blackall aerodrome lighting quotation

53
 BLACKALL-TAMBO REGIONAL COUNCIL Quotation for: Supply & Installation of Lighting of Runway, Taxiway and Apron Blackall Aerodrome QUOTATIONS CLOSE AT 4.30PM, FRIDAY 29 AUGUST 2014

Upload: graceenggint8799

Post on 03-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 1/53

Page 2: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 2/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

CONDITIONS OF QUOTATION

1. The Tenderer shall state :-(a) in the case of an individual, full Christian or given names, surname and address;(b) in the case of a business name, the names and addresses of all proprietors and the

address of the principal place of business;

(c) in the case of a company, the full name of the company and the address of theregistered office of the company.

2. Every quotation shall be enclosed in a sealed envelope addressed to :-

The Chief Executive Officer

Blackall – Tambo Regional CouncilPO Box 21BLACKALL Q 4472

and be endorsed on the front of the envelope :-

Quotation for Supply & Installation of Lighting of Runway, Taxiway and Apron - Blackall Aerodrome

Documents required to be lodged must include: Quotation Form Completed Schedule of Prices

Completed Works Programme & Methodology Schedule

3. Quotations shall be lodged in the tender box in the office of Blackall – Tambo RegionalCouncil, 6 Coronation Drive, Blackall before 4.30pm on Friday 29 August 2014.

Page 3: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 3/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Franking machine stamps will not be accepted as proof of the date of posting of a tenderreceived after the specified closing time for the receipt of quotations.

4. Quotations may only be sent or transmitted direct to the office of Council by facsimile oremail with the prior approval of the Principal. No other forms of lodgement by electronic

means will be accepted. No guarantee as to the confidentiality of information can be givenfor any quotations sent electronically to the Principal.

Quotations lodged by a Tenderer or Agent in facsimile form, in accordance with subclauses(2) and (3), will be considered by Council.

5. Every quotation lodged shall contain a statement by the Tenderer that the quotation price isfixed and no increase will be sought from or imposed on Blackall – Tambo Regional Council,except as varied with the approval of Council.

6. Tenderers shall show in the quotation the time within which the quotation will be fulfilled.

7.

Council may accept the quotation that in view of all the circumstances appears to be themost advantageous, or may decline to accept any quotation.

8. Canvassing of Councillors is prohibited and may lead to outright rejection of a quotation.

Page 4: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 4/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

QUOTATION FORM

NAME OF TENDERER: ...................................................................................

ADDRESS OF TENDERER : ...................................................................................

...................................................................................

ABN: ...................................................................................

Licence No.: ...................................................................................

QUOTATION AMOUNT: ...................................................................................(GST inclusive)

DATE FOR COMPLETION: ...................................................................................

SIGNATURE OF TENDERER: ...................................................................................

DATE: ...................................................................................

SIGNATURE OF WITNESS: ...................................................................................

Page 5: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 5/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

LIGHTING OF RUNWAY, TAXIWAY AND APRON - BLACKALL AERODROME

SCHEDULE OF PRICES

ItemNo.

DescriptionAmount

$

1 Establishment on Site incl. Site Facilities

2 Project Management3 Supply & Install Runway Switchboard

4 Supply & Install Runway Lights

5 Supply & Install Taxiway Lights

6 Supply & Install Apron Flood Lights

7 Supply & Install Illuminated Wind Direction Indicator

8 Supply & Install Runway Conduits incl. Trenching, Backfilling and Pits

9 Supply & Install Taxiway Conduits incl. Trenching, Backfilling and Pits

10 Supply & Install Runway Primary & Secondary Cables

11 Supply & Install Taxiway Primary & Secondary Cables

12 Testing & Commissioning of Installation incl. Ground Checks & Training

13 Cleanup of Site of Works14 Spare Parts

15 Manuals

16 Additional Nominated Items Not Included Above:

SUB-TOTAL

GST (10%)

TOTAL

Page 6: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 6/53

Page 7: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 7/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

COMPLIANCE WITH TECHNICAL REQUIREMENTSThe Tenderer shall state hereunder adetailed assessment of the compliance of their proposal withtechnical performance requirements contained in this Specification.

……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..……………………………………………………………………………………………………………………..

Page 8: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 8/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

WORKS PROGRAMME AND METHODOLOGY

The Tenderer shall state hereunder adetailed preliminary indication of their proposed worksschedule, including key milestone points, construction methodology and likely cash flow. A full worksprogramme in bar chart form shall be provided prior to the prestart meeting for the contract, withsuch programme to be updated regularly as necessary.

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

……………………………………………………………………………………………………………………..

Page 9: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 9/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

QUOTATION INFORMATION

1. Information to be Supplied with Quotation

Complete all schedules attached to this quotation document (if any).

2. Fixed Price Quotation

The Quotation shall be a for a FIXED PRICE LUMP SUM. The Quotation shall NOT besubject to variation on account of rise and fall of wage rates or materials prices. Noincrease will be sought from or imposed on Blackall – Tambo Regional Council except asvaried according to this specification.

3. Licensed Builders

The attention of Tenderers is drawn to the contents of the Building Services Authority Act.Where required by the Act, Tenderers must tender in the name of the licensed builder(s)under the Act. The signature of the Tenderer must be that of the licensed builder(s) or

authorised agent in which case a copy of the authority should be enclosed with the Tender.

4. Enquiries

Tenderers shall be deemed to have satisfied themselves of all aspects of the proposedworks and the contents of this quotation document prior to submission of their quotation.Enquiries during the quotation period shall be directed to Bryan Payne of Brandon & Associates, ph 46223799.Council’s Manager of Works, LesEdmistone, ph 46216600 mob 0427574298, will bePrincipal’s Representative and Superintendent for the works.

Page 10: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 10/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

6. Discrepancies

Should a Tenderer find discrepancies in or omissions from the Specification, or be in doubtas to their meaning, they shall at once notify the Superintendent and obtain a ruling on thematter. The whole of the work shall be executed to the true intent of the Specification.

7. Permits and Approvals

Submit a Method of Working Plan (MOWP) to Council for forwarding to obtain CASAapproval for the project. The Contractor will be required to comply with conditions includedin such approval, including submission of required certificates of workmanship.Written evidence of all other required permits and approvals shall be provided to Council

before commencement on site.

8. Workplace Health and Safety

The Contractor will be appointed the Principal Contractor in respect of the work which is thesubject of this contract in accordance with the provisions of the Act.

Where the word “Owner” appears in the Act, “Owner” shall be defined as the Principalreferred to in the Specification and/or General Conditions of Contract.The initial completion and lodgement of the Notification and Payment Form and payment ofthe Notification Fee shall be the responsibility of the Principal. The Contractor shall beresponsible for all other requirements under the Act, including completion and lodgement ofother forms, notices and work plans, use of appropriately trained and qualified staff andpayment of other fees.

9. Security

All work activities in the aerodrome precinct are subject to relevant aerodrome security

Page 11: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 11/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

All other requirements shall be the responsibility of the Contractor.

