON
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 34Bathurst Station - Preliminary Design Overview
NORTH/EAST CORNER OF BATHURST AND EGLINTON
Bathurst Station Preliminary Design
04/13/23 35Bathurst Station - Preliminary Design
Overview
Rear Laneway
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 36Bathurst Station - Preliminary Design Overview
PROPERTY LINE
NEW SETBACK
GREEN BARRIER
• Setbacks TBD
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 37Bathurst Station - Preliminary Design Overview
Bathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview38
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 Bathurst Station - Preliminary Design Overview
39
Bathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview40
Bathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview41
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 42Bathurst Station - Preliminary Design Overview
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 43Bathurst Station - Preliminary Design Overview
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 44Bathurst Station - Preliminary Design Overview
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 45Bathurst Station - Preliminary Design Overview
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 46Bathurst Station - Preliminary Design Overview
Passenger Circulation
ISOMETRIC
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 47Bathurst Station - Preliminary Design Overview
Architectural Concept: Preliminary Representation•subject to change
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 48Bathurst Station - Preliminary Design Overview
Preliminary Representation•subject to change
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23 49Bathurst Station - Preliminary Design Overview
Preliminary Representation•subject to change
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview50
Bathurst Station Preliminary DesignBathurst Station Preliminary Design
04/13/23Bathurst Station - Preliminary Design
Overview51