bethlehem parking authority feasibility study
TRANSCRIPT
-
7/24/2019 Bethlehem Parking Authority feasibility study
1/27
PARKING
DEMAND
&
FEASIBILITY
STUDY
February
24,
2016
PreparedFor:
BethlehemParkingAuthority85 W N h S
-
7/24/2019 Bethlehem Parking Authority feasibility study
2/27
TABLEOFCONTENTS
SECTION PAGE
IExecutiveSummary 1
IIParkingDemandAnalysis 2
IIIProposedParkingImprovements 13
IVFinancialAnalysis 14
V
Findings
22
List
of
Figures
FIGURE PAGE
1StudyArea 2
2OnStreetParkinginStudyArea 3
3OffStreetParkinginStudyArea 4
4ObservedPeakOccupancybyStreetSegmentandOffStreetFacility 7
5ProposedDevelopmentLookingSouthwest 8
6ProposedDevelopmentfromtheWest 9
7
Existing
Parking
Supply
within
Reasonable
Walking
Distance
11
8ProposedNewStreetGarageGradeLevelPlan 13
List
of
Tables
TABLE PAGE
1OnStreetParkingInventory&PeakOccupancy 5
2OffStreetParkingInventory&PeakOccupancy 6
3StudyAreaPeakParkingDemand 6
4FutureParkingDemandAnalysis 10
-
7/24/2019 Bethlehem Parking Authority feasibility study
3/27
SectionIExecutiveSummary
DESMANhasbeenengagedbytheBethlehemParkingAuthority(BPA)toprepareaParkingDemandand
FeasibilityStudytoassistinevaluatingtheneedsofexistingandfutureparkinggeneratorsintheStudy
Areaandprovidetheinfrastructuretomeetdemand.Thisassignmenthasagreatpotentialtopositively
influencethequalityoflifeoftheCitysresidents,employers,workersandvisitorsbyestablishingawell
conceivedplantomeetparkingandtransportationneeds.It iscriticalthatthisassignmentresults ina
planthatisimplementable,costeffective,safe,andwillbewellreceivedbythecommunity.
TheStudyAreaforthisassignmentisgenerallyboundby2ndStreetonthenorth,PackerAvenueonthe
south,WebsterStreetontheeastandBrodheadAvenueonthewest. ThisStudyintendstoprovidethe
BPAwithanevaluationoftheparkingconditions thatareexpected intheCitysSouthsideDowntown
with the planned development of several projects by private developers. This Report addresses the
existingparkingdemandsandtheanticipatedparkingconditionsafterthecompletionofthe foreseen
development initiatives in the study area. Subsequent tasks included an analysis of the financial
feasibility andperformanceof the BPAwith addeddebt from the constructionof a parking facility to
meetfuture
parking
demand
in
the
Southside,
maintenance
of
its
existing
infrastructure
and
general
operatingrequirements.
Basedonapprovedandplanneddevelopmentscenarios intheStudyArea,anadditionalpeakparking
demandof680spacesisexpectedduringtheweek.Thisinconjunctionwiththeexistingpublicparking
demand in the area of 104 vehicles, barring any other development which would increase parking
demand in the area, results in a total future peak weekday parking demand of approximately 780
spaces.Basedonthis levelofdemand,the idealfutureparkingsupply intheareawouldbeabout850
spaces,which
would
ensure
that
approximately
10%
of
the
public
parking
spaces
remain
vacant
during
thepeakdemandperiod,reducingexcessivecirculationofvehicles looking foranavailablespace. It is
commonpracticeintheparkingindustrytodesignparkingfacilitiesandsystemswiththislevelofexcess
peakcapacity. Assumingan ideal futureparkingsupplyof850spacesandanexpectedsupplyof144
spaces(74onstreet+70offstreet),approximately700additionalspaceswouldneedtobeconstructed
in order to adequately address the parking needs of this area of Bethlehem, assuming the proposed
developmentsarebuiltascurrentlyenvisioned.
Inorder
to
meet
the
expected
demand
for
parking
in
the
study
area
the
BPA
is
proposing
to
construct
aparkingstructureatthecornerofSouthNewStreetandRinkStreet.Thefacilityisplannedtoprovide6
levels of parking allowing for a capacity of 626 spaces. Budgets prepared to date for Design Costs,
Permits, Inspections,GeneralConditions,FeesandConstructionofthe626space facility indicatesthe
projectwillhaveacostofapproximately$17,750,000.
h bj i f hi fi i l l i d i h h h hl h ki
-
7/24/2019 Bethlehem Parking Authority feasibility study
4/27
needed such as parking rate increases and/or City of Bethlehem guarantees to cover the Authoritys
operationalexpenses
and
debt
obligations.
