Black Creek Sanitary Drainage Area Servicing Improvements Class Environmental Assessment Study
The purpose of this Environmental Assessment Study is to recommend improvements for the Black Creek Sanitary Trunk Sewer (STS) system
This Environmental Assessment Study is not focused on basement flooding• The Basement Flooding Protection Program is separately
addressing basement flooding issues at the local sewer level• Information from the Basement Flooding Protection Program
studies will inform the analysis and recommendations made for the Black Creek STS Environmental Assessment
WelcomeBlack Creek Sanitary Drainage Area Servicing ImprovementsMunicipal Class Environmental Assessment StudyPublic Information Centre
Date: April 26 and April 28, 2016Time: 6:00 pm to 8:00 pm
Please sign in to receive project updates on the study. Please provide your comments by completing a comment sheet and placing it in the box or forwarding it to the Project Team by May 20, 2016.
Purpose of Today’s Information Session
• Present the purpose and objectives of the study• Provide background on the Black Creek Sanitary Trunk Sewer System• Present the problems and opportunities for the study• Present potential solutions to be considered• Present draft criteria for evaluating alternatives• Receive your comments
We Want to Hear From YouYou can participate by:• Signing in at the attendance register• Reviewing the display panels• Asking questions from City Staff and Consultants• Completing a comment form• Participating in future Public Information Centres
2
Study Purpose and Objectives
The purpose of this study is to assess capacity issues with the Black Creek Sanitary Trunk Sewer (STS) system, identify solutions and develop a plan to achieve the following objectives:• Service projected population growth in the sanitary drainage area to 2041• Reduce surcharge levels in the Black Creek STS during wet weather events• Reduce combined sewer overflow discharges to Black Creek• Reduce Inflow and Infiltration into the Black Creek STS
3
Municipal Class Environmental Assessment Process – Schedule C
• Identify the Problem/ Opportunity
• Consult with Public, Agencies, Stakeholders
• PIC #1 April 2016
Phase 1
• Review of background studies, relevant EAs and existing conditions
• Develop and Evaluate Alternative Solutions
• Consult with Public, Agencies, Stakeholders
• PIC #2 • Select a Preferred
Solution
Phase 2
• Identify Design Concepts
• Consult with Public, Agencies, Stakeholders
• PIC #3 • Select the
Preferred Design Concept
Phase 3
• Complete Environmental Study Report
• File Environmental Study Report for Review by Public, Agencies, Stakeholders
Phase 4
Weare
here
30 DayReview Phase 5
• Design, Construct and Monitor
4
Black Creek Sanitary Trunk Sewer System and Drainage Area• The Black Creek STS was built in the 1960’s• It is a tributary to the Humber Sanitary Trunk Sewer and discharges into
the Humber Wastewater Treatment Plant• The Black Creek STS is 15 km long, from Finch Avenue West to Scarlett
Road• The Black Creek STS services a sanitary drainage area of 5,700 ha• It services a population of 386,100 in 2011 (70% residential, 30%
employment)• 80% of the sanitary drainage area has separated local sanitary and
storm sewers; 20% has local combined sewers• There are 3 combined trunk sewers that connect to the Black Creek
STS:• Hillary Combined Trunk Sewer• Mt. Dennis Combined Trunk Sewer• St. Clair Combined Trunk Sewer
• There are 8 combined sewer overflow structures that control flows to 7 combined sewer outfalls
5
Overflow structures divert, or bypass flows to relieve an overloaded sewer
Outfalls from the combined trunk sewers to Black Creek
Study Area (portrait orientation)
Study Area (portrait orientation)
Separated Sanitary Sewer System
8
Combined Sanitary Sewer System
9
Servicing Population Growth
Problem:• Residential and Industrial/Commercial/Institutional populations are expected to grow within the study area• Population growth may increase capacity constraints on the Black Creek STS
Objective:• Ensure capacity in the Black Creek STS to service population growth to 2041 and beyond
10
Sanitary Trunk Sewer Surcharge Levels During Wet Weather Events
Problem:• Surcharge of the Black Creek STS happens when the flows through the trunk sewer exceed its design capacity• This may occur due to inflow during large storm events when large
amounts of stormwater enter the Black Creek STS. • Excessive flows in the Black Creek STS may backup into local sewer
systems, valleys and ground surface.
