block a front elevation - the website shop · coloured front panel 7. window - opening section 8....
TRANSCRIPT
49500
34000
02 - A - GROUND FLOOR
37000
03 - A - FIRST FLOOR
40000
04 - A - SECOND FLOOR
43000
05 - A - THIRD FLOOR
46000
06 - A - PENTHOUSE
49000
07 - A - ROOF LEVEL
3000
3000
3000
3000
3000
15000
2.2. 2. 3.3. 4.
3.3.
1.2.
1. 2.2.2.
9.
9.
50152
METAL OUTSHOT PARAPET
48660
Level 40
9.
9.
9.9.
9747
12365
16065
57465
34000 34000
7. 2.1.1.9.9.9.9.9. 1.
MATERIAL LEGEND
1. SELECTED ENGINEERED BRICK2. CURTAIN WALLING SYSTEM - SILVER GREY PPC FRAMEWORK / SILVER GREY PPC SPANDRELS AND CLEAR GLAZING3. CURTAIN WALLING SYSTEM - SILVER GREY PPC FRAMEWORK / SILVER GREY PPC SPANDRELS AND OPAQUE GLAZING4. GLAZED GUARDING5. BALCONY DOOR6. COLOURED FRONT PANEL7. WINDOW - OPENING SECTION8. RECESSED ENTRANCE9. FEATURE ALUMINIUM PANELTO SELECT COLOUR10. ZINC STANDING SEAM
15000
3000
3000
3000
3000
3000
47100
34000
02 - A - GROUND FLOOR
37000
03 - A - FIRST FLOOR
40000
04 - A - SECOND FLOOR
43000
05 - A - THIRD FLOOR
46000
06 - A - PENTHOUSE
49000
07 - A - ROOF LEVEL
6.6.
4.5.
1.
7.
2.2.
3.
2. 2.
2. 9.
9. 9.
5. 5. 4.4.
9.
9. 9. 9. 9. 9. 9. 9. 9. 9.
9. 9. 9. 9. 9. 9. 9. 9.
2.1. 1. 1.
9. 9. 9. 9. 9. 9. 9. 9.
50152
METAL OUTSHOT PARAPET
48660
Level 40
57465
15534
12680
8541
13532
34000
10. 10. 10.
Cathedral CourtNew StreetDublin 8IrelandD08 YY51
T: +353-1 491 [email protected]
Client:
Project:
Drawing Title:
Job Number:
Drawing Number:
Drawing Reference:
Scale:
Date Created:
Revision:
Author:
. . .Rev.
Do not scale. Use figured dimensions only. All dimensions to be checked on site.Any discrepancies between site and figured dimensions to be broughtimmediately to the architect's attention. Digital copies cannot be guaranteed.Only information in hard copy can be relied upon for conformity and accuracy.c This drawing is copyright.
OS maps are produced under Ordnance Survey Ireland Licence No.AR 0031117. c Ordnance Survey Ireland and Government of Ireland.
GENERAL NOTEAny deviation from the proposed specifications to be brought immediately to thearchitect's attention. All product substitutions to meet the project performancerequirements and the minimum requirements of the Building Regulations. Allproducts to be installed in strict accordance with the manufacturer's specification.Any discrepancies between site and figured dimensions to be broughtimmediately to the architect's attention. Subcontractors to confirm sitedimensions with the main contractor prior to manufacture. Subcontractors tosupply fabrication drawings to the architect for approval or comment prior tomanufacture.All sub-structure, structural steelwork and reinforced concrete to structuralengineer's design, detail and specification. Structural precast concrete elementsby specialist subcontractor. Any inconsistencies between structural andarchitectural drawings to be brought immediately to the architect's attention.
Stage:
ISSUED FOR PLANNINGB 10/01/18
B 1 : 100
B
DH MD
0151
DH
BLOCK A - ELEVATIONS
Fassaugh Ave
16047
15/08/17
Labinies Ltd.
16047
PLANNING
AP 0151
AP
1 : 100
BLOCK A REAR ELEVATION2
1 : 100
BLOCK A FRONT ELEVATION1