SectionIIParkingDemandAnalysis
ThissectionofourStudypresentstheresultsofourParkingDemandAnalysisperformedinconjunction
withourengagement. TheStudy Area isgenerally bounded by the Lehigh River to thenorth, Packer
Avenuetothesouth,WebsterStreettotheeast,andMontclairAvenuetothewest.Figure1showsthe
studyarea
boundaries.
ThestudyareaincludesaportionofLehighUniversity,significantretail,restaurantandofficespace,and
single andmultifamilyresidentialbuildings.TothenorthandeastofthestudyareaareNorthampton
CommunityCollege (NHCC),an icerink (Steel IceCenter),commercialspace,andtheremnantsofthe
old Bethlehem Steel plant and offices, a portion of which was redeveloped into SteelStacks arts and
entertainmentdistrict.Ontheeastandwest,thestudyarea isborderedmostlybyresidentialstreets,
whileonthesouthitisborderedbytheLehighUniversitycampus.Additionaldevelopmentisplannedin
thearea,
which
will
be
addressed
later
in
the
report.
Figure1StudyArea
-
7/24/2019 Bethlehem Parking Authority feasibility study
5/27
DataCollection
Inventoryandhourlyoccupancycountsoftheonstreetandoffstreetparking inthestudyareawere
performed on Wednesday, April 15, 2015 between 9AM and 8PM. The onstreet parking spaces
surveyed are monitored usingsinglespace meters whichaccept both coin and credit/debit cards and
areenforcedfrom8AMto9PM,MondaythroughSaturday.Theonstreetrateisa$1perhourwitha3
hourmaximumtimelimit.
Figure2showsthestreetsegmentswheremeteredparkingiscurrentlylocatedwithinthestudyarea.
Figure2OnStreetParkinginStudyArea
Source: DESMAN
-
7/24/2019 Bethlehem Parking Authority feasibility study
6/27
-
7/24/2019 Bethlehem Parking Authority feasibility study
7/27
Table1OnStreetParkingInventoryandPeakOccupancy
Street Between Sideof
Street #ofSpaces 1:00PM Occ.%
UnionStation UnionStationPlace&W.2ndSt. East 7 0 0%
W.2ndSt. Un ionStationPlace&S.NewSt. North 16 0 0%
E.3rdSt. S.NewSt.&AdamsSt. North 4 4 100%
E.3rdSt. S.NewSt.&AdamsSt. South 5 3 60%
E.3rdSt. AdamsSt.&WebsterSt. North 12 6 50%
E.3rdSt. AdamsSt.&WebsterSt. South 7 4 57%
AdamsS t. C ol umb iaSt.&E.3rdSt. East 4 4 100%
AdamsS t. C ol umb iaSt.&E.3rdSt. West 4 4 100%
AdamsSt. E.3rdSt.&Mechanic East 3 0 0%
AdamsSt. The
Greenway
&
E.
4th
St. East 4 4 100%
AdamsSt. TheGreenway&E.4thSt. West 3 3 100%
AdamsSt. E.4thSt.&E.MortonSt. East 7 6 86%
AdamsSt. E.4thSt.&E.MortonSt. West 1 0 0%
MechanicSt. S.NewSt.&AdamsSt. North 11 3 27%
MechanicSt. AdamsSt.&WebsterSt. North 6 1 17%
WebsterSt. W.PackerAve.&E.MortonSt. West 14 8 57%
WebsterSt. E.MortonSt.&E.4thSt. West 4 4 100%
WebsterSt. E.3rdSt.&MechanicSt. West 6 0 0%
MontclairAve. CressSt.&Broadway St. East 3 0 0%
MontclairAve. CressSt.&Broadway St. West 3 0 0%
Broadway St. E.4thSt.totheSouthwest North 5 2 40%
BroadwaySt. E.
4th
St.
to
the
Southwest South 4 0 0%
Broadway St. E.4thSt.&BrodheadAve. North 6 3 50%
Broadway St. E.4thSt.&BrodheadAve. South 5 1 20%
BrodheadAve. E.4thSt.&W.PackerAve. West 32 3 9%
BrodheadAve. E.4thSt.&E.MortonSt. East 6 1 17%
BrodheadAve. E.MortonSt.&W.PackerAve. East 16 2 13%
W.PackerAve. BrodheadAve.&VineSt. North 11 2 18%
W.PackerAve. VineSt.&WebsterSt. North 34 29 85%
W.PackerAve. BrodheadAve.&WebsterSt. South 40 35 88%
E.MortonSt. BrodheadAve.&Mariel St. North 5 2 40%
E.MortonSt. MarielSt.&VineSt. North 5 3 60%
E.MortonSt. BrodheadAve.&VineSt. South 5 0 0%
E.MortonS t. V in eSt.&S.NewSt. North 8 8 100%
E.MortonS t. V in eSt.&S.NewSt. South 6 4 67%
E.MortonSt. S.NewSt.&AdamsSt. North 13 4 31%
E.MortonSt. S.NewSt.&AdamsSt. South 11 5 45%
E.MortonSt. AdamsSt.&WebsterSt. North 7 6 86%
E.MortonSt. AdamsSt.&WebsterSt. South 14 1 7%
E.4thSt. Bi rk elAve.&BrodheadAve. South 2 2 100%
E.4thS t. Bro dh eadAve.&VineSt. North 13 8 62%
E.4thS t. Bro dh eadAve.&Mariel St. South 8 6 75%
E.4thSt. Mari elSt.&VineSt. South 5 5 100%
E.4thSt. VineSt.&S.NewSt. North 8 7 88%
E.
4th
St. Vine
St.
&
S.
New
St. South 10 8 80%E.4thSt. S.NewSt.&AdamsSt. North 8 4 50%
E.4thSt. S.NewSt.&AdamsSt. South 8 4 50%
S.NewSt. E.3rdSt.&TheGreenway West 3 1 33%
S.NewSt. W.GrahamPl.&E.4thSt. East 7 5 71%
S.NewSt. W.GrahamPl.&E.4thSt. West 6 4 67%
S.NewSt. E.4thSt.&E.MortonSt. East 4 4 100%
S.NewSt. E.4thSt.&E.MortonSt. West 5 3 60%
VineSt. RinkSt.&E.4thSt. West 3 3 100%
-
7/24/2019 Bethlehem Parking Authority feasibility study
8/27
Table2OffStreetParkingInventoryandPeakOccupancy
Source:DESMAN
As seen in Tables 1 and 2, the onstreet metered parking spaces within the study area were 53%
occupied(264occupiedoutof502spaces)atpeak,whiletheoffstreetspaceswere33%occupied(128
occupied out of 392 spaces). The overall occupancy of the study area during the 1PM peak demand
periodwas44%,asshowninTable3.
Figure4shows theobservedoccupancyofeachmeteredstreetsegmentandoffstreet facilityduring
the1PM
peak
demand
hour
and
the
complete
set
of
hourly
on
and
off
street
parking
occupancy
counts
performedisincludedintheAppendixofthisreport.
Table3StudyAreaPeakParkingDemand
DESMAN
Thefinalfactortoconsiderinthisanalysisistheconceptofpracticalcapacity,whichsaysthataparking
systemisperceivedtobefullyoccupiedbythecommonuseratlessthanitsactualcapacity.Generally,
MapID FacilityNameorDescription Location Capacity 1:00PM Occ.%
A LehighRiverportParking
Garage 11W.SecondStreet 149 49 33%
B BroadwayStreetLot 201BroadwayStreet 22 4 18%
C WestThirdStreetLot ThirdStreetb/wBrodhead&
New 30 15 50%
D NewStreetBridgeLot 13W.ThirdStreet 17 5 29%
E ThirdStreet
Lot 24
E.
Third
Street 23 8 35%
F GrahamStreetLot 327S.NewStreet 38 27 71%
G Me chani c&WebsterLot Mechanicb/wAdams&
Webster 56 12 21%
H Third&WebsterLot CornerofWebster&3rd 15 8 53%
I BeneathFahyBridge EastofLehighRiverportParking
Garage 42 0 0%
TotalOffStreetParkingInventoryandOccupancy 392 128 33%
ParkingType InventoryObservedPeak
OccupancyOcc.%
OnStreet 502 264 53%
OffStreet 392 128 33%
TOTAL 894 392 44%
-
7/24/2019 Bethlehem Parking Authority feasibility study
9/27
Figure4ObservedPeakPeriodOccupancybyStreetSegmentandOffStreetFacility
Source:DESMAN
FutureDevelopments
Inorder
to
determine
the
anticipated
future
parking
demand
conditions
within
the
study
area,
it
was
necessary to identify any potential developments which could impact the supply of and demand for
parking. As the major institution in the study area, we spoke with Lehigh University regarding their
future development plans, as well as speaking with other stakeholders. While the University is not
currentlyplanninganydevelopmentsinornearthestudyareawhichwouldaffectpublicparking,there
are other projects being planned by private developers which could significantly impact public parking in
-
7/24/2019 Bethlehem Parking Authority feasibility study
10/27
west.Basedonconversationswiththedeveloper,ithasbeenassumedthatthecombined53,000SFof
groundfloor
retail
space
will
be
split
65%
to
35%
between
restaurant
and
retail
land
uses,
respectively.
Inaddition,apublicparkingfacilityisenvisionedtobebuiltencompassingtheentireblockboundedby
W.GrahamPl.onthenorth,S.NewSt.ontheeast,RinkSt.onthesouth,andVineSt.onthewest.This
analysisoftheimpactofthedevelopmentonfutureparkingsupplyanddemandwillhelpdeterminethe
appropriatesizefortheproposedparkinggarage.
Figures5and6providetworenderingsoftheproposedproject.
Figure5ProposedDevelopmentLookingSouthwestfromIntersectionof3rd
St.andS.NewSt.
Source:HowardKulpArchitects,P.C.
-
7/24/2019 Bethlehem Parking Authority feasibility study
11/27
Figure6ViewofProposedDevelopmentfromtheWest
Source:HowardKulpArchitects,P.C.
As
currently
envisioned,
this
development
will
result
in
the
loss
of
the
38space
Graham
Street
Lot,
identifiedinFigure4asLotF.Byfactoringthislossofparkingintotheanalysisofadditionaldemand
expected to be generated by the development itself, it is possible to determine the net impact the
developmentwillhaveonparkingdynamicswithinthestudyarea.
FutureParkingDemandAnalysis
Afutureparkingdemandanalysiswasperformedinthestudyareatodeterminethenumberofspaces
needed
in
the
proposed
parking
structure
to
support
future
development
in
the
area.
This
analysis
considered both the transient and monthly parking demand. The Urban Land Institutes (ULI) Shared
Parking,2nd
Edition was applied to project the future parking demand of the proposed development.
This isa well regarded resource in the professional parking services field that applies historic parking
data from specific land uses to understand the peak parking demand factor, time of day factor, and
monthly factor.This type of shared parking analysis provides a more accurate representation of the
truepeakparkingdemandas ittakes intoaccountthechange inparkingdemandoverthecourseofa
dayforeachlanduse.
Table4showsthesharedparkingdemandfortheproposeddevelopmentduringboththeweekdayand
weekendpeaks,basedonthespecificcharacteristicsofthedevelopmentdetailedpreviously.
-
7/24/2019 Bethlehem Parking Authority feasibility study
12/27
Table4FutureParkingDemandAnalysis
LandUse Size
WeekdayPeak
Demand(2PM)
SaturdayPeak
Demand(2PM)
APPROVEDBUIDLING
Office 88,000sf 270spaces 30spaces
Retail 18,0000sf 30spaces 40spaces
ProjectedParkingDemand 300spaces 70spaces
PROPOSEDBUILDING
StudentBeds 335beds 210spaces 240spaces
Restaurant 34,500sf 140spaces 250spaces
Retail 18,500sf 30spaces 40spaces
ProjectedParkingDemand 380spaces 530spaces
TotalFutureStudyAreaParkingDemand 680spaces 600spaces
Source:DESMAN
As shown in Table 4, the peak weekday demand at 2PM is projected to be 300 vehicles with the
approved development that will increase to approximately 680 spaces with the additional planned
mixedusebuilding.Theweekendparkingdemandsfromtheseprojectsareexpectedtoreach70spaces
initiallythatcouldgrowto600spaceswithfullbuildout.
Asstated
previously,
Shared
Parking,
2nd
Edition
was
applied
for
the
future
parking
demand
analysis.
A
mode split factor of20% wasapplied to theemployee parking demand, which is based on 2012 U.S.
CensusdataforthemeansoftransportationtoworkfortheCityofBethlehem.Variouscapturefactors
were applied for retail and restaurant visitors on weekdays and weekends due to the fact that office
workers and residents are expected to account for a large portion of the patronage of these
establishmentsduringtheweekdaydaytime,whilethosenot livingorworking inthedevelopmentare
expectedtoconstitutethelargestcustomersegmentduringtheeveningsandonweekends.
Thenext
phase
of
the
analysis
is
to
determine
the
number
of
additional
spaces
needed
in
this
area
to
supportthedevelopment.
AdequacyoftheFutureParkingSupply
In order to determine the number of additional parking spaces that may need to be constructed to
t thi f t d l t it i t id th i ti ki d d th f t
-
7/24/2019 Bethlehem Parking Authority feasibility study
13/27
Figure7depictstheportionofthestudyareawithina300footradiusofthepresumedmainentrances
toeach
of
the
buildings
in
the
proposed
development.
Figure7ExistingParkingSupplywithinReasonableWalkingDistanceofProposedDevelopment
Source:DESMAN
The existing on and offstreet parking spaces within these radii are viewed as reasonablyclose
-
7/24/2019 Bethlehem Parking Authority feasibility study
14/27
Table5FutureOnStreetParkingSupplyAvailabletoServeDevelopment
Source:DESMAN
Table6
Future
Off
Street
Parking
Supply
Available
to
Serve
Development
Source:DESMAN
AsnotedinTable6,becausetheGrahamStreetLotwillbedisplacedbytheproposeddevelopment,the
capacity
of
this
lot
was
reduced
to
zero.
However,
the
existing
demand
for
the
lot
will
have
to
be
accommodatedelsewhere,thusitiscountedinthetotalpeakoffstreetoccupancycount.
Accordingtothisanalysisofreasonablewalkingdistance,inthefuture,duringthepeakdemandperiod,
it is anticipated that there will be 40 spaces of existing parkingsupply available to accommodate the
demand generated by the proposed development ((74 49) + (70 55) = 40 spaces) Given that the
Street Between Sideof
Street #ofSpaces
Weekday
DaytimePeak
Occ.
Occ.%
E.3rdSt. S.NewSt.&AdamsSt. North 4 4 100%
E.3rdSt. S.NewSt.&AdamsSt. South 5 3 60%
MechanicSt. S.NewSt.&AdamsSt. North 11 3 27%
E.4thSt. VineSt.&S.NewSt. North 8 7 88%
E.4thSt. VineSt.&S.NewSt. South 10 8 80%
E.4thSt. S.NewSt.&AdamsSt. North 4 2 50%
E.4thSt. S.NewSt.&AdamsSt. South 4 2 50%
S.NewSt. E.3rdSt.&TheGreenway West 3 1 33%
S.NewSt. W.GrahamPl.&E.4thSt. East 7 5 71%
S.NewSt. W.GrahamPl.&E.4thSt. West 6 4 67%
S.NewSt. E.4thSt.&E.MortonSt. East 4 4 100%
S.NewSt. E.4thSt.&E.MortonSt. West 5 3 60%
VineSt. RinkSt.&E.4thSt. West 3 3 100%
74 49 66%TotalOnStreetParkingInventoryandOccupancy
MapID FacilityNameorDescription Location Capacity
Weekday
DaytimePeak
Occ.
Occ.%
C WestThirdStreetLot ThirdStreetb/wBrodhead&
New 30 15 50%
D NewStreetBridgeLot 13W.ThirdStreet 17 5 29%
E ThirdStreet
Lot 24
E.
Third
Street 23 8 35%
F GrahamStreetLot* 327S.NewStreet 0 27
70 55 79%TotalOffStreetParkingInventoryandOccupancy
*The future capacityofthis l oti s shown as "0"because the lo twill be l o sttothe development.The 27parkers displacedfrom
this l otwill need tobe accommodated elsewhere, thus theyare still countedi nthe peakoccupancynumber
-
7/24/2019 Bethlehem Parking Authority feasibility study
15/27
approximately780spaces.Basedon this levelofpeakdemand, the ideal futureparkingsupply in the
areawould
be
about
850
spaces.
This
supply
of
parking
would
ensure
that
approximately
10%
of
the
spacesremainvacantduringthepeakdemandperiod,reducingexcessivecirculationofvehicleslooking
for an available space; it is common practice in the parking industry to design parking facilities and
systemswiththislevelofexcesspeakcapacity.
Assumingan ideal futureparkingsupplyof850 spacesandanexpectedsupply of 144 spaces (74 on
street+70offstreet),approximately700additionalspaceswouldneed tobeconstructed inorderto
adequatelyaddresstheparkingneedsofthisareaofBethlehem,iftheproposeddevelopmentsarebuilt
ascurrently
envisioned.
SectionIIIProposedParkingImprovements
InordertomeettheexpecteddemandforparkinginthestudyareatheBPAisproposingtoconstructa
parkingstructureatthecornerofSouthNewStreetandRinkStreet.Thefacilityisplannedtoprovide6
levelsofparkingallowingforacapacityof626spaces.Thefacilitywillnotincludeanyparkinggenerating
mixeduse space and will be operated by BPA as a public parking facility providing support to the
adjoiningSouthside
neighborhoods.
It
is
expected
that
the
facility
will
operate
on
a
24hour
7
day
basis.Figure8illustratesthearrangementoftheproposedfacilityanditsgradelevelrelationshiptothe
surroundingstreets.
Figure8ProposedNewStreetGarageGradeLevelPlan
-
7/24/2019 Bethlehem Parking Authority feasibility study
16/27
BPA hasengagedArchitects, EngineersandaConstruction Manager todesignand construct the New
Street
Parking
Garage.
Plans
have
been
progressed
and
received
approval
from
the
Citys
HistoricConservation Commission and has been submitted to the Citys Planning Commission for approval.
Based on the progression of the Construction Documents, BPAs Construction Manager Boyle
Construction, Inc. from Allentown, PA has developed construction budgets for the project. Budgets
prepared todate forDesignCosts,Permits, Inspections,GeneralConditions,FeesandConstructionof
the 626space facility indicates the project will have a cost of approximately $17,750,000. For the
purposeoftheseanalysesthiswastheassumedConstructionCostfortheNewStreetParkingGarage.
SectionIV
Financial
Analysis
Thenexttaskforthisstudy istoprepareafinancialanalysisthatcombinestheannualizedcostforthe
developmentoftheNewStreetGarage,andtheassociatedoperatingexpensesandrevenues, intothe
BPAsprojectedOperatingStatementoverthenext30years,ortheexpectedlengthofthedebtservice
forthisproject.ThisfinancialanalysisispremisedonanexpectationthattheBPAwillissuenew30year
parkingrevenuebondstofundthedevelopment. Theobjectiveofthisfinancialanalysisistodetermine
whetherornottheBPAcanbeexpectedtogenerateenoughsystemwiderevenuetobeselfsupported,
meaning
the
systemwide
revenues
are
sufficient
to
cover
the
BPAs
expected
operating
expenses,
capitalexpendituresanddebtserviceobligations.
DESMAN,workedinconjunctionwithBPAsFinancialAdvisorPublicFinancialManagement,Inc.from
Harrisburg, PA to develop debt service schedules, operating expenses and revenue forecasts for both
theproposedNewStreetGarageandBPAsentiresystem. Theseprojectionswherethenintegratedinto
BPAssystemwidebudgetforecaststodeterminethefeasibilityoftheAuthoritytoincuradditionaldebt
associatedwiththisproject,whilestillremaininginapositivecashflowposition.
ThefollowingAssumptionshavebeenincludedinthefinancialanalysesandmodeling:
1. NewStreetParkingGarageConstructionCostof$17,750,000.
2. $2,100,000 of net Pennsylvania Redevelopment Assistance Capital Program proceeds is
availablefortheNewStreetParkingGarage.
3. Bonding will be structured and issued for a 30year term with 50% taxexempt and 50%
taxabledebt.Ablendedinterestrateof5.26%wasusedfortheseanalyses.
4.
The
Authority
will
have
expenditures
of
approximately
$7,000,000
in
2019
for
necessary
deferredcapitalrepairs,restorationandmaintenanceofitsexistingparkingstructures.Itis
anticipatedthesecostswillbefinancedwithabond issueanddebtservicestructuredover
20years.
5.
An annual Capital Reserve Fund of $200,000 was included up to year 2017. After BPA
accumulated a $1,000,000 Reserve Fund the annual expense was reduced to $100,000.
-
7/24/2019 Bethlehem Parking Authority feasibility study
17/27
6.5.
MonthlyRateinSouthsideSurfaceLotswillincreasefrom$31/monthto$40/month.
7.
AllMonthly
Rates
will
increase
every
5
th
year
by
$5.00/month.
8.
Special Event,Advertisement, Park& Shop, Resident Permits, Tow,Valet&Miscellaneous
RevenueGrowthRate2%annually.
9. ParkingViolationRevenuehasassumedtobeflatforthedurationofthebond.
10.SalaryandBenefitGrowthRateswereasfollows:
10.1. Salaries3.04%annually.
10.2. Benefits3.00%annually.
10.3. Pension/Other2.00%annually.
11.
OperatingExpense
Growth
Rate
2.00%
annually.
12.Estimatesfor2015arebasedonnumbersasofNovember2015fromBPA.Itistheseanalyseswillbe
updatedafterfinal2015operatingstatementsareavailablefromBPA.
Withtheadditionofthe626spaceNewStreetParkingGarageBPAwillincuradditionalOperatingand
Maintenance Costs. The combination of utility, contracted maintenance services and laborrelated
expenses(i.e.wages,vacationaccrual,payrolltaxes,workerscompensationandhealth&welfare)will
account for more than 75% of the direct operating expenses for this new facility. The total annual
operatingcost
estimate
also
includes
a$50.00
per
space
sum
that
should
be
deposited
annually
into
aRepairandReplacementFundtocover thecostofanystructural repairs. Workingwithofficials from
BPA DESMAN has forecasted the additional expected expenses associated with operating and
maintaining this facility. UsingBPAsexistingoperationand practices,Table7 illustrates theexpected
YearOneBudgetfortheNewStreetParkingGarage.
-
7/24/2019 Bethlehem Parking Authority feasibility study
18/27
-
7/24/2019 Bethlehem Parking Authority feasibility study
19/27
Table 8 provides a detailed breakdown of the anticipated annual revenue estimates the New Street
Garagewill
generate
in
the
first
full
year
of
operation.
The
parking
rates
in
the
table
are
reflective
of
the
proposedincreasesrecommendedbyBPAandtentativeagreementswiththedeveloperoftheadjacent
building.Themonthlyparkersareassumedtobenewpermitholderstothesystemratherthantransfers
from other BPA facilities, with the exception of the Graham Street Lot which will displaced by this
project. Similarly,thedailynumberoftransientorhourlyparkersprojectedtousetheproposedgarage
representsnewuserswhowillbevisitorstotheplanneddevelopmentadjacenttothegarage. Forthe
purposeoftheseanalysesweassumedthattherewouldbenogrowthinparkingdemandasaresult
ofanyfuturedevelopment. Clearly as additional redevelopment and/or new development comes on
line
in
the
immediate
area
the
demand
for
public
parking
will
increase,
thus
increasing
the
revenuepotentialfortheNewStreetGarage.
Table8NewStreetGarage YearOneRevenueForecast
-
7/24/2019 Bethlehem Parking Authority feasibility study
20/27
Table9incorporatesthepreviouslydetailedannualrevenueandoperatingexpenseprojectionsaswell
asproject
debt
service
obligations
for
the
New
Street
Garage
into
asystem
wide
BPA
multi
year
cash
flowproforma. Table9also incorporates theAssumptionspreviously referencedand included in this
sectionoftheStudy.
-
7/24/2019 Bethlehem Parking Authority feasibility study
21/27
ParkingDemand&FeasibilityStudy
BethlehemParkingAuthority
Page19of25
Table9ForecastedSystemWideSummaryofRevenues&Expenses
-
7/24/2019 Bethlehem Parking Authority feasibility study
22/27
ParkingDemand&FeasibilityStudy
BethlehemParkingAuthority
Page20of25
Table9ForecastedSystemWideSummaryofRevenues&Expenses
-
7/24/2019 Bethlehem Parking Authority feasibility study
23/27
ParkingDemand&FeasibilityStudy
BethlehemParkingAuthority
Page21of25
Table9ForecastedSystemWideSummaryofRevenues&Expenses
-
7/24/2019 Bethlehem Parking Authority feasibility study
24/27
SectionVFindings
This Report addressed the existing parking demands and the anticipated parking conditions after the
completionoftheforeseendevelopmentinitiativesintheidentifiedSouthsidestudyareawithintheCity
ofBethlehem.Subsequenttasksincludedananalysisofthefinancialfeasibilityandperformanceofthe
Bethlehem Parking Authority with added debt from the construction of the 626space New Street
Parking Garage. DESMAN, in conjunction with the Authoritys Financial Advisor Public Financial
Management,Inc.,preparedafinancialanalysisthatcombinedthedebtservice,operatingexpensesand
revenuesassociatedwiththedevelopmentoftheNewStreetGarageintotheBPAsprojectedOperating
Statement
over
the
next
30
years,
or
the
expected
length
of
the
revenue
bond
that
will
be
issued
for
thisgarage.
The objective of this financial analysis was to determine whether or not the Bethlehem Parking
Authoritycanbeexpectedtogenerateenoughsystemwiderevenuetobeselfsupported,meaningthe
systemwide revenues are sufficient to cover the BPAs expected operating expenses, capital
expenditures and debt service obligations. . Based on these analyses it appears the Authority will
operatewithsurplusrevenuesuntil2029 ifparkingdemands intheStudyAreaseenogrowth.Should
the
area
continue
to
see
redevelopment
activity
it
is
anticipated
there
would
be
a
demand
for
additional
publicparkingthatwouldchangetheforecastscontainedherein. Otherwiseadditionalrevenuesources
will be needed such as parking rate increases and/or City of Bethlehem guarantees to cover the
Authoritysoperationalexpensesanddebtobligations.
-
7/24/2019 Bethlehem Parking Authority feasibility study
25/27
APPENDIX
-
7/24/2019 Bethlehem Parking Authority feasibility study
26/27
Page24of25
OffStreet
Parking
Inventory
and
Hourly
Occupancy
Counts
Source:DESMAN
MapID FacilityNameorDescription Location Owner Capacity 9:00AM Occ.% 10:00AM Occ.% 11:00AM Occ.% 12:00PM Occ.% 1: 00PM Occ.% 2: 00PM Occ.% 3: 00PM Occ.% 4:00PM Occ.% 5:00PM Occ.% 6: 00PM Occ.% 7: 00PM
A LehighRiverportParking
Garage 11W.SecondStreet
BethlehemParking
Authority 149 43 29% 52 35% 48 32% 55 37% 49 33% 34 23% 37 25% 60 40% 65 44% 80 54% 72
B BroadwayStreetLot 201BroadwayStreet BethlehemParking
Authority 22 5 23% 6 27% 4 18% 4 18% 4 18% 4 18% 4 18% 3 14% 7 32% 4 18% 4
C WestThirdStreetLot ThirdStreetb/wBrodhead&
New
BethlehemParking
Authority 30 15 50% 13 43% 11 37% 12 40% 15 50% 13 43% 12 40% 12 40% 12 40% 15 50% 12
D NewStreetBridgeLot 13W.ThirdStreet BethlehemParking
Authority 17 2 12% 3 18% 4 24% 11 65% 5 29% 6 35% 5 29% 8 47% 7 41% 9 53% 9
E Third
Street
Lot 24
E.
Third
Street
BethlehemParking
Authority 23 6 26% 9 39% 14 61% 10 43% 8 35% 8 35% 11 48% 12 52% 12 52% 11 48% 12
F GrahamStreetLot 327S.NewStreetBethlehemParking
Authority 38 26 68% 27 71% 29 76% 27 71% 27 71% 28 74% 24 63% 25 66% 23 61% 15 39% 12
G Mechanic&WebsterLot Mechanicb/wAdams&
Webster
BethlehemParking
Authority 56 9 16% 8 14% 11 20% 10 18% 12 21% 13 23% 17 30% 13 23% 13 23% 9 16% 10
H Third&WebsterLot CornerofWebster&3rdBethlehemParking
Authority 15 6 40% 6 40% 5 33% 8 53% 8 53% 9 60% 12 80% 10 67% 10 67% 12 80% 15
I Be ne athFahyBridge EastofLehighRiverportParking
Garage
BethlehemParking
Authority 42 0 0% 2 5% 2 5% 2 5% 0 0% 2 5% 0 0% 0 0% 0 0% 8 19% 7
392 112 29% 126 32% 128 33% 139 35% 128 33% 117 30% 122 31% 143 36% 149 38% 163 42% 153 TotalOffStreetParkingInventoryandOccupancy
-
7/24/2019 Bethlehem Parking Authority feasibility study
27/27