11. Supervision

The Contractor shall ensure work is supervised at all times by an appropriately qualified andexperienced person.

12. Licensed Persons

Only persons appropriately licensed shall supervise the particular trade aspect of work onthe project.

13.

Insurance

Contract work insurance should be effected by the Contractor.

14. Electrical Power & Water Supply

The Contractor shall be responsible for arranging supply of electrical power and water asrequired for the works.Existing electrical power and water supply services to the Aerodrome may be used at nocost but at the Contractor’s own liability.

15. Special Working Hours and Operations

The Contractor will be bound by any requirements of the approved Method of Working Plan,Civil Aviation Safety Regulations and relevant security arrangements to remove themselvesfrom any location or all of the site of works when aircraft are landing, disembarking,boarding and taking off. This will include both regulated passenger transport flights and all

Page 12: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 12/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

a whole are therefore of significant importance to Council in assessment of the mostsuitable Contractor for this project.Ensure the enclosed Works Programme and Methodology Schedule is completed in anaccurate and informative manner and submitted with the Schedule of Prices. All work shall be completed prior to the agreed date for completion.Failure to complete the works within the specified time (after allowance for approved

extensions) shall incur Liquidated Damages of Two Hundred Dollars ($200.00) per day orpart thereof.

17. Payment

Progress payments will be made at monthly intervals for completed items in accordance

with the Schedule of Prices and on satisfactory completion of all works.

18. Defects Liability

A defects liability period of twelve (12) months shall be applicable to work performed underthis quotation.Retention money equivalent to five per cent (5%) of the final quotation amount, includingany variations, shall be held by Council pending successful completion of this period.

Page 13: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 13/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

JOB SPECIFICATION

1.0 Scope

The work to be performed under this quotation consists of design and installation of newairside lighting to the Blackall Aerodrome as specified herein and as approved by Council.

The successful tenderer will be directly engaged by Council and will work as visitors undercontrol of ASIC red card client supplied personnel. Council will provide airside securitycontrol during works where necessary for interaction with aerodrome operations. All costsassociated with conformance and safety requirement costs shall be borne by the Contractor. All tenderers are required to submit a Method of Working Plan (MOWP) that outlines howthey will install all equipment during an operating aerodrome, including supply of temporary

equipment as required to maintain lighting operations during construction, and showing theexpected full duration of works.The existing runway and taxiway lighting system must continue to operate outside workinghours.The Contractor’s work methodology will require for temporary relocations and connectionsof some lights to support continuous operating lighting system. The Contractor must allowfor all work associated with these temporary relocations, and this document does not detailthis work as it is up to the Contractor to provide this information via the MOWP.It is imperative that prospective Contractors include in their tender submission how theexisting system will be maintained during all modifications. All work shall be carried out in accordance with the Specification, Drawings and such detailsand instructions as are issued by the Principal’s Representative and / or the Principal duringthe progress of the work.This Specification shall be read in conjunction with the drawings and tender schedules, all ofwhich are intended to be mutually explanatory. All work called for by the one even if not bythe other shall be fully executed.

Page 14: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 14/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

3.0 Works by the Principal

Work to be performed by the Principal shall include: Liaison with CASA in relation to relevant approvals.

4.0

Extent of Works

Works to be completed includes but may not be limited to the following: Contract administration, MOWP, time duration scheduling and reporting, all temporary

supply and installation of equipment to support MOWP, all works associated withdisconnection, removal or temporary rerouting of existing runway cables to support the

MOWP; Provision of a safe isolation procedure for isolation of the existing lighting system whenworking in proximity to the existing system;

Supply of all staff on site facilities including office, staff lunchroom and toilets; The demolition and relocation of existing runway and taxiway lighting; Supply and installation of new Runway, Taxiway and Apron Flood Lighting, complete

with all underground conduits, pits, runway cables, secondary cables, series isolationtransformers, above ground lights and inset lights as shown on the drawings;

Supply and installation of a new Illuminated Wind Direction Indicator, complete with allunderground conduits, pits and cables as shown on the drawings;

Design review from equipment supplier, with conformance statements for compliance toMOS139;

Supply and installation of a new runway lighting switchboard for connection of newequipment and commissioning assistance for the new and modified runway and taxiwaylighting;

Installation of above ground lighting emulsion spray aprons in locations as shown on thedrawings;

Page 15: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 15/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Asphaltic Concrete (AC) cutting for secondary cable installation and AC coring forinstallation of inset lights, complete with supply and installation of all required two potepoxy, backing rods and bitumastic fillers;

Under-boring of taxiways as shown on the drawings by specialist under-boringcontractor.

Termination and joining accessories;

Supply of all required runway and secondary cable, and any control cables; Equipment supports and bracing; Supply of foundations for Apron floodlighting poles; Complete commissioning of the new system in accordance with CASA requirements,

including ground checks and a flight check. Refer to the latest relevant CASA AdvisoryCircular for further requirements. The flight check must be carried out by CASA

approved pilot who holds a Letter of Competency from CASA to conduct flight checks ofaerodrome lighting systems;

Supply of Maintenance Manuals; Supply of As-Installed Drawings; Installation, testing and commissioning; 12 months warranty on installation works;

Training of Aerodrome Operations staff; Maintenance during 12 months defects liability period.

Related work in connection with the Electrical Services (performed by other trades) includesthe following: Site coordination for work scheduling with respect to asphalt overlay and how it will

interact with installation of above ground and inset lights; Site coordination for work scheduling with respect to Terminal Building work to wire in

Airside Lighting to the new location of the Runway Lighting Switchboard.

0 S l f i l d i

Page 16: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 16/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

7.0

Closure of Access

The prior approval of Council must be sought should it be considered necessary for safetyor logistic purposes to close access adjoining the site of works, either temporarily or for theduration of the works.

8.0

Services

Before commencement of any work on site, the Contractor shall verify the nature, locationand extent of all existing services, both above and below ground, within a 3 metre margin ofthe construction perimeter.The Contractor shall be responsible for the protection of all services, unless otherwiseapproved by the Principal. Any damage which occurs to services required to be protectedduring the quotation period shall be repaired at no cost to the Principal.

9.0 Excavation

Excavation must be sufficient for construction of footings. Excavated soil shall be disposedof neatly. Excavated rocks and other surplus debris shall be removed from site or toapproved location.Trenches where excavation in hard rock is necessary will be verified by the Principal’sRepresentative prior to filling with concrete or backfilling as appropriate. An allowance overand above the tendered amount will be negotiated for each trench in which hard rock needsto be removed.

10.0 Clean Up

The whole of the site shall be left in a neat and tidy condition on completion.

Page 17: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 17/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

TECHNICAL SPECIFICATION

SECTION 3 GENERAL REQUIREMENTS3.1 GENERAL

This section outlines general requirements which are applicable to all sections of thisspecification and the works.

