beam secondary shower acquisition system: bws pcvd measurements on sps ba5 bws51731 be-bi-bl jose...

15

Upload: valerie-davidson

Post on 19-Jan-2018

218 views

Category:

Documents


0 download

DESCRIPTION

1. Preparing the pCVD Amplifier 1.1 Transimpedance amplifier configuration Something extremely simple (J. Koopman 08/10/2007 EDA-01716) 1x THS3001 1x Resistor 1 K ohm 2x Resistor 51 ohm BE-BI-BL Jose Luis Sirvent Blasco 3 2 x Decoupling Caps 100nF 2 x Decoupling Caps 6.8uF 2 x SMA Connectors (IN/OUT) 2 x LEMO Connectors (Power +/- 12V) I in V out Vout = Rf * Iin V out (50 ohms Load) = (1K * I in) / 2

TRANSCRIPT

Page 1: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent
Page 2: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

2

Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731

Jose Luis Sirvent BlascoPhD. Student

Student Meeting22/06/2015

Page 3: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

3

1. Preparing the pCVD Amplifier1.1 Transimpedance amplifier configuration

• Something extremely simple (J. Koopman 08/10/2007 EDA-01716)• 1x THS3001• 1x Resistor 1 K ohm • 2x Resistor 51 ohm

• 2 x Decoupling Caps 100nF• 2 x Decoupling Caps 6.8uF • 2 x SMA Connectors (IN/OUT)• 2 x LEMO Connectors (Power +/- 12V)

I in V out

Vout = Rf * Iin

V out (50 ohms Load) = (1K * I in) / 2

Page 4: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

4

1. Preparing the pCVD Amplifier1.2 Testing before installation

20 ns

350 mV

• Using a Photodiode to emulate the Diamond Detector:• Aim: Testing the timing behaviour• Same electric model (but different values)• Similar response (light charged particles)• Laser driver circuit built

• Modulation with pulse source (3ns pulses)• Laser direct modulation

• SMF 9/125 um connection

Page 5: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

5

1. Preparing the pCVD Amplifier1.2 Testing before installation

20 ns

350 mV

• Using a Photodiode to emulate the Diamond Detector:• Aim: Testing the timing behaviour• Same electric model (but different values)• Similar response (light charged particles)• Laser driver circuit built

• Modulation with pulse source (3ns pulses)• Laser direct modulation

• SMF 9/125 um connection

Page 6: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

6

1. Preparing the pCVD Amplifier1.3 Same Set-up but with CIVIDEC 20dB amplifier (just for curiosity)

Faster (obviously)Ringing observed

Page 7: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

7

1. Preparing the pCVD Amplifier1.4 Testing before installation (now with radiation, Alpha)

CIVIDEC 40dB Amplifier Transimpedance EDA-01716

4.5 mV

~ 13ns

4 mV

~ 13ns

40 mV

40 mV

~ 7ns

~ 7ns

pCVD HV = 700V

pCVD HV = 700VpCVD HV = -700V

pCVD HV = -700V

Thanks to Marcin collaboration!

Page 8: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

8

• Connections:• 3501876A HV• 3501873A +12V• 3501872A -12V• 3501868A Signal

Cable Distance: 80m up to measurement point

2. Measurements on SPS BA52.1 Testing profiles on BWS51730 (Set-up)

BWS51730 H&V pCVD + AmplifScintillator + PMT + Amplif

~ 1.6m

On Surface…

Synch (Turn + Bunch Clk)

Page 9: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

9

2. Measurements on SPS BA52.1 Testing profiles on BWS51730 (Single Loss, no Scan done)

-2 -1 0 1 2 3 4 5 6 7

x 10-8

-1

0

1

2

3

4

5

x 10-3

Time (s)

Am

plitu

de (v

)

pCVD Diamond Detector Measurement Campaign (18/06/2015)

pCVD Diamond Detector SignalBunch Clock (40MHz)

-2 -1 0 1 2 3 4 5 6 7

x 10-8

0

5

10

15x 10

-3

Time (s)

Am

plitu

de (v

)

pCVD Diamond Detector Measurement Campaign (18/06/2015)

pCVD Diamond Detector SignalBunch Clock (40MHz)

