BHAGYANAGAR GAS LIMITED (A JOINT VENTURE OF HPCL & GAIL) CNG & CITY GAS DISTRIBUTION PROJECT AT KAKINADA ADDENDUM-I For BID DOCUMENT FOR LAYING & CONSTRUCTION OF 10”- 46Km , 6” - 19 Km & 4” NB - 10 Km U/G STEEL P/L NETWORK & ASSOCIATED WORKS IN KAKINADA CITY Bid Document No.: 05/51/23LZ/BGL-KAKI/001-i) PREPARED AND ISSUED BY MECON LIMITED (A Govt. of India Undertaking) Delhi, India 1

Upload: dangliem

Post on 19-May-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

BHAGYANAGAR GAS LIMITED

(A JOINT VENTURE OF HPCL & GAIL)

CNG & CITY GAS DISTRIBUTION PROJECT AT KAKINADA

ADDENDUM-I

For BID DOCUMENT FOR

LAYING & CONSTRUCTION OF 10”- 46Km , 6” - 19 Km

& 4” NB - 10 Km U/G STEEL P/L NETWORK & ASSOCIATED WORKS IN KAKINADA CITY

Bid Document No.: 05/51/23LZ/BGL-KAKI/001-i)

PREPARED AND ISSUED BY MECON LIMITED

(A Govt. of India Undertaking) Delhi, India

1

Page 2: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MECON LIMITED

Sl. No. Description Volume Tender Page

No.

Clause / Para /

Section Remarks

1.0 Annexure-I to IFB Vol I of III 9 5.2.2.2 Modification

1

9.0 Schedule of Rates (SOR) Vol I of III 316 to 348 10 Modification

For and on Behalf of Bhagyanagar Gas Limited

Sl. No.

For Indian Bidders(in INR)

5.75 crores (each partner)Total Package basis

Minimum Annual Turnover RequirmentGroup

The revised Schedule of Rate is attached as Annexure - 1 to this Addendum.

The table stands mofiied to the following extent

ADDENDUM #1LAYING & CONSTRUCTION OF 10”- 46Km , 6” - 19 Km & 4” NB - 10 Km U/G STEEL P/L NETWORK & ASSOCIATED WORKS IN KAKINADA

CITYFOR

CNG & CITY GAS DISTRIBUTION PROJECT AT KAKINADA

Amendment / Addition / Modification / Deletion

Date : 13.04.2010Tender Document No. 05/51/23LZ/BGL-KAKI/001-i)

Owner : BHAGYANAGAR GAS LIMITED

S. S. Roy DGM I/c (Contracts)

MECON, Delhi

Page 1 of 12

Page 3: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

1.0 CARBON STEEL PIPES 1.1 PIPELINE LAYING / INSTALLATION in normal surface/ unprepared surface built up

surface / hard surface. "Receiving and taking over" as defined in the specifications, handing, loading, transportationand unloading of Owner supplied 3-Layer PE coated and bare linepipes from Owner'sdesignated stack-yard to Contractor's stock yard/workshop/work-site including preliminaryactivities, preparation of drawings, wherever required for crossing etc. including handling,stacking, stringing on the pipeline Right-of-Use/ pipeline route alignment, carrying outinspection of company supplied materials including linepipes at the time of taking over, laying/installation of coated linepipes, associated burried valves, barred tees, insulating joints,flanges & fittings of all sizes, thickness & ANSI class rating and accessories as perspecification wherever required depending on site condition including execution of all works,"taking over", handling , including loading and unloading, transportation of Owner suppliedmaterials other than linepipe from Owner's designated place (s) of issue to work site, additional lands required for Contractor's storage, fabrication, access for construction,procurement and supply of all materials (except Owner supplied materials), consumables,equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works,ready for commissioning of pipeline as per drawings, specifications, other provisions ofContract document and instructions of Engineer-in-charge, including but not limited to carryingout the following works:

- Surveying of route and detours required at the time of execution including marking the same intopographical sheet, preparation of construction drawings showing survey details, and submitsame to Owner for review / approval.

- Staking and installation of construction markers, clearing, fencing, grubbing, cutting of trees,full filling all the requirements of various statutory/ environment authorities to the entiresatisfaction of concerned authorities, grading of work area. Shifting of all obstruction within theROU/ Pipeline route alignment viz. electrical lines/ poles, telephone line / poles, etc. co-ordination with concerned authorities and obtain permissions from these authorities.

- Barricading the pipeline construction area prior to execution of the works as perdrawing no. MEC/23LZ/05/21/M/000/0004 enclosed with tender document and to theentire satisfaction of Owner / Engineer-in-charge.

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 1 of 32

3

Page 4: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

- Trenching to all depths by excavation in all types of soils including soft/ hard rock anddifferent type of pavement / footpath / roads etc. including rock breaking, chiselling orotherwise cutting etc. as required and storing excavated soil, reusable materials atdesignated area as directed by Engineer in charge and to a width to accommodate the pipeline and HDPE conduit for OFC as per the relevant standard/ specification etc. [The minimumdepth of the top of pipeline shall be 1.0m measured from top of pipeline coating to the top ofundisturbed surface of the soil or as per SCC/ OISD - 226, whichever is higher]. Dewater oftrenches if required as per site condition.

- Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs ofdefects of pipe coating not attributable to Owner including defects/ damages occurring duringtransportation / handling.

- Stringing of line pipes along pipeline trench / ROU on straw / sand / soft soil bags includingsupply of bags and its filling materials.

- Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for weldingand field adjustments including pipe fittings, welding, carrying out non-destructive testing ofwelds as required including 100% radiography by X-ray and providing all requisite equipment,labour, supervision, materials, films, consumables, all facilities and personnel to process,develop, examine and interpret radiographs and other tests as required, carrying out repairs ofweld joints found defective by Engineer-in-Charge, carrying out re-radiography and other testsas required on repaired joints.

- Carrying out installation of carrier line pipe at all minor crossing viz. road, carttrack, pathway,water bodies etc. at designated depth by open cut (except at crossing by HDD method).

- Carrying out installation of carrier line pipe in the casing pipe at cased crossing (excludinginstallation of casing pipes which is covered separately).Installation of LR Bends where ever required.

- Coating of field weld joints, long radius bends (R=3D), elbows, buried fittings and valves etc.including supply of coating materials etc. (i.e. heat shrinkable sleeves and high build epoxyetc.) as per PJS & Technical Specification compatible with 3 layer PE coating material of theline pipe.

- Counting the number and type of trees cut in presence of DFO/concerned authorities andkeeping record thereof, stacking and handing over of all cut tress.

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 2 of 32

4

Page 5: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

- Installation / lowering the pipeline in trench to required depth as per PJS, TechnicalSpecification & drawings, supply & placement of 1.0mm thk. & Pipe dia plus 300mm widthHDPE Yellow colour warning mat over the pipeline & HDPE duct in same trench along thecomplete route as per standard drawings, data sheets & technical specifications, paddingaround pipeline as per Standard Drg. no. MEC/SD/05/21/PL/WS-001/004 including supply ofsuitable padding material duly approved by EIC , backfilling to its original condition withexcavated earth / borrowed select soil duly approved by EIC & its compaction &crowning. At certain specific area of ROU, trench shall be backfilled & compacted andshall be made ready for restoration & their Restoration shall be carried as per separateSOR item mentioned elsewhere in the SOR or to be done by Owner / concernedauthorities.

- Supply and installation of slope breakers, wherever required or, as directed by Onwer /Engineer–in–charge.

- Supply and installation of bank protection alongwith backfill materials duly approved by EIC forpipeline trench and banks falls under minor water body crossing as per technical specification& Std. Drg. No. MEC/23LZ/05/11/C/001/0001, wherever required or, as directed by Onwer /EIC.

- Training and diversions of streams in steep slope area, wherever required. - Carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing of complete

pipeline with required quantity of corrosion inhibitor including pre-testing of designatedsections complete as per specification and approved by Engineer–in–charge to specifiedpressures indicated elsewhere and duration after stabilization as per specification, providing allequipment, pumps, fittings, instruments, dead weight tester, pressure recorder, thermocouplesetc., and services, supervision, labour, consumables, water including supply of corrosioninhibitor, air, etc. as required, locating of leaks and rectification of defect attributable toContractor (rectification of defects in linepipe material not attributable to contractor shall bepaid separately as per other item of schedule of rate), re-testing after rectification, dewateringafter successful completion of hydrotesting of entire section and as approved by Engineer-in-

- All tieing-in, including the tie-in(s) of the pipeline with the adjacent sections of pipelineincluding cutting of test header, rebevelling as required, radiography and other NDTexamination, joint coating as per specification.

