BIM… Not Just for Construction… A Solution For Facility Operations
Sunday, June 8, 2014 ▪ 2:30 pm – 3:45 pm, Hidalgo
Presented by: Keith Beck, Director, Division of Facilities Management, Wisconsin Bureau of Building Management Mark Cervenka, Manager, Facilities & Construction, Texas A&M University of Health Science Center
The concept of collecting BIM/COBiE data has been around for several years now. Using BIM for design and construction
has become a common practice in the industry. Yet, some institutions are not taking advantage of the opportunity to
gather this data for their operations and load it into their FM application. This presentation will provide a road map for
institutions to follow in order to collect and utilize this data from design to operations.
ABOUT THE SPEAKERS KEITH BECK has over 30 years of experience in facilities engineering and 25 years in facilities management with the
State of Wisconsin. Keith is the BIM-FM Handover champion and is responsible for the development and implementation
of the State’s BIM to FM Program. Keith has developed guidelines that specify model requirements and data exchange
methods. These guidelines define the path for data exchanges between BIM files and FM applications, from the initial
project concept phase through final commissioning and project closeout. MARK CERVENKA began working for the Texas A&M Health Science Center as the Facilities Manager in December
2006. Prior to working for the Health Science Center, Mark worked for the Texas A&M University System Facilities
Planning and Construction office. His responsibilities there involved the contract administration and budget management
of a $750m. construction management program. He received his Finance and Accounting degrees from Texas A&M
University. Mark’s current duties involve managing the facilities and construction operations of all Texas A&M Health
Science Center facilities and campuses. The HSC has campus locations across Texas in Dallas, Temple, Round Rock,
Bryan, College Station, Houston, Corpus Christi, Kingsville and McAllen. Recent accomplishments include monitoring the
design, construction and bringing into operation two new academic campuses in Round Rock and Bryan as well as the
installation of a new integrated, web-based Facilities Management System at all HSC campuses. These two new
campuses were green field campuses and represent the beginning of campus master plan developments. The Bryan
campus construction project included a BIM/COBIE deliverable from the design and construction contracts. Mark worked
extensively on the development of the scope and criteria used by the contractors to deliver this information.
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
1
BIM and FM Handover in Wisconsin
Keith Beck, PEDirector, Bureau of Building Management
Division of Facilities ManagementDepartment of Administration
State of [email protected]
It started in 2008 …
BIM Tools existed We envisioned a benefit We started our journey
Route? Destination?
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
2
From FM Point of view
Design Development Involvement Construction Documentation took
forever Typically 6 months after startup
CMMS – Data entry was difficult Space Management from scratch BAS from scratch Security was a challenge
Loss of Knowledge
Current FM Handover
We are no different than Lyle
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
3
FM Handover Pilot Projects
FM Group Requirements Interest (See the Benefit) Talent (Knowledge of Electronic Data) Ability (In House Technology)
AE and Contractor Comment “Just tell us what you want”
Pilot Projects Results
Data Exchanges were completed Rooms / Spaces Doors Door Hardware / Security MEP Equipment Provided key records to link documents Eliminated significant data entry
ChallengesMultiple FM App Platforms
CMMS - Archibus, AssetWorks, TMA, Homemade
BAS – Johnson Controls, Andover, Niagara/Tridium
Space Management – Archibus, Homemade
Security - Homemade Most have simple dataset Import
Capability
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
4
Worker Input
“I want to know what the Contractors know … before we open the doors to this place”
“You mean I wouldn’t have had to hand enter all that data?”
FM Handover Goals
Educate Building Staff Receive Information as soon as
available Utilize Electronic data where possible Reduce Manual Entry Maximize Use of Technology
BIM Data “What We Want”
BIM Data Spaces
Rooms, Walls, Doors, Windows, Zones Furniture, IT and AV Equipment
Hardware Door Hardware Keying, Card Access
Equipment All MEP Equipment, Systems
What is Where
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
5
FM Handover:Supplement to AE Guidelines
Object Properties (Space)
Rooms (Spaces) RoomNo Name Type Category Level
What is in each Room What is where
Object Properties (Hardware)
Doors DoorNo To/From RoomNo Other Properties as Scheduled
Hardware (Key and Security Database) HardwareID Description External Related File is acceptable
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
6
Object Properties (MEP)
All MEP Equipment TAG Service or Description Location UniFormatNo External File of Scheduled Design Data Used for CMMS and BAS Database
Why UniFormat
UniFormat (Grouping of equipment) Uniform Naming of Equipment Crosses to MasterFormat MasterFormat Crosses to Spec Section Construction Documentation follows
Spec Section
Equipment to be Scheduled
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
7
Level of DetailObject Properties
TAG Property is Required Minimum:
properties as spelled out
Desired: All properties to produce the Equipment
Schedule on CDs
BIM to FM tools
Many to pick from COBie BIM App API
3rd Party Plugins
3rd Party Tools using IFC SimpleBIM BIM Servers Other
Which Tool to Use
Decision Tree: Export Method From Model – Native or IFC By Group or “All in One” Data Verification or Cleanup Import Method to FM App
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
8
Construction Documentation
Contains a wealth of information Cut Sheet for exact piece of equipment O&M Manual for exact system Construction Verification Sheets Functional Performance Test Results Air Balance Report As-Built Drawings (2D)
Construction Documents
Need to receive timely Submittals go untouched after approval O&M Manual is available after item is
purchased Functional Performance Testing happens
well before Turnover Air Balance Report Control drawings are usually last
Electronic, Uploaded and Timely
Document Management
SharePoint Path is URL based Libraries and Folders for Organization Applications point to SP location Outside Consultants can Upload
Commissioning Agent
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
9
Data Exchanges during Design
Design Phase
Project Knowledge
Linking it TogetherSpace Data (CAFM)
Design BIM Data
Shop Drawings
Field Verification
Functional Testing
Equipment Data (CMMS)
Operational Data (BAS)
Space Equipment
O & M Manuals
As-Built Model
Training Videos
Construction Photos
CD Schedules
Design model dataset
Construction
Documentation
Document
Management
System
Design
BIM
model
BIM
DataData Transfer by
COBie/Other
Upload When Ready
Document Link
Keith Beck
3.28.2013
Data Transfer by COBie/Other
BIM FM Data Transfer
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
10
Room 120 Inventory
Name Type Category TAG UniFormat
WDHM ‐ 3‐0 x 7‐0 ‐ 2 Hd F‐Sgl Doors C1020320
WDHM ‐ 3‐6 x 7‐0 ‐ 2 Hd (45 MIN) F‐Sgl Doors C1020320
Powered ‐ Dual Control 30‐11.5x9 Shelving‐Mobile Furniture E2020200
Powered ‐ Dual Control ‐ 20x9 Shelving‐Mobile Furniture E2020200
24"x24" Sink‐Mop‐Square‐3D Plumbing Fixtures
WDHM ‐ 3‐0 x 7‐0 ‐ 2 Hd F‐Sgl Doors C1020320
5" Strainer ‐ 3" Drain A‐Floor Drain ‐ Round Plumbing Fixtures 1
24x24 ‐ 10 Neck A‐Supply Diffuser ‐ Round Air Terminals 17
24x24 ‐ 10 Neck A‐Supply Diffuser ‐ Round Air Terminals 19
24x24 ‐ 10 Neck A‐Supply Diffuser ‐ Round Air Terminals 20