Page 10: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

10

2. Measurements on SPS BA52.1 Testing profiles on BWS51730 (Speed: 1 ms-1, Beam : 1e10 ppb, pCVD HV= - 700V)

-0.5 0 0.5 1 1.5 2 2.5 3 3.5 4

x 10-3

0

0.05

0.1

0.15

0.2

0.25

Time (s)

Am

plitu

de (v

)

pCVD Diamond Detector Measurement Campaign (18/06/2015)

pCVD Diamond Detector Signal

-0.5 0 0.5 1 1.5 2 2.5 3 3.5 4

x 10-3

0

0.05

0.1

0.15

0.2

0.25

0.3

Time (s)

Am

plitu

de (v

)

pCVD Diamond Detector Measurement Campaign (18/06/2015)

pCVD Diamond Detector Signal

Just showing RAW DATA analysis needed!!

Page 11: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

11

-0.5 0 0.5 1 1.5 2 2.5 3 3.5 4

x 10-3

-0.25

-0.2

-0.15

-0.1

-0.05

0

0.05

Time (s)

Am

plitu

de (v

)

pCVD Diamond Detector Measurement Campaign (18/06/2015)

pCVD Diamond Detector Signal

2. Measurements on SPS BA52.1 Testing profiles on BWS51730 (Speed: 1 ms-1, Beam : 1e10 ppb, pCVD HV= + 700V)

Just showing RAW DATA analysis needed!!

-0.5 0 0.5 1 1.5 2 2.5 3 3.5 4

x 10-3

-0.25

-0.2

-0.15

-0.1

-0.05

0

0.05

Time (s)

Am

plitu

de (v

)

pCVD Diamond Detector Measurement Campaign (18/06/2015)

pCVD Diamond Detector Signal

Wider??

Page 12: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

12

-0.5 0 0.5 1 1.5 2 2.5 3 3.5 4

x 10-3

-0.25

-0.2

-0.15

-0.1

-0.05

0

0.05

Time (s)

Am

plitu

de (v

)

pCVD Diamond Detector Measurement Campaign (18/06/2015)

pCVD Diamond Detector Signal

2. Measurements on SPS BA52.1 Testing profiles on BWS51730 (Speed: 1 ms-1, Beam : 1e10 ppb, pCVD HV= + 500V)

Just showing RAW DATA analysis needed!!

Wider??

-0.5 0 0.5 1 1.5 2 2.5 3 3.5 4

x 10-3

-0.25

-0.2

-0.15

-0.1

-0.05

0

0.05

Time (s)

Am

plitu

de (v

)

pCVD Diamond Detector Measurement Campaign (18/06/2015)

pCVD Diamond Detector Signal

Page 13: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

13

-0.5 0 0.5 1 1.5 2 2.5 3 3.5 4

x 10-3

-0.25

-0.2

-0.15

-0.1

-0.05

0

0.05

Time (s)

Am

plitu

de (v

)

pCVD Diamond Detector Measurement Campaign (18/06/2015)

pCVD Diamond Detector Signal

2. Measurements on SPS BA52.1 Testing profiles on BWS51730 (Speed: 1 ms-1, Beam : 1e10 ppb, pCVD HV= + 300V)

Just showing RAW DATA analysis needed!!

Wider??

-0.5 0 0.5 1 1.5 2 2.5 3 3.5 4

x 10-3

-0.25

-0.2

-0.15

-0.1

-0.05

0

0.05

Time (s)

Am

plitu

de (v

)

pCVD Diamond Detector Measurement Campaign (18/06/2015)

pCVD Diamond Detector Signal

Page 14: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent

BE-BI-BL Jose Luis Sirvent Blasco ([email protected])

14

3. Issues and To-do list• 1. Scans data from BWS51730 not stored on DB

• Need to repeat measurements for comparison • 2. Noise studies (FFT, distribution, stdev…)

• Check correlation with Cable measurement campaign (all systems were off)• 3. Profile analysis and processing (To-do)

• Base-Line removal• Integrals by software every 25ns (using Bunch CLK)• Voltage on 50ohm Charge value• Select only one bunch• Gaussian fit on profiles considering 1ms-1 (Beam sigma comparison)• Study non-uniformity of Gaussian profile (Scint + PMT looks “more Gaussian”)

• Betatron oscillations??• Effect of random particle shower?? • Wire vibration??• Noise on HV??• Longer pulse??• …• Theories are welcome!! Thanks to Emiliano’s help!

Page 15: Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent