benjamin chilton steven andrew martin rose schneider ecj parking lot redesign ut austin: group 5

14
BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

Upload: lynne-jones

Post on 17-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

BENJAMIN CHILTON

STEVEN ANDREW MARTIN

ROSE SCHNEIDER

ECJ PARKING LOT REDESIGNUT AUSTIN: GROUP 5

Page 2: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

OVERVIEW

• Define Study Area

• Current Operation & Problems

• Research & Design Challenges

• Calculations

• Final Design Decision

• Next Steps

Page 3: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

STEP 1: REPRESENTATION

Page 4: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

STEP 1: REPRESENTATION

Page 5: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

STEP 2: PROCESS

• Average Annual Rainfall: 32.15 in

• Roof flow piped directly into Waller Creek

• Flow from parking lot to Waller Creek

Page 6: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

STEP 3: EVALUATION

• Inadequate drainage

• Unfiltered runoff

• Large obtrusive wall

• Erosion of soil

• Uncontrolled flow

• Wasted space

Page 7: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

STEP 4: CHANGE

• Remove and replace the existing wall

• Porous pavement

• Rain garden

Page 8: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

POROUS PAVEMENT

• Pavement surface with a stone reservoir underneath

• Temporarily stores surface runoff before infiltrating it into the subsoil

• Incorporates void spaces that allow infiltration

Page 9: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

RAIN GARDEN

• Capture stormwater and provide for natural infiltration

• Decrease flooding risks

• Filter pollutants

• Alleviate erosion

Page 10: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

DESIGN LAYOUT

Total area: 35,300 ft2

Asphalt: 14,700 ft2

Porous pavement: 17,900 ft2

Rain garden: 2,717 ft2

Page 11: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

STEP 5: IMPACT, RAIN GARDEN

Page 12: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

STEP 5: IMPACT, POROUS PAVEMENT

Page 13: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5
Page 14: BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER ECJ PARKING LOT REDESIGN UT AUSTIN: GROUP 5

STEP 6: DECISION