Page 1: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Battery & Energy Storage29th November 2017The Slate at University of Warwick

Faithful ChandaInnovation & Low Carbon Networks Engineer

Page 2: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Agenda

Who we are

Context – Network issues

Storage Projects: Industrial & Commercial Project LV Connect & Manage Solar Storage

Conclusion

Battery & Energy Storage

Page 3: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Western Power Distribution

7.8 Million customers over a 55,500 sq kms service area

WPD network consists of 216,000 kms of overhead lines and underground cables, and 184,000 substations

LV to 132kV Network ownership

Network - East Midlands, West Midlands, South Wales, and South West

Industrial & Commercial Storage Project

Page 4: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

ContextNetwork Issues

Battery & Energy Storage

Climate change is

happening

Reduction in centralised generation

Constrained and

overloaded grid

Rapidly increasing sale of EVs

EVs are part of electrical

energy systems

Increase in distributed generation

New loads and load

profiles on the grid

A strong future for

distributed storage

Smart systems require control

Page 5: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

A typical demand increase in EVs

From the start of data collection (Q2, 2012) the cumulative Electric Vehicle (EV) data shows a sustained and dramatic growth of the EV car and van market

In Q2, 2012, there were 3,000 registered EV’s on the road

By Q2, 2014, this had rose to over 10,000

After this time there was exponential growth

The latest results Q3, 2016, shows 90,000 registered EV’s

Battery & Energy Storage

Page 6: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

The future strategy for managing the grid Statement: There is an increase in demand for electric vehicles The grid can do one of three things to cope with this demand:

Option 1: Introduce more capacity to the grid through generation and expand the networks capacity

Option 2: Introduce more flexible generation in order to deal with spikes seen from chargers

Option 3: Introduce local storage to greatly reduce the demand spike by using storage to deal with the ramp up of power

Option 3 is the most cost effective for the network as options 1 & 2 both require the local, and eventually, the national network to be upgraded in order to handle the capacity increase / capacity potential.

Battery & Energy Storage

Page 7: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Our response – WPD Innovation ProjectsDSO Flexibility from Energy Storage

Battery & Energy Storage

Stor

age

Solar StorageFALCON

I&C StorageConnect&Manage

SoLa BRISTOL

Solar Storage Co-location with Solar DG. Testing revenue stacking conflicts and optimisation

FALCON Assessment of DSO owned storage Technical and Commercial insight

I&C Storage Co-location with larger demand customers Connection design options and DSR services

SoLa BRISTOL In-home storage plus PV. DC networks. Community

microgrid optimisation. Connect and Manage

Integration of domestic storage (connection options) DSR revenue stacking and smart grid integration

Grid Scale

Domestic

Page 8: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Industrial & Commercial Storage Project

Page 9: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Project Aims & Objectives

Promote innovation, flexibility and non-network solutions (50kW, 210kWh) Engage with Industrial and Commercial Customers to test Energy Storage Systems Determining the scope of terms and conditions and practical implications of using

batteries on the LV networks Attitudinal analysis and performance assessment of participants within the commercial

environment Development of new policies, processes and systems to support commercial

deployment of Energy Storage Systems Provide knowledge to inform new regulations.

Industrial & Commercial Storage Project

Page 10: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Trial sites

Industrial & Commercial Storage Project

Cardiff

Taunton

Spilsby

Boston

Page 11: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Operating modes

Varied test configurations at 4 WPD sites

Industrial & Commercial Storage Project

Spilsby

At peak demand, storage can be used to eliminate

peaks

Taunton

Demonstrating Backup/Islanding

Sensing either grid failure or a simulation of grid failure the energy storage system then

energises the selected maintained loads

Boston Cardiff

Active control by WPD – Own controller and scheduling

tools

Flexibility and scalability for various trials -Operating the

site at constant load, constant voltage, etc.

FFR, Triad Avoidance and DUoS Charge reduction

UK “Standard Battery Storage” approach. Most common use

case today in the UK

Peak Shaving + PV integration

Page 12: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Site works Delivery of the Energy Storage units to site (s)

– June 2017

Civil works – Plinth – all sites

Electrical connections: Spilsby – 27th of July - No shutdown Boston 25th of July - Shutdown for 3hrs Cardiff – 29/30th July. New busbar

installed for connection due to insufficient capacity in existing DB

Taunton – Planned for November

Commissioning: Spilsby – 14th August Boston – 16th August Cardiff – 9th October Taunton - December

Industrial & Commercial Storage Project

Page 13: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

In general we can use the Tesla Powerpacks for….• Grid Support • Energy Management • Others

Industrial & Commercial Storage Project

Grid support1. Primary &

Secondary reserve2. Black Start

3. Load following/levelling

Uninterruptible Power Supply1. Emergency

backup2. Power Quality

Grid support1. Load Shifting

2. Voltage support3. Stability

4. Peak shaving

Energy Management1. Bulk Energy

Trading2. Arbitrage

Original load profile Load profile after Powerpack

Page 14: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

What does this mean to a customer?