3.2 STANDARDS AND REGULATIONSConform to the latest editions of all standards and regulations. The following standards andregulations are always applicable: AS/NZS 3000 Wiring Rules State Workplace/Occupational Health and Safety Legislation Electrical Safety Act and Regulations

Australian Government Civil Aviation Safety Authority Regulations and Standards CASA Manual of Standards Part 139 – Aerodromes. (MOS 139) Electrical Safety Act and Regulation All other relevant airport lighting standards within Australia AS 3012 for Construction and Demolition Sites AS 60529 for Degrees of Protection of Enclosures

AS/NZS 3017 for testing for safety of low voltage electrical systems3.3 QUALITY OF MATERIALS AND WORKMANSHIP

All materials shall be new, of the best quality and of the class most suitable for the purposespecified. All equipment shall have a verified history of successful use in the commercial environment.No prototype equipment will be accepted.

All work on the site shall be supervised by a competent tradesman supervisor who shall bepresent on site when requested by the Principal’s Representative for all phases of the project. A representative shall be nominated, who shall be present and responsible for theday to day running of the project.The entire electrical installation shall be executed by licensed experienced tradesmen and

Page 18: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 18/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

The equipment supplier shall provide a priced option to provide an extended five yearwarranty.The tender documents shall include a warranty statement from the tenderer that detailswhat is included, and excluded for each individual different type of equipment, and thewarranted duration for this equipment.Include copies of final warranty certificates in the data sheet and maintenance manuals.

Replacement lights and spare parts shall be available for a minimum of 7 years.Provide 18 months warranty on installation and workmanship.Include copies of warranties in the maintenance manuals.

3.6 SUBMISSIONS3.6.1 Tender submissionProvide the following information with the tender:

Company profile List of previous relevant projects, work history, with emphasis placed on offeredequipment

Reference sites and contact details. (include equipment supplied and value of theproject)

Quality Assurance Certification

Detailed warranty breakdown Equipment brochures Manufacturer’s technical specifications and data sheets Type test reports, copies of relevant standards certification Performance data Suppliers spare parts listings with part numbers

Installation details etc. as required Compliance statement for MOS 139 CV of site supervisor CV for proposed commissioning engineer

N i d CASA if i il

Page 19: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 19/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

changed location.3.7 CERTIFICATIONCertify that the works have been installed to the requirements of all applicable rules andregulations.The contractor’s airside lighting supplier shall review the current design for compliance toMOS 139 using their supplied equipment and shall provide a statement of compliance to

MOS 139. If required the supplier shall provide recommendations for modification attendering time to ensure this compliance.3.8 HAZARD ASSESSMENT AND RISK MANAGEMENT

Comply with the requirements of the Workplace Health and Safety Act and Regulations withrespect to hazard identification and risk management.Submit a Hazard Assessment and Risk Management Plan (HARMP) for the constructionphase of the works.Provide a safe working isolation procedure, as part of the MOWP, for isolation of theexisting runway lighting system when working in close proximity to the existing cabling andsystem equipment. Allow to trace all existing cabling using cable locators to assist withidentification of routes and extend of impact with new works.The Principal will provide airside security control with ASIC red card authorised personnel.The contractor shall allow for all costs associated with DAMP (Drug and Alcoholmanagement plan), training and testing of all their personnel to be able to work airside as avisitor under these supervisors.

3.9 ELECTROMAGNETIC COMPATIBILITYEnsure that the entire installation covered by this specification meets the ElectromagneticCompatibility requirements of the Australian Communications and Media Authority.

3.10 SITE CONDITIONS AND PRECAUTIONSThe site will be occupied and operational for the duration of the contract.Ensure that systems remain fully connected and operational at all times, except whereshutdowns are required.Where shutdowns of systems are required:

Page 20: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 20/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Provide a safe working isolation procedure for isolation of the existing runway lightingsystem when working close to the existing cabling and system equipment. Allow totrace all existing cabling using cable locators to assist with identification of routes andextend of impact with new works. Assist with any necessary fault finding andrecommissioning. Assist where necessary with any required relocation and rerouting orinstallation of temporary cables.

Carry out the work in such a manner as to interfere as little as possible with other tradesand persons having access rights.

Ensure that normal access ways to buildings, runways and taxiways are unobstructed.3.11 SETTING OUT

The positioning of equipment as shown on the Drawings is approximate and diagrammaticonly, and these Drawings shall not be used for exact setting out. Final locations of all

taxiway and runway lights shall be marked on the civil line marking drawings to ensure thatinstalled positionsare correct. For conflicting information refer to the Principal’s Representative for resolution.The location of pits and lights will be pegged by survey for the Contractor by the Principal’s Representative prior to works commencing on site.

3.12 DEMOLITION AND TEMPORARY SERVICES

Decommission, disconnect and remove from site all existing redundant electrical servicesincluding pits, cables, conduits, etc. Do not burry redundant assets on site.Provide temporary connections and interfaces as detailed on the drawings or as necessaryto support the works.Provide temporary services to assist with the civil works methodology for completion of theworks. This may include temporary relocation and connection of lights and equipment fordisplaced thresholds.Discuss actual requirements with BTRC and provide all assistance as necessary tocompletethe construction. Note that the airport will be operating at all times during the constructionphase, and airport lighting must be operational at all times.

Page 21: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 21/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Organise reticulated services neatly and with applicable segregation.Provide all access equipment and temporary lighting necessary for the installation ofelectrical services.

3.15 CORROSION PROTECTION All metallic materials and components shall be suitably protected against corrosion.Bolts, screws, rivets etc. for external use shall be non-ferrous or stainless steel, or whereapproved galvanised steel.Brackets, plinths, rods etc. shall be hot dip galvanised after fabrication. All steel sheets shall be corrosion protected by means of degreasing, priming and paintingas a minimum.

3.16 FINISHES All equipment shall be painted unless the equipment material is chromium, anodisedaluminium, plastics, stainless steel or other non-ferrous metals.Paint and paint application shall comply with AS/NZS 2311 and AS/NZS 2312.Carry out all powder coating to AS3715.

3.17 ADHESIVESProvide adhesives and sealants capable of transmitting imposed loads, sufficient to ensurethe rigidity of the assembly or the integrity of the joint and which will not causediscolouration or lack of adhesion of finished surfaces.

3.18 FASTENERSProvide masonry anchors, bolts, nuts, washers, screws, nails and plugs as required forinstallation of electrical services.Fastener materials, finishes and physical sizes shall be as appropriate for the loads, thetypes of materials in contact with the fastener and the environment. All fasteners shall be SS304 or hot dipped galvanised.

3.19 METALSProvide metal sections and sheet as required for the electrical services.Finish invisible joints by welding, brazing, soldering, grinding and buffing prior to applicationof finishes such as galvanising or painting.