- Final clean-up of right-of-use or area disturbed by contractor during their construction activitiesfor laying of pipeline works and disposal of debris and surplus material to designated disposalareas and backfilling of trench and compaction of the same as per satisfaction of Owner and /Or as directed by Engineer–in–charge.

- Installation of all burried valves (except extended stem valves) inside the valve pit and makingprovision to operate the valve.

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 3 of 32

5

Page 6: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

- Liasioning & follow up for Permission with all the concerned authorities & boards vizRailways, NH, R&B, Local Municipal, Panchyat, Electricity, REC, RES, Sewage water,Drinking water, Forest, Social Forestry, Owners of OFC, Traffic, Law & Order, FireBrigade etc. for entire pipeline length and associated terminals alongwith associatedwork as per tender.

- Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as-built drawings and 1 soft copy and 6 hard copies of pipe book) All the works shall be executedin accordance with the provision of contract including carrying out all temporary/ ancillary/auxiliary works required for the performance of the works and all other acts, deeds, mattersand things necessary to make the pipeline ready for precommissioning activities.Specified dia Thk (mm) Material Coating Type Length of each pipe(inches) NB

1.1.1 10" 6.4 API 5L Gr. X-42 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

Meter 46000

1.1.2 6" 6.4 API 5L Gr. B 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

Meter 19000

1.1.3 4" 6.4 API 5L Gr. B 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

Meter 10000

Note:i) This item shall be applicable for the underground steel grid main pipeline & branch pipeline

including tap-off for distribution pipelines, OLS, DRS, MS etc.along with installation ofnecessary valves, insulating joints, bends (R=3D), flanges & fittings, accessories etc. andaboveground approach pipeline upto Insulating Joint (excluding installation of abovegroundinsulating joint) for various stations.

ii) Contractor shall not perform any pipeline activities along ROU without specifiedbarricading as per Drg. No. MEC/23LZ/05/21/M/000/0004 and other safety measures. Incase contractor does not provide specified barricading, Owner will levy penalty at 5%of the pipeline laying running meter rate, for the relevant section of the pipeline apartfrom other actions as per contract.

iii) Items except above are covered separately. The lengths of pipelines are tentative. iv) For restoration of asphalt / concrete roads, the item for construction of asphall top / concrete

top / red stone / paver shall be paid separately as per the rates quoted for the same elsewherein the SOR.

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 4 of 32

6

Page 7: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

2.0 RESTORATION 2.1 Restoration of asphalt / concrete / red stone roads / pavement including compaction of soil, to

original condition as per requirement and to the entire satisfaction of EIC and / or concernedOwners having jurisdiction for following thickness.

2.1.1 Restoration of Asphalt road upto 10 cm thickness Sq. metre 100

2.1.2 Restoration of Asphalt road beyond 10 cm upto 20 cm thickness Sq. metre 100

2.1.3 Restoration of Concrete road upto 10 cm thickness Sq. metre 150

2.1.4 Restoration of red stone road / footpath / pavement upto 4 cm thickness Sq. metre 150

2.1.5 Restoration of Paver block Sq. metre 150

3.0 CONTINUOUS CONCRETE COATING (FOR CS PIPES)3.1 Supply of all consumables, materials and application of 80mm thk continuous concrete weight

coating of minimum density 2245 kg/m3 of mininum grade M-20 (nominal mix) and field jointsthereof in all areas of work wherever required as per site condition and performing all works asper specification on the line pipe for following sizes :-

3.1.1 10" NB x 6.4 mm W.T. Meter 363.1.2 6" NB x 6.4 mm W.T. Meter 453.1.3 4" NB x 6.4 mm W.T. Meter 604.0 CONCRETE SADDLE WEIGHTS(Precast/Cast in situ)4.1 Unit rate for additional works over and above item no. 1.0 for supply of all consumables and

materials including supply of 3mm, HDPE sheets, fabrication and installation of concretesaddle weights on pipeline and performing all works as per specifications, drawings, andinstructions of Engineer-in-charge and other provisions of the Contract document.

4.1.1 Specified 10"NB x 6.4 mm W.T. Nos. 104.1.2 Specified 6" NB x 6.4 mm W.T. Nos. 104.1.3 Specified 4" NB x 6.4 mm W.T. Nos. 10

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 5 of 32

7

Page 8: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

5.0 MAJOR CASED Crossing5.1 Complete work of the rail crossing (between the limits as defined in approved drawings)

excluding supply of casing pipe (for 10" NB & 6" NB Pipeline) & Bare CS conduit of size150mm x 6.4mm thk (for OFC / HDPE duct) confirming to API 5L Gr. B / IS : 3589 orequivalent ERW pipe alongwith handling, loading, transportation, unloading to Contractor'sown stock yard/ work site. Pre-construction survey and making of crossing drawing based on site visit and getting theirapproval from concerned Authority/ Engineer-in-charge prior to start the execution of work. Installation of casing pipe by jacking/ boring/ for rail crossings in all type of soil strata includingsoft / hard rock and open cut for adjacent service road, canal, minor nature of water channel,utility line crossing etc. (if any) wherever required for all depth in all type of soils and terrrainfor carrier pipe insertion and for OFC/ HDPE duct. All other Contractor supplied materials likecasing insulators, Zinc Ribbon Anodes and casing end seals as per enclosed specification/drawings materials for casing vents and drain assembly etc. including supply of all othermaterials, equipments, consumables, manpower, welding including visual inspection of allweld joints.Preparation of required length of carrier pipeline welded string including all other works asmentioned in item no. 1.0 above and as per specification/ drawings. Pulling of OFC/ HDPEduct through CS conduit & insertion of carrier pipe in casing pipe after above groundpretesting at specified test pressure including installation of casing insulators and Zn ribbonanode as per approved design calculation, specification/ drawings. Insatllation of vent anddrain assembly, fixing of end seals, backfilling and restoration as original of the facilitiescrossed and performing all other works including pigging, cleaning, final hydrotesting etc.alongwith mainline works (as mentioned in item no. 1.0 above) and as per specification,approved procedure, drawing etc. and instruction of Engineer-in-charge and provision ofcontract document, getting NOC from all concerned Authority of the facilities crossed. Details of X-ings

5.1.1 Madhavapatinam Railway Line at chainage approx. 4.3 km in the sarpavaram to peddapuramsection

a) By Jacking/ Boring of Casing Pipe - 16" NB, mm wall thk. (for 10" NB pipeline) M 35

b) By Jacking/ Boring of CS Conduit 150mm NB, 6.4mm wall thk. (for OFC & their conduit) M 35

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 6 of 32

8

Page 9: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

5.1.2 Samalkot Railway crossing at chainage apprx. 11.1 Km in the sarpavaram to peddapuramsection

a) By Jacking/ Boring of Casing Pipe - 12" NB, mm wall thk. (for 6" NB pipeline) M 65

b) By Jacking/ Boring of CS Conduit 150mm NB, 6.4mm wall thk. (for OFC & their conduit) M 65

5.1.3 Railway crossing at chainage approx. 11.93 km in the sarpavaram to pithapuram section

a) By Jacking/ Boring of Casing Pipe - 12" NB, mm wall thk. (for 6" NB pipeline) M 35

b) By Jacking/ Boring of CS Conduit 150mm NB, 6.4mm wall thk. (for OFC & their conduit) M 35

5.1.4 Railway crossing at chainage approx. 2.06 km in the Bhanugudi to Zillaparisad section

a) By Jacking/ Boring of Casing Pipe - 16" NB, mm wall thk. (for 10" NB pipeline) M 20

b) By Jacking/ Boring of CS Conduit 150mm NB, 6.4mm wall thk. (for OFC & their conduit) M 20

5.1.5 Other unspecified cased crossing

a) By Jacking/ Boring of Casing Pipe - 16" NB, mm wall thk. (for 10" NB pipeline) M 60

b) By Jacking/ Boring of Casing Pipe - 12" NB, mm wall thk. (for 6" NB pipeline) M 25

c) By Jacking/ Boring of Casing Pipe - 10" NB, mm wall thk. (for 4" NB pipeline) M 25

d) By Jacking/ Boring of CS Conduit 150mm NB, 6.4mm wall thk. (for OFC & their conduit) M 110

5.1.6 Cased crossing by Open cut method

a) By Open Cut of Casing Pipe - 16" NB, mm wall thk. (for 10" NB pipeline) M 40

b) By Open Cut of Casing Pipe - 12" NB, mm wall thk. (for 6" NB pipeline) M 40

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 7 of 32

9

Page 10: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

c) By Open Cut of Casing Pipe - 10" NB, mm wall thk. (for 4" NB pipeline) M 10

d) By Open Cut of CS Conduit 150mm NB, 6.4mm wall thk. (for OFC & their conduit) M 90

Note: (i) Actual length & cover from top of casing pipe string may vary depending upon siteconditions, approved drawings, specification etc. and / or as decided by concerned Authority /Engineer-in-charge.(ii) Exact centreline location of boring of 6" NB CS conduit as a casing pipe shall be minimum4.0m or as per available ROU either side based on as installed centreline dimension of carrierpipe inside casing pipe at all cased crossing. The cover to top of casing pipe for cable conduitshall be same as cover to top of the pipeline/ casing pipe as applicable.(iii) Payment for supply & installation of Zinc ribbon anode and its design excluded from aboveitem and covered elsewhere in the SOR. (iv) Payment for the length carrier pipeline string inserted in casing pipe laid by Boring arecovered separately and shall be paid under other items mentioned elesewhere in the SOR.(v) Width of above crossings indicated are tentative. The width indicated in SOR item 5.1.5 &5.1.6 are not for any single crossings. This shall be as per requirement at site for crossings atdifferent locations.

