Page 1: Biomass Gasification Overview - Ilkka Hannula

Biomass  gasifica+on  overview  

Conference  of  the  European  Biogas  Associa+on  2014  Ilkka  Hannula,  Esa  Kurkela  VTT  Technical  Research  Centre  of  Finland    

Page 2: Biomass Gasification Overview - Ilkka Hannula

2  07/10/14   2  

Page 3: Biomass Gasification Overview - Ilkka Hannula

3  

1995 2000 2005 2010 2015 2020 1985 2025 2030

LAHTI II, 160 MW WASTE-TO-ENERGY

WASTE-TO-ENERGY PLANTS WITH MATERIAL RECOVERY o  HIGH ELECTRIC EFFICIENCY o  RECOVERY OF VALUABLE METALS

LIME-KILN GASIFIERS

REPLACEMENT OF FOSSIL FUELS IN BOILERS AND KILNS o  WOOD, AGROBIOMASS o  10-200 MW FUEL

BIOMASS/WASTE GASIFIERS FOR POWER

CBF/BFB GASIFICATION R&D AND PILOTING

R&D on o  HOT GAS FILTRATION o  WASTE AND STRAW

GASIFICATION

R&D NEEDS 2013 - 17 o  FILTER ASH UTILISATION o  RECOVERY OF METALS

o  IMPROVED GAS CLEANING

JOUTSENO LIME KILN 2012

Biomass  and  waste  gasifica+on  for  boilers  and  kilns  

LAHTI 60 MW

Page 4: Biomass Gasification Overview - Ilkka Hannula

4  07/10/14   4  

Page 5: Biomass Gasification Overview - Ilkka Hannula

5  07/10/14   5  

Production of Synthesis Gas from Solid Fuels Initial step - two main approaches  

Page 6: Biomass Gasification Overview - Ilkka Hannula

6  

Biomass  gasifica+on  for  fuels  and  chemicals  

PEAT AMMONIA PLANT OULU, FINLAND

SYNGAS R&D FOR BIOFUELS o  GASIFICATION PROCESS DEVELOPMENT o  CATALYTIC REFROMING o  FINAL GAS CLEANING o  TESTING OF SYNTHESIS CATALYSTS

GASIFICATION R&D AND PILOTING USA, GERMANY, SWEDEN, FINLAND

2010 2015 2020 1985 2005 2030 2000 1995 2025

BIO-DME PLANT PITEÅ, SWEDEN

GTI PILOT, USA

NSE BIOFUELS, FINLAND

BIO-FUELS AND CHEMICALS o  DIESEL, MeOH, DME,

SNG, H2, GASOLINE o  OLEFINS, OTHER CHEMICALS o  FOREST & AGRO-INDUSTRY

INTEGRATION o  INTEGRATION TO HEAT

AND POWER o  INTEGRATION TO SOLAR &

WIND ENERGY o  NEW WASTE-TO-FUEL

CONCEPTS

SKIVE CHP, DENMARK

CEGABTL 2015 - 2017 o  IMPROVED LARGE-SCALE GASIFICATION PROCESS

o  NEW PROCESSES FOR SMALLER SCALE o  SIMPLER, CHEAPER GAS CLEANING o  NEW CONCEPTS FOR INTEGRATED

PRODUCTION OF FUELS, POWER AND HEAT

Page 7: Biomass Gasification Overview - Ilkka Hannula

Updated  Techno-­‐Economic  Assessment    •  Detailed  evalua4on  of  20  

individual  plant  configura4ons  

•  MeOH,  DME,  FTL  &  MTG  

•  Plant  configura4ons  technically  proven  at  pre-­‐commercial  scale  

•  Impact  of  further  R&D  to  the  overall  economics  es4mated  

•  Large  scale:  300  MWth  of  biomass  (~1500  mtpd,  dry)  

•  Nth  plant  economics  

•  Available  for  download:  hXp://bit.ly/192Vl3G  

Page 8: Biomass Gasification Overview - Ilkka Hannula
Page 9: Biomass Gasification Overview - Ilkka Hannula

*Liquid  transporta4on  fuels  via  large-­‐scale  fluidised-­‐bed  gasifica4on  of  lignocellulosic  biomass,  Hannula,  Ilkka;  &  Kurkela,  Esa  2013.  VTT,  Espoo.  114  p.  +  app.  3  p.  VTT  Technology:  91  

•  Mature technology •  No investment support •  No CO2 credits •  No tax assumptions

Gasoline  @150$/bbl  

Gasoline  @100$/bbl  

Before  tax  Ref.margin:  13.4$/bbl  1€  =  1.33$  (2010)  

Levelised  produc+on  cost  es+mates*  300  MW  biomass  @  17  €/MWh,  0.12  ann.  factor  Electricity  50  €/MWh,  DH  30  €/MWh@5500  h/a  

Page 10: Biomass Gasification Overview - Ilkka Hannula

DUAL-­‐BED  STEAM  GASIFIER  Features  -­‐  No  oxygen  needed  -­‐  Large  steam  consump4on  -­‐  Challenging  to  pressurise  -­‐  Reactor  size  limited  to  

100MWth?  

Biomass

Steam Air

 Fluegas  

~80  %  of  carbon  to  product  gas  and  tars  

Page 11: Biomass Gasification Overview - Ilkka Hannula

Source:  Göteborg  Energi  

Page 12: Biomass Gasification Overview - Ilkka Hannula

12  07/10/14   12  

Fully  indirect    produc+on  route  (no  oxygen  needed)  

Page 13: Biomass Gasification Overview - Ilkka Hannula

13  07/10/14   13  

Levelised  produc+on  cost  es+mates  100  MW  biomass  @  18  €/MWh,  0.12  ann.  factor  Electricity  50  €/MWh,  DH  30  €/MWh@5500  h/a  

Fully  indirect    produc+on  route  (no  oxygen  needed)  

Page 14: Biomass Gasification Overview - Ilkka Hannula

14  07/10/14   14  

Levelised  produc+on  cost  es+mates  100  MW  biomass  @  18  €/MWh,  0.12  ann.  factor  Electricity  50  €/MWh,  DH  30  €/MWh@5500  h/a  

Fully  indirect    produc+on  route  (no  oxygen  needed)  

External  costs  not  included  -­‐  pressurisa4on  -­‐  distribu4on  -­‐  vehicle  related  costs  

Page 15: Biomass Gasification Overview - Ilkka Hannula

15  07/10/14   15  

Take  home  messages  

§ Successful  biomass  gasifica4on  plants  built  con4nuously  since  late  1970  § Suitable  technology  depends  on  feedstock,  scale  and  applica4on  § More  demanding  applica4ons  require  cleaner  gas  –>  increase  in  CAPEX  § Large  CAPEX  calls  for  large  scale  and  high  on-­‐stream  factors  § Waste  gasifica4on  brings  down  feedstock  costs  but  puts  addi4onal  requirements  for  technology  

§ No  clear  answer  to  “what  fuel  to  produce”.  Solu4on  is  systemic.  § Technology  for  synthe4c  biofuels  produc4on  technically  demonstrated  at  precommercial  scale  –>  near-­‐term  deployment  possible  

Page 16: Biomass Gasification Overview - Ilkka Hannula

TECHNOLOGY FOR BUSINESS