bellevue downtown association downtown bike series · 28/09/2017  · the bicycle rapid...

47
Bellevue Downtown Association Downtown Bike Series Meeting 1: Introduction & Information Franz Loewenherz Andreas Piller Kyle Potuzak Chris Long September 28, 2017

Upload: others

Post on 20-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Bellevue Downtown Association Downtown Bike Series

Meeting 1: Introduction & Information

Franz LoewenherzAndreas PillerKyle PotuzakChris Long

September 28, 2017

Page 2: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Today’s Agenda:

1) Meeting Purpose

2) PBII Overview

3) BDA Consultative Process

4) Next Steps: Bike Share

5) Next Steps: Demo Corridor

2

Page 3: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

33Meeting Purpose

The BDA has asked the Bellevue Transportation Department to engage in a timely discussion about how to make Downtown a comfortable, safe, and attractive place for people to bike.

Page 4: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Meeting Purpose4

10/26/17 Committee

11/16/17 Committee

12/19/17 Board

9/28/17 Committee

BDA Transportation Committee will conduct an internal review and discussion, followed by driving consensus on a recommendation.

The recommendation will be presented to the BDA Board of Directors (12/19).

The Board will vote on a position that will be communicated to the Bellevue Transportation Commission.

Page 5: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

55Meeting Purpose

Page 6: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

66Meeting Purpose

Page 7: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

77Meeting Purpose

Page 8: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

88Meeting Purpose

Page 9: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

99Meeting Purpose

Page 10: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

1010Meeting Purpose

Page 11: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

2009 Pedestrian & Bicycle Plan

Ordinance No. 5861 (2/17/2009)

Formulated vision, goals, objectives.

Assessed gaps in the non-motorized network.

Established performance targets.

11

Page 12: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

12

2019 Performance Target:

“Within 10 years, implement at least two completed, connected, and integrated north-south and at least two east-west bicycle routes that connects the boundaries of the city limits, and connects to the broader regional bicycle system.”

- 2009 Pedestrian & Bicycle Transportation Plan

Priority Bicycle Corridors

Page 13: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Priority Bicycle Corridors13

Page 14: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

PBII Scope of Work14

“Engage community stakeholders in setting the priorities for investment in non-motorized facilities.”

- Council Program Principle(s)

Page 15: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Bellevue City Council

Transportation Commission

Business Organizations

Non-Profit Organizations

Residents, Employees, Students

Colleges, Schools, Transit Agencies

PBII Oversight15

Page 16: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

16Board & Commission Mtg (8/18/15)

“The separated lane is very attractive for safety reasons. My greatest concern is the taking of scarce roadway space for a limited user base.” – Lampe

“Separating the biker from traffic is a given…. We provide it for cars to prevent accidents. We should provide it for bikers given the imbalance in protection.” – Barksdale

Page 17: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

1717BDA Board Results (10/25/15)

0

10

20

30

40

50

60

4%

19%

56%

22%

Which of these types of facilities would encourage you/your employees to bike in Downtown Bellevue?

Shared Lane Marking Bike Lane Protected Bike Lane Off-Street Path

Page 18: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

1818

“Downtown Bellevue is not an area where the faint of heart would choose to ride; that said, it is prime for investment to attract additional riders. What’s needed are safe and inviting bicycle facilities that are separated from the auto.”

- Karen Doherty, Senior Vice President, Puget Sound Area Manager of HDR

Stakeholder Interviews

Page 19: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

19

Fall 2015: Locations that feel unsafe for people walking and bicycling.

Spring 2016: Comments on 52 project ideas being considered in the BRIP.

Wikimap Outreach

Page 20: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

20Open House (March 2016)

Page 21: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

21BRIP Report (April 2016)

Page 22: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

22Business Community (April 2016)

“We strongly urge you to prioritize funding for a complete, connected 57 mile network of bike/ped infrastructure throughout Bellevue, emphasizing protected bike paths as much as possible.”

- Eric Artz, Chief Operating Officer

“We support increased investment in bicycling infrastructure and taking rapid action on the following projects …”

- Al Kinisky, Senior Director of Real Estate

“… the Bicycle Rapid Implementation plan is a cost-effective strategy to help transform Bellevue into a safe and inviting urban center for bicyclists and vital for improving station access in preparation for Sound Transit’s East Link….”