6.0 Supply of Casing Pipe 6.1 Supply of following casing pipe including handling, loading, transportation & unloading etc. to

contractor's own stock yard / worksite(s).

6.1.1 Supply of Casing Pipe - size 16" NB, mm wall thk. of material API 5L Gr. B / IS : 3589 orequivalent ERW Pipe (for 10" NB pipeline) duly Corrosion coated of High build epoxy ofminimum 450 microns thickness.

M 90

6.1.2 Supply of Casing Pipe - size 12" NB, mm wall thk. of material API 5L Gr. B / IS : 3589 orequivalent ERW Pipe (for 6" NB pipeline) duly Corrosion coated of High build epoxy ofminimum 450 microns thickness.

M 120

6.1.3 Supply of Casing Pipe - size 10" NB, mm wall thk. of material API 5L Gr. B / IS : 3589 orequivalent ERW Pipe (for 4" NB pipeline) duly Corrosion coated of High build epoxy ofminimum 450 microns thickness.

M 25

6.1.4 Supply of CS Conduit 150mm NB, 6.4mm wall thk. API 5L Gr. B / IS : 3589 or equivalent ERWPipe (for OFC & their conduit) duly Corrosion coated of High build epoxy of minimum 450microns thickness.

M 235

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 8 of 32

10

Page 11: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

7.0 ROAD CROSSING BY HDD7.1 Complete work of the road crossing (between the limits are defined as approved drawings) by

HDD method including "Receiving and taking over" owner supplied three layer PE coated linepipes from Owner's designated place to issue/ dump site(s) and transportation to Contractor'sstock yard/ work shop/ work site including all handling loading, unloading, aligning etc. supplyof all Contractor supplied material including required length of CS conduit duly Corrosioncoated of High build epoxy of minimum 450 microns thk duly for OFC laying of size 150mmNB; 6.4mm thk. of API 5L Gr. B / IS : 3589 or equivalent ERW pipe to work site(s), manpower,equipment, other resources and aquiring the required land for storage, fabrication inclduingstring preparation of pipes, welding, welding repair, radiography, coating of field joints withspecial type Heat Shrink Sleeve and repair of pipeline coating with special repair patchmaterials as per specification, pre-testing etc. of complete string made for crossing access for Contractor etc.and execution of, but not limited to, following works in accordance with specifications andinstruction of Engineer-in-charge and as per all provision of Contract Document.Pre-construction survey based on site visit, collection of data (if required) from concernedAuthority including design and detail engineering and making of crossing drawings for gettingtheir approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC forroad crossing as well as utility crossings (if any) encountered during road crossing prior to startthe execution of work.

Directional drilling to required depth from top of road including maintenance of drill hole in alltypes of strata including rocky terrain at all depth to accommodate the pipeline and CS conduitfor OFC laying at all conditions encountered during rail/ road crossing by approved HDDmethods for providing minimum cover specified in code/ specification or the actual depth asdecided by concerned authority, whichever is more.

Backfilling of the ditch/ trench including restoration and cleanup of area and all other worksincluding pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned initem no. 1.0 above) required as per specification, approved drawings, calculations, methodsand to the satisfaction of Engineer-in-charge and/or as directed by concerned Authority.Details of Road CrossingRoad Crossings at various locations as decided by EIC at site as per concerned authorityrequirement.

7.1.1 Line pipe detail 10" NB, 6.4 mm thk API 5L X 42 pipe, C.S. conduit 6"NB, 6.4mm thk of API 5LGr. B / IS: 3589 / or equivlent ERW pipe)

Meter 80

7.1.2 Line pipe detail 6" NB, 6.4 mm thk API 5L X42 pipe, C.S. conduit 6"NB, 6.4mm thk of API 5LGr. B / IS: 3589 / or equivlent ERW pipe)

Meter 60

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 9 of 32

11

Page 12: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

7.1.3 Line pipe detail 4" NB, 6.4 mm thk API 5L X42 pipe, C.S. conduit 6"NB, 6.4mm thk of API 5LGr. B / IS: 3589 / or equivlent ERW pipe)

Meter 60

Note: (i) Crossing width may vary as per site condition. Tenderer are advised to visit site foractual assessment of extent of crossing. Actual string length for HDD shall be as per designcalculations so that pipe is not under stress as permitted by codes/ specifications. Howeverfinal length of string & cover from top of pipe shall be decided by concerned Authority/Engineer-in-charge.(ii) Payment for the length of final tied-in carrier pipeline string with mainline and CS conduitmade for crossing laid by HDD method are inclusive in the above item rate and no separatepayment shall be made under other item mentioned elsewhere. (iii) The Contractor has to quote alongwith 6" CS conduit. No any extra payment shall bemade against this item. It is sole descretion of the Contractor to do HDD crossing of mainlinepipe as well as CS conduit pipe either by suitabily strapping together both the carrier pipe &CS conduit and pulled through the same drill hole. or making separate HDD for 6" CS conduitfor OFC laying at minimum 4m distance apart from centreline of HDD of mainline either side.No separate payment for HDD for 6" Dia CS conduit shall be paid.(iv) Width of above crossings indicated are tentative. The width indicated are not for any singlecrossings. This shall be as per requirement at site for crossings at different locations.

8.0 WATER BODY CROSSINGS BY HDD METHOD8.1 Complete work of the water crossings i.e. Canal / Nala / Drain / Pond etc. (between the limits

as defined in approved drawing) by Horizontal Directional Drilling (HDD) method including"Receiving and taking over" owner supplied three layer PE coated line pipes from owner'sdesignated places of issue/ dump site(s) and transportation to Contractor's stock yard/ workshop/ worksite including all handling, loading, unloading, aligning etc. supply of all Contractorsupplied material including required length of CS conduit of size 150mm NB, 6.4mm thick. ofAPI - 5L Gr. B / IS : 3589 or equivalent ERW Pipe duly Corrosion coated of High build epoxyof minimum 450 microns thk for OFC laying works site(s)manpower, equipments, otherresources and acquiring the required land for storage, fabrication, access for Contractor etc.and execution of, but not limited to, following works in accordance with specifications scope ofwork and instructions of Engineer-in-charge and as per all provision of Contract Document.

- Pre-construction surveys based on site visit, collection of historical data from irrigation/concerned department including design & calculation and detail engineering and making ofcrossing drawing for getting their approval from concerned Authority/ Engineer-in-charge,getting work permit/ NOC for water crossings/ road crossings as well as utility crossings (ifany) encountered during crossing prior to start the execution of work.

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 10 of 32

12

Page 13: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

- In case of water crossing, drilling to the required depth on the banks and bed includingmaintenance of drill hole in all types of soil strata including soft / hard rock, all depth toaccommodate the pipeline and CS conduit for OFC laying at all conditions of the watercrossings by HDD methods for providing with minimum cover over top of the pipe at all pointacross the maximum possible width of water bed (as per drawing) either 1.5 mtrs. below thepredicted scour profile expected during the life time of the pipeline or 2.5 mtrs. below theavailable lowest firm bed (if scour profile/ depth not available) of the water crossing byascertaining bed level upto 50 mtrs. both the side from crossing location or the actual depth asdecided by concerned Authority/ Engineer-in-charge whichever is more.

- Laying of the pipeline by the approved HDD method across the crossing including, stringspreparation of pipes, welding, testing, radiography, welding repair and retest, coating of fieldjoints with special type Dirax Heat Shrink Sleeve or equivalent and repair of pipeline coatingwith special PERP-80 repair patch or equivalent material as per specification, pre-hydrotest ofcomplete strings made for crossing etc.

- Backfilling of the ditch/ trench including restoration and clean-up of area etc. to the satisfactionof Engineer-in-charge/ Concerned Authority.

- Post installation hydrotest dewatering and tie-in with pipeline at either banks etc.

- All other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (asmentioned in item no. 1.0 above) required as per specifications, codes, approved drawings,calculations, methods and as directed by Engineer-in-charge.

8.1.1 Crossing of other water/ canal/ nallah/ drain/ channel crossings by carrier pipeline of size 10"NB x 6.4 / 9.5 mm thk. of API 5L X42 and CS conduit of 6" NB x 6.4mm thick. of API 5L Gr. Bor equivalent ERW Pipe for cable Conduit.

Mtrs. 100

8.1.2 Crossing of other water/ canal/ nallah/ drain/ channel crossings by carrier pipeline of size 6"NB x 6.4 / 9.5 mm thk. of API 5L X42 and CS conduit of 6" NB x 6.4mm thick. of API 5L Gr. Bor equivalent ERW Pipe for cable Conduit.

Mtrs. 120

8.1.3 Crossing of other water/ canal/ nallah/ drain/ channel crossings by carrier pipeline of size 4"NB x 6.4 / 9.5 mm thk. of API 5L X42 and CS conduit of 6" NB x 6.4mm thick. of API 5L Gr. Bor equivalent ERW Pipe for cable Conduit.

Mtrs. 100

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 11 of 32

13

Page 14: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

Note: (i) Crossing width may vary as per site condition. Actual string length for HDD shall varyas per design calculations so that pipe is not under stress as permitted by codes/specifications. However final length of string & cover from top of pipe shall be decided byconcerned Authority/ Engineer-in-charge.(ii) Payment for the length of final tied-in carrier pipeline string with mainline and CS conduitmade for crossing laid by HDD method are inclusive in the above item rate and no separatepayment shall be made under other item mentioned elsewhere. (iii) The Contractor has to quote alongwith 6" CS conduit. No any extra payment shall bemade against this item. It is sole descretion of the Contractor to do HDD crossing of mainlinepipe as well as CS conduit pipe either by suitabily strapping together both the carrier pipe &CS conduit and pulled through the same drill hole. or making separate HDD for 6" CS conduitfor OFC laying at minimum 4m distance apart from centreline of HDD of mainline either side.No separate payment for HDD for 6" CS conduit shall be paid.(iv) Width of above crossings indicated are tentative. The width indicated are not for any singlecrossings. This shall be as per requirement at site for crossing at different locations.

9.0 Excavation of hard rock 9.1 Excavation of hard rock wherever hard rock of single piece exceeding 1.0 m in length

removable by pneumatic chisel/ drill as per direction of EIC.Cub.m 10

10.0 REPAIR OF DEFECT IN PIPES (NOT ATTRIBUTED TO CONTRACTOR)10.1 Repair of defects on Owner supplied linepipes of all grades and wall thickness as specified in

following items, noted and recorded at the time of "receiving and taking over" by Contractor inthe presence of Engineer-in-charge.

10.1.1 Cutting and rebevelling for dents in bevels exceeding 3 mm in depth for pipe sizes:10.1.1.a Specified OD 10" Nos. 1010.1.1.b Specified OD 6" Nos. 1010.1.1.c Specified OD 4" Nos. 1010.1.2 Jack out of dents in bevels ranging between 1.5 mm and 4 mm in depth for pipe sizes:

10.1.2.a Specified OD 10" Nos. 1010.1.2.b Specified OD 6" Nos. 1010.1.2.c Specified OD 4" Nos. 10

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 12 of 32

14

Page 15: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

11.0 REPAIR OF COATING DEFECTS (NOT ATTRIBUTED TO CONTRACTOR)11.1 Repair of Holiday in Coating (Noted and recorded at the time of "receiving and taking

over")Supply of all coating repair materials as per requirements of specification to be compatible withline pipe coating material, supply of all consumables, utilities, equipments and all manpowerrequired, pipe cleaning and surface preparation, repairing of coating defects (resulting inholiday) and testing including all handling, transportation, etc. for line pipes, performing allworks necessary for the completion of the works stirctly in accordance with relevantspecification and instructions of Engineer-In-Charge. This rate shall be applicable per sq. cmof the exposed steel area exposed steel area.

Sq. cm 100

12.0 PERMANENT MARKERS12.1 Supply, fabrication and installation of all types of permanent markers along the route including

all associated civil works such as excavation in all types of soil, construction in all types of soil,construction of pedestals and grouting with concrete, clearing, supply and application ofapproved colour and quality of primer and paint, stencil letter cutting for numbers, direction,change etc., restoration of area to original condition and performing all works as per drawing,specification and instruction of engineer-in-charge.

12.1.1 Pipeline RCC boundary / route marker as per drawing Nos. 1500

12.1.2 Pipeline warning markers / Direction marker with post & foundations Nos. 330

12.1.3 Pipeline KM with post & foundations Nos. 75

12.1.4 Pipeline Arial marker Nos. 1013.0 LEAK / BURST (ATTRIBUTABLE TO OWNER)13.1 All works for locating leak / burst in Company's supplied material only (occurred during hydro-

static testing) including necessary repairing/replacing defective pipe lengths including cuttingand out and removing the defective pipe, pre-testing and welding of replacement pipe, NDT ofwelds, repair and retesting of defective welds, coating/painting of replacement pipe, pretestingthe replacement pipe into mainline/branch line, coating/painting of welding joints, cleanup,retesting including cost of all labour materials, consumables and performing all works inaccordance with the provisions of the Contract document and as directed by Owner /Engineer-in-charge/ Engineer in-charge

13.1.1 For 10" NB Line Lumpsum 113.1.2 For 6" NB Line Lumpsum 113.1.3 For 4" NB Line Lumpsum 1

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 13 of 32

15

Page 16: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

Note:i) This rate is applicable for manufacturing defects in Owner supplied material only.ii) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per

approved procedure by Contractor with a view that completion of all activity for successfulhydrotesting is not inordinalely extended which will hamper the overall project schedule.

14.0 PRE-COMMISSIONING AND ASSISTANCE IN COMMISSIONING OF PIPELINE SYSTEM 14.1 Swabbing, drying, purging with nitrogen of the complete pipeline network and the associated

facilities being installed to the specified acceptance criteria, carrying out pre-commissioningworks, providing assistance during the complete duration of commissioning operations forentire pipeline network system including supply of all equipment, man-power, consumables(including pigs & nitrogen required for purging with maintaining nitrogen column of mininum10% of pipeline geometric volume) materials for all temporary works and performing allassociated works, complete as per the relevant specifications, other provisions of Contractdocument and instructions of Engineer-in-charge.

14.1.1 For 10" NB Line Meter 4600014.1.2 For 6" NB Line Meter 1900014.1.3 For 4" NB Line Meter 1000015.0 IDLE TIME PRESERVATION OF PIPELINE 15.1 Preservation of complete pipeline and associated facilities forming part of the pipeline as per

Bid document and its maintenance including supply of all consumables, all equipment, man-power, etc. complete as per the requirements of specifications, other provisions of Contractdocument and instructions of Engineer-in-charge. Note : Owner reserves the right to exercise either or none of the rates below.

15.1.1 By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of 3 months.

15.1.1.a For 10" NB Pipeline Meter 4600015.1.1.b For 6" NB Pipeline Meter 1900015.1.1.c For 4" NB Pipeline Meter 1000015.1.2 For every additional period of three month or part thereof

15.1.2.a For 10" NB Pipeline Meter 4600015.1.2.b For 6" NB Pipeline Meter 1900015.1.2.c For 4" NB Pipeline Meter 10000

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 14 of 32

16

Page 17: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

16.0 PIPING WORKS FOR SECTIONALISING VALVE STATION-CUM-TAP-OFF POINT16.1 All works for fabriaction and installation of all piping above ground at all elevations and below

ground at all depth for Sectionalising Valve Station alongwith preparation of constructiondrawings duly approved by EIC, in all type of terrains and soils including transportation andhandling of all Owner supplied materials and contractor supplied materials as per PMS,respective data sheet and TS (payment for contractor supplied shall be made as per separateitem mentioned elsever in SOR) i.e. extended stem butt welded sectionalising ball valve,other types of valves, Barred Tee,line pipes for mainline, Only 4" NB pipe for all branch lineincluding ventlines from Owner's designated place(s) of issue to work site. Contractor shallsupply of all consumables, manpower, machinaries, materials etc. and carrying out allmechanical works of underground and above ground piping including fabrication, welding,nondestructive testing of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydrotesting &hydrostatic testing, dewatering, functional testing, cutting of mainline and bevelling (if required), tie-in of valveassembly, including radiography of tie-in joints, corrosion, coating and external painting asrequired, installation of instruments like pressure/ temperature instruments/ gauges alongwithcomplete SS Tubing works including supply of SS Tube and thier accessories etc., asrequired, obtaining all statutory clearances, approvals and permissions for the works(wherever required), making of valve pit (for detail refer relevant drawings. Also refer note-iii)for SV Stations-cum-tap-off points enclosed with tender filled with sand, excavation and fillingin all types of soils including soft/ hard rock for installation of piping/ pipe supports providingpipe supports, area fencing and gate including all associated civil and structural works;painting, finishing, clean-up and restoration of site; preparation of as-built drawings,documents and project records and performing all works as per drawings, PJS, TechnicalSpecifications, other provisions of Contract document and instructions of Engineer-in-charge.

16.1.1 Type - I SV Station with vent16.1.1.a For 10" NB Pipeline Lumpsum

for each7

16.1.1.b For 6" NB Pipeline Lumpsumfor each

4

16.1.1.c For 4" NB Pipeline Lumpsumfor each

1

16.1.2 TYPE - II SV STATION WITH VENT & FUTURE TAP-OFF16.1.2.a For 10" NB Pipeline Lumpsum

for each9

16.1.2.b For 6" NB Pipeline Lumpsumfor each

2

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 15 of 32

17

Page 18: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

16.1.2.c For 4" NB Pipeline Lumpsumfor each

1

Note:i) Work under above items are exclusive of all works associated with main pipeline covered

under Item No. 1.0 above.ii) All civil/ structural works including area fencing and gate except items mentioned in note-iii will

be paid separately as per unit rate provided elsewhere in the SOR.iii) Construction of valve pits and Pipe Supports are included in the above item and no separate

payment will be made for them.iii) All Assorted pipe,fittings & flanges including Olet below 2"& all sizes of ,coupling, nipples etc.

as required shall be suplied by contractor but no separate payments shall be made as it iscovered under above item rate.

17 SUPPLY OF ASSORTED PIPE, FITTINGS, FLANGES & VALVES Complete works of supply of pipes, flanges & fittings for aboveground & undergroundinstallation including all taxes, duties, transportation and inspection charges but not limited to,the following items in accordance with PMS (piping material specification), relevantspecifications & drawings indicated in job specification under SCC (technical) and instructionsof Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.

- Handling including lifting, transportation from Contractor Stores to CONTRACTOR's workshopfor fabrication and/ or to work site for field fabrication and erection for all piping items suppliedby Contractor.

17.1 Carbon Steel Pipe (API 5L Gr. B PSL-2, BE SEAMLESS )Size Rating/ Schedule

i) 10" NB, BE Sch. Std. Meter 18Ii) 8" NB, BE Sch. 40 Meter 45

17.2 Carbon Steel Pipe (A 106, Gr. B(Charpy), Seamless B-36.10)Size Rating/ Schedule

i) 4" NB, BE Sch. 40 Meter 36

ii) 2" NB, BE Sch. XS Meter 30

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 16 of 32

18

Page 19: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

17.3 Flangesa) Weld Neck (B-16.5, 300# A105(Charpy))RF,125AARH)

Size Rating/ Schedule

ii) 4" NB, RF End thickness to match with pipe wall thickness Nos. 8

iii) 2" NB, RF End thickness to match with pipe wall thickness Nos. 8

b) Blind Flanges (B-16.5, 300# A105(Charpy))Size Rating/ Schedule

ii) 4" NB RF 125AARH Nos. 8

iii) 2" NB RF 125AARH Nos. 8

17.4 Elbow (Seamless)

a) 90° Elbow (A234 Gr. WPB(Charpy), B-16.9, 1.5D)Size Rating/ Schedule

i) 8" NB BW, End thickness to match with pipe wall thickness(Sch.40) Nos. 2

ii) 4" NB BW, End thickness to match with pipe wall thickness(Sch.40) Nos. 40

iii) 2" NB BW, End thickness to match with pipe wall thickness(Sch.XS) Nos. 20

b) 90° Elbow [MSS - SP - 75, Gr. WPHY-52, MSS - SP - 75, 3D, BW]Size Rating/ Schedule

i) 10" NB BW, End thickness to match with pipe wall thickness(sch 40) Nos. 30

c) 90° Elbow (A234 Gr. WPB(Charpy), B-16.9, 3.0D)Size Rating/ Schedule

i) 6" NB BW, End thickness to match with pipe wall thickness(Sch.40) Nos. 20

ii) 4" NB BW, End thickness to match with pipe wall thickness(Sch.40) Nos. 15

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 17 of 32

19

Page 20: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

d) 45° Elbow [MSS - SP - 75, Gr. WPHY-52, MSS - SP - 75, 3D, BW]Size Rating/ Schedule

i) 10" NB BW, End thickness to match with pipe wall thickness(sch 40) Nos. 25

e) 45° Elbow (A234 Gr. WPB(Charpy), B-16.9, 3.0D)Size Rating/ Schedule

i) 6" NB BW, End thickness to match with pipe wall thickness(Sch.40) Nos. 15

ii) 4" NB BW, End thickness to match with pipe wall thickness(Sch.40) Nos. 10f) 22½° Elbow [MSS - SP - 75, Gr. WPHY-52, MSS - SP - 75, 3D, BW]

Size Rating/ Schedulei) 10" NB BW, End thickness to match with pipe wall thickness(sch 40) Nos. 30

g) 22½° Elbow (A234 Gr. WPB(Charpy), B-16.9, 3.0D)Size Rating/ Schedule

i) 6" NB BW, End thickness to match with pipe wall thickness(Sch.40) Nos. 10

ii) 4" NB BW, End thickness to match with pipe wall thickness(Sch.40) Nos. 10h) 15° Elbow [MSS - SP - 75, Gr. WPHY-52, MSS - SP - 75, 3D, BW]

Size Rating/ Schedulei) 10" NB BW, End thickness to match with pipe wall thickness(sch 40) Nos. 20

i) 15° Elbow (A234 Gr. WPB(Charpy), B-16.9, 3.0D)Size Rating/ Schedule

i) 6" NB BW, End thickness to match with pipe wall thickness(Sch.40) Nos. 10

ii) 4" NB BW, End thickness to match with pipe wall thickness(Sch.40) Nos. 8

17.5 Tees (Seamless)a) Equal Tee (A234 Gr. WPB(Charpy), B16.9)

Size Rating/ Schedule

ii) 4" NB x4" NB x 4" NB BW, End thickness to match with pipe wall thckness(Sch.40) Nos. 16

iii) 2" NB x2" NB x 2" NB BW, End thickness to match with pipe wall thckness(Sch.XS) Nos. 8

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 18 of 32

20

Page 21: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

b) Unequal Tee (A234 Gr. WPB(Charpy), B16.9)Size Rating/ Schedule

i) 8" NB x8" NB x4" NB BW, End thickness to match with pipe wall thckness(Sch.40) Nos. 1

4" NB x 4" NB x 2" NB BW, End thickness to match with pipe wall thickness (Sch 40) Nos. 8

17.6 Weldolet and Sockolet a) Weldolet (A 105 (Charpy),MSS-SP97)

Size Rating/ Schedule 6"NB X 2"NB BW,S80 Nos. 12

b) Reducer (A234 Gr. WPB(Charpy), B16.9) 10"NB X 8"NB BW,S40 Nos. 2

c) Disc End( A234 Gr. WPB(Charpy), B16.9)10" NB Disc End Nos. 26" NB Disc End Nos. 44" NB Disc End Nos 12

17.7 Barred Tees a) Equal / Unequal Barred Tees (As per Data Sheets)

Size Rating/ Schedulei) 10"X10"X10" BW,End thickness to match Pipe thickness Nos. 3

ii) 10"X10X6" BW,End thickness to match Pipe thickness Nos. 4

iii) 10"X10X4" BW,End thickness to match Pipe thickness Nos. 46

iv) 4"X4"X4" BW,End thickness to match Pipe thickness Nos. 1

v) 6"X6"X4" BW,End thickness to match Pipe thickness Nos. 3

b) Equal / Unequal Tees (A234 Gr. WPB, B16.9)i) 4"X4"X2" BW,End thickness to match Pipe thickness Nos. 4

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 19 of 32

21

Page 22: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

17.8 Insulating Joints i) 10" NB , ANSI Rating 300# (As per Data Sheet enclosed) Nos. 2

ii) 4" NB , ANSI Rating 300# (As per Data Sheet enclosed) Nos. 8

18.9 Ball Valve (BS5351, B 16.11 ANSI Rating 800#) ii) 3/4" NB BW,FB (As per Data Sheet enclosed) 800# Nos. 12

Note:i) For all the supply items mentioned above, procurement shall be made as per enclosed Data

Sheets and respective technical specification, after due approval of Engineer-in-charge.ii) The quantities mentioned above are tentative and quantities for above supply items shall be

finalised & procured by Contractor only after due approval of EIC. Contractor supplied any surplus item during reconciliation shall not be accepted / taken by the Owner.

19.0 PLANT PIPING (ABOVEGROUND)Transportation of all piping items from Owner's and/ or Contractor's storage point to work atsite/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes,flanges and fittings and making ready for further Commissioning / Start-up of carbon steelpiping of all sizes and ratings including supply of all consumables, equipment, manpower andother resources and execution of, but not limited to, the following works in accordance withrelevant specifications indicated in item 5.5 of PJS & scope of work indicated in SCC,drawings, specification and instructions of Engineer-in-charge and as per all provisions of theCONTRACT DOCUMENT.

- Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes,fittings, flanges etc. to match with the matching edges of uneven/different thickness whereverrequired, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of all sizesof nipples and coupling etc. as required for completion of job.

- Weldolets, sockolets, flanges, vent and drain point connection etc., including providing stub-inconnections, fabricated fittings and reinforcement pads etc., as required.

- Erection including prior cleaning, lifting, placing on pipe sleepers and supports, overhead onracks, skids and at all elevations including installation and carrying out connected activities forall types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever requiredfor all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment,nozzles, strainers, tie-in with existing piping/facilities, etc. tapping for inline instruments likepressure gauges, thermowells, sample connection, etc.

- Preparation of final bill of material based on piping GADs.

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 20 of 32

22

Page 23: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

- Preparation of isometric and fabrication drawings.- Carrying out Non-destructive testing as required. Except item mentioned in sl.no. 22 of SOR.- Surface preparation before application of primer by means of sand blasting including supply of

approved quality of sand, manpower, machineries, tools & tackles to achieve requiredroughness as per specification and as per instruction of Engineer-in-charge.

- Painting of entire system (including aboveground all pipes fittings, flanges and accessories) asper specification MEC/S/05/21/07 suitable for highly corrosive area environment includingsupply of approved paints and primers, application of primer and paints, indentificationlettering/ numbering, colour coding, etc. as specified including rub down & touch up of shopprimer or scrapping of shop primer wherever required by COMPANY and providing scaffoldingfor all heights etc.

- Cleaning and flushing by water/ compressed air, testing of the systems including hydrostatic,pneumatic and any other type of testing as specified, draining, drying by compressed air/othermethods approved by COMPANY.

- Precommissioning & making operational all piping system and equipments.

- Commissioning Contractor scope shall provide all necessary assistance in term of supply ofman-power, equipment, tools and tackles required amount of nitrogen for purging of entireterminal piping system including equipments etc. to the company during commissioningactivities.

- Completion of all such work in all respects as per scope of work and as per drawings,specifications and instructions of the COMPANY and keeping the system ready in all respectsfor further commissioning and start up.

- Hook-up works (with client/ consumer piping at battery limits):

19.1 Complete Carbon Steel aboveground Piping Work with painting including all fittings, flangesand supply of all required gaskets, studs bolts & nuts etc. as described under item 20.0 above

Carbon Steel Pipe (ASTM A 106, Gr. B, Seamless B-36.10)Size Rating/ Schedule

i) 10" NB, BE S40 Meter 18

ii) 8" NB, BE S40 Meter 45

iii) 4" NB, BE S40 Meter 36

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 21 of 32

23

Page 24: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

iv) 2" NB, BE S80 Meter 30

Note: 1) Pipe Specification and thickness may vary depending upon availability of pipe. No extrapayment shall be made for this.2) All butt welded fittings & flanges end shall generally match with connecting pipe wallthickness. However, in case of misalignment, Contractor shall have to do end preparationwithout any extra cost. 3)All Assorted pipe,fittings & flanges including Olet below 2"& all sizes of ,coupling, nipplesetc. as required shall be suplied by contractor but no separate payments shall be made as it iscovered under above item rate.

20.0 RADIOGRAPHY

Performance of radiographic inspection by gamma radiation as per scope of work and as per specifications in piping of all types and thickness including providing/hiring of all necessary equipments, supply of all consumables, and whatever else even though not expressely mentioned but required to perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-radiography of the repaired joint and additional radiography necessitated due to poor performance of contractor's welder shall be carried out by the Contractor at his own cost and shall not be paid extra by Company). Radiographs shall be submitted to the Engineer-in-Charge for acceptance, whose decision shall be final and binding.

Sizei) 10" NB No.of 8

ii) 8" NB No.of 20Joints

iii) 4" NB No.of 40Joints

iv) 2" NB No.of 24Joints

Note:i) The quantities mentioned above are tentative.

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 22 of 32

24

Page 25: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

21.0 Aboveground installation of Insulating Joint & Valves etc.

Handling including lifting and transportation from COMPANY's warehouse to CONTRACTOR'SStores and/or work site and installation of all types of valves, insulating joint includingassembly of valve accessories, (if any) by bolting, threading or welding, supply and insertion ofgaskets, nuts & bolts, nipples, etc. at all elevations of pipe sleepers, supports or overhead onracks, equipments nozzle, skid & painting etc. supply of all consumables, manpower,equipment, etc. for completion of all works as per scope of work and as per drawings,specifications and instructions of Engineer-in-charge including servicing/ cleaning of valvewherever requried.

21.1 Flanged/ Welded Valves (Full Bore/ Reduced Bore)Ball / Globe / Plug Valve

Size Rating/ Schedule

ii) 8" NB 300# Nos. 6

iii) 4" NB 300# Nos. 9

iv) 2" NB 300# Nos. 10

21.2 Sockolet Welded Valve (Ball / Globe /Plug )

Size Rating/ Schedulei) 1" NB 800# Nos. 18

3/4" NB 800# Nos. 1021.3 Insulating Joint

i) 10" NB, 300# Nos 2

4" NB, 300# Nos 8

Note:The quantities mentioned above are tentative.

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 23 of 32

25

Page 26: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

22.0 Supply of Coating repair material

i) Cross linked Thermoplastic adhsive of Repair patch( Perp 80 patch of covalance raychem orequivalent)

Sq.m. 25

ii) Coating Silicon Roller Nos. 10

iii) PERP FILLER of Covalance Raychem or equivalentt. Sq.m. 15

23.0 STRUCTURAL WORKS23.1 Supply of erection of single leaf mild steel gate 2.5m high with mesh upto 2m height and

barbed wire fencing and 2m wide complete in all respect including painting as per TS on allMS items, all works as per specification and drawings excluding foundations and RCC beams.

No. 24

23.2 Supply of all materials, fabrication and erection of chain link fencing 2.5m high with mesh up to2m height and barbed wire fenching complete in all respects including painting as per TS on all MS items, all works as per specification and drawings excluding foundation and RCC beams.

RM 720

23.3 Pipe Supports & Other Structuresa) Supply, fabrication and erection of all types of pipe supports like clamps, saddle, guide stops,

cradles, turn buckles, anchors, T-posts; stockade/ trestle and pipe bridge for overhead piping;frames for canopy, approach ladders and platforms, crossover, cable tray supports, etc.including painting suitable for highly corrosive area as per specification labour andsupervision & complete work as per drawings, specifications and instruction of Engineer-in-charge. (Bolts, nuts, washers, U-clamps etc. for supporting shall be supplied by the Contractorwithin the rates quoted. These items will not be measured and paid seperately). The work isto be completed in all respect as per scope of work and specification.

M.Ton. 4

Notes:i) The quantities indicated are estimated values and hence are approximate. Final payment will

be made based on actual quantities to be certified by the Purchaser.ii) The cost of MS bolts (permanent and service(, washers, electrodes, putty, gases, cost of

straightening the raw materials, cutting of flats from plates and providing splices, paints, tools,plants etc., as required for the work shall be deemed to be included in the quoted rates.

iii) All handling and transport charges of raw materials and fabricated structures including doublehandling, as required, for completion of work in accrodance with time schedule, are deemedbe included in the quoted rates.

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 24 of 32

26

Page 27: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

24.0 CIVIL WORKS (for GAIL Tap-off, CGS, PRS, SV's cum Tap-off and Mainline) 24.1 Site Grading

Earth in excavation and filling to the grades and levels shown in the approved drawings in allkinds of conditions including for Road embarkments, using approved quality good earth fromdesignated borrow area, for all heights and depths including clearing and stripping (min.150mm) of the area marked for filling, taking spot levels, consolidating the exposed natural soil surface, excavating the earth from borrow area loading, transporting & unloading, spreading inlayers not exceeding 150mm thickness, breaking clods, watering (if reqd.), ramming andcompacting by manual/ mechanical means to give minimum 92% of modified Proctor's densityof earth, testing & dressing including disposal of all unserviceable material all complete as perspecifications and directions of Engineer-in-charge.

M3 150

(Rate to include cost of all labour, tools, tackles, equipment, hire charges, cost of borrow earthby way of royalties, right of way, cess etc., as applicable with all bye works and sundry works).

24.2 Plain Cement ConcreteSupplying and laying plain cement concrete (including shuttering of required) in all types ofconcrete works including levelling courses below foundation, substructure, superstrcuture,chambers, cable tranch, under floors and any other locations, at all leveies as per drawings,specifications and directions of the Engineer-in-charge.

a) PCC 1:4:81 Cement : 4 Coarse sand : 8 stone aggregate 40mm nominal size. M3 15(Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of allmaterials, shuttering, earthwork in excavation and backfilling using approved earth in allconditions etc. with all bye works and sundry works.)

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 25 of 32

27

Page 28: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

24.3 Reinforced Cement Concrete

Providing and laying reinforced cement of grade M-20 with 20mm and down grade crushedstone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipesupports, sleepers cable trench inlcuding constrcution joints, bitumen painting on surface incontact with soil, providing and fixing reinforcing steel, shuttering, inserts, finishes etc. at alldepths and heights complete as per drawings, specifications and direction of the Engineer-in-charge.

M3 170

Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all maerialssuch as minimum 43 grade cement including sulphate resistant cement for sub-structures, R/Fsteel, Inserts, bolts, conduits, bitumen, other minor constrcution materials, shuttering,stanging, earthwork in excavation and backfilling using serviceable earth in all conditions,shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works andsyndry works.

24.4 Concrete PavementProviding and laying reinforced cement concrete of (M-20 grade) with 20mm and down gradecrushed stone aggregate in pavement, including preparation of base (i.e. compactedsubgrade, 200 thk sand and 50 thk PCC M-10 grade), leaving pockets if necessary, makingrecess, projections, fixing inserts conduit pipes (GI, PVC, HDPE, etc.) laying in alternatepanels, filling the gaps between the panels with bitumen etc., making slopes, finishing edges,leaving bars for pedestals & sleepers including providing sand fill isolation , shuttering,providing and fixing reinforcing steel, curing, chipping and modification works etc. as specifiedin any shape, thickness, position and finishing the top surface smooth as per requirement etc.all complete as per drawings, specifications and directions of the Engineer-in-charge. - 150 mm thick (Type-I) M2 100

24.5 Brick WorkProviding brick work with brick class designation M-7.5 of IS:1077 in cm1:4 (1 cement : 4sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with alllead, depths & height including curring, scaffolding, etc., as per specifications and drawingswith all bye-works and direction of the Enfineer-in-charge.

M3 180

(Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of allmaterials such as minimum 43 grade cement bricks, finishes, bitumen, other minorconstrcution materials, shuttering, staging, masnory work, plastering, painting etc. with all bye-works and sundry works).

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 26 of 32

28

Page 29: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

24.6 Laying of Brick / Concrete / or impact resistant tape Providing single layer of Brick / Concrete / or impact resistant tape to entire width of trenchabove Warning Mat placed in trench over the laid pipeline as per OISD 226, standard drawing,specification and instruction of Owner. (Rate to include cost of all labour, tools, tackles, equipment, hire charges & supply of allmaterials, etc.)

24.6.1 Brick Layer for width of 16" pipeline trench as per drawing (75 mm thk.) Sq. m 100

24.6.2 Concrete for width of 16" pipeline trench as per drawing (80 mm thk.) Sq. m 100

24.6.3 Impact Resistant Tape of 3 mm thk for width of 16" pipeline trench Sq. m 100

25.0 TEMPORARY CATHODIC PROTECTION SYSTEM

25.1 Design, detailed engineering, supply, installation, testing and commissioning of the temporaryCathodic protection system using Mg/ Zn galvanic anodes to protect the external surface of 3LPE coated entire 78.0 km (approx.) long steel pipeline network against corrosion for designlife of minimum 1 year or till commissioning of PCP system whichever is later as per standardspecification No. MEC/TS/05/21/016A for temporary cathodic protection system. Scope shallalso include but not limited to the following for completion of jobs:

a) Measurement of soil resistivity along the right of way of the main pipeline route as perspecification for design & installation of anodes.

b) Collection of additional data related to cathodic protection along the right of way of pipeline asper specifications.

c) Supply, installation, testing & commissioning of one set of spark gap arrestor with 2 plate Zincgrounding cell of 20 kg net weight each across each insulating joint as per specification.

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 27 of 32

29

Page 30: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

d) Supply, installation, testing & commissioning one set of polarisation cell with zinc anode at allhigh tension (66KV or higher) electrical power transmission line/Equipment crossing or runningparallel to the pipeline for grounding purpose as per specification. The rating shall dependupon anticipated fault current & ground bed resistance at the location of installation. However,the rating of polarisation cell (krick) shall not be less than 5 KA & number of 20 kg net weightzinc anode shall not be less than two.

e) Supply & installation of Zinc Ribbon Anodes at 4-8 O’Clock position in the interval of 2 metre(max.) on carrier pipes at all cased crossings i.e. railways/ roads etc.

f) Monitoring of the protection system for 6 months

g) All civil/ structural works related to TCP system including supply of bricks, cement & steel etc.required for completion of the system.For 10" meter 46000For 6" meter 19000For 4" meter 10000

28.0 FIELD INSTRUMENTATION28.1 PRESSURE INSTRUMENTS

28.1.1 Supply, Calibration, Installation of Pressure Gagues and their accessories inclusive of supplyof necessary piping materials and tubings alongwith all necessary valves & fittings, fabricationand installation of impulse lines/ manifolds & hydraulic testing as per installation standardattached elsewhere in Tender Document and Supply as per Data SheetNo.MEC/23LB/05/E5/I/001/DS-PG. Give breakup of supply and Installation rate.

Nos. 4

28.2 TEMPERATURE INSTRUMENTS 28.2.1 Supply, Calibration, Installation of Temperature Gauges with flanged Thermowell inclusive of

installation of thermowell on the nozzle and installation of instruments as per installationstandard attached elsewhere in Tender Document and Supply as per Data Sheet No.MEC/23LB/05/E5/I/001/DS-TG. Give breakup of supply and Installation rate.

Nos. 4

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 28 of 32

30

Page 31: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

28.3 FREE ISSUE ITEM Handling, including lifting, transportation from Company's stores to Contractor's work-shop forfabrication or/ and to worksite for field fabrication, assembly of parts/ sub-assemblies erectionfor all vessels, equipments supplied by company above ground/ underground at all elevation/depth, fixing of foundation bolts welding wherever required, alinging, grouting, hooking-up,cleaning and flushing by water draining, drying by compressed air providing all mountings,ancilliary, enabling works as required and completing in all respect as per drawings,specification and instruction of Engineer-in-charge. Contractor's scope shall include supply ofall material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts,finish coat of painting including rub down & touch up of shop primer/ paint scrapping of shopprimer/ paint and further their painting after application of primer as per specification, whereverrequired by Company. Approx. erection weight and Details of major equipments are as under(Refer P&ID included with Tender).Details of major equipments are as under Details of Equipment Nos.

28.3.1 Metering Skid alongwith all accessories and control panel at CGS-I 1 MT 10

28.3.2 Metering Skid alongwith all accessories and control panel at CGS-II 1 MT 10Note:

i) The quantities mentioned above are tentative and quantities for above including supply items shall be finalised & procured by Contractor only after due approval of EIC. Contractor supplied any surplus item during reconciliation shall not be accepted / taken by the Owner.

ii) For all the supply items mentioned above, procurement shall be made as per specification & Data Sheets, after due approval of Engineer-in-charge.

29.0 TELECOMMUNICATION WORK : SUPPLY AND LAYING HDPE DUCTS AND ASSOCIATEDWORKS: Supply of materials/ equipments ,storage,erection and services (as perspecification, drawings etc. provided in this Bid Document ).

29.1 Supply of Permanently Lubricated Telecom HDPE Duct & Accessories as per MECON Technical Specification No. MEC/TS/05/E5/T/037 Rev 1. Design, Manufacturing,factory testing, inspection, packaging, forwarding, transportation, insurance,receipt and storage at site etc.

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 29 of 32

31

Page 32: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

29.1.1 Supply of 40 mm OD , permanently lubricated HDPE DUCT, Factory Acceptance Testing,: Factory acceptance testing of 40 mm OD, 6 Kg/cm2, permanently lubricated HDPE duct as per spec.

Meter 75000

29.1.2 Supply of HDPE Duct Accessories: Supply of HDPE Duct accessories required includingPlastic Couplers, End Plugs, Cable Sealing Plugs, End Caps, etc suitable & sufficient forabove supplied Duct with extra 20 % quantity for future use.

Lumpsum 1

30.0 TELECOMMUNICATION SITE WORK (as per scope of work, Standard Specification no.MEC/S/05/E5/T/001 Rev 0 & ../002 Rev 0 of Bid documents)

30.1 Submission of optical fiber cable & HDPE alignment sheets (CAS) based on the existingpipe line survey (No separate survey reqd.),estimation of OFC & HDPE duct including allaccessories in accordance with the alignment sheet and specifications.Laying work can notbe started without approval of these documents from Client / Consultant / EIC.

Lumpsum 1

30.2 Blowing of Optical Fiber Cable

All activities pertaining to blowing of optical fiber cable (after testing of drum at site) in PLEHDPE Duct laid in same pipeline trench,through CS/ HDPE conduits at crossing, cablesealing, padding, backfilling if required separately etc. using all materials required includingSupply and Laying of Warning Mats if required separately, etc. , at the each end OFC to bestored in pit with proper sealing all complete as per specifications and drawing provided in thebid document & as per direction of consultant.

Per Meter of Trench Length

75000

30.3 Laying of HDPE Telecom Duct as per specification

Laying of 40mm OD permanently lubricated HDPE ducts( PLE HDPE Duct), in same pipelinetrench direct buried or cased crossing through CS/ HDPE conduit in all type of soil & terrain,excavation as required, padding, backfilling if required separately etc. including cleaning andsealing of ducts at the end of laid drum lengths, preparation & Supply of Cable Blowing Pit ateach KM including sand, jointing of HDPE conduit, Testing of HDPE Duct and accessoriesafter laying,preparation of report and final drawing & documents as per specification, jointlocation marking , erection accessories (suitable for min 8 kg/cm2 pressure rating) ,allcomplete as per specifications provided in the bid document & as per direction of consultant.

Per Meter of Trench Length

75000

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 30 of 32

32

Page 33: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

30.4 Supply and installation of jointing pits, including sand, etc. all complete as per spec.,drawing provided in the bid document and the direction of consultant. (Quantity shall vary asper project / site requirement based on approved Cable Alignment Sheet).

Nos. 25

30.5 Supply & installation of 300 dia cable markers at all pipeline marker locations on same pipeline marker post (including at every crossing etc.) as per specifications & drawingprovided in the bid document and direction of consultant.

Nos. 50

29.6 Splicing, Jointing of optical fiber cable (including supply and installation of jointmarkers, etc.), end to end testing all completed as per specifications & drawing provided inthe bid document and direction of consultant.Splicing with steet fibre, test of the fibre for thesmooth operation system on wavelength. Power Testing of laid OFC, end to end testing,Identification of the fault,Rectification, final testing & commissioning , preparation of reportsetc. work complete in all respect with all necessary accessories for all location till the finalHanding over & taking over by Owner of the laid Optical Fiber Cable alongwith HDPE TelecomDuct complete as per specification,Drawings and Documentation as per specification &contract agreement and as per the direction of Engineers in charge.

Lumspum 1

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 31 of 32

33

Page 34: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

MAINLINE, TERMINALS & ASSOCIATED WORKS

Item Description of items Unit Quantity In Figure In Word

No

Unit Rate (in Rs.) inclusive of all taxes and duties including service tax and WCT

Total Amount inclusive of all

taxes and duties including service

tax and WCT(in Rs.)

REVISED SCHEDULE OF RATES FOR

LAYING & CONSTRUCTION OF CITY GAS STEEL PIPELINE GRID & ASSOCIATED WORKS IN KAKINADA

30.7 Supply and Installation & Commissioning of Electronic Marker System as perspecification , test certificate and documents etc. consisting of :

a) Electronic Markers (To be buried underground along with OFC Joints at all jointing location) Nos. 25- The make & model shall be same as of existing electronic marker. - Detail of marker will be provided to successful bidder. - Quantity shall vary as per project / site requirement based on approved Cable Alignment

Sheet. Note : The quantites of individual item can varied as per site requirement.The payment will be made as per actual certified measurement at site.For the Payment purpose the actual pipeline length will be considered for the payments of laid OFC and HDPE Duct along the pipeline and length upto control room inside terminal will be considered separately.The location of Jointing and the quantity of jointing pit and closure may be finalised with the Cable alignment sheet approval as per actual laying conditions at site.

General Note : 1 All SOR item shall be quoted by the bidder in the price part of the bid other-wise bid will

be rejected. 2 All Bidders are requested to refer clause no. 17C.0 of Particular Job Specification for

Mainline, Mechanical & Associated works before filling the price against each item of above SOR.

Total Amount in INR (inclusive of all taxes & duties) in Figures : in Words :

%age of VAT considered in the above priceAmount of VAT included in the above total price in INR

%age of Service Tax considered in the above priceAmount of Service Tax included in the above total price in INR

Amount of Excise duty included in the above total price in INR

%age of custom duty on CIF value considered included in the above price CIF value of imported component included in the above total price in INR

%age of Excise Duty in the above total price

D:\BGL - Kakinada\Laying\Addendum-I\SOR - BGL_KAK_NEW -12.04.10-FINAL.xls SOR No. 05/21/23LZ/CG/SOR-01, Rev.-1 Page 32 of 32

34

Page 35: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

D:\old data\Vijyant\BGL-23LB\BGL-Kakinada\Tender\Laying\Summary of Prices-BGL.doc

2) SUMMARY OF PRICES (To be submitted with priced part of the offer) [LAYING & CONSTRUCTION OF 10”; 6” & 4” NB U/G STEEL P/L NETWORK & ASSOCIATED WORKS IN KAKINADA CITY – {Part of Tender No. : 05/51/23LZ/BGL-KAKI/001-i)]

(In Figures) (In Words)

1. Gross Total amount of quoted price for Mainline & Associated Work SOR

2. Grand Total Amount (inclusive of all applicable taxes & duties)

3. Rebate (if any) offered on gross total amount (Sl.No. 2) above. (which will be applicable on each item of Schedule of Rate)

________________ % of quoted rate

____________________ Percent of quoted rates

4. Amount of Rebate as per Sl.No. 3 above

5. Net total amount {2-3} (after considering rebate indicated at Sl.No. 3)

Note: The total amount shall also be given by the bidder in the quoted currency(ies).

Place : _________________ Signature of Authorised Signatory Date : _________________ Name :

Designation : Seal : Tender No.: ________________________________________________ Offer No. & Date : ___________________________________________

35

Page 36: BHAGYANAGAR GAS LIMITED · BHAGYANAGAR GAS LIMITED ... barred tees, insulating joints, flanges & fittings of all sizes, ... specifications, other provisions of

TENDER NO. 05/51/2LZ/BGL-KAKI/001-i)

S.No. Cl.No. Page no. Volume Tender Specifications Query Addendum / Clarification

1 1.1 ii) 192 I of III Terms of Payment : -In tender document: ii) The second stage payment of 10% as per sub-clause 1.1.2 above will be released on completion of continuous stretch of4 km

We request you to change the continuous stretch of 4 Km. to 2 Km.

2 1.6.1 a) 200 I of III Reconciliation of Owner suppliedmaterials :-

In Tender Document: a) For the purpose of accounting of coated pipes following allowancesshall be permitted :i) Unaccountable wastage : 0.1%ii) Scrap (all cut pieces of pipes measuring less than 2 m) : 0.25%iii) Serviceable materials (all cust pieces of pipe) : 0.5%

1.1 As it is city gas pipeline there are more number of turning points andcrossings comparatively normal cross country pipelines. So, we requestyou to chnage the scrap and other allowances as follows:- i) Unaccountable wastage : 0.25%ii) Scrap (all cut pieces of pipes measuring less than 2 m) : 0.1%iii) Serviceable materials (all cust pieces of pipe) : 0.3%

2.1 Also, we request you to consider the serviceable length of 2 t 9 mm to2 to 8 m and from 8 m and above length to be considered as good length.

3 13.0 43 II of III Working Spread Limitations : Working Spread Limitations :In tender document: Contractor shall, in general, observe the followingmaximum distances between the working mainline spread:Between ROW grading, clearing and backfilling : 30 kms Between backfilling and final clean-up : 05 kms.

As it is city gas pipeline, we request you to remove the clause of workingspread limitation because the front availability will be based on theauthorities permissions only. Hence limitation of working spread may notbe possible during execution.

4 - 187 I of III Annexure-3 to SCC In tender document : The time completion period for the project is 11 months.As the pipeline rute seems to be too conjected, so we kindly request youto ammend the time of completion from 11 months to 18 months.

Tender Condition Prevail

REPLY TO BIDDERS QUERIES RAISED DURING PRE BID MEETING

Tender Condition Prevail

Tender Condition Prevail

Accepted