Page 22: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 22/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Minimum letter heights shall be 3mm.Refer to the lighting section for specific requirements for runway and taxiway lighting labels.3.21 OPERATION AND MAINTENANCE MANUALS

Provide Operation and Maintenance Manuals for all systems and components covered bythis specification. Include As-Installed documentation for the entire installation in thesemanuals. As-installed locations of electrical works to include both new and existing worksthat make up the systems operations on completion of contract works.Provide three (3) copies of manuals and drawings neatly bound into A4 size hard cover ringbinders which are permanently labelled with the Project Name, Contract Description andSubcontractor’s Name. Copies to be provided to the Principal’s Representative. Include the following in each set of manuals: Index Brief description of the Electrical installation. Copies of all test results, certificates and approvals. Manufacturer's operating instructions and details of model numbers, serial numbers,

operating instructions, and manufacturer's guarantee certificate for equipment supplied. Warranty certificates. MOS 139 certificate and compliance statement.

Installation details. Paper prints of all As-Installed Drawings as follows:o As-Built drawings prepared using AutoCAD of all electrical layout drawings and

installation details. (Note that design drawings will be made available for thispurpose.)

o System schematic diagrams and schedules.o

The title block of each drawing amended to include the Subcontractor's name andcontact details, Subcontractor's drawing number and date of issue. A CD-ROM, or approved equal medium, containing electronic copies of the manuals in

“.doc” format and all As-Installed drawings in AutoCAD “.dwg” format and “.pdf” format.A recommended maintenance programme for all equipment installed based on

Page 23: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 23/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Manuals have been received.3.22 CLEAN UP At completion clean all electrical equipment to as-new condition.Remove all waste and debris on a continuous basis.Ensure work site is completely free of Foreign Object Debris (FOD) on completion of eachwork ship and on project completion.

3.23 TESTING AND COMMISSIONINGFully test and commission the complete electrical installation prior to actual completion date.Record all test results and submit for inspection to Principal’s Representative prior to actual completion date.Provide a commissioning engineer to assist with the commissioning of the complete system.This engineer shall preferably be supplied from the equipment supplier and as such will befully conversant with the lighting equipment.Provide personnel to assist the commissioning engineer as necessary to complete all works. As this person will be on site for limited defined periods it is essential that his time is usedefficiently. Coordinate his arrival with completion of all works to ensure that time is notwasted.Completely commission the new system in accordance with CASA requirements, includingground checks and a flight check. Refer to the latest relevant CASA Advisory Circular forfurther requirements. The flight check must be carried out by CASA approved pilot whoholds a Letter of Competency from CASA to conduct flight checks of aerodrome lightingsystems.

3.24 TEST INSTRUMENT CALIBRATION All test instruments shall have current calibration certificates. Certificates shall be shown tothe Principal’s Representative prior to commencement of each test. Certificate currencyshall be 12 months maximum.

3.25 INSPECTION AT ACTUAL COMPLETION DATE Arrange for an Actual Completion Date Inspection by the Principal’s Representative. A minimum of 10 working days notice shall be given.

Bl k ll T b R i l C il

Page 24: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 24/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

complexity of the systems. Provide a training schedule to the Principal’s Representative for approval.3.27 MAINTENANCE AND WARRANTY DURING DEFECTS LIABILITY PERIOD

Carry out preventative maintenance on a regular schedule as prescribed by the equipmentmanufacturer.Promptly rectify all defects during the defects liability period. Attend site within 1 working dayof notification of non-critical defects. Attend site immediately to rectify critical defects. Criticalsystem defects shall be rectified immediately. Critical defects include those defects that willmean the operation of the airside lighting system will be fail to meet operation requirementsas detailed in CASA Manual of Standards Part 139 outside the hours of 6am to 5pm within12 hours of defect notification to the Contractor. Non-critical defects are those defects thatmean the system can still operate in accordance with CASA MOS 139 – however requireaction to minimise further defects or worsening of the defect into a critical defect within thesystem.Costs associated with the Principal arranging for a third party Electrical Contractor to attendto critical defects due to the Contractors failure to attend site, within the mentionedtimeframes for the defect classification, will be borne by the Contractor under this contract.

3.28 METHOD OF WORKING PLANSubmit a Method of Working Plan (MOWP) that outlines how the Contractor will install allequipment during an operating aerodrome, including supply of temporary equipment asrequired to maintain lighting operations during construction, and showing the expected fullduration of works.Maintain and supplement this MOWP during the construction stage to add as necessary anyadditional works necessary to complete the project.Provide a time schedule to the Principal at tendering time, and then during constructionupdate and maintain this schedule on a weekly basis and review it and all works during theweekly site meeting with Principal’s Representative. Attend all site meetings and provide all necessary updates and documentation for sitemeetingsin compliance with the Principal’s requirements.

Bl ck ll– T mbo Region l Co ncil

Page 25: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 25/53

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Supply of inset dry type sealed bases, c/w alignment jigs Supply of the new runway lighting switchboard

Supply of Apron floodlights, and associated conduits, pits, low voltage cabling, poles,rag bolts and footing cages

Supply of Illuminated Wind Direction Indicator and associated conduits, pits, low voltagecabling, pole, rag bolts and footing cage

Supply of all Primary runway cable Supply of all Primary cable plug/socket connectors Supply of Secondary extension cable Supply of Secondary cable crimp connectors Secondary 300mm long cable extension kits with moulded rubber plugs SIT end Secondary 300mm long cable extension kits with moulded rubber plugs light fitting end

Installation instructions Commissioning assistance Supply of new 100 watt SIT’s for outer threshold lights Supply of all 400mA and 700mA SIT’s for all lights. Note that alternative SIT’s may be

required to conform to the intensity requirement ration of MOS 139 with respect torunway lighting versus taxiway lighting. Refer to drawings for details

Storage of all equipment All conduits and pits to complete the works Epoxy grout for inset lights Sealant and filler for tarmac saw-cuts as shown on the drawings Light surround emulsion sprays with compacted fill and white paint circles as shown on

the drawings All ancillary cables, supports, fixings, labels, signs, bolting hardware, termination

accessories, lugs, terminals, glands, packers and items necessary to provide acomplete project

2 years warranty

Blackall– Tambo Regional Council

Page 26: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 26/53

Blackall Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

SECTION 5 LIGHTING5.1 GENERAL

Supply and install all luminaires, lamps and lighting controls as scheduled, detailed andspecified and shown on the pricing schedule and drawings. All LED lighting engines shall be natural colour for uniformity of spares and ability tointerchange LED lamps between lamps using different lens colours. All offered runway and taxiway lighting shall be proprietary equipment purposemanufactured for this application. All lighting offered shall have a proven track record inother installations.

5.2 PRODUCTS5.2.1 Luminaire ConstructionLuminaires shall:

Be thermally designed to ensure optimum lamp operation and component operatingtemperatures below recommended limits

Be rigid, true and symmetrical in construction Have support and fixing mechanisms to suit the intended application Have photometric performance equivalent to the published data Be constructed of durable and corrosion resisting materials suitable for the installed

conditions and environment Be complete with all required lamp holders, terminal blocks, fuses, control gear,temperature rated cabling, reflectors, lamps, cable clamps, and fixings as required forcomplete luminaires

Have SIT’s and lampsmatched for optimum performance Have purpose built low loss electronic controllers for LED lamps

Have C-Tick approval for EMC classification Be provided with inset bases for inset lights , c/w all termination accessories, includingcable glands , connectors and links

Be provided with all necessary terminating equipment such as primary cableconnectors heat shrink sleeving and ancillary crimp links and connectors as detailed in

Blackall – Tambo Regional Council

Page 27: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 27/53

Blackall Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

5.2.3 Illuminated Wind Direction IndicatorSupply and install a new Illuminated Wind Direction Indicator. An indicative location for the unit is shown on the drawings, however the exact final locationshall be as advised by the Principal’s Representative. Provide an Illuminated Wind Direction Indicator that complies with Section 9.6 of the CASAManual of Standards Part 139.Provide the unit complete with a hot dip galvanised painted steel pole with rag bolt and cageassemblies, component hatch secured with vandal-proof bolts, outreach arms, mountingspigots and corrosion resistant fixings.Foundations shall be of approved structural design for the installation conditions andenvironment.

5.3 INSTALLATION5.3.1 GeneralInstall luminaires in line, parallel, level, at the same mounting height, plumb and flush withsurrounding surfaces to drawing requirements.Support luminaires using proprietary supports. Fix and secure luminaires to ensurepermanent mounting under service conditions. Provide a minimum of 2 fixings per luminaireand more as required to avoid movement or distortion.Primary and secondary cable joins shall only be via manufacturer’s approved connectors, and joining systems. In all cases epoxy filled heat shrink shall be used to encase allconnections and provide a watertight join.Install cablesand SIT’s in accordance with the standard details shown on the drawings. Install luminaires so that there are no light leaks. Adjust lamp locations and aim luminaires to design specifications.5.3.2 External LightingMaintain the required IP rating at cable entry and fixing points.Provide cable entries to manufacturers recommendations to maintain weather or water proofenclosure.Provide in-situ concrete footings to structural design requirements for all post or pole

Blackall – Tambo Regional Council

Page 28: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 28/53

Blackall Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

5.4 COMPLETIONTest and verify operation of all luminaires.Program all lighting control systems. Adjust all controls in conjunction with the Principal’s Representative and Principal for systemoperation as required.Clean all luminaires and diffusers to as-new condition.Provide all necessary access equipment for luminaire and lighting controls commissioning.

SECTION 6 INSTALLATION REQUIREMENTS6.1 GENERAL

Supply and install all required cables and cable support systems as detailed on thedrawings

6.2 QUALITY6.2.1 StandardsInstallation and selection to AS/NZS 3000, AS/NZS 3008.1.Cables to AS/NZS 5000.1, 2 and AS/NZS 4961, YSVE 4005Conduits to AS 2053 Series.Fire and mechanical performance to AS/NZS 3013.Testing to AS/NZS 3017.

6.3 PRODUCTS.6.3.1 LV and HV Power CablesCables shall be multi-stranded copper conductor with PVC, XLPE insulation and sheath.Cables shall be 0.6/1kV, V75 rated as a minimum standard.Provide all cables and cable terminating accessories as shown in the pricing schedule. Allcables and accessories shall be proprietary type compliant with all MOS 139 standards.

Primary runway cable to AS/NZS 4961, YSVE 4005 Secondary extension cable to AS/NZS 5000.1, 2 Primary cable termination kits, c/w boots and special HV rated pins

Blackall – Tambo Regional Council

Page 29: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 29/53

gSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Select cable sizes to comply with volt drop, short circuit and earth fault / touch voltagerequirements of AS 3000.Cable lugs shall be of the correct size and material for the conductor.6.3.2 Conduits All conduits shall:

Be 20mm minimum diameter; Be installed so that conductors are only drawn into conduit at equipment positions. Be fitted with a sealed cap to prevent the ingress of moisture or obstructions entering

the conduit; Be fitted with expansion joints when conduit runs between slabs of concrete deliberately

separated for thermal movement; Be positioned with a minimum of 25mm of cover within concrete structures.

All conduits and ducts shall be used and installed in accordance with the requirements of AS/NZS 3000.Surface mounted conduits shall be rigid non-metallic conduits complying with AS/NZS2053and shall be fastened at intervals not exceeding 900mm using double sided saddles andfixed to approval. Corrugated PVC conduit shall not be used.Flexible conduits complying with AS/NZS2053 shall be used for connection to free standingequipment. Corrugated PVC conduit shall not be used.Provide flexible conduit only as required for final connection of cables to equipment which issubject to movement or vibration. Flexible conduit shall be anaconda range metal sheathedflexible PVC served type liquid-tight or equivalent. Corrugated PVC conduit shall not beused.Conduits shall be laid in straight and symmetrical lines with easy sets or bends. Bends orsets shall be made without altering the section of the conduit.Large sweep bends shall be used for all conduits rising to lighting pits.Join PVC conduits in accordance with the manufacturer’s instructions using the recommended jointing cement.Conduits concealed in floor slabs shall be rigid non-metallic complying with AS/NZS2053

Blackall – Tambo Regional Council

Page 30: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 30/53

gSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

6.4 INSTALLATION6.4.1 Cables and Cable Supports GenerallyInstall low voltage cables in accordance with AS/NZS 3000:2007 and in particular all ofSection 3 “Selection and Installation of Wiring Systems”. All wiring shall be fully supported along the entire route length.Cables and wiring for separate systems shall be run separately and on separate cablesupport systems or in segregated sections of the same support system.Low voltage cable sizes shown on the drawings are based on installation methods to avoidderating in accordance with AS 3008.1. Increase cable sizes as required when cables areinstalled in a manner requiring a derating factor to be applied. All cables shall be installed in a manner which enables easy removal and rewiring. All wiring shall be installed on the loop-in system with connections made at equipment oraccessories.Ensure minimum bending radius requirements for all cable types are maintained at all times.For cables run in conduit use draw wires to pull in cable groups from point to point. Fillconduit to a maximum of 75% of the capacity noted in AS/NZS 3000.Run all wiring systems grouped, tied or enclosed, square and parallel. Do not use adhesivefixing for cable support systems.Install cables in a manner that does not damage the cable during installation. Any noted “Spare Mains” are to have 6mm nylon draw wire installed within the conduits for future hauling of cables. Draw wires shall be fixed to the caps at the ends of these conduitsat the pit locations on Spare Mains.6.4.2 Mains and SubmainsRun in conduits or on cable support systems.Terminate using cable lugs and crimping tool.Use suitable glands when entering equipment or assemblies.Identify cables at both ends using stamped tags or similar. All gaps and / or voids / holes shall be plugged / capped on completion of works. Any spare

Blackall – Tambo Regional Council

Page 31: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 31/53

Supply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

conduit only. Remaining conduits shall be left spare and termed Spare Mains. The use ofconduits shall be confirmed on site before cables are pulled in. All joints shall be glued using gap filling adhesive to manufacturer's specification.Spare conduits shall be capped.6.4.5 Setting OutThe underground conduit system shall be set out generally in accordance with the routesshown on the drawings. After setting out the proposed conduit system routes and locating of cable pits, obtainapproval from the Principal’s Representative before commencing work. The finished levels to the top of cable pits shall be to suit finished runway/taxiway levels onsite. Liaise with the Principal’s Representative to ensure that the correct levels are obtainedbefore installation of pits commences.Pits or conduits which are installed at incorrect levels shall be repositioned at no extra cost.6.4.6 ExcavationLocate all existing underground services on site which are in the vicinity of proposedexcavation. Any damage to underground services shall be repaired to the satisfaction of thePrincipal’s Representative at no extra cost to the Principal. 6.4.7 Underground ConduitsUnderground 415V/240V wiring shall be installed in a Category `A' system in heavy dutyrigid plain conduit of insulating material to AS/NZS 2053, colour orange. All LV conduits shall have 600mm minimum cover unless specified otherwise or shown onthe drawings. All trenching to be 450mm nominal width, 600mm maximum width.The trench shall be cleared of all rocks and other sharp materials and the conduits laid on50mm thick bed of selected sand.Before backfilling, the conduits shall be covered with a further 50mm layer of sand. A PVC"Electrical" marker tape (complete with tracer wire) shall be buried in the trench over theentire length of the cable route above the conduit.Provide for all excavation, spoil removal from site, rock excavation, bedding, backfilling andreinstatement for all underground cabling and pit construction as part of this contract.

Blackall – Tambo Regional Council

Page 32: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 32/53

Supply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Backfill shall be compacted in 150mm layers by watering and ramming or other approvedmethod, care being taken not to dislodge conduits. All surplus backfilling shall be removedfrom the site or disposed of to Principal’s Representative’s directions on site. The intent of this requirement is so that there cannot be any more than 25mm settling in anyrunway or taxiway area after backfilling. If more than this amount of settling is found in anylocation it will be the Contractor’s responsibility to correct this settling at no cost to the Principal.6.4.9 Pit DrainageThe complete pit and conduit system shall be drained as specified below.Concrete benching / grout benching shall be provided in base of pits with a fall to ensure fulldrainage of pits. Conduit penetrations through pit walls shall be fully sealed to approval ofPrincipal’s Representative . The conduit system shall be provided with falls to pits to suit the finished contour levels, andpits located in the lowest points of the system shall be drained.Drains shall be 90mm slotted PVC drain pipes through rubble pits. 90mm PVC drain pipes(unslotted) shall connect the conduit system to the rubble pit drainage system.Drains are to discharged into rubble drains.Rubble drains shall be 600mm wide x 1000mm deep located clear of the Runway strip atlocations as generally noted on the drawings. Drains shall be lined with “Geofabrics Filter -Wrap” all around and backfilled with 50mm rock ballast. Bed slotted PVC pipe in 200mmrock under. Trench length to be 6m min length. Grade trench at min 1:200 longitudinalgrade.Conduit fall from pits to start of rubble drain to be min 1:200 longitudinally. Finish rubbledrain nom. 200mm from finished surface level and complete application of filter wrap.Backfill last 200mm with clean general fill and topsoil and grass and maintain untilestablishment. Stake rubble drains with nom 50mm x 50mm white timber posts drive min1000mm into ground.Survey of site to provide as-built locations of all rubble drains and PVC drain lines to rubbledrains. Invert levels to be included in as-built information.

Blackall – Tambo Regional CouncilS l & I ll i f Li h i f R T i d A

Page 33: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 33/53

Supply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

one (1) metre approximately from the point of entry of conduits into buildings at all conduit stubs directly above terminal point of the conduit.

Markers shall be 300 x 300 x 300 deep cast concrete blocks. An engraved brass markerplate 150 x 150 shall be fixed to the block to indicate type of service and direction ofunderground conduit run.Alternative 2 A proprietary service route marker system may be installed by the Contractor that iscompletely located below ground with no ground surface markers present and that is able tobe activated / excited by an electronic handheld service marker locator / detector by fieldstaff to determine the location of the underground service being traced and for marking byfield staff as required from time to time.Such a proprietary system shall be maintenance free, reliable and be able to be traced fromground surface when installed in the service trench depth noted on the design drawings.The design life and maintenance requirements of such a proprietary system shall bedetailed by the Contractor in the Operation and Maintenance manuals described in Section3.22 of this specification.Prior to commencement of construction, the Contractor shall seek the Principal’s Representative’s approval in written form for the proprietary system to be used. 6.4.11 Reinstatement of Existing SurfacesExisting surfaces shall be reinstated to their original condition to the Principal’s Representative’s approval. Mass concrete aprons shall be provided in accordance with the details on the drawings fortaxiway pit, and other selected locations.Provide peaked lids over cable support systems where run exposed to sunlight and/or rain.Provide cable protection where cables enter or leave cable support systems.Separate low voltage power cables by distances sufficient to avoid derating in accordancewith AS/NZS 3008.1 Table 23.6.4.12 BoringEngage a suitably qualified specialist contractor for all underground boring works.

Blackall – Tambo Regional CouncilS l & I t ll ti f Lighti g f R T i d A

Page 34: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 34/53

Supply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

SECTION 7 SWITCHBOARD7.1 GENERAL

This section covers the supply of the Runway Lighting Switchboard. Provide a new runwayswitchboard complete with all required accessories and equipment as detailed in thisspecification and on the drawings.7.1.1 Standards and RulesThe design of the Runway Lighting Switchboard shall be in accordance with requirementsof:

AS3439.1 Low Voltage switchboards AS/NZS 3000 Wiring Rules Australian Government Civil Aviation Safety authority CASA Manual of Standards Part 139 - Aerodromes (MOS 139) All other relevant airport lighting standards within Australia The local supply authority

7.1.2 DesignThe switchboards shall be designed for the following conditions:

Supply: 415V, 50 Hz 3 Phase 4 Wire Fault Level: As shown on the drawings

Earthing: MEN System Form of Segregation: Switchboards Form 2B to AS3439.1 Degree of Protection: External Switchboards Minimum IP56 to AS1939

7.1.3 System Fault Level and Protection

The system fault level applicable to the electrical installation shall be as specified herein ornominated on the drawings. All equipment connected to the system shall be of a design and type providing safeoperation at the fault level specified.All t ti d i i l di g l f i it b k d th lik h ll b g d d t

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway Taxiway and Apron

Page 35: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 35/53

Supply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Principal’s Representative for review. Three (3) copies of the detail drawings of each Switchboard shall be submitted. The drawings shall clearly indicate the arrangement ofcomponents, the clearance between components and terminals, etc., the type of equipmentand the construction of the Board.The drawings shall include:

General arrangement Busbar details and connection Schematic Diagrams including metering and protection circuits.

Any review of drawings by the Principal shall in no way relieve the manufacturer of theirobligations under other sections of the specification.7.1.5 Tests and InspectionsThe switchboards shall be routine tested, as specified for partially type tested assemblies,before delivery to site. A final inspection shall be carried out by the Principal’s Representative before delivery tosite.7.1.6 Spare SpaceThe space required for future circuit breakers and equipment shall be as shown on thedrawings.