Deliver more options for customer connections through alternative connections –develop an alternative connection agreement for behind-the-meter

Triad avoidance Lower future DUoS charges due to the reduced reinforcement requirements Overall reduction in power consumption due to onsite generation Access to the flexible market Through storage customers can support the local grid independently and reduce strain

on the network

Industrial & Commercial Storage Project

Page 15: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

LV Connect & Manage Project

Page 16: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Low carbon technology (LCT) connections on LV network:

LV Connect and Manage

Trend for ‘clustering’ Hard to predict and plan ahead reinforcement Traditional reinforcement is expensive and takes time Delayed customers’ connections Reverse Power Flow (RPF) impact on distribution network

Presenter
Presentation Notes
-Social – demographic environment - maintain the highest standard to service to its customers, WPD plans to connect them as quickly and cost-effectively as possible and then actively manage them, once connected.
Page 17: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

LV Connect and Manage

LV Connect & Manage outline

£1.7m NIA project (April 2016 - March 2019) Ability to provide more power during non – peak hours Bi-directional power flow control via “Domestic Load Controller” (DLC) hardware Accelerate connection of LCTs (storage, EVs, heat pumps) Protect WPD assets from overload 6 distribution substations and 100 customers in Furzton, Milton Keynes (Energy

Storage) and West Bridgford, Nottingham (EV chargers)

Presenter
Presentation Notes
Development of a smart interface point for domestic customers. This will give customer the ability to take larger amounts of power from the network when circumstances allow. It will also allow us protect assets from overload under exceptional circumstances when we would have the ability to turn down customer equipment such as chargers for electric cars.
Page 18: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

LV Connect and Manage

Objectives

The project objectives are to trial and demonstrate:

Smart ANM solution for LV network Possibility of load management, as an alternative to network reinforcement BPL communication - Broadband over powerline (substation to customers’ homes) New business processes, based on proven, off-the-shelf technology, which can be

quickly and cost effectively deployed

Presenter
Presentation Notes
The objectives of this project are to trial and demonstrate the following: 1.Broadband over powerline, providing the communications solution between distribution substations and customers (enabling the bi-directional power flow control of LCTs) 2.ANM solutions with intelligence distributed into the LV network to monitor and control LCTs in real-time and optimize import / export patterns within operational limits 3.ANM solutions, as a short or long term alternative to network reinforcement, in areas where network constraints are becoming a problem due to the localized uptake of LCTs 4.New business processes, based on proven, off-the-shelf technology, which can be quickly and cost-effectively deployed to connect and manage LV customers’ LCTs.
Page 19: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

LV Connect and ManageCustomer benefits

Intelligent interface to accelerate connection of LCTs (storage, EVs, heat pumps)

Avoid costly reinforcement Reduced amount of street works Provide flexibility to export more power

during non – peak hours or/and use stored energy in ‘self consumption’ mode

Consume energy in more sustainable, environmentally friendly way. Reduce amount of CO2 emissions

Page 20: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

LV Connect and Manage

Hereford depot trial installation

Demonstration of PV/battery export control Demonstration of EV charge control

Customer side

Presenter
Presentation Notes
The communications test was from Nortech’s Envoy via PPC’s Compact Modem to a Head-end Modem (using Broadband-over-Powerline) through a 4G Westermo router (with secure VPN link) to iHost.
Page 21: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

LV Connect and Manage

LV substationinstallation

Hereford depot trial installation

Page 22: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

LV Connect and Manage

Project roll out

Control & monitoring equipment is installed in 6 distribution substations:942197 GRASSCROFT BLETCHLEY (FURZTON)942196 PARKSIDE FURZTON942183 PERRACOMBE FURZTON

881417 WEST BRIDGFORD RUGBY ROAD881418 WEST BRIDGFORD COMPTON ACRES881089 WEST BRIDGFORD HAWTHORNE PARK

Customers engagement activities: Customer engagement meetings Leaflets Social networks Customer engagement video Website: www.wpdconnectandmanage.co.uk

Page 23: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

LV Connect and Manage

Customer installations - Storage 38/50 sign-ups in Milton Keynes, 14 installations to date

Page 24: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

LV Connect and Manage

Customer installations - EVs 27/50 sign-ups in Nottingham, 26 installations to date

Page 25: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Solar Storage Project

Page 26: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Project Overview

Solar Storage Project

Trial of a behind-the-meter battery energy storage system (300kW/600kWh) on a large solar site (1.3MW) in Somerset.

Quantify benefits of nine use cases for both the DNO & battery owner.

See how use cases be combined and revenues stacked.

Explore routes to market – challenges and rewards.

Making the case for energy storage in new connection offers.

© Western Power Distribution 2017

Page 27: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Solar Storage Project

Benefits split into 9 use cases

© Western Power Distribution 2017

Page 28: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Summary

Page 29: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

Energy Storage Integration - Summary

Innovation projects are developing Real world learning on storage operation Knowledge to adjust technical standards Alternative connection variants – customer

choice

Challenges ahead Use of system charging Software interlocking of operational modes Open standards Cyber security

Battery & Energy Storage

Page 30: Battery & Energy Storage - internetofbusiness.com to 132kV Network ownership ... (substation to customers’ homes ) New business processes, ... PowerPoint Presentation

T H A N K S F O R L I S T E N I N G

[email protected]

Faithful ChandaWestern Power DistributionInnovation and Low Carbon Networks Engineer+44 7595 [email protected]