Objective:• Reduce Black Creek STS surcharge levels to the ground surface and valleys and potential impacts on the local sewer systems
11
Water Inflow/Infiltration to the Black Creek STS
Problem:• Significant amounts of wet weather flows enter the Black Creek STS during rain events. The sources of the inflow/infiltration may be:• Connections in the local sanitary and combined sewers • Leakages in the trunk sewers, for example, openings in the
maintenance hole covers which allow water into the sewer• Water level increases in the creek/rivers, water gets inside the trunk
sewer via combined sewer outfalls and manholes that are located in the floodplains
Objective:• Reduce Inflow/Infiltration water entering the Black Creek STS to reduce capacity constraints.
12
Sanitary Trunk Sewer Surcharge Levels and Inflow/Infiltration (I&I) During Wet Weather Events
13
Combined Sewer Overflows
Problem:• Combined trunk sewers carry a mixture of stormwater and
domestic sewage. During rainstorms, or high levels of snowmelt, excess flow can result in discharge of combined sewer overflow from outfalls to Black Creek
14
Objectives:• Reduce discharges of combined sewer
overflows to meet the Ministry of Environment and Climate Change Procedure F-5-5• Procedure F-5-5 requires efforts be made to
eliminate combined sewer overflows• Improve water quality in Black Creek
and downstream watercourses
Potential Solutions Being Considered for the Development of Alternatives• New relief trunk sewer: Construction of new trunk sewers to
accommodate future growth and provide a relief to Black Creek Trunk Sewer • Combined sewer overflow storage tank: Temporary storage tanks
allow storage of additional flow during storm events until there is capacity in the downstream infrastructure
• Flow diversion: Diverting flow to other sewers in specific locations to address capacity constraints in those locations.• Flow control structures: Making adjustments to existing flow control
and combined sewer overflow control structures• Maintenance hole adjustments: Raise maintenance holes and
reduce number of openings in maintenance hole cover15
Storage tanks are underground andsurface areas are landscaped to pre-construction conditions
How We Are Developing Alternative Solutions
Technical, environmental and cultural studies are being completed. The work to develop alternative solutions involve:• Review of background information and
previous studies• Data collection• Rainfall and flow monitoring• Water quality sampling• Modelling trunk sewer capacity and
combined sewer overflows under current and future conditions• Geotechnical and other field investigations• Environmental impact assessments• Stage 1 Archaeological and Cultural Heritage
Assessments 16
Draft Evaluation Criteria for Alternative Solutions
Alternative solutions and selection of a preferred alternative will be evaluated based on their ability to address the Study’s Problem and Opportunities, stakeholder input, and potential impacts based on the criteria belowNatural Environment
• Terrestrial impacts (e.g. trees, vegetation, wildlife)
• Aquatic habitat impacts (e.g. water quality, erosion and sedimentation impacts)
• Soil • Geology
Social • Public Health and Safety• Disruption to the community
(e.g. noise, dust, traffic)• Impact to public property and
recreational use• Cultural heritage and
archaeological impacts• Odour issues
Technical • Constructability• Regulatory approvals• Capacity for future growth• Reduce combined sewer overflows• Reduce surcharging• Impacts to local infrastructure and the
Humber Wastewater Treatment Plant
Cost • Capital cost• Risk/benefit analysis• Operations and maintenance costs
17
Next Steps for the Black Creek Sanitary Drainage Area Servicing Improvements Environmental Assessment
Phase Phase 1 Phase 2 Phase 3 Phase 4
TaskIdentification of Problem and
Opportunity
Identification of Alternative Solutions
Identification of Alternative
Design Concept
Environmental Study ReportIdentify
Alternatives
Assess and Recommend
Preferred Alternative
Month N D J F M A M J J A S O N D J F M A M J JYear 2015 2016 2017
PIC#1 PIC#2 PIC#3
18
After today’s meeting:• Finalize hydraulic model• Develop alternative solutions• Evaluate alternative solutions and recommend a preferred solution• Present alternatives evaluation and preferred solution at Public Information Centre #2
in late 2016 for feedback
30 Day Review
Thank You for Attending
We welcome your feedback. Please fill out the comment sheet provided.Following this PIC, the project team will review and consider your comments in the evaluation of alternative solutions.