7. 2 CONSTRUCTION7.2.1 GeneralSwitchboards shall be metal clad, totally enclosed, dustproof or weatherproof type ofconstruction as specified herein or nominated on the drawings, of approved manufacture.The Switchboards shall be of the front access type and contain the types of switches, fuses,circuit breakers, number of poles and equipment as specified herein and shown on thedrawings.Particular attention shall be made in the design of the Switchboards to ensure satisfactoryhandling into position on Site during construction and that the Switchboard is designed tosuit the installation requirements and the available space.Switchboard mounting shall be as specified herein.

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway Taxiway and Apron

Page 36: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 36/53

Supply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

lockable door handles, operating a latching system into slots at top and bottom. Allmechanisms shall be cadmium plated. All switchboard locks shall be keyed alike. Locks shall be Lowe and Fletcher No.92268 orapproved alternative. Two keys suitably labelled shall be provided for each switchboard.The width of a single door shall not exceed 750mm with a door swing of at least 90 degrees.Covers shall be fixed to frames using at least 4 fixings, held captive in the cover, andprovided with nylon washers. Cover edges shall be rested on the cubicle body or onmullions.Covers shall be provided with corrosion resistant “D” type handles. 7.2.3 Equipment Mounting PanelsProprietary escutcheon plates shall be provided for each control panel for mounting of allequipment.Panels shall be sized to suit the weight of mounted equipment, and provided with angle orplate supports bolted or welded to enclosure sides. All cut-outs for panel mounted equipment shall be neatly made and additional supports shallbe provided where necessary to avoid panel distortion.Escutcheon plates shall be provided with neat circuit breaker toggle cut-outs allowinginterchangeability of 1, 2, and 3 pole circuit breakers. Cut-outs shall also be provided forfuture circuit breakers and fitted with black clip-in type in-fill panels.Escutcheon plates shall be held in position with chromium plated captive type knurled thumbscrews. Where such panels are greater than 1 m2 in area they shall be hinged.Corrosion resistant lifting handles or knobs shall be provided.7.2.4 Cable EntriesProvision for cable entries shall be made in the top and bottom or rear of the switchboard.Sufficient clear space shall be provided within each enclosure, next to cable entries, to allow

incoming and outgoing cables and wiring to be neatly run and terminated without unduebunching or sharp bends.Removable gland plates fitted with gaskets shall be provided. Cable entries shall be sealedwith non-setting mastic after installation of the cables.

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and Apron

Page 37: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 37/53

Supply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

7.2.6 MountingWall mounted switchboards shall have adequately reinforced bolt fixing holes. Recessed orsemi-recessed assemblies shall be provided with angle trims of the same material and finishas the enclosure.Floor mounted switchboards shall be provided with a 75mm X 40mm X 6mm galvanised MSchannel plinth, with toe-out profile. The channel shall form a continuous box section aroundthe base of the switchboard.7.2.7 Finishing of MetalworkSwitchboards shall be etch primed followed by one (1) coat of undercoat and finishedexternally with two (2) coats of high gloss enamel, colour as advised by the Principal’s Representative, and internally with one (1) coat of high gloss enamel, white.

7.3 BUSBARS7.3.1 GeneralBusbar assemblies shall be provided to the ratings shown on the Schematic Diagram.Busbars shall be solid copper, of rectangular section with radiused edges, and sized andsupported to withstand the specified fault level.The neutral busbar shall be rated to match the neutral conductor current carrying capacity.The minimum size busbar shall be 13mm X 3mm copper.Busbar assemblies shall be used to connect the incoming isolator to all outgoing circuitbreakers. The use of flexible cable in lieu of busbar assemblies is not acceptable unlessnominated on the tender drawings, and written acceptance provided.7.3.2 Phase SequenceFor main busbars and connections to switching devices, set out phase sequence for phases A, B, and C from left to right, top to bottom, and back to front when viewed from the front ofthe assembly.

7.3.3 Colour Coding Active conductors: Red, white, and blue respectively for A, B, and C phase.Neutral busbar: Black.7.3.4 Busbar Insulation

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and Apron

Page 38: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 38/53

pp y g g y, y pBlackall Aerodrome

high tensile steel bolts, washers and lock nuts or nuts with locking tabs.7.4 AIR CIRCUIT BREAKERS

7.4.1 Rating Air circuit breakers having a rated short circuit breaking capacity at least equal to the faultlevel at the incoming terminals of the assembly shall be provided as shown on theSchematic Diagram. Alternatively, where current limiting protection is provided, or where rating and interruptingcapacities permit, circuit breakers may be moulded case types, to comply with AS 3111 or AS/NZS 60898.1, having a minimum interrupting capacity of 6kA.7.4.2 MountingCircuit breakers shall be mounted on a standard mounting chassis of approved manufacturesecurely fastened to a channel fixed to the back of the Switchboard enclosure.Construction of the circuit breaker assembly shall be such that a double or triple pole circuitbreaker can be replaced by three (3) single pole circuit breakers and vice versa, withoutmodification to the busbar assembly.Cabling zones 125mm wide (minimum) shall be provided between the rows of circuitbreakers. Additionally, a minimum distance of 125mm for cabling shall be provided betweencircuit breakers and the top, bottom and sides of the Switchboard cabinet. Circuit breakersshall be numbered with push-in circular disk type numbers in the appropriate phase coloursfixed to the escutcheon plate. Circuit breakers shall be further numbered within theSwitchboard to correspond to the numbers on the escutcheon.Circuit breakers controlling heaters shall be grouped together and labelled "HEATERS" in4mm high letters engraved in "Red on White" Traffolyte.Provide circuit breakers of NHP, ABB , Merlin Gerin manufacture.7.4.3 Residual Current Devices

Provide combined residual current device (RCD)/circuit breakers for power circuits whereshown on the drawings.Provide RCD/circuit breakers which comply with AS 3190 or AS/NZS 61009, and whichhave a rated residual operating current of 30 mA unless noted otherwise.

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and Apron

Page 39: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 39/53

pp y g g y y pBlackall Aerodrome

of 20%. The responsibility for correct and final sizing of the MIT lies fully with theswitchboard manufacturer, and shall be confirmed in the switchboard workshop drawings.The new mains multi-tap isolation transformer shall be purpose constructed by a reputabletransformer manufacturer. Transformers shall conform to all current CASA requirements.Manufacturer’s details shall be included in the tender documents. Transformer secondary output shall be constant at 6.6 Amps in line with CASA runwaylighting requirements. Transformers shall be enclosed in painted sheet steel enclosures,with internal connection terminals on connection plates, purpose built for Runway lightingapplication. Taps shall be as follows:

0V, 400V, 420V, 440V input voltage taps 0V, 80V, 796V, 955V 1114V 1273V 1432V 1591V output taps

Tenders shall provide full technical specifications for MIT’s, in the form of data sheets, showing all losses, efficiencies, ratings, winding ratios, current and voltage levels at eachtap.Transformers shall be rated to withstand 10% overload continuously.