- Lisa Brandenburg, President

Page 23: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

23Levy Funding (November 2016)

In 2017-2018, the BRIP program will leverage roughly $1.7M of funding from the Transportation Levy.

Page 24: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

24

10/26/17 Committee

11/16/17 Committee

12/19/17 Board

9/28/17 Committee

Bike Share

Demonstration Bikeway Project

Downtown Bicycle Network

BDA Consultative Process (Phase I)

Page 25: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Bellevue City Council

Transportation Commission

Business Organizations

Non-Profit Organizations

Downtown Residents

Downtown Employees

Downtown Consultative Process 25

Page 26: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Bike Share26

“Provide people in Bellevue access to a bicycle when they want one, without having to worry about storage, security, and maintenance.”

- PBII Scope of Work

Page 27: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

What is Bike Share27

Page 28: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

United States of Bike Share28

Page 29: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Why Use Bike Share?

Convenience

Expedience

Expanded Range

Flexibility

Improved Access to Transit

Enjoyment

Bike Mobility without…– Maintenance

– Parking/Storage

– Planning Ahead

Why Use Bike Share29

Page 30: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Station-Based

30

Hub-Based Free-Floating

Types of Bike Share

Page 31: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Bike Share Permit Requirements:

Safety

Parking

Operations

Data Sharing

Fees

Application

Seattle Pilot Program31

Page 32: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Bike Share in Bellevue32

Page 33: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Bicycling and Bike Share Survey33

Page 34: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

34Survey Results Preview

56%

20%

24% Yes, I would use bikeshare in Bellevue

No, I would not usebike share

I don't know

If a bike share service was available in Bellevue today, would you use bike share in Bellevue?

n=580

Page 35: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

35Eastside Bike Share Vendor Fair

Page 36: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

36Eastside Bike Share Vendor Fair

Page 37: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Common Concerns

Public Investment

Helmet Law

Safety

Aesthetics

Vandalism

Common Concerns37

Page 38: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Initial Feedback?

1. Questions/concerns?

2. Should we permit private companies to operate bike share in Bellevue in 2018?

38BDA Feedback on Bike Share

Page 39: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Demonstration Bikeway Project39

“Advance the implementation of Bellevue’s planned Bicycle Priority Corridors to facilitate continuous bicycle travel along a connected grid of safe facilities throughout the city and the region.”

- Council Program Principle(s)

Page 40: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

40Demonstration Bikeway Project

RAPID LOW-COST ASSESSMENT

Page 41: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Chicago

Washington, DC

Austin

Pittsburgh

Demonstration Bikeway Project41

Page 42: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

42Where People Ride

Be

llevu

e W

ay

10

8th

Ave

NE

11

2th

Ave

NE

Main St

NE 12th St

NE 2nd St

Page 43: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

2017-18 Bike Projects: 108th Ave NE/SE 112th Ave NE NE 12th St NE 24th St SE 8th St

43Existing Bike Network

Page 44: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Downtown Bicycle Network Candidate Corridors:

North-South 100th Ave NE 106th Ave NE 108th Ave NE 114th Ave

East-West Main St NE 2nd St NE 12th St

44Potential Bike Network

Page 45: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Demonstration Bikeway Project Candidate Corridors:

108th Ave NEMain St to NE 12th St

Main St105th Ave to 112th Ave

NE 2nd St106th Ave NE to 110th Ave NE

106th Ave NEMain St to NE 12th St

45Candidate Demo Corridors

Page 46: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

BDA Feedback on Evaluation Criteria46

Did we miss something?

•Existing bike network connections

•High comfort bikeway

•Consistency with community feedback

Bicycle Improvements

•Construction activity

•Driveways

Land Use

•Travel lanes repurposed

•Turn lanes repurposed

•Changes to on-street parking

•Transit operation challenges

Street Use Impacts

Next Steps: Share Assessment @ 10/26 BDA Meeting

Page 47: Bellevue Downtown Association Downtown Bike Series · 28/09/2017  · the Bicycle Rapid Implementation plan is a cost-effective ... storage, security, and ... Improved Access to Transit

Franz LoewenherzTransportation [email protected]‐452‐4077

For More Information47