6 x 6 A‐Exhaust Grille ‐ Sidewall Air Terminals 56
24x24 ‐ 14 Neck A‐Return Grille ‐ Round Air Terminals
Room Area and Finishes
Room No Room Name Area Floor North East South West Ceiling
100 VESTIBULE 158 CT‐6 P‐1 P‐1 ‐‐ P‐1 ACT‐1
101 ENTRY 136 VCT‐1/2/3 P‐1 P‐1 PE‐1 P‐1 ACT‐1/2
102 CORRIDOR 209 VCT‐1/2/3 P‐1 P‐1 P‐1 P‐1 ACT‐1
103 OFFICE 122 CPT‐1 P‐1 P‐1 PE‐1 P‐1 ACT‐1
104 OFFICE 123 CPT‐1 P‐1 P‐1 PE‐1 P‐1 ACT‐1
105 OPEN OFFICE 786 CPT‐1 P‐1 P‐1 PE‐1 PE‐1 ACT‐1
105A OPEN OFFICE 641 CPT‐1 P‐1 P‐1 P‐1 PE‐1 ACT‐1/2
105B OPEN OFFICE 660 CPT‐1 P‐1 P‐1 P‐1 PE‐1 ACT‐1/2
107 WORKING LAB 1810 RF‐1 PE‐1 PE‐1 PE‐1 PE‐1 ACT‐1/2
108 CORRIDOR 215 VCT‐1/2/3 P‐1 P‐1 P‐1 P‐1 ACT‐1
109 NEW STAIRS 202 RF‐1 P‐1 P‐1 P‐1 P‐1 ACT‐1
110 CORRIDOR 500 VCT‐1/2/3 P‐1 P‐1 P‐1 P‐1 ACT‐1
111 QUANT / POST AMP 181 RF‐1 PE‐1 PE‐1 PE‐1 PE‐1 ACT‐3
112 EXTRACT 123 RF‐1 PE‐1 PE‐1 PE‐1 PE‐1 ACT‐3
113 ROBOTIC 184 RF‐1 PE‐1 PE‐1 PE‐1 PE‐1 ACT‐3
114 SWEEPING 184 RF‐1 PE‐1 PE‐1 PE‐1 PE‐1 ACT‐3
115 BULK STORAGE 123 VCT‐1 P‐1 P‐1 P‐1 P‐1 ACT‐1
116 BREAK RM 127 VCT‐1 P‐1 P‐1 P‐1 P‐1 ACT‐1
Room 123 Equipment
Category Name Type UniFormat
Air Terminals 24x24 ‐ 10 Neck A‐Supply Diffuser ‐ Round Connection
Casework 30D x 36H x 1.5 Counter ‐ Backsplash C1030400
Casework 25D x 36H x 1.5 Counter ‐ Backsplash and 1 Sidesplash
Doors WDHM ‐ 3‐0 x 7‐0 ‐ 2 Hd NL‐Sgl C1020320
Plumbing Fixtures 5" Strainer ‐ 3" Drain A‐Floor Drain ‐ Round
Plumbing Fixtures Standard Safety_Station‐Eyewash D2010900
Plumbing Fixtures 26‐5/8" x 16‐5/8" Sink Lab‐Square D2010400
Specialty Equipment 36" x 24" x 34" Dishwasher E1090400
Specialty Equipment 35" x 24 RH Refrigerator ‐ UC E1090400
Specialty Equipment 35" x 24 RH Refrigerator ‐ UC E1090400
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
11
Mechanical EquipmentRoom Name Name Type TAG UniFormat
VESTIBULE 100 A‐Cabinet Unit Heater A‐Cabinet Unit Heater 1
ENTRY 101 8'‐0" Fin Tube No Cover 1 D3060100
OFFICE 103 8'‐0" Fin Tube No Cover 1 D3060100
OFFICE 103 DESV‐06 Terminal_Unit‐Single_Duct‐Titus‐DESV 104 D3040100
OFFICE 104 8'‐0" Fin Tube No Cover 1 D3060100
WORKING LAB 107 22'‐6" Fin Tube No Cover 2 D3060100
QUANT / POST AMP 111 A18BA HVAC_Indoor_Unit_PEA_208‐230_Mitsubishi 3 D3030
QUANT / POST AMP 111 DESV‐06 Terminal_Unit‐Single_Duct‐Titus‐DESV 111 D3040100
EXTRACT 112 DESV‐06 Terminal_Unit‐Single_Duct‐Titus‐DESV 112 D3040100
ROBOTIC 113 DESV‐08 Terminal_Unit‐Single_Duct‐Titus‐DESV 113 D3040100
ROBOTIC 113 A18BA HVAC_Indoor_Unit_PEA_208‐230_Mitsubishi 4 D3030
BULK STORAGE 115 DESV‐05 Terminal_Unit‐Single_Duct‐Titus‐DESV 128 D3040100
BREAK RM 116 DESV‐05 Terminal_Unit‐Single_Duct‐Titus‐DESV 117 D3040100
CORRIDOR 121 A18BA HVAC_Indoor_Unit_PEA_208‐230_Mitsubishi 5 D3030
MEN'S 126 DESV‐10 Terminal_Unit‐Single_Duct‐Titus‐DESV 124 D3040100
OPEN OFFICE 105B 22'‐6" Fin Tube No Cover 2 D3060100
OPEN OFFICE 105B 24'‐0" Fin Tube No Cover 2 D3060100
OPEN OFFICE 105B DESV‐16 Terminal_Unit‐Single_Duct‐Titus‐DESV 105 D3040100
Door To/From Roomand Hardware Type
Door No Door Type Width Height From Room To Room Hardware ID
10 33 2' ‐ 8" 7' ‐ 0" 105A 130 A
11 33 2' ‐ 8" 7' ‐ 0" 105B 105A C
12 33 2' ‐ 8" 7' ‐ 0" 105B 123 C
15 33 2' ‐ 8" 7' ‐ 0" 110 122 A
16 33 2' ‐ 8" 7' ‐ 0" 110 124 A
17 33 2' ‐ 8" 7' ‐ 0" 110 114 A
18 33 2' ‐ 8" 7' ‐ 0" 110 115 A
19 33 2' ‐ 8" 7' ‐ 0" 110 116 A
20 34 2' ‐ 0" 7' ‐ 0" 110 117 A
127 29 3' ‐ 0" 7' ‐ 0" 110 127 A
24 33 2' ‐ 8" 7' ‐ 0" 110 120 A
25 33 2' ‐ 8" 7' ‐ 0" 120 125 F
31 80 3' ‐ 0" 7' ‐ 0" 105A 25 H
Keith Beck
9.16.2013
Where are we going next
CMMS CAFMBAS SEC
Model File
3D Viewer
BIM…Not Just for Construction...A SolutionFor Facility Operations ‐‐ Keith Beck Slides
Sunday, June 8, 2014 ▪ 2:30 pm –3:45 pm
12
Any Questions