7.6 ENCLOSURE WIRING All Wiring shall be adequately tied, run neatly and enclosed in cable ducts. Ducts shall haveperforated sides with split tops for cable access to individual terminals and shall be fittedwith lids. Ducts shall have a minimum spare capacity of 25% over and above the allowancefor future equipment shown on the drawings or specified herein.Enclosure PVC slotted cable ducting shall be rated to withstand 70 degree ambienttemperature.Where insufficient space is available within junction boxes to fit cable ducts, wires shall beneatly loomed using cable ties.Ducts as detailed above shall be provided adjacent to each row of equipment for outgoingcircuit wiring and shall extend the full width or height of the cabinet.The duct cover shall be fixed such that it cannot be installed on a different duct.The cross sectional area of the plastic duct shall be sufficient to accommodate all outgoingcircuit cables in accordance with the wiring regulations, and the requirements of this

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and Apron

Page 40: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 40/53

Blackall Aerodrome

ELV active or DC positive - white ELV neutral or DC negative - grey Earth - green-yellow

Wiring on (or to) all equipment, doors or hinged panels shall be arranged in a manner thatprevents any strain or chaffing of the wiring over the full travel of the door or panel.Flexible wiring shall be used across such hinged or removable sections. Wiring shall not reston busbars or metal edges. All cable cores shall be of sufficient length at each termination to allow a fresh connection tobe made.The correct size and type of screwdriver shall be used for making terminal blockconnections.Push fit terminals shall not be used. All terminals shall be single screw type, single height,minimum size 2.5 mm of Weidmuller, Sprecher and Schuh, or similar approvedmanufacture.Double deck terminal blocks shall not be used.Terminal strips shall be provided within enclosures and equipment for control cableterminations.Terminal strips shall be provided with the number of terminals required to allow onetermination per terminal.Provide protective covers and warning labels over all outgoing power connections withinenclosures. This shall comprise a Perspex cover mounted on stand-offs, fitted with a“Danger high voltage” label. Each terminal shall be identified with a number using permanent clip-on non-flammableterminal markers with black characters on a white background.

7.7 CABLE FERRULESThe cores of all cables shall be continuity checked, and numbered with white engravedferrules with black numbers to correspond to the relevant termination diagrams andequipment drawings. Wrap around adhesive markers are not acceptable. The Contractorshall ensure that the component numbers of the identifier are aligned that the identifier is

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and Apron

Page 41: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 41/53

Blackall Aerodrome

mounted main isolators as shown on the drawings.7.9 AUXILIARY EQUIPMENT

7.9.1 General Auxiliary equipment including time switches and contactors controlling equipment shall beincorporated within the Switchboard. All equipment shall be readily accessible for adjustment without the removal or opening ofthe escutcheons. Time switches, etc. shall protrude through the escutcheon.7.9.2 ContactorsContactors shall be mounted within the Switchboard and labelled accordingly.Contactors shall be a minimum of single pole 30 amp (or as indicated on drawings), andshall be of Schneider or NHP manufacture.7.9.3 Photo-Electric SwitchSupply and install a Photo Electric (PE) Switch to control external lighting as shown on theSchematic Diagram.Provide additional Future CCR PE switches and wire these switches to relays in the controlsystem for future integration of the PAPI CCR.

7.10 TRANSIENT PROTECTION7.10.1 Surge DivertersSupply and install shunt connected Metal Oxide Varistor (MOV) based surge diverters for

each phase on the line side of incoming functional units as shown on the drawings.Provide protection fuses for the surge diverters in accordance with the manufacturer’s recommendations.Provide surge diverters in the following locations:

Switchboard incoming supply Runway lighting outgoing circuit

Provide Novaris surge diverters, type SDN3 – 100-275, 3 phase & N AND N-E 100 kA rated,for the incoming switchboard supply point.Provide Novaris surge diverters, type SDH 100-2000 high voltage 100kA 2000 volt ratedfuse base mounted surge diverters for the runway circuit on each leg of the circuit.

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBl k ll A d

Page 42: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 42/53

Blackall Aerodrome

Instrument fuses shall be HRC cartridge type of appropriate rating, mounted in a mouldedplastic carrier with a moulded plastic fuse base.HRC fuses shall be of the same manufacture throughout the entire installation.Three (3) spare fuses of each type and rating used in the installation shall be supplied andstored in a suitable enclosure within the Switchboard.

7.11 MARKING7.11.1 GeneralClearly label all equipment in accordance with regulations and to indicate function.Provide labels including control and circuit equipment ratings, functional units, notices foroperational and maintenance personnel, incoming and outgoing circuit rating. Provide labelsfixed to access panels, doors, covers, and escutcheon panels, and internal equipment,indicating the relevant section and component. Blank panels shall be provided for futurecircuits. All labels shall be machine engraved Traffolyte or equivalent, screw fixed with nickel platedbrass metal thread screws.Prior to engraving the labels, a label schedule shall be submitted to the Principal’s Representative for review.7.11.2 Minimum Lettering HeightsMain Assembly Designation: 15mm

Distribution Assembly Designation: 10mmMain Switches: 10mmOutgoing Functional Units: 8mmOther labels including equipment labels within cabinets: 4mm7.11.3 Label ColoursLabels for main switches shall be “red-on-white”; circuit breakers controlling emergency

lights“white-on-red”; others shall be “black-on-white”. 7.11.4 Circuit ScheduleProvide a typed circuit schedule on the inside of the door of each switchboard in a suitablemetal frame (minimum dimensions 150mm x 150mm), protected by a clear plastic cover.

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBl k ll A d

Page 43: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 43/53

Blackall Aerodrome

Energise assemblies in accordance with Workplace Health & Safety and company qualityassurance procedures.Provide copies of wiring diagrams and airside lighting system / network layout on inside faceof airside lighting switchboard for operational and maintenance staff reference.

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Page 44: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 44/53

Blackall Aerodrome

SAMPLE PHOTOGRAPHS

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Page 45: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 45/53

Blackall Aerodrome

AERIAL VIEW OF BLACKALL AERODROME LOCATION

COMPOSITE VIEW OF RUNWAY / CROSS-STRIP / TAXIWAY

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Page 46: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 46/53

Blackall Aerodrome

EXISTING RUNWAY LIGHTING FIXTURES

Blackall – Tambo Regional CouncilSupply & Installation of Lighting of Runway, Taxiway and ApronBlackall Aerodrome

Page 47: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 47/53

DRAWINGS

Page 48: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 48/53

Page 49: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 49/53

Page 50: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 50/53

Page 51: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 51/53

Page 52: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 52/53

Page 53: Blackall Aerodrome Lighting Quotation

8/11/2019 Blackall Aerodrome Lighting Quotation

http://slidepdf.com/reader/full/blackall-aerodrome-lighting-